1 APPENDIX C Noxious Weed Management Plan Prospector Pipeline Company North Elko Pipeline TABLE OF CONTENTS 1 INTRODUCTION Project Description Plan Purpose Goals and Objectives Noxious Weed Management Noxious Weed Inventory Noxious Weed Management Identification of Problem Areas Environmental Protection Measures/Design Features Treatment Methods Reclamation Methods Private Landowner Requirements MONITORING Reclamation Monitoring On-going Monitoring HERBICIDE APPLICATION, HANDLING, SPILLS, & CLEANUP Herbicide Application and Handling Herbicide Spills and Cleanup Worker Safety and Spill Reporting
2 1 INTRODUCTION 1.1 Project Description Prospector Pipeline Company (PPC) proposes to construct and operate an approximately 24 mile underground natural gas pipeline, to supply natural gas from the recently completed Ruby Pipeline for delivery to the Barrick Goldstrike Mine. The pipeline, referred to as the (NEPP), would be located on BLM and private lands in Elko and Eureka counties, Nevada. The proposed route of the pipeline is shown in Figure 1-1, Project Location and Figures 2-1 and 2-2 of the Environmental Assessment (EA). 1.2 Plan Purpose The purpose of this plan is to prescribe methods to prevent, mitigate, and control the spread of noxious and invasive weeds before, during and after construction of the Project. PPC and its contractors would be responsible for carrying out the methods described in this plan. This plan is applicable to the construction and operation of the Project. The practices described in this plan for survey, treatment and monitoring for noxious weed control for the Project described in this plan have been developed in coordination with the Elko District Noxious Weed Specialist and are in accordance with the BLM Elko Field Office Programmatic Environmental Assessment of Integrated Weed Management on Bureau of Land Management Lands (1998), and Nevada Revised Statutes Chapter 555 Control of Insects, Pests and Noxious Weeds. 1.3 Goals and Objectives The goal of the preventative and control measures outlined in this document is to minimize the spread of noxious weeds during the construction and operation of the Project. PPC s objective is to assist the BLM in their noxious weed control efforts; to comply with requirements designed to prevent the spread of noxious weeds as a result of the NEPP; and to implement weed control measures on PPC s areas of soil disturbance including the temporary rights-of-way and staging areas. In carrying out these measures, PPC would identify specific locations of noxious weed infestation, treat and monitor the treatment for the life of the project. Monitoring during the construction and operation of the Project would include identification of any local areas on and immediately adjacent to the Project ROW and staging areas that may experience infestation. An evaluation of the efficiency of the prescribed control measures would also be implemented during the operational phase as described in the Reclamation Plan. 2 Noxious and Invasive Weed Management Noxious and invasive weeds are opportunistic and often exotic plant species that readily invade disturbed areas. This invasion may prevent native plant species from establishing functioning plant communities. If these invasions are left untreated the invasion may become permanent. Federal Invasive Species Executive Order defines control as eradicating, suppressing, reducing, or managing invasive species populations; preventing spread of invasive species from areas where they are present; and taking steps such as restoration of native species and habitats to reduce the effects of 89
3 invasive species and to prevent further invasions (U.S. Federal Register 1999). In January/February of 2012 PPC consulted with the BLM Elko District to request information regarding noxious weed species identified along the Project ROW, and any weed management requirements for the NEPP. 2.1 Noxious Weed Inventory In Nevada, 48 species are officially designated as noxious weeds under the Nevada Control of Insects, Pests and Noxious Weeds Act (Nevada Revised Statutes: Chapter 555). A complete list can be found at Species are classified as Category A (control required), Category B (control required in areas where not well established), and Category C (control at discretion of state officer). The table below summarizes the known occurrences of noxious weeds and their Nevada management category within proximity of the NEPP alignment and staging areas pursuant to information obtained by the BLM and NEPP. The location of these species is displayed in Figure 3-5 of the EA. Table 1 Known occurrence of noxious weeds in proximity to the NEPP. Common Name Scientific Name Category Scotch thistle Onopordum acanthium B medusahead Taeniatherum caput-medusae B hoary cress Cardaria draba C spotted knapweed Centaurea masculosa A Prior to construction for the Project, a noxious weed inventory would be conducted in the spring of 2012 to determine noxious weed occurrence within the proposed temporary rights-of-way and all staging areas including a 150 yard buffer for public lands. Data would be collected and logged using global positioning system (GPS) units and then would be plotted on United States Geological Survey 1:24,000 scale topographic maps. PPC would submit draft inventory results to the BLM Noxious Weed Specialist within 2 weeks of completion of the survey. Draft inventory results would include a species list of noxious weeds encountered by Class, GPS coordinates of each encounter location and encounter locations displayed on 1:24,000 scale topographic maps. All noxious weeds within these areas will be controlled, however, repeated control measures are generally not considered to be effective in areas along or adjacent to the Project ROW where invasive weed species are already established and abundant. For example, it is recognized by the BLM, and other agencies that the widespread distribution of some non-native species such as cheatgrass (Bromus tectorum) and weeds not listed as noxious precludes the possibility of general control. 2.2 Noxious Weed Management The following sections outline PPC s approach to identifying problem areas, preventative strategies, and treatment measures for noxious weeds. 90
4 2.2.1 Identification of Problem Areas In the spring of 2012, PPC s qualified botanist would identify noxious weed occurrence and density along the Project area s ROW, staging areas inclusive of a 150 yard buffer on public lands. Prior to construction, PPC would provide its contractors with information and training regarding noxious weed management, weed identification, and the impacts of such weeds on agriculture, livestock, and wildlife. The contractors would be informed of the importance of preventing the spread of noxious weeds in areas not infested and of controlling the proliferation of weeds already present. Prior to construction, noxious weed locations would be identified and flagged in the field by PPC s botanist. These locations would include noxious weed species that require treatment or pre-treatment as determined in consultation with the BLM. The flagging would alert construction personnel to the infestation and prevent significant ground disturbance until noxious weed preventive measures (outlined below) have been implemented. These areas would be treated prior to or during construction using methods described in section Environmental Protection Measures/Design Features PPC recognizes that prevention is the most cost-effective approach to noxious weed management. PPC would provide noxious weed control measures within their right of way and associated disturbed areas; comply with preventative requirements; and implement weed control measures on areas of the Project identified to be of concern. The following measures would be implemented to prevent the spread of noxious weeds: 91 PPC would educate all Project personnel regarding environmental concerns and requirements, including weed identification, prevention, and control methods. No personnel would be allowed to enter the Project ROW before taking part in the pre-construction environmental information meeting at any point during the Project. Qualified environmental inspectors approved by BLM would be used to conduct the pre-construction environmental information meeting and conduct on-site biological monitoring before and during construction and reclamation, and annually during operation. Prior to construction mobilization, PPC would contract with a qualified botanist to complete an inventory of the Project rights-of-way and staging areas both inclusive of a 150 foot applicable on public lands to determine the location, extent and population characteristics for noxious weed species. Based on those survey results, in cooperation with the BLM Noxious Weed Specialist, PPC would refine/revise the Noxious Weed Management Plan (NWMP) as necessary to address site and species specific treatments. All herbicide applications would be conducted by a Nevada licensed applicator. PPC would limit the extent of surface disturbance to that necessary to construct and install the NEPP. In cooperation with the BLM Weed Specialist, PPC would conduct ground disturbing activities in a manner that includes project area pretreatment measures to preclude spread of noxious weeds from the project area to unaffected adjacent areas. Construction methods for the NEPP would include the following: Prior to entering the Project Area, all vehicles and construction equipment would be washed to remove dirt, debris and plant materials to minimize the spread of weed materials. All vehicle and equipment cleaning will occur offsite with two exceptions: 1) the heavy equipment
5 92 utilized to remove the noxious weed infested dirt can be washed on site with the location being reported to the BLM. 2) NEPP may conduct on site cleaning if they provide a system capable of collecting all of the dirt and debris for offsite disposal. PPC s contractor would develop a sticker program to identify all vehicles and equipment that have successfully been cleared of noxious weeds. Vehicles and equipment without the proper stickers would be barred from entering new areas until cleaned of noxious weeds. Cleaning would be carried out using power or high-pressure equipment to remove seeds, roots, and rhizomes from the equipment before transport off site. Cleaning would concentrate on tracks or tires and on the undercarriage, with special emphasis on axles, frames, cross members, motor mounts, the underside of running boards, and front bumper/brush guard assemblies. If the weather conditions and ROW conditions are dry, compressed air would be used to clean vehicles and equipment. If muddy conditions exist, a mat platform with containment would be set up and the vehicles and equipment would be cleaned with high pressure water. Vehicle cabs would be swept out and refuse disposed of in waste receptacles. The contractor would ensure that vehicles and equipment are free of soil and debris capable of transporting noxious weed seeds, roots, or rhizomes before the vehicles and equipment are allowed use of access roads. During construction, PPC would dedicate one piece of equipment to excavate weed affected soils for stockpiling and for backfill of weed-affected soils. The equipment may be used elsewhere on the project after washing. In areas where infestations were identified in the field, the contractor would stockpile cleared vegetation and salvaged topsoil adjacent to the area from which they were stripped to eliminate the transport of soil-borne noxious weed seeds, roots, or rhizomes. Weed-infested stockpiles would be marked with clearly visible flagging until reclamation, when the contractor would return topsoil and vegetative material from infestation sites to the areas from which they were stripped. In addition, the contractor would not be permitted to move soil and vegetative matter outside of the identified and marked noxious weed infestation areas. The contractor would ensure that straw or hay bales used for sediment barrier installations or mulch distribution were weed-free. If weed free bales were unavailable, alternative weed free sediment barrier installations such as coir logs would be utilized. PPC would reclaim and seed all disturbed ground concurrent with ground disturbing activities in accordance with the Reclamation Plan (Appendix A of the EA). After, construction is done and reclamation completed, there would be no other disturbances planned during the life of the project. Monitoring for reclamation success would ensure adequate vegetative cover to prevent the invasion of noxious weeds Treatment Methods PPC would implement noxious weed control measures in accordance with existing regulations and BLM requirements. PPC would focus on noxious weed control emphasizing areas containing species specifically requiring treatment, per BLM discussions. The Project would coordinate with the BLM Noxious Weed Specialist to determine which of the species determined to be located within the Project area would require treatment and/or treatment schedules. It should be noted that the occurrence of many noxious and/or invasive weed species within the vicinity of the Project, is to an extent that eradication would not be possible unless performed on a scale well
6 beyond that of the Project construction. With this in mind, preventative measures outlined in section would be implemented for such species, however PPC proposes no site specific treatment for these broadly distributed species located outside the Project area as defined by the NWMP. PPC s long term approach to effective noxious weed control is addressed in the Project s Reclamation Plan, which provides details of the proposed reclamation, seeding and monitoring activities following construction. The following treatment measures would be implemented to prevent the spread of noxious weeds. PPC would implement and monitor the implementation of the Environmental Protection Measures/Design Features (Section 2.2.2). Based on the results of the spring 2012 Draft Noxious Weed Inventory Report, PPC would coordinate closely with the BLM Noxious Weed Specialist to determine if preconstruction herbicide treatment is necessary. If necessary, in compliance with the Elko Field Office Programmatic Environmental Assessment of Integrated Weed Management on Bureau of Land Management Lands, PPC and the TFO Specialist will revise this plan to contain: o Specific locations that require pre-construction herbicide treatment o Specific formulations of herbicide approved for use on BLM lands o Specific application rates and application timing for specified herbicides approved for use on BLM lands. o All herbicide applications will be conducted by a Nevada licensed application for treatment of noxious weeds o PARS (pesticide application records) will be completed within 24 hours of any application of herbicides and will be submitted to the BLM Noxious Weed Specialist within 2 weeks of all herbicide applications. 93 o All herbicide applications will be conducted in accordance with all applicable rules, laws and regulations regarding the application of herbicides in the state of Nevada and on public lands administered by the BLM. Herbicide treatments would not be conducted during precipitation events or when precipitation is expected within 24 hours. If weeds targeted for herbicide treatments are found in the vicinity of sensitive sites, proper buffers would be used to prevent the spread of herbicides to these areas. PPC would consult with the BLM for additional support regarding noxious weed control issues that may occur during the pipeline operations. Pre-construction herbicide treatments would only be used in areas specifically identified by the BLM in coordination with PPC. Bare Ground Treatments At the Willow Creek and Goldstrike Meter Stations and the Coyote Creek Main Line Valve Station, the area prescribed in the EA to accommodate pipeline facilities would be grubbed and cleared of all vegetation. Soil sterilant such as Diuron or Imazapyr (to be approved by the BLM), would be applied by a Nevada certified applicator. The entire area to be fenced would be lined with a heavy duty (3 ounce) weed barrier such as DeWitt Company Typar. Installation would be conducted in accordance with the manufacturer s recommendations. The installed weed barrier would be top-dressed with 4-8 inches of gravel. Bare ground treatment areas would be inspected annually for integrity of the weed barrier and establishment of vegetation within the gravel cover. If at any time during the life of the project, the weed barrier integrity is found to be degraded by evidence of any vegetation perforating the barrier or vegetation becoming established in the gravel layer, PPC would revise this plan in coordination with the
7 BLM to include herbicide treatment of the subject bare ground treatment area. Vegetated Ground Treatments Within the Project area including staging areas and a 150 yard buffer on public lands mechanical treatment as follows would be applied. At each noxious weed encounter location, staking and flagging will be installed for colonies with boundaries, and pin flags of the same color as the flagging will be installed for individual plants. Within areas to be disturbed by construction PPC would dedicate one piece of equipment to excavate weed affected soils for stockpiling and for backfill of weed-affected soils. The equipment may be used elsewhere on the project after washing. In areas where infestations were identified in the field, the contractor would stockpile cleared vegetation and salvaged topsoil adjacent to the area from which they were stripped to eliminate the transport of soilborne noxious weed seeds, roots, or rhizomes. Weed-infested stockpiles would be marked with clearly visible flagging until reclamation, when the contractor would return topsoil and vegetative material from infestation sites to the areas from which they were stripped. In addition, the contractor would not be permitted to move soil and vegetative matter outside of the identified and marked noxious weed infestation areas. Within areas not be disturbed by construction the flagging and in flags will serve as a no entrance zone either on foot or otherwise. The NEPP disturbance area by design will be restricted to the temporary ROW and the staging areas for both public and private lands. Given that construction is scheduled to begin August 1 which is post seed dispersal for most plants, herbicide treatment methods are not likely to be used within the temporary ROW on public and private lands and the 150 yard buffer on public lands. However, based on the results of the spring 2012 Draft Noxious Weed Inventory Report, PPC would coordinate closely with the BLM Noxious Weed Specialist to determine if preconstruction herbicide treatment is necessary. Post-reclamation Methods Treatment methods other than herbicide application, such as mechanical and enhancement measures, would be employed during the reclamation process to facilitate noxious weed control. The clearing, grading where necessary and trenching of the Project ROW, combined with successful reclamation and monitoring, would effectively combat noxious weeds and provide native vegetation a higher potential to out-compete weed species. Additionally, during years of higher-than-average rainfall, noxious weeds can appear in greater numbers than normal. For these reasons, reclamation (through clearing, preparing seedbeds, and seeding of species) of areas containing broadly occurring invasive species is the preferred measure (detailed reclamation measures are described in PPC s Reclamation Plan). Post-construction and reclamation control measures to possibly be employed during monitoring for reclamation success may include one or more of the following methods: Mechanical methods would use hand held equipment to remove the top growth off of noxious weed species. Subsequent over-seeding would be conducted as soon as possible following top growth removal to enhance native species competition. Application of mechanical methods would not be conducted in native habitat areas. 94
8 Herbicide application is an effective means of reducing the size of noxious weed populations. Herbicide application would be limited to the three fenced facilities locations Reclamation Methods Reclamation activities would follow the progress of construction. Reclamation and seeding is addressed in the Reclamation Plan (Appendix A of this EA). Of significant importance to weed control is the need to re-seed areas as soon as possible following site disturbance. Quickly reseeding these areas would reduce the potential for noxious weed invasion. Specific formulations of herbicide to be used, if necessary will be in compliance with the BLM Elko District EA and will be approved for use prior to any application of herbicides Private Landowner Requirements There are no unique or land owner specific requirements known at the time of writing of this NWMP. 3.0 MONITORING Monitoring of noxious weeds would be conducted as part of reclamation monitoring specified in the Reclamation Plan. In all areas affected by Project construction, noxious weeds will be monitored for on an ongoing basis as described in the Reclamation Plan. If infestations of noxious weeds are noted during monitoring activities, site specific treatment methods would be developed by PPC and the BLM. Treatments could include: over-seeding of the areas after noxious weed treatment using methods including herbicide application, and mechanical control. In the event of an infestation, the monitoring schedule described in the Reclamation Plan may become more frequent, if deemed necessary by the BLM. Small infestations are likely to be locally treated with herbicide applications, with a focus on treating individual plants. In the event that a large infestation occurs or reoccurs, an evaluation would be performed to determine what led to the infestation, and a new strategy may be implemented. This evaluation would be made available to relevant local noxious weed supervisory authorities. 3.1 Reclamation Monitoring The overall purpose of a monitoring program is to document whether areas that have been restored are progressing toward the long-term goal of soil stability, appropriate (noxious-weed free) vegetative cover and diversity, and habitat replacement. PPC intends to begin monitoring during the first growing season following construction. Monitoring would be carried out as described in the Reclamation Plan. For all construction spreads, reclamation and associated noxious weed monitoring would begin in the spring of 2013 following 2012 construction. 3.2 On-going Monitoring PPC would maintain ongoing communication with individual land owners, counties, and the BLM regarding noxious weeds within their respective jurisdictions. These parties may also contact PPC to report the presence of noxious weeds. PPC would control all noxious weeds found on BLM lands and include a summary of actions taken in the Reclamation Plan Monitoring Report for that period. PPC 95
9 would provide training for the annual visible pipeline inspector for the identification of noxious weed species. The pipeline inspector would contribute to monitoring reports by documenting noxious weeds observed during normal annual inspections. In this way, the Project ROW would be monitored on an ongoing basis. 4.0 HERBICIDE APPLICATION, HANDLING, SPILLS, & CLEANUP 4.1 Herbicide Application and Handling Herbicide application would be conducted according to the rules, laws and regulations of the BLM and the Nevada Department of Agriculture, (NRS Chapter 555). A Nevada certified applicator would perform the application in accordance with applicable laws and regulations. No treatments will occur without prior coordination with and concurrence of the BLM and affected private landowners. All herbicide applications would follow U.S. Environmental Protection Agency label instructions. Application of herbicides would be suspended if any of the following conditions existed: 96 Wind velocity exceeds 10 miles per hour (mph) during herbicide application Snow or ice covers the foliage of noxious weeds; or Precipitation is occurring or imminent. Vehicle-mounted sprayers (e.g., handgun or boom) would be used mainly in open areas that are readily accessible by vehicle. Hand-application methods (e.g., backpack spraying) that target individual plants would be used to treat small or scattered weed populations in rough terrain. Calibration checks of equipment would be conducted at the beginning of spraying and periodically to ensure that proper application rates were achieved. Herbicides would be transported to the Project site daily with the following provisions: Only the quantity needed for that day s work would be transported; Concentrate would be transported in approved containers only, in a manner that would prevent tipping or spilling, and in a compartment isolated from food, clothing, and safety equipment; Mixing would be done off site and at a distance greater than 200 feet from open or flowing water, wetlands, or other sensitive resources. No herbicides would be applied at these areas unless authorized by appropriate regulatory agencies; and All herbicide equipment and containers would be inspected for leaks daily. 4.2 Herbicide Spills and Cleanup All reasonable precautions would be taken to avoid herbicide spills. In the event of a spill, cleanup would be immediate. Nevada State certified applicators would keep spill kits in their vehicles and in herbicide storage areas to allow for quick and effective response to spills. Items to be included in the spill kit are: Protective clothing and gloves; Adsorptive clay, kitty litter, or other commercial adsorbent; Plastic bags and bucket; Shovel;
10 Fiber brush and screw-in handle; Dust pan; Caution tape; Highway flares (use on established roads only); and Detergent Response to an herbicide spill would vary with the size and location of the spill, but general procedures would include: Controlling traffic, Dressing the clean-up team in protective clothing, Stopping the leaks, Containing the spilled material, Cleaning up and removing the spilled herbicide and contaminated adsorptive material and soil, and Transporting the spilled pesticide and contaminated material to an authorized disposal site. 4.3 Worker Safety and Spill Reporting All herbicide contractors would obtain and have readily available copies of the appropriate material safety data sheets for the herbicides used. All herbicide spills would be reported in accordance with applicable laws and requirements. 97
SECTION 02100 SITE PREPARATION
SECTION 02100 SITE PREPARATION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and General Provisions of Contract, including General Conditions and Supplementary Conditions and Division 1 through Division
Appendix C. Municipal Planning and Site Restoration Considerations
Appendix C Municipal Planning and Site Restoration Considerations 67 68 Appendix C - Municipal Planning and Site Restoration Considerations This appendix contains best practice standards for site planning
REFERENCE. All National Grid personnel who plan and perform work involving protected water resources are responsible for:
EG-30NY ENVIRONMENTAL GUIDANCE PAGE 1 of 9 DATE 10/1/10 EP 3 Natural Resource Protection 1.0 SCOPE AND RESPONSIBILITIES National Grid s New York service territory encompasses thousands of wetlands, lakes,
ALLEGANY WIND POWER PROJECT CONSTRUCTION SPILL PREVENTION PLAN
ALLEGANY WIND POWER PROJECT CONSTRUCTION SPILL PREVENTION PLAN Best Management Practices (BMPs) will be implemented during construction of the Allegany Wind Power Project to prevent and contain spills.
Activity Yes No N/A Notes
CE 2020 (Rev. 12/11) Page 1 of 5 PROJECT NAME AND SITE ADDRESS: CONTRACT NUMBER: ORACLE NUMBER: WDID NUMBER: CONTRACTOR NAME AND ADDRESS: PROJECT SITE RISK LEVEL: Risk Level 1 Risk Level 2 Risk Level 3
SITE-SPECIFIC BEST MANAGEMENT PRACTICES (BMP) PLAN REVIEW CHECKLIST
This checklist may be used by applicants for encroachment permits, and contractors in development of Site- Specific BMP Plans for projects. plan reviewers will use this checklist to review the Site-Specific
SITE-SPECIFIC BEST MANAGEMENT PRACTICES (SSBMP) PLAN/STORM WATER POLLUTION PREVENTION PLAN (SWPPP) REVIEW CHECKLIST
This checklist may be used by applicants for encroachment permits, and contractors in development of Site Specific Best Management Practice (SSBMP) Plans or Storm Water Pollution Prevention Plans (SWPPP)
PHASE 1: Pest Management Plan Development
B.C. Integrated Pest Management Regulations for Forestry, Noxious Weed and Industrial Vegetation Managers Summary of Requirements and Explanatory Notes PHASE 1: Pest Management Plan Development Ministry
IAC 7/2/08 Utilities[199] Ch 9, p.1 CHAPTER 9 RESTORATION OF AGRICULTURAL LANDS DURING AND AFTER PIPELINE CONSTRUCTION
IAC 7/2/08 Utilities[199] Ch 9, p.1 CHAPTER 9 RESTORATION OF AGRICULTURAL LANDS DURING AND AFTER PIPELINE CONSTRUCTION 199 9.1(479,479B) General information. 9.1(1) Authority. The standards contained herein
City of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements
City of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements Overview of the City s Construction Storm Water Program The City of Paso Robles is committed to protecting
SAMPLE FRACTION MITIGATION CONTINGENCY PLAN FOR DIRECTIONAL DRILLING
SAMPLE FRACTION MITIGATION CONTINGENCY PLAN FOR DIRECTIONAL DRILLING 1 TABLE OF CONTENTS 1.0 Introduction and Purpose 3 2.0 Description of Work 3 3.0 Site Supervisor/Foremen Responsibilities 4 4.0 Equipment
United States Depmiment of the Interior Bureau of Reclamation Western Colorado Area Office Grand Junction, Colorado
WCAO-GJ-FONSI -14-01 United States Depmiment of the Interior Bureau of Reclamation Western Colorado Area Office Grand Junction, Colorado FINDING OF NO SIGNIFICANT IMPACT SPURLIN MESA LATERAL OF THE CRAWFORD
Proposed Action: Morrow Flat Substation Construction and Related Improvements Near Boardman, Oregon
DOE F 1325.8 e Electronic Form Approved by CGIR - 01/20/95 (8-89) United States Government memorandum Department of Energy Bonneville Power Administration DATE: August 8, 2014 REPLY TO ATTN OF: KEC-4 SUBJECT:
How To Plan A Buffer Zone
Backyard Buffers Protecting Habitat and Water Quality What is a buffer? A buffer (also called a riparian buffer area or zone) is the strip of natural vegetation along the bank of a stream, lake or other
STORMWATER POLLUTION PREVENTION PLAN TEMPLATE. 1.0 SITE DESCRIPTION 1.1 Project Name and Location Date
STORMWATER POLLUTION PREVENTION PLAN TEMPLATE Disclaimer: This template was developed for guidance purposes only in an effort to assist Construction Storm Water permit applicants in meeting state and local
Chapter 2 Stormwater Pollution Prevention Plan (SWPPP) for Park Operations
SWPPP for Park Operations 2 Chapter 2 Stormwater Pollution Prevention Plan (SWPPP) for Park Operations Bordered by Lake Washington & Lake Sammamish, the City of Bellevue has more than 60 miles of streams,
OSU Extension FACT SHEET
OHIO STATE UNIVERSITY EXTENSION! OSU Extension FACT SHEET Ohio State University Extension, 2120 Fyffe Road, Columbus, OH 43210 Shale Oil and Gas Development Fact Sheet Series A Landowner s Guide to Understanding
WEED MANAGEMENT PLAN FOR. (NAME of PROPERTY or MANAGED AREA) (TOWN or COUNTY, STATE) (TIME PERIOD; e.g. 1996-2000)
(WEED MANAGEMENT PLAN OUTLINE FOR PUBLIC LAND MANAGERS) (Note: This outline is a modification of a weed management plan template produced by The Nature Conservancy) WEED MANAGEMENT PLAN FOR (NAME of PROPERTY
Post-Wildfire Clean-Up and Response in Houston Toad Habitat Best Management Practices
Post-Wildfire Clean-Up and Response in Houston Toad Habitat Best Management Practices Purpose The purpose of this document is to provide guidance and recommendations for minimizing potential impacts to
SE-10 STORM DRAIN INLET PROTECTION. Objectives
STORM DRAIN INLET PROTECTION SE-10 Objectives Erosion Control - EC Sediment Control - SE Tracking Control - TC Wind Erosion Control - WE Non-Storm Water Management - NS Waste and Materials Management -
CRP Mid-Contract Management Option: Integrated Wildlife Management (645)
CRP Mid-Contract Management Option: Integrated Wildlife Management (645) Conservation Practice Job Sheet ID - CRP, JS-20 Revised August 2013 The purpose of mid-contract management activities is to enhance
RECORD OF PLAN CONFORMANCE AND CATEGORICAL EXCLUSION (CX) DETERMINATION
RECORD OF PLAN CONFORMANCE AND CATEGORICAL EXCLUSION (CX) DETERMINATION CX Log #: DOI-BLM-OR-V060-2015-032-CX CE Exemption category: 516 DM 11.9, E.12: Grants of right-of-way wholly within the boundaries
Minimizes sediment and debris from entering storm drains that lead to waterways and watercourses.
4.5-p DRAIN INLET PROTECTION Alternative Names: DI protection, Drop Inlet Protection DESCRIPTION Storm drain inlet (DI) protection slows and ponds stormwater, and filters sediment and debris before it
COLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION
COLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION (1) Project Name: (2) Project Contractor: (3) Erosion Control Supervisor/SWMP Administrator: (4) CDOT Project
Inquiring Minds Want to Know: Questions Landowners Should Ask in Negotiations with Companies Seeking Easements
Inquiring Minds Want to Know: Questions Landowners Should Ask in Negotiations As a property owner, you should make a decision about granting an easement based on the same level of information available
Waste Handling & Disposal
Objectives Cover Contain Educate Reduce/Minimize Product Substitution Description Improper storage and handling of solid wastes can allow toxic compounds, oils and greases, heavy metals, nutrients, suspended
Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department
Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth
Prattsville Berm Removal Project. 1.0 Project Location
Prattsville Berm Removal Project 1.0 Project Location The project site is located between the New York State Route 23 Bridge over the Schoharie Creek and the Schoharie Reservoir. The restoration plan encompassed
DEPARTMENT OF ENVIRONMENTAL QUALITY Environmental Assessment
DEPARTMENT OF ENVIRONMENTAL QUALITY Environmental Assessment Water Protection Bureau Name of Project: Applicant: Ueland Land Development LLC Type of Project: Proposed discharge of treated domestic wastewater
Good? Bad? Why? http://uncultured.com/2007/09/20/notre-dame-and-watering-sidewalks/ Training Module 4
Good? Bad? Why? http://uncultured.com/2007/09/20/notre-dame-and-watering-sidewalks/ Solution Sprinklers should be directed at lawn areas Spraying water on pavement increases runoff Look for more water-efficient
Storm Water Management Requirements for Construction Projects Less than One Acre
Storm Water Management Requirements for Construction Projects Less than One Acre Purpose: UC Irvine s Phase II Small MS4 Storm Water Permit requires construction projects less than one acre in size to
Beseck Switching Station Inspection
Page 1 of 5 Docket No. 272 Development and Management Plan Inspection The Connecticut Light and Power Company Certificate of Environmental Compatibility and Public Need for the construction of a new 345-kV
SECTION 104 PREVENTION, CONTROL, AND ABATEMENT OF EROSION AND WATER POLLUTION
SECTION 104 PREVENTION, CONTROL, AND ABATEMENT OF EROSION AND WATER POLLUTION 104-1 Description. Provide erosion control measures on the project and in areas outside the right-of-way where work is accomplished
City of Shelbyville Site Inspection Checklist
City of Shelbyville Site Inspection Checklist General Information Project Name: KYR10 Permit Number: Date: Project Location: Contractor: Conractor Representative: Inspector's Name: Title: Signature : Weather
CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE
CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE The following template may be used as a general guide for development of a Stormwater Pollution Prevention Plan (SWPPP) for construction activities.
UNIFIED FACILITIES GUIDE SPECIFICATIONS
USACE / NAVFAC / AFCEC / NASA UFGS-31 31 16.13 (November 2014) -------------------------------- Preparing Activity: USACE Superseding UFGS-31 31 16 (August 2008) UNIFIED FACILITIES GUIDE SPECIFICATIONS
Wildlife Habitat Conservation and Management Plan
Wildlife Habitat Conservation and Management Plan For [Applicant Name] [Insert photo of property] Developed in Cooperation with Jane Doe Habitat Conservation Biologist Oregon Department of Fish and Wildlife
Pesticide Spills. Chapter 26. In This Chapter. Keywords. Accidents. Pesticides Act and Environmental Protection Act
Chapter 26 Pesticide Spills In This Chapter Keywords Accidents After learning the information in this chapter, you will be able to: 1. Define a spill. 2. Describe when a spill must be reported to the Spills
Definition of Tower from the Bradley County Zoning Resolution
Definition of Tower from the Bradley County Zoning Resolution 43. TOWER. Any outdoor structure designed and constructed to support one (1) or more transmitting or receiving devices for telephone, radio
A. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems.
19. STORMWATER MANAGEMENT A. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems. The majority of the approximately ±500 acre Property
Mine Plan of Operations Reclamation Bond Checklist
Mine Plan of Operations Reclamation Bond Checklist NOTE: This checklist is provided to assist the operator in calculating the engineering and environmental costs required to properly stabilize, reclaim,
Standard Operating Guideline Pest/Rodent Control
Standard Operating Guideline (SOG) Title: PEST/RODENT CONTROL District Name: Date Prepared: Date Revised: OBJECTIVE: - Ensuring effective system-wide preventive and predictive maintenance actions - Ensure
Preventing Storm Water Pollution: What We Can Do
Preventing Storm Water Pollution: What We Can Do ~Employee Training Series~ Streets and Drainage Maintenance PREPARED IN COOPERATION WITH THE Texas Commission on Environmental Quality AND U.S. ENVIRONMENTAL
Vehicle Tracking Pad
Stormwater Quality Best Management Practices Construction Sites s When to use: Where construction vehicles leave active construction areas onto surfaces where runoff is not checked by sediment controls
S Y S T E M M O D E R N I Z A T I O N
S Y S T E M M O D E R N I Z A T I O N T H E L I N E M B E X T E N S I O N P R O J E C T B A L T I M O R E A N D H A R F O R D C O U N T I E S, M A R Y L A N D Project Overview Columbia Gas Transmission
PIPELINE ROUTING PERMIT. For A NATURAL GAS PIPELINE DAKOTA AND RAMSEY COUNTIES ISSUED TO NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY
PIPELINE ROUTING PERMIT For A NATURAL GAS PIPELINE IN DAKOTA AND RAMSEY COUNTIES ISSUED TO NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY PUC DOCKET No. G002/GP-05-1706 In accordance with the requirements
APPENDIX I DEVELOPMENT PROCESS CHECKLIST
APPENDIX I DEVELOPMENT PROCESS CHECKLIST Bureau of Indian Affairs, Western Regional Office 400 N. 5 th St., Two AZ Center/Phoenix, AZ 85004/Telephone/website PRE-DEVELOPMENT PROCESS CHECKLIST This checklist
Index. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1
6 Index inlet protection excavated drop inlet protection (Temporary) 6.50.1 HARDWARE CLOTH AND GRAVEL INLET PROTECTION Block and gravel inlet Protection (Temporary) sod drop inlet protection ROCK DOUGHNUT
Appendix N Framework Spill Prevention, Containment, and Countermeasures Plan Prepared by: Idaho Power Company 1221 W Idaho Street Boise, ID 83702
Appendix N Framework Spill Prevention, Containment, and Countermeasures Plan Prepared by: Idaho Power Company 1221 W Idaho Street Boise, ID 83702 November 2011 TABLE OF CONTENTS 1.0 PURPOSE... 1 2.0 RESPONSIBILITY
Helen Mercury Mine EE/CA OPINION OF PROBABLE COST
G Cost Estimates Helen Mercury Mine EE/CA Alternative 2: Limited Action 3 Minor Road Improvements 4 Clear & Grub diversion channel areas 5 Surveying 6 Cleanup & Demobilization 7 Pull back of material 8
Colorado Department of Public Health And Environment Hazardous Materials and Waste Management Division
Brian Long Solid Waste Compliance Assurance Unit [email protected] Richard Mruz Hazardous Waste Corrective Action Unit [email protected] Colorado Department of Public Health And Environment
DESCRIPTION OF WORK:
DEPARTMENT OF PUBLIC WORKS COUNTY OF HENRICO P.O. BOX 27032 RICHMOND, VIRGINIA 23273 PERMIT NO. One (1) copy of application and four (4) copies of plans are hereby made to the Director of Public Works
1.7.0 Floodplain Modification Criteria
1.7.0 Floodplain Modification Criteria 1.7.1 Introduction These guidelines set out standards for evaluating and processing proposed modifications of the 100- year floodplain with the following objectives:
Integrated Pest Management, Erosion and Sedimentation Control, and Landscape Management Plan
Integrated Pest Management, Erosion and Sedimentation Control, and Landscape Management Plan Introduction Conventional site and landscape management can have adverse impacts on the surrounding environment
1 INTRODUCTION. Kayenta Complex Page 9 December 2011 Cumulative Hydrologic Impact Assessment
1 INTRODUCTION The Office of Surface Mining Reclamation and Enforcement (OSMRE) is the regulatory authority for coal mining operations under the Surface Mining Reclamation and Control Act of 1977 that
City of West Chicago Community Development Department 475 Main Street, West Chicago, IL 60185 Phone: (630) 293-2200 x 131 / Fax: (630) 293-1257
City of West Chicago Community Development Department 475 Main Street, West Chicago, IL 60185 Phone: (630) 293-2200 x 131 / Fax: (630) 293-1257 APPLICATION FOR DEMOLITION PERMIT Permit Number: Date Received:
Frequently Asked Transmission Pipeline Questions
Frequently Asked Transmission Pipeline Questions Who is PennEast, LLC? PennEast was formed by the partnership of AGL Resources, NJR Pipeline Company, South Jersey Industries and UGI Energy Services (UGIES).
Stormwater/Wetland Pond Construction Inspection Checklist
: Construction Inspection ChecklistsTools Stormwater/Wetland Pond Construction Inspection Checklist Project: Location: Site Status: Date: Time: Inspector: SATISFACTORY/ UNSATISFACTORY COMMENTS Pre-Construction/Materials
King Fire Restoration Project, Eldorado National Forest, Placer and El Dorado Counties, Notice of intent to prepare an environmental impact statement.
This document is scheduled to be published in the Federal Register on 12/24/2014 and available online at http://federalregister.gov/a/2014-30158, and on FDsys.gov [3410-11- P] DEPARTMENT OF AGRICULTURE
Appendix I: BMP Inspection Form CASQA SWPPP Template 91 January2011 BMP INSPECTION REPORT Date and Time of Inspection: Date Report Written: Inspection Type: (Circle one) Weekly Complete Parts I,II,III
BMP-7. A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet.
BMP-7 BMP: STORM DRAIN INLET PROTECTION Definition A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet. To prevent sediment from entering storm drainage systems
CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE
1008 STORM DRAINAGE (3/24/05) 1008.01 PURPOSE To minimize the amount of stormwater runoff resulting from development utilizing nonstructural controls where possible, maintain and improve water quality,
Vehicle Tracking Control (VTC)
Vehicle Tracking Control (VTC) SM-4 Description Vehicle tracking controls provide stabilized construction site access where vehicles exit the site onto paved public roads. An effective vehicle tracking
Chapter 11 Site Rehabilitation and Stabilization
Chapter 11 Site Rehabilitation and Stabilization Chapter 11 Layout: Part 1 - Page 131 Planning Site Rehab Part 2 - Page 132 Controlling Runoff and Capturing Sediment Part 3 - Page 133 Rehab for Crossings
Storm Drain Inlet Protection - IP
Storm Drain Inlet Protection - IP DEFINITION A temporary protective device formed around a storm drain drop inlet to trap sediment. PURPOSE To prevent sediment from entering storm drainage systems, prior
SPILL PREVENTION PLAN
SPILL PREVENTION PLAN ASPHALT BATCH PLANT NIRB FILE # 15XN046 Presented to NIRB September 2015 TABLE OF CONTENTS PAGE 1. SPILL CONTROL PLAN... 1 1.1 RESPONSE EQUIPMENT... 1 1.2 GENERAL PROCEDURES IN CASE
MAGB HEALTH, SAFETY AND ENVIRONMENT GROUP POLLUTION INCIDENT RESPONSE PLAN
MAGB HEALTH, SAFETY AND ENVIRONMENT GROUP POLLUTION INCIDENT RESPONSE PLAN SCOPE: This guidance sets out best practice for producing a Pollution Incident Response Plan to deal with an environmental incident
Developing a Prescribed Fire Burn Plan: ELEMENTS & CONSIDERATIONS
Developing a Prescribed Fire Burn Plan: ELEMENTS & CONSIDERATIONS What s Inside PURPOSE OF A BURN PLAN Goals and Objectives 3 Burn Site Information 3 Site Preparation 3 Prescription 3 Ignition and Holding
Chapter 3 SENSITIVE AREAS AND VEGETATED CORRIDORS
Chapter 3 3.01 General Provisions 3.01.1 Introduction 3.01.2 Application and Interpretation of Chapter 3.01.3 Unbuildable Lots 3.01.4 Other Permits 3.01.5 Prohibited Activities 3.02 Service Provider Letter
APPENDIX 4. Risk Tables
APPENDIX 4 Tables Preliminary Qualitative Criteria The qualitative risk assessment criteria have been developed to identify key risks to the environment, society, heritage and business reputation. The
MULTI-AGENCY COMPENSATORY MITIGATION PLAN CHECKLIST 1
MULTI-AGENCY COMPENSATORY MITIGATION PLAN CHECKLIST 1 Mitigation Goals and Objectives o Describe functions lost at impact site o Describe functions to be gained at mitigation site o Describe overall watershed
FUELING AND FUEL STORAGE
FUELING AND FUEL STORAGE BENCHMARK Implement spill prevention measures whenever fuel is handled or stored. Report, minimize, contain and clean up spills that do occur. FUELING BMPS Spills of diesel, oil,
Storm Drain Inlet Protection
Objectives EC Erosion Control SE Sediment Control TR Tracking Control WE Wind Erosion Control Non-Stormwater NS Management Control Waste Management and WM Materials Pollution Control Legend: Primary Objective
Carlton Fields Memorandum
Carlton Fields Memorandum TO: FROM: RE: DAN WEEDE FRED RUSHING RIPARIAN BUFFER DATE: JULY 26, 2013 BACKGROUND Both the state of Georgia and the city of Atlanta 1 have certain guidelines that must be followed
Underground Commercial Electric Service
Underground Commercial Electric Service SCANA Corporation 2013 Revised: June 2013 Table of Contents SECTION PAGE I. Specification and Requirements 2 A. General B. Definition of Terms C. Company and Developer
CONSTRUCTION MANAGEMENT PLAN REQUIREMENTS MANUAL
CONSTRUCTION MANAGEMENT PLAN REQUIREMENTS MANUAL This manual applies to all development projects within Pitkin County. A Construction Management Plan (CMP) shall be submitted for all projects in Pitkin
Landscape Maintenance
Photo Credit: Geoff Brosseau Description This category includes businesses that provide landscaping and landscape maintenance/gardening services. Pollutant Sources The following are sources of pollutants:
Draft. ATLANTIC COAST PIPELINE, LLC ATLANTIC COAST PIPELINEINE Docket No. PF15-6-000. and
ATLANTIC COAST PIPELINE, LLC ATLANTIC COAST PIPELINEINE Docket No. PF15-6-000 and DOMINION TRANSMISSION, INC SUPPLY HEADER PROJECT Docket No. PF15-5-000 Draft Prepared by July 2015 TABLE OF CONTENTS 1.0
Restoring Anadromous Fish Habitat in Big Canyon Creek Watershed. Summary Report 2002
Restoring Anadromous Fish Habitat in Big Canyon Creek Watershed Summary Report 2002 DOE/BP-00005268-5 November 2002 This Document should be cited as follows: "Restoring Anadromous Fish Habitat in Big Canyon
ITEM 634.90030011- RODENT AND VERMIN CONTROL - INITIAL SURVEY. BAITING AND SANITATION ITEM 634
DESCRIPTION A. Under these items the Contractor shall perform and satisfy the rodent and vermin control (extermination) and site sanitation requirements within construction areas as designated by the engineer.
Florida Department of Environmental Protection
Florida Department of Environmental Protection Background Mobile vehicle and equipment washing involves washing at a location where vehicles are based (such as a trucking company, warehouse, bus station,
Landscape Maintenance
Landscape Maintenance SC-73 Objectives Contain Educate Reduce/Minimize Product Substitution Description Landscape maintenance activities include vegetation removal; herbicide and insecticide application;
Low Impact Development Checklist
New Jersey Stormwater Best Management Practices Manual February 2004 A P P E N D I X A Low Impact Development Checklist A checklist for identifying nonstructural stormwater management strategies incorporated
Environmental Site Inspection Checklist
Note : This form is designed for general use and may not be exhaustive. Modifications and additions may be necessary to suit individual projects and to address specific environmental issues and associated
STATEMENT OF RON HUNTSINGER NATIONAL SCIENCE COORDINATOR BUREAU OF LAND MANAGEMENT U.S
STATEMENT OF RON HUNTSINGER NATIONAL SCIENCE COORDINATOR BUREAU OF LAND MANAGEMENT U.S. DEPARTMENT OF THE INTERIOR BEFORE THE HOUSE APPROPRIATIONS SUBCOMMITTEE ON INTERIOR, ENVIRONMENT AND RELATED AGENCIES
Construction Site Inspection. Inspecting to Keep You in Compliance
Construction Site Inspection Inspecting to Keep You in Compliance Inspection/Monitoring/Reporting Know if your plan is working Document corrective actions Ketchikan A Contractor that destroys their site
Compost-Based Stormwater Best Management Practices Using Compost to Improve Stormwater Management and Erosion Control On Roadsides
Compost-Based Stormwater Best Management Practices Using Compost to Improve Stormwater Management and Erosion Control On Roadsides Chris Newman US EPA Region 5 Chicago, IL Compost-Based BMPs Compost-based
The Fennel Battle on MCB Camp Pendleton: Partnerships and Techniques in Combating the Invasion
The Fennel Battle on MCB Camp Pendleton: Partnerships and Techniques in Combating the Invasion Todd Easley and Deborah Bieber Land Management Branch MCB Camp Pendleton, CA Carl Bell U.C. Cooperative Extension
INFORMATION BULLETIN BUSINESS FLOOD PLANNING AND MITIGATION GUIDE ACE GLOBAL RISK ENGINEERING. Flood risk assessment. Introduction
ACE GLOBAL RISK ENGINEERING INFORMATION BULLETIN BUSINESS FLOOD PLANNING AND MITIGATION GUIDE Introduction The most common cause of flooding is due to established water storage areas (natural and man-made)
Clean Water: Supply side potable water, not wastewater. Gray Water/Sewage: Wastewater originating from a drain (sink, toilet, urinal).
Procedures for Emergency Responses to Flooding and Building Water Intrusion PURPOSE: To establish uniform, sanitary, and systematic procedures for responding to flooding and water intrusion emergencies.
Construction Management Statement. Residential development at Bywell House, St Mary s Hill, Ascot
Construction Management Statement Residential development at Bywell House, St Mary s Hill, Ascot Parking of Vehicles of Site Personnel, Operatives and Visitors Site staff, visitors to the development and
March 2008. Prepared by: Irvine Ranch Water District. 15600 Sand Canyon Avenue. Irvine, CA 92618. Contact: Natalie Likens (949) 453-5633
ADDENDUM TO THE MICHELSON WATER RECLAMATION PLANT PHASE 2 & 3 CAPACITY EXPANSION PROJECT FEBRUARY 2006 FINAL ENVIRONMENTAL IMPACT REPORT AND THE SAN JOAQUIN FRESHWATER MARSH ENHANCEMENT PLAN REVISED SEPTEMBER