1 Damage Assessment Report "Water and Waste Water Infrastructure and Facilities" (Gaza; 27 Dec Jan. 2009) Jan. 2009

2 TABLE OF CONTENTS Page Acknowledgement INTRODUCTION METHODOLOGY TARGETED FACILITIES AND INFRASTRUCTURES DAMAGES CLASSIFICATIONS DAMAGES ASSESSMENT FORM FOR FIELD SURVEY DAMAGES ASSESSMENTS IMPLEMENTATION PLAN FAST TRACK INTERMEDIATE TRACK LONG TERM PLAN.. 8 ANNEXES

3 Acknowledgement Coastal Municipalities Water Utility (CMWU) would like to highly appreciate the exceptional interventions of the World Bank, UNRWA, ACF, UNICEF and OXFAM during the Israeli Military Operation in distributing water and fuel in various inaccessible locations, especially in Gaza and Northern areas. It s also important to highlight the readiness that presented some of the financing agencies such as the World Bank, QRC, UNDP, KFW, ANERA, OCHA, UNICEF, Oxfam, ACH, and others to finance the CMWU Recovery Plan based on the Damage Assessment Report. A special thanks to the PWA management team who helps in the material coordination access to Gaza with Israeli side and helps in accomplished the damage assessment report for NGEST. 1

4 1.0 INTRODUCTION Coastal Municipalities Water Utility (CMWU) is the service provider for all water and wastewater services through out all Gaza strip governorates. CMWU has funded partners such as World Bank, EU, KFW, UNICEF, Care, ICRC, ACF, OCHA, QRC and others, also CMWU has a very good cooperation with other working agencies in the area such as UNRWA and EWASH group. On 27 December 2008 at about 11 o clock in the morning, the Israeli aircrafts started shelling Gaza Strip from the air, and the military Israeli boats were shelling Gaza Strip coast all over the shore line, afterwards the Israeli tanks starts invading the Gaza Strip from different locations, the war has lasted for 22 days, then the cease fire has started on 18 January During the Israeli offensive war in the Gaza Strip, CMWU has submitted all the water and waste water facilities coordinate locations to the ICRC agency to coordinate with the Israeli military to avoid shelling these locations which will lead to severe humanitarian crisis if water is stopped supplying or if wastewater flooding happens in case of targeting these locations. Even though, some were targeted directly by F16 air strike rockets and military tanks. However, during the Israeli Military Operation, the CMWU in cooperation with the ICRC, UNRWA, OCHA and PWA tried to obtain the IDF green light to enter some sites in order to fix damages occurred during the IDF Military Operations (MO), but unfortunately all the efforts were without success; except for a week before cease fire when we managed to refuel BLWWTP Infiltration PS. Therefore, the CMWU in its Press Release a week after the IDF-MO announced its complete incapability to keep providing its services for the inhabitants of the Gaza Strip and a list of reported damaged locations were identified. After the cease-fire, CMWU took the lead towards repairing and surveying the damages in all water and waste water infrastructure facilities all over the Gaza Strip in cooperation with its partners to prepare for a Recovery Plan. However, as a fast track and in order to re-establish some of the main water and sewage carriers, henceforth provide minimum services to the most affected areas (Mostly in Gaza and Northern Area), UNICEF and ICRC allocated emergency budget beside GEWP and its additional finance (World Bank Fund) in order to repair damages occurred in the incursion areas. 2

5 CMWU team has carried out a comprehensive field survey in the damaged areas to produce this report for damage assessment in order to be presented to our partners. This report is summarizing the descriptive damage assessment and informative data sheets and photos related to damaged sites and facilities, where all physical, technical faults and damages have been recorded with detailed requirements of technical and financial estimates required to rectify and relief the situation as per the indicative implementation time table. 2.0 METHODOLOGY After the cease fire declaration, several technical and administrative teams have been formed by CMWU to carry out detailed physical, technical and environmental survey to assess various damages occurred during the period of Israeli Military Offensive in the Gaza Strip for water and wastewater infrastructure and facilities. Several types of damages have been assessed and classified for various elements of water and wastewater facilities and infrastructures affected during the Israeli offensive war occurred through out all Gaza Strip Governorates. 2.1 TARGETED FACILITIES AND INFRASTRUCTURES The following facilities and infrastructures including all associated elements and systems listed here below shall be assessed and evaluated with respect to different types of damages: Water wells and its associated systems Water reservoir Water distribution networks Wastewater pumping stations Wastewater treatment plants Wastewater collection networks and its associates Administrative and operation buildings and stores Vehicle and trucks Staff and employees 3

6 2.2 DAMAGES CLASSIFICATIONS Damages assessment report is provided for all types of damages whether it is physical or operational damages which affecting the continuity of services and the level of interruptions. Facilities, structures and civil works damages Mechanical and electrical damages Water and wastewater networks and its associates. Operational damages and interruptions Environmental damages Logistical damages Lost of life for employees and operators 2.3 DAMAGES ASSESSMENT FORM FOR FIELD SURVEY The designated field survey form is configured to include for the following items and details: Date of assessment Name of assessment team work General description of event Damage location and site Type of damages as per each anticipated system Damage magnitude (Serious, Moderate, Light) Descriptive and quantified recovery needs as per each damage type Damage photos Unseen damages need further investigation and tests Damage Assessment field survey form has been initiated and included as per the attached annexes. 3.0 DAMAGES ASSESSMENT Based on the field survey form that filled by the CMWU different teams during and after the Israeli Military Offensive war on the Gaza Strip, a total damages estimates reaches up to 6 Million $ USD as a preliminary figure so far and it may become more since every day there are some new damages found in other areas of the Gaza Strip which still under construction debris. 4

7 The estimated cost of the damages encountered are based on the availability of materials in the local market, where as the materials are not found at the time being due to the closure of commercial borders, the damages repair can not take place. Table 1 and 2 represent the damages categories and type encountered during the IDF- MO. The tables show that the water and waste water network have the largest damages value between the other categories because the tanks were excavating the lands while they were moving and its value reaches up to 44% of the total damages encountered. Table 1: Damages and Estimated Cost Per Categories Damages Type Estimated Cost USD$ Water wells 381,500 Water Network Distribution 1,792,490 Waste water Network Distribution 834,750 Waste water Facilities 134,000 Water Tanks 625,000 Expected Un seen Damages especially in Rafah were the vibration bombs used may destroyed 450,000 the nearby networks Services (Water and Waste water) to be provided for re-allocated peoples 750,000 Civil Work, Equipment and Material Damages 570,000 Contingency 250,000 NGEST Damages 183,950 Total USD $ 5,971,690 The field survey shows that three new wells have been totally destroyed in Jabalia and Beit Hanoun where those wells were supplying more than 50,000 inhabitants with water. As well as waste water facilities such as Gaza Waste Water Treatment Plant (GWWTP) and North Gaza Emergency Sewage Treatment (NGEST) have also severe damages in their basins and inlet pressure pipe lines. The assessment also includes an estimation amount of the unseen damages in Rafah which is resulted from the vibration bombs. 5

8 Table 2: Damages and Estimated Cost Per Locations Damages Type Governorate Area Estimated Cost USD$ Beit Hanoun 126,000 Water wells North Beit Lahia 5,000 Jabalia 202,000 Gaza Gaza 48,500 North North 264,963 Gaza Gaza 130,897 Water Network Distribution Middle Middle 16,080 Khan Younis Khan Younis 21,890 Rafah Rafah 186,485 valves and fitting material damages All Over Gaza Strip 1,172,175 Beit Hanoun 36,000 North Beit Lahia 500,000 Waste water Network Distribution Jabalia 26,000 Gaza Gaza 139,750 Rafah Rafah 133,000 Beit Hanoun 10,000 North Waste water Facilities Beit Lahia 24,000 Gaza Gaza 100,000 North Jabalia 600,000 Gaza Gaza 10,000 Water Tanks Mograga 10,000 Middle Wadi Salqa 5,000 Expected Un seen Damages especially in Rafah were the vibration bombs used All Over Gaza Strip 450,000 may destroyed the nearby networks Services (Water and Waste water) to be provided for re-allocated peoples All Over Gaza Strip 750,000 Civil Work, Equipment and Material Damages All Over Gaza Strip 570,000 Contingency All Over Gaza Strip 250,000 NGEST Damages North Gaza Emergency Sewage Treatment Plant 183,950 Total USD $ 5,971,690 Details of the damages descriptive, type, location and images can be found in the Annexes 6

9 4.0 IMPLEMENTATION PLAN As a result of the damages assessment survey, an implementation plan is required to re-establish the water and waste water facilities to the normal services especially in the most affected areas (Northern area, Gaza city and Rafah). Three tracks has been followed to achieve our target plan which are, (i) fast track, (ii) intermediate and (iii) long term track, each one of the those tracks are summarized in the following sections; 4.1 FAST TRACK (DONE AND IN PROGRESS) This track concerns in the re-establishing some of the main water and sewage carriers damage in order to provide minimum services to the most affected areas especially in the Gaza and Northern area. This track has been followed from the first week of the IDF-MO in the Gaza Strip with the cooperation with the ICRC, UNRWA, OCHA and PWA agencies in trying to get a green light from the IDF to enter the damaged sites in order to fix the damages and run back the services. Even though, the IDF refuse to do so, CMWU kept trying with our partners until one week before cease fire where CMWU team could manage in re-filling fuel in BLWWTP Infiltration Pumping Station beside repair the damages in the carrier pipe line in El Naser - Rafah. This track has been fully supported by our partners UNICEF and ICRC who allocated a direct emergency budget beside GEWP World Bank finance in order to repair damages. After the cease fire there were an important measures and actions which have been taken in order to maintain the water and waste water services running trying to avoid any environmental and health catastrophe especially where mixing of water and waste water may happen, as well as flooding of sewage in areas of broken main pressure sewage pipes. A summary of these measures and its status are summarized in tables 3 and 4. 7

10 Table 3: Fast Track Activities in Waste Water Waste Water Activities Activity Status 12 sewage carrier in Salah Khalaf Street in Gaza finished 14 sewage carrier between PS9 and PS7B in Gaza finished Repair of the generator and electrical panel of PS Mashroaa in Beit Lahia finished PS4 electrical repair in Beit Lahia finished 16 sewage carrier from Beit Hanoun main PS to BLWWTP on-going 24 sewage carrier between PS7B and GWWTP on-going Embankment of the anaerobic lagoon no 3 in GWWTP on-going Table 4: Fast Track Activities in Water Water Activities Activity Status 12 carrier pipe line from Safa wells group to Gaza city finished Re-operate Naaja wells finished fix Shiekh Ejleen2 electrical connection finished Installation of electrical motor in Zohor Well in Jabalia finished 10 carrier pipe line from Mograga wells group to Nusseirat finished Carrier pipe lines repairs in Fukhari and Naser Villages finished Additional financing is required to complete this track and ensuring that the services of water and waste water are running. 4.2 INTERMEDIATE TRACK The concept of this track will be in areas where partially destruction of the water and waste water facilities by preparing project packages from the assessment damages data sheet for bidding as National Shopping. The finance of these projects will be part of World Bank support under GEWP and other donors (QRC, UNDP, UNICEF, ACF, ) 4.3 LONG TERM PLAN Some of areas have been totally destroyed buildings, water and waste water infrastructure and other facilities. These areas are mostly in Beit Lahia, Jabalia, Beit Hanoun, part of Zaitoun area in Gaza city, south of Rafah and Eastern Villages. Those areas needs a complete water and waste water infrastructure which may require re-designing the networks based on the new population in the area. The design will take place during debris removal and in cooperation with Ministry of Housing. 8

11 These projects will be formulated to be financed through GEWP - World Bank and CMWU other partners. 9

12 Annexes Water and Waste Water Facilities Damages Assessment

13 Damage Assessment Form for Field Survey

14 Palestinian National Authority Gaza Emergency Water Project Funded By The World Bank السلطة الوطنية الفلسطينية مشروع مياه غزة الطارئ الممول من البنك الدولي Damage Assessment Form Date Infrastructure : Area: Services Category : Site: General Description of Damages Recovery Time List of Damages Description : Utilities and Services (List Affected utilities): List Affected Hardware: Building structure (List Affected areas): Personnel (List affected employees): List other affected resources : Overall damage magnitude (Serious,Moderate,Light): Other Assessment Information regarding damage events : Prepared by :

15 Damage Assessment Detail

16 Water Wells Damage Assessment Water and Waste Water Facilities Damages Assessment

17 Beit Hanoun Area Well No Well Name Damages Details Q (m3/hr) Pump type Water Wells Damages Assessment (January 2009) Engine HP Reparis Details C/79 Awqaf Electrical engine damage 100 Vertical 75 Supply and install 75hp Electrical engine with all cables to be connected to the control panel 7,000 7 Days Repair the 6 in Manifold and the hydrocyclone 10,000 Supply and install a new generator with 100KVA perkins or caterpillar including electrical cables from the generator to the electrical control panel of the well 40,000 Supply and install a new and complete electrical control panel including all fittings 10,000 Refurbishment, overhauling and replacement of borehole and vertical turbine water pumping 20,000 set The well facility is totally C/155 Khadiga 70 Vertical Day damage Complete building for the well including all electrical and lightining in the building (100m 2 area) 15,000 Supply and install a 3000 diesel tank including epoxy painting and tank foundation 8,000 Supply and install a chlorination tank (500L) and its dosing pumps including all related accessories 8,000 Supply and install blockwork boundary wall with 60m long with 2m heigh including steel main gate with 360X200cm. All works include plastering and painting 8,000 Sub Total USD$ 126,000 Estimated price $ Time Frame

18 Beit Lahia Area Water Wells Damages Assessment (January 2009) Well No Well Name Damages Details Q Engine Estimated Time Pump type Reparis Details (m3/hr) HP price $ Frame A/180 Ghaben Civil work damage Repair the hole (120X140cm) in the ceiling including plastering and painting 1, Batteries damages Change 2 batteries with the 160AH 1,000 3 Days Repair the holes in the eastern wall including plastering and painting 1,000 D/67 Atatra Civil work damage 140 Repair the main gate door and surrounding civil work 1,000 7 Days Repair the bathroom civil and mechanical work 1,000 Sub Total USD$ 5,000

19 Water Wells Damages Assessment (January 2009) Jabalia Area Well No Well Name Damages Details Q (m3/hr) Pump type Engine HP Reparis Details Drill a complete groundwater well-18" diameter borehole with all associated 14 inches diameter screen filters and shell pipes of 90 meters depth Supply and install complete vertical turbine water pumping unit of 8" diameter vertical discharge pipes,discharge head,drive shafts,bowels,impellers and all assocaited fittings and accessories - pumping rating of 150m3/hr & 12 bar Estimated price $ 40,000 30,000 Time Frame Supply and install a complete 8 inches water pumping Manifold and a complete hydrocyclone 12,000 Supply and install 150hp eectric drive motor with all associated fittings and accessories 15,000 Q/40A and Q/40 Namar Well The 2 well facilities are Supply and install a new generator with250kva perkins or caterpillar including electrical 150 Vertical 100 Group totally damage cables from the generator to the electrical control panel of the well 40, Days Supply and install a new and complete electrical control panel including all fittings and accessories 15,000 Complete building for the well including all electrical and lightining in the building (60m2 area) 10,000 Supply and install a 3000 diesel tank including epoxy painting and tank foundation 8,000 Supply and install 8 inches diameter cement lined steel pipes to connect served area 8,000 Supply a spare parts and tool kit to be used in the well facility 8,000 Supply and install a chlorination tank (500L) and its dosing system including all related accessories 5,000 D/75 Zohour Electrical engine damage Supply and install an electrical engine with 100 hp 9, Vertical 100 Electrical damages Repair the electrical network in the well facility including supply and install new cables 2,000 7 Days Sub Total USD$ 202,000

20 Gaza Area Water Wells Damages Assessment (January 2009) Well No Well Name Damages Details Q Engine Estimated Time Pump type Reparis Details (m3/hr) HP price $ Frame Submersible pump Supply and Install a complete Submersible pump with all its accessories 8,000 Electrical engine Supply and install 40hp Electrical engine with all cables to be connected to the control panel 4,000 R/113A 4in Manifold diameter and Supply and install a 4in Manifold diameter and a complete Hydrocyclone 10,000 Sh. Ejleen 4 Hydrocyclone 70 Submersible Days (Ashgal) Steel door with 140X220cm Supply and install a complete Steel door with 140X220cm including painting 2,000 Steel window with Supply and install a complete Steel window with 80X200cm with steel frame including steel 80X200cm painting 2,000 Chlorination room damage Supply and install hollow block for chlorination room size 2.5X2.5m including building, plastering and painting as well as supply and install a steel window and door as required 4,000 R/265 Building damages Repair the eastern wall of the well building 1,000 Sh. Ejleen 3 90 (Weqaai) Supply and install a complete Steel window with 80X140cm with Steel frame including steel Windows damages 1,500 painting 7 Days R/277 Generator damage _perkins Supply and install a new generator with 110KVA perkins or caterpillar including electrical Sh. Ejleen 5 6, KVA 70 Submersible 40 cables from the generator to the electrical control panel of the well (Barcelona) Diesel Tank (3000L) Repair the Diesel tank from the holes and test its funcionality 2,000 7 Days Sh. Rad. Clinic Sh. Radwan Clinic Truss Damages 60 Submersible Repair the holes in the eastern truss 1,500 3 Days Maslakh Generator damages and Supply and install two batteries of 105 AH and repair of damaged electrical and mechanical 2,500 batteries systems for generator Al Hadaba Well building fabric damages 70 Vertical 60 Repair and rehabilitation of damaged building civil works 2, Days /Maslakh Electrical damages and Supply and install electrical cabling to connect electric drive motor and to replace damaged 2,000 cabling cables 4x70mm2 Sub Total USD$ 48,500

21 Water Wells Damages Assessment (January 2009) Water Wells Damages Assessment By Area Area Estimated price $ Beit Hanoun Area Beit Lahia Area Jabalia Area Gaza Area Total USD$ 381, ,000 5, ,000 48,500

22 Water Tanks Damage Assessment Water and Waste Water Facilities Damages Assessment

23 Water Tank Damages Assessment (January 2009) Gov Area Type Capacity (m3) Damage Detials Repair details Estimated price $ Time Frame North Jabaila Circular Ground concrete tank 5000 Totally damage Supply and install a circular concrete ground tank with a capacity of 5000 m3 including the water network from the tank to the main water network feeders 600, Days Gaza Johr Deek Damages part of the water tank reservoir 350 Middle Mograga Damages part of the water tank reservoir 350 Middle Wadi Salqa Damages part of the water tank reservoir 350 Partially damage Partially damage Partially damage Repair the damages in the water tanks, the work includes all civil and mechanical work associated Repair the damages in the water tanks, the work includes all civil and mechanical work associated Repair the damages in the water tanks, the work includes all civil and mechanical work associated 10, Days 10, Days 5, Days Total USD $ 625,000 Water Tanks

24 Water Networks Damage Assessment

25 Water Network Damages By Governorates (January 2009) Gov. Damaged Material Type Length (m) Time Frame 160mm Upvc mm Upvc mm PE " Steel 500 North Gaza Middle Khan Younis Rafah 225mm Upvc mm MDPE " Steel 500 6" Steel " Steel " Steel 500 6" Steel mm Upvc mm Upvc mm PE mm Upvc 80 10" Steel mm Upvc mm Upvc mm Upvc " Steel mm Upvc 20 50mm PE mm Upvc mm Upvc mm Upvc 50 8" Steel " Steel mm Upvc mm Upvc mm Upvc mm Upvc 50 50mm PE mm Upvc Days 30 Days 7 Days 14 Days 30 Days

26 Water Networks Damages Assessment (January 2009) Water Networks Pipes Material Type Damages Damaged Pipes Material Type Length (m) Estimated Price $ 50mm MDPE 1,000 10,000 50mm PE 10, , mm Upvc 2,360 56, mm Upvc 1,110 42, mm Upvc , mm Upvc , mm Upvc ,000 3" Steel 500 7,500 4" Steel 250 5,500 6" Steel 2,000 60,714 8" Steel ,500 10" Steel ,000 12" Steel 1, ,000 Sub Total USD$ 620,315 Valves and Fittings Material Type Damages Damaged Fittings Material Type Unit Estimated Price $ Gate Valve 6" Gate Valve 4" Gate Valve 10" Gate Valve 12" Complete manholes 1.25m Complete manholes 1.0m Manhole slab with cover 1.25m Manhole slab with cover 1.0m House connections Repair collars S.Steel 4" Repair collars S.Steel 6" Repair collars S.Steel 8" Repair collars S.Steel 10" Repair collars S.Steel 12" Straight Coupling (dresser) 4" Straight Coupling (dresser) 6" Straight Coupling (dresser) 8" Straight Coupling (dresser) 10" Straight Coupling (dresser) 12" Flanged Dresser 4" Flanged Dresser 6" Flanged Dresser 8" Flanged Dresser 10" Flanged Dresser 12" Bolts and nuts 5/8" 6-10cm Gaskets 4" Gaskets 6" Gaskets 8" Gaskets 10" Gaskets 12" Supply and install all material and fittings required to connect 10,000 household service connection including meters 10,000 1,000,000 Sub Total USD$ 1,172,175 Total USD$ 1,792,490 Water Networks

27 Waste Water Networks Damage Assessment Water and Waste Water Facilities Damages Assessment

28 Waste Water Network Damages Assessment (January 2009) Street Name Area Gov Damage Detials Repair details Estimated Time price $ Frame 14in Galvanized Steel Pressure pipe with length of 30m is damage Supply and install 30m Galvanized steel pressure pipe with 14in diameter, including all fittings and others 5,000 Sewage distribution and collection of size 4 and 6in is damage Supply and install 100m 4in and 6in to replace the damaged ww networks, the work includes all required fittings and manholes 10,000 Sekka St. near Main station Supply and install 20m concrete pipe with 18in diameter, including all fittings 18in concrete pipe with length of 20m is damage and manholes required Beit Hanoun 3, Days Circular concrete manhole with diameter of 1.5m and deep of 2.5m Supply and install the damaged manhole 3,000 Supply and install 100m 4in and 6in to replace the damaged ww networks, the Sewage distribution and collection of size 4 and 6in is damage work includes all required fittings and manholes 10,000 Beit Hanoun North Forcemain of Beit Hanoun sewage in BLWWTP is damage Repair sewage forcemain from Beit Hanoun to BLWWTP 5,000 3 Days Beit Lahia Beit Lahia Waste water network distribution and collection were totally damages including manholes destructions the work will include supply and install manholes as required, the work is also incll fittings required 500,000 Dardona Masood Intersection Scattered segments of wastewater networks is damage and manholes Repair and fix the existing sewage pipeline including Manholes 3, Days End of Mahkama Road 8" sewage pipeline is damage Repair and fix 8" sewage pipeline 1,000 Jabalia Jabal Alkashef 400m of 8in sewage network is damage and some manholes ring and covers is also damaged Supply and install 400m sewage network with 8in diameter, the work including all fittings required and repairing and installing manholes covers and rings 22, Days 14in UPVC pressure pipe with length of 15m is damage Supply and install 15m UPVC pressure pipe with 14in diameter, including all fittings and manholes required 2,250 Industrial St. (Fawayda area) 2 concrete manholes with steel covers size 1.5m are damage Supply and install the damaged manhole including the steel covers The wet Pit is full of sands and concrete Clean Wet Pit 2,500 1,000 Tal Elhawa area Sheikh Ejleen GWWTP Gaza Gaza Fuel Tank has some holes 2000m of sewage network is damage 10 concrete manholes and their steel covers are damage size 3m deep and 1.5m diameter 14in UPVC pipeline with length of 10m is damage The manholes has been broken in PS6 The manholes has been broken in PS7B The sewage pressure line from PS7B towards GWWTP has been damaged Pond 3 in GWWTP basins has broken due to shellings Repair the damages in the fuel tank 1,000 Supply and install 2000m UPVC pipe with different sizes 4, 6, and 8in diameter, including all fittings and manholes required 80,000 Supply and install the damaged manhole including the steel covers 10,000 Supply and install 10m UPVC pipeline with 14in diameter, including all fittings required 1,000 Install 1.5M Diameter manhole rings each one meter height for the existing Air release valve for the force Maine from Samer (PS 6) to Treatment Plant 1,000 Install 1.5M Diameter manhole rings each one meter height for the existing Air release valve for the force Maine from 7B to Treatment Plant 1,000 Repair 900 mm sewage forcemain from PS 7B to GWWTP Repair the existing embankment of the third anaerobic pond No 3 10,000 30, Days Different areas in Rafah Municipal Area Rafah Rafah 50m Damages in PVC pipe 12" Supply and install the 50m Damages in PVC pipe 12" 50m Damages in PVC pipe 10" Supply and install the 50m Damages in PVC pipe 10" 50m Damages in PVC pipe 8" Supply and install the 50m Damages in PVC pipe 8" 20m Damages in PVC pipe 6" Supply and install the 20m Damages in PVC pipe 6" 3 Manholes Concrete 125cm diameter has been damaged Supply and install 3 Manholes Concrete sized 125cm diameter 500 Household service connection has been damaged Supply and install all material and manholes required to connect the 500 household service connection 10,000 7,000 5,000 2,000 9, , Days Total USD$ 834,750 WW_Networks

29 Waste Water Facilities Damage Assessment Water and Waste Water Facilities Damages Assessment

30 Waste Water Facilities Damages (January 2009) Gov Area Damage Detials Repair details North Estimated price $ Destruction of service room at north Beit Hanon small Repair the destruction 10,000 7 Days Beit Hanon pumping station (7.5 kw) Generator Electrical Control Panel damage in Sewage Repair the generator (160KVA Perkins) and its control panel 4,000 pumping Station 7 Days Civil work damage in Sewage pumping Station Repair the civil work in the operation room including plastering and painting 5,000 Beit Lahia Mahader P S, the bar screen space is damaged Repair the destruction 5,000 4 Days El Mashroo P S generator's control panel destruction in Bait Repair the destruction 10, Day Lahia Time Frame Gaza Gaza GWWTP Montada P S No. 1 partial destruction of the building and the manifold, the pump room is full of debris Repair the destruction 20, Day Adam P S No. 2, same as P S No. 1 Repair the destruction 20, Day El Fawayda P S No. 9 the pump station is full of debris and Repair the destruction 50, Day the wet pit needs cleaning, and the manifold needs repairing Biotower pumps No. 1 and 4 has been damaged + High and Low electrical pressure line has been destorid Supply and Install biotower pumps instead of the damaged including their control panels 10, Days Total USD$ 134,000 Sewage Facility

31 North Gaza Emergency Sewage Treatment (NGEST) Damage Assessment

32 DAMAGE DESCRIPTION It is worthy to mention that both the TPS and PM contracts were supposed to be handed over early January 2009, and IB on mid January 2009 (if remaining materials crossed to Gaza.) 1. INFILTRATION BASINS a. Service rooms: The services rooms at the infiltration basin 1,2,4,6 and 8 have been completely damaged especially the upper part of the chambers which were subjected directly by the Israeli bulldozers, and tanks, the bulldozers have deliberately destroyed, the upper part of the chambers which include the block and concrete works, the finishing works, plastering, doors, windows and lifting cranes. Large quantities of rubble have entered into the under ground part of the chambers and may have caused damage to the on/off valve, this has to be checked latter after removing the debris. It is noticed that the chambers damaged are located on the northern part of the access road while the other 4 chambers were not hit because of the existence of trench excavated a long the southern site of the access road which most likely prevented the bulldozers from reaching far chambers. b. Electrical control room: This control room was located near infiltration basin no.1; it is 12 m. steel containers furnished to accommodate the electrical panel unit and air compressor unit, in addition to the services and operator room. The container was pushed by the bulldozers and dragged to the embankment of infiltration basin no.1, it was difficult at this stage to estimate the exact damages but it seems that the panel subjected to severe damage. c. Contractor s sits offices: 9 site offices containers have been completely damaged, these offices were equipped with computers sets, office furniture and some engineering equipments levels and (Total station approximate cost $ ) and stock project materials. d. PMU fuel tank storages: 3000 liters diesel tank storages used to be utilized by the PMU staff have been completely damages all the Diesel were poured out, the tank and its containers was dragged and thrown into basin no.1, which result in polluting the ground

Water Sector Damage Assessment Report

Water Sector Damage Assessment Report Water Sector Damage Assessment Report This Report has been prepared in full coordination and cooperation with August 204 Dedication To the souls of the seven Municipal Water Technicians who were killed

More information

Damages Assessment Report Water and Wastewater Infrastructure (Gaza Strip; 7 July - 14 August 2014)

Damages Assessment Report Water and Wastewater Infrastructure (Gaza Strip; 7 July - 14 August 2014) Assessment Report and Infrastructure (Gaza Strip; 7 July - 14 August 2014) August 2014 Table of Contents 1. Acknowledgment... 1 2. Introduction... 2 3. Methodology... 4 4. Assessment... 6 5.... 8 5.1 Urgent

More information

Speeding up relief, recovery and reconstruction in post-war Gaza

Speeding up relief, recovery and reconstruction in post-war Gaza UNITED NATIONS SEMINAR ON ASSISTANCE TO THE PALESTINIAN PEOPLE Speeding up relief, recovery and reconstruction in post-war Gaza PLENARY II: Resolving Gaza s critical water crisis United Nations Office

More information

BILL OF QUANTITY ENGINEERING & MANAGEMENT CONSULTING CENTRE "BEIT HANOUN EMERGENCY WATER SUPPLY PROJECT" CONSTRUCTION OF KHADEJA STORAGE TANK, WELL,

BILL OF QUANTITY ENGINEERING & MANAGEMENT CONSULTING CENTRE BEIT HANOUN EMERGENCY WATER SUPPLY PROJECT CONSTRUCTION OF KHADEJA STORAGE TANK, WELL, LOT # 1 "BEIT HANOUN EMERGENCY WATER SUPPLY PROJECT" CONSTRUCTION OF KHADEJA STORAGE TANK, WELL, AND BOOSTER PUMPING STATION AT BEIT HANOUN BILL OF QUANTITY ENGINEERING & MANAGEMENT CONSULTING CENTRE PREAMBLE

More information

50AI01oe 02/15. Labko GRP cesspools. Instructions for installation, operation and maintenance

50AI01oe 02/15. Labko GRP cesspools. Instructions for installation, operation and maintenance 02/15 Labko GRP cesspools Instructions for installation, operation and maintenance Reliable solutions Wastewater treatment systems Contents 1 LABKO CESSPOOLS... 3 1.1 GENERAL... 3 1.2 IMPORTANT TO KNOW

More information

SANITARY SEWER SPECIFICATIONS

SANITARY SEWER SPECIFICATIONS SANITARY SEWER SPECIFICATIONS OCTOBER 2003 HARVEST-MONROVIA WATER, SEWER, AND FIRE PROTECTION AUTHORITY SECTION 1.00 1.10 Purpose The purpose of this document is to assemble the sewer specifications, policies,

More information

SECTION 02400 - STORM DRAIN SYSTEM

SECTION 02400 - STORM DRAIN SYSTEM SECTION 02400 - STORM DRAIN SYSTEM CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement And

More information

1.3.2 Method of construction and restoration of existing water service connections. This shall include:

1.3.2 Method of construction and restoration of existing water service connections. This shall include: 1.0 GENERAL 1.1 DESCRIPTION: This specification shall cover the rehabilitation of existing water lines using the GRUNDOCRACK PIPE BURSTING SYSTEM. Pipe bursting is a system by which the pneumatic bursting

More information

Detailed Infrastructure Damage Assessment

Detailed Infrastructure Damage Assessment Detailed Infrastructure Damage Assessment GAZA - 2014 Photo credit: UNDP image bank - by Shareef Sarhan Table of Contents 1. Introduction... 05 2. The Assessment... 07 3. Results of the Detailed Infrastructure

More information

Emerging Technologies in Wastewater Collection Systems

Emerging Technologies in Wastewater Collection Systems Keville Enterprises Emerging Technologies in Wastewater Collection Systems Douglas McCutchen, CCM Brian Karmasin, P.E., BCEE CMAA Annual Conference Oct 2008 San Francisco, California Today s s Presentation

More information

Buildings Construction Procurement Strategy

Buildings Construction Procurement Strategy Buildings Construction Procurement Strategy Graham Strickleton Site, Buildings and Power supplies Procurement Manager JOURNEE DEDIEE AUX INDUSTRIELS ET AUX MEMBRES DU RESEAU A.P.I Disclaimer: these slides

More information

MAINTENANCE OF SMALL WATER SUPPLY, SANITATION AND IRRIGATION SCHEMES

MAINTENANCE OF SMALL WATER SUPPLY, SANITATION AND IRRIGATION SCHEMES MAINTENANCE OF SMALL WATER SUPPLY, SANITATION AND IRRIGATION SCHEMES John van Rijn INDEVELOPMENT MAINTENANCE OF SMALL WATER SUPPLY, SANITATION AND IRRIGATION SCHEMES Any part of this publication may be

More information

Homes destroyed or severely damaged in Gaza

Homes destroyed or severely damaged in Gaza Occupied Palestinian Territory: Gaza Emergency Situation Report (as of 13 July 2014, 1500 hrs) This report is produced by OCHA opt in collaboration with humanitarian partners. It covers the period from

More information

Special Specification 7021 Water Main and Sewer Line Replacements

Special Specification 7021 Water Main and Sewer Line Replacements Special Specification 7021 Water Main and Sewer Line Replacements 1. DESCRIPTION Furnish, install, or replace water pipe, water valves, water meters and boxes, water service connections, fire hydrant assemblies,

More information

CHAPTER 2 QUANTITY TAKE-OFF

CHAPTER 2 QUANTITY TAKE-OFF CHAPTER 2 QUANTITY TAKEOFF The quantity takeoff is an important part of the cost estimate. It must be as accurate as possible and should be based on all available engineering and design data. Use of appropriate

More information

Septic Tank to Cistern Conversions. Saving Water & Saving Money

Septic Tank to Cistern Conversions. Saving Water & Saving Money Florida Keys Aqueduct Authority 1100 Kennedy Drive Key West, Florida 33040 Septic Tank to Cistern Conversions Saving Water & Saving Money One of the benefits of connecting to the Central Wastewater System

More information

Project : CONSTRUCTION OF BUILDING(including electrical and plumbing works) FOR NATIONAL CENTRE FOR SUSTAINABLE COASTAL MANAGEMENT,CHENNAI

Project : CONSTRUCTION OF BUILDING(including electrical and plumbing works) FOR NATIONAL CENTRE FOR SUSTAINABLE COASTAL MANAGEMENT,CHENNAI Project : CONSTRUCTION OF BUILDING(including electrical and plumbing works) FOR NATIONAL CENTRE FOR SUSTAINABLE COASTAL MANAGEMENT,CHENNAI TENDER CLARIFICATIONS- no 3 dated 3rd Oct 13 issued in response

More information

MAP KEYS GLOSSARY FOR THE DRAINAGE AND WATER REPORT

MAP KEYS GLOSSARY FOR THE DRAINAGE AND WATER REPORT Record MAP KEYS GLOSSARY FOR THE DRAINAGE AND WATER REPORT Abandoned Gravity Private Combined Gravity Private Foul Gravity Private Surface Water Gravity Public Combined Gravity Public Foul Gravity Public

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 1100 SLIP-LINING SANITARY SEWERS

San Antonio Water System Standard Specifications for Construction ITEM NO. 1100 SLIP-LINING SANITARY SEWERS ITEM NO. 1100 SLIP-LINING SANITARY SEWERS 1100.1 DESCRIPTION: This item shall consist of slip-lining sanitary sewer pipe, which is accomplished by pulling or pushing liner pipe into existing sewers by

More information

PRODUCT SELECTOR Pollution Control, Pumping and Rainwater Harvesting Systems

PRODUCT SELECTOR Pollution Control, Pumping and Rainwater Harvesting Systems PRODUCT SELECTOR Pollution Control, Pumping and Rainwater Harvesting Systems PACKAGE SEWAGE TREATMENT SYSTEM Clearwater treatment plants are ideal for single houses and employ the well proven aerobic biological

More information

Greater Dublin Strategic Drainage Study Regional Drainage Policies - Volume 2 New Development

Greater Dublin Strategic Drainage Study Regional Drainage Policies - Volume 2 New Development 7 SPECIFICATIONS There is currently no Irish specification for construction of drainage works, or water supply works. There are several publications that give guidance on drainage works, such as the Building

More information

Terms of Reference. Aqaba Water and Wastewater Utility Asset Valuation

Terms of Reference. Aqaba Water and Wastewater Utility Asset Valuation Technical Support for Procurement and Project Management and Private Sector Participation to the Ministry of Water and Irrigation, Water Authority of Jordan and the Jordan Valley Authority Support for

More information

CITY OF WASHINGTON SPILL PREVENTION, CONTROL AND COUNTERMEASURE PLAN

CITY OF WASHINGTON SPILL PREVENTION, CONTROL AND COUNTERMEASURE PLAN CITY OF WASHINGTON SPILL PREVENTION, CONTROL AND COUNTERMEASURE PLAN Adopted October 5, 2009 Table of Contents Chapter Description Page 1 Facility Descriptions... 3 1.1 Municipal Power Plant, 1001 Park

More information

1,255. Homes destroyed or severely damaged in Gaza

1,255. Homes destroyed or severely damaged in Gaza Occupied Palestinian Territory: Gaza Emergency Situation Report (as of 14 July 2014, 1500 hrs) This report is produced by OCHA opt in collaboration with humanitarian partners. It covers the period from

More information

SECTION 6 SANITARY SEWER MAIN 6.01 SCOPE

SECTION 6 SANITARY SEWER MAIN 6.01 SCOPE 6.01 SCOPE The work covered by this section of the specifications consists of the furnishing of all plant, labor, materials, equipment and supervision and performing all operations involved in the construction

More information

DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL

DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL 1.01 DESCRIPTION A. Furnish and install all storm drains, including manholes, inlets, service lines and other appurtenant

More information

BUILDING OVER OR NEAR WATER & SEWER MAINS POLICY

BUILDING OVER OR NEAR WATER & SEWER MAINS POLICY MURRAY SHIRE COUNCIL BUILDING OVER OR NEAR WATER & SEWER MAINS POLICY ADOPTED: 1 May 2012 1 BUILDING OVER OR NEAR WATER AND SEWER MAINS POLICY CONTENTS 1. Objective... 2 2. Requirements for Building Near

More information

SECTION 02763 POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe.

SECTION 02763 POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe. SECTION 02763 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Repairs to existing sewer lines by replacing short lengths of failed pipe. 1.02 UNIT PRICES A. Measurement for point repairs is on a unit price

More information

VILLAGE OF GRANVILLE SEWER BACK-UP and WATER LEAK POLICIES

VILLAGE OF GRANVILLE SEWER BACK-UP and WATER LEAK POLICIES VILLAGE OF GRANVILLE SEWER BACK-UP and WATER LEAK POLICIES SEWER BACK-UP POLICY General Sewer back-ups are an unfortunate, but common problem in older communities. A sewer back-up can create a health or

More information

Cardok Sàrl CP37 CH-1295 Tannay Switzerland Phone: 0041 22 77 66 051 info@cardok.com

Cardok Sàrl CP37 CH-1295 Tannay Switzerland Phone: 0041 22 77 66 051 info@cardok.com CARDOK CARLIFT Fast access to underground garages Fast, Silent, Discreet, Design, High-Tech Installation to replace an access ramp on private property Dimensions: (Built to measure, all dimensions can

More information

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary

More information

AIR RELEASE, CLEANOUT, AND SEWER MANHOLES

AIR RELEASE, CLEANOUT, AND SEWER MANHOLES AIR RELEASE, CLEANOUT, AND SEWER MANHOLES **From Hartford IM BLDG(10) DESCRIPTION. This work shall consist of the construction of air release, cleanout, and sanitary sewer manholes; and the furnishing

More information

SECTION 15410 GROUND WATER STORAGE TANKS

SECTION 15410 GROUND WATER STORAGE TANKS SECTION 15410 GROUND WATER STORAGE TANKS PART 1 GENERAL.01 SCOPE A. Section Includes Requirements for designing, fabricating, and erecting a welded steel ground storage tank..02 SYSTEM DESCRIPTION A. Design

More information

STANDARD SPECIFICATIONS SECTION 02512 CLEANING AND LINING WATER MAINS

STANDARD SPECIFICATIONS SECTION 02512 CLEANING AND LINING WATER MAINS STANDARD SPECIFICATIONS SECTION 02512 CLEANING AND LINING WATER MAINS PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements for cleaning and lining existing cast iron and ductile iron water mains

More information

Unit Price Averages Reports

Unit Price Averages Reports Unit Price Averages Reports 12/7/2015 UNIT PRICE AVERAGES REPORT Disclaimer The information provided in the following Unit Price Averages Report is only for the use of Alberta Infrastructure & Transportation

More information

VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10

VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10 VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10 SECTION B1: PREPARATION GUIDE B1.1 INTRODUCTION... B1-1

More information

SANITARY SEWER BACKUP. Causes & Prevention

SANITARY SEWER BACKUP. Causes & Prevention SANITARY SEWER BACKUP Causes & Prevention A. PURPOSE The purpose of this publication is twofold: 1. It provides homeowners with basic information on the causes of sanitary sewer backups. 2. It provides

More information

Gaza Municipal Sector Damage Assessment DRAFT FOR DISCUSSION

Gaza Municipal Sector Damage Assessment DRAFT FOR DISCUSSION Gaza Municipal Sector Damage Assessment DRAFT FOR DISCUSSION This report was prepared by the Municipal Development and Lending Fund (MDLF) and endorsed by the Ministry of Local Government (MoLG) as Part

More information

SECTION 02630 STORM DRAINAGE SYSTEM

SECTION 02630 STORM DRAINAGE SYSTEM SECTION 02630 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for storm drainage systems including modifications and connections to existing storm drainage systems. 1.02 REFERENCE

More information

CLASSIFICATION SYSTEM BY FIELD AND SUB-FIELD OF EXPERTISE SUPPLIERS REGISTRY OF GOODS AND SERVICES ENAP GROUP OF COMPANIES I. Suppliers are classified in three groups: Classification Equipments, materials

More information

FY08 SEWER POINT REPAIRS BID TABULATION

FY08 SEWER POINT REPAIRS BID TABULATION 6-07-831 Page 1 of 12 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING "

More information

LONDON BOROUGH OF HACKNEY BUILDING SERVICES ENGINEER REPORT GAS HOUSE, SPRINGFIELD PARK, HACKNEY

LONDON BOROUGH OF HACKNEY BUILDING SERVICES ENGINEER REPORT GAS HOUSE, SPRINGFIELD PARK, HACKNEY LONDON BOROUGH OF HACKNEY BUILDING SERVICES ENGINEER REPORT GAS HOUSE, SPRINGFIELD PARK, HACKNEY 10 TH JUNE 2011 London Borough of Hackney Page 1 of 6 Brief Description of the Proposed Works The existing

More information

KESSEL KTP 500 Submersible Pump with lateral and vertical outlet connection Order Numbers 28710, 28810, 28850

KESSEL KTP 500 Submersible Pump with lateral and vertical outlet connection Order Numbers 28710, 28810, 28850 INSTALLATION AND OPERATING INSTRUCTIONS KESSEL KTP 500 Submersible Pump with lateral and vertical outlet connection Order Numbers 28710, 28810, 28850 Product advantages Automatic float switch as water

More information

SECTION 02110 - ASBESTOS CEMENT PIPE REPAIRS, DEMOLITION, AND DISPOSAL

SECTION 02110 - ASBESTOS CEMENT PIPE REPAIRS, DEMOLITION, AND DISPOSAL SECTION 02110 - ASBESTOS CEMENT PIPE REPAIRS, DEMOLITION, AND DISPOSAL PART 1 - GENERAL 1.1 WORK INCLUDED IN THIS SECTION A. The WORK of this Section includes the repair, demolition, and disposal of asbestos

More information

City of Friendswood FY 2010 Capital Improvements Program - Water & Sewer Projects 5-Year CIP

City of Friendswood FY 2010 Capital Improvements Program - Water & Sewer Projects 5-Year CIP City of Friendswood FY 2010 Capital Improvements Program - Water & Sewer Projects 5-Year CIP PROJECT ESTIMATED COST ESTIMATED COUNCIL IDENTIFIED FUNDING SOURCES STRATEGIC COMPLETION INITIATIVES FM 2351/Beamer

More information

WEFTEC.06. Kent Von Aspern,* Collins Orton** *Carollo Engineers 2700 Ygnacio Valley Rd Suite 300 Walnut Creek, CA 94598

WEFTEC.06. Kent Von Aspern,* Collins Orton** *Carollo Engineers 2700 Ygnacio Valley Rd Suite 300 Walnut Creek, CA 94598 Lessons Learned from Large Diameter Sanitary Sewer Pipe Bursting Project: Conversion of Abandoned Gravity Sewer Main Into Upsized Sanitary Force Main South San Francisco, CA Kent Von Aspern,* Collins Orton**

More information

Standards for Water, Sewer, and Sewage Lift Station Design

Standards for Water, Sewer, and Sewage Lift Station Design Standards for Water, Sewer, and Sewage Lift Station Design February 2015 Edition I. Plan Format Requirements General Requirements Water Line Requirements Sewer Line Requirements II. III. IV. Water Design

More information

ELECTRIC PERISTALTIC MORTAR POINTING PUMP

ELECTRIC PERISTALTIC MORTAR POINTING PUMP ELECTRIC PERISTALTIC MORTAR POINTING PUMP pointing gun & control valve ACF405 PERISTALTIC PuMP hopper feed roller & tube pump for refurbishment & repair trades heritage & conservation bridge & underground

More information

A. Contractor shall furnish, to the Engineer, all materials certifications available from the manufacturer for all required materials.

A. Contractor shall furnish, to the Engineer, all materials certifications available from the manufacturer for all required materials. PART 1 GENERAL 1.1 SCOPE A. This item shall include the work necessary for the installation of storm sewer line construction. B. Reference Section 3800 Trenching and Backfill and the General Conditions,

More information

Sewer Pipe Lining An Economic Solution for Pipe Rehabilitation By Tawana Albany Nicholas, Virgin Islands Waste Management Authority

Sewer Pipe Lining An Economic Solution for Pipe Rehabilitation By Tawana Albany Nicholas, Virgin Islands Waste Management Authority Sewer Pipe Lining An Economic Solution for Pipe Rehabilitation By Tawana Albany Nicholas, Virgin Islands Waste Management Authority Abstract The United States Virgin Islands Waste Management Authority

More information

INSTALLATION AND START UP REPORT CERTIFYING THE CORRECT FUNCTIONALITY OF THE AD HOC REFUELLING STATION LIFE+ MHYBUS LIFE 07-ENV/IT/000434

INSTALLATION AND START UP REPORT CERTIFYING THE CORRECT FUNCTIONALITY OF THE AD HOC REFUELLING STATION LIFE+ MHYBUS LIFE 07-ENV/IT/000434 Feb. 15, 212 Sheet: 1 of 27 INSTALLATION AND START UP REPORT CERTIFYING THE CORRECT FUNCTIONALITY OF THE AD HOC REFUELLING STATION Ref. Number: LIFE+ MHYBUS LIFE 7-ENV/IT/434 Project Acronym: MHYBUS Project

More information

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation

FY11 Sanitary Sewer Main Rehab and Point Repair Bid Tabulation 644-10-569 Page 1 of 9 1 FOR CLEANING AND TELEVISING EXISTING SEWERS, AS SPECIFIED, ANY REQUIRED CLEANING, ANY LOCATION, ANY LENGTH OF SEWER, COMPLETE IN PLACE, FOR VARIOUS PIPE DIAMETERS. A. EXISTING

More information

Water. in the West Bank and Gaza. ANERA Reports. on the ground in the Middle East

Water. in the West Bank and Gaza. ANERA Reports. on the ground in the Middle East Water in the West Bank and Gaza ANERA Reports on the ground in the Middle East Volume 2 March 2012 INTRODUCTION The semi-arid Middle East suffers from a chronic scarcity of water. The causes are multiple

More information

Improving the flood resistance of your home. Advice sheet 6: Flood-resilient floors

Improving the flood resistance of your home. Advice sheet 6: Flood-resilient floors Improving the flood resistance of your home Advice sheet 6: Flood-resilient This sheet provides guidance on identifying different types of floor, assessing the routes floodwater may enter, and describes

More information

The checklist utilized by the Authority will be similar to that which is shown below. Project Name: Location: Consulting Engineering Firm:

The checklist utilized by the Authority will be similar to that which is shown below. Project Name: Location: Consulting Engineering Firm: Page 1 of 6 Section 1. PURPOSE This policy is an Engineering checklist of the Local Review Program for sanitary sewer improvement projects by the Bedford Regional Water Authority ( Authority ). Section

More information

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250. 02150-1 of 6 SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING 02150.01 GENERAL A. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily

More information

Does Part of My Basement Floor Have to Be Removed to Install. Where Does the Water from the Sump Pump Go?...Page 5

Does Part of My Basement Floor Have to Be Removed to Install. Where Does the Water from the Sump Pump Go?...Page 5 PROTECTIVE PLUMBING - WHAT IS IT? TABLE OF CONTENTS Protective Plumbing What is it?...page 1 What is Foundation Drainage?...Page 2 What is a Sump Pumping System?...Page 4 Does Part of My Basement Floor

More information

ICRC WORK SPECIFICATIONS IRAQ WATER AND HABITAT

ICRC WORK SPECIFICATIONS IRAQ WATER AND HABITAT ICRC WORK SPECIFICATIONS IRAQ WATER AND HABITAT GOVERNORATE : DISTRICT : LOCATION : DOHUK SUMEL SUMEL GO code : IRAK GEN ASSENG0 TITLE : Sharia / PHCC / Rehabilitation SO n : SO 03 WPA n : KIR16 0015 Job

More information

Jay R. Smith Mfg. Co.

Jay R. Smith Mfg. Co. Jay R. Smith Mfg. Co. Automatic Backwater Valve SMITH CUSTOMER DRIVEN FLOOD-GATE FEATURES Index Page Flood-Gate Features and Applications 2 How Flood-Gate Works 3 Flood-Gate Operation & Approvals 4 Valve

More information

SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS

SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS SECTION 08000 STORM DRAINAGE 08010 DESIGN A. Location B. Sizing TABLE OF CONTENTS 08020 MATERIALS A. Pipe Materials B. Structure Materials C. Installation D. Inlets and Outlets 08030 INSPECTIONS AND TESTING

More information

WATER UTILITY REFERENCE MANUAL

WATER UTILITY REFERENCE MANUAL Utility Plant and Accumulated Depreciation Capitalization Policy Costs are capitalized in the utility plant accounts, rather than being expensed in the current year, if: the service life is more than one

More information

Plumbing. Helpful Hints Residential Construction. Lincoln County. Bert Polk Plumbing Inspector

Plumbing. Helpful Hints Residential Construction. Lincoln County. Bert Polk Plumbing Inspector Plumbing Helpful Hints Residential Construction Bert Polk Plumbing Inspector Lincoln County 2015 Waste and vent fittings Vent 90 medium 90 long 90 1/16 bend,1/8 bend,1/6 bend, medium 90 san tee combination

More information

SECTION 22 LIGHTNING PROTECTION SYSTEM

SECTION 22 LIGHTNING PROTECTION SYSTEM SECTION 22 LIGHTNING PROTECTION SYSTEM 22.01 SCOPE: A. These Specifications shall form a part of the Contract Documents and shall govern construction work for all buildings to be built or modified for

More information

San Diego County Water Authority Contracting Opportunities - July 4, 2016, 1:52 a.m.

San Diego County Water Authority Contracting Opportunities - July 4, 2016, 1:52 a.m. San Diego County Water Authority Contracting Opportunities - July 4, 2016, 1:52 a.m. Needs Assessment and Recommendation - Wholesale Water Utility Billing and Information Management Software Application

More information

BILL OF QUANTITIES Part No.: Part Description

BILL OF QUANTITIES Part No.: Part Description Page 1 of 5 A. REMOVAL OF STRUCTURES 801 Demolition of Existing Structure lot 1 in words in words B. MASONRY WORKS 506(1)a Masonry Units (CHB) sq.m. 58.80 in words in words C. FABRICATED MATERIALS & HARDWARE

More information

DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES 33 00 00 SITE UTILITIES

DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES 33 00 00 SITE UTILITIES SECTION INCLUDES Domestic Water Fire Water Service Water Well Sanitary Sewer Storm Drains Foundation Drainage RELATED SECTIONS 03 30 00 Concrete 21 00 00 Fire Suppression - Sprinklers 22 00 00 Plumbing

More information

Capital Expenditure. The common definition of capital expenditure is

Capital Expenditure. The common definition of capital expenditure is Capital Expenditure Under standard accounting practices local authorities are required to account for revenue expenditure and capital expenditure differently. Capital expenditure is defined in the Local

More information

L_All_Vocatinal_Ed_Construction. Sector: Construction. Sr. No Specialisation Page No 1 Construction and Building Technology 02.

L_All_Vocatinal_Ed_Construction. Sector: Construction. Sr. No Specialisation Page No 1 Construction and Building Technology 02. L_All_Vocatinal_Ed_Construction Sector: Construction Sr. No Specialisation Page No 1 Construction and Building Technology 02 1 P a g e 2 P a g e VOCATIONAL EDUCATIONAL QUALIFICATION FRAMEWORK (Sector -

More information

Truck Company Operations

Truck Company Operations Truck Company Operations Instructor Guide Session Reference: 1-1 Topic: Salvage Level of Instruction: Time Required: 2 Hours Materials: Various Items of Salvage Equipment Salvage Covers References: Ladder

More information

PROJECT COST ESTIMATES & FEASIBILITIES

PROJECT COST ESTIMATES & FEASIBILITIES PROJECT COST ESTIMATES & FEASIBILITIES Project Cost and budget management Project success elements Scope meet the scope defined for the project Budget It is within established budget Programme It is designed

More information

UVDB empowered by Achilles

UVDB empowered by Achilles UVDB empowered by Achilles DISAB Centurion: High Performance Wet/Dry Materials Handling Unit DISAB Centurion: High performance vacuum tanker that will vacuum dry or wet material The DISAB can vacuum material

More information

Storm Sewer Trenchless Upgrade Alternatives and Recommendations

Storm Sewer Trenchless Upgrade Alternatives and Recommendations Storm Sewer Trenchless Upgrade Alternatives and Recommendations Background Approximately 1,930 feet of the 40-inch and 42-inch CMP storm sewer pipe from manhole M22 to manhole M12 will be evaluated for

More information

Water Quality Contingency Planning Standard EPB 540B

Water Quality Contingency Planning Standard EPB 540B Water Quality Contingency Planning Standard EPB 540B November 15, 2012 Water Quality Contingency Planning Standard The Water Quality Contingency Plan Standard is provided to aid waterworks owners and operators

More information

CCU Engineering Specifications. Section 003300 PRECAST CONCRETE PRODUCTS

CCU Engineering Specifications. Section 003300 PRECAST CONCRETE PRODUCTS CCU Engineering Specifications Section 003300 Effective Date: Nov. 1st, 2011 Page 1 of 5 PRECAST CONCRETE PRODUCTS PART 1 - GENERAL The following specification is intended for use for the design, selection

More information

PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE

PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE Storm Sewer Design Criteria REVISED July 2009 PUBLIC WORKS STORM SEWER DESIGN CRITERIA TABLE OF CONTENTS 1.0

More information

TECHNICAL SERVICE GROUP

TECHNICAL SERVICE GROUP TECHNICAL SERVICE GROUP Introduction : Technical Services Group T.S.G. The Technical Services Group supplies, installs, and maintains a wide range of equipment and material required for civil and electro-mechanical

More information

LS 2540 SEWER LATERALS AND INSPECTION TEES

LS 2540 SEWER LATERALS AND INSPECTION TEES LS 2540 SEWER LATERALS AND INSPECTION TEES A. Summary B. Submittals C. Site Information D. Sewer Pipe and Fittings E. Lateral Locations F. Lateral Installation G. Inspection Tee Installation H. Removal

More information

SECTION 33 11 00.15 DUCTILE IRON PIPE AND FITTINGS

SECTION 33 11 00.15 DUCTILE IRON PIPE AND FITTINGS SECTION 33 11 00.15 DUCTILE IRON PIPE AND FITTINGS PART 1: GENERAL 1.01 COORDINATION OF WORK Connection to existing pipelines may require shutdown of AW facilities. Closely coordinate construction work

More information

Building over or close to a public sewer

Building over or close to a public sewer Building over or close to a public sewer thameswater.co.uk/developerservices thameswater.co.uk/developerservices 1 Questions and answers Did you know Thames Water is legally responsible for more than 100,000

More information

MEMORANDUM. General: Foundation:

MEMORANDUM. General: Foundation: MEMORANDUM State of Alaska Department of Transportation and Public Facilities Central Region - Division of Construction and Operations Public Facilities Branch TO: Jennifer Murrel DATE: August 19, 2010

More information

Appendix S Pump Station Evaluation

Appendix S Pump Station Evaluation Appendix S Pump Station Evaluation Technical Memorandum Date: October 12, 2001 To: Re: Orange County Utilities Task 6.4 Raw Wastewater Pump Stations 1.0 Summary In accordance with Task 6.4 of the Orange

More information

Rehabilitation of an Aging Concrete Reservoir Adit Tower

Rehabilitation of an Aging Concrete Reservoir Adit Tower Rehabilitation of an Aging Concrete Reservoir Adit Tower Raymond S. Tombaugh, Senior Coatings Consultant KTA-Tator, Inc. and Mongkol Mahavongtrakul, P.E. Corrosion Control Contract Manager San Francisco

More information

Plugging Home Drains to Prevent Sewage Backup

Plugging Home Drains to Prevent Sewage Backup AE-1476 Plugging Home Drains to Prevent Sewage Backup Why plug drains For homes in areas of the country prone to flooding or heavy rain, taking a few steps to prepare for water levels that could result

More information

SEWER BACKUP PREVENTION PROGRAM

SEWER BACKUP PREVENTION PROGRAM SEWER BACKUP PREVENTION PROGRAM The Village of La Grange Park is pleased to announce a program to assist single-family homeowners with the cost of plumbing improvements to address sanitary sewer related

More information

Meeting the Challenge of Pipeline Emergency Repair

Meeting the Challenge of Pipeline Emergency Repair Meeting the Challenge of Pipeline Emergency Repair Michael R. McReynolds, PE, SE 1 Tao Peng, PE, SE 2 ABSTRACTS The Metropolitan Water District of Southern California (MWD) is the nation s largest provider

More information

G. Common Defects in Buildings - Leakage

G. Common Defects in Buildings - Leakage F. Common Defects in Buildings - Structural 32. Recently, some concrete chips have fallen from the ceiling in my kitchen. There are rusty steel bars and the area in question measures about 300 x 400mm.

More information

Sports Buildings: budget costs for the Flood Relief Fund

Sports Buildings: budget costs for the Flood Relief Fund Sports Buildings: budget costs for the Flood Relief Fund The list below provides typical costs for flood insurance works, typically required by sports clubs or facilities. The list is not exhaustive but

More information

Product Systems AQUAFIN-IC CEMENTITIOUS CRYSTALLINE PENETRATING WATERPROOFING. Waterproofing Specification

Product Systems AQUAFIN-IC CEMENTITIOUS CRYSTALLINE PENETRATING WATERPROOFING. Waterproofing Specification AQUAFIN-IC CEMENTITIOUS CRYSTALLINE PENETRATING WATERPROOFING Typical s Table of Contents: No. 4 5 6 7 8 9 0 External waterproofing of below ground concrete wall & slab Internal waterproofing of foundation

More information

B-1 Buildings & Service Maintenance

B-1 Buildings & Service Maintenance B-1 Buildings & Service Maintenance B-1 Buildings & Service Maintenance SAFETY, HEALTH AND ENVIRONMENTAL POLICY: B-1 DATE OF ISSUE: AUGUST 1994. BUILDINGS AND SERVICES MAINTENANCE 1. Introduction It is

More information

After reading this lesson you will be able to: 12.3 IMPORTANCE OF ROOF 12.4 TYPES OF ROOF IN A HOUSE

After reading this lesson you will be able to: 12.3 IMPORTANCE OF ROOF 12.4 TYPES OF ROOF IN A HOUSE 86 :: Certificate in Construction Supervision (CIVIL) 12 ROOF 12.1 INTRODUCTION The structure provided to cover the house surface (floor) is known as roof. For different situation and requirement, it is

More information

KAWERAU DISTRICT COUNCIL BUSINESS DISASTER RECOVERY PLAN 2011

KAWERAU DISTRICT COUNCIL BUSINESS DISASTER RECOVERY PLAN 2011 KAWERAU DISTRICT COUNCIL BUSINESS DISASTER RECOVERY PLAN 2011 Kawerau District Council Private Bag 1004 Ranfurly Court KAWERAU 3169 Tel (07) 306 9009 Fax (07) 323 8072 Email kaweraudc@kaweraudc.govt.nz

More information

Moving Small Mountains Vesuvius Dam Rehab

Moving Small Mountains Vesuvius Dam Rehab Moving Small Mountains Vesuvius Dam Rehab Susan L. Peterson, P.E., regional dams engineer, Eastern Region, Bedford, IN Note: The following article, Moving Small Mountains Vesuvius Dam Rehab, by Sue Peterson,

More information

SEWER BACKUPS & BASEMENT FLOODING PREVENTATIVE SOLUTIONS FOR THE BUILDING OWNER

SEWER BACKUPS & BASEMENT FLOODING PREVENTATIVE SOLUTIONS FOR THE BUILDING OWNER Village of Shorewood, Wisconsin SEWER BACKUPS & BASEMENT FLOODING PREVENTATIVE SOLUTIONS FOR THE BUILDING OWNER Prepared By: Thomas A. Zoulek, P.E., LEED A.P. Vice President Mid City Plumbing & Heating

More information

CHAPTER 11 STORM DRAINAGE

CHAPTER 11 STORM DRAINAGE CHAPTER 11 STORM DRAINAGE SECTION 11 GENERAL 11.1 Scope. The provisions of this chapter shall govern the materials, design, construction and installation of storm drainage. 11.2 Where required. All roofs,

More information

City of Regina Standard Construction Specification SECTION 1320 SEWERMAIN TESTING

City of Regina Standard Construction Specification SECTION 1320 SEWERMAIN TESTING 1.0 GENERAL 1.1 Scope 2.0 PRODUCTS 1.1.1 The work shall consist of testing wastewater and/or storm mains to ensure construction conforms to the proper line, grade, cross section and performance. 2.1 The

More information

Let Us Give Utilities the Respect that they Deserve.

Let Us Give Utilities the Respect that they Deserve. Water & Sewer Utilities Miscellaneous Design and Plan Preparation Guidelines Issued by: Ray Mowla, P.E. Jefferson Parish Department of Engineering, Utilities Section The purpose of issuing these miscellaneous

More information

Sewer Rehabilitation Design Requirements

Sewer Rehabilitation Design Requirements Sanitary Sewer Overflow (SSO) Control and Wastewater Facilities Program Sewer Rehabilitation Design Requirements City of Baton Rouge/Parish of East Baton Rouge Department of Public Works Submitted by Prepared

More information

WATER MAIN CONSTRUCTION TECHNIQUES DEPARTMENT OF PUBLIC WORKS WATER & WASTEWATER DIVISION

WATER MAIN CONSTRUCTION TECHNIQUES DEPARTMENT OF PUBLIC WORKS WATER & WASTEWATER DIVISION WATER MAIN CONSTRUCTION TECHNIQUES Overview Water Main - Materials Specifications Installation Future? Water Main Materials Material Types There are various material types used for water mains, these include:

More information

FREQUENTLY ASKED QUESTIONS

FREQUENTLY ASKED QUESTIONS FREQUENTLY ASKED QUESTIONS VILLAGE OF CORRALES WASTEWATER UTILITY (SEWER) SYSTEM AND INDIVIDUAL PROPERTY OWNER SERVICE CONNECTIONS I. AVAILABILITY OF SEWER SERVICE; WHEN CONNECTION IS REQUIRED. Q. Where

More information

Chapter. Restoration of Damaged Structures

Chapter. Restoration of Damaged Structures 5 Chapter Restoration of Damaged Structures Bringing back a damaged structure to its pre-earthquake state and original strength is called restoration. This is the first step of building rehabilitation.

More information