1 Division 23: HVAC I. PURPOSE This technical standard is a narrative describing Beaverton School District s (BSD s) Basis of Design for mechanical systems and heating, ventilation, and air conditioning (HVAC) control systems. The information contained herein shall be used by the Project Design Team to develop a sustainable, integrated mechanical, HVAC, and controls system that is economical to maintain and operate and that enhances learning by providing a suitable work environment for staff and students. This document shall be used as part of BSD s General Design Standards (comprised of the BSD Educational Specifications and s). II. GENERAL A. DESIGN DOCUMENTS The Project Design Team shall provide to the BSD, as part of all Design Document Submittals, a narrative with detailed descriptions of system features, functionality, limitations, design assumptions, and parameters. The narrative shall be provided as a deliverable with the Schematic Design, and shall be updated with each subsequent design delivery including Design Development (DD) and Construction Document (CD) Phases. The narrative shall be detailed enough to provide necessary and beneficial information to future Project Design Teams and shall be written in a manner that is informative and useful to building operations personnel. In its final form, this document shall be incorporated into the Construction Documents and placed on the first sheet of the mechanical drawings. Drawings shall contain all equipment schedules including HVAC, plumbing, lighting, glazing, and insulation. Design assumptions that define the capabilities of the building shall be documented on the drawings. These include, but are not limited to: maximum occupancy, indoor and outdoor HVAC design conditions, Oregon Energy Code Compliance documentation, lighting thermal load, hours of operation, and provisions for future expansion (if any). This will ensure that the information is retrievable years later when only the drawings are available to facility operations. Life-cycle costing will be the decision making tool for evaluating new systems and equipment. Mechanical systems should be evaluated on a 50 year life-cycle. Energy modeling shall be incorporated in new school design and schools with major mechanical remodels. Small projects may incorporate other ASHRAE approved methods for calculating energy use. B. COMMISSIONING Commissioning is required for all HVAC or Controls Capital Improvement Projects. The Commissioning Agent shall be brought on board prior to the beginning of DD for projects that incorporate mechanical and/or control system changes. The Commissioning Agent will be expected to participate in the 100% DD review and the 80% CD review presentations by the Division 23: HVAC Revised: 9/17/14 Page 1 of 16
2 Project Design Team. Remodel projects without major system changes may bring the Commissioning Agent at the beginning of CD. The Commissioning Agent is expected to develop specific testing and verification protocols as part of the Project s Commissioning Plan. The testing and verification protocols need to clearly define what is expected of the controls subcontractor so that they will be able to accurately and adequately bid on the Project. A draft of this plan shall be included as part of the Project s Construction Documents at the 50% CD stage and finalized as part of the Bid Documents. C. BUILDING AUTOMATION All building automation systems should fit into the District s enterprise network model. Systems that will not currently be included in the enterprise network should be designed so that they may be integrated at a later date with minimal equipment changes. The District currently has two enterprise level platforms: the ADS server and Tridium Niagara AX. Programming tools not already owned by the District must be provided for all levels of the system as part of the Project. All projects greater than $100,000 shall include a control contractor as part of the Project Design Team to specify Basis of Design through the development of line drawings and sequence of operation. (Subsequently, all requests for substitution must include line drawings.) At the end of SD, the Project Design Team shall request from the BSD HVAC Department what current versions of controls are appropriate for the project. D. ENERGY USE All mechanical systems shall meet and/or exceed both current ASHRAE 90.1 standards and current Oregon Energy Code. Design goals should provide building energy use that would allow easy qualification as an Energy Star rated building. Controls Contractor shall install BSDsupplied schedules as part of the initial programming. Equipment must be running on BSDsupplied schedules and utilizing all other control measures as soon as equipment is operational to minimize energy use during the Project. New schools and major remodels should use energy modeling to confirm compliance with Energy Star ratings and be at the bottom of the Oregon Department of Energy s Energy Use Index (EUI) Range guidelines. E. NAMING CONVENTIONS BSD equipment and system naming conventions shall be used on all Project documents at and beyond the Design Development Phase. This will ensure that equipment labels are consistent with programming conventions. Equipment naming for new construction and retrofits must follow industry standard naming conventions. Remodels and retrofits shall follow the naming used for the existing building and on the prints. Request points list from BSD HVAC Department prior to DD. Numbering of equipment shall logically and sequentially follow the numbering used on existing equipment. Room numbers used on all plans should be the final room number as assigned by the District. The Project Design Team is responsible for obtaining a copy of the District s standardized classroom numbering system from the BSD. Division 23: HVAC Revised: 9/17/14 Page 2 of 16
3 F. TRAINING Provide for training of District and building personnel with additional detailed training for Maintenance staff. Maintenance training shall provide a minimum of the following: review of complete O&M manuals, including but not limited to, programming and setup of any control systems training on all required maintenance and troubleshooting listing of all current factory support contact names and phone numbers Regarding retrofit projects, BSD HVAC Department shall be notified of start-up date and will attend at their discretion as part of the training requirement. The District shall be provided with factory service manuals, software tools, and specialized test equipment. This requirement may be modified for equipment already in use by the District. Additional specialized training shall be required for any new technology being introduced to the District, and for any equipment that is new to the District (i.e., equipment not already installed and being maintained by the District). A determination of specialized training requirements shall be made by the Maintenance staff at 80% CD. Formal institute training shall be provided locally, either on-site or in the Portland area. All costs associated with the training shall be covered by the project. III. CONTROLS The controls contractor is responsible for delivering a complete and workable system. On retrofit and remodel work, it is assumed that the system is complete and operable before the controls modifications. It is the responsibility of the Controls Contractor to submit in writing a list of any unworkable equipment to the Owner prior to beginning any demolition work or modifications to the existing equipment. A. QUALIFIED CONTROLS CONTRACTORS The Controls Contractor shall be regularly engaged in the engineering, programming, installation, and service of Control Systems by the selected manufacturer and shall have a minimum of five years experience with the complete, turn-key installation of Controls by the same manufacturer of similar size and technical complexity. If portions of the installation will be performed by a subcontractor, the Controls Contractor will submit to BSD, two sample installations performed by subcontractor which are similar to the current project. The Controls Contractor shall have a local branch facility within a 75-mile radius of the job site. Emergency service shall be available on a 24-hour, 7-day-a-week basis. Acceptable Controls Contractors: Johnson Controls, Inc., Northwest Control Contractors, or selected Johnson Controls Inc. Authorized Building Controls Specialist (ABCS), and their designated agents. Selection of Controls Contractors is subject to approval by BSD. Controls Contractors not currently approved by the District shall provide a list of five comparable projects that have Controls with the features as specified for this project. These projects must be on-line and functional. Division 23: HVAC Revised: 9/17/14 Page 3 of 16
4 B. GENERAL CONTROL SYSTEMS Enterprise Servers are programs installed on a server class PC that use the District s IT network to collect and send information to the supervisory level controllers. This is the level that houses graphics and long-term trends (limited graphics also reside in the Supervisory Controller). The District currently has two enterprise level platforms: the ADX server, Tridium Niagara AX. Appendix A contains a diagram of the District Controls Network Structure. All Niagara products will be open licensed and all programming tools used in the project will be licensed to BSD and provided as part of the project. All Johnson programming tools used in the project will be provided to BSD as part of the project. For control systems in new construction, Johnson Metasys will be the Basis of Design. For control system renovations, the mechanical engineer and BSD HVAC Department will choose the Basis of Design for the controls portion of the project. Supervisory Controllers shall have a web-based user interface available through current web browsers using standard communications protocols. The Supervisory Controller shall be housed at the local building level. Supervisory Controllers shall have communications buses for, and be capable of communicating on, one of the two approved protocols. Approved communications protocols include LON and BACnet. Preferred bus shall be specified by the District for individual projects. Basic graphics shall reside in the Supervisory Controller. As a cost savings measure on smaller projects, supervisory controllers that only communicate on the needed bus may be approved by BSD for that particular project only. Software application used to access server and supervisory controllers on building network shall be Windows and Macintosh based and approved by BSD. Local (building level) controls that use IP standards shall communicate on a subnetwork behind a Router/Switch. When BACnet IP communications are used, the Project Design Team shall coordinate capacity and security needs with IT design. Otherwise, the Supervisory Controller will serve as the switch or gateway between the District network and the communications buses. All IP communication lines and equipment shall be tested to meet or exceed current industry standards. Systems using more than one internet connection must have prior approval from BSD Representative. It may be desirable to use existing BSD IT infrastructure when considerable overall cost savings can be realized stand-alone reliability can be maintained. Programming shall use BSD naming conventions to ensure continuity between systems. The existing file path on an Enterprise Server defines the naming convention and file structure for that server. This convention provides a unique name for every point on the District s network and ensures that summaries and reports are consistent. Programming and point naming shall follow conventions used on the applicable Enterprise Server and must be obtained from the BSD HVAC Department no later than the beginning of Design Development. These conventions must be used during controls design, programming, and in the specifications. Division 23: HVAC Revised: 9/17/14 Page 4 of 16
5 C. APPLICATION-SPECIFIC CONTROLLERS AND LOCAL CONTROL UNITS Application-Specific Controllers are specialized Local Control Units and can include, but are not limited to, PLCs (programmable logic controllers), unitary controllers, manufacturers on-board controls, vendor devices, and other controls. The BSD prefers Application-Specific Controllers with standard ( canned ) sequences. Controllers requiring custom programming and complex sequences shall be avoided. The goal at each level of Application-Specific Controls is to provide the simplest most straightforward sequence, program, and system that will meet the District s operational and maintenance needs, consistent with the District s established energy standard. Where cost effective, design, and build each system with capacity for expansion to meet future operational needs. Local Control Units for HVAC equipment shall be factory installed. Local Control Units shall be by approved manufacturer. Controls by HVAC equipment manufacturer must be approved by BSD (see Appendix B) on a project-specific basis. Local Control Units shall use approved communication protocol. Preferred protocol is JCI MetasysBACnet. Other protocols shall be approved on a project-specific basis include: BACnet IP: BTL listed, BACnet MS/TP: Metasys Compliant, LON: Lonwork Certified. Local Control Units shall operate as stand-alone controllers capable of performing specified control responsibilities independent of other controllers in the network. The District maintains the control system with in-house staff so programming should favor Application-Specific Controllers with standard sequences. All Application-Specific Controllers must be capable of remote programming over the District Enterprise network and all programs required will be installed, licensed to BSD, and BSD personnel will be trained on their use. IV. HVAC SYSTEMS A. GENERAL 1. Refrigerants The following refrigerants are acceptable for use in chillers and DX equipment as appropriate on District projects: R-410a, R-134a, R-404a, and R-407c. The District goal is to use the same refrigerant throughout each individual facility. Refrigerant selection for equipment over 20 tons will be finalized at 100% DD review with District Maintenance input. 2. Air Filters Air filters are required on all air handlers. MERV 8 (Farr 30/30), 2 pleated high efficiency filters or better required. 3. Life Cycle All HVAC systems should be designed around a 50-year life cycle. The Project Design Team must provide unbiased life-cycle costing as part of the evaluation process for any system requiring BSD approval. Replacement cost and equipment life must be based on industry accepted and recognized sources. HVAC systems cannot be accurately analyzed without defined setpoints and sequence of operation. HVAC systems must have setpoints and Division 23: HVAC Revised: 9/17/14 Page 5 of 16
6 sequence of operation defined at beginning of Design Development, prior to doing life-cycle cost comparison. 4. Air-Handling Equipment The BSD prefers air-handling equipment installed in penthouse spaces as opposed to being roof mounted. This will allow the opportunity to explore the use of alternate roof systems. Hot water or chilled water coils on rooftop air handlers may only be used with BSD approval. The entire system must be freeze protected to 10 F. 5. Load Calculations The Project Design Team shall provide HVAC load calculations and demonstrate that equipment is not oversized or undersized. Equipment shall be designed to accommodate load swings. Air handling (fan capacity) shall provide 110% of calculated design requirements. Equipment heating and cooling capacity for any single system should not exceed calculated design load by more than 10%. HVAC calculations will include both the maximum and minimum heat/cool loads. Energy efficiency shall be maintained down to 25% of maximum building load. 6. Redundancy Redundancy is desired in heating systems. Full redundancy in each system is not required; however, no single equipment failure should take the building out of its established operating parameters (such as a single boiler or pump). 7. Miscellaneous Airside economizers are required for all air handling equipment, regardless of size. Provide necessary outside air, but no more than required. On systems of greater than 2,000 cfm (5 tons) design controls to dynamically vary outside air with occupancy. Evaluate use of heat recovery ventilation on all systems larger than 2,000 cfm. Any gas fired unit with a burner rating over 199,000 Btu shall have a fully modulating burner with at least a 4:1 turndown ratio. Air handling units over 5,000 cfm shall have a method for reducing ventilation fan power during light loads (i.e., VFD). Mixed air low limit required for all air handlers (even with gas heat). Areas that regularly have occupancy scheduled outside of the schools operating hours (e.g., summer office hours and auditoriums) shall be identified. Options that minimize energy use shall be evaluated using life-cycle costing. All spaces with year-round cooling demand, such as computer rooms and data centers, shall have their own dedicated system with airside economizer. Heat recovery opportunities will be evaluated for areas with more than 5 kw of equipment load. Design Zone HVAC to minimize simultaneous heating and cooling. Where possible, design with separate systems for interior and exterior zones. This will improve comfort and also Division 23: HVAC Revised: 9/17/14 Page 6 of 16
7 reduce the inherent need for simultaneous heating and cooling. Variable refrigerant flow systems should be designed and zoned per manufacturer s recommendations. Design for ASHRAE Standard 55 comfort envelope, which indicates 90% comfort in our climate at a space temp of 70 F heating and 75 F cooling. Installed control set points should meet this standard. Design shall allow easy maintenance, with unobstructed access to items requiring regular maintenance. Installation must allow all access doors to fully open. All filters, valves, controls, sensors, motors, and bearings must be accessible. Minimize fan-powered Variable Air Volume (VAV) boxes. BSD approval required at beginning of DD. Phase monitors and protection required for all 3-phase equipment larger than 5 hp. B. DUCTWORK Ductwork shall be installed to current industry recommended standards. 1. Flex Duct Flex duct shall be limited to a maximum length of Duct Board Duct board shall not be used on new installations. During remodels if the ductwork being modified is duct board, then removal and replacement of the duct board is required in effected area. C. PIPING AND VALVE SCHEDULE Hydronic Piping No black iron piping below 3 Ø. Threaded pipe and fittings shall only be used at terminations. No threaded fittings or drains shall be located above hard lids. See Division 22 Plumbing for domestic water, sanitary and natural gas connections. PIPING SCHEDULE Service Size Location Material Hydronic and Chilled Water Systems Through 2 Ø All Copper-Type L or Better, Soldered Fttgs. ProPress fittings allowed where accessible for maintenance 2-1/2 Ø All Copper-Type L or Better, Brazed Fttgs 3 Ø And Larger All Black Steel w/ Welded or Flanged Fttgs All Ø s, Two foot maximum length All Flex Connectors, Stainless Steel, or Copper, Two foot maximum length Division 23: HVAC Revised: 9/17/14 Page 7 of 16
8 VALVE SCHEDULE System Service Valve Type Size Material Hydronic Shut-Off, Throttling, Ball, Full-Port All Bronze and Chilled Drain Shut-Off, Throttling Butterfly 3 Ø Or Cast Iron or Bronze Water Systems Throttling Globe Larger All Bronze D. MOTORS AND VARIABLE FREQUENCY DRIVES (VFD) All HVAC fan and pump motors that are 1/6 th horsepower and greater shall provide status signal to the building management system through use of a current sensing device to verify that the motor is running. All field installed VFDs shall be manufactured by ABB or District approved equal. All VFDs other than ABB will require additional training. All variable frequency drives (VFD) shall be rated for HVAC service. Mount VFDs on the equipment being controlled (within sight of) and served by the same disconnect as the equipment it serves. Bypasses shall not be used on VAV HVAC air handling equipment. Bypasses are acceptable for use on pumps. Factory installed VFDs are acceptable when provided on package equipment if thoroughly covered in manufacturer s service manual and fully covered by the package equipment manufacturer s warranty. E. VARIABLE AIR VOLUME (VAV) VAV is the most commonly used system in the District. VAV is not the only system allowed, but it is the only one that has been used enough in the BSD to be a valid point of comparison. All other proposed systems should be compared to VAV with the parameters found in Appendix C. All energy modeling and cost comparison should use VAV as the baseline. F. VARIABLE VOLUME BY TEMPERATURE (VVT) VVT shall only be used with BSD approval. BSD approval required at beginning of DD. Review and evaluation based on comparison to VAV system. VVT should not be used with more than three zones. Must be minimal disparity between zones if VVT is to be considered. Both the heating load and the cooling load must be similar in all VVT zones. G. DISPLACEMENT VENTILATION Displacement ventilation shall only be used with BSD approval. BSD approval required at beginning of DD. Review and approval shall be based on comparison to VAV system. Division 23: HVAC Revised: 9/17/14 Page 8 of 16
9 H. SPLIT SYSTEMS Condensing units on grade are discouraged. For approved systems: All condensing units must be isolated from sight. Noise generated by the condensing unit must be controlled so that sound levels are not increased in instructional areas when the condensing unit is running. Condensing units shall be protected from vandalism. Limit split systems to the following areas, with BSD approval. BSD approval required at beginning of DD. Review and evaluation based on comparison to single-zone rooftop air handler with economizer. Elevator mechanical rooms Server rooms Electrical rooms Retrofit computer labs Office portables or modular buildings with multiple zones Areas with occupancy should be provided with independent ventilation such as a heat recovery ventilator. Mechanical rooms should have an exhaust fan with thermostatic control. All split systems must have control strategy specified at design and be integrated into the total system. Gravity feed condensate drains are required on all indoor units. Condensate evaporators and pumps are not acceptable. I. DATA FRAME ROOMS Provide engineered HVAC system for MDF (main data frame) and IDF (intermediate data frame) server rooms. Design shall provide outside air intake, adequate air changes per hour, and cooling to meet anticipated equipment load and maintain temperatures below 80 F on a Design Day. Data frame room HVAC systems shall be thermostatically controlled with cooling and ventilation available 24 hours, seven days a week. Data frame rooms that are designed with exhaust only systems must provide outside air intake and a chase adequate to allow future addition of mechanical cooling. J. UNIT VENTILATORS Avoid unit ventilators and Package Terminal Air Conditioning (PTAC) units in new construction. BSD approval required at beginning of DD. Review and evaluation should be based on comparison to single-zone rooftop air handler with economizer and/or fin tube as appropriate. Univents shall not be approved for use in new classroom construction. Univents may be approved for use as replacement for existing univents in remodels and retrofits. Univents may be approved for use in new construction for corridors and lobbies (compare to fin tube). Valve control only. No face and bypass heating control. Division 23: HVAC Revised: 9/17/14 Page 9 of 16
10 K. MULTI-ZONE AIR HANDLERS Multi-zone air handlers are not approved for use in the Beaverton School District. L. RESIDENTIAL FURNACE HEATING AND COOLING Residential furnace heating and cooling is not approved for use in the Beaverton School District. M. SINGLE-ZONE ROOFTOP SYSTEM Must have an airside economizer Any unit larger than 2,000 cfm shall have a fully modulating outside air damper. All single-zone units over five tons shall have demand ventilation. Any gas fired unit with a burner rating over 199,000 Btu shall have a modulating burner with at least a 4:1 turndown ratio. Large units, such as high school gyms, should have a method for reducing ventilation fan power during light loads (e.g., Variable Frequency Drive (VFD)). N. HEAT PUMPS Must have an airside economizer. Systems must have control strategy specified at design and be integrated into the total system. Special care should be taken to minimize use of electrical resistance heating and associated demand charges. Heat pump systems over five tons should have gas heat as supplemental heat source. Due to limited air conditioning season, heat pump efficiency shall be evaluated on Heating Seasonal Performance Factor (HSPF). O. EXHAUST FANS 1. Kiln Rooms Kilns shall not be located in conditioned space. Provide adequate ventilation to maintain space temperature at or below 80 F while the kiln is being fired with the kiln room door closed. Kiln room ventilation shall be designed with high exhaust and low make-up air intake. Exhaust fan shall be brought on at 80 F regardless of building HVAC schedules. 2. Restrooms Exhaust fans for single stall restrooms shall be controlled by the lighting occupancy sensors. Multiple stall restrooms shall have exhaust fans controlled through the building management system (BMS). The exhaust fan operation shall be scheduled to start and stop with the HVAC for that portion of the building. The exhaust fan shall be capable of being scheduled or overridden to operate independent of the HVAC systems operation. Division 23: HVAC Revised: 9/17/14 Page 10 of 16
11 V. CENTRAL PLANTS A. BOILERS 1. General Requirements (Applies to New Construction and Remodels) Natural gas fired only. Boiler Systems must be capable of stand-alone operation. No domestic hot water (DHW) on heating boiler systems. Fully redundant pumping systems. Hydronic heating systems are preferred. Chemical water treatment required for all heating boilers. New construction Hydronic heating systems are preferred No distributed pumping. Central pump with VFD and full redundancy is required. 2. Heating Boilers Fully modulating burner control with a minimum 4:1 turndown ratio. For systems without rooftop gas packs, boiler plants should be designed N+1 to provide redundancy. Systems using condensing boilers should be designed around the manufacturer s recommendations to provide the best life-cycle cost. Constant flow loops may need to be of the primary secondary type to operate the boiler in its efficiency range. Steam boilers will not be installed in new heating distribution systems. Condensate treatment required for all condensing boilers. Above 4 MMBtu total capacity, cast iron sectional boiler(s) with a condensing boiler as pony boiler to increase seasonal efficiency is preferred. Control panels on Condensing boilers must be integrated into the BAS system. Sequencing controllers shall only be used for installation with multiple boilers. Multiple boilers shall have a manufacturer s approved sequencing panel with dedicated outside air sensor for stand-alone operation. Single boilers will have onboard modulating control. Boiler controls and sequence of operation require Owner approval no later than 100% Design Development (DD). 3. Domestic Hot Water Central system in boiler room vs. distributed system shall be determined by site-specific comparison. Comparison should be based on life-cycle costing. Specific retrofit and remodeling application may require life-cycle comparison of electric vs. natural gas vs. tankless demand. District preferred systems: Commercial 199,000 Btu high-efficiency natural gas water heaters with a 90+ rating, or condensing hot water boiler with storage tank. For large systems provide life-cycle cost comparison of multiple 199,000 Btu water heaters vs. single condensing boiler with storage tank. Division 23: HVAC Revised: 9/17/14 Page 11 of 16
12 B. CHILLERS All Projects Chilled water coils on rooftop air handlers shall be used only with BSD approval and entire system must be freeze protected to 10 F. BSD approval required at beginning of DD. Life-cycle costing should be used for system comparisons if chilled water systems are being considered as an option during design. Only use chillers if it pays through life-cycle costing. Comparison should include Direct Expansion (DX) (as baseline) vs. Air Cooled Chiller vs. Water Cooled Chiller vs. Chiller with Water-Side Economizer. No chilled water systems under 100 tons. Always consider chilled water system in multi-story buildings with high ratio of interior to exterior zones. Because of limited summer run-time, emphasize turn down ratio and Integrated Part Load Value (IPLV) over Energy Efficiency Rating (EER). Refrigerants: All systems over five tons must use a refrigerant approved by BSD HVAC Department. Refrigerant R-410a is acceptable for small DX equipment (20 tons or less). Ground fault protection for equipment is required on systems over 50 tons. VI. APPENDICES Division 23: HVAC Revised: 9/17/14 Page 12 of 16
13 APPENDIX A Controls Network Structure IT Net District IT Network IP Address ADX Server Enterprise Server HVAC Net NAE N1 ROUTER Local Bus & Devices LON Bus LON Devices B A C n e t B u s JCI Serial BACnet N2 Bus N2 Devices N1 BACnet IP Devices Air Handler Chiller Division 23: HVAC Revised: 9/17/14 Page 13 of 16
14 APPENDIX B VAV Design Parameters Size to: Heating: 70 +/- 1 F Cooling: 75 +/- 1 F Economizer Return Air (RA)> Outside Air (OSA) > 50 F Heating Design Day 17 F o o o o For hydronic system (hot water reset = 40 F/140 F) Preferred system: Gas pack Air Handling Unit (AHU) (17 F HDD) and Hydronic VAV (40 F/140 F) Gas pack used for warm up and Night Low Limit (NLL) only. Rooftop units over 200,000 Btu = modulating burner 4:1 turndown minimum Match zone loads to avoid simultaneous cooling and heating. Design with separate interior and perimeter zones. Airside economizers required for all air handling equipment. Use demand control ventilation when required by Oregon code and for spaces with large population diversity. The method chosen should limit outside air to a reasonable default set point in the event of a sensor going out of calibration. Heat recovery ventilation recommended for areas with greater than 50% minimum outside air. BSD approval required for any system requiring greater than 50% minimum outside air. Fume hoods and exhaust fans need tempering of make up air. Air balance must be addressed during design. Design minimum air setting for VAV boxes to balance at less than 50% of cooling cubic feet per minute (cfm). Floating-point valve actuators shall not be used with VAV systems. Self-balancing ball valves are preferred. All rooftop VAV systems with gas packs shall be designed and programmed so that the gas heat is used only for night low limit, morning warm-up, and provide backup during a boiler failure. There are three modes of control for each rooftop unit. A separate Proportional Integral Derivative (PID) control loop shall be required for each mode. The modes are heating mode, ventilate, and mechanical cooling mode. Building static control should be accomplished by controlling return fans to track supply fans. Units with exhaust fan instead of a return fan should have the fan controlled as recommended by the unit manufacturer. Division 23: HVAC Revised: 9/17/14 Page 14 of 16
15 APPENDIX C VAV Sequence of Operations Gas-Fired, DX Cooled, Variable Air Volume RTU with VAV Exhaust Fan Sequence of Operations All values in parentheses are initial settings and shall be user-adjustable from the graphical and text user interfaces. Unoccupied Fans off, heat off, DX cooling off, and dampers indexed to full recirculation. Unoccupied Low Limit The unoccupied low limit shall be accomplished by both the RTU gas furnace and the terminal unit hot water re-heat (boiler operation). The system shall continuously monitor the lowest VAV terminal unit zone temperature associated with the VAV RTU. When the lowest zone temperature drops below the RTU night low limit set point (55 F), the RTU fan will start and heating staged to full heating. All VAVs shall be indexed to control to current air flow set point to ensure proper flow across RTU heat exchanger. RTU dampers shall remain in full recirculation. Units shall heat until lowest zone is five degrees above RTU night low limit set point. Subject to the boiler outside air lockout temperature (65 F), when the RTU fan is operational in unoccupied low limit and there is a call for heating at any VAV terminal unit served by that unit, the boiler system will be enabled. Warm-up Fan runs continuously. Based on the average zone temperature, the optimum start/stop function starts the RTU in warm-up mode so that the average zone temperature will reach set point at the scheduled occupancy time. The RTU set point shall be the calculated average of all individual zone temperature set points for the VAV terminal units served by the RTU. During warm-up, the dampers shall remain in full circulation and shall cycle to minimum outside/co 2/economizer control at occupancy time regardless of average zone temperature. The boiler system and terminal units shall be enabled for warm-up mode at the same time as the first RTU starts for warm-up. Occupied The occupied sequence of operations for the gas-fired heat, DX cooled, Roof Top Units shall consist of three separate control modes: heating, ventilation and mechanical cooling modes. All modes are active continuously during occupied mode subject to individual mode limits. This will allow heating and ventilation mode to be in effect at the same time and ventilation and mechanical cooling to be in effect at the same time. Based on mode limits, heating and mechanical cooling modes should not be in effect at the same time. Fan runs continuously. Modulate gas furnace, economizer dampers, and mechanical cooling to control zone temperatures per the following operating modes. Division 23: HVAC Revised: 9/17/14 Page 15 of 16
16 Heating Mode The gas furnace shall be locked out above an outside air temperature of (65) F. Gas furnace is disabled unless average zone temperature falls below RTU heating/warm-up set point. Ventilation Mode The mixed air control shall modulate to control the following, in the priority order listed: Mixed air low limit set point (45 F) to prevent comfort problems. Mixed air high limit set point (85 F) to prevent excess cooling load. CO 2 high limit set point ( ppm reset). Discharge air temperature set point (reset on outside air) subject to outside air temperature lockout. If the outside air is above return air temperature (2 degree dead band), modulate dampers to minimum air flow. Minimum ventilation air flow rate: (350 cfm). The discharge air set point shall be reset from (55) F at (70) F outside air to (65) F at (50) F based on an outside air temperature reset. If the outside air temperature is above the return air temperature the mixed air should be at minimum position as allowed by the minimum outside air setting and CO 2 level. Mechanical Cooling Mode DX cooling shall be locked out below an outside air temperature of (60) F. The system shall continuously monitor the highest VAV terminal unit zone temperature associated with the VAV RTU. The RTU will modulate the mechanical cooling to maintain the highest VAV terminal unit temperature at the RTU cooling temperature set point. The computer room unit thermostat should not be allowed to participate in any voting for average or maximum zone temperature. Fan Control The RTU supply fan shall control to a duct static pressure set point. The system shall continuously monitor the maximum VAV terminal unit damper position and reset the duct static pressure from 0.5 to 1.5 so the maximum damper position is continuously at 95%. The exhaust fan shall not be energized unless the dampers are positioned at greater than 50%. When operating, the RTU exhaust fan shall control to the building static pressure set point (0.03 ). Division 23: HVAC Revised: 9/17/14 Page 16 of 16
UNIVERSITY OF MISSOURI 23 0000 - Heating Ventilating and Air-Conditioning (HVAC) March 2015.01
GENERAL: This section provides general standards for overall sizing and design of Heating, Ventilating, and Air Conditioning (HVAC) systems. Other sections contain specific standards for each system per
Presentation Outline. Common Terms / Concepts HVAC Building Blocks. Links. Plant Level Building Blocks. Air Distribution Building Blocks
Presentation Outline Common Terms / Concepts HVAC Building Blocks Plant Level Building Blocks Description / Application Data Green opportunities Selection Criteria Air Distribution Building Blocks same
AIR COOLED CHILLER CHILLED WATER PUMP CONTROL: The chilled water pump with the lowest runtime will automatically start when the outside air temperature rises above the system enable setpoint. When the
SAM HOUSTON STATE UNIVERSITY
PART 1: GENERAL 1.01 General Requirements A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the
Commissioning - Construction Documents (Page 1 of 6)
Commissioning - Construction Documents (Page 1 of 6) A. General Information Climate Zone: Building Type: Conditioned Area (sf): Reviewer's Name: Reviewer's Agency: Note: Design Review for each system/subsystem
HVAC Processes. Lecture 7
HVAC Processes Lecture 7 Targets of Lecture General understanding about HVAC systems: Typical HVAC processes Air handling units, fan coil units, exhaust fans Typical plumbing systems Transfer pumps, sump
A. The Commissioning Authority (CxA) has been contracted or will be contracted directly with the Owner for this project.
DIVISION 23 HEATING, VENTILATING, AND AIR CONDITIONING (HVAC) SECTION 23 08 02 PART 1 GENERAL 1.01 AUTHORITY (CxA) A. The Commissioning Authority (CxA) has been contracted or will be contracted directly
Advanced Energy Design Guide LEED Strategies for Schools. and High Performance Buildings
Advanced Energy Design Guide LEED Strategies for Schools and High Performance Buildings Today s Presenters Stephen Koontz, LEED AP Energy Services Leader Tampa Bay Trane Allen Irvine General Sales Manager
HVAC Systems: Overview
HVAC Systems: Overview Michael J. Brandemuehl, Ph.D, P.E. University of Colorado Boulder, CO, USA Overview System Description Secondary HVAC Systems Air distribution Room diffusers and air terminals Duct
Example Retrocommissioning Measure: Opening Throttled Discharge Valves
Opening Throttled Discharge Valves This 21-story building, constructed in 1997, is located in Oregon and contains 589,000 gross square feet of mostly office occupancy. The HVAC system includes six large
UNIFIED FACILITIES GUIDE SPECIFICATIONS
USACE / NAVFAC / AFCEC / NASA UFGS-23 09 93 (November 2015) ----------------------------- Preparing Activity: USACE Superseding UFGS-23 09 23 (May 2011) UNIFIED FACILITIES GUIDE SPECIFICATIONS References
KU DESIGN GUIDELINES APPENDIX XVI RECOMMENDED BAS I/O CONTROL POINTS BY EQUIPMENT / SYSTEM
KU DESIGN GUIDELINES APPENDIX XVI RECOMMENDED BAS I/O CONTROL POINTS BY EQUIPMENT / SYSTEM AIR HANDLING UNITS... 1 CHILLERS... 2 COOLING TOWERS... 2 CLOSED LOOP COOLERS... 2 MISCELLANEOUS SUPPLY FANS...
Bring the fresh in. Dedicated Outside Air Systems
Bring the fresh in. Dedicated Outside Air Systems The inside story on outside air. On average, we breathe in 3,400 gallons of air each day. Ambient indoor air pollution is a major problem, affecting health
2 STEPS TO CONDUCTING YOUR HVAC ASSESSMENT
Presentation Synopsis Heating, Ventilating and Air Conditioning Building Condition Assessment Vancouver, B.C. Prepared for: EPIC Prepared by: Douglas Spratt, P.Eng Douglas Spratt & Associates Ltd. www.dspratt-associates.com
Sample - Existing Building Commissioning Plan
Sample - Existing Building Commissioning Plan Version: Draft for Review Final Approved: Owner Site Address: Primary Site Contact Name and Telephone Number: Date Building Description The site consists of
ENHANCED LABORATORY HVAC SYSTEM
ENHANCED LABORATORY HVAC SYSTEM INTRODUCTION Since the early 1980's the attention to more energy efficient laboratory designs has been on the rise due to the increase in energy cost and the emergence of
Heating, Ventilation & Air Conditioning Equipment
FinAnswer Express Wyoming Incentive Catalog Effective as of October 1, 2011 Heating, Ventilation & Air Conditioning Equipment Rocky Mountain Power provides incentives for many types of energy efficient
SECTION 23 81 03 - PACKAGED ROOFTOP AIR CONDITIONING UNITS NON-CUSTOM
SECTION 23 81 03 - PACKAGED ROOFTOP AIR CONDITIONING UNITS NON-CUSTOM PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Packaged rooftop air conditioning unit (5 tons and smaller). 2. Roof curb. 1.2
Heating, Ventilation & Air Conditioning Equipment
FinAnswer Express Utah Incentive Catalog Effective as of May 19, 2012 Heating, Ventilation & Air Conditioning Equipment Rocky Mountain Power provides incentives for many types of energy-efficient technologies.
Tim Sisson - Trane HVAC OVERVIEW
Tim Sisson - Trane HVAC OVERVIEW HVAC Systems System Types Acoustics Controls Modernization more than one Down to the Studs Opportunity for new System Type Renovation Possible opportunity for new System
1. What percent of a commercial business s energy usage comes from their HVAC system? A. 13% B. 23% C. 33% D. 43% E. 53%
1 1. What percent of a commercial business s energy usage comes from their HVAC system? A. 13% B. 23% C. 33% D. 43% E. 53% 2. How much money do commercial facilities spend per square foot on energy costs
Design Guide. Retrofitting Options For HVAC Systems In Live Performance Venues
Design Guide Retrofitting Options For HVAC Systems In Live Performance Venues Heating, ventilation and air conditioning (HVAC) systems are major energy consumers in live performance venues. For this reason,
NEBB STANDARDS SECTION-8 AIR SYSTEM TAB PROCEDURES
NEBB STANDARDS SECTION-8 AIR SYSTEM TAB PROCEDURES 8.1 INTRODUCTION Testing, adjusting, and balancing of HVAC systems can best be accomplished by following a series of systematic procedures. The NEBB TAB
Fundamentals of HVAC Control Systems
ASHRAE Hong Kong Chapter Technical Workshop Fundamentals of HVAC Control Systems 18, 19, 25, 26 April 2007 2007 ASHRAE Hong Kong Chapter Slide 1 Chapter 5 Control Diagrams and Sequences 2007 ASHRAE Hong
Glossary of Heating, Ventilation and Air Conditioning Terms
Glossary of Heating, Ventilation and Air Conditioning Terms Air Change: Unlike re-circulated air, this is the total air required to completely replace the air in a room or building. Air Conditioner: Equipment
5.6 Technical Specification: Premium Efficiency Electric Air Conditioning Equipment
5.6 Technical Specification: Premium Efficiency Electric Conditioning Equipment Small Premium Project Type: For Premium Conditioning Retrofit Projects: Projects that voluntarily replace existing unitary
Building Energy Systems. - HVAC: Heating, Distribution -
* Some of the images used in these slides are taken from the internet for instructional purposes only Building Energy Systems - HVAC: Heating, Distribution - Bryan Eisenhower Associate Director Center
1.2 Refrigerant Equipment. General
Part 1 General 1.1 Summary.1 Unless otherwise indicated, follow the standards below when specifying heating, ventilation and air conditioning (HVAC) work. These standards are not intended to restrict or
B.C. Buildings Corporation. Mandatory Preventive Maintenance Standard. To Meet Section 4.78 of the WCB OH & S Regulation
B.C. Buildings Corporation Mandatory Preventive To Meet Section 4.78 of the WCB OH & S Regulation Prepared by: BCBC WCB-IAQ Steering Committee Mandatory Preventive TABLE OF CONTENTS Page no. INTRODUCTION...1
SECTION 23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC INTRODUCTORY INFORMATION
SECTION 23 05 93 TESTING, ADJUSTING, AND BALANCING FOR HVAC INTRODUCTORY INFORMATION The purpose of this guide specification is to assist the specifier in correctly specifying Mechanical System Testing
The main steam enters the building in the basement mechanical room; this is where the condensate line also leaves the building.
MSV: Square Footage: 24,844 No. of Floors: 1 Year Built: 1963 Type of Use: Lounge and dining area open all night for snacks Steam Water-cooled condenser, 50-Ton York unit with a 6 cylinder-reciprocating
Element D Services Heating, Ventilating, and Air Conditioning
PART 1 - GENERAL 1.01 OVERVIEW A. This section supplements Design Guideline Element D3041 on air handling distribution with specific criteria for projects involving design of a Data Center spaces B. Refer
Condensing Boiler Efficiency
Condensing Boiler Efficiency Date: July 17, 2012 PRES E NT ED BY DO N L E O NA RDI LE O N A RD I I NC. HV AC T RAI N I N G & C ON SU LT IN G Concepts 1 The current state of evolution in boiler design 2
Ductless Heat Pumps. Gary Nordeen January 2009. www.nwbuildings.org/dhp.aspx [email protected]
Ductless Heat Pumps Gary Nordeen January 2009 www.nwbuildings.org/dhp.aspx [email protected] Outline Heat Pump Basics Ductless Heat Pumps Efficiency Advantages Commercial installations Planning (applications,
HVAC Simplified Approach Option
HVAC Simplified Approach Option Part I Project Address: City: HVAC System Designer of Record: Date: Zip: Qualification The building is 2 stories or less in height and has a gross floor area is less than
for Plans Examiners and Building Inspectors
Building Technologies Program HVAC Controls Guide for Plans Examiners and Building Inspectors September 2011 Authors: Eric Makela, PNNL James Russell, PECI Sarah Fujita, PECI Cindy Strecker, PECI Prepared
ALBUQUERQUE PUBLIC SCHOOLS Facility Design & Construction / Maintenance & Operations
ALBUQUERQUE PUBLIC SCHOOLS Facility Design & Construction / Maintenance & Operations MECHANICAL SYSTEMS DESIGN STANDARDS Appendix A RECOMMENDED HVAC SYSTEMS BY TYPE OF SPACE Matt Higgins Valentin Lucero
RFI Response RFP: HSCG88-16-R-PQQ015 Replace HVAC Bldg A & C San Diego, CA.
1. There is verbiage in the hazardous material report referring to a state licensed abatement contractor. Within the recommendations part of the report (page 64 of 111 of the specification pdf) is the
Energy Efficiency in Industrial HVAC Systems
Energy Efficiency in Industrial HVAC Systems Heating, ventilation and air conditioning (HVAC) constitutes up to 35 percent of energy used in manufacturing facilities. This fact sheet is geared towards
Variable Air Volume - VAV
Mode Enable Sensor Options Variable Air Volume - VAV The temperature of this sensor will determine if the unit is in heating, cooling or vent mode during occupied operation. The following options are available:
HVAC Technologies for Building Energy Efficiency Improvements 2013 National Symposium on Market Transformation. Richard Lord Carrier Fellow
HVAC Technologies for Building Energy Efficiency Improvements 2013 National Symposium on Market Transformation Richard Lord Carrier Fellow HVAC Industry Challenges and Issues Ozone Deletion Global Warming
Guide Specification SECTION 23 08 00 - COMMISSIONING OF HVAC PART 1 - GENERAL 1.1 SUMMARY
SECTION 23 08 00 - COMMISSIONING OF HVAC PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. HVAC Commissioning description. 2. HVAC Commissioning responsibilities. 1.2 REFERENCES A. American Society
Mechanical, Plumbing, and Fire Protection Conditions
Mechanical, Plumbing, and Fire Protection Conditions Mechanical Conditions The mechanical systems within the building consist of a combination of the original 1926 systems and renovations that occurred
ASPE Seminar Water Heater Piping Strategies. Presented by Joe Kalarickal, EIT Regional Sales Manager AERCO International
ASPE Seminar Water Heater Piping Strategies Presented by Joe Kalarickal, EIT Regional Sales Manager AERCO International Presentation Overview Water Heater Piping Strategies How to size a water heater?
HVAC Basic Science - System Capacity
HVAC Basic Science - System Capacity Btu/hour, btu/h, b/h, btuh. btu?? 1 MBH = 1000 btu/hour 1 KBH = 1000 btu/hour 1 ton of cooling= 12,000 btu/hour 1 watt = 3.414 btu/hour 1 kilowatt = 1000 watts = 3,414
3/29/2012 INTRODUCTION HVAC BASICS
INTRODUCTION HVAC BASICS AND HVAC SYSTEM EFFICIENCY IMPROVEMENT SECTION O HVAC systems or Heating, Ventilating and Air-Conditioning systems control the environment for people and equipment in our facilities.
HVAC Systems in Schools & Commercial Buildings and Radon
HVAC Systems in Schools & Commercial Buildings and Radon References US EPA Radon Prevention in the Design and Construction of Schools and Other Large Buildings http://www.epa.gov/ordntrnt/ord/nrmrl/pubs/1993/air/
Sample Company SECTION 019113 GENERAL COMMISSIONING REQUIREMENTS PART 1 GENERAL 1.1 SUMMARY AND CONTRACT RESPONSIBILITIES
SECTION 019113 GENERAL COMMISSIONING REQUIREMENTS PART 1 GENERAL 1.1 SUMMARY AND CONTRACT RESPONSIBILITIES A. The Owner will contract separately and directly for the majority of the commissioning work
Lesson 36 Selection Of Air Conditioning Systems
Lesson 36 Selection Of Air Conditioning Systems Version 1 ME, IIT Kharagpur 1 The specific objectives of this chapter are to: 1. Introduction to thermal distribution systems and their functions (Section
Printing and Publishing Energy Savings Guide
Printing and Publishing Energy Savings Guide Oregon printing and publishing plants face challenges of rising operating costs, environmental and other regulations, outdated equipment and customer demand
Greenhouse Gas Implications of HVAC Upgrades in Multi-Unit Residential Buildings
Greenhouse Gas Implications of HVAC Upgrades in Multi-Unit Residential Buildings J A NUARY 2015 INTRODUCTION This Research Report explores best practices and approaches for reducing greenhouse gas (GHG)
Glossary of HVAC Terms
Glossary of HVAC Terms Heating, Ventilation and Air Conditioning (HVAC) is a major sub- discipline of mechanical engineering. The goal of HVAC design is to balance indoor environmental comfort with other
CHAPTER 8 HVAC (Heating, Ventilation, and Air-Conditioning)
CHAPTER 8 HVAC (Heating, Ventilation, and Air-Conditioning) Objectives Survey current HVAC system(s), operating procedures, and maintenance schedule. Analyze results of energy audit for HVAC system(s)
Creating Efficient HVAC Systems
Creating Efficient HVAC Systems Heating and Cooling Fundamentals for Commercial Buildings Heating, ventilating, and air conditioning (HVAC) systems account for nearly half of the energy used in a typical
48/50EJ,EK,EW,EY038, 044, 048 SINGLE-PACKAGE COOLING UNITS VARIABLE VOLUME CONSTANT VOLUME FACTORY-INSTALLED OPTIONAL HEAT
48/50E-4SB 48/50EJ,EK,EW,EY038, 044, 048 SINGLE-PACKAGE COOLING UNITS VARIABLE VOLUME CONSTANT VOLUME FACTORY-INSTALLED OPTIONAL HEAT GAS HEAT ELECTRIC HEAT PERFORMANCE DATA CERTIFIED DIMENSION PRINT CERTIFIED
Introduction to Building Automation Systems (BAS)
Introduction to Building Automation Systems (BAS) Ryan R. Hoger, LEED AP 708.670.6383 [email protected] Building Automation Systems Centralized controls Change scheduling for multiple HVAC units
Centauri. Condensing Fire Tube Water Boiler 399 to 1000 MBH
Centauri Condensing Fire Tube Water Boiler 399 to 1000 MBH Pre-mix surface burner with up to a 7-to-1 turndown NOx levels as low a 5 ppm at full rate Operates on 4" gas pressure shown with optional gauges
Rev. No. 0 January 5, 2009
ENERGY & ENVIRONMENTAL ENERGY ISSUES COMMITTEE 415 Main Building Telephone (574) 631-6666 Notre Dame, Indiana Facsimile (574) 631-5883 46556 USA Energy Conservation Plan For HVAC Systems Rev. No. 0 January
Data Realty Colocation Data Center Ignition Park, South Bend, IN. Owner: Data Realty Engineer: ESD Architect: BSA LifeStructures
Data Realty Colocation Data Center Ignition Park, South Bend, IN Owner: Data Realty Engineer: ESD Architect: BSA LifeStructures Project Overview Data Realty is a data center service provider for middle
NYC Department of Education Building Condition Assessment Survey 2014-2015 BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 10004
School: InspectionId Asset Data Inspection Type Building Assessment Survey 204-205 BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 0004 Time In Last Edited 255 MECHANICAL 205-05-8 09:00AM
Xcel Business Customers: Program and Rebate Summary
Xcel Business Customers: Program and Rebate Summary Rebates for New Energy-Efficient Equipment Xcel offers prescriptive rebates to its business customers. What s a prescriptive rebate? It simply means
Design Options for HVAC Distribution Systems
Design Options for HVAC Distribution Systems Course No: M06-017 Credit: 6 PDH A. Bhatia Continuing Education and Development, Inc. 9 Greyridge Farm Court Stony Point, NY 10980 P: (877) 322-5800 F: (877)
CONTROL STRATEGIES FOR HVAC SYSTEMS
CONROL SRAEGIES FOR HVAC SYSEMS ZBIGNIEW POPIOLEK Department of Heating, Ventilation and Dust Removal echnology Silesian University of echnology, Poland 1 Definition of control: to apply a regulating influence
QUESTIONS TO ASK WHEN REPLACING YOUR HVAC TOGETHERWESAVE.COM
QUESTIONS TO ASK WHEN REPLACING YOUR HVAC TOGETHERWESAVE.COM TOGETHERWESAVE.COM IS IT TIME TO REPLACE YOUR HVAC SYSTEM? If your heating and cooling system is 15 to 20 years old and is experiencing problems,
STANDARD COMMISSIONING PROCEDURE FOR PACKAGED HEAT PUMP (AIR-TO-AIR) & AIR CONDITIONING UNITS
STANDARD COMMISSIONING PROCEDURE FOR PACKAGED HEAT PUMP (AIR-TO-AIR) & AIR CONDITIONING UNITS BUILDING NAME: APPLICATION #: BUILDING ADDRESS: NAME & FIRM OF PERSON(S) DOING TEST: DATE(S) OF TEST: General
Topics for Today. Order of Magnitude Mechanical Estimating. Order of Magnitude Estimate Goal. Project Delivery Methods. Questions for Client
Order of Magnitude Mechanical Estimating Justin Apprill, P.E. Topics for Today Estimate Goals A Concept for Accurate Conceptual Estimating HVAC Systems Common System Types and Rules of Thumb Pricing Example
Ventilation Retrofit Opportunities for Packaged HVAC
Ventilation Retrofit Opportunities for Packaged HVAC Reid Hart, PE National Energy Efficiency Technology Summit September 2012 PNNL-SA-90782 Acknowledgements Bonneville Power Administration City of Eugene
2015 C&I HVAC RETROFIT APPLICATION FOR PRESCRIPTIVE REBATES
2015 C&I HVAC RETROFIT APPLICATION FOR PRESCRIPTIVE REBATES WELCOME TO THE POWER MOVES C&I HVAC RETROFIT PROGRAM. We look forward to working with you. If you have questions after reading this application,
Case Study -Sandy Grove Middle School First Net Positive Energy P3 School In North Carolina
Case Study -Sandy Grove Middle School First Net Positive Energy P3 School In North Carolina Public-Private Partnership (P3) Government - provides incentive(s): transfer of asset (land), one time grant,
Preliminary Final Proposal
1 Butler Memorial Hospital New Inpatient Tower Senior Capstone Project Mechanical Option Preliminary Final Proposal Mechanical System Re-design and Breadth Topics Butler Memorial Hospital New Inpatient
Heating, Ventilation and Air Conditioning Rebate Catalog Saving energy for a brighter future
Pacific Gas and Electric Company Energy-Efficiency s for Your Business Heating, Ventilation and Air Conditioning Catalog Saving energy for a brighter future Customers may be eligible to participate in
PMI-IF-H High Efficiency Gas Heat Units
PMI-IF-H High Efficiency Gas Heat Units Mechanical High Efficiency Gas Fired Make-Up Air Units Price s new line of high efficiency indirect fired gas heating products are designed to meet the goals of
Presented By: WALTER E. JOHNSTON, PE CEM, CEA, CLEP, CDSM, CPE <[email protected]
Presented By: WALTER E. JOHNSTON, PE CEM, CEA, CLEP, CDSM, CPE
Impact of Control System Technologies on Industrial Energy Savings
Impact of Control System Technologies on Industrial Energy Savings Priyam Parikh Industrial Assessment Center Texas A&M University Bryan P. Rasmussen Industrial Assessment Center Texas A&M University http://farolconsulting.com/?page_id=110
Energy Design Resources Commissioning Plan Outline Template
IMPORTANT NOTICE: This sample document is provided for instructional purposes only. CCC is not rendering advice concerning any commission project or practices. This document is neither approved nor intended
HVAC Checklist - Long Form
HVAC Checklist - Long Form Page 1 of 14 Appendix B discusses HVAC system components in relation to indoor air quality. utside Air Intake Location pen during occupied hours? Unobstructed? Standing water,
BPC Green Builders. Green building for new and existing homes. Health Comfort Energy
BPC Green Builders Green building for new and existing homes Health Comfort Energy Mechanical Systems Installed HVAC Systems Primary energy source large, roof mounted, solar thermal array (AET flat plate)
SECTION 23 81 43 HEAT PUMPS
SECTION 23 81 43 HEAT PUMPS PART 1 GENERAL 1.1 SUMMARY A. Section Includes: 1. Packaged rooftop heat pumps. 1.2 REFERENCES A. American Society of Heating, Refrigerating and Air-Conditioning Engineers:
SECTION 23 00 01 HEATING, VENTILATION AND AIR CONDITIONING EQUIPMENT
SECTION 23 00 01 HEATING, VENTILATION AND AIR CONDITIONING EQUIPMENT PART 1 - GENERAL 1.1 DESCRIPTION A. The Work specified in this Section consists of designing, furnishing and installing factory-assembled
Retrofitting for Optimum HVAC Performance by Greg Jourdan Wenatchee Valley College
Retrofitting for Optimum HVAC Performance by Greg Jourdan Wenatchee Valley College 1 Diamonds are Forever But the sparkle in your building may be wasted energy. It s the Little Things The Low-Cost /No-Cost
HEATING, VENTILATION & AIR CONDITIONING
HEATING, VENTILATION & AIR CONDITIONING as part of the Energy Efficiency Information Grants Program Heating and cooling can account for approximately 23 % of energy use in pubs and hotels 1. Reducing heating
How To Buy A Lennox Power System
HVAC for Schools A Comprehensive Look at Products for a Clean, Comfortable Learning Environment Why Schools Choose Lennox Even as resources for schools continue to be constrained, education leaders and
Design Options For HVAC Distribution System
PDHonline Course M147 (4 PDH) Design Options For HVAC Distribution System Instructor: A. Bhatia, B.E. 2012 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax, VA 22030-6658 Phone & Fax: 703-988-0088
Innovent LASER Packaged Fresh Air Conditioning Units
LASER Latent And Sensible Energy Reduction Latent And Sensible Energy Reduction For Outside Air Innovent LASER Packaged Fresh Air Conditioning Units Innovent LASER units provide both sensible and latent
Florida Power & Light Company. Business Heating Ventilation & Air Conditioning ( HVAC ) Program Standards. Effective: November 9, 2015
Florida Power & Light Company Business Heating Ventilation & Air Conditioning ( HVAC ) Program Standards Effective: November 9, 2015 Table of Contents Eligibility Requirements - Chiller... 2 Rebate Amount
HVAC For Schools How to purchase an HVAC system that meets your school s unique requirements and stays within your budget
A PRIMER Educational HVAC For Schools How to purchase an HVAC system that meets your school s unique requirements and stays within your budget Contents: Introduction: The best HVAC system is durable, reliable
HIGH EFFICIENCY RTU. www.reznorhvac.com HIGH EFFICIENCY, PACKAGED SPACE CONDITIONING. DX System IEER> 13.2 Gas Heat Efficiency > 92% Capacities Tons
Capacities 10-25 Tons 100-400 MBH HIGH EFFICIENCY, PACKAGED SPACE CONDITIONING DX System IEER> 13.2 Gas Heat Efficiency > 92% HIGH EFFICIENCY RTU 30-120 kw 3,000-11,550 CFM Comfort Comfort is determined
COMMERCIAL HEATING VENTILATION & AIR CONDITIONING (HVAC)
COMMERCIAL HEATING VENTILATION & AIR CONDITIONING (HVAC) REBATE FORM Valid July 1 - December 31, 2015 Steps to Getting Your Rebate: 1. Confirm that equipment is eligible. 2. Purchase and install new eligible
Mechanical Systems Proposal revised
Mechanical Systems Proposal revised Prepared for: Dr. William Bahnfleth, Professor The Pennsylvania State University, Department of Architectural Engineering Prepared by: Chris Nicolais Mechanical Option
Building Commissioning 17900-1
SECTION 17900 BUILDING COMMISSIONING PART 1 - GENERAL 1.01 WORK DESCRIPTION: A. General: 1. The Commissioning process is a joint team effort to ensure that all mechanical equipment, controls, and systems
Energy Efficiency. Energy Efficient Home Cooling:
Energy Efficiency Energy Efficient Home Cooling: Choosing an air conditioning system is an important decision. A poor choice may be costly to purchase and operate and yet fail to provide the desired cooling
RPV - RP - RA air handling units
APPLICATIONS Heating, ventilation, cooling >> FACTORIES >> WAREHOUSES >> HALLS >> DISTRIBUTION CENTRES >> COMMERCIAL PREMISES >> PLACES OF WORSHIP RPV - RP - RA air handling units www.reznor.eu RPV - RP
SECTION 15750 PACKAGED ROOFTOP AIR CONDITIONING UNITS
SECTION 15750 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes requirements for roof mounted, self-contained units, with electric cooling, and electric or reverse refrigeration cycle (heat pump) heating
C. Burner management system to follow requirements of Industrial Risk Insurers (IRI).
SECTION 23 52 30 PART 1 - GENERAL 1.01 RELATED WORK A. Section 23 05 00: Common Work Results for HVAC B. Section 23 25 00: Chemical Water Treatment C. Section 23 51 23: Flue Piping 1.02 QUALITY ASSURANCE
SPECIAL ISSUE: NATIONAL SCIENCE FOUNDATION WORKSHOP
research journal 2013 / VOL 05.01 www.perkinswill.com SPECIAL ISSUE: NATIONAL SCIENCE FOUNDATION WORKSHOP ARCHITECTURE AND ENGINEERING OF SUSTAINABLE BUILDINGS Current Trends in Low-Energy HVAC Design
ECOCIAT. Domestic hot water heat recovery unit
Heat recovery unit Domestic hot water High energy efficiency with R410A Compact and quiet Scroll compressors Brazed-plate heat exchangers Heating Heat recovery ENVIRONMENTALLY HFC R410A PROTECTION DE FRIENDLY