2 Expo Board Presentation Monthly Project Status Update May 7, 2015

3 Expo Phase 1

4 Phase 1 Project Status Closeout Status Completing Closeout of Remaining Elements of Work Final As-Builts nearing completion Open Warranty/Final Acceptance items nearing completion Ridership Expo Line ridership for March 2015: 30,000 weekday riders

5 Expo Phase 2

6 Construction Activities Test Train Crossing at Bagley Avenue

7 Construction Activities Train Clearance Testing Inside the I-10 Box

8 Construction Activities Progress at the Westwood Kiss-n-Ride

9 Construction Activities Expo/Sepulveda Station Plaza Paving

10 Construction Activities West Yard at the Operations and Maintenance Facility

11 Construction Activities Progress at the Downtown Santa Monica Station

12 Project Status Alignment Design-Build Contract Construction Highlights Track installation is complete Overhead Catenary System installation is underway Signal crossing equipment installation is ongoing at all grade crossings New traffic signals at Bagley, Overland and Westwood are operational Train testing began on April 6 in Segment 1 of the alignment

13 Project Status Operations and Maintenance Facility Continued construction of main and secondary buildings Traction power substation commissioning activities continue OCS pole foundation work is complete Track installation is continuing Venice Boulevard Aerial Structure Sidewalk improvements and traffic signal work has been completed Working on City of Los Angeles punchlist items with contractor Finalizing bus stop configuration at the northeast corner of Venice/Robertson Bikeway Contract Grading, paving, irrigation and drainage systems work is ongoing

14 Project Status Major Issues Substantial Completion Dates for both the mainline guideway and OMF have slipped: Evaluating interim milestones for turnover to Metro to begin Pre-Revenue operations and light rail vehicle commissioning Still working towards a Revenue Operations target date of March 2016 Unanticipated settlement of 300 feet of the MSE wall at Centinela: Contractor has solicited cost proposals from 4 contractors to provide an approach and cost to stabilizing the soil at this location.

15 Project Status Community Outreach Conducted targeted outreach for: Several full and partial closures for final paving Street improvement work at various intersections Worked with Metro transit safety education staff to schedule informational tables at community events through the summer

16 L/SBE Program Update Commitment through March 2015 SRJV and its subcontractors have employed 300 small businesses, 213 of which are local Over $142 million has been committed to SBE s Over $77 million has been committed to Local SBE s Bonds have been waived for 46 SBE s Insurance requirements have been relaxed for 40 SBE s

17 L/SBE Goals and Signed Contracts SBE Report through March 31, 2015* Project Completion: 89.3% 30.00% 25.00% 20.00% SBE GOAL = 20% 15.00% Committed Attainment LOCAL SBE GOAL = 7% 15.00% 10.00% 5.00% 24.82% 19.83% 10.00% 5.00% 13.48% 10.42% 0.00% Thru Mar % Thru Mar-15 Commitment and Attainment are based on Total Contract Value of $576,002,028.88

18 Total Project Craft Hours To Date Total Forecast Project Craft Hours Total Craft Hours Percent PROJECT COMPLETION: Local Jobs Program Update 1,717, ,800, % 89.3% Percentage (%) Craft Hours June 1, March 21, 2015 Craft Hours June 1, March 21, 2015 Craft Hours March 22, April 25, 2015 LOCAL HIRING BREAKDOWN Community Area Hours 299, % 6,047.3 Local Area Hours 533, % 12,239.2 Local Worker Hours Subtotal 832, % 18,286.5 Non-Local Hours 852, % 13,756.1 Total 1,685, ,042.6 DISADVANTAGED LOCAL 424, % 9,116.5 Percentage (%) Craft Hours March 22, April 25, 2015 Cumulative Craft Hours To Date Percentage (%) Cumulative Craft Hours To Date 18.9% 305, % 38.2% 545, % 57.1% 850, % 42.9% 866, % 1,717, % 433, % RACE/ETHNICITY BREAKDOWN African-American 146, % 2,512.9 Asian/Pacific Islander 43, % Caucasian 390, % 6,244.8 Hispanic 1,011, % 21,891.2 Native American 30, % 59.5 Other 20, % Declined to Respond 42, % Total 1,685, ,042.6 GENDER BREAKDOWN Female 34, % Male 1,650, % 31,146.6 Total 1,685, ,042.6 CRAFT LEVEL BREAKDOWN** Journeymen 1,003, % 22,509.3 Apprentices 196, % 3,992.0 Total 1,199, , % 148, % 2.8% 44, % 19.5% 397, % 68.3% 1,033, % 0.2% 30, % 0.9% 20, % 0.4% 42, % 1,717, % 35, % 97.2% 1,681, % 1,717, % 1,025, % 15.1% 200, % 1,226,177.4 * Hours are included in Local Hire Hours. ** Does not include Operating Engineers. (requirement is 1 Apprentice:5 Journeymen based on workers) CRAFT WORKER UTILIZATION FOR MARCH 22, APRIL 25, 2015 CRAFTS Laborers Operating Engineers Carpenters Electricians Painters Sheet Metal Workers Glaziers Sprinkler Fitters # Workers CRAFTS Cement Masons Ironworkers Elevator Constructors Plumbers/Pipe Fitters Bricklayers Roofers Plasterers TOTAL WORKERS* # Workers *Does not include Non- Apprenticeable craft workers.

Completing an A.A.S. degree in Applied Trades

Completing an A.A.S. degree in Applied Trades Completing an A.A.S. degree in Applied Trades Applied Trades Verification Form Letter IMPORTANT - Pick up a program completion verification form letter from the Applied Trades program counselor. This form

More information

PROJECT LABOR/LABOR HARMONY/ ACCESS TO SKILLED LABOR POOL

PROJECT LABOR/LABOR HARMONY/ ACCESS TO SKILLED LABOR POOL Memorandum To: TJPA Board of Directors From: Maria Ayerdi-Kaplan, Executive Director Date: For the Board Meeting of July 9, 2015 Re: Project Labor Agreement Status Report The Project Labor Agreement (PLA)

More information

Northwest Light Rail Extension Pre-Construction/Final Design. Public Meeting November 27 & 29, 2012

Northwest Light Rail Extension Pre-Construction/Final Design. Public Meeting November 27 & 29, 2012 Northwest Light Rail Extension Pre-Construction/Final Design Public Meeting November 27 & 29, 2012 6:00 6:30 p.m. Open House 6:30 7:00 p.m. Presentation 7:00 8:00 p.m. Open House 2 Project Overview Carla

More information

DIVISION OF APPRENTICESHIP STANDARDS 320 W. FOURTH ST.#830 LOS ANGELES DISTRICT OFFICE LOS ANGELES,

DIVISION OF APPRENTICESHIP STANDARDS 320 W. FOURTH ST.#830 LOS ANGELES DISTRICT OFFICE LOS ANGELES, DIVISION OF APPRENTICESHIP STANDARDS 320 W. FOURTH ST.#830 LOS ANGELES DISTRICT OFFICE LOS ANGELES, CA 90013 RATIOS OF APPRENTICES TO JOURNEYMEN PHONE: (213) 576-7750 FAX: (213) 576-7758 July 22, 2008

More information

STATE OF HAWAII DEPARTMENT OF LABOR AND INDUSTRIAL RELATIONS. List of Construction Trades in Registered Apprenticeship Programs

STATE OF HAWAII DEPARTMENT OF LABOR AND INDUSTRIAL RELATIONS. List of Construction Trades in Registered Apprenticeship Programs STATE OF HAWAII DEPARTMENT OF LABOR AND INDUSTRIAL RELATIONS List of Construction Trades in Registered Apprenticeship Programs Apprenticeship programs for the following construction trades were approved

More information

Los Angeles Metro Rapid

Los Angeles Metro Rapid Los Angeles Metro Rapid Why BRT In Los Angeles Public dissatisfied with slow bus service Average bus speeds had declined by 10% since late- 1980s LADOT found that 50% of the time a bus is in service it

More information

PREVAILING WAGE RATES. for. Public Works Contracts in Oregon

PREVAILING WAGE RATES. for. Public Works Contracts in Oregon PREVAILING WAGE RATES for Public Works Contracts in Oregon Brad Avakian Commissioner Bureau of Labor and Industries Effective: January 1, 2015 BRAD AVAKIAN COMMISSIONER CHRISTIE HAMMOND DEPUTY COMMISSIONER

More information

Introduction to Construction Project/Jobsite Management

Introduction to Construction Project/Jobsite Management Introduction to Construction Project/Jobsite Management Hal Johnston April 23, 2014 Professor Emeritus Construction Management California Polytechnic State University San Luis Obispo, California, US Visiting

More information

5.0 FINANCIAL ANALYSIS AND COMPARISON OF ALTERNATIVES

5.0 FINANCIAL ANALYSIS AND COMPARISON OF ALTERNATIVES 5.0 FINANCIAL ANALYSIS AND COMPARISON OF ALTERNATIVES 5.1 FINANCIAL ANALYSIS The cost of a transportation investment falls into two categories: capital costs, and operating and maintenance (O&M) costs.

More information

STATE OF NEW JERSEY DEPARTMENT OF LABOR AND WORKFORCE DEVELOPMENT. NOTICE OF GRANT OPPORTUNITY Fiscal Year 2016

STATE OF NEW JERSEY DEPARTMENT OF LABOR AND WORKFORCE DEVELOPMENT. NOTICE OF GRANT OPPORTUNITY Fiscal Year 2016 STATE OF NEW JERSEY DEPARTMENT OF LABOR AND WORKFORCE DEVELOPMENT NOTICE OF GRANT OPPORTUNITY Fiscal Year 2016 NEW JERSEY BUILDERS UTILIZATION INITIATIVE FOR LABOR DIVERSITY NJBUILD NEWARK PROGRAM Announcement

More information

APPENDIX F RIGHTS-OF-WAY PRESERVATION GUIDELINES

APPENDIX F RIGHTS-OF-WAY PRESERVATION GUIDELINES Los Angeles County Metropolitan Transportation Authority (Metro) 2009 Transportation Improvement Program Call for Projects APPENDIX F RIGHTS-OF-WAY PRESERVATION GUIDELINES Los Angeles County Metropolitan

More information

DIVISION OF APPRENTICESHIP STANDARDS 320 W. FOURTH ST

DIVISION OF APPRENTICESHIP STANDARDS 320 W. FOURTH ST DAS Chief. If there are any questions, please contact this DAS office. File #19719 Southern California Acoustical Installers JATC Imperial, Inyo, Kern, Los Angeles, Mono, Orange, Riverside, San Bernardino

More information

Targeted Hiring Programs: Helping the Poor and Disadvantaged Gain Access to Job Creation Projects

Targeted Hiring Programs: Helping the Poor and Disadvantaged Gain Access to Job Creation Projects Targeted Hiring Programs: Helping the Poor and Disadvantaged Gain Access to Job Creation Projects CWA Spring Conference 23APRIL2014 Aiming for Targeted Hiring Impacting generational income mobility through

More information

Project Status Update Open House West End Corridor

Project Status Update Open House West End Corridor Project Status Update Open House West End Corridor The Exposition Construction Authority cordially invites you to a Project Status Update Open House for the Exposition Light Rail Line At this meeting we

More information

Multi-Craft Core Curriculum

Multi-Craft Core Curriculum Multi-Craft Core Curriculum Multi-Craft Core Curriculum he Building and Construction Trades Department s new Multi- Craft Core Curriculum program is open for training. With a rich history of converting

More information

Transit, Rail, Program, Project & Construction Management Experience

Transit, Rail, Program, Project & Construction Management Experience Point of Contact Peter M. Cipolla Vice President, Rail & Transit Mobile: 925.219.5235 Email: [email protected] Project Management Oversight Services Introduction & Background Hatch Mott MacDonald

More information

SAN FRANCISCO LOCAL HIRING POLICY FOR CONSTRUCTION 2013 2014 ANNUAL REPORT

SAN FRANCISCO LOCAL HIRING POLICY FOR CONSTRUCTION 2013 2014 ANNUAL REPORT SAN FRANCISCO LOCAL HIRING POLICY FOR CONSTRUCTION 2013 2014 ANNUAL REPORT TO THE SAN FRANCISCO BOARD OF SUPERVISORS GREETINGS FROM THE MAYOR On behalf of the City and County of San Francisco, I am pleased

More information

City of St. Louis Workforce Study. Volume

City of St. Louis Workforce Study. Volume Volume 2 Final Report June 2015 City of St. Louis Workforce Study Table of Contents CHAPTER 1: CITY OF ST. LOUIS WORKFORCE STUDY... 1-1 I. INTRODUCTION... 1-1 II. LEGAL FRAMEWORK... 1-2 A. LOCAL ORDINANCES...

More information

0909 INSULATION WORKER. Sponsor: ASSOCIATED BUILDERS & CONTRACT Address: 4035 Denton Road,KANSAS CITY,MO64133 Contact: SARA FLAHERTY,913-831-2221

0909 INSULATION WORKER. Sponsor: ASSOCIATED BUILDERS & CONTRACT Address: 4035 Denton Road,KANSAS CITY,MO64133 Contact: SARA FLAHERTY,913-831-2221 U.S. Department of Labor Office of Apprenticeship State: MISSOURI Apprenticeship & Training Rep. Kansas City Area Roy Konkey (816) 502 9093 Sponsor: ASBESTOS WKRS - KC Address: 400 SOUTH MAIN,INDEPENDENCE,MO64050

More information

Light Rail Transit in Phoenix

Light Rail Transit in Phoenix 4. Presentation and Discussion: Phoenix Light Rail Implementation Wulf Grote Planning and Development Director, Phoenix Valley Metro Light Rail Transit in Phoenix Broadway Citizen s Task Force February

More information

Oregon Apprenticeship Degrees, Certificates, and Occupations (April 7, 2015)

Oregon Apprenticeship Degrees, Certificates, and Occupations (April 7, 2015) Oregon Degrees, Certificates, and (April 7, 2015) Blue Mountain Central Oregon Chemeketa Clackamas Clatsop Klamath Lane Linn Benton Mt. Hood (AAS Degree) Construction Trades General Construction Trades,

More information

Report September, 2008 How Many is Too Many?

Report September, 2008 How Many is Too Many? Report September, 2008 How Many is Too Many? A comparative analysis of journeyperson-to-apprentice ratios across Canada Plamen Petkov, Senior Policy Analyst Introduction Canada currently has 13 different

More information

EXHIBIT A Accessible Truck Routes Map

EXHIBIT A Accessible Truck Routes Map EXHIBIT A Accessible Truck Routes Map ASHEVILLE, NORTH CAROLINA ROUTE: A ROUTE: B ROUTE: C ROUTE: D ROUTE: E EXHIBIT A EXHIBIT B Craven Street Improvements Map ASHEVILLE, NORTH CAROLINA EXHIBIT B EXHIBIT

More information

City of Los Angeles Department of Public Works Targeted Hiring Guidelines for Contractors

City of Los Angeles Department of Public Works Targeted Hiring Guidelines for Contractors City of Los Angeles Department of Public Works Targeted Hiring Guidelines for Contractors DISCLAIMER: This is meant to be a guide, and should not be used as a replacement from reviewing and understanding

More information

Exploring Skilled Trades & Apprenticeship. This project is funded by the Government of Canada s Sector Council Program

Exploring Skilled Trades & Apprenticeship. This project is funded by the Government of Canada s Sector Council Program Exploring Skilled Trades & Apprenticeship This project is funded by the Government of Canada s Sector Council Program Do you WANT Respect? Opportunity? Good Pay? What about a career in SKILLED TRADES?

More information

INDIANA DEPARTMENT OF TRANSPORTATION ON-THE-JOB TRAINING PROGRAM & PARTNERSHIP AGREEMENT

INDIANA DEPARTMENT OF TRANSPORTATION ON-THE-JOB TRAINING PROGRAM & PARTNERSHIP AGREEMENT INDIANA DEPARTMENT OF TRANSPORTATION ON-THE-JOB TRAINING PROGRAM & PARTNERSHIP AGREEMENT Table of Contents 1.1 Definitions. 1 1.2 Policy Statement.... 1 1.3 Nondiscrimination in Programs and Activities

More information

POST HIGH SCHOOL OPTIONS TECHNICAL & TRADE PROGRAMS. Bella Capelli

POST HIGH SCHOOL OPTIONS TECHNICAL & TRADE PROGRAMS. Bella Capelli POST HIGH SCHOOL OPTIONS TECHNICAL & TRADE PROGRAMS Bella Capelli -Bidwell Training Center -Community College of Allegheny County -Community College of Beaver County -For-Profit Schools -New Century Careers

More information

OFFICIAL LIST OF PHYSICALLY TAXING POSITIONS

OFFICIAL LIST OF PHYSICALLY TAXING POSITIONS Able Seaman 91501 Administrative Superintendent of Water and Sewer Systems 10081 Ambulance Corpsman 00222 Apprentice Construction Laborer 90748 Area Supervisor (Highway Maintenance) Level I and II 91352

More information

General Obligation Bond Projects FYE 2013-2018

General Obligation Bond Projects FYE 2013-2018 General Obligation Bond Projects FYE 2013-2018 2009 City of Norman Community Survey Final Report 2011 CTP Survey Results Storm Drainage and Street Widening Projects Combined Storm Water/Transportation

More information

Contract No. E22PS02 DOCUMENT CONTROL PLAN (DCP) For PRELIMINARY ENGINEERING AND DESIGN/BUIILD PROCUREMENT

Contract No. E22PS02 DOCUMENT CONTROL PLAN (DCP) For PRELIMINARY ENGINEERING AND DESIGN/BUIILD PROCUREMENT Contract No. E22PS02 (DCP) For PRELIMINARY ENGINEERING AND DESIGN/BUIILD PROCUREMENT Prepared By: Paul Eckler Date Project Controls Lead Karen Arpino-Shaffer Deputy Program Manager Date Michael J. McBride,

More information

RIGHT -OF-WAY ACQUISITION AND RELOCATION SERVICES BENCH AUTHORIZE INCREASE TO CONTRACT MODIFICATION AUTHORITY

RIGHT -OF-WAY ACQUISITION AND RELOCATION SERVICES BENCH AUTHORIZE INCREASE TO CONTRACT MODIFICATION AUTHORITY ~...,eo.., Metro...-,..._ One Gateway Plaza Los Angeles, CA 90012-2952 213.922.2000 metro. net 39 CONSTRUCTION COMMITTEE SEPTEMBER 19, 2013 SUBJECT: ACTION: RIGHT -OF-WAY ACQUISITION AND RELOCATION SERVICES

More information

I-66 Pavement Rehabilitation

I-66 Pavement Rehabilitation I-66 Pavement Rehabilitation Fall Asphalt Conference Richmond, VA David Shiells, P.E. Virginia Department of Transportation David White Superior Paving Corporation October 2, 2012 Project Location 2 Goal

More information

Imagine. Building a Career. in the Trades. yourself in the trades! Co-operative Education 2012. Meet some of this year s young apprentices.

Imagine. Building a Career. in the Trades. yourself in the trades! Co-operative Education 2012. Meet some of this year s young apprentices. Education 2012 Building a Career in the Trades Imagine yourself in the trades! Meet some of this year s young apprentices. Cassandra Goodchild OYAP is funded by the Ministry of Training, Colleges and Universities

More information

Training Provider / Program & Level Designated Campus Designation Expiry

Training Provider / Program & Level Designated Campus Designation Expiry BYLAW: B1004 INDUSTRY TRAINING AUTHORITY BYLAW Bylaw: Bylaw Number: Designated Training Providers B1004 Definition: A Designated Trainer is one that has been approved by the Industry Training Authority

More information

Executive Summary. Transportation Needs CHAPTER. Existing Conditions

Executive Summary. Transportation Needs CHAPTER. Existing Conditions CHAPTER 1 Executive Summary The City of Forest Grove Transportation System Plan (TSP) was updated to keep it consistent with recent growth trends in the city and other transportation planning efforts in

More information

List of Alberta Regulatory Authorities

List of Alberta Regulatory Authorities List of Regulatory Authorities Acupuncturist Agrologists College and Association of Acupuncturists of Institute of Agrologists Agricultural Equipment Technician Appliance Service Technician Architects

More information

Introduction to Station Area Planning The Charlotte Story

Introduction to Station Area Planning The Charlotte Story Introduction to Station Area Planning The Charlotte Story Boston 2009 Steve Hamwey - Sasaki Associates, Inc. Troy Russ - Glatting Jackson, Inc. October 31 st, 2009 Station Area Planning October 15th History

More information

ATTACHMENT TO NOTICE TO FIXED GUIDEWAY SYSTEM VEHICLE SUPPLIERS REQUEST FOR INFORMATION (RFI 001)

ATTACHMENT TO NOTICE TO FIXED GUIDEWAY SYSTEM VEHICLE SUPPLIERS REQUEST FOR INFORMATION (RFI 001) ATTACHMENT TO NOTICE TO FIXED GUIDEWAY SYSTEM VEHICLE SUPPLIERS REQUEST FOR INFORMATION (RFI 001) INTRODUCTION To supplement and expand its understanding of available fixed guideway transit system vehicle

More information

Evergreen Line Rapid Transit Project

Evergreen Line Rapid Transit Project Evergreen Line Rapid Transit Project Preliminary Design November 2009 www.evergreenline.gov.bc.ca Evergreen Line Connecting Coquitlam, Port Moody, Burnaby and Vancouver What is the Evergreen Line Project?

More information

Bond Release Process for New Subdivision Developments in Fairfax County

Bond Release Process for New Subdivision Developments in Fairfax County Bond Release Process for New Subdivision Developments in Fairfax County An Overview for Homeowners Associations A Fairfax County, Va., publication April 2009 For more information or to request this document

More information

Project Management Oversight Services

Project Management Oversight Services Solicitation Number: Reference-Number-FTA-08-PMOC Project Management Oversight Services Federal Transit Administration Our fundamental business strategy is forging strong, long-term relationships with

More information

5. MAJOR STREET CONSTRUCTION The B-Permit. 5.1. B-Permit Description and Purpose

5. MAJOR STREET CONSTRUCTION The B-Permit. 5.1. B-Permit Description and Purpose 5. MAJOR STREET CONSTRUCTION The B-Permit 5.1. B-Permit Description and Purpose The B-Permit is required for major street construction in the public right-of-way. This includes the widening of streets,

More information

VILLAS OF TRADITIONS AT GREY OAKS

VILLAS OF TRADITIONS AT GREY OAKS Report of Turnover Survey VILLAS OF TRADITIONS AT GREY OAKS Grey Oaks Development Naples, Collier County, Florida Forge Engineering Project Number 2907-001.01 March 2015 Richard P..Lundberg, P.E cn=richard

More information

Section 2. Definitions - As used in this regulation:

Section 2. Definitions - As used in this regulation: RULES AND REGULATIONS RELATING TO LABOR STANDARDS FOR THE REGISTRATION OF APPRENTICESHIP PROGRAMS UNDER TITLE 28, CHAPTER 45 APPRENTICESHIP PROGRAMS IN TRADE & INDUSTRY Section 1. Purpose and Scope (a)

More information

Construction Technology COURSE OUTLINE

Construction Technology COURSE OUTLINE Technology COURSE OUTLINE 1. Course Title: Technology 2. CBEDS Title: Introduction to 3. CBEDS Number: 5501 4. Job Titles: Carpenters Concrete Laborers Managers Drywall installers Electricians Roofers

More information

U.S. DEPARTMENT OF LABOR PREVAILING WAGE RESOURCE BOOK 2010 DAVIS-BACON SURVEYS

U.S. DEPARTMENT OF LABOR PREVAILING WAGE RESOURCE BOOK 2010 DAVIS-BACON SURVEYS DAVIS-BACON SURVEYS OVERVIEW OF DAVIS-BACON SURVEY PROCESS KEY CLASSES CERTIFIED PAYROLLS SURVEY FORM WD-10 & INSTRUCTION SAMPLE SURVEY INFORMATION FORMS AND RELATED WAGE DETERMINATION 1 OVERVIEW OF DAVIS-BACON

More information

High School Apprenticeship Program (HSAP) It Pays to be an Apprentice

High School Apprenticeship Program (HSAP) It Pays to be an Apprentice High School Apprenticeship Program (HSAP) It Pays to be an Apprentice What is Apprenticeship? Apprenticeship is a great way to train to become a certified journeyperson in a trade where your credentials

More information

WHAT KIND OF JOB DO I WANT? A LOOK AT APPRENTICESHIPS GRADES: 11-12 LESSON: 3

WHAT KIND OF JOB DO I WANT? A LOOK AT APPRENTICESHIPS GRADES: 11-12 LESSON: 3 Sparking the Future WHAT KIND OF JOB DO I WANT? A LOOK AT APPRENTICESHIPS GRADES: 11-12 LESSON: 3 LEARNING GOALS: Students will describe the key points of apprenticeship. Students will identify the qualities

More information

GUIDANCE FOR TRANSIT FINANCIAL PLANS

GUIDANCE FOR TRANSIT FINANCIAL PLANS U.S. Department of Transportation Federal Transit Administration GUIDANCE FOR TRANSIT FINANCIAL PLANS JUNE 2000 Prepared By: Federal Transit Administration Office of Planning Office of Program Management

More information

R c e o c g o n g i n ti t on o n o f o P i r or o r E x E p x e p r e i r en e c n e c and Qualifications

R c e o c g o n g i n ti t on o n o f o P i r or o r E x E p x e p r e i r en e c n e c and Qualifications Recognition of Prior Experience and Qualifications Trades Qualification (TQ) Provincial Certificate Holder For Interprovincial Status Agreement on Internal Trade (AIT) Experience Counts! Why is a Certificate

More information

Addendum to the Arterial Transitway Corridors Study

Addendum to the Arterial Transitway Corridors Study January 2013 1 Addendum to the Arterial Transitway Corridors Study The Arterial Transitway Corridors Study (ATCS) evaluated and prioritized arterial bus rapid transit (BRT) improvements to nine corridors

More information

Appendix J Santa Monica Travel Demand Forecasting Model Trip Generation Rates

Appendix J Santa Monica Travel Demand Forecasting Model Trip Generation Rates Appendix J Santa Monica Travel Demand Forecasting Model Trip Generation Rates SANTA MONICA TRAVEL DEMAND FORECASTING MODEL TRIP GENERATION RATES SUBMITTED BY: 201 Santa Monica Blvd., Suite 500 Santa Monica,

More information

Memorandum. PROJECT: Postmark Emergency Storm Repair Alternative Analysis

Memorandum. PROJECT: Postmark Emergency Storm Repair Alternative Analysis Memorandum CRW Engineering Group, LLC 3940 Arctic Blvd. Suite 300 Anchorage, AK 99503 (907) 562-3252 FAX 561-2273 TO: Mike Lee, P.E., Chief Engineer, ADOT/ANC FROM: Shane Blanchard, P.E. THRU: Mike Rabe,

More information

BART Project Status Report State of Good Repair, OAC & WSX. BART Project Status Report Agenda. 1) BART Risk-Based Asset Management Planning

BART Project Status Report State of Good Repair, OAC & WSX. BART Project Status Report Agenda. 1) BART Risk-Based Asset Management Planning 5.1B Alameda County Transportation Commission Citizens Watchdog Committee January 12, 2015 BART Project Status Report State of Good Repair, OAC & WSX 1 BART Project Status Report Agenda 1) BART Risk-Based

More information

Including Climate Change Risks in Prioritization for Asset Management. Emily Grenzke CH2M HILL, Transit and Sustainability Washington, DC

Including Climate Change Risks in Prioritization for Asset Management. Emily Grenzke CH2M HILL, Transit and Sustainability Washington, DC Including Climate Change Risks in Prioritization for Asset Management Emily Grenzke CH2M HILL, Transit and Sustainability Washington, DC The impacts of climate change are felt across all transit asset

More information

List of Occupations Regulated in Both Provinces

List of Occupations Regulated in Both Provinces List of Occupations Regulated in Both Provinces BC Name Accountant (Certified General) Accountant (Certified General) Accountant (Certified Management) Accountant (Certified Management) Accountant (Chartered)

More information

2008 TTC OPERATING BUDGET

2008 TTC OPERATING BUDGET Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: NOVEMBER 14, 2007 SUBJECT: 2008 TTC OPERATING BUDGET RECOMMENDATION It is recommended that the Commission: 1) Approve the

More information

ENGINEERING SOLUTIONS FOR DESIGNING YOUR SAFE ROUTES

ENGINEERING SOLUTIONS FOR DESIGNING YOUR SAFE ROUTES How to Get Started ENGINEERING SOLUTIONS FOR DESIGNING YOUR SAFE ROUTES Design Elements Selecting appropriate design treatments for school neighborhoods creates environments that address the needs of all

More information

Spatial / GIS Resources Brown Bag Discussion: Metro LAR-IAC4 Pictometry Tool

Spatial / GIS Resources Brown Bag Discussion: Metro LAR-IAC4 Pictometry Tool Los Angeles County Metropolitan Transportation Authority Spatial / GIS Resources Brown Bag Discussion: Metro LAR-IAC4 Pictometry Tool M. Quant Rail Operations Strategic Planning 8/18/2015 Agenda Metro

More information

Mayors Welcome Strong Surrey Votes Yes Coalition Support. Yes Vote Would Vastly Improve Transit and Transportation in Fast Growing City

Mayors Welcome Strong Surrey Votes Yes Coalition Support. Yes Vote Would Vastly Improve Transit and Transportation in Fast Growing City Mayors Welcome Strong Surrey Votes Yes Coalition Support Yes Vote Would Vastly Improve Transit and Transportation in Fast Growing City February 11, 2015 Vancouver, BC The Mayors Council on Regional Transportation

More information

The Bond Release Process for New Subdivision Developments: An Overview for Homeowners Associations DRAFT 6-4-08. Revised 9-25-08

The Bond Release Process for New Subdivision Developments: An Overview for Homeowners Associations DRAFT 6-4-08. Revised 9-25-08 The Bond Release Process for New Subdivision Developments: An Overview for Homeowners Associations DRAFT 6-4-08. Revised 9-25-08 Fairfax County requires developers to post a performance bond if they are

More information

ITA Performance Measurement Report

ITA Performance Measurement Report ITA Performance Measurement Report Service Plan Performance Indicators October 31, 2013 Measure Baseline 2010/11 Results 2011/12 Results 2012/13 Results 2013/14 Service Plan Target 2013/14 YTD Results

More information

ADA POST INSPECTION CHECKLIST. Job No. Route County Location

ADA POST INSPECTION CHECKLIST. Job No. Route County Location ADA POST INSPECTION CHECKLIST Job No. Route County Location SIDEWALKS All sidewalks constructed within the project limits are ADA compliant. Sidewalks are 5 or greater in width. Exception, existing sidewalks

More information

PROJECT MANUAL FOR A GENERAL CONTRACT

PROJECT MANUAL FOR A GENERAL CONTRACT Muckleshoot Housing Program PROJECT MANUAL FOR A GENERAL CONTRACT Project: Owner: Bid for Installation ofnew HV AC for unit 27 in Skopabsh Village Muckleshoot Housing Program 38037 ~ 158th Avenue SE Auburn,

More information

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS Los Angeles, CA Project Manual and Specification DIVISION 1 GENERAL CONDITIONS 01 01 10 STATEMENT OF WORK 01 11 00 SUMMARY OF THE WORK 01 14 05 METRO (OWNER) - DIRECTED STOPPAGES 01 20 00 PRICE AND PAYMENT

More information

PPP Experience on the Canada Line

PPP Experience on the Canada Line PPP Experience on the Canada Line International Practicum on Innovative Transit Funding & Financing June 13, 2014 Fred Cummings, P.Eng. President and General Manager BC Rapid Transit Co. Outline TransLink

More information

Minor Accommodation Planning Review Application

Minor Accommodation Planning Review Application City of Beverly Hills Planning Division 455 N. Rexford Drive Beverly Hills, CA 90210 Tel. (310) 285 1141 Fax. (310) 858 5966 Planning Review Overview: Minor Accommodation Planning Review Application Before

More information

Moving a House in Pasadena

Moving a House in Pasadena Moving a House in Pasadena To assist homeowners and contractors wishing to relocate a home in Pasadena, this handout summarizes the steps in the permitting process. Please keep in mind that the sequence

More information

PREVAILING WAGE RATE DETERMINATION

PREVAILING WAGE RATE DETERMINATION The New Jersey Prevailing Wage Act (N.J.S.A. 34:11-56.25 et seq.) requires that the Department of Labor and Workforce Development establish and enforce a prevailing wage level for workers engaged in public

More information

in Marina Del Rey Prepared by: County of Los Angeles Department of Public Works

in Marina Del Rey Prepared by: County of Los Angeles Department of Public Works Planned Public Works Projects in Marina Del Rey Prepared by: County of Los Angeles Department of Public Works Planned Projects in Marina Del Rey Waterline Projects Phase II Phase III Roadway Projects Admiralty

More information

CITY OF DAYTON HUMAN RELATIONS COUNCIL AFFIRMATIVE ACTION ASSURANCE (AAA) FORM

CITY OF DAYTON HUMAN RELATIONS COUNCIL AFFIRMATIVE ACTION ASSURANCE (AAA) FORM CITY OF DAYTON HUMAN RELATIONS COUNCIL AFFIRMATIVE ACTION ASSURANCE (AAA) FORM The City of Dayton requires an Affirmative Action Assurance form approved by the Human Relations Council for all entities

More information

Executive Director s Recommendation Commission Meeting: March 5, 2015

Executive Director s Recommendation Commission Meeting: March 5, 2015 Executive Director s Recommendation Commission Meeting: March 5, 2015 PROJECT Curseen-Morris Processing and Distribution Center Parking Lot 900 Brentwood Avenue NE Washington, DC SUBMITTED BY United States

More information

PREVAILING WAGE RATE DETERMINATION

PREVAILING WAGE RATE DETERMINATION The New Jersey Prevailing Wage Act (N.J.S.A. 34:11-56.25 et seq.) requires that the Department of Labor and Workforce Development establish and enforce a prevailing wage level for workers engaged in public

More information

Trane U.S. Inc. Authorized Government Price List. GSA Hourly Billing Rates for Labor Categories Under SINs 811-002 and 811-003. Position Description

Trane U.S. Inc. Authorized Government Price List. GSA Hourly Billing Rates for Labor Categories Under SINs 811-002 and 811-003. Position Description GSA Hourly Billing Rates for Labor Categories Under s 811-002 and 811-003 Trane U.S. Inc. Trane Position Title Comparable Government Category Position Description GSA Price Rate/Hour with IFF (Eff. 8/28/14

More information