1 PMI PMP & CAPM sertifikacija Priprema članova PMI Serbia Chapter-a Project Integration Management припремио: 28.Јануар Београд Милан Шмигић, ПМП
2 PMBOK Intro 10 PM knowledge areas: 1. Integration management, 2. Scope management, 3. Time management, 4. Cost management, 5. Quality management, 6. Human resources management, 7. Communications management, 8. Risk management, and 9. Procurement management 10. Stakeholder Management
3 Project Integration Management Who? Why? What? A project manager is responsible for all that goes on in the project! One of the most importantduties thatthe projectmanager can perform is Integration Balancing allthe PM ProcessesandKnowledge areas
4 Integration Management Includes Processes and Activities Needed to: Identify Define Combine Unify and Coordinate The variousprocessesandpm activitieswithin PM Process Groups
5 Integration Management Big Picture There are 6 processes: 1. Develop Project Charter -Initiating 2. Develop Project Management Plan -Planning 3. Direct and Manage Project Executions -Executing 4. Monitor and Control Project Work Monitor & Controlling 5. Perform Integrated Change Control -Monitor & Controlling 6. Close Project or Phase -Closing
6 Develop Project Charter Inputs Project Statement of Work Business Case Agreements Contract Enterprise Environmental Factors Organizational Process Assets Tools & Techniques ExpertJudgment Facilitation techniques Outputs Project Charter
7 Develop Project Charter Data Flow Diagram Project Initiator/ Sponsor Contract Project Statement of Work Business Case Organizational Process Assets Enterprise Environmental Factors Enterprise/ Performance Project Integration Management Develop Project Charter Project Charter Develop Project Management Plan Define Scope Collect Requirements Identify Stakeholders
8 Develop Project Management Plan Inputs Project Charter Outputs from other Processes Enterprise Environmental Factors Organizational Process Assets Tools & Techniques Expert Judgment Facilitation techniques Outputs Project Management Plan
9 Develop Project Management Plan Data Flow Diagram Define Scope Create WBS Enterprise Organization Collect Requirements Determine Budget Develop Schedule Plan Quality Develop HR Plan Plan Communications Plan Risk Management Plan Procurements Project Scope Statement Scope Baseline Organizational Process Assets Enterprise Environmental factors Requirements Documentation Requirements Management Plan Cost Performance Baseline Schedule Baseline Quality Management Plan Process Improvement Plan Human Resource Plan Communication Management Plan Risk Management Plan Procurement Management Plan Project Management Plan Updates Project Integration Management DevelopPM plan Develop Project Charter Project Charter Project Management Plan Direct and Manage Project Execution Monitor and Control Project Work Perform Integrated Change Control Close Project or Phase Verify Scope Control Scope Control Schedule Control Cost Perform Quality Assurance Perform Quality Control Acquire Project Team Develop Project Team Manage Project Team Distribute Information Manage Stakeholder Expectations Report Performance Monitor and Control Risks Conduct Procurements Administer Procurements Close Procurements
10 Direct and Manage Project Work Inputs Project Management Plan Approved Change Requests Enterprise Environmental Factors Organizational Process Assets Tools & Techniques Expert Judgment Project Management Information System Meetings Outputs Deliverables Work Performance Data Change Requests Project Management Plan Updates Project Documents Updates
11 Direct and Manage Project Work Data Flow Diagram Enterprise/ Performance Organizational Process Assets Enterprise Environmental Factors Develop Project Management Plan Project Management Plan Project Integration Management Project Management Plan Updates Direct and Manage Project Work Work Performance Information Perform Integrated Change Control Change Requests Work Performance Information Project Document Updates Deliverables Project Documents Perform Quality Control Report Performance Monitor and Control Risks Control Scope Control Schedule Control Costs Perform Quality Assurance Administer Procurements
12 Monitor and Control Project Work Inputs Project Management Plan Schedule forecasts Cost forecasts Validated Changes Work Performance Information Enterprise Environmental Factors Organizational Process Assets Tools & Techniques Expert Judgment Analytical techniques Project Management Information System Meetings Outputs Change Requests Work performance reports Project Management Plan Updates Project Documents Updates
13 Monitor and Control Project Work Data Flow Diagram Report Performance Performance Reports Enterprise/ Organization Organizational Process Assets Enterprise Environmental Factors Project Integration Management Develop Project Management Plan Project Management Plan Project Management Plan Updates Monitor and Control Project Work Change Requests Perform Integrated Change Control Project Document Updates Project Documents
14 Perform Integrated Change Control Inputs Project Management Plan Work Performance Reports Change Requests Enterprise Environmental Factors Organizational Process Assets Tools & Techniques Expert Judgment Change Control Tools Meetings Outputs Approved Change Requests Change Log Project Management Plan Updates Project Document Updates
15 Perform Integrated Change Control Data Flow Diagram Verify Scope Control Scope Control Costs Control Schedule Perform Quality Control Perform Quality Analysis Manage Project Team Manage Stakeholder Expectations Report Performance Monitor and Control Risks Conduct Procurements Plan Procurements Administer Procurements Monitor and Control Project Work Project Integration Management Project Management Plan Change Requests Enterprise/ Organization Work Performance Information Direct and Manage Project Work Perform Integrated Change Control Organizational Process Assets Enterprise Environmental Factors Develop Project Management Plan Project Management Plan Updates Change Requests Status Updates Project Documents Perform Quality Control Administer Procurements
16 Close Project or Phase Inputs Project Management Plan Accepted Deliverables Organizational Process Assets Tools & Techniques Expert Judgment Analytical techniques Meetings Outputs Final Product, Service or Result Transition Organizational Process Assets updates
17 Close Project or Phase Data Flow Diagram Project Integration Management Verify Scope Develop Project Management Plan Enterprise/ Organization Accepted Deliverables Organizational Process Assets Project Management Plan Close Project or Phase Final Product, Service or Result Transition Customer Organizational Process Assets Updates
18 Kako izgledaju pitanja?
19 1. Your project has a budget of $ 1M for the first year, $ 2.5M for the second, $1.2M for third and $ 0.8M for the final year. Most of the project budget is spend during: project plan development project plan execution integrated change control project initiation
20 2. One of the key project staff identified in the project plan may not be available for the project. Your assumption involves some risk because: it is based on lessons learned may not have a historical precedent involves a factor that limits the project management team s option involves a factor which is considered to be true, real or certain
21 3. You established a CCB and specific procedures to govern its operations. The procedure requires all approved changes to be reflected in the: performance measurement baseline change management plan quality assurance plan project plan
22 4. You need to review organization s informal and formal policies while working on your project plan. Which one of the following is not an organizational policy whose effects on the project must be considered? continuous improvement targets status meetings employee performance reviews time reporting
23 5. You are implementing a project management methodology, which requires establishment of CCB. Which of the following best describes the CCB? recommended for use on all projects used as required to approve or reject change request managed by project manager composed of key project team members
24 6. As a project manager, you realize the importance of status review meetings on one hand, and the busy schedule of your team, on the other. Because you are in project execution phase, these meetings should be held frequently to obtain agreement about goals and methods to achieve them can be reduced in frequency need to be intensified to tie up loose ends must be scheduled regularly
25 7. You have established a system for measuring project performance regularly to identify variances from the plan. A variance is significant if it is considered to be a project risk it becomes a lesson learned as a result of corrective action selected it jeopardizes project objectives it requires corrective action
26 Pitanja i odgovori? Milan Šmigić, PMP smigicm@cpm.rs
27 Хвала! Придружите нам се! PMI Serbia Chapter 2014 All rights reserved.
PMLead. Project Management Professional. edition. Based on PMBOK Guide 4 th. www.pmlead.net
PMLead Project Management Professional Based on PMBOK Guide 4 th edition www.pmlead.net SECTION II Chapter 3 Project Management Processes Chapter 3 Project Process Groups A process is a set of interrelated
More informationProject Management Professional Exam Prep Plus
In this course, you ll gain the essentials preparation needed to pass the PMP exam. Concentrating on exam content form the Guide to the Project Management Body of Knowledge-Fifth Edition (PMBOK Guide)
More informationThe 10 Knowledge Areas & ITTOs
This document is part of a series that explain the newly released PMBOK 5th edition. These documents provide simple explanation and summary of the book. However they do not replace the necessity of reading
More informationMinnesota Health Insurance Exchange Project (MNHIX) Deliverable Definition Document (DDD) For Project Management Plan Date: 07-31-2012
Minnesota Health Insurance Exchange Project (MNHI) Deliverable Definition Document (DDD) For Project Plan Date: 07-31-2012 11/9/2012 1:18 PM Page 1 of 8 1. High Level Deliverable Description The Project
More informationFamily Computer Centre
PMP - Project Professional 35 Contact Hours Comprehensive Training Program Designed on the basis of Project Body of Knowledge (PMBOK Guide) Family Computer Centre Ground Floor, Al Rayyan Complex P. O Box:
More informationImpact of PMBOK 5 th Edition
PMP Exam Changes Impact of PMBOK 5 th Edition When the PMI exam will change Major Updates X1.1 Scope of Update Comments and feedbacks for prior version Overall review for accuracy Appropriate alignment
More informationPMP Examination Tasks Puzzle game
PMP Examination Tasks Puzzle game Here is a great game to play to test your knowledge of the tasks you will be tested on in the actual examination. What we have done is take each of the domain tasks in
More informationProject Management Body Of Knowledge (PMBOK ) Guide 5 th Edition. February 21, 2013
Project Management Body Of Knowledge (PMBOK ) Guide 5 th Edition February 21, 2013 1 PMBOK 4 th Edition Released in 2008 5 Process Groups 9 Knowledge Areas 42 Processes Released in 2013 5 Process Groups
More informationCertification Preparation Course LATVIKON (R.E.P.)Centre
PMP Certification Preparation Course LATVIKON (R.E.P.)Centre ABOUT THIS COURSE Your ability as a project manager to demonstrate best practices in Project Management both on the job and through professional
More informationMinnesota Health Insurance Exchange (MNHIX)
Minnesota Health Insurance Exchange (MNHIX) 1.2 Plan September 21st, 2012 Version: FINAL v.1.0 11/9/2012 2:58 PM Page 1 of 87 T A B L E O F C O N T E N T S 1 Introduction to the Plan... 12 2 Integration
More informationProject Risk Management
Project Risk Management Study Notes PMI, PMP, CAPM, PMBOK, PM Network and the PMI Registered Education Provider logo are registered marks of the Project Management Institute, Inc. Points to Note Risk Management
More information1.3 What is Project Management? 1.4 Relationship Among Project Management, E-mail:info@iibs.ca
1 Project Management Professional (PMP) is a credential offered by the Project Management Institute (PMI).The PMP Certification Exam assesses the adeptness of a professional in applying the knowledge,
More informationTime Management. Herb Pollard III
Time Management A Small Business Perspective Herb Pollard III Project Manager for Time Management - Pollard PMI Slide 1 Introduction: Time Management - Pollard PMI Slide 2 Project Phases and the Areas
More informationPMP and CAPM Exam Preparation Workshop - A 5 Day Workshop (or five 1 Days) -
PMP and CAPM Exam Preparation Workshop - A 5 Day Workshop (or five 1 Days) - Delivered in Classroom or as an Internet Receive 35 PDU s PMI's Project Management Professional certification is one of the
More informationQuick Reference Guide Interactive PDF Project Management Processes for a Project
Project Processes for a Project Click the Knowledge Area title (below and left in blue underline) to view the details of each Process Group. Project Process Groups and Knowledge Areas Mapping Project Process
More informationATTACHMENT 3 SPS PROJECT SENIOR PROGRAM MANAGER (SPM) DUTIES & RESPONSIBILITIES
1. ROLE DEFINITIONS ATTACHMENT 3 SPS PROJECT SENIOR PROGRAM MANAGER (SPM) DUTIES & RESPONSIBILITIES The purpose of this section is to distinguish among the roles interacting with the SPM obtained through
More informationProject Management Professional (Certified by PMI)
Project Management Professional (Certified by PMI) PMI certified Project Management Professional credential is the most important industryrecognized certification for project managers. This recognition
More informationA Comparison of PMI s PMBOK Guide Versions 4 & 3
PM WORLD TODAY FEATURED PAPER MAY 2009 A Comparison of PMI s PMBOK Guide Versions 4 & 3 By Germán Bernate The Project Management Institute PMI announced on December 31, 2008 the availability of PMBOK Version
More informationProject Management (PMI Based)
Training Services ITIL, Cobit, ISO/IEC 20000, Project Management, Information Security, Business Continuity, Risk Management, Cloud Computing and Green-IT Project Management (PMI Based) Project Management
More informationApplication of Standard Project Management Processes in Fiber Optic Cable Plant Project Management. Introduction. Alfred Sankara, DigiBridge TelCo
Application of Standard Project Management Processes in Fiber Optic Cable Plant Project Management Alfred Sankara, DigiBridge TelCo Introduction The Project Management Institute (PMI) is the world's leading
More information- ATTACHMENT - PROGRAM MANAGER DUTIES & RESPONSIBILITIES MARYLAND STATE POLICE W00B0400021
- ATTACHMENT - PROGRAM MANAGER DUTIES & RESPONSIBILITIES MARYLAND STATE POLICE W00B0400021 About this document this is a detailed description of typical Project Manager (PM) duties, responsibilities, and
More informationComparison. streamlining the intersection of innovation strategy, new product development, and project management. Eric van der Meulen, President
streamlining the intersection of innovation strategy, new product development, and project management PMBOK Guide Comparison Slide 1 www.qvive.biz 248.906.1526 eric@qvive.biz Eric van der Meulen, President
More informationPROJECT MANAGEMENT PROFESSIONAL CERTIFIED ASSOCIATE IN PROJECT MANAGEMENT (PMP & CAPM) EXAM PREPARATION WORKSHOP
TSE015 PROJECT MANAGEMENT PROFESSIONAL CERTIFIED ASSOCIATE IN PROJECT MANAGEMENT (PMP & CAPM) EXAM PREPARATION WORKSHOP Course Outline I. Introduction and Course Objectives A. About PMI B. PMP and CAPM
More informationIntegration Mgmt / Initiating Process Group 4.1 Develop Project Charter
1 Mgmt / Initiating Process Group 4.1 Develop Project Charter Project statement of work Business case Agreements Facilitation techniques Project charter 26/02/2013 18:23:36 1 2 Mgmt / Planning Process
More informationLooking to. pass the exam. training is. America. (unauthorized. courseware) 5 Days. of Training. happy. first day. training) have a highh
PMP /CAPM Certification Looking to pass the PMP or CAPM exam on your first try? We have helped thousands to pass the exam on their first try. We are one of the top training provider of PMP /CAPM training.
More informationAgenda. 0 Agenda review 2 minutes. 0 Chapter of the week 50 minutes. 0 Q&A of chapter 10 minutes. 0 Break 10 minutes. 0 Exercises 25 minutes
Agenda 0 Instructor Introduction 3 minutes 0 Agenda review 2 minutes 0 Chapter of the week 50 minutes 0 Q&A of chapter 10 minutes 0 Break 10 minutes 0 Exercises 25 minutes 0 Round table 15 minutes 0 Closure
More informationCertified Associate in Project Management (CAPM) Examination Content Outline
Certified Associate in Project Management (CAPM) Examination Content Outline Project Management Institute PMI Certified Associate in Project Management (CAPM) Exam Content Outline Published by: Project
More informationOnline Saturday & Sunday 4-Day Live PMP Training
Online Saturday & Sunday 4-Day Live PMP Training Course Syllabus: DAY 1: Welcome a. Who is BOBCAT Academy? b. Introduce Yourself c. Follow Us Module 1: Course Introduction a. Course Dates b. Start/Stop
More informationTHE PROJECT MANAGEMENT KNOWLEDGE AREAS
THE PROJECT MANAGEMENT KNOWLEDGE AREAS 4. Project Integration Management 5. Project Scope Management 6. Project Time Management 7. Project Cost Management 8. Project Quality Management 9. Project Human
More informationIT Project Management Methodology. Project Scope Management Support Guide
NATIONAL INFORMATION TECHNOLOGY AUTHORITY - UGANDA IT Project Management Methodology Project Scope Management Support Guide Version 0.3 Version Date Author Change Description 0.1 23 rd Mar, 2013 Gerald
More informationProject Management Professional (PMP) Examination Content Outline
Project Management Professional (PMP) Examination Content Outline Project Management Institute Project Management Professional (PMP) Examination Content Outline June 2015 Published by: Project Management
More informationPMP 2013 Exam Prep. Course Overview
PMP 2013 Exam Prep Course Overview This course has been designed to prepare participants to take the Project Management Institute's Project Management Professional (PMP) Exam, 2013 edition and is based
More informationThe Project Management Body of Knowledge, generally known as PMBOK, deals with nine fundamental subjects for the project management.
Knowledge Areas The Project Management Body of Knowledge, generally known as PMBOK, deals with nine fundamental subjects for the project management. These are: Project Integration Management Project Scope
More informationPROJECT MANAGEMENT PLAN CHECKLIST
PROJECT MANAGEMENT PLAN CHECKLIST The project management plan is a comprehensive document that defines each area of your project. The final document will contain all the required plans you need to manage,
More informationProject Integration Management
Integration Initiating ning Executing Monitoring & Controlling Closing 4.1 Develop Charter Statement Of Work Business Case 4.2 Develop 4.3 Direct and Manage Work 4.4 Monitor and Control Work 4.5 Perform
More informationProject Scope Management in PMBOK made easy
By Dr. TD Jainendrakumar The main objective of any project is to fulfill the scope of the project on time and within the budget. What is Project Scope? Scope refers to all the work involved in creating
More informationOverview of A Guide to the Project Management Body of Knowledge (PMBOK Guide) Fourth Edition
Overview of A Guide to the Project Management Body of Knowledge (PMBOK Guide) Fourth Edition Topics for Discussion PMI Foundational Standards Harmonization of PMI s Foundational Standards Top 10 changes
More informationProject Management Professional (PMP)
Project Management Professional (PMP) Duration: 5 days Course Objectives: PMI s Project Management Professional (PMP) credential is the most important industry-recognized certification for project managers.
More informationProject Management Standards: A Review of Certifications/Certificates
Project Standards: A Review of Certifications/Certificates Standards for Project Supporting Certification and Certificates Certificate Certification The Project Body of Knowledge PMBOK Guide Projects in
More informationYIIP1100 PROJECT MANAGEMENT
YIIP1100 PROJECT MANAGEMENT PLANNING THE PROJECT - DEVELOPING PROJECT MANAGEMENT PLAN EXECUTING, CONTROLLING & MONITORING THE PROJECT JOUNI HUOTARI, JUHA HAUTANEN & JOHN MUSSER BASED ON PMBOK, SECTIONS
More informationManaging IT Projects. Chapter 2 The PMI Framework
Managing IT Projects Chapter 2 The PMI Framework The PMI Framework The Project Management Institute,USA is an internationally acclaimed organization Devoted to Creation & sharing of knowledge in the area
More informationEXAM PREP COURSE. Course Overview. Course Objectives. Course Materials Include: Our PMP Exam Prep (Fifth Edition) training program:
PMP EXAM PREP COURSE Course Overview The purpose of this course is to prepare you to pass the Project Management Professional (PMP) certification exam. The course is based on the 10 knowledge areas in
More informationMNLARS Project Audit Checklist
Audit Checklist The following provides a detailed checklist to assist the audit team in reviewing the health of a project. Relevance (at this time) How relevant is this attribute to this project or audit?
More informationGPMCEP GLOBAL PROJECT MANAGEMENT, LLC C O U R S E
C O U R S E C E GPMCEP GLOBAL PROJECT MANAGEMENT, LLC Project Management Professional (PMP) Certification Exam Prep Global Project Management, LLC is a Global Registered Education Provider (R.E.P.) of
More informationPMBOK 5. Chapters. 1. Introduction What is Project Management 2. Organizational Influences and Project Life Cycle 3. Project Management Processes
PMBOK 5 Chapters PMBOK 5 1. Introduction What is Project Management 2. Organizational Influences and Project Life Cycle 3. Project Management Processes Knowledge Areas 4. Project Integration Management
More informationProject Stakeholder Management
Project Stakeholder Management PMBOK 5 th Edition New Knowledge Area Dr. Vijay Kanabar, PMP. 2013 PM Programs Boston University kanabar@bu.edu http://www.bu.edu/met Our Goal Project Stakeholder Processes
More informationPMI Certified: PMP - Project Management 5 Days
www.etidaho.com (208) 327-0768 PMI Certified: PMP - Project Management 5 Days Course Description This PMP certification training class is designed for individuals who have on-the-job project management
More informationProject Management for Everyone
Project Management for Everyone Contact Information Adam Donaldson, PMP Business Management & Analysis Group System, Analytics & Insights Group Phone: (202) 994-6867 Email: adonald@gwu.edu Objectives Basic
More informationA Guide To The Project Management Body of Knowledge (PMBOK) Significant Changes from the 3 rd edition to the 4 th edition
A Guide To The Project Body of Knowledge (PMBOK) Significant Changes from the 3 rd edition to the 4 th edition Major Changes The adoption of the verb-noun format for process names Amplification as to Enterprise
More informationCourse Syllabus. Project Management Certificate
Course Syllabus Project Management Certificate Prerequisite(s): Some college and professional experience in managing projects. Required Materials/Texts: ISBN: PMBOK Guide 5 th Edition 978-1935589679 Managing
More informationInput, Output and Tools of all Processes
1 CIS12-3 IT Project Management Input, Output and Tools of all Processes Marc Conrad D104 (Park Square Building) Marc.Conrad@luton.ac.uk 26/02/2013 18:22:06 Marc Conrad - University of Luton 1 2 Mgmt /
More informationComparing PMBOK Guide 4 th Edition, PMBOK Guide 5 th Edition and ISO 21500
Project Training Company Comparing PMBOK Guide 4 th Edition, Edition and STS Sauter Training & Simulation S.A. Avenue de la Gare 10 1003 Lausanne Switzerland Web: www.sts.ch E-mail: office@sts.ch Phone:
More informationThe PMP Application Process
The PMP Application Process The purpose of this document is to explain the PMP application process and provide helpful links and tools for submitting your application. Reference: The reference for the
More informationDevelop Project Charter. Develop Project Management Plan
Develop Charter Develop Charter is the process of developing documentation that formally authorizes a project or a phase. The documentation includes initial requirements that satisfy stakeholder needs
More informationProject Procurement Management
Project Procurement Management Study Notes PMI, PMP, CAPM, PMBOK, PM Network and the PMI Registered Education Provider logo are registered marks of the Project Management Institute, Inc. Points to Note
More informationMaking project management indispensable for business results. Project Management 101
Making project management indispensable for business results. Project Management 101 Donald E. Moore, MBA, PMP, President of PMI NB Kelly Barter, Chapter Manager of PMI NB AGM April 28, 2011 Topics of
More informationProject Management Certificate (IT Professionals)
Project Management Certificate (IT Professionals) Whether your field is architecture or information technology, successful planning involves a carefully crafted set of steps to planned and measurable goals.
More informationBest Practices Statement Project Management. Best Practices for Managing State Information Technology Projects
State of Arkansas Office of Information Technology 124 W. Capitol Ave. Suite 990 Little Rock, AR 72201 501.682.4300 Voice 501.682.4020 Fax http://www.cio.arkansas.gov/techarch Best Practices Statement
More informationAPPENDIX X1 - FIFTH EDITION CHANGES
APPENDIX X1 FIFTH EDITION CHANGES The purpose of this appendix is to give a detailed explanation of the changes made to A Guide to the Project Management Body of Knowledge (PMBOK Guide) Fourth Edition
More informationThe 9 Things in the PMBOK
The 9 Things in the PMBOK 9/15/2011 The PMBOK Project Body of Knowledge sum of knowledge within the profession of project management used dto document and standardize di generally accepted project management
More informationoutput: communications management plan
Q1. (50 MARKS) A. List the nine PMBOK knowledge areas and give a one sentence description of the purpose of each knowledge area along with at least one output (document etc.) and its purpose. 1.Project
More informationErrata 1 st Printing. Errata 2 nd Printing
Errata 1 st Printing NOTE: The following errata only pertain to the first printing of the PMBOK Guide Fifth Edition. In order to verify the print run of your book (or PDF), refer to the bottom of the copyright
More informationErrata. 133 Figure 5-15 Corrected the output for 8.3 Control Quality to read verified deliverables
Errata NOTE: The following errata only pertain to the first printing of the PMBOK Guide Fifth Edition. In order to verify the print run of your book (or PDF), refer to the bottom of the copyright page
More informationProject Management Professional (PMP) Examination Content Outline
Project Management Professional (PMP) Examination Content Outline Project Management Institute Project Management Professional (PMP ) Examination Content Outline Revised August 2011 Published by: Project
More informationManage Project Professionally &Earn Your PMP Certification
COURSE BROCHURE Manage Project Professionally &Earn Your PMP Certification R PMP PMBOK, The PMI Registered Education Provider are registered marks of the Project Management Institute, Inc Join the success
More informationProject Management Guidelines
Project Management Guidelines Overview Section 86-1506 (5) directs the NITC to adopt guidelines regarding project planning and management. The goal of project management is to achieve the objectives of
More informationPMP Project Management Professional Study Guide, Third Edition
PMP Project Management Professional Study Guide, Third Edition Joseph Phillips McGraw-Hill is an independent entity from the Project Management Institute, Inc. and is not affiliated with the Project Management
More informationPMP project management methodology applied in ITRI
PMP project management methodology applied in ITRI Industry Technology Institute Research Laser Application Technology Center Flexible Electronics Equipment Dept. Wing, PMP 2008/12/29 About Wing 林 敬 智,
More informationProgram Title: Advanced Project Management Knowledge, Skills & Software Program ID: #1039168 Program Cost: $4,690 Duration: 52.
Program Title: Advanced Project Management Knowledge, Skills & Software Program ID: #1039168 Program Cost: $4,690 Duration: 52.5 hours Program Description The Advance Project Management Knowledge, Skills
More informationProject Management Fundamentals. Office of the Senior Associate Vice President for Finance
Project Management Fundamentals Project Management Institute PMI is an aggregation of best practices from thousands of professional project managers Principles in this training are based on PMI methodologies,
More informationPartnering for Project Success: Project Manager and Business Analyst Collaboration
Partnering for Project Success: Project Manager and Business Analyst Collaboration By Barbara Carkenord, CBAP, Chris Cartwright, PMP, Robin Grace, CBAP, Larry Goldsmith, PMP, Elizabeth Larson, PMP, CBAP,
More informationProject Management Body of Knowledge (PMBOK) (An Overview of the Knowledge Areas)
Project Management Body of Knowledge (PMBOK) (An Overview of the Knowledge Areas) Nutek, Inc. 3829 Quarton Road, Suite 102 Bloomfield Hills, Michigan 48302, USA. Phone: 248-540-4827, Email: Support@Nutek-us.com
More informationChapter 4 Project Integration Management (PMBOK Guide)
Chapter 4 Project Integration Management (PMBOK Guide) h d j bi Mohammad A. Rajabi Dept. of Geomatics Eng., University of Tehran Tel: +98 21 8833 4341, Cell: +98 912 132 5823 Email: marajabi@ut.ac.ir Homepage:
More informationProject Management Plan Template
Abstract: This is the project management plan document for . This is a controlled document and should be maintained in a configuration environment. Project Management Plan Template Contents REVISION
More informationProgram Title: Advanced Project Management Program ID: #1025924 Program Cost: $3,780 Duration: 37.5 hours. Course Description
Program Title: Advanced Project Management Program ID: #1025924 Program Cost: $3,780 Duration: 37.5 hours Course Description This course is the flagship course for Project Management certifications including
More informationwww.aryanengineering.com Email: info@aryanengineering.com
What is PMP Certification exam? www.aryanengineering.com PMP stands for Project Management Professional certification exam. PMP, is one of the most respected and globally recognized certification is offered
More informationProject Management Concepts
Project Management Concepts Day Workshop Course PM12 PM12 - Project Management Concepts Course ID: PM12 Credits: 21 PDUs Course Duration: 3 days Course Level: Basic 3 Days 21 PDUs Course Description: In
More informationProject Cost Management
Project Cost Management Study Notes PMI, PMP, CAPM, PMBOK, PM Network and the PMI Registered Education Provider logo are registered marks of the Project Management Institute, Inc. Points To Note Please
More informationCan Complement PMBOK and Your PMP
How PRINCE2 Can Complement PMBOK and Your PMP JAY M. SIEGELAUB PMI/ Westchester Chapter January 8, 2004 What is PRINCE2? PROJECTS IN CONTROLLED ENVIRONMENTS! Registered trademark! UK Government recognized
More informationThe PMP Exam Application Reference Guide
The PMP Exam Application Reference Guide Version 3.0 (4 th Ed. PMBOK Guide) September 2011 112 Townpark Dr. NW Suite 150 Kennesaw, GA 30144-3743 Toll-Free 888.568.2527 Local 770.424.3535 Fax 770.424-3565
More informationProject Management Professional (PMP) Certification: PMBOK Guide Fifth Edition
Project Management Professional (PMP) Certification: PMBOK Guide Fifth Edition Course Specifications Course Number: 095001 Course Length: 5 days Course Description Overview: If you are taking this course,
More informationUsing Your PMO to Drive Successful Organizational Change Management
Using Your PMO to Drive Successful Organizational Change Management Joe Saliunas, Booz Allen Hamilton 11 November 2012 1 Agenda Organizational change management overview Case studies PMBOK Guide processes
More informationProgram Management Professional (PgMP) Examination Content Outline
Program Management Professional (PgMP) Examination Content Outline Project Management Institute Program Management Professional (PgMP ) Examination Content Outline April 2011 Published by: Project Management
More informationProject Time Management
Project Time Management Study Notes PMI, PMP, CAPM, PMBOK, PM Network and the PMI Registered Education Provider logo are registered marks of the Project Management Institute, Inc. Points to Note Please
More informationProject Management Professional (PMP) Boot Camp
Project Management Professional (PMP) Boot Camp According to the Project Management Institute, the world's leading association for the project management profession: "PMP Certification is the profession's
More informationProject Time Management
Project Time Management Study Notes PMI, PMP, CAPM, PMBOK, PM Network and the PMI Registered Education Provider logo are registered marks of the Project Management Institute, Inc. Points to Note Please
More informationThe Plan s Journey From Scope to WBS to Schedule
The Plan s Journey From Scope to WBS to Schedule Presented by: Rick Clare, CBAP, PMP, OCP, CSM PM Centers USA, LLC. 2013 Company Background Consulting and Training (Virtual, Public and Private Training)
More informationProject Quality Management
Project Quality Management Study Notes PMI, PMP, CAPM, PMBOK, PM Network and the PMI Registered Education Provider logo are registered marks of the Project Management Institute, Inc. Points to Note Please
More informationProgram Management Professional. PgMP
Program Management Professional PgMP COURSE BACKGROUND COURSE LENGTH: 3 days (2.1 CEUs / 21 PDUs) COURSE DESCRIPTION: The Program Management course addresses the essential aspects or Program selection,
More informationA User's Manual to the PMBOK Guide. 2nd Edition
Brochure More information from http://www.researchandmarkets.com/reports/2326796/ A User's Manual to the PMBOK Guide. 2nd Edition Description: The must-have manual to understand and use the latest edition
More informationProject Cost Management - 2 Days
Project Cost Management - 2 Days Course Description: The Cost Management course addresses the identification, elaboration, planning, and management of the project budget. Including selected processes from
More informationCrosswalk Between Current and New PMP Task Classifications
Crosswalk Between Current and New PMP Task Classifications Domain 01 Initiating the Project Conduct project selection methods (e.g., cost benefit analysis, selection criteria) through meetings with the
More informationModule 5 Cost Management PMP Exam Questions
Module 5 Cost Management PMP Exam Questions PMP, PMBOK and the Registered Education Provider logo are registered marks of the Project Management Institute, Inc Question 1 A company, which provides professional
More informationSaskatoon Business College Corporate Training Centre 244-6340 corporate@sbccollege.ca www.sbccollege.ca/corporate
Saskatoon Business College Corporate Training Centre 244-6340 corporate@sbccollege.ca www.sbccollege.ca/corporate Project Management Professional (PMP) 5-day Training Program September 21-25, 2015 Cost:
More informationProgram Title: Advanced Project Management Program ID: #1025924 Program Cost: $3,780 Duration: 37.5 hours. Program Description
Program Title: Advanced Project Management Program ID: #1025924 Program Cost: $3,780 Duration: 37.5 hours Program Description The Advance Project Management course is a training offering for professionals
More informationPMP Certification Exam Prep Bootcamp
Commitment / Vision / Results SM Toll Free (US): (800) 877-8129 Office: (919) 495-7371 Fax: (919) 556-0283 Email: info@cvr-it.com Web site: www.cvr-it.com Course Overview PMP Certification Exam Prep Bootcamp
More informationAppeals Case Management System Project. Scope Management Plan. November 20, 2014
Appeals Case Management System Project Version 1.0 Health and Human Services Agency, Office of Systems Integration Template Revision History REVISION HISTORY REVISION # DATE OF RELEASE OWNER SUMMARY OF
More informationVisit www.pm-prepcast.com for Exam Resources P a g e 16
Module and Lesson Directory No Lesson Title Type Duration Module 00.0 Welcome & Exam Overview 1. L00.00 Welcome Video 28:28 Module 00.1 Student Workbook 2. L00.10 PM PrepCast Student Workbook PDF -- Module
More informationTransformation Management
Transformation Management Presentation to the HIMSS Change Management Task Force Scott Coplan, PMP, CPHIMS Courtesy of Scott Coplan (scoplan@coplan.com) HIMSS Management Engineering & Process Improvement
More informationModule 7: Change Management
Module 7: Change Module 7: Change Integrating Project with Change They think by installing this system they will end my services let us see if they will ever manage to get it done What is the purpose of
More information