Safe Work Method Statement
|
|
|
- Shawn Rose
- 9 years ago
- Views:
Transcription
1 Safe Work Method Statement Prepared By: Paul Sefton-Rowston Document Owner(s) Paul Sefton-Rowston Organisation Role Director Version Control Version Date Author Reviewer Change Description /09/12 Kirsty McInnes Paul Sefton-Rowston Draft /09/12 Kirsty McInnes Paul Sefton-Rowston Final External Distribution List Version Date To Company /09/12 Sandy Alp Sunbuild GAW012 SWMS.doc Authorised by: Page 1 of 11
2 Company details SAFE WORK METHOD STATEMENT Part 1 Company Name: Gawled Pty Ltd Contact Name: ABN: Position: Phone number: Address: 1/6 Aristos Place Winnellie NT 0820 Project details Project: Charles Darwin University Accommodation Block Area: Darwin Paul Sefton-Rowston Director Job Address: Ellengowan Drive, Brinkin NT Principal Contractor: Sunbuild Pty Ltd Job Description: Activity: Mechanical Services This SWMS has been developed in consultation with: Name: Job Title: Paul Sefton- Rowston Daniel Banks Air Conditioner Installation Construction Manager 06/08/12 Apprentice Refrigeration Mechanic SWMS Approved by: Name: Paul Sefton-Rowston Joseph Gallez Luke Comber Electrician Refrigeration Mechanic Personnel responsible for monitoring and managing activity: Paul Sefton-Rowston Overall Risk Rating After Controls Implemented (Refer to Part 3: Risk Assessment) ALL PERSONS INVOLVED IN TASK MUST HAVE THIS SWMS COMMUNICATED TO THEM PRIOR TO WORK COMMENCING M8 Moderate Regular inspections and observations will be conducted by Paul Sefton-Rowston to ensure SWMS is being complied with. Daily Tool Box Talks will be undertaken to identify, control and communicate additional site hazards. Work must cease immediately if incident or near miss occurs. SWMS must be amended in consultation with relevant persons. Amendments must be approved by Paul Sefton-Rowston and communicated to all affected workers before work resumes. GAW012 SWMS.doc Authorised by: Page 2 of 11
3 Personal Protective Equipment Green 204 Foot Protection Hearing Protection High Visibility Head Protection Hand Protection Protective Clothing Day Operations Normal Requirements: Safety footwear (non-slip boots), hearing protection, high visibility shirt or vest, hard hat and sun protection if required, hand protection (gloves), protective clothing. Emergency Procedures 1. Work under Sunbuild emergency procedures 2. Site induction in accordance with Sunbuild 3. First aid kits to be available on site and in vehicles 4. Qualified first aid personnel on site (Sunbuild) 5. Participate in trial evacuation, as required Purpose of SWMS: This SWMS covers risks associated with general installation of air conditioning systems. Ensure the manufacturer s installation manual/guide is available for specific information on all installation works. Main risks: - Falls from height - Electrocution/electric shock - Exposure to hazardous atmosphere GAW012 SWMS.doc Authorised by: Page 3 of 11
4 Risk Rating Risk Rating Activities Possible Safety or Environmental Hazards RB Control Measures to Reduce risk Risk is to be controlled using hierarchy of control measures: 1. Elimination (completely remove from hazard); 2. Substitution (replace the hazard with a lesser hazard); 3. Isolation/ Engineering controls (make a structural change to the work environment or work process) 4. Administration controls (procedures); 5. Personal protective equipment. RA Responsible Officer NOTE: RB = Risk Rating before controls implemented - RA = Risk Rating after controls are implemented. Hazardous substances on site Carrying materials onto site Hazardous materials 3 D H:18 Refrigerant Gases: o Ensure restrained adequately on transport vehicle. o Avoid storing inside cabin of vehicles o Keep minimum quantities o Ensure Material Safety Data Sheet available (within 5 year issue date) o Inspect cylinders regularly to ensure no damage or leaks Take care not to kink copper pipes. Expel air from system as required by manufacturer. Check for refrigerant leakage from pipe connectors. Use appropriate gas detector, or soapy water in a spray bottle. If bubbles form, tighten all fittings and recheck. Ensure adequate ventilation Manual handling injury 3 C M:13 Avoid working in static or awkward postures (such as bending or working with arms raised above head height) for more than 30 minutes at a time and/or 2 hours over entire shift. Ensure regular rest breaks are taken. 1 D M: 10 PSR 2 C M:9 PSR Slips/ Trips 4 B M:12 Clear any obstructions from the access path 1 B L:3 PSR Traffic management 3 D M:13 Wear high-visibility clothing at all times. Unload only in areas which are declared as safe by the principal contractor. 1 D M:10 PSR GAW012 SWMS.doc Authorised by: Page 4 of 11
5 Risk Rating Risk Rating Activities Possible Safety or Environmental Hazards RB Control Measures to Reduce risk Risk is to be controlled using hierarchy of control measures: 1. Elimination (completely remove from hazard); 2. Substitution (replace the hazard with a lesser hazard); 3. Isolation/ Engineering controls (make a structural change to the work environment or work process) 4. Administration controls (procedures); 5. Personal protective equipment. RA Responsible Officer NOTE: RB = Risk Rating before controls implemented - RA = Risk Rating after controls are implemented. Unloading heavy materials Manual handling injury 5 C M:20 Use hand trucks, cable trolleys to move materials Use mechanical aids to lift and hold pipes in position (such as duct lifters) Lift heavy materials as a team All team members must undergo manual handling training Ensure duct lifters have safety gears capable of holding the load in the event of a failure of hoisting rope) Lifting equipment has suitable SWL. Use smaller sized cable drums Slips/ Trips 4 B M:12 Ensure work areas are cleared of off-cuts/ tripping hazards regularly. Traffic management 3 D M:13 Wear high-visibility clothing at all times. Be aware of the traffic management requirements. 2 C M: 9 PSR 1 B L:3 PSR 1 D M:10 PSR GAW012 SWMS.doc Authorised by: Page 5 of 11
6 Risk Rating Risk Rating Activities Possible Safety or Environmental Hazards RB Control Measures to Reduce risk Risk is to be controlled using hierarchy of control measures: 1. Elimination (completely remove from hazard); 2. Substitution (replace the hazard with a lesser hazard); 3. Isolation/ Engineering controls (make a structural change to the work environment or work process) 4. Administration controls (procedures); 5. Personal protective equipment. RA Responsible Officer NOTE: RB = Risk Rating before controls implemented - RA = Risk Rating after controls are implemented. Working on roof Working in ceiling spaces Working at heights 5 E E:25 Check type of roof (pitched, tile, skylights etc) Check condition of roof (fragile, brittle etc) Ensure support walls, ceiling and roof have sufficient load bearing capacity. Ensure work area is of the required height. Check the number of persons expected on roof/ceiling space. Ensure scissor lift or step platforms are used. If ladders are only option, ensure they are industrial, good condition, set-up correctly and secured both top and bottom. Where a roof pitch exceeds 35 degrees, do not stand on the roof. Work from a cherry picker, scaffold or travel restraint system. If using travel restraint or fall arrestors, ensure harness and clips are compatible, anchor points have been assessed by qualified persons, training undertaken and emergency plan in place for rescue. Working in ceiling/confined space 3 D H:18 Avoid entering ceiling space work from solid platform. If required to enter, ensure joists/purlins are capable of holding weight of person and equipment and tested for load capacity Don t stand on fragile areas such as plasterboard Walk along planks and crawl if required. Ensure regular rest breaks are taken 2 C M: 9 PSR 1 D M:10 PSR GAW012 SWMS.doc Authorised by: Page 6 of 11
7 Risk Rating Risk Rating Activities Possible Safety or Environmental Hazards RB Control Measures to Reduce risk Risk is to be controlled using hierarchy of control measures: 1. Elimination (completely remove from hazard); 2. Substitution (replace the hazard with a lesser hazard); 3. Isolation/ Engineering controls (make a structural change to the work environment or work process) 4. Administration controls (procedures); 5. Personal protective equipment. RA Responsible Officer NOTE: RB = Risk Rating before controls implemented - RA = Risk Rating after controls are implemented. Air conditioning cabling installation Working outside Working inside Electric shock 3 D H:18 Check proximity to power lines Power supply off Ensure equipment has been checked regularly. Check the equipment register is up to date. Inspect wiring before each use. Do not operate Electrical equipment near water or chemicals. Hazardous atmosphere. (e.g. Dust) 3 C M:13 Avoid placing unit in direct sun or under drains etc (if possible) Leave sufficient space between front, rear and sides (as specified by manufacturer) Keep away from hazardous atmospheres or ignition sources Ensure base and supporting frame is secure and capable of holding unit Located in area where there is fresh air. Wear high-visibility clothing to avoid collisions with moving vehicles. Slips and trips 3 B M:8 Ensure work areas are cleared of off-cuts/ tripping hazards regularly. Hazardous atmosphere. (e.g. Dust) 3 C M:13 No heating or steam sources nearby No hazardous materials nearby Check anchor points (suitable work load and position) Location of existing services (heating, water, pipes, electrical leads) Good air circulation Not too near doorways Positioned where vents will not be blocked. 1 D M:10 PSR 1 C M:6 PSR 1 B L:3 PSR 1 C M:6 PSR GAW012 SWMS.doc Authorised by: Page 7 of 11
8 Risk Rating Risk Rating Activities Possible Safety or Environmental Hazards RB Control Measures to Reduce risk Risk is to be controlled using hierarchy of control measures: 1. Elimination (completely remove from hazard); 2. Substitution (replace the hazard with a lesser hazard); 3. Isolation/ Engineering controls (make a structural change to the work environment or work process) 4. Administration controls (procedures); 5. Personal protective equipment. RA Responsible Officer NOTE: RB = Risk Rating before controls implemented - RA = Risk Rating after controls are implemented. Using power tools Cutting into structures Slips and trips 3 B M:8 Ensure work areas are cleared of off-cuts/ tripping hazards regularly. Electric shock from tools 3 D H:18 Guards in place Electrical leads in good condition and tested/tagged, RCDs in use Correct for job/used for purpose Laceration 4 D H:21 Avoid putting face too close to work. Stand to side when tightening with pipe wrenches, strip cable away from body. Cover sharp edges of duct. Ensure protective caps are placed into end of thread droppers. Use pipe cutters and cable strippers rather than hacksaws and knives. Manual handling 5 C M:20 Avoid working in static or awkward postures (such as bending or working with arms raised above head height) for more than 30 minutes at a time and/or 2 hours over entire shift. Ensure regular rest breaks taken. Hazardous materials (e.g. Asbestos) 3 D H:18 Determine material type before cutting. Provide suitable personal protective equipment for short term works. 1 B L:3 PSR 1 D M: 10 PSR 2 C M:9 PSR C A M:9 PSR 1 D M: 10 PSR GAW012 SWMS.doc Authorised by: Page 8 of 11
9 SAFE WORK METHOD STATEMENT Part 2 Only undertake work which is allowable under the specific licence held. For example, an electrical license is required in order to perform electrical installations. A refrigerant mechanic with a restricted license cannot perform electrical installation work, but they can disconnect and connect electrical equipment and replace with like components of the a/c and refrigerant equipment. Employee Personal Qualifications, Licenses and Experience required for the job: Duties and Responsibilities of those employees undertaking the task: Training Required to Complete the Work: (All employees must be trained in relevant procedures.) Paul Sefton-Rowston A9040 NT Electrical Licence (A9040) Electrical, Management Daniel Banks NT Refrigeration Licence (L075814) Air conditioning & Refrigeration Joseph Gallez NT Electrical Licence (A9714) Electrical Luke Comber NT Refrigeration Licence (L013997) Air conditioning & Refrigeration White Card - Industry standard safety induction. Site specific inductions. Training in this SWMS White Card - Industry standard safety induction. Site specific inductions. Training in this SWMS White Card - Industry standard safety induction. Site specific inductions. Training in this SWMS White Card - Industry standard safety induction. Site specific inductions. Training in this SWMS Details of regulatory permits/licenses required: NT Electrical licence. Attain any necessary permits from Sunbuild. Engineering Details/Certificates/Work Cover Approvals: N/A The following legislation is applicable to this project: Legislation Work Health and Safety [National Uniform Legislation]Act 2011 (as in force at 1 st January 2012) Work Health and Safety [National Uniform Legislation]Regulations 2011 (as in force at 1 st January 2012) Workplace Health and Safety Act 2011 Workplace Health and Safety Regulations 2011 Electricity Reform Act & (Safety & Technical) Regulations GAW012 SWMS.doc Authorised by: Page 9 of 11
10 The following codes of practice are applicable to this project: Codes of Practice National National Code of Practice: First Aid in the workplace National Code of Practice: Construction Work National Code of Practice: Hazardous manual tasks National Code of Practice: How to manage work health and safety risks National Code of Practice: Managing the risk of falls at workplaces National Code of Practice: Managing the work environment and facilities National Code of Practice: Managing noise and preventing hearing loss at work National Code of Practice: Confined spaces National Code of Practice: Labelling of workplace hazardous chemicals National Code of Practice for Induction for Construction Work May 2007 Adopted National Exposure Standards for Atmospheric Contaminants in the Occupational Environment [NOHSC:1003(1995)] The following standards are applicable to this project: Standards Applicable National Standard for Licensing Persons Performing High Risk Work 2006 National Standard for Manual Tasks 2007 ISO Risk Management AS Wiring Rules AS Electrical installations Relocatable premises AS Electrical Installations Construction and demolitions sites AS In-service safety inspection and testing of electrical equipment AS3100 Approval & Test Specification General requirements for electrical equipment AS Occupational Noise Management Noise Control Management AS1336 Recommended Practices for Occupational Eye Protection AS1800 Occupational Protective Helmets selection, care and use AS2210 Occupational Protective Footwear Part 1 Guide to selection, care and use AS Occupational Protective Gloves Selection, use & maintenance AS4602 High Visibility Garments Plant/Tools/Equipment: (List plant and equipment to be used on the job.) Calibration Certificate: (Current / N/A) Maintenance Details: (Include maintenance on cranes, forklifts, electrical equipment etc.) Refer to attached Detailed Asset List. No Calibration Required. All equipment to be checked for appropriate tags prior to use. If out of date, organise a re-tag. GAW012 SWMS.doc Authorised by: Page 10 of 11
11 Part 3- RISK ASSESSMENT Risk Management Code of Practice 2007, AS/NZS Risk Management Principles and guidelines Step 1 Determine What is the possibility that the effect will occur? Almost certain Likely Criteria Expected in most circumstances. Will probably occur in most circumstances. Description Effect is a common result Effect is known to have occurred at this site or it has happened Possible Might occur at some time Effect could occur at the site or I ve heard of it happening Unlikely Rare Could occur at some time May occur only in exceptional circumstances Effect is not likely to occur at the site or I have not heard of it happening Effect is practically impossible. Step 2 Determine - What will be the expected effect? Level of Effect Insignificant/Acceptable Minor Moderate Major Catastrophic Example of each level No effect or so minor that effect is acceptable First aid treatment only; spillage contained at site. Medical treatment; spillage contained but with outside help. Extensive injuries; loss of production Death; toxic release of chemicals Step 3 Determine the risk score A: Insignificant 5: Almost certain B: Minor C: Moderate D: Major E: Catastrophic M11 H16 H20 E23 E25 4: Likely M7 M12 H17 H21 E24 Step 4 Record risk score on worksheet (Note Risk scores have no absolute value and should only be used for comparison and to engender discussion.) Score Extreme: High: Moderate: 4-13 Action ACT NOW Urgent - do something about the risks immediately. Requires immediate attention. Highest management decision is required urgently. Follow management instructions. 3: Possible M4 M8 M13 H18 H22 2: Unlikely L2 M5 M9 H14 H19 Low: 1-3 OK for now. Record and review regularly, and if any equipment/ people/ materials/ work processes or procedures change. 1: Rare L1 L3 M6 M10 H15 GAW012 SWMS.doc Authorised by: Page 11 of 11
NORTHWEST AIRCONDITIONING SERVICE P/LFill = Green 204 SAFE WORK PROCEDURE Workplace: Page: 1 of 6 TASK / OPERATION: Air Conditioner Installation
NORTHWEST AIRCONDITIONING SERVICE P/LFill = Green 204 SAFE WORK PROCEDURE Workplace: Page: 1 of 6 TASK / OPERATION: Air Conditioner Installation Overall Risk Rating After Controls 4 Acute 3 High 2 Moderate
SITE CONTRACTOR PROCEDURES
SITE CONTRACTOR PROCEDURES Asset Collection Type B Assets are considered High risk ; the site activities must be in accordance with Graysonline contractor procedures and are to be collected by appointment
WHS Contractor Management Procedure
Procedure Approved: 09/07/2013 Next Review: 09/07/2015 1. Overview The District council of Mount Remarkable Council is committed to engaging quality Contractors who have a sound understanding and commitment
SAFE WORK PROCEDURE SWP 015 WORKING AT HEIGHT SEPTEMBER 2013 DOC. NO. D13/248399
Operation Brief Description of Activity Limitations MORELAND CITY COUNCIL Operations Centre 7-9 Walter Street Hadfield Vic 3046 Tel: 8311 4300 Working at height Approved by the Walter Street OHS committee
Risk Assessment Tool (example only)
HAZARD IDENTIFICATION & RISK ASSESSMENT TOOL Hazard identification You have an obligation to identify, assess and control any foreseeable hazards that may result as a consequence of your actions. If it
CONTRACTOR INDUCTION HANDBOOK
CONTRACTOR INDUCTION HANDBOOK POLICY The health and safety of all school employees and contractor employees is a vital concern at the school. Contract personnel will be treated in a manner consistent with
Tremline Pty Ltd trading as The Hills Bark Blower
JSA No: Rev: 10011 Date: 10010 ABN 1 07 880 6 Website: wwwbarkblowercomau Job Number Start Time: Vehicle : Max Length Hose Date: Company Name: Product: Quantities Depth Job site address: Description of
Job safety analysis Installing wall frames and roof trusses on-site
Job safety analysis Installing wall frames and roof trusses on-site 1. Taking delivery: - unloading the truck - moving materials manually to the work area Body sprains and strains from lifting materials
Slip, Trip & Fall Prevention Handbook
Slip, Trip & Fall Prevention Handbook This prevention handbook provides you with a basic understanding of what causes a slip, trip or fall and gives you some ideas on what you can do to stop these incidents
Contractor s Safe Working Agreement
Contractor s Safe Working Agreement This statement provides details on how I/we, the Trade Contractor will manage the health and safety hazards associated with my/our work. ASSESSING WORKPLACE HEALTH AND
PREVENTION OF FALLS WORKING ON ROOFS
PREVENTION OF FALLS WORKING ON ROOFS 1ST EDITION JUNE 2005 The following information is provided for people in the workplace who have responsibilities under the Occupational Health and Safety (OHS) Act
68 Metal Industry Guidelines for Safe Work
3 68 Metal Industry Guidelines for Safe Work section 3 high-risk 3 activities Metal Industry Guidelines for Safe Work 69 section 3 high risk activities 3.1 working at heights Falls from heights have been
Risk Assessment: An introduction
Preamble The purpose of a risk assessment is to systematically identify all of the risks associated with a task, activity or process, and put appropriate controls in place to eliminate or reduce the risks
JOB SAFETY ANALYSIS WORK SHEET WORKING AT HEIGHTS, ROOF OR GUTTER WORK
Trade Specific Job Safety Analysis (JSA) JOB SAFETY ANALYSIS WORK SHEET WORKING AT HEIGHTS, ROOF OR GUTTER WORK Repair roof/gutters Access difficulties, falling Use elevated work platform or cherry picker
WORKING IN CONFINED SPACES GUIDELINES
WORKING IN CONFINED SPACES GUIDELINES Contents 1 Introduction... 2 2 Scope... 2 3 Definitions... 2 4 Responsibilities... 3 4.1 Permit Authoriser... 3 4.2 Permit Receiver... 3 4.3 Responsible UOW Officer...
THE UNIVERSITY OF SHEFFIELD WORK AT HEIGHT POLICY
THE UNIVERSITY OF SHEFFIELD WORK AT HEIGHT POLICY CONTENTS Page No 1 INTRODUCTION 2 2 LEGISLATION 2 3 HIERARCHY OF CONTROL 2 4 WORK AT HEIGHT POLICY 3 5 ROLES AND RESPONSIBILITIES 3 6 RISK ASSESSMENTS
WORKSAFE VICTORIA A HEALTH AND SAFETY SELF-ASSESSMENT CHECKLIST FOR SMALL BUSINESS
Aug 2013 WORKSAFE VICTORIA A HEALTH AND SAFETY SELF-ASSESSMENT CHECKLIST FOR SMALL BUSINESS As a small business operator, you need to be aware of your health and safety responsibilities, and identify risks
Document ref: MG(M)201 Version no: 01 Page no: 1 / 12. Contractor rules
Page no: 1 / 12 Contractor rules Table of Contents Purpose... 2 Scope... 2 1. Responsibilities... 2 2. Planning Stage... 3 3. Site induction, emergency procedures and documentation... 3 4. Risk Assessment
Confined Space Management Procedure
1. Overview The District Council of Mount Remarkable as part of its commitment under its Hazardous Work Policy, recognises its obligation to eliminate, or where that is not reasonably practicable, minimise,
SAFE WORK ON ROOFS PART 1: COMMERCIAL AND INDUSTRIAL BUILDINGS. making a difference CODE OF PRACTICE 2009. New South Wales Government
SAFE WORK ON ROOFS PART 1: COMMERCIAL AND INDUSTRIAL BUILDINGS CODE OF PRACTICE 2009 making a difference New South Wales Government Disclaimer This publication may contain occupational health and safety
Safety and Health Office WORKPLACE SAFETY CHECKLIST
Location: Date: Inspected by: Safety and Health Office WORKPLACE SAFETY CHECKLIST WORK ENVIRONMENT Ventilation Removal of fumes and dust Temperature and humidity control Noise levels Vibration Lighting
EVENT RISK ASSESSMENT EXAMPLE / 04
EVENT RISK ASSESSMENT EXAMPLE / 04 No matter the nature or size of your event, your event will have risks. It is your responsibility as the event organiser, to identify and manage these risks. Event organisers
WHS Induction Series. 36 Toolbox Talks. Contents
36 Toolbox Talks 3-5 minute toolbox talks for induction or refresher safety training. Having regular training programs that educate your workers about workplace issues has never been easier than now with
WHS CONTRACTOR MANAGEMENT PROCEDURE
1. Overview The Port Augusta City Council as part of its commitment under its WHS Contractor Management policy, recognises its obligation to: Ensure, so far as is reasonably practicable, the health and
Title: OHS Risk Management Procedure
Issue Date: July 2011 Review Date: July 2013 Page Number: 1 of 9 1. Purpose: To outline the methodology by which Department of Education and Early Childhood Development (DEECD) identifies, assesses, controls
WHS LEGISLATIVE COMPLIANCE GUIDELINES
WHS LEGISLATIVE COMPLIANCE GUIDELINES CONTENTS 1 Introduction... 2 2 Scope... 2 3 Responsibilities... 2 3.1 Manager WHS Unit... 2 3.2 Management of Faculties, Divisions and Research Institutes... 2 4 Maintaining
WHS Contractor Management Procedure
Wudinna District Council 1. Overview Wudinna District Council as part of its commitment under its Policy recognises its obligation to: Ensure, so far as is reasonably practicable, the health and safety
WHS CONTRACTOR MANAGEMENT PROCEDURE
MANAGEMENT PROCEDURE 1. OVERVIEW The Flinders Ranges Council as part of its commitment under its WHS Contractor Management Policy, recognises its obligation to: Ensure, so far as is reasonably practicable,
CONFINED SPACE PROCEDURE
Document uncontrolled when printed Procedure ID no 0460/05 CONFINED SPACE PROCEDURE This procedure is applicable to: All Department of Education and Children's Services employees. DOCUMENT CONTROL Managed
Generic Risk Assessment: Working on Roofs (FMRA 0006)
Generic Risk Assessment: Working on Roofs (FMRA 0006) Only staff and contractors who are Authorised by Facilities Management are allowed to access roof areas. Those who need access who are not Authorised
CONFINED SPACE ENTRY WORK STANDARD
CONFINED SPACE ENTRY WORK STANDARD CONFINED SPACE ENTRY WORK STANDARD Copyright 2007 All rights reserved. Reproduction of this document in whole or in part by any means is prohibited, unless authorized
Benchmark OHS Consulting Pty Ltd Self Assessment WHS Audit Tool
Benchmark OHS Consulting Pty Ltd Self Assessment WHS Audit Tool This WHS Auditing System Tool is to be used as a self-assessment of YOUR COMPANY compliance with AS 4801 and the Work Health and Safety Act
WorkSafe Guidance Document FALL PROTECTION IN RESIDENTIAL CONSTRUCTION
WorkSafe Guidance Document FALL PROTECTION IN RESIDENTIAL CONSTRUCTION WorkSafe Guidance Document Fall Protection in Residential Construction Table of Contents Executive Summary... 1 Introduction... 1
Injury Prevention for the Construction Industry
Injury Prevention for the Workers in the construction industry encounter a variety of hazards, some of which can lead to serious injuries and fatalities. This fact sheet: Increases awareness of the primary
GHD EPCM Standard operating procedure Working at height May 2013 v1
GHD EPCM Standard operating procedure Working at height May 2013 v1 Table of contents 1. Purpose 2. Scope 3. Duty of care 4. Lifesaving rules; An overview 5. Roles and responsibilities 4.1 Operating centre
Slips, trips & falls Prevention Policy & Procedure 45
Bethany Care Ltd Slips, trips & falls Prevention Policy & Procedure 45 A little slip at work can have a big impact on your life. Date Created 30/06/2008 Date Reviewed 22/10/2014 Document Review Details
NZQA registered unit standard 23229 version 4 Page 1 of 6
Page 1 of 6 Title Use safety harness system when working at height Level 3 Credits 4 Purpose People credited with this unit standard are able to: demonstrate knowledge of the hazards associated with wearing
AUSTRALIAN AIRCONDITIONING SERVICES SAFETY MANAGEMENT PLAN
AUSTRALIAN AIRCONDITIONING SERVICES SAFETY MANAGEMENT PLAN ISSUE NOVEMBER 2010 AU07899 TABLE OF CONTENTS 1. DOCUMENT CONTROL 3 2. PLAN AND SAFETY OBJECTIVES AND TARGETS 4 3. OCCUPATIONAL SAFETY AND HEALTH
Risk Management Program March 2015
AS/NZS 4801 OHSAS 18001 OHS20309 SAI Global Risk Management Program March 2015 Introduction Monash University s Victorian campuses are all governed by the Victorian OHS Act 2004 and its subordinate regulations
Hazard Identification, Risk Assessment and Control Procedure
Hazard Identification, Risk Assessment and Control Procedure 1. Purpose To ensure that there is a formal process for hazard identification, risk assessment and control to effectively manage workplace and
Pollution Incident Response Plan
Pollution Incident Response Plan Introduction Schmidt Quarries is committed to ensuring all aspects of our quarrying activities comply with the environmental legislative requirements in NSW. This Pollution
Guide Document for Development of WHS Management Plans
DISCLAIMER: THIS DOCUMENT IS PROVIDED AS GUIDANCE TO ASSIST CONTRACTORS IN MEETING THEIR OBLIGATIONS UNDER THE WHS LAW AND NTG CONTRACTS. NTG DOES NOT ACCEPT ANY RESPONSIBILITY FOR THE CONTENTS OF CONTRACTORS
Construction OS&H Working at height
Construction OS&H Working at height Summary Common hazards with working at height General OS&H requirements when working at height Scaffolding Structural frames Demolition of above ground structures Roof-work
Uncontrolled if Printed
Hazard Table Hazard Types Any Hazard Kinetic / Mechanical Gravitational Thermal and/or Explosive Electrical Pressurised Chemicals / Substances Radiation Biological Manual Handling / Postural Noise and/or
Heading FACT SHEET. Overview. www.safeworkaustralia.gov.au
ELECTRICAL RISKS AT THE WORKPLACE Heading FACT SHEET Overview This fact sheet provides general guidance for persons conducting a business or undertaking (PCBUs) and workers on managing electrical risks
The Tomato Plant Company Ltd. Method Statement and Risk Assessment Loads requiring lifting
The Tomato Plant Company Ltd Method Statement and Risk Assessment Loads requiring lifting Generic method statement & risk assessment for the removal of portable accommodation units and/or shipping containers
Fact Sheet: Slips, trips and falls
Fact Sheet: Slips, trips and falls Slips, Trips & Falls Slips, Trips and Falls are one of the highest causes of workplace injuries. They include those, which occur on the same level as a result of uneven
TEMPORARY EMPLOYEES SAFETY PROCEDURES
TEMPORARY EMPLOYEES SAFETY PROCEDURES Temporary Agencies will ensure that any temporary employee sent to work at Modern will have received and understand the General Safety Rules. GENERAL SAFETY RULES
FLAMMABLE LIQUIDS COMPLIANCE NOTE
Issued by: Heather Rice Page: 1 of 7 COMPLIANCE NOTE INTRODUCTION This document provides additional guidance to support the Arrangement on Flammable Liquids (Ref No. CYC/HS/A27) CONTENTS Section Topic
WHS CONTRACTOR MANAGEMENT PROCEDURE
WHS CONTRACTOR MANAGEMENT PROCEDURE Version No: Issued 3.0 18/11/2013 15/11/2018 1. Overview The District Council of Peterborough as part of its commitment under its WHS Contractor Management policy, recognises
SPECIFIC SAFETY OBLIGATIONS FOR CONTRACTORS ENGAGED WITH THE CITY OF BUNBURY.
SPECIFIC SAFETY OBLIGATIONS FOR CONTRACTORS ENGAGED WITH THE CITY OF BUNBURY. The City of Bunbury acknowledges that it has a Duty of Care obligation under the Occupational Safety and Health Act 1984 (Section
Safety and Environmental Information for External Companies Koehler Oberkirch
and al and at Work 1. Delivery, Notice, Signature After receiving the following information sheets, the team leader from every external company is required to read through them, explain them to their employees,
Guidance Note GN049. Using portable ladders safely. WorkSafe Tasmania Department of Justice. Introduction and purpose
Guidance Note GN049 Using portable ladders safely Introduction and purpose The purpose of this guidance note is to answer the most common questions that WorkSafe Tasmania receives about using portable
Installation Instructions for Alarm Module Kit A043F059
Instruction Sheet 07-2013 Installation Instructions for Alarm Module Kit A043F059 1 Introduction The information contained within is based on information available at the time of going to print. In line
Completed by: Technical Staff & Academic Staff. Adel Mitry, Michael Morris, Meloni Muir, Sharon Herkes, Isabel Arnaiz. Current version 01
Completed by: Technical Staff & Academic Staff WHS Risk assessment and control form Adel Mitry, Michael Morris, Meloni Muir, Sharon Herkes, Isabel Arnaiz For additional information refer to Risk Assessment
METHOD STATEMENT INSTALLATION OF INSULATING FLANGE KITS
METHOD STATEMENT INSTALLATION OF INSULATING FLANGE KITS Revision Date Prepared By Approved By Method Statement IF Kits BAC Corrosion Control Limited Stafford Park 11 Telford TF3 3AY Tel: 01952 290321 Fax:
OCCUPATIONAL HEALTH AND SAFETY RISK ASSESSMENT PROGRAM FOR AGRICULTURE
OCCUPATIONAL HEALTH AND SAFETY RISK ASSESSMENT PROGRAM FOR AGRICULTURE Definitions of Commonly Used Terms in Risk Management Hazard: anything, including a work practice or procedure, that causes, or has
6 STEPS TO RISK MANAGEMENT
6 STEPS TO RISK MANAGEMENT Disclaimer This Guide provides general information about the obligations of persons conducting a business or undertaking and/or persons in control of premises and workers under
HEALTH & SAFETY HANDBOOK. No Body GetsHurt. Our Safety Slogan is:
HEALTH & SAFETY HANDBOOK Our Safety Slogan is: No Body GetsHurt CONTENTS Page(s) Introduction 1 Health & Safety Policy 2 What happens if you get Injured at work 3 Chemicals 4 Company Vehicles 4 Compressed
H2 Opening Statement Asbestos
H2 Opening Statement Asbestos Every year there are thousands of asbestos related deaths. Asbestos fibres accumulate in the lungs, therefore several diseases can occur, among these are two main types of
FALLING OBJECTS EXCESSIVE NOISE CHAINSAW & CHIPPER WORK AT HEIGHTS MANUAL HANDLING
JOB NO: PROJECT: DATE: SWMS NO: SWMS 001.1 PREPARED BY: Ian Hartley REVISED BY: Nick Bragg & Cameron McNeil ACTIVITY: TREE REMOVAL & PRUNING SIGNED BY: REVISION DATE: December 2015 MINIMUM PERSONAL PROTECTIVE
Static, Hazard & Risk Assessment of Mobile Plant
Static, Hazard & Risk Assessment of Mobile Plant Company Name ELITE ROADS Make / Model BOBCAT S130 Meter Reading: 511 Skidsteer Loader Plant Registration or ID. Assessed by GREG CORNELL 03 9763 5449 Assessed
DRAFT FOR CONSULTATION
DRAFT FOR CONSULTATION Health and Safety at Work (General Risk and Workplace Management) Regulations 2015 Governor-General Order in Council At Wellington this day of 2015 Present: in Council Pursuant to
Working at a height of two metres or more while carrying out general work activities or construction works
1. Working at Heights 2. Scope / Description of Job Working at a height of two metres or more while carrying out general work activities or construction works 3. Critical Safety Issues A fall from any
Procedure. Working at Heights. 1. Purpose. 2. Scope. 3. Definitions. 4. Planning. 4.1. QUT risk check. 4.2. Work at Height permit
Procedure Working at Heights 1. Purpose The purpose of this procedure is to establish compliance requirements and specify precautions to be taken during the conduct of work at height within QUT to prevent
RISK RATING SAFE WORK METHOD STATEMENT 1 HIGH 2 MEDIUM 3LOW. I approve the use of this Safe Work Method Statement: NAME: POSITION: Department Manager
RISK RATING 1 HIGH 2 MEDIUM 3LOW SAFE WORK METHOD STATEMENT Title: : Gantry Crane Operation Ref No: 1 I approve the use of this Safe Work Method Statement: NAME: POSITION: Department Manager SIGNATURE:
WHS Policies and Procedures Package
WHS Policies and Procedures Package The following is an extract to highlight the style and layout of this publication, as well as a snapshot of the content. Some samples may not be included in their entirety
Hazard/Risk Identification and Control Procedure
Hazard/Risk Identification and Control Procedure Introduction Hazard identification and the steps taken to minimize the risks associated with identified hazards are a critical component of working safely.
Workplace Health, Safety & Welfare
Relevant Legislation Workplace (Health, Safety and Welfare) Regulations 1992 Construction (Design & Management) Regulations 2015 Provision & Use of Work Equipment Regulations 1998 (PUWER) Lifting Operations
Work Health and Safety Management Plan
Work Health and Safety Management Plan Controlled COPY No. 1 Issue No. 1.0 Date: 01 Jan 2013 This is a controlled document. Only registered holders of controlled copies will receive updates Wo Document
7. PRINCIPAL STEPS 8. POTENTIAL HAZARDS 9. RECOMMENDED CONTROLS
ACTIVITY HAZARD ANALYSIS (AHA) 1. Contract Number: 2. Contractor Name: 3. Date prepared: 4. Title/Activity Performed: FIXED SCAFFOLDING 5. Location: 6. Estimated Date of Completion: 7. PRINCIPAL STEPS
David Hicks Consultants Ltd Industrial Roofing & Cladding Consultants
28 Orwell Drive, Aylesbury, Bucks, HP21 9JN Office: 01296 719 775 Mobile: 07980 432 848 Roof Inspection Risk Assessment & Method Statement This document is prepared to cover any type of roof construction
Mechanical Engineering
RISK ASSESSMENT Mechanical Engineering January 2011 Mark Hoare Health and Safety Manager The University of Birmingham Course Content Introduction to health and safety How heath and safety is managed at
Level 1 Award in Health and Safety in a Construction Environment
Level 1 Award in Health and Safety in a Construction Environment Student notes (sample) www.britsafe.org Membership Training Qualifications Audit and Consultancy Audit and Policy Consultancy and Opinion
Safety Systems Review Facilities Management Guidance and specification Version 1 2014
Safety Systems Review Facilities Management Guidance and specification Version 1 2014 Membership Training Qualifications Audit and Consultancy Policy and Opinion Awards Contents Page Safety Systems Review
Scaffold Standard (Standard to Managing and Appointing Scaffolding Contractors on University College London (UCL) Projects) Management Standard
Scaffold Standard (Standard to Managing and Appointing Scaffolding Contractors on University College London (UCL) Projects) Management Standard UNIVERSITY COLLEGE LONDON Engineering, Maintenance & Infrastructure
Pollution Incident Response Management Plan (PIRMP)
Pollution Incident Response Management Plan (PIRMP) For NSW Ports For Construction of Berth 103 Stage 2 Extension WATERWAY CONSTRUCTIONS PTY LTD ABN 74 061 311 395 Po Box 290, Annandale NSW 2038 TELEPHONE:
Metal welding safety. Guidance Note. Practical advice for employers on controlling hazards when welding. June 2011. Background. How to use the table
Guidance Note Metal welding safety Practical advice for employers on controlling hazards when welding. June 2011 Background Metal welding involves the application of heat to join two metals together. The
Which generic risk assessments are provided? Construction Risk. Assessments Plus. ervices
Which generic risk assessments are provided? Assessments Plus A01 Asbestos Containing Materials A02 Brick/Block Laying A03 Cable Pulling A04 Carpentry/Joinery A05 Concreting Operations A06 Confined Spaces
Method Statement. Risk Assessment
Method Statement Risk Assessment Client: Location: Page 1 of 6 Health and Safety Method Statement and Risk Assessment Customer & Address: Site Address: Description of Works: Method Statement: Risk Assessment:
Safety and Environmental Information for External Companies
1. Delivery, Notice, Signature After receiving the following information sheets, the team leader from every external company is required to read through them, explain them to their employees, and after
Workplace Job Accommodations Solutions for Effective Return to Work
Workplace Job Accommodations Solutions for Effective Return to Work Workplace Job Accommodations Solutions for Effective Return to Work Published by 102 275 Broadway Winnipeg, MB R3C 4M6 www.mflohc.mb.ca
BCIT. CNST 1100 Construction Safety Officer Training. Lesson Plan
BCIT CNST 1100 Construction Safety Officer Training Lesson Plan BCIT Two Week Outline- CNST 1100 (Please note there may be adjustments made to this outline) Monday- Day #1 Week #1 0730 Paperwork Introductions
SITE SPECIFIC FALL PROTECTION PLAN
1 THIS PLAN IS SPECIFIC TO: PROJECT & ADDRESS 1.1 THIS PLAN IS SPECIFIC TO THE FOLLOWING AREA(S) ON SITE: Parkade level: Typical level: Other: Between G/L: 1.2 THIS PLAN IS APPLICABLE TO THE FOLLOWING
WORKING AT HEIGHT GUIDELINES. Version II
WORKING AT HEIGHT GUIDELINES Version II 21 st September 2011 WORKING AT HEIGHT GUIDELINES EXECUTIVE SUMMARY Working at height is where an individual is carrying out work in any place in the course of obtaining
4.05e WHS Guidelines for Incident Investigation Procedures Page 1 of 7
Page 1 of 7 1 Purpose It is a legal requirement under the NSW Work Health and Safety Act 2011 and NSW Work Health and Safety Regulation 2011 to identify hazards, assess the risk of those hazards, implement
REFRIGERATION & AIR CONDITIONING
Musculoskeletal hazards and controls REFRIGERATION & AIR CONDITIONING Photocopy this profile and distribute it as widely as possible! Musculoskeletal disorders (MSDs), such as chronic back pain or shoulder
CONTRACTOR SAFETY MANAGEMENT PROCEDURE
CONTRACTOR SAFETY MANAGEMENT PROCEDURE Version 1.0 TRIM file number Short description Relevant to Authority Responsible officer Responsible office Date introduced July 20, 2015 Date(s) modified June 11,
Activity risk assessment Assessment title: New Generic Office environment
Activity risk assessment Assessment title: New Generic Office environment Assessment N o Location: CASS (Generic Assessments) 159838 Local Rules & Procedures for completing Risk Assessments I Confirm I
Personal protective equipment (PPE) at work A brief guide
Personal protective equipment (PPE) at work A brief guide Introduction This leaflet describes what you, as an employer, may need to do to protect your employees from the risk of injury in the workplace.
5. Training All supervisors and other relevant staff will be trained in regard to this SOP.
1. Purpose The purpose of this SOP is to provide a process for the management of workplace hazards and risks to minimise the potential for injury, adverse health effects, loss or damage due to workplace
How To Prevent Accidents At Work
2 Preventing vehicle accidents Construction work is considered to be one of the most hazardous industrial activities in the EU. The rate of injury in the construction industry is higher than in other industries.
Notes. Material 1. Personal Protective Equipment 2.
29CFR 1926.20(b)-Accident Reduction, 29CFR 1926.21- Safety Training & Education 29CFR 1926.20(a)-Unsafe Working Conditions 29 CFR 1910.132-138, the "Personal Protection Equipment" standard. & 20 CFR 1910.134
No. Name of Legislation Applicable Issues and Requirements Demonstration of Compliance 1. Health and Safety at Work Act 1974
The Police Treatment Centres Health and Safety Legal Compliance Register No. Name of Legislation Applicable Issues and Requirements Demonstration of Compliance 1. Health and Safety at Work Act 1974 2.
Company Name Company Address Company Phone Number Company Fax Number
Job Hazard Analysis Plumbing Company Name Company Address Company Phone Number Company Fax Number Job/Task Plumbing fixture and piping Date Prepared: 08.04.2010 installation Project Name: Project Name
PORT HEDLAND PORT AUTHORITY
PORT HEDLAND PORT AUTHORITY Working at Heights Procedure PR-OHS021 Document Users : All Contractors All Port Users Port Hedland Port Authority Position Responsible For Keeping Document Current : Safety