TERCERO HOUSING IMPROVEMENT PROJECTS

Size: px
Start display at page:

Download "TERCERO HOUSING IMPROVEMENT PROJECTS"

Transcription

1 TERCERO HOUSING IMPROVEMENT PROJECTS Tiered Initial Study Negative Declaration OFFICE OF RESOURCE MANAGEMENT AND PLANNING University of California One Shields Avenue 376 Mrak Hall Davis, California February 2003

2 TERCERO HOUSING IMPROVEMENT PROJECTS Draft Tiered Initial Study Negative Declaration Prepared By: OFFICE OF RESOURCE MANAGEMENT AND PLANNING University of California One Shields Avenue 376 Mrak Hall Davis, California February 2003 Contact: A. Sidney England Director of Environmental Planning (530)

3 TERCERO HOUSING IMPROVEMENT PRJOECTS TABLE OF CONTENTS List of Tables... ii List of Figures... ii I. PROJECT INFORMATION... 3 II. ENVIRONMENTAL REVIEW AND APPROVAL... 6 Introduction... 6 Scope of the Focused Tiered Initial Study... 7 Public and Agency Review... 8 Organization of the Tiered Initial Study... 8 III. PROJECT DESCRIPTION UC Davis Project Description Construction Schedule and Staging Project Approvals IV. CONSISTENCY WITH THE LRDP LRDP Scope of Development LRDP Population Projections LRDP Land Use Designation LRDP Objectives LRDP EIR Cumulative Analyses V. ENVIRONMENTAL FACTORS POTENTIALLY AFFECTED VI. DETERMINATION VII. EVALUATION OF ENVIRONMENTAL IMPACTS Introduction Land Use and Planning Agricultural Resources Population and Housing Transportation/Circulation Noise Air Quality Hazards and Hazardous Materials i -

4 8. Biological Resources Hydrology and Water Quality Geology and Soils Mineral Resources Cultural Resources Aesthetics Public Services Recreation Utilities and Service Systems Mandatory Findings of Significance Fish and Game Determination VIII. REFERENCES IX. COMMENTS AND RESPONSES TO COMMENTS X. AGENCIES AND PERSONS CONTACTED XI. REPORT PREPARERS APPENDIX A. APPENDIX B. APPENDIX C. Amendments to the 1994 Long Range Development Plan and Revisions to the 1994 Long Range Development Plan Environmental Impact Report (through May 2001) Negative Declaration Cumulative Impacts Analysis - Focus on Potential Environmental Effects Associated with Projected Student Enrollment Increases through LIST OF TABLES Table 1. Projected Population Increases for Projects Currently Under Environmental Review LIST OF FIGURES Figure 1. Regional Location Figure 2. Project Area and Phasing Figure 3. Building Footprint and Site Diagram ii -

5 TERCERO HOUSING IMPROVEMENT PRJOECTS ENVIRONMENTAL CHECKLIST FORM UNIVERSITY OF CALIFORNIA February 24, 2003 CAMPUS: Davis I. PROJECT INFORMATION 1. Project title: Tercero Housing Improvement Projects 2. Project location: University of California, Davis Yolo County 3. Lead agency name and address: Office of Resource Management and Planning University of California One Shields Avenue 376 Mrak Hall Davis, CA Project sponsor s name and address: See Item 3 5. Contact person and phone number: A. Sidney England Director of Environmental Planning (530) Location of the administrative record for this project: See Item Identification of previous EIRs relied upon for tiering purposes (including all applicable LRDP and project EIRs) and address where a copy is available for inspection: This environmental analysis is tiered from the 1994 Long Range Development Plan (LRDP) Environmental Impact Report (EIR) (State Clearinghouse No ), as updated and revised by a number of subsequent documents (listed below). These documents are available for review during normal operating hours at the UC Davis Office of Resource Management and Planning, 376 Mrak Hall on the UC Davis campus; at Reserves in Shields Library on the UC Davis campus; at the Yolo County Public Library, 315 E. 14 th Street, Davis; at the Vacaville Public Library, 1020 Ulatis Drive, Vacaville; and online at (technical appendices are not available online). Hereafter, reference to the 1994 LRDP EIR includes the 1994 LRDP EIR as revised by the documents listed below. Revisions to the 1994 LRDP EIR identified in subsequent environmental review documents are summarized in the list below. Appendix A of this Tiered Initial Study includes further information about the changes to the 1994 LRDP and LRDP EIR since original publication

6 Wastewater Treatment Plant (WWTP) Replacement Project EIR (State Clearinghouse Nos and ): Updated 1994 LRDP EIR analysis to reflect changes to land use designations presented in the 1994 LRDP (Section 4.6 of the WWTP Replacement Project Draft EIR). Identified the loss of an additional 20 acres of prime agricultural land and ruderal/annual grassland habitat over the amount identified in the 1994 LRDP EIR analysis and increased the magnitude of land use and biological resource impacts associated with this loss (Sections 4.4 and 4.6 of the WWTP Replacement Project Draft EIR, and Appendix G of the Final EIR). Reevaluated cumulative 1994 LRDP EIR Hydrology and Water Quality, Hazardous Materials and Public Safety, and Air Quality impacts (Sections 4.1, 4.3, and 4.3 of the Draft EIR) Major Capital Improvement Projects Supplemental EIR (SEIR) (State Clearinghouse No ): Updated 1994 LRDP EIR analysis to reflect changes to land use designations presented in the 1994 LRDP (Sections 5.3, 6.3, and 7.3 of the Draft SEIR). Identified the loss of an additional 20 acres of prime agricultural land and 31 acres of ruderal/annual grassland habitat over the amount identified in the 1994 LRDP EIR. To mitigate this loss, identified measure to redesignate 20 acres of prime farmland and ruderal/annual grassland habitat at the Russell Ranch from land designated as Academic and Administrative Low Density to Teaching and Research Fields (Sections 5.3, 5.5, 6.3, 6.5, 7.3, and 7.5 of the Draft SEIR). Identified the loss of 11 acres of ruderal/annual grassland habitat over the amount identified in the 1994 LRDP EIR analysis and increased the magnitude of biological resource impacts associated with this loss (Appendix A of the Final SEIR). Included project-specific mitigation measure to reduce the magnitude, but not the level of significance, of the cumulative impact on burrowing owl nesting habitat (Section 2 of the Draft SEIR). Included updated transportation and circulation analysis to assess a new traffic survey and the decision by the City of Davis not to expand the Richards Boulevard undercrossing from two to four lanes. Revised 1994 LRDP EIR transportation Mitigation Measure (b) to account for the new traffic information (Section 8 of the Draft SEIR). Reevaluated cumulative air quality and noise impacts (Section 8 of the Draft SEIR)

7 Center for the Arts Performance Hall and South Entry Roadway and Parking Improvements Tiered Initial Study and Mitigated Negative Declaration (State Clearinghouse No ): Updated 1994 LRDP EIR analysis to reflect changes to land use designations presented in the 1994 LRDP (page 29 of the Initial Study). Identified the loss of 8.5 acres of prime farmland and ruderal/annual grassland habitat over the amount assessed in the 1994 LRDP EIR. To mitigate this loss, identified measure to redesignate 8.5 acres of prime farmland and ruderal/annual grassland habitat designated as Support to Teaching and Research Fields (pages and 60 of the Initial Study). USDA Western Human Nutrition Research Complex Tiered Initial Study and Mitigated Negative Declaration (State Clearinghouse No ): Updated the 1994 LRDP EIR analysis to reflect changes to land use designations presented in the 1994 LRDP (pages of the Initial Study). Revised a project-specific mitigation measure presented in the Major Capital Improvement Projects SEIR that reduced the magnitude, but not the level of significance, of the cumulative impact on burrowing owl nesting habitat (page 65 of the Initial Study). Veterinary Medicine Laboratory and Equine Athletic Performance Laboratory Facilities Focused Tiered EIR (State Clearinghouse No ): Further updated the 1994 LRDP EIR cumulative transportation and circulation impact analysis to account for more accurate estimates of campus population growth in the Health Sciences District. The updated analysis identified that the intersection of Hutchison Drive and Health Sciences Drive would exceed level of service standards. Included a mitigation measure to reduce the impact at this intersection to a less-than-significant level (Section 3 of the Final EIR). Segundo Housing Improvement Projects Tiered Initial Study and Mitigated Negative Declaration (State Clearinghouse No ): Updated the 1994 LRDP EIR analysis to reflect changes to the land use designations presented in the 1994 LRDP (pages 33 to 35 of the Initial Study). Conference Center, Hotel, and Graduate School of Management Building Focused Tiered EIR (State Clearinghouse No ): Updated the 1994 LRDP EIR analysis to reflect changes to the land use designations presented in the 1994 LRDP (Appendix A of the Final EIR)

8 II. ENVIRONMENTAL REVIEW AND APPROVAL INTRODUCTION This environmental analysis is a Tiered Initial Study for the proposed Tercero Housing Improvement Projects (proposed project). The environmental analysis for the proposed project is tiered from the UC Davis 1994 LRDP EIR in accordance with Sections and of the California Environmental Quality Act (CEQA) Guidelines and Public Resources Code Section The 1994 LRDP EIR is a Program EIR, prepared pursuant to Section of the CEQA Guidelines (Title 14, California Code of Regulations, Sections et seq.). The 1994 LRDP EIR analyzed full implementation of uses and physical development proposed under the 1994 LRDP through the year and identified measures to mitigate the significant adverse project and cumulative impacts associated with that growth. The CEQA concept of "tiering" refers to the coverage of general environmental matters in broad program-level EIRs, with subsequent focused environmental documents for individual projects that implement the program. This environmental document incorporates by reference the discussions in the 1994 LRDP EIR (the Program EIR) and concentrates on project-specific issues. CEQA and the CEQA Guidelines encourage the use of tiered environmental documents to reduce delays and excessive paperwork in the environmental review process. This is accomplished in tiered documents by eliminating repetitive analyses of issues that were adequately addressed in the Program EIR and by incorporating those analyses by reference. Section 15152(d) and 15168(d) of the State CEQA Guidelines provide for simplifying the task of preparing environmental documents on later parts of the program by incorporating by reference factors that apply to the program as a whole. Where an EIR has been prepared or certified for a program or plan, the environmental review for a later activity consistent with the program or plan should be limited to effects that were not analyzed as significant in the prior EIR or that are susceptible to substantial reduction or avoidance. Accordingly, the tiering of the environmental analysis for the proposed project allows this Tiered Initial Study to rely on the 1994 LRDP EIR for the following: a discussion of general background and setting information for environmental topic areas; overall growth-related issues through ; issues that were evaluated in sufficient detail in the 1994 LRDP EIR for which there is no significant new information or change in circumstances that would require further analysis; and cumulative impacts assessment. The purpose of this Tiered Initial Study is to evaluate the potential environmental impacts of the project with respect to the 1994 LRDP EIR to determine what level of additional environmental - 6 -

9 review, if any, is appropriate. Based on the analysis contained in this Tiered Initial Study, one of the following determinations will be made: the project is exempt from CEQA; the project incrementally contributes to, but does not exceed, environmental impacts previously identified in the 1994 LRDP EIR, no additional mitigation measures are required, and preparation of Findings consistent with this determination is appropriate; the project would result in new impacts that were not previously identified in the 1994 LRDP EIR, but there is no substantial evidence that such new impacts may have a significant effect on the environment and preparation of a Negative Declaration is appropriate; the project would result in new potentially significant impacts that were not previously identified in the 1994 LRDP EIR, but proposed project-specific mitigation measures would reduce such impacts to a point where clearly no significant effects would occur and there is no substantial evidence that the project as mitigated may have a significant effect on the environment, and preparation of a Mitigated Negative Declaration is appropriate; or the project would result in new significant environmental impacts not previously identified in the LRDP EIR, and preparation of a tiered EIR is appropriate. Mitigation measures identified in the 1994 LRDP EIR that apply to the proposed project will be required to be implemented as part of the project. SCOPE OF THE TIERED INITIAL STUDY Based on the analysis presented in this Tiered Initial Study, it has been determined that the proposed project would not result in any potentially significant impacts that cannot be mitigated to a less-than-significant level through implementation of 1994 LRDP EIR mitigation measures or are not sufficiently addressed by the 1994 LRDP EIR. The analysis contained in this Tiered Initial Study concludes that the proposed project would result in the following categories of impacts, depending on the environmental issue involved: no impact; less-than-significant impact; less-thansignificant impact with the incorporation of 1994 LRDP EIR; or contribute to a significant unavoidable impact that was adequately analyzed in the 1994 LRDP EIR for which no new mitigation measures are available and no new analysis is proposed. The preparation of a Negative Declaration is appropriate (the Negative Declaration is presented in Appendix B). Since none of the conditions described in CEQA or the CEQA Guidelines calling for preparation of a subsequent EIR have occurred, this Tiered Initial Study includes only minor technical changes or additions to the analysis set forth in the 1994 LRDP EIR. The analysis presented in this document does not raise important new issues about the significant effects on the environment analyzed in the 1994 LRDP EIR

10 PUBLIC AND AGENCY REVIEW Public and agency comments on the Draft Tiered Initial Study and Proposed Draft Negative Declaration will be accepted from February 24, 2003 to March 25, Copies of the Tiered Initial Study are available during normal operating hours at the UC Davis Office of Resource Management and Planning, 376 Mrak Hall on the UC Davis campus; at Reserves in Shields Library on the UC Davis campus; at the Yolo County Public Library, 315 E. 14th Street, Davis; at the Vacaville Public Library, 1020 Ulatis Drive, Vacaville; and online at Copies of the 1994 LRDP, 1994 LRDP EIR, WWTP Replacement Project EIR, Major Capital Improvement Projects SEIR; Center for the Arts Tiered Initial Study and Mitigated Negative Declaration; USDA Western Human Nutrition Research Center Tiered Initial Study and Mitigated Negative Declaration; Veterinary Medicine Laboratory and Equine Athletic Performance Laboratory Facility Tiered EIR; the Segundo Housing Improvement Projects Tiered Initial Study and Mitigated Negative Declaration; and the Conference Center, Hotel, and Graduate School of Management Building Focused Tiered EIR are also available at these locations. Comments on this Draft Tiered Initial Study must be received by 5pm on March 25, 2003 and can be ed to or sent to: John A. Meyer Vice Chancellor - Resource Management and Planning 376 Mrak Hall One Shields Avenue University of California Davis, CA ORGANIZATION OF THE TIERED INITIAL STUDY This Tiered Initial Study is organized into the following sections. Section I - Project Information: provides summary background information about the proposed project, including project location, lead agency, and contact information. Section II - Environmental Review and Approval: includes a summary of the Tiered Initial Study's relationship to the 1994 LRDP EIR, the scope of the Tiered Initial Study, public and agency review information, and an overview of the document's organization. Section III - Project Description: includes the description of the proposed project. Section IV - Consistency with the 1994 LRDP: describes the consistency of the proposed project with the 1994 LRDP and the 1994 LRDP EIR. Section V - Environmental Factors Potentially Affected: identifies which environmental factors were determined to be a "Potentially Impact" as indicated by the Tiered Environmental Checklist

11 Section VI - Determination: indicates whether impacts associated with the proposed project are significant, and what, if any, additional environmental documentation is required. Section VII - Evaluation of Environmental Impacts: contains the Tiered Environmental Checklist form for each resource area. The checklist is used to assist in evaluating the potential environmental impacts of the proposed project with respect to the 1994 LRDP EIR. The checklist identifies potential project effects as follows: (1) new potentially significant project impacts that were not adequately analyzed in the 1994 LRDP EIR, or previously identified significant impacts for which new feasible mitigation measures are available; (2) new less-than-significant impacts with mitigation incorporated; (3) environmental impacts of the project that were adequately analyzed and mitigated in the 1994 LRDP EIR; (4) less-than-significant impacts; and (5) effects that would not result in any adverse environmental impact. This section also contains an explanation of all checklist answers and recommended mitigation measures. Section VIII - References: lists references used in the preparation of this report. Section IX Comments and Responses to Comments: will be prepared for the final Initial Study and will summarize all comments received during the comment period. Section X - Agencies and Persons Consulted: provides the names of individuals contacted in preparation of this document. Section XI - Report Preparers: lists the names of individuals involved in the preparation of this report. Appendix A - Amendments to the 1994 LRDP and Revisions to the 1994 LRDP EIR: summarizes amendments to the 1994 LRDP and revisions to the 1994 LRDP EIR through November Appendix B Negative Declaration: presents the proposed Negative Declaration for the project. Appendix C - Cumulative Impacts Analysis - Focus on Potential Environmental Effects Associated with Projected Student Enrollment Increases through : presents an evaluation of currently anticipated campus growth through and associated potential cumulative environmental effects

12 III. PROJECT DESCRIPTION UC DAVIS The 5,300 acre UC Davis campus (the campus) is located in Yolo and Solano Counties approximately 72 miles northeast of San Francisco, 15 miles west of the City of Sacramento, and adjacent to the City of Davis (see Figure 1). The campus, in general, is comprised of four campus units: the central campus, the south campus, the west campus, and Russell Ranch (see Figure 3-2, Regional and Local Setting, on page 3-5 of the 1994 LRDP Draft EIR). The "main campus" refers to the central, south, and west campus units, excluding Russell Ranch. Most of the academic and extracurricular activities occur within the central campus. The central campus is bounded approximately by Russell Boulevard to the north, State Route 113 (SR 113) to the west, Interstate 80 (I-80) and the Union Pacific Railroad tracks to the south, and A Street to the east. The south campus is located south of I-80 and north of the South Fork of Putah Creek. The west campus is bounded by SR 113 to the east, Putah Creek to the south, Russell Boulevard to the north, and extends approximately one-half mile west of County Road 98. The south and west campus units are contiguous with the central campus and are used primarily for field teaching and research. The 1,590 acre Russell Ranch portion of the campus lies to the west, separated from the west campus by approximately one and one-half miles of privately owned agricultural land. Russell Ranch was acquired by the campus in 1990 and is intended for use in large-scale agricultural and environmental research and the study of sustainable agricultural practices. Russell Ranch is bordered roughly by County Road 96 on the east, Putah Creek on the south, Covell Boulevard on the north, and Russell Boulevard on the west and northwest. In addition, UC Davis owns several buildings in Research Park, located in the City of Davis south of I-80. PROJECT DESCRIPTION The proposed project includes facility expansion and improvements to the Tercero housing area in the Central Campus at UC Davis. Three specific projects with associated utility connections are proposed: 1) new dormitory housing for 1,200 first-year students; 2) renovation and expansion of the existing Tercero dining commons building; and, 3) construction of a new centralized catering kitchen building for the UC Davis campus (Figure 2). The existing Tercero Housing area provides housing and dining facilities for approximately 1,110 students on approximately 12.3 acres. The proposed project would provide housing for an additional 1,200 students and would increase the occupied acreage of the Tercero area by approximately 6 acres. The proposed housing expansion would include three phases, each providing new housing for 400 first-year students. Each phase would include two buildings housing approximately 200 students each. The buildings would be four-stories tall with approximately 50,000 gross square feet (gsf) each. No additional parking is proposed to accompany the new housing because freshman students are generally not permitted to park on-campus and adequate parking is available for firstyear community college transfer students. Each building would include lounge space, study space, and a main floor entry and lobby area. The new housing is proposed to provide on-campus housing for expected increases in freshman enrollment. Phase 1 construction would start in 2004 with occupancy expected in Phase 2 construction would start in 2005 with occupancy expected in Phase 3 construction would start in 2007 or 2008 with occupancy expected in

13 2010 (Figure 3)

14

15

16 The site of the Phase 3 construction includes temporary modular office buildings currently used by Communication Resources staff. These modular buildings would be relocated or removed prior to the construction of Phase 3 in Program needs and the decision to remove or relocate the modular buildings would be made at that time. Options could include moving and reusing the trailers at another campus location or disposing of the trailers and distributing the workers to existing or future campus buildings. Due to the uncertainty of the future use of these modular buildings, this CEQA evaluation does not include the relocation or removal of the modular buildings. The trailers are relatively new and do not have lead or asbestos contamination. The proposed renovation and expansion of the Tercero dining commons building would provide additional dining capacity and study space to match the capacity needed for the planned addition of 1,200 students in the Tercero housing area. The dining commons building would be expanded by approximately 25,000 gsf, from 35,000 gsf to approximately 60,000 gsf but would remain a two-story structure. The proposed expansion would take place on the south, west, and east sides of the building and would include increased baking facilities, meal serving, a student lounge, a maintenance shop, and study space on the first floor and dining room and support space on the second floor (Figure 3). The proposed catering kitchen building would consist of a two-story, 10,000 gsf structure west of the existing Tercero dining commons buildings and east of Dairy Road (Figure 3). The building would include space for food preparation, food storage, restrooms, dishwashing, offices, a conference room, and a loading dock for receiving food materials and for loading distribution trucks. Project Site The proposed projects would be located on approximately 6 acres. The Tercero housing area is located near the southwest portion of the UC Davis core campus and is bounded by Bioletti Way on the east, Dairy Road on the west, South La Rue Road on the south, and Tercero Hall Circle on the north. The housing expansion would take place on 2.0 acres currently used as a recreation field, 2.5 acres currently used for 313 parking spaces, and 0.5 acres currently used for temporary modular offices. The dining commons expansion would take place on approximately 12,500 square feet adjacent to the existing dining commons building in an area that includes a bike path and landscaping. The catering kitchen building would occupy a site of approximately 0.5 acres. The site is currently landscaped on the west side and the east side is currently developed with a solar hot water system that formerly supplied a portion of the hot water needs for the existing Tercero dining commons building. The solar hot water system is no longer operational because of equipment failures and age and will be removed to provide an adequate site for the catering kitchen building. Project Background and Need The growing California population has resulted in increased enrollment and a projection for further increases in UC Davis enrollment through UC Davis seeks to offer housing to all eligible first-year students and the existing UC Davis freshman housing is at capacity. The Segundo Infill housing project will be completed in September 2003 and will provide freshman

17 housing for approximately 380 students. Additional housing is needed to accommodate the expected enrollment increases from 2003 to First-year housing units do not include kitchen facilities and the planned increase in housing in the Tercero area would result in insufficient capacity to feed the increased number of students. The proposed dining commons renovation and expansion would increase the capacity for food production at the Tercero dining commons and would increase the available dining space for students. In addition, the expansion would include study space for students. The proposed catering kitchen building would consolidate the campus catering operations in order to increase efficiency and quality of service. The building would replace space currently used in multiple parts of the campus for managing, preparing, and distributing food to campus events. The existing facilities at the UC Davis Memorial Union and the Silo do not meeting current or expected space needs for catering operations, and the separation of the existing facilities into two locations decreases the efficiency of the catering operation. In addition, the space currently used by the catering staff is needed to expand other campus food service operations and will be absorbed by the existing food service entities at the Memorial Union and the Silo. Project Objectives The campus identified the following objectives for the proposed project: Provide increased housing capacity for first-year students. The proposed addition of 1,200 units would match the housing demand for the foreseeable increase in first-year students. The increased housing for first-year students would help implement the goal of the 1994 LRDP of offering housing to all eligible incoming first-year students. Design a project to create an environment that encourages social interaction among residents and achieves privacy, comfort, and safety. Provide adequate food production and dining commons space for the increased number of first-year students. The student experience of living on campus in a dormitory setting includes frequent social interactions during trips to and from the dining commons. The objective of this project is to provide adequate dining commons space to meet the need of the increased number of students. The proposed expansion would provide adequate space to retain a pleasant dining experience for students as well as study, recreational, advising, and computer laboratory space in close proximity to the eating facility and to the housing facilities. Provide a centralized catering kitchen facility close to the core campus to minimize food transit times, maximize food quality, and enable student catering employees to quickly get to and leave work. Project Elements Housing Expansion First-year housing for 1,200 students phased in 400 student increments

18 Six four-story buildings with approximately fifty students per building floor (50,000 gsf per building). Lounge and study space in each building. Dining Commons Expansion Approximately 25,000 gsf of building space. Increased dining room and food service capacity, new lounge and study space, recreational, advising, and computer laboratory space, and new quick-serve food area. Loading dock improvements. Catering Kitchen Building Food and equipment storage with approximately 3,000 gsf. Food preparation and clean-up space with approximately 5,500 gsf. Office and conference room for catering management and catering sales with approximately 1,500 gsf

19

20 Population The proposed housing expansion would result in housing for an additional 1,200 students at UC Davis. The dining commons expansion would result in approximately ten new employees. The catering kitchen building is not expected to directly result in any new employees but the space vacated on campus by the existing catering kitchen staff would be fully reoccupied by growth in other food service operations at UC Davis. Therefore, for the purposes of this analysis, the campus assumes that the catering kitchen project would increase the on-campus population by approximately 15 employees. Landscaping Landscaped areas would be provided adjacent to all of the new buildings and would provide outdoor gathering places, enhanced building entries, and offer improved pedestrian walkway connections. Landscape design would use appropriate plantings, in terms of cost, durability, and aesthetics. To encourage infiltration and reduce runoff, an effort would be made to minimize impervious surfaces. Stormwater drainage on the project site would be channeled, where possible, through swales and over other pervious surfaces to filter runoff and maximize percolation. Utilities The proposed project would require connections to campus utilities including domestic/fire water, utility water, sewer, storm drainage, natural gas, chilled water, steam, electricity, and telecommunications. The capacities of existing utility systems are analyzed in the Utilities and Service Systems section of the attached Environmental Checklist (Section VII). Domestic/Fire Water The proposed project would connect to the existing campus domestic/fire water system at a point located east of the Phase 3 housing expansion buildings in the area of the existing temporary modular buildings. The water connection would be looped via Diary Road to a second connection in South La Rue Road. Utility Water For irrigation of the project's landscaped areas, the proposed project would connect to an existing utility water line at a point west of the project in Dairy Road. Sewer The project would connect to the existing campus sanitary sewer system at a point west of the project in Dairy Road. Natural Gas

21 Natural gas for the housing expansion will connect to an existing gas line near the temporary modular buildings. Natural gas for the dining commons and the catering kitchen building will be provided by an existing gas line immediately south of the building. Storm Drainage New catch basins throughout the project area will be connected to an existing underground storm drain located west of the project site in Dairy Road. Chilled Water and Steam The campus chilled water and steam systems would cool and heat the proposed housing buildings and would connect to the campus system approximately 250 yards north of the proposed building. The proposed connection to the campus steam system would be placed underground in the landscaped area east of Dairy Road. The proposed chilled water connection would be placed within Dairy Road. Electricity Electricity would be provided for the proposed project from a transformer located at the intersection of Bioletti Way and Bainer Hall Drive. From the transformer to the project site, the electrical connection would be placed underground in the landscaped area between the existing Tercero dining commons building and Bioletti Way. Telecommunications The proposed project would connect to the telecommunications facilities in the Tercero dining commons building. Roadways and Parking Vehicles would access the housing from Dairy Road and South La Rue Road and from Parking Lot 47 on the east side of the housing development. Service vehicles would have additional access to service areas adjacent to each building. Vehicles would access the dining commons building via the existing driveway from Dairy Road to the loading dock on the west side of the building. Vehicles would access the catering kitchen building via the dining commons driveway from Dairy Road. Bikes would continue to access the project sites from Dairy Road, South La Rue Road, and from the bike paths within the Tercero housing area. Bicycle parking would be provided adjacent to all of the proposed buildings. CONSTRUCTION SCHEDULE AND STAGING The housing project would be constructed in three phases with construction beginning in 2004 and ending in The dining commons building expansion would be take place in 2004 and The schedule for the catering kitchen building is currently not certain but would probably

22 take place between 2004 and Construction staging would take place adjacent to each phase of construction. PROJECT APPROVALS As a public agency principally responsible for approving or carrying out the proposed project, the University of California (the University) is the Lead Agency under CEQA and is responsible for reviewing and certifying the adequacy of the environmental document and approving the proposed project. The housing projects and the dining commons expansion project will be considered by the Board of Regents in May It is anticipated that the UC Davis Facilities and Enterprise Policy Committee (FEPC) will consider design approval of the catering kitchen building in January The UC Davis Chancellor is the Chairperson of the UC Davis FEPC

23 IV. CONSISTENCY WITH THE LRDP In order to determine the project s consistency with the 1994 LRDP and 1994 LRDP EIR, the following questions must be answered: Is the proposed project included in the scope of the development projected in the 1994 LRDP? Is the proposed location of the project in an area designated for this type of use in the 1994 LRDP? Are changes to campus population that would result from the proposed project included within the scope of the 1994 LRDP population projections? Are the objectives of the proposed project consistent with the objectives adopted for the 1994 LRDP? Is the proposed project within the scope of the cumulative analysis in the 1994 LRDP EIR? The following discussion describes the proposed project s relationship to development projections, population projections, land use designations, and objectives contained in the 1994 LRDP and the project s consistency with each of these items. The proposed project's consistency with the 1994 LRDP EIR cumulative analysis is also discussed below. Appendix A of this document summarizes the amendments to the 1994 LRDP and the revisions and updates to the 1994 LRDP EIR since original publication LRDP SCOPE OF DEVELOPMENT The 1994 LRDP anticipated additional housing needs to serve the increased population and identified future housing projects occurring either as infill housing within the existing area of campus housing or as expansions of the student housing provided in the Tercero area (page 60 of the 1994 LRDP). The 1994 LRDP identified the campus policy of providing on-campus housing to all freshman students who desire such housing. The proposed project would contribute towards the objective of providing housing for 25 percent of campus student enrollment (page 60 of the LRDP). This proposed development is a component of the development expected under the 1994 LRDP and would not exceed planned growth

24 TABLE 1. PROJECTED POPULATION INCREASES FOR PROJECTS CURRENTLY UNDER ENVIRONMENTAL REVIEW Program Student Population Faculty & Staff Population Total On-Campus Population Built or Approved through February, , ,500 36,370 Campus Child Care Center Catering Kitchen Building Tercero Housing Expansion Tercero Dining Commons Expansion Veterinary Medicine Instructional Facility Expected Campus Enrollment Increase ( ) 1, ,980 Total Proposed 1, ,030 Existing, Approved and Proposed Projects 26, ,550 38,400 Projections for (LRDP) 26,000 12,630 38, three-quarter average student headcount 2. Projected three-quarter average headcount LRDP LAND USE DESIGNATION The proposed project would include uses that are consistent with the 1994 LRDP land use designation of Housing for the project sites LRDP POPULATION PROJECTIONS The on-campus population anticipated under the 1994 LRDP for is 38,630 (26,

25 students and 12,630 faculty and staff). The on-campus population estimate was 35,370 (24,870 students and 10,500 faculty and staff). Recently built and approved projects would bring this total to approximately 36,370 (24,870 students and 11,500 staff). The proposed project would contribute approximately 25 new campus employees and would provide housing space for approximately 1,200 additional students that are expected to be enrolled through Population growth accommodated with the proposed project would not exceed population projections assumed in the 1994 LRDP EIR. The proposed project together with the Veterinary Medicine Instructional Facility, the Campus Child Care Center, and expected enrollment increases would add approximately 50 new campus employees and 1,768 new students to this total (Table 1). The expected increases would not exceed the on-campus population anticipated under the 1994 LRDP LRDP OBJECTIVES The purpose of the 1994 LRDP is to guide campus land use and development in response to projected population growth and the changing nature of academic programs. The 1994 LRDP responds to projected growth in the campus-related population by: providing new instructional space and classrooms required to serve the anticipated growth in student population, providing expanded instruction and research space projected for the biological sciences, agricultural sciences, physical sciences, and veterinary medicine, and providing flexibility for significant expansions in response to future academic missions. In addition, the LRDP contains specific objectives that are of relevance to the proposed project, including: Housing 25 percent of student enrollment on campus. [page 60 of the LRDP] Student Housing within the freeways. Concentrate new student housing east of Highway 113. [Student Housing Objective, page 60 of the LRDP.] Infill new student housing. Locate new student housing as expansions of existing housing neighborhoods on campus. [Student Housing Objective, page 60 of the LRDP.] The proposed projects would help implement both of the identified objectives by concentrating new student housing east of Highway 113 and by providing new student housing as infill of an existing campus housing area LRDP EIR CUMULATIVE ANALYSIS The 1994 LRDP EIR contained cumulative analyses for the projected buildout of the 1994 LRDP. The cumulative context in the 1994 LRDP EIR varied depending on the nature of the issue being studied. Cumulative effects were classified by either natural resources boundaries (i.e., biological

26 resources, hydrology, geology, and air quality); or by population growth and associated development within the City of Davis and Yolo and Solano counties (i.e., public and community services, transportation, hazardous materials, noise, aesthetics, and cultural resources). The cumulative impact analysis for each environmental issue in the EIR was defined based on the cumulative context that best defined the geographic extent of the possible cumulative effect (see Section 5.2, Cumulative Impacts, of the 1994 LRDP EIR). The proposed project includes construction and operation of the Tercero Housing Improvement Projects. As discussed above, the proposed project is within the scope of development and population assumed in the 1994 LRDP EIR. Therefore, the proposed project incrementally contributes to, but does not exceed, the cumulative impact evaluation presented in the 1994 LRDP EIR, as revised. The technical discussions in the Tiered Initial Study Environmental Checklist, attached hereto, conclude that the proposed project would: not contribute to significant and unavoidable cumulative impacts identified in the 1994 LRDP EIR related to loss of prime agricultural land (Item 2a), use and disposal of radioactive materials (Item 7 a, b), use and disposal of biohazardous materials (Item 7a, b), loss of valley elderberry longhorn beetle habitat (Item 8a); and groundwater recharge (Item 9b) incrementally contribute to, but not exceed, significant and unavoidable impacts identified in the 1994 LRDP EIR related to intersection level of service (Item 4b), increased noise sources (Item 5a, c), construction air pollutants (Item 6b), criteria air emissions (Item 6b, c), toxic air emissions (Item 6b, c, d), use and disposal of hazardous materials (Item 7a, b), development on potentially contaminated sites (Item 7d), demand for emergency response (Item 7g), loss of ruderal/annual grassland (Item 8a), receiving water quality (Item 9a), demand for water from the deep aquifer (Item 9b), seismic effects (Item 10a), loss of cultural resources (Item 12b, d), loss of rural character (Item 13b, d), City of Davis fire protection services (Item 14a[i]), City of Davis police protection services (Item 14 a[ii]), and contribution of school-age students in the Davis Joint Unified School District (Item 14 a[iii]); and incrementally contribute to, but not exceed, less-than-significant cumulative impacts identified in the 1994 LRDP EIR related to carbon monoxide emissions (Item 6b, c), water demand from the shallow/intermediate aquifer (Item 9b), demand for parks and recreation (Item 14a[iv] and 15a), demand for libraries (Item 14a[v]), demand for electricity (Item 16h), wastewater capacity (Item 16a, b, e), and solid waste disposal capacity (Item 16f). Adequacy of the 1994 LRDP EIR through As presented in Appendix C of this document, the campus has updated projections for campus growth through based on information provided by the University regarding enrollment growth and based on reasonably foreseeable campus projects. As presented in Appendix C, the

27 campus has concluded that, because development and the environmental effects associated with projected increases in the campus population through will be within the parameters assumed in the 1994 LRDP, the cumulative impacts of growth through have been adequately addressed in the 1994 LRDP EIR. Environmental Effects through The University has recently determined that enrollment throughout the University system will increase by approximately 60,000 to 70,000 students within the next 10 to 15 years. This growth in enrollment is related to projected demographic changes that are expected to increase the demand for a college education in California. UC Davis is currently considering how it should plan to accommodate the campus' share of this enrollment growth. The campus' share of this growth could bring the three-quarter average on-campus student population to approximately 29,500 by The 1994 LRDP already assumed 26,000 of these students. This anticipated enrollment growth and associated increases in employees and facility construction for would surpass the assumptions identified in the 1994 LRDP for and evaluated in the 1994 LRDP EIR. The campus will prepare a new LRDP to identify the changes required to accommodate anticipated growth, and the campus will prepare an EIR to assess the environmental impacts of such changes. It is anticipated that The Regents will review and consider approval of the updated LRDP and its EIR in the fall of To the extent that growth and physical development anticipated for were not considered in the 1994 LRDP EIR, additional environmental effects that were not previously identified may occur. However, it would be speculative to determine or analyze these effects now because most components of the next LRDP are not currently known. Nevertheless, the campus has prepared a Cumulative Impacts Analysis, presented as Appendix C of this document, that serves to inform the public concerning all that is currently known about the campus' potential growth through

28 V. ENVIRONMENTAL FACTORS POTENTIALLY AFFECTED The environmental factors checked below would be potentially affected by this project, involving at least one impact that is a Potentially Impact as indicated by the checklist on the following pages. Land Use/Planning Hazards & Hazardous Materials Aesthetics Agricultural Resources Biological Resources Public Services Population/Housing Hydrology/Water Quality Recreation Transportation/Traffic Geology/Soils Utilities/Service Systems Noise Mineral Resources Mandatory Findings of Significance Air Quality Cultural Resources Based on the analysis presented in this Tiered Initial Study, it has been determined that for all resource areas, the proposed project would: not result in any significant impacts that cannot be mitigated to a less-than-significant level or are not sufficiently addressed by the 1994 LRDP EIR, as revised. This Tiered Initial Study has concluded that the project would incrementally contribute to, but not exceed, certain significant impacts previously identified in the 1994 LRDP EIR, and that for such impacts, no new mitigation measures, other than those previously identified in the 1994 LRDP EIR, are required. Therefore, preparation of a Negative Declaration is appropriate. The proposed Negative Declaration is presented in Appendix B of this document

29 VI. DETERMINATION Pursuant to Sections and of the CEQA Guidelines, this Tiered Initial Study has been prepared to evaluate the potential environmental impacts of the proposed project in relation to the programmatic environmental analysis contained in the 1994 LRDP EIR. On the basis of the evaluation that follows, I find that: _X The proposed project is exempt from CEQA pursuant to the general exemption (CEQA Guidelines, 15061(b)(3)), a statutory exemption, and/or a categorical exemption, and that if a categorical exemption, none of the exceptions to the exemption apply. A NOTICE OF EXEMPTION will be prepared. Pursuant to Section 15168(c)(2) of the CEQA Guidelines, the proposed project may incrementally contribute to, but will not exceed, the significant environmental impacts previously identified in the 1994 LRDP EIR, and the project will otherwise result in no new significant environmental impacts. Further, having been avoided or mitigated pursuant to the 1994 LRDP EIR, no new mitigation measures, other than those previously identified in the 1994 LRDP EIR, are required. FINDINGS consistent with this determination will be prepared. The proposed project may incrementally contribute to, but will not exceed, significant environmental impacts previously identified in the 1994 LRDP EIR. Further, the proposed project will result in no new significant impacts other than those previously identified in the 1994 LRDP EIR. However, the project will have environmental impacts not previously addressed in the 1994 LRDP EIR, but there is no substantial evidence that such impacts may have a significant impact on the environment. No new mitigation measures, other than those previously identified in the 1994 LRDP EIR, are required. A NEGATIVE DECLARATION will be prepared. (The Negative Declaration is presented in Appendix B). The proposed project may incrementally contribute to, but not exceed, certain significant cumulative impacts previously identified in the 1994 LRDP EIR, and that for such impacts, no new mitigation measures, other than those previously identified in the 1994 LRDP EIR, are required. In addition, the project may result in a potentially significant impact not previously identified in the 1994 LRDP EIR, but a proposed project specific mitigation measure would reduce the effect of such impact to a point that clearly no significant impact would occur. On the basis of the Tiered Initial Study and implementation of all proposed project specific mitigation measures, there is no substantial evidence that the project as mitigated may have a significant effect on the environment. A MITIGATED NEGATIVE DECLARATION will be prepared. The proposed project may incrementally contribute to, but will not exceed, certain significant environmental impacts previously identified in the 1994 LRDP EIR. For such impacts, no new mitigation measures, other than those previously identified in the 1994 LRDP EIR, are required and are incorporated by reference. Further, there is substantial evidence that the project may result in a significant environmental impact that was not previously identified in the 1994 LRDP EIR, and/or will exacerbate a significant environmental impact previously identified in the 1994 LRDP EIR. An Environmental Impact Report will be prepared that addresses the new impacts not previously identified in the 1994 LRDP EIR and supplements the 1994 LRDP EIR. Planning Date John A. Meyer Vice Chancellor - Resource Management and

CALIFORNIA ENVIRONMENTAL QUALITY ACT FINDINGS AND APPROVAL OF THE DESIGN OF THE GENOME LAUNCH FACILITY PROJECT, DAVIS CAMPUS

CALIFORNIA ENVIRONMENTAL QUALITY ACT FINDINGS AND APPROVAL OF THE DESIGN OF THE GENOME LAUNCH FACILITY PROJECT, DAVIS CAMPUS CALIFORNIA ENVIRONMENTAL QUALITY ACT FINDINGS AND APPROVAL OF THE DESIGN OF THE GENOME LAUNCH FACILITY PROJECT, DAVIS CAMPUS I. ADOPTION OF THE MITIGATED NEGATIVE DECLARATION Pursuant to Title 14, California

More information

CAMPUS CHILD CARE CENTER

CAMPUS CHILD CARE CENTER CAMPUS CHILD CARE CENTER Tiered Initial Study and Mitigated Negative Declaration State Clearinghouse No. 2005092017 The following Initial Study has been prepared in compliance with CEQA. Prepared By: OFFICE

More information

NOTICE OF PREPARATION

NOTICE OF PREPARATION PLANNING DIVISION CITY OF SUNNYVALE P.O. BOX 3707 SUNNYVALE, CA 94088-3707 NOTICE OF PREPARATION TO: Responsible, Trustee, and Other Interested Public Agencies FROM: Sunnyvale Community Development 456

More information

5. Environmental Analysis

5. Environmental Analysis 5.11 The potential for adverse impacts on utilities and service systems was evaluated based on information concerning current service levels and the ability of the service providers to accommodate the

More information

TO MEMBERS OF THE COMMITTEE ON GROUNDS AND BUILDINGS: ACTION ITEM

TO MEMBERS OF THE COMMITTEE ON GROUNDS AND BUILDINGS: ACTION ITEM GB2 OFFICE OF THE PRESIDENT TO MEMBERS OF THE COMMITTEE ON GROUNDS AND BUILDINGS: For the Meeting of May 15, 2013 ACTION ITEM APPROVAL OF THE BUDGET AND APPROVAL OF DESIGN FOLLOWING ACTION PURSUANT TO

More information

3.1.8 Utilities and Service Systems

3.1.8 Utilities and Service Systems 3.1.8 Utilities and Service Systems This section discusses potential impacts to utilities and service systems, including water, wastewater, and solid waste hauling and disposal, resulting from the implementation

More information

TO MEMBERS OF THE COMMITTEE ON GROUNDS AND BUILDINGS: 1 DISCUSSION ITEM

TO MEMBERS OF THE COMMITTEE ON GROUNDS AND BUILDINGS: 1 DISCUSSION ITEM GB3 Office of the President TO MEMBERS OF THE COMMITTEE ON GROUNDS AND BUILDINGS: 1 For Meeting of July 21, 2015 DISCUSSION ITEM PRELIMINARY PLANS FUNDING, MISSION BAY EAST CAMPUS PHASE 1 (BLOCK 33) BUILDING,

More information

NOTICE OF INTENT TO ADOPT A MITIGATED NEGATIVE DECLARATION. Vallecitos Water District Rock Springs Sewer Replacement Project

NOTICE OF INTENT TO ADOPT A MITIGATED NEGATIVE DECLARATION. Vallecitos Water District Rock Springs Sewer Replacement Project NOTICE OF INTENT TO ADOPT A MITIGATED NEGATIVE DECLARATION Vallecitos Water District Rock Springs Sewer Replacement Project Vallecitos Water District has prepared a Draft Mitigated Negative Declaration

More information

INSTITUTIONAL MASTER PLAN NOTIFICATION FORM / PROJECT NOTIFICATION FORM BOSTON UNIVERSITY MEDICAL CENTER

INSTITUTIONAL MASTER PLAN NOTIFICATION FORM / PROJECT NOTIFICATION FORM BOSTON UNIVERSITY MEDICAL CENTER INSTITUTIONAL MASTER PLAN NOTIFICATION FORM / PROJECT NOTIFICATION FORM BOSTON UNIVERSITY MEDICAL CENTER JUNE 7, 2013 SUBMITTED TO: BOSTON REDEVELOPMENT AUTHORITY ONE CITY HALL SQUARE BOSTON, MA 02201

More information

INITIAL STUDY AND ADDENDUM #6. Cancer Research Building 17C University of California San Francisco Mission Bay

INITIAL STUDY AND ADDENDUM #6. Cancer Research Building 17C University of California San Francisco Mission Bay INITIAL STUDY AND ADDENDUM #6 Cancer Research Building 17C University of California San Francisco Mission Bay LONG RANGE DEVELOPMENT PLAN Final Environmental Impact Report University of California San

More information

San Francisco Water Powe Sewer Services of the San Francisco Public Utilities Commission

San Francisco Water Powe Sewer Services of the San Francisco Public Utilities Commission San Francisco Water Powe Sewer Services of the San Francisco Public Utilities Commission 525 Golden Gate Avenue, 13th Floor San Francisco, CA 94102 T 415.554.3155 F 415.554.3161 TTY 415.554.3488 January

More information

Proposed General Plan Update Goals, Policies, and Implementation Actions

Proposed General Plan Update Goals, Policies, and Implementation Actions Proposed General Plan Update Goals, Policies, and Implementation Actions The construction and maintenance of infrastructure is necessary to support existing and planned land uses and to achieve Environmental

More information

March 2008. Prepared by: Irvine Ranch Water District. 15600 Sand Canyon Avenue. Irvine, CA 92618. Contact: Natalie Likens (949) 453-5633

March 2008. Prepared by: Irvine Ranch Water District. 15600 Sand Canyon Avenue. Irvine, CA 92618. Contact: Natalie Likens (949) 453-5633 ADDENDUM TO THE MICHELSON WATER RECLAMATION PLANT PHASE 2 & 3 CAPACITY EXPANSION PROJECT FEBRUARY 2006 FINAL ENVIRONMENTAL IMPACT REPORT AND THE SAN JOAQUIN FRESHWATER MARSH ENHANCEMENT PLAN REVISED SEPTEMBER

More information

SR 89/Fanny Bridge Community Revitalization Project. Draft Environmental Impact Report/ Environmental Impact Statement/ Environmental Assessment

SR 89/Fanny Bridge Community Revitalization Project. Draft Environmental Impact Report/ Environmental Impact Statement/ Environmental Assessment SR 89/Fanny Bridge Community Revitalization Project Draft Environmental Impact Report/ Environmental Impact Statement/ Environmental Assessment 2015 Meeting Purpose Provide a summary description of alternatives

More information

CEQA PRACTICUM: SUPPLEMENTAL ENVIRONMENTAL REVIEW

CEQA PRACTICUM: SUPPLEMENTAL ENVIRONMENTAL REVIEW NAEP/AEP Conference Los Angeles CEQA PRACTICUM: SUPPLEMENTAL ENVIRONMENTAL REVIEW P RESENTED B Y : C URTIS E. ALLING, AICP G ARY D. JAKOBS, AICP A SCENT E NVIRONMENTAL, INC. A PRIL 2013 AEP CONFERENCE

More information

Sacramento Municipal Utility District Headquarters Building and Site Rehabilitation Project March, 2015

Sacramento Municipal Utility District Headquarters Building and Site Rehabilitation Project March, 2015 Addendum 1: Changes to the Draft IS/MND Text and Figures Introduction This summary presents minor corrections and revisions made to the Draft IS/MND initiated by the public, staff and/or consultants based

More information

Water Conservation and the State s New Green Building Code for Residential Construction

Water Conservation and the State s New Green Building Code for Residential Construction Water Conservation and the State s New Green Building Code for Residential Construction Silver Sponsors Media Sponsors Certified Sponsors Solano County Water Agency Zone 7 Water Agency Founding Partners

More information

TO MEMBERS OF THE COMMITTEE ON GROUNDS AND BUILDINGS: ACTION ITEM

TO MEMBERS OF THE COMMITTEE ON GROUNDS AND BUILDINGS: ACTION ITEM GB6 Office of the President TO MEMBERS OF THE COMMITTEE ON : For Special Meeting of ACTION ITEM APPROVAL OF PHASE 1 OF THE UTILITY LINE REMEDIATION PROJECT RELATED TO THE MISSION BAY DILLER BUILDING, ROCK

More information

Proposal For Design-Build Competitions in Irvine County, California

Proposal For Design-Build Competitions in Irvine County, California GB10 Office of the President TO THE MEMBERS OF THE COMMITTEE ON : For Meeting of ACTION ITEM AMENDMENT OF THE BUDGET FOR CAPITAL IMPROVEMENTS AND THE CAPITAL IMPROVEMENT PROGRAM, ADOPTION OF MITIGATED

More information

8. The City received a $100,000 grant from the Monterey Peninsula Water Management District to conduct initial planning and engineering analyses.

8. The City received a $100,000 grant from the Monterey Peninsula Water Management District to conduct initial planning and engineering analyses. RESOLUTION NO. 14-071 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PACIFIC GROVE CERTIFYING THE FINAL ENVIRONMENTAL IMPACT REPORT (FEIR), ADOPTING THE MITIGATION MONITORING AND REPORTING PLAN, AND APPROVING

More information

NYCIDA PROJECT COST/BENEFIT ANALYSIS June 5, 2014

NYCIDA PROJECT COST/BENEFIT ANALYSIS June 5, 2014 NYCIDA PROJECT COST/BENEFIT ANALYSIS June 5, 2014 APPLICANT Skyline Restoration Inc. CGI Northeast, Inc. Spring Scaffolding LLC Metropolitan Northeast LLC 11-20 37 th Avenue Long Island City, NY 11101

More information

SUBJECT: NOTICE OF PREPARATION OF A DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT REPORT FOR THE BERTHS 97-109 [CHINA SHIPPING] CONTAINER TERMINAL PROJECT

SUBJECT: NOTICE OF PREPARATION OF A DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT REPORT FOR THE BERTHS 97-109 [CHINA SHIPPING] CONTAINER TERMINAL PROJECT September 18, 2015 SUBJECT: NOTICE OF PREPARATION OF A DRAFT SUPPLEMENTAL ENVIRONMENTAL IMPACT REPORT FOR THE BERTHS 97-109 [CHINA SHIPPING] CONTAINER TERMINAL PROJECT The City of Los Angeles Harbor Department

More information

CHAPTER 2.0 EXECUTIVE SUMMARY

CHAPTER 2.0 EXECUTIVE SUMMARY CHAPTER 2.0 EXECUTIVE SUMMARY This chapter is an executive summary of the Environmental Impact Report (EIR) for the implementation of the University of California San Diego (UCSD) 2004 Long Range Development

More information

BASSETT CREEK VALLEY MASTER PLAN OPEN HOUSE

BASSETT CREEK VALLEY MASTER PLAN OPEN HOUSE BASSETT CREEK VALLEY MASTER PLAN OPEN HOUSE February 23, 2006 PROJECT INTRODUCTION Project Area 230 acres $50 million estimated market value (approximately) 50 acres parkland 100 residences (estimated)

More information

Chapter 4.0 - Impacts of the Proposed Project

Chapter 4.0 - Impacts of the Proposed Project Chapter 4.0 - Impacts of the Proposed Project 4.0 Impacts of the Proposed Project This section presents the baseline conditions and the analysis of the potential for the proposed Ridgecrest Sanitary Landfill

More information

9988 REDWOOD AVENUE PROJECT TRAFFIC IMPACT ANALYSIS. April 24, 2015

9988 REDWOOD AVENUE PROJECT TRAFFIC IMPACT ANALYSIS. April 24, 2015 9988 REDWOOD AVENUE PROJECT TRAFFIC IMPACT ANALYSIS April 24, 2015 Kunzman Associates, Inc. 9988 REDWOOD AVENUE PROJECT TRAFFIC IMPACT ANALYSIS April 24, 2015 Prepared by: Bryan Crawford Carl Ballard,

More information

SACRAMENTO COUNTY SUMMARY OF ZONING CLASSIFICATIONS

SACRAMENTO COUNTY SUMMARY OF ZONING CLASSIFICATIONS SACRAMENTO COUNTY SUMMARY OF ZONING CLASSIFICATIONS This document provides a brief overview of zoning designations only. Inaccuracies may be present. Please consult the Sacramento County Zoning Code for

More information

Low Impact Development Checklist

Low Impact Development Checklist New Jersey Stormwater Best Management Practices Manual February 2004 A P P E N D I X A Low Impact Development Checklist A checklist for identifying nonstructural stormwater management strategies incorporated

More information

Telemedicine Resource Center & Rural PRIME Facility

Telemedicine Resource Center & Rural PRIME Facility University of California, Davis School of Medicine Telemedicine Resource Center & Rural PRIME Facility Larry Vanderhoef, Chancellor, UC Davis Michael Boyd, Executive Director FPD & C, UCDHS Tom Rush, Manager,

More information

Summary and Description of 2014 Enhancements to New Jersey Model Stormwater Control Ordinance for Municipalities

Summary and Description of 2014 Enhancements to New Jersey Model Stormwater Control Ordinance for Municipalities Summary and Description of 2014 Enhancements to New Jersey Model Stormwater Control Ordinance for Municipalities This document summarizes and provides explanation for the purpose and intent of major recommended

More information

TRAFFIC IMPACT ANALYSIS HANDBOOK VOLUME I METHODOLOGIES & REQUIREMENTS

TRAFFIC IMPACT ANALYSIS HANDBOOK VOLUME I METHODOLOGIES & REQUIREMENTS TRAFFIC IMPACT ANALYSIS HANDBOOK VOLUME I METHODOLOGIES & REQUIREMENTS Downtown panoramic photo provided by 1stACT Silicon Valley (blank below this line) Volume I Methodologies and Requirements TABLE OF

More information

City of Los Angeles CALIFORNIA ERIC GARCETTI MAYOR. November 6, 2014

City of Los Angeles CALIFORNIA ERIC GARCETTI MAYOR. November 6, 2014 DEPARTMENT OF CITY PLANNING 200 N. SPRING STREET, ROOM 525 LOS ANGELES, CA 90012-4801 AND 6262 VAN NUYS BLVD., SUITE 351 VAN NUYS, CA 91401 - CITY PLANNING COMMISSION DAVID H. J. AMBROZ PRESIDENT RENEE

More information

Iowa Smart Planning. Legislative Guide March 2011

Iowa Smart Planning. Legislative Guide March 2011 Iowa Smart Planning Legislative Guide March 2011 Rebuild Iowa Office Wallace State Office Building 529 East 9 th St Des Moines, IA 50319 515-242-5004 www.rio.iowa.gov Iowa Smart Planning Legislation The

More information

Robert D. Trimborn Airport Director Santa Monica Airport

Robert D. Trimborn Airport Director Santa Monica Airport Robert D. Trimborn Airport Director Santa Monica Airport Association of California Airports Conference - September 18, 2009 Noise Air Emissions Ground Support Equipment Alternative Fuels and Green

More information

Los Angeles Union Station, CA Sustainable Neighborhood Assessment. April 22-23, 2014

Los Angeles Union Station, CA Sustainable Neighborhood Assessment. April 22-23, 2014 Los Angeles Union Station, CA Sustainable Neighborhood Assessment April 22-23, 2014 Sustainable Neighborhood Assessment Through the Sustainable Neighborhood Assessment Tool developed by Global future development

More information

Southern California International Gateway Project Description

Southern California International Gateway Project Description Southern California International Gateway Project Description Introduction This Supplemental Notice of Preparation and Initial Study is to inform Responsible, Trustee Agencies, and the public that the

More information

University of California, San Diego University House Meeting Center and Chancellor Residence

University of California, San Diego University House Meeting Center and Chancellor Residence University of California, San Diego University House Meeting Center and Chancellor Residence Findings, Facts In Support Of Findings, And Statement Of Overriding Considerations For The University House

More information

Introduction to the Envision Sustainability Rating System

Introduction to the Envision Sustainability Rating System THE ENVISION RATING SYSTEM Introduction to the Envision Sustainability Rating System Russell Moore, PE, ENV SP Richard Gomez, PE, MSEM, ENV SP test APWA Public Works Conference Richmond, CA November 2015

More information

THE COMMUNITY REDEVELOPMENT AGENCY OF THE CITY OF LOS ANGELES, CALIFORNIA M E M O R A N D U M DATE: APRIL 15, 2004 HO2020

THE COMMUNITY REDEVELOPMENT AGENCY OF THE CITY OF LOS ANGELES, CALIFORNIA M E M O R A N D U M DATE: APRIL 15, 2004 HO2020 THE COMMUNITY REDEVELOPMENT AGENCY OF THE CITY OF LOS ANGELES, CALIFORNIA M E M O R A N D U M 8 DATE: APRIL 15, 2004 HO2020 TO: FROM: RESPONSIBLE: PARTIES AGENCY COMMISSIONERS ROBERT R. OVROM, CHIEF EXECUTIVE

More information

Finding of No Significant Impact

Finding of No Significant Impact Finding of No Significant Impact PROPOSED CONSTRUCTION AND OPERATION OF OPERATIONAL READINESS TRAINING COMPLEX FORT HUNTER LIGGETT, MONTEREY COUNTY, CALIFORNIA Pursuant to the Council on Environmental

More information

Storm Water Management Requirements for Construction Projects Less than One Acre

Storm Water Management Requirements for Construction Projects Less than One Acre Storm Water Management Requirements for Construction Projects Less than One Acre Purpose: UC Irvine s Phase II Small MS4 Storm Water Permit requires construction projects less than one acre in size to

More information

K A N S A S DEPARTMENT OF HEALTH AND ENVIRONMENT PERMIT APPLICATION FOR A RECLAMATION FACILITY. 1. Applicant's Name

K A N S A S DEPARTMENT OF HEALTH AND ENVIRONMENT PERMIT APPLICATION FOR A RECLAMATION FACILITY. 1. Applicant's Name K A N S A S DEPARTMENT OF HEALTH AND ENVIRONMENT PERMIT APPLICATION FOR A RECLAMATION FACILITY 1. Applicant's Name Address (Street or Rural Route) (City & State) (Zip) Person to contact Title Phone Fax

More information

How To Amend A Stormwater Ordinance

How To Amend A Stormwater Ordinance Regulatory Alternatives to Address Stormwater Management and Flooding in the Marlboro Street Study Area Alternative 1: Amend Existing Local Regulations This proposed alternative provides an incremental

More information

Floodplain Development Land Use Review

Floodplain Development Land Use Review COMMUNITY DEVELOPMENT DEPARTMENT Planning Division P.O. Box 490 333 Broadalbin Street SW Albany, OR 97321 Phone 541-917-7550 Fax 541-791-0150 www.cityofalbany.net Floodplain Development Land Use Review

More information

V. ENVIRONMENTAL IMPACT ANALYSIS E. Hazardous Materials

V. ENVIRONMENTAL IMPACT ANALYSIS E. Hazardous Materials E. HAZARDOUS MATERIALS An Environmental Site Assessment Phase I Update was performed on the subject properties by California Environmental Inc. in March 2000 1. This report is included in Appendix E of

More information

CWSRF Project Descriptions and Examples for Green Project Reserve

CWSRF Project Descriptions and Examples for Green Project Reserve CWSRF Project Descriptions and Examples for Green Project Reserve I. Water Efficiency a. Water efficiency is the use of improved technologies and practices to deliver equal or better services with less

More information

CITY OF HIGHLAND PARK, ILLINOIS Stormwater Management Fact Sheet

CITY OF HIGHLAND PARK, ILLINOIS Stormwater Management Fact Sheet CITY OF HIGHLAND PARK, ILLINOIS Stormwater Management Fact Sheet WHAT IS STORMWATER MANAGEMENT? Stormwater management is the method for channeling rainfall through pipes and sewers away from property to

More information

Save Our Heritage Organisation v. San Diego Unified Port District

Save Our Heritage Organisation v. San Diego Unified Port District Save Our Heritage Organisation v. San Diego Unified Port District 1 San Diego County Regional Airport Authority created by legislation in 2003 Operates San Diego International Airport Acts as the Airport

More information

INTRODUCTION TO ZONING DISTRICT REGULATIONS

INTRODUCTION TO ZONING DISTRICT REGULATIONS INTRODUCTION TO ZONING DISTRICT REGULATIONS Classification of Zoning Districts Zoning districts in Dorchester County are categorized as Suburban Urban, Suburban Transition, or Rural. These districts are

More information

Post-Construction Stormwater Management Checklist* (5,000 SF or Greater)

Post-Construction Stormwater Management Checklist* (5,000 SF or Greater) Applicability: Required for projects that create and/or replace 5,000 square feet or greater of impervious surface (i.e. asphalt roads, concrete structures, building area, sidewalks, etc.). Impervious

More information

2010 Salida Community Priorities Survey Summary Results

2010 Salida Community Priorities Survey Summary Results SURVEY BACKGROUND The 2010 Salida Community Priorities Survey was distributed in September in an effort to obtain feedback about the level of support for various priorities identified in the draft Comprehensive

More information

3.1 Historical Considerations

3.1 Historical Considerations 3. Recommended Scope of Bridge improvements 3.1 Historical Considerations In the fall of 2000, an outside consultant, Fraser Design, suggested that the existing 4 th St. Bridge is potentially eligible

More information

SECTION 5.15 ELECTRICITY AND NATURAL GAS

SECTION 5.15 ELECTRICITY AND NATURAL GAS SECTION 5.15 ELECTRICITY AND NATURAL GAS 5.15 ELECTRICITY AND NATURAL GAS This section addresses the potential impacts of the proposed project with regard to electricity and natural gas consumption. The

More information

SAN FRANCISCO GROUNDWATER SUPPLY PROJECT

SAN FRANCISCO GROUNDWATER SUPPLY PROJECT SAN FRANCISCO GROUNDWATER SUPPLY PROJECT Draft Environmental Impact Report Volume 2 of 2 Planning Department State Clearinghouse No. 2009122075 March 2013 City and County of San Francisco San Francisco

More information

KEYPORT COMMUNITY PLAN

KEYPORT COMMUNITY PLAN PLANNING COMMISSION TASKS Collect Public Comments on Draft Plan. Provide Clear Direction for: Preferred LAMIRD Boundary Lot Clustering Provision View Protection Recommendation to Board of County Commissioners.

More information

CHAPTER 372-68 WAC WATER POLLUTION CONTROL AND ABATEMENT PLANS FOR SEWAGE DRAINAGE BASINS

CHAPTER 372-68 WAC WATER POLLUTION CONTROL AND ABATEMENT PLANS FOR SEWAGE DRAINAGE BASINS CHAPTER 372-68 WAC WATER POLLUTION CONTROL AND ABATEMENT PLANS FOR SEWAGE DRAINAGE BASINS Last Update: 6/8/88 WAC 372-68-010 Authority. 372-68-020 Purpose. 372-68-030 Definitions. 372-68-040 Planning guide.

More information

CITY COUNCIL / PLANNING COMMISSION JOINT STUDY SESSION AGENDA REPORT

CITY COUNCIL / PLANNING COMMISSION JOINT STUDY SESSION AGENDA REPORT CITY COUNCIL / PLANNING COMMISSION JOINT STUDY SESSION AGENDA REPORT MEETING DATE: SEPTEMBER 8, 2015 ITEM NUMBER: 1 SUBJECT: PROPOSED GENERAL PLAN LAND USE ALTERNATIVE FOR THE YEAR 2015-2025 GENERAL PLAN

More information

Capital Facilities Financial Plan (2007-2012) Supporting document to the 20-year Comprehensive Management Plan

Capital Facilities Financial Plan (2007-2012) Supporting document to the 20-year Comprehensive Management Plan Capital Facilities Financial Plan (2007-2012) Supporting document to the 20-year Comprehensive Management Plan Revised May 2007 CAPITAL FACILITIES FINANCIAL PLAN 2007-2012 CLARK COUNTY 20-YEAR GROWTH MANAGEMENT

More information

4.7 HAZARDS AND HAZARDOUS MATERIALS

4.7 HAZARDS AND HAZARDOUS MATERIALS LSA ASSOCIATES, INC. MARCH 2008 FINAL ENVIRONMENTAL IMPACT REPORT YUCCA VALLEY RETAIL SPECIFIC PLAN The State defines hazardous material as any material that, because of its quantity, concentration, or

More information

Alternatives Analysis

Alternatives Analysis CHAPTER 6 Alternatives Analysis CEQA requires that an EIR describe a range of reasonable alternatives to the proposed project or to the location of the proposed project site that could feasibly avoid or

More information

Los Angeles Mission College Facilities Master Plan Draft Program Environmental Impact Report 3.5 ENERGY CONSERVATION AND SUSTAINABILITY.

Los Angeles Mission College Facilities Master Plan Draft Program Environmental Impact Report 3.5 ENERGY CONSERVATION AND SUSTAINABILITY. 3.5 ENERGY CONSERVATION AND SUSTAINABILITY As a result of the analysis undertaken in the Initial Study 1 for the Los Angeles Mission College Facilities Master Plan, the LACCD determined that the proposed

More information

I. APPROVAL OF THE LOS RIOS COMMUNITY COLLEGE DISTRICT DAVIS CENTER AND CONSIDERATION OF THE CERTIFIED 2002 LRDP EIR AND ADDENDUM THERETO

I. APPROVAL OF THE LOS RIOS COMMUNITY COLLEGE DISTRICT DAVIS CENTER AND CONSIDERATION OF THE CERTIFIED 2002 LRDP EIR AND ADDENDUM THERETO CALIFORNIA ENVIRONMENTAL QUALITY ACT FINDINGS IN CONNECTION WITH THE DESIGN APPROVAL FOR THE LOS RIOS COMMUNITY COLLEGE DISTRICT DAVIS CENTER, DAVIS CAMPUS I. APPROVAL OF THE LOS RIOS COMMUNITY COLLEGE

More information

Corridor Goals and Objectives

Corridor Goals and Objectives Corridor Goals and Objectives This chapter presents the goals and objectives, developed by the Corridor Study Committee, that serve as the purpose and intent of the Corridor Plan. This plan covers a twenty

More information

UNIVERSITY SYSTEM OF GEORGIA BOARD OF REGENTS PHYSICAL MASTER PLANNING TEMPLATE. Copyright Notice (c)1996 University System Of Georgia

UNIVERSITY SYSTEM OF GEORGIA BOARD OF REGENTS PHYSICAL MASTER PLANNING TEMPLATE. Copyright Notice (c)1996 University System Of Georgia UNIVERSITY SYSTEM OF GEORGIA BOARD OF REGENTS PHYSICAL MASTER PLANNING TEMPLATE Copyright Notice (c)1996 University System Of Georgia All rights reserved. This "template" is for the exclusive use of the

More information

Comparison of Greenhouse Gas Efficiency Metrics for Projects, Specific Plans, General Plans, and Climate Action Plans

Comparison of Greenhouse Gas Efficiency Metrics for Projects, Specific Plans, General Plans, and Climate Action Plans Comparison of Greenhouse Gas Efficiency Metrics for Projects, Specific Plans, General Plans, and Climate Action Plans Extended Abstract # 15 Whitney R. Leeman, J. Matthew Gerken, and Jeffrey A. Henderson

More information

SAN FRANCISCO PLANNING DEPARTMENT

SAN FRANCISCO PLANNING DEPARTMENT SAN FRANCISCO PLANNING DEPARTMENT Certificate of Determination EXEMPTION FROM ENVIRONMENTAL REVIEW 1650 Mission St. Suite 400 San Francisco. CA 941032479 Case No.: 2012.1333E Reception: Address: 415.558.6378

More information

Mitigation Measurement and Emissions - Mitigated Negative Decletermination in the City of Moreno Valley

Mitigation Measurement and Emissions - Mitigated Negative Decletermination in the City of Moreno Valley RIVERSIDE COMMUNITY COLLEGE DISTRICT PLANNING AND OPERATIONS COMMITTEE Report No.: III-C-1 Date: Subject: Moreno Valley College Dental Education Center Mitigated Negative Declaration Background: An Environmental

More information

INFORMATION SHEET ORDER NO. R5-2011-XXXX TRIANGLE ROCK PRODUCTS, INC. FLORIN ROAD AGGREGATE PLANT SACRAMENTO COUNTY

INFORMATION SHEET ORDER NO. R5-2011-XXXX TRIANGLE ROCK PRODUCTS, INC. FLORIN ROAD AGGREGATE PLANT SACRAMENTO COUNTY ORDER NO. R5-2011-XXXX INFORMATION SHEET Background Triangle Rock, Inc. (Discharger) submitted a Report of Waste Discharge (RWD) on 23 August 2010. The Discharger is expanding the mining operations at

More information

Mobile Restaurant Permit Application Checklist

Mobile Restaurant Permit Application Checklist Checklist 1. The food truck business owner completes Sections I - III on Page 2 of this Mobile Restaurant Permit Application. 2. Complete Section IV and obtain copies of the necessary documents listed

More information

APPENDIX G. California Coastal Commission & Conservancy Accessibility Standards

APPENDIX G. California Coastal Commission & Conservancy Accessibility Standards APPENDIX G California Coastal Commission & Conservancy Accessibility Standards STANDARDS AND RECOMMENDATIONS FOR ACCESSWAY LOCATION AND DEVELOPMENT These standards provide guidelines for the location,

More information

WHAT CITIES NEED TO KNOW ABOUT CEQA AND CLIMATE CHANGE

WHAT CITIES NEED TO KNOW ABOUT CEQA AND CLIMATE CHANGE WHAT CITIES NEED TO KNOW ABOUT CEQA AND CLIMATE CHANGE Sandy Goldberg Deputy Attorney General California Attorney General s Office 510-622-2145 [sandra.goldberg@doj.ca.gov] May 28, 2008 CLIMATE CHANGE

More information

SAN DIEGO UNIFIED PORT DISTRICT GUIDELINES FOR COMPLIANCE WITH THE CALIFORNIA ENVIRONMENTAL QUALITY ACT

SAN DIEGO UNIFIED PORT DISTRICT GUIDELINES FOR COMPLIANCE WITH THE CALIFORNIA ENVIRONMENTAL QUALITY ACT SAN DIEGO UNIFIED PORT DISTRICT GUIDELINES FOR COMPLIANCE WITH THE CALIFORNIA ENVIRONMENTAL QUALITY ACT Prepared by: Suzanne R. Varco & Associates for San Diego Unified Port District 225 Broadway, Suite

More information

Final Subsequent Environmental Impact Report

Final Subsequent Environmental Impact Report Meritage Senior Living Project Final Subsequent Environmental Impact Report Volume I: Report June 2013 Meritage Senior Living Project Final Subsequent Environmental Impact Report Volume I: Report Prepared

More information

CITY OF FERNDALE EAGLE Checklist

CITY OF FERNDALE EAGLE Checklist CITY OF FERNDALE EAGLE Checklist Purpose of the Checklist: The City of Ferndale has adopted EAGLE, an indicator-based program intended to provide the citizens of Ferndale, the applicant, and the City with

More information

COUNTY OF SACRAMENTO CALIFORNIA

COUNTY OF SACRAMENTO CALIFORNIA COUNTY OF SACRAMENTO CALIFORNIA For the Agenda of: June 10, 2014 Timed: 2:00 p.m. To: From: Subject: Supervisorial District(s): Board of Supervisors Department of Community Development PLNP2013-00065.

More information

Governor Gray Davis. The Planner s Guide to. Specific Plans. Steven A. Nissen, Director. Terry Roberts, Manager, State Clearinghouse

Governor Gray Davis. The Planner s Guide to. Specific Plans. Steven A. Nissen, Director. Terry Roberts, Manager, State Clearinghouse Governor Gray Davis The Planner s Guide to Specific Plans Governor s Office of Planning and Research 1400 Tenth Street Sacramento, CA 95814 (916) 445-0613 Steven A. Nissen, Director Terry Roberts, Manager,

More information

City of Atlanta. Department of Watershed Management. Post-Development Stormwater Management Ordinance Summary of Revisions

City of Atlanta. Department of Watershed Management. Post-Development Stormwater Management Ordinance Summary of Revisions City of Atlanta Department of Watershed Management Post-Development Stormwater Management Ordinance Summary of Revisions Cory Rayburn, CPESC Environmental Program Manager crayburn@atlantaga.gov Stormwater

More information

NAPA COUNTY WATERSHED SYMPOSIUM

NAPA COUNTY WATERSHED SYMPOSIUM Planning, Building, and Environmental Services NAPA VALLEY GROWTH NAPA COUNTY WATERSHED SYMPOSIUM Plunging Forward May 15, 2015 1 YOU CAN T CROSS THE SEA MERELY BY STANDING AND STARING AT THE WATER. Rabindranath

More information

Permeable Pavers. calstone.com. Permeable Interlocking Concrete Pavements (PICP s)

Permeable Pavers. calstone.com. Permeable Interlocking Concrete Pavements (PICP s) Permeable Pavers Permeable Interlocking Concrete Pavements (PICP s) CBC Title 24/ADA Compliant LEED Functional Optimum balance of surface infiltration and joint interlock Available in a 6 x 9 Quarry Stone

More information

URBAN DRAINAGE CRITERIA

URBAN DRAINAGE CRITERIA URBAN DRAINAGE CRITERIA I. Introduction This division contains guidelines for drainage system design and establishes a policy for recognized and established engineering design of storm drain facilities

More information

TO MEMBERS OF THE COMMITTEE ON GROUNDS AND BUILDINGS: DISCUSSION ITEM DISCUSSION OF ANDERSON SCHOOL OF MANAGEMENT ADDITION, LOS ANGELES CAMPUS

TO MEMBERS OF THE COMMITTEE ON GROUNDS AND BUILDINGS: DISCUSSION ITEM DISCUSSION OF ANDERSON SCHOOL OF MANAGEMENT ADDITION, LOS ANGELES CAMPUS Office of the President GB2 TO MEMBERS OF THE COMMITTEE ON GROUNDS AND BUILDINGS: For Meeting of March 24, 2016 DISCUSSION ITEM DISCUSSION OF ANDERSON SCHOOL OF MANAGEMENT ADDITION, LOS ANGELES CAMPUS

More information

SAN JOSE/EVERGREEN COMMUNITY COLLEGE DISTRICT LAND DEVELOPMENT PROJECT. March 5, 2015

SAN JOSE/EVERGREEN COMMUNITY COLLEGE DISTRICT LAND DEVELOPMENT PROJECT. March 5, 2015 SAN JOSE/EVERGREEN COMMUNITY COLLEGE DISTRICT LAND DEVELOPMENT PROJECT March 5, 2015 2 WHY IS THE SJECCD BOARD OF TRUSTEES ACTING TO IMPLEMENT A SURPLUS LAND DEVELOPMENT PUBLIC/PRIVATE PARTNERSHIP? Fiscal

More information

1.7.0 Floodplain Modification Criteria

1.7.0 Floodplain Modification Criteria 1.7.0 Floodplain Modification Criteria 1.7.1 Introduction These guidelines set out standards for evaluating and processing proposed modifications of the 100- year floodplain with the following objectives:

More information

San Francisco State University Campus Master Plan. Chapter 10. Campus Infrastructure

San Francisco State University Campus Master Plan. Chapter 10. Campus Infrastructure San Francisco State University Campus Master Plan Chapter 10. 10. The master plan projects the infrastructure needs of the campus for the planning horizon, to the year 2020. The following discussion focuses

More information

AGENDA LARIMER COUNTY PLANNING COMMISSION Wednesday, April 20, 2016/6:30 P.M./Commissioners' Hearing Room

AGENDA LARIMER COUNTY PLANNING COMMISSION Wednesday, April 20, 2016/6:30 P.M./Commissioners' Hearing Room AGENDA LARIMER COUNTY PLANNING COMMISSION Wednesday, April 20, 2016/6:30 P.M./Commissioners' Hearing Room A. CALL TO ORDER B. PLEDGE OF ALLEGIANCE C. PUBLIC COMMENT ON THE COUNTY LAND USE CODE D. PUBLIC

More information

FILE NO.: Z-6915-C. Gamble Road Short-form PCD and Land Alteration Variance Request

FILE NO.: Z-6915-C. Gamble Road Short-form PCD and Land Alteration Variance Request FILE NO.: Z-6915-C NAME: Gamble Road Short-form PCD and Land Alteration Variance Request LOCATION: Located on the Northwest corner of Chenal Parkway and Gamble Road DEVELOPER: Davis Properties P.O. Box

More information

SUMMARY University of California San Francisco Medical Center at Mission Bay. Environmental Impact Report (State Clearinghouse No.

SUMMARY University of California San Francisco Medical Center at Mission Bay. Environmental Impact Report (State Clearinghouse No. SUMMARY University of California San Francisco Medical Center at Mission Bay Environmental Impact Report (State Clearinghouse No. 2008012075) September 2008 UCSF MEDICAL CENTER AT MISSION BAY ENVIRONMENTAL

More information

PUBLIC NOTICE Application for Permit

PUBLIC NOTICE Application for Permit PUBLIC NOTICE Application for Permit 30-Day Notice Issue Date: June 20, 2016 Expiration Date: July 20, 2016 US Army Corps of Engineers No: NWP-2010-535 Oregon Department of State Lands No: 58311-RF Interested

More information

MODESTO CITY COUNCIL RESOLUTION NO. 2005-466

MODESTO CITY COUNCIL RESOLUTION NO. 2005-466 MODESTO CITY COUNCIL RESOLUTION NO. 2005-466 A RESOLUTION FINDING THAT THE FOLLOWING PROJECT IS WITHIN THE SCOPE OF THE PROJECT COVERED BY THE MODESTO URBAN AREA GENERAL PLAN MASTER ENVIRONMENTAL IMPACT

More information

COMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES. April 20, 2010 EXHIBIT 1

COMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES. April 20, 2010 EXHIBIT 1 COMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES April 20, 2010 EXHIBIT 1 ELEMENT 4 WATER RESOURCES TABLE OF CONTENTS 4.1 INTRODUCTION 4.2 GOALS AND POLICIES 4.2.A General Goals and Policies 1 4.2.B

More information

Engineering. 2006 2007 2007 2008 2008 2008 Major Service Actual Budget Projected Request Executive Adopted

Engineering. 2006 2007 2007 2008 2008 2008 Major Service Actual Budget Projected Request Executive Adopted Engineering Agency Number: 53 Budget Function: Public Works and Transportation The Engineering Division is responsible for the design, supervision and inspection of all street, highway, sidewalk and bike

More information

AREA: 0.16 acres NUMBER OF LOTS: 1 FT. NEW STREET: 0 LF

AREA: 0.16 acres NUMBER OF LOTS: 1 FT. NEW STREET: 0 LF FILE NO.: Z-9020 NAME: Hometown Tax Service Short-form PD-O LOCATION: Located at 3008 West 12 th Street DEVELOPER: Mark Green 65 Westfield Loop Little Rock, AR 72210 SURVEYOR: Kittler-Roberts Group, LLP

More information

Comprehensive Plan for the National Capital DRAFT Federal Environment Element Policies

Comprehensive Plan for the National Capital DRAFT Federal Environment Element Policies Comprehensive Plan for the National Capital DRAFT Federal Environment Element Policies SECTION A: Climate Change 1. Ensure that climate change impacts are addressed in long range plans and in the review

More information

3.4 DRAINAGE PLAN. 3.4.1 Characteristics of Existing Drainages. 3.4.2 Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN

3.4 DRAINAGE PLAN. 3.4.1 Characteristics of Existing Drainages. 3.4.2 Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN 3.4 DRAINAGE PLAN This section describes the existing onsite drainage characteristics and improvements proposed within this Specific Plan. Following this description, drainage plan development standards

More information

A. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems.

A. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems. 19. STORMWATER MANAGEMENT A. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems. The majority of the approximately ±500 acre Property

More information

Chapter 7 ZONING PLAN

Chapter 7 ZONING PLAN Chapter 7 ZONING PLAN Introduction This Chapter opens with a general description of a zoning plan. It is followed by a brief explanation of the relationship between this Growth Management Plan and the

More information

THE LEAGUE OF WOMEN VOTERS OF WASHINGTON COUNTY PROGRAM FOR ACTION

THE LEAGUE OF WOMEN VOTERS OF WASHINGTON COUNTY PROGRAM FOR ACTION THE LEAGUE OF WOMEN VOTERS OF WASHINGTON COUNTY PROGRAM FOR ACTION I. PUBLIC TRANSPORTATION (1988, 2006) The LWVWC supports coordinated public transportation service in Washington County and Northwest

More information

BLOCK 400 PLANNED COMMUNITY DISTRICT

BLOCK 400 PLANNED COMMUNITY DISTRICT BLOCK 400 PLANNED COMMUNITY DISTRICT Newport Center December 1983 Newport Beach, California Ordinance 88-119 Adopted December 12, 1988 Amendment No. 672 Resolution No. 95-115 Adopted October 9, 1995 Amendment

More information

Application No.: 14.074 Steve Rush, representing Rocky Mountain Power Rocky Mountain Power Project Location: approximately 1600 N. 6800 E.

Application No.: 14.074 Steve Rush, representing Rocky Mountain Power Rocky Mountain Power Project Location: approximately 1600 N. 6800 E. Planning Commission Staff Report Planning and Development Services Croydon Substation Conditional Use Permit Public Meeting August 28, 2014 Application No.: 14.074 Applicant: Steve Rush, representing Rocky

More information

Restoration. a brief look at

Restoration. a brief look at Copyright 2009 Canin Associates, Inc. All rights reserved. No part of this publication may be reproduced or transmitted by any means without written permission from Canin Associates, Inc. a brief look

More information