1 Quick fix for frost heave: HELICAL PILES Megan Milbradt Civil Engineer Basin Electric Power Shane Vasbinder Civil Engineer Basin Electric Power Concrete piers were 6 inches to 2 feet out of the ground. Notice the frost heave particularly evident on the pier at right. Frost heave created major problems at Basin Electric Cooperative s Logan substation. The busses were at an angle. The light posts were leaning and you could pull some of the fence posts out of the ground by hand. Frost heave was a serious issue at Logan Substation, on the Basin Electric Power Cooperative (Bismarck, North Dakota) system. To compound the problem, the only outages the engineers could get were short and in the spring and fall, when the ground would be thawing or freezing. 2
2 Logan Substation is located on a windswept plain, about 100 miles north of Bismarck, ND, where temperatures vary from -40 F in the winter to 100 F in the summer. The frost line is about five or 6 feet down and the soil is mainly clay. The site was wet to begin with and when the substation was built, in 1979, grading (to level the site) created a bit of a depression that was topped with gravel. Drainage has been a serious issue from the start and frost heave has been an ongoing challenge. Frost heave is a problem throughout the substation; basically everything is moving. Some of the small piers, supporting lights posts, had come up almost 2 feet. It was crazy to see the piers heaved that high out of the ground, says Shane Vasbinder, Civil Engineer, Basin Electric Co-op. The biggest problem was the piers that were supporting the bus-rack structures. The 9-foot concrete piers weren t rising uniformly and the equipment on the racks was at an angle. A Need for Speed In 2010, the situation had gotten to the point that something had to be done, but Basin Electric s engineers were not sure what to do. They did not want to move the structures or expend the time or effort needed to remove and replace the existing 9-foot concrete piers. One approach the engineers considered was to remove the structures, grind down the existing piers, pour two concrete piers (one on each side) and then install a beam across the two. The structures could then be re-erected in the same spot. While it would work in theory, it was not a practical solution. They would not be able to get the necessary outages needed to pour concrete and let it harden. Getting an outage was going to be a challenge. Basin Electric is a GT co-op that provides power to 135 member co-ops. Its total territory covers 540,000 square miles and stretches from Canada to Mexico. Member companies provide power to 2.8 million consumers in nine states. Logan is a 230kV and 115kV transmission substation, providing power to native load and member co-ops. Logan Substation feeds a number of critical regions. As the lines go west, they feed all the new oil development areas. We just can t take extended outages, says Vasbinder. Besides, the only time dispatchers could arrange an outage was during low-load times (the soonest was in October) late enough in the year that freezing temperatures and snow storms were a real possibility. Basin Electric needed another solution. A light post at the station sticking about 18 out of the ground. As the superstructures move, conductors connected to them are stretched, including those connected to the substation ground grid. We had used the A.B. Chance (Hubbell Power Systems, HPS) Helical Piles before to fix transmission structures in the middle of winter and that looked like our best option. We couldn t take a long, extended outage to go in and pour concrete, says Vasbinder. If we used Helical Piles, we could drill the anchors down and, later that day or the next day, put the structures back up. We could get a whole area done in a week, at most. That was about as long of an outage we could get. Further, we could work in October and not worry about heating enclosures for concrete, so we went with the Helical Piles. Helical Piles: Fast and Winter Friendly To begin, Basin Electric contacted Lee Goen, Senior Chance Anchoring Application Engineer, for help. The co-op was able to provide all the necessary load information, including vertical 3
3 (or axial) overloads and turning moments. The axial loads were minimal, but, due to strong winds at the site, the moment loads were significant. And, Basin Electric provided bore logs from the site that let me determine the strength of the soil, so I could pick out the right pile, says Goen. It was possible to replace each foundation with a single Helical Pile, but Basin Electric s engineers decided to install two, on either side of the original foundation, perpendicular to the frame. They installed a grade beam across the two and re-erected the structures in the original locations. First, spotting the precise location for a Helical Pile s lead section, then the drive tools engage the box coupler at its top. The Helical Piles used at Logan Substation are 14-feet long, consisting of two 7-foot sections, so they could be installed while nearby bus-work was still in place. (That area of the substation was, obviously, de-energized.) An Aggressive Schedule After taking off the top 2 feet of the existing concrete foundation, the contractor installed two Helical Piles one on either side. Working with the dispatchers, Basin Electric was able to schedule a few outages. The engineers broke the work into phases and hired High Mark (Piedmont, SD) to install the Helical Piles. The concrete foundations had not heaved at the same rate. Some of them were up more than others. In some less serious cases, we just adjusted the cross members, so that they and the equipment on them were level, again. In more serious cases, we had to replace the concrete piers with Helical Piles and re-install level structures, says Megan Milbradt, Civil Engineer, Basin Electric Coop. When the lead section is torqued into the ground, the Helical Pile s baseplate section is added by bolting together their box couplers. Then the proper drive tool is attached and the entire Helical Pile is torqued to grade. We decided to focus on the worst foundations, first. We looked at our survey and picked a number of foundations that had heaved significantly and were in groups. We had one area with eight foundations that were in really bad shape and decided to fix those during the first outage to see how it went, explains Milbradt. We got the first outage in October It was cold at that time, but the ground wasn t completely frozen, says Milbradt. 4
4 After the Helical Piles were installed, a welded grade beam was bolted across the pair. To align the beam s middle plate so the bus structure could be re-installed where it originally was, a magnetic-base drill was used to locate appropriate bolt holes in the pier bases. Vertical alignment is maintained by using a carpenter s level periodically during the process. Hubbell Power Systems sent a representative, Jason Herron, out to the field to help us get started and oversee the contractor... just in case we ran into any problems, which we didn t. We have a really good working relationship with Hubbell Power Systems, says Milbradt. It is not unusual for AB Chance (HPS) to send a representative to a job site, says Jason Herron, Chance Anchoring Application Engineer. I went out the day before they installed the piles. On the first day, the workers took down the bus work and began demolition of the concrete piers. On the second day, High Mark workers started installing the Helical Piles. I was there to answer any questions and help with the installation, because this particular contractor had 5
5 never installed our Helical Piles before. So, I directed them on how to put the tooling together and how to attach it to their drill rig. It isn t hard to get a new contractor up to speed. The biggest thing is working with their equipment. Most people think that whenever you install a Helical Pile, you need a large drill rig or something similar. This contractor came out with this large drill rig and that is not typically what an installer needs. The contractors that install a lot of Helical Piles usually install a torque motor on a skid steer loader, or for these larger diameter piles, they will generally put a higher capacity torque motor on an excavator, says Herron. Helical Piles have to be installed at a certain rate typically eight to 20 revolutions per minute. For every revolution the anchor will embed itself 3 inches into the ground. If you drill too fast, it will have the effect of auguring the hole out. You are actually disturbing the soil and you don t get the bearing pressure you need. If you go too slowly, you are just wasting your time. At Logan Substation, the equipment (designed to drill holes) was turning a bit too fast. So, we had to work with the operator to get it slowed down. Typically, this is achieved by adjusting the flow rate on the machine or slowing the RPM or the machine. They made the adjustments and averaged about 14 revolutions per minute, says Herron. During the first outage, work began on Tuesday and finished on Saturday. In that time, the co-op finished eight foundations and that included removing the structures, jack-hammering out a couple feet of the existing foundations and clearing the site, drilling in the Helical Piles and putting the structures back up. During a second outage in October, Basin Electric Co-op completed work on ten more foundations. Then, winter arrived in earnest and a third outage, scheduled for December, had to be cancelled. The rest of the work will be completed in the spring. Overall, using the Helical Piles was a good solution for us. Most importantly, we didn t need long outages. The expense was most likely less than pouring concrete and we didn t have to pour concrete in cold weather. We got the results we needed, says Milbradt. For more information, consult your Hubbell Power Systems terrritory manager or visit 6
Transmission Foundations Case History : Helical piles Hydro One Networks Inc.
Transmission Foundations Case History : Helical piles Hydro One Networks Inc. www.hubbellpowersystems.com Late in 2008, an aerial patrol discovered three 500kV towers with partially-collapsed foundations
New construction Repairing failed or old foundations Retrofit foundations Permanent battered piers Machinery/equipment foundations
from New construction foundations don t have to be a headache. The CHANCE Helical Pier Foundation System gives you the performance of concrete without the drawbacks and liabilities of driven piles and
LEGACY REPORT ER-5110. www.icc-es.org. ICC Evaluation Service, Inc. Reissued November 1, 2003. Legacy report on the 1997 Uniform Building Code
LEGACY REPORT Reissued November 1, 2003 ICC Evaluation Service, Inc. www.icc-es.org Business/Regional Office # 5360 Workman Mill Road, Whittier, California 90601 # (562) 699-0543 Regional Office # 900
System. Stability. Security. Integrity. 150 Helical Anchor
Model 150 HELICAL ANCHOR System PN #MBHAT Stability. Security. Integrity. 150 Helical Anchor System About Foundation Supportworks is a network of the most experienced and knowledgeable foundation repair
Cold Weather Concrete Practices
Cold Weather Concrete Practices The Information below is an outline of common practice for residential foundation placement and winter construction utilize Edmonton and surrounding Area. Conditions in
Designed and Engineered to Perform
History EARTH CONTACT PRODUCTS, L.L.C., is a family owned company, based in Olathe, Kansas. This company was built upon Don May s U.S. Patented fourth-generation Steel Piering System that has led to the
Transmission Foundations. helical piles and guy anchors for transmission structures. www.hubbellpowersystems.com
Transmission Foundations helical piles and guy anchors for transmission structures www.hubbellpowersystems.com Grid locked on your transmission job? Instant Foundation helical piles go places concrete
PTS HELICAL PIERS INSTALLATION SPECIFICATIONS NOTICE
FORM A PTS HELICAL PIERS INSTALLATION SPECIFICATIONS NOTICE The following suggested specifications are written as a guide to assist the specifier in writing his own specifications. Specific circumstances
ATLAS RESISTANCE Pier Foundation Systems
ATLAS RESISTANCE Pier Foundation Systems Foundation Repair Systems for Civil Construction Applications: Residential, Commercial, Industrial Atlas Resistance Piers have been used to restore and/or stabilize
Foundation Experts, LLC Specializes in Foundation Repair and Waterproofing
1 Most basements show some signs of leaking and cracking. Through the years, problems with water, poor soils, grading, drainage and possible settling affect the integrity of a basement. Being able to recognize
ENGINEERED FOUNDATIONS. Department of Public Works Jeff Hill, PE
ENGINEERED FOUNDATIONS Department of Public Works Jeff Hill, PE What is an engineered foundation. A Foundation Design Developed by a Trained Professional (Engineer) Types of Foundations (All of which can
Chapter 3 Pre-Installation, Foundations and Piers
Chapter 3 Pre-Installation, Foundations and Piers 3-1 Pre-Installation Establishes the minimum requirements for the siting, design, materials, access, and installation of manufactured dwellings, accessory
SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS
July 14, 2015 1.0 GENERAL BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS This work shall consist of furnishing all materials, equipment, labor, and incidentals necessary for conducting bi-directional
symptoms of a faulty foundation
symptoms of a faulty foundation How does drought impact your home's foundation? For many Texas families, their home becomes the single largest investment and also the family fortune. The home's foundation
The Stabilizer TM. Benefits. www.griptite.com. Supplemental support system for sagging beams and floor joists within a crawl space
The Stabilizer TM Supplemental support system for sagging beams and floor joists within a crawl space Pre-drilled holes in steel plate allow for connection to beam or floor joists. Benefits Levels and
High Capacity Helical Piles Limited Access Projects
High Capacity Helical Piles Limited Access Projects Tel 403 228-1767 Canada, USA, Russia Brendan ODonoghue 519 830-6113 Presentation Summary 1. Helical piles Background on large diameter shafts and helices
Pump Skid Fabrication for Magnetic Coupling. Rick Soltis Chief Mechanic City of Bedford
Pump Skid Fabrication for Magnetic Coupling Rick Soltis Chief Mechanic City of Bedford Contents Magnetic Couplings What They Are, How They Work, Where They re Used Fabrication and Manufacturing of Pump
A Solid Foundation Solution for Homeowners. from. Our products are made with 90% Recycled Material Down. Right. Solid. GREEN.
A Solid Foundation Solution for Homeowners from Our products are made with 90% Recycled Material Down. Right. Solid. GREEN. Stop the damaging effects of foundation settling... Sinking foundations, cracked
High Strain Dynamic Load Testing of Drilled Shafts
Supplemental Technical Specification for High Strain Dynamic Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (9/15) September 3, 2015 1.0 GENERAL This work shall consist of performing high-strain
SECTION 1 GENERAL REQUIREMENTS
Page 1 of 6 SECTION 1 GENERAL REQUIREMENTS 1. SCOPE OF WORK: The work to be performed under the provisions of these documents and the contract based thereon includes furnishing all labor, equipment, materials,
Stability. Security. Integrity.
Stability. Security. Integrity. PN #MBHPT Foundation Supportworks provides quality helical pile systems for both new construction and retrofit applications. 288 Helical Pile System About Foundation Supportworks
Helical Pier Foundations
Screw piers are a cost-effective option for steep sites and expansive soils Helical Pier Foundations FOR PROBLEMSITES SITES Our company, HighCraft Builders in Fort Collins, Colo., specializes in room additions
Up-Down Construction Utilizing Steel Sheet Piles and Drilled Shaft Foundations
Up-Down Construction Utilizing Steel Sheet Piles and Drilled Shaft Foundations Nathan A. Ingraffea, P.E., S.E. Associate, KPFF Consulting Engineers, Portland, Oregon, USA Abstract The use of steel sheet
ITEM #0702770 OSTERBERG CELL LOAD TESTING OF DRILLED SHAFT
ITEM #0702770 OSTERBERG CELL LOAD TESTING OF DRILLED SHAFT Description: This work shall consist of furnishing all materials, equipment and labor necessary for conducting an Osterberg Cell (O-Cell) Load
International Greenhouse Company
Greenhouse Foundation Design As with any building, a good solid foundation is crucial for the long term durability and functionality of your greenhouse. A weak foundation will cause your greenhouse to
Baton Rouge Foundation Repair
Baton Rouge Foundation Repair 13822 Florida Blvd Bldg 3 Baton Rouge, LA 70819 Baton Rouge Foundation Repair offers services to correct the settlement of both Slab foundations and Pier & Beam foundations
The minimum reinforcement for the stem wall is the placement of:
PolySteel creates an ideal insulated stem wall for concrete slabs that can make this part of your project easier and faster, in addition to making your finished project more energy-efficient. Figures 3.20
TYPES OF PIERS USED IN NORTH AND EAST TEXAS RESIDENTIAL FOUNDATION REPAIR
TYPES OF PIERS USED IN NORTH AND EAST TEXAS RESIDENTIAL FOUNDATION REPAIR If you listen to the hype, it sounds like there must be 20 or 30 different types of piers out there. Company A says they have an
It's large enough to handle most welding job shop projects, yet small enough to make it a worth while home-workshop tool
It's large enough to handle most welding job shop projects, yet small enough to make it a worth while home-workshop tool H Craft Print Project No. 272 ERE'S a metal bender that will enable you to bend
Soils, Foundations & Moisture Control
Soils, Foundations & Moisture Control Soil The top loose layer mineral and/or organic material on the surface of the Earth that serves as a natural medium for the growth of plants and support for the foundations
Hyperlinks are Inactive
Prepared by: NIB/EOB PLANNING GUIDE FOR SINGLE CUSTOMER SUBSTATIONS SERVED FROM TRANSMISSION LINES 05503 Department: Electric T&D Section: T&D Engineering and Technical Support Approved by: G.O. Duru (GOD)
Assembly Instructions for the InteliTrack 3000 Rail Tracking System
Assembly Instructions for the InteliTrack 3000 Rail Tracking System InteliTrack is a trademark of Sedona Solar Technology. Sedona Solar Technology 16 April 2013 1 1. Before you begin WARNING Safety equipment
ALIGNMENT. Pump and Driver Alignment
ALIGNMENT Pump and Driver Alignment Alignment Subject: Pump and Driver Alignment In the pump business alignment means that the centerline of the pump is aligned with the centerline of the driver. Although
Engineered, Time-Tested Foundation Repairs for Settlement in Residential and Light Commercial Structures. The Leading Edge.
TM TM Engineered, Time-Tested Foundation Repairs for Settlement in Residential and Light Commercial Structures. SM The Leading Edge. 10 One Major Causes of foundation settlement or more conditions may
POST AND FRAME STRUCTURES (Pole Barns)
POST AND FRAME STRUCTURES (Pole Barns) Post and frame structures. The following requirements serve as minimum standards for post and frame structures within all of the following structural limitations:
Residential Foundations and Basements
Residential Foundations and Basements Disclaimer All of the following information is based on the 2006 International Residential Code with Kentucky Amendments. As some information is paraphrased, article
Homeowner s Guide Foundation Water PenetrationTips TIPS TO IDENTIFY WATER PENETRATION PROBLEMS / CRACKING BASEMENTS
Homeowner s Guide Foundation Water PenetrationTips TIPS TO IDENTIFY WATER PENETRATION PROBLEMS / CRACKING BASEMENTS MAINTAINING YOUR HOME BASEMENT FOUNDATION BY HOMEOWNER PREVENTATIVE MAINTENANCE LUX WATERPROOF
For a Coastal Site. A Pier-and-Beam Foundation. Our company specializes in oceanfront
A Pier-and-Beam Foundation For a Coastal Site Where unstable soil and periodic tidal flooding are a concern, helical piers topped with a concrete stem wall rise to the challenge by Fred Ambrose Our company
Section 02702 SEWER PIPE INSTALLATION AND TESTING
PART 1 - GENERAL Section 02702 SEWER PIPE INSTALLATION AND TESTING 1-1. SCOPE. This section covers the installation and testing of all sewer pipe furnished under the following specification sections: Concrete
Materials. Estimating Steel. Players. Materials. Shop Drawings. Detailing Process. Standard shapes. Fabricated members, Built-up sections
Materials Standard shapes W sections, C channels, Structural T, Angles, Pipes, Tubes, Rods and Plates Fabricated members, Built-up sections Adding plates to beam flanges, Stiffeners to beam webs Built
DIVISION OF WATER QUALITY CONSTRUCTION GRANTS & LOANS SECTION FAST TRACK AUDIT CHECKLIST
DIVISION OF WATER QUALITY CONSTRUCTION GRANTS & LOANS SECTION FAST TRACK AUDIT CHECKLIST CERTIFICATION 1. Did the engineer submit a certificate of completion utilizing the appropriate page of the issued
EAST LYME HIGH SCHOOL
Overview: 1971 N 1966 GYM 1966 CLASSROOM WING 1966 AUD. 1971 GYM 1998 1998 POOL EAST LYME HIGH SCHOOL Original 1966 Building: The original East Lyme High School was constructed in 1966 and was composed
Industry Track Inspection
Industry Track Inspection Track Supervisor Phone Number 1 TABLE OF CONTENTS INTRODUCTION 3 GAUGE 4 ALINEMENT 6 TRACK SURFACE 8 BALLAST 11 CROSSTIES 13 DEFECTIVE RAILS 16 RAIL JOINTS 17 TURNOUTS 18 OTHER
Proposed Action: Morrow Flat Substation Construction and Related Improvements Near Boardman, Oregon
DOE F 1325.8 e Electronic Form Approved by CGIR - 01/20/95 (8-89) United States Government memorandum Department of Energy Bonneville Power Administration DATE: August 8, 2014 REPLY TO ATTN OF: KEC-4 SUBJECT:
Building Pluto Subwoofers with Large PVC Pipe
Building Pluto Subwoofers with Large PVC Pipe I decided to make the Pluto subwoofers from 10-12 diameter PVC pipe. It seemed to me that these would be a better visual match to the Plutos themselves. The
PC-Concrete Injectable Concrete Anchoring and Repair System
PC-Concrete Injectable Concrete Anchoring and Repair System DESCRIPTION: PC-Concrete is a two component (1:1 ratio), 100% solids, high modulus, structural epoxy paste. PC-Concrete is a solvent free, no
Uniform Construction Code (UCC) Manufactured Homes. Modular Homes. Building Permit Application Package
Uniform Construction Code (UCC) Manufactured Homes (Single-Wide, Double-Wide) Modular Homes Building Permit Application Package Per the Uniform Construction Code (UCC) all structures must be built per
Table 4.9 Storm Drain Inlet Protetion Applicable for
BMP C220: Storm Drain Inlet Protection Purpose To prevent coarse sediment from entering drainage systems prior to permanent stabilization of the disturbed area. Conditions of Use Type of Inlet Protection
Standards Committee T echnical Technical Conference
Standards Committee Technical Conference Agenda Overview of claims costs Years 0 2 claims and resolutions Years 3 10 claims What are we commonly seeing now? An example of what we might see in future? Summary
ROTATING MACHINES. Alignment & Positioning of. Fast, easy and accurate alignment of rotating machines, pumps, drives, foundations, etc.
Alignment & Positioning of ROTATING MACHINES Fast, easy and accurate alignment of rotating machines, pumps, drives, foundations, etc. To compete in today s marketplace, you have to outperform your competitors
Embedded Parts Introduction - Anchors
In the plant construction or process plants such as chemical, petrochemical, gas or power plants various disciplines are brought into contact and built on each other. Civil, mechanical, electro technical
5/1/2013. Topics. The challenge is to better maintain native characteristics of soils during and after construction
PIN Foundations Topics Applications Design and Construction Flow Control Credits www.pinfoundations.com Copyright 2008, Pin Foundations, Inc. Curtis Hinman WSU Extension Faculty, Watershed Ecologist [email protected]
Safe & Sound Bridge Terminology
Safe & Sound Bridge Terminology Abutment A retaining wall supporting the ends of a bridge, and, in general, retaining or supporting the approach embankment. Approach The part of the bridge that carries
LIFE SCIENCE. Hoop House Construction for New Mexico: 12-ft. x 40-ft. Hoop House BRINGING TO YOUR HOME ECONOMICS COLLEGE OF AGRICULTURE AND
Hoop House Construction for New Mexico: 12-ft. x 40-ft. Hoop House COLLEGE OF AGRICULTURE AND HOME ECONOMICS BRINGING SCIENCE TO YOUR LIFE Hoop House Construction for New Mexico: 12-ft. x 40-ft. Hoop House
Building Permit Application Packet. BUILDING CODES Adopted by La Plata County For Enforcement In The Unincorporated Areas Of La Plata County
Building Permit Application Packet The purpose of Building Codes is to establish the minimum requirements to safe guard the public health, safety and general welfare through structural strength, means
BMP-7. A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet.
BMP-7 BMP: STORM DRAIN INLET PROTECTION Definition A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet. To prevent sediment from entering storm drainage systems
SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DEEP FOUNDATIONS
Page 1 of 9 SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DEEP FOUNDATIONS 1. GENERAL REQUIREMENTS 1. Description of Work: This work consists of furnishing all materials, equipment and
Metropolitan Builders Association Masonry & Concrete Standard
Metropolitan Builders Association Masonry & Concrete Standard Background Masonry and concrete work in residential construction often provides the base structure upon which the house is built or as a veneer.
Section 2100-Trenching and Tunneling
SECTION 5200 - STORM SEWER PART 1 - GENERAL 1.01 SCOPE: This Section covers installation of storm sewer mains and culverts. Topics include permits and fees, trench widths, pipe laying, bedding, initial
Structural Foundation System
Structural Foundation System SLABTEK, a technological advancement in foundation designs for residential and lightweight commercial structures SlabTek is a patent allowed process for concrete foundations
Instruction Manual 19/9/01. Flat Roof Carport
Flat Roof Carport Thank you for choosing this quality carport. We strongly recommend that you read these instructions thoroughly. The carport you are building may vary from a carport previously bought
Page B-1 Hubbell Power Systems, Inc. All Rights Reserved Copyright 2014 LOAD TESTS
Page B-1 Hubbell Power Systems, Inc. All Rights Reserved Copyright 2014 Appendix B CONTENTS STATIC (TIEBACKS)... B-3 STATIC AXIAL (COMPRESSION/TENSION)... B-6 STATIC (LATERAL)... B-9 CAPACITY VERIFICATION
Whitepaper. Modular Substation Cable Termination Design. Author: Allan Bozek P.Eng, MBA, EngWorks Inc, Calgary, Canada
Whitepaper Modular Substation Cable Termination Design Author: Allan Bozek P.Eng, MBA, EngWorks Inc, Calgary, Canada Abstract The methods for cable penetrations into modular industrial substations are
How to Design Helical Piles per the 2009 International Building Code
ABSTRACT How to Design Helical Piles per the 2009 International Building Code by Darin Willis, P.E. 1 Helical piles and anchors have been used in construction applications for more than 150 years. The
Elevating Your House. Introduction CHAPTER 5
CHAPTER 5 Elevating Your House Introduction One of the most common retrofitting methods is elevating a house to a required or desired Flood Protection Elevation (FPE). When a house is properly elevated,
Preventing water damage in the basement
Preventing water damage in the basement Thousands of home insurance claims are filed every year. Some losses are major, others aren t, but they re always an inconvenience and usually avoidable! As prevention
The Ultimate Guide To Protecting Your House From Water In The Basement
The Ultimate Guide To Protecting Your House From Water In The Basement Table of Contents 3 Causes of Water in the Basement!... 3 Reason Number 1: Poor Grading!... 3 Reason Number 2: Improper Drainage!...
SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.
02150-1 of 6 SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING 02150.01 GENERAL A. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily
Comprehensive Design Example 2: Foundations for Bulk Storage Facility
Comprehensive Design Example 2: Foundations for Bulk Storage Facility Problem The project consists of building several dry product storage silos near an existing rail siding in an open field presently
PUSD High Frequency Word List
PUSD High Frequency Word List For Reading and Spelling Grades K-5 High Frequency or instant words are important because: 1. You can t read a sentence or a paragraph without knowing at least the most common.
DIVISION: 31 00 00 EARTHWORK SECTION: 31 63 00 BORED PILES REPORT HOLDER: HUBBELL POWER SYSTEMS, INC.
0 ICC ES Report ICC ES (800) 4 6587 (56) 699 054 www.icc es.org 000 Most Widely Accepted and Trusted ESR 794 Reissued 05/05 This report is subject to renewal 05/06. DIVISION: 00 00 EARTHWORK SECTION: 6
DESIGNING STRUCTURES IN EXPANSIVE CLAY
DESIGNING STRUCTURES IN EXPANSIVE CLAY A GUIDE FOR A RCHITECTS AND E NGINEERS Table of Contents 1. Introduction Page 1 2. Common Foundation Systems Page 2 3. Drilled Piers Page 3 a. Skin Friction Piers
Wood Projects Outdoors. Post Hole Specifications. Deck Span Tables. www.jon Eakes.com
Wood Projects Outdoors Post Hole Specifications & Deck Span Tables www.jon Eakes.com Building Fences The depth of the fence posts into the ground must be at least one foot below the frost level for your
AXIS system used to install gravity flow sewer Laser-guided boring technology capable of pinpoint, on-grade accuracy
AXIS system used to install gravity flow sewer Laser-guided boring technology capable of pinpoint, on-grade accuracy The City of Kitchener, Ontario, Canada, was in a dilemma. After repeated breakdowns
TECHNICAL SPECIFICATIONS CONCRETE SIDEWALKS, DRIVEWAYS AND CURB AND GUTTER
TECHNICAL SPECIFICATIONS CONCRETE SIDEWALKS, DRIVEWAYS AND CURB AND GUTTER I. Scope of Work Work done under this item shall consist of the construction, reconstruction, or alteration of a one-course Portland
Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation
Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation Jeff R. Hill, P.E. Hayward Baker Inc. 111 W. Port Plaza Drive Suite 600 St. Louis, MO 63146 314-542-3040 [email protected]
Chapter 2. My Early Days Trading Forex
Chapter 2 My Early Days Trading Forex I want to talk about my early days as a Forex trader because I m hoping that my story will be something you can relate to. So it doesn t really matter if you are brand
METHOD OF STATEMENT FOR STATIC LOADING TEST
Compression Test, METHOD OF STATEMENT FOR STATIC LOADING TEST Tension Test and Lateral Test According to the American Standards ASTM D1143 07, ASTM D3689 07, ASTM D3966 07 and Euro Codes EC7 Table of Contents
The quadrature signals and the index pulse are accessed through five 0.025 inch square pins located on 0.1 inch centers.
Quick Assembly Two and Three Channel Optical Encoders Technical Data HEDM-550x/560x HEDS-550x/554x HEDS-560x/564x Features Two Channel Quadrature Output with Optional Index Pulse Quick and Easy Assembly
IH-635 MANAGED LANES PROJECT, SEG. 3.2
IH-635 MANAGED LANES PROJECT, SEG. 3.2 Location: Dallas, Texas Owner: Texas Department of Transportation Client: Ferrovial Agroman Construction Cost: $1 Billion Construction Completion Date: December,
by Greg DiBernardo Working With Helical Piers Steel piles are an affordable foundation option for small jobs and tricky sites
by Greg Diernardo Working With Helical Piers Steel piles are an affordable foundation option for small jobs and tricky sites My deck company builds about 50 projects a year. That s a lot of footings, especially
MHI. Overview of Manufactured Home Installation MANUFACTURED HOUSING INSTITUTE. This guide contains an overview. of the HUD-Code manufactured home
MANUFACTURED HOUSING INSTITUTE Overview of Manufactured Home Installation This guide contains an overview of the HUD-Code manufactured home installation process. This is only a guide, and it is recommended
COLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION
COLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION (1) Project Name: (2) Project Contractor: (3) Erosion Control Supervisor/SWMP Administrator: (4) CDOT Project
How To Retaining Wall Guide
How To Retaining Wall Guide Before you start: Consents and Engineering Building Consent Retaining walls over 1.5m high will require a building consent from the Local Body Council. Walls that carry extra
LARGE DIAMETER PIPELINE INNOVATIVE FAST TRACKED REPAIR
LARGE DIAMETER PIPELINE INNOVATIVE FAST TRACKED REPAIR ABSTRACT Phil Hubbard, P.E., HRSD Paul Wilson, P.E., Brown and Caldwell* Mark Harber, P.E., Brown and Caldwell *301 Bendix Road, Suite 400 Virginia
Twist Drill Grinding Attachment By Steven Skiprat Jackson June 2009
Twist Drill Grinding Attachment By Steven Skiprat Jackson June 2009 Part 1. About the tool Part 2. Mounting the tool Part 3. Using the tool Part 1. About the tool This little gadget while not a precision
DTU Animal Cart Programme
DTU Animal Cart Programme TECHNICAL 21 RELEASE PIPE AND ROLLER DONKEY CART AXLES Development Technology Unit, Department of Engineering, University of Warwick, Coventry, CV4 7AL UK, tel: +44 (0)1203 523523
Seven. Easy Steps. Your Own Walkway, Without Mortar. or Concrete. to Installing. Driveway and Patio
Seven Easy Steps to Installing Your Own Walkway, Driveway and Patio Without Mortar or Concrete Brick is one of the world s oldest and most enduring building materials. Those same qualities also make it
How To Prepare A Geotechnical Study For A Trunk Sewer Project In Lincoln, Nebraska
APPENDIX B Geotechnical Engineering Report GEOTECHNICAL ENGINEERING REPORT Preliminary Geotechnical Study Upper Southeast Salt Creek Sanitary Trunk Sewer Lincoln Wastewater System Lincoln, Nebraska PREPARED
DIRT DWELLING. and your. www.pinfoundations.com. Pin Foundations Inc., 2008
DIRT and your DWELLING 2008 Pin Foundations Inc., 2008 If we accept that preserving soil in its native condition is necessary, then how do we build? Utilities? Roads? Foundations? Typical Strip, Transfer,
MAINTENANCE OF WHEELMOVE IRRIGATION SYSTEMS
MAINTENANCE OF WHEELMOVE IRRIGATION SYSTEMS F. Richard Beard, Agricultural Equipment, Structures and Electricity Robert W. Hill, Biological & Irrigation Engineering Boyd Kitchen, Uintah County Extension
Structures Construction Pre-Work Checklist PRE-WORK SHEET FOR PROJECT MANAGERS
Structures Construction Pre-Work Checklist PRE-WORK SHEET FOR PROJECT MANAGERS 1 Proposal & Plans Received? 2 Review Proposal, highlight important facts. Know proposal well to be able to find answers quickly.
Report on. Wind Resistance of Signs supported by. Glass Fiber Reinforced Concrete (GFRC) Pillars
Report on Wind Resistance of Signs supported by Glass Fiber Reinforced Concrete (GFRC) Pillars Prepared for US Sign and Fabrication Corporation January, 2006 SUMMARY This study found the attachment of
6 RETROFITTING POST & PIER HOUSES
Retrofitting Post & Pier Houses 71 6 RETROFITTING POST & PIER HOUSES by James E. Russell, P.E. 72 Retrofitting Post & Pier Houses Retrofitting Post & Pier Houses 73 RETROFITTING POST AND PIER HOUSES This
Overhang Bracket Loading. Deck Issues: Design Perspective
Deck Issues: Design Perspective Overhang Bracket Loading Deck overhangs and screed rails are generally supported on cantilever brackets during the deck pour These brackets produce an overturning couple