CONCEPTUAL PLAN. For project namely: The ParkSyde
|
|
|
- Sharyl Williams
- 10 years ago
- Views:
Transcription
1 CONCEPTUAL PLAN For project namely: The ParkSyde by Khasara No. : 319/ 1 to 2, 320/ 8, 320/ 12-13, 321/8, 321/12-13, 343, 344/2, 345/1, 358/1-3, 359/1-3, Village : Kachna Tehsil : Raipur District : Raipur [C.G.]
2 Index 1.0 Brief Description of the Project : Introduction: About Promoters: Location: Surroundings: Connectivity: Site plan: Project Layout Plan: Area Statement: Population calculation: Estimation of Residents: Estimation of total population: Water requirement, effluent generation and its recycling: Introduction: Estimation of total water demand: Estimation of effluent generation: Recycling of treated effluent: Water Balance chart: Brief of Waste Water Treatment: brief of STP: process Flow sheet of STP: Qualitative parameters: Alteration in Natural slope: Impact on ground water potential: Solid Waste Generation and its Management:
3 7.1 Introduction: Solid Waste Management during Construction Stage: Solid Waste Management during Operational Stage: Energy requirement and its conservation: Estimation of power requirement: Source of power: Energy Saving Efforts: Internal Traffic Circulation and Parking details: Environmental Management Plan: During Construction Period: Site Preparation Air Environment: Water Environment Noise Environment Land Environment: Waste management & recycling During Post Operational Phase: Air Emission Management: Water Pollution Management: Solid Waste Management: Noise Level Management Land Environment Green Belt Development *****
4 1.0 Brief Description of the Project : 1.1 Introduction:- M/s Rishabh Buildtech India Private Limited [RBIPL] is coming up with a multistoried residential Building project in the name and style of The ParkSyde comprising of High-rise apartments at Khasra Nos. 319/ 1 to 2, 320/ 8, 320/ 12-13, 321/8, 321/12-13, 343, 344/2, 345/1, 358/1-3, 359/1-3 of Kachna, Raipur, Chhattisgarh. The total plot area of the project is m 2 (4.295 Hectares) and the proposed total built up area is m 2. As per the E1A notification, 2006 and further amendments all Building & Construction Projects with built-up area is ranging from 20,000 m 2 to 1,50,000 m 2 falls under item 8 (a) of schedule I of EIA notification, dated 14 th September, Projects falling under item 8 (a) are categorized as category B-2 projects. Proposed project is a multistoried residential Building scheme and all the necessary permissions are obtained from Town & Country Planning Department and Municipal Corporation, Raipur for development and implementation of the project. Approved layout of the project is enclosed as Annexure 01. Project comprises of creating comfortable living facilities in affordable price. Salient features of the project are: affordable housing facility with all modern facilities, adequate parking, rain water harvesting system, waste Management facility and green area. 1.2 About Promoters: - Being a builder is not just about putting up concrete structures, collecting money and making the balance sheets grow in figures and numbers. Rather, it is about shouldering a much larger social responsibility where in a person s life earnings are at stake for a shelter of his dreams or a commercial base to flourish. Therefore, the buildings should be constructed on the stronger Page No.: 1
5 foundation of faith and commitments. A builder should not collect money without getting fully satisfied about the title and all the statutory clearances. Then, we should think about the needs of the end users of the apartments, shops and offices.we should not aim at constructing buildings with just brick and mortar, but with feelings and a goal to deliver the best. We must make a difference in the life of every person and uplift society benchmarks so that we are able to create a better tomorrow for everyone. Our organization would first like to become a better citizen of the society before becoming World s best company. We should be careful in looking at the welfare of every worker and laborer for it is they who construct our houses brick by brick. We should also not forget about our planet that has permitted us to live on it. Thus, our buildings should be environment friendly causing least burden on the natural resources. In a nutshell, we should own up responsibilities, create benchmarks without caring for costs, follow commitments and success will follows us. Our corporate philosophy and guiding principles are the insights that guide and direct us to realize our group vision with every task we undertake. We believe that we are dedicated towards creating spaces reflecting perfect harmony with nature, aesthetics, standards, technology, sustainability and value. With a wide presence our project covers many facets Condominiums, Plot development, Built up villas, Commercial complexes and Shopping malls. Serving customers with YOU ON PRIORITY approach is the foundation of our business operations. Strengthening bonds with associates and stakeholders with greater value sharing is our motto. We believe that professionally managed technology, driven with right ideas; innovation and actions always bring in the desired growth. Accordingly, we are Page No.: 2
6 roaring to capture diverse frontiers and imprint achievements into our success saga. The Company promoted by Shri Basant Katariya, now Chairman and mentor of the group. The routine activities and other business activities are taken care by C.E.O. Mr. Pritesh Katariya and C.O.O. Mr. Abhilesh Katariya. 1.3 Location:- Proposed project The ParkSyde is coming up in the part of Raipur; which have best developmental opportunities in Raipur i.e. at Kachna Area. This area having proximity on Baloda Bazar Raipur Highway. The Site plan of the project is given as below: 1.4 Surroundings:- The surrounding of the proposed site has best prospects regarding infrastructural development in the Raipur city. Following are the exact surrounding of our proposed site: Page No.: 3
7 West side Others [unutilized] land. North side Kachna Road. East side Others [unutilized] land. South side- Others [unutilized] land. The 2 km radial distance Google map and topographical map is enclosed as Annexure 2; while 500 m radial distance map of project site is also enclosed as Annexure 3 of this report. 1.5 Connectivity:- The proposed site is well connected with metalled Kachna Road. 1.6 Site plan:- Given as above in point no.: Project Layout Plan:- Approved layout of the project is enclosed as Annexure 1 of this report. 1.8 Area Statement:- Layout of the project has been approved for construction up to m 2, for construction of multi-storied buildings from Block A to Block U. Brief regarding construction area is given as below: Table for Constructed area: Block Floors [construction in m 2 ] Ground Floor 1st 2nd 3rd Parking built-up Floor Floor Floor Block - A Block - B Block - C Block - D Block - E Block - F Block - G Block - H Block - I Block - J Block - K Block - L Block - M Block - N Block - O Block - P Block - Q Block - R Block - S Block - T Page No.: 4
8 Block Floors [construction in m 2 ] Ground Floor 1st 2nd 3rd Parking built-up Floor Floor Floor Block - U Ramp Area Total Block Floor 4th Floor 5th Floor 6th Floor 7th Floor 8th Floor 9th Floor 10th Floor Block - A Block - B Block - C Block - D Block - E Block - F Block - G Block - H Block - I Block - J Block - K Block - L Block - M Block - N Block - O Block - P Block - Q Block - R Block - S Block - T Block - U Total Block-wise total construction area Block Total Built-up Area Block - A Block - B Block - C Block - D Block - E Block - F Block - G Block - H Block - I Block - J Block - K Block - L Block - M Block - N Block - O Block - P Block - Q Block - R Block - S Block - T Block - U Total ***** Page No.: 5
9 2.0 Population calculation: It is estimated that the proposed project will accommodate about 3045 nos. of persons including residents, staff and visitors. The detailed calculation is given as below: 2.1 Estimation of Residents: - We are coming up with wide range of accommodation right from 1 BHK to 5 BHK. Following table depicts the nos. of residents to be accommodating in the project: Unit type No. of Units occupancy ratio Estimated population 1 BHK A BHK A BHK B BHK C BHK D BHK A BHK B BHK C PH-A 3BHK PH-B 4BHK PH-B1 4BHK PH-B2 4BHK PH-D 5BHK TH-A 4BHK TH-B 4BHK TH-C 5BHK TH-D 5BHK TH-E 5BHK Total Estimation of total population: - This Project will accommodate approx nos. persons in totality; which includes residents, workers and visitors or guests. The following table gives the calculative derivation of aforementioned figure: Page No.: 6
10 Sr. No. Type No. of Units Person Per Unit (Nos.) 1. Residents (apartments) 535 Nos. --- Given above 3. Staff of (House-keeping & security + residential Commercial + Club) Population Population (Nos.) Visitors (Residential + 2% of 57 Commercial) residential population Total Population of Project Site 3045 ***** Page No.: 7
11 3.0 Water requirement, effluent generation and its recycling: 3.1 Introduction:- Based on the total population to 3045; it is estimated that about 456 m 3 / day of water will be required for the project. Out of 427 m 3 / day; total fresh water demand will be about 230 m 3 / day and remaining 197 m 3 / day will be recycled water. 3.2 Estimation of total water demand: - Basis of total water demand of the project is given as below: Sr. Particular Water Requirement Remarks No. 1. Domestic Purpose m 3 / Day Fresh Water 2. Flushing m 3 / Day Recycled Water 3. Washing 25.0 m 3 / Day Recycled Water 4. Horticulture 40.0 m 3 / Day Recycled Water Total Water Requirement m 3 / Day Fresh + Recycled 3.3 Estimation of effluent generation: - Basis of total water demand of the project is given as below: Sr. Particular Ratio Effluent generation No. 1. Domestic effluent 90% m 3 / Day 2. From Flushing 100% m 3 / Day Total effluent m 3 / Day 3.4 Recycling of treated effluent: - Most of the treated effluent will be utilized within the project for flushing, washing and horticulture purpose. Quantum is given as below: Sr. Particular Quantity No. 1. Flushing m 3 / Day 2. Washing 25.0 m 3 / Day 3. Horticulture 40.0 m 3 / Day Total effluent m 3 / Day Page No.: 8
12 3.5 Water Balance chart: - Following picture depict the water balance of the proposed activity. ***** Page No.: 9
13 4.0 Brief of Waste Water Treatment: It is proposed to construct Sewage Treatment Plant, having capacity to treat 425 m3/ day of effluent. Technical brief of the STP is given as below: 4.1 brief of STP: - Only source of waste water generation will be sanitary waste water which will be treated in STP with Moving bed Bio-Reactor technology. The treated waste water will be utilized for non-potable purposes like Toilet flushing & gardening. During construction of Complex, Dual Plumbing system will be done. Two separate water tanks will be provided for storing Treated wastewater & another for fresh water. Separate pipeline system will be provided to treated wastewater tank to pump the water for toilet flushing & gardening purposes. There by net water withdrawal will be reduced. Process Description BAR SCREEN: The influent passes through an in-line screen for removal of coarse suspended solids. These screens would be manual Oil and Grease trap: Complete oil and grease trap with siphon arrangement to arrest all oil contents in the trap will be provided. This trap will have specific RCC partition with underflow arrangement to trap oil contents in each chamber. In last chamber there will be a siphon arrangement as outlet for sewage. The tarp oil contents can be cleaned manually. There can be a provision of oil skimmer application on higher volume of oil contents. Page No.: 10
14 4.1.3 Collection cum Equalization: The oil free water is then collected in a collection cum equalization tank to meet the peak hour s requirement and to get a homogenous mixture. Equalization tank helps in sedimentation of grit in the absence of grit chamber. An aeration grid can be provided to keep the suspended matter in suspension and to avoid septic conditions Aeration Reactors: The influent from the equalization tank(s) is pumped to packaged system. The treatment occurs in various aerobic chambers provided in the system. The system will have the flexibility of varying the sequence of aerobic chambers depending upon flow rates. MBBR technology will be adopted in the aeration reactors Tube Settlers: The wastewater from bioreactors will be pumped to a Tube settler so as to settle out the solids. A chemical dosing system will be provided before Tube settler to aid in solid settling. The supernatant from the tube settler will be fed to surge tank whereas the sludge will be sent to sludge drying bed. A part of sludge is re-circulated as MLSS to aeration tank Disinfection: Clarified water is fed to the chlorine contact tank or surge tank. A chlorination system will dose chlorine on a continuous basis. This tank will also act as housing tank for filter feed pumps Pressure Sand Filter: The disinfected water will then be passed through Pressure sand filter (PSF) to reduce suspended load and turbidity, BOD, colours, odour and fine particles. It finally polishes the treated water and also reduces the Page No.: 11
15 residual chlorine. The wastewater so treated can be utilized for gardening or for flushing and recycling. The backwash from the MMF unit will be fed back into the collection tank Sludge Drying Bed: A proportion of sludge from the clarifier and bioreactor is pumped via the hydro cyclone into the sludge holding tanks/ Sludge drying beds (SDB). Supernatant from the sludge holding tanks is decanted and returned to collection tank for re-processing. A part of sludge is periodically re-circulated as MLSS to bioreactors. 4.2 process Flow sheet of STP: - Raw Sewage SCREENING Oil & Grease Trap Sewage Collection cum Equalization Tank Sludge Drying Bed/ Slurry Collection Tank MBB REACTOR TUBE SETTLER Sludge SURGE TANK DISINFECTION PRESSURE SAND FILTER ACTIVATED CARBON FILTER FINAL COLLECTION (WILL BE USED FOR GARDENING, FLUSHING ETC.) Page No.: 12
16 4.3 Qualitative parameters: - Parameters Inlet Outlet Temperature Ambient Ambient ph TSS mg/l <10 mg/l BOD mg/l <10 mg/l COD mg/l <60 mg/l O & G 5-10 mg/l <5 mg/l Page No.: 13
17 5.0 Alteration in Natural slope: The topography of site is flat with marginal slope towards N and NW. hence doesn t require lot of filling and leveling. So there will not be change in natural slope of the project site. Page No.: 14
18 6.0 Impact on ground water potential: It is earlier discussed that 230 kl/ day of water will be drawn from ground water sources; which certainly cause impact on availability of ground water. However it is also proposed to recharge ground water table through rain water harvesting. For this necessary guidance will be taken from Central Ground water Board. Page No.: 15
19 7.0 Solid Waste Generation and its Management: 7.1 Introduction:- Solid waste would be generated during construction as well as operational phase. 7.2 Solid Waste Management during Construction Stage: - Solid waste expected to be generated during construction phase will comprise of excavated materials, used bags, bricks, concrete, MS rods, tiles, wood etc. Details regarding solid waste management plan during construction phase is given as below: Solid Waste Management during Construction Phase: Sr. No. Solid Waste 1. Waste materials like MS Rods, bricks, concrete, broken tiles, wood pieces, cement bags etc. Solid Waste Management Material would be segregated. Recyclable material will be sold to authorize dealers. Rest will be used within project site for filling & leveling purpose. Remaining will be sent for disposal through government authorized vendors. Cement bags will be used for road making. 2. Excavated Soil Top soil will be stored in covered areas and will be later used for landscaping purpose. Remaining soil will be used for back filling & leveling of site. Unused soil will be disposed off to designated side through authorized vendors on payment basis. 7.2 Solid Waste Management during Operational Stage: - It is estimated that about kg of solid waste will be generated from the proposed building project. This comprises of biodegradable and nonbiodegradable. The categorized quantification of the wastes is given as below: Sr. No. Category Capacity (Nos.) / Area (acres) Waste Generation (Kg/day/capita) Waste generated (kg/day) RESIDENTIAL 1. Residents kg/person Staff kg/person Visitors kg/person Landscape Waste 1.05 Acres 0.1 kg/acres 0.21 Total waste collection (Source: For Waste Collection, Chapter 3, Table 3.6, Page no. 49, of Central Public Health & Environment Engineering Organization, Ministry of Urban Development, (Government of India, May 2000) Page No.: 16
20 Sr. No. Type of Waste Quantity of Waste 1. Compostable-Wet/food waste 60% of total waste) Kg/day 2. Recyclable 30% of total waste) Kg/day 3. Inert of total Waste) Kg/day Solid Waste ( Kg / Day) Wet / Food Waste ( Kg / Day) Recyclable Waste ( Kg / Day) Insert Waste ( Kg / Day) Green Bins Blue Bins Grey Bins Onsite Composting Manure for Green Area To be sold to Recyclers on regular basis To be disposed off through Govt. Authorized agencies to landfill site Collection and Segregation of waste 1. A door to door collection system will be provided for collection of domestic & commercial waste from project site 2. Local vendors will be hired for waste collection and management 3. Separate colored bins for dry recyclables wet compostable and inert waste will be provided 4. Litter bin will also be provided in open areas like parks etc. Treatment of Waste Bio-Degradable wastes a. Bio-degradable waste will be treated in Organic Waste Converter to convert it into manure which can later be used for landscaping b. STP sludge is proposed to be used for horticultural purposes as manure. Page No.: 17
21 Recyclable wastes Recyclable wastes like paper, plastic, metals etc. will be sold off to authorized recyclables. Disposal Inert fraction of waste will be sent through authorized vendor for disposal. Apart from the municipal waste, E-waste comprising of rejected CFL, bulbs, laptops, TV sets, computers etc will be generated. This waste will be insignificant in initial stage. These will be sold to authorized vendors on regular basis. Very less quantity of used oil will be generated from the DG set and will be sold to authorized vendors on regular basis. Page No.: 18
22 8.0 Energy requirement and its conservation: 8.1 Estimation of power requirement:- About 4 MW power will be required during the post commencement of the project. 8.2 Source of power: - The desired quantum of power will be drawn from nearby CSPDCL Grids. 8.3 Energy Saving Efforts:- Common areas like internal roads, gardens etc will be illuminated with Solar power LED Common area within the building will be powered with Solar LEDs. Page No.: 19
23 9.0 Internal Traffic Circulation and Parking details: Adequate parking is provided to accommodate the expected vehicles during operation phase OF the project. Parking is provided in accordance to Madhya Pradesh & Chhattisgarh Bhoomi Vikas Niyam, 1984 & NBC, Parking required and provided is given as below: Parking Required: Total Area for Multistoried building and Club House = m 2 Defined NBC norms = 1 car for every 100 m 2 total car parking required = Cars..1. or say 506 total LIG area = m 2 NBC norms = 1 car for every 200 m 2 total car parking required = Cars..2. or say 25. Total nos. of parking to be provided [1 + 2] = 531 Nos. of cars Proposed parking: Stilt Parking area = m 2 Ratio = 30 m 2 hence stilt parking can accommodate = cars..3. Open parking area = m 2 Ratio = 25 m 2 hence stilt parking can accommodate = cars..4. Proposed parking areas can accommodate [3 + 4] = Nos. of cars Or = 560 nos. of cars Page No.: 20
24 10.0 Environmental Management Plan: Environmental pollution is inevitable during the construction phase. The project proponent should take appropriate steps to control pollution during construction phase. The following are the factors requiring control during construction phase During Construction Period: Site Preparation In the proposed project, all necessary control measures will be taken during site preparation. The soil type in the area of project site area is Black soil. Sparse vegetation is observed in small portion of the Project area. Hence there will not be much removal of top soil during construction activities. To keep the damage to top soil minimum, excavators will be utilized for construction Top soil excavated during construction activities will be stacked at safe place for reuse at a later stage of construction Air Environment: Dust is the major emission during the construction period. The following control measures will be followed during the construction period Application of dust suppressants will be done Locally available gravel will be applied to the roads and lots, to prevent the dust emanation Measures will be taken to cover the stored materials to prevent the dust emission during high winds Speed of the vehicles in the project area will be limited 20 Kmph Rescheduling the works during high speedy winds Inspection will be done for use of covering sheet to prevent dust dispersion at buildings site Page No.: 21
25 Water Environment Conceptual Plan Water required during the construction the residential complex will be met from the ground water resources. Total water requirement during construction period will be 25 KLD and construction period lasts for period of 36 months. The following control measures will be taken to reduce the reduce the water requirement during construction Curing water will be sprayed on concrete structures; free flow of water will not be done for curing. After liberal curing on the first day, all concrete structures will be painted with curing chemical to save water. This will stop daily water curing hence save water. Concrete structures will be covered with thick cloth/gunny bags and then water will be sprayed on them. This will avoid water rebound and will ensure sustained and complete curing. Ponds will be made using cement and sand mortar to avoid water flowing away from the flat surface while curing. Waste water management during construction Waste water generation will be minimized by following above control measures Sanitary waste water generated during construction stage will be sent to septic tank followed by soak pit Noise Environment The main sources of noise in the process of construction activities will be cement concrete mixing, welding, aluminum channel folding, drilling and DG sets etc. Diesel generator sets will be provided with integral acoustic enclosure at the manufacturing stage itself Equipment like earmuffs, earplugs etc. will be used for hearing protection for workers. Page No.: 22
26 Land Environment: Conceptual Plan Proper planning and management during construction period is very much vital. We proposed to implement the following control measures to mitigate the waste generation Delivery of material on site will be done over a durable, impervious and level surface, so that first batch of material does not mix with the site surface. Availability of covered storage will be assured. The recyclable items like metal, plastic will be sent to recyclable industry, and rest of this scrap will be stored in a covered area. Wherever materials (aggregates, sand, etc.) are more likely to generate fine airborne particles during operations, nominal wetting by water will be practiced. Workers / labour will be given proper air masks and helmets. Skilled labour and good workmanship will be employed for judicial utilization of materials and minimizing the waste. Proper estimate of material will be done to minimize the undue wastage. Contaminated runoff from storage will be captured in ditches or ponds with an oil trap at the outlet. Materials wasted on site will be reused at the same place Waste management & recycling The construction waste includes debris, concrete (often recycled and reused at the site), steel and other metals, pallets, packaging and paper products, fluorescent tubes, wood beams, joists, studs, baseboards, cabinets and cupboards, railings, brick, doors and casings, interior windows, bathroom fixtures, light fixtures, ceiling grid and tile, furnishings etc. Waste recycling Plan Waste and recycling plans will be developed prior to beginning construction activity. The plan aims at identifying wastes to be generated, and designate handling, recycling and disposal method to be followed. Page No.: 23
27 Handling Handling of waste material requires special precautions such as personal protective equipment and special procedures to prevent the injury. Safe operating methods will be developed for waste collection, storage, and disposal operations in a manner to protect the health and safety of personnel, minimize environmental impact and promote material recovery and recycling. Waste Segregation Gross segregation of construction wastes into roadwork materials, structural building material, salvaged building parts and site clearance wastes will be done and additional segregation will be done to facilitate reuse/ recycling. Storage Adequate provision will be made for storage of solid waste and for easy access to the dustbins for labors from source to the place of storage, and from the place of storage to a collection point specified by the waste collection authority and/or contractor Three colors of wheeled bins: Dark grey for inert waste, Green for wood and ply waste and Blue for hazardous waste will be used. A minimum of 4% of the total site area will be allocated for storage and pretreatment of the waste. This storage area will be covered to prevent any impact on surrounding During Post Operational Phase: In the proposed project, all necessary control measures will be taken during site preparation Air Emission Management: During operation of the proposed Residential complex, the emissions will be mainly from DG Sets which will be used for backup power supply and vehicles. Emissions will be mainly Particulate matter, Hydrocarbons, Nitrogen dioxide and Carbon monoxide. Page No.: 24
28 The following control measures will be taken up during the operation All the internal roads will be grass paved. This will reduce the dust generation due to the vehicular movement Stack of adequate height will be provided to the DG Sets as per CPCB guidelines Green belt will be developed in the premises of complex which will act as sink for air emissions Hence there will not be any impact on surrounding environment due to the air emissions from the proposed complex. Recommendations a. All the internal roads shall be black topped to reduce the fugitive dust due to vehicle movement. b. Greenbelt shall be provided around the boundary and along the internal roads Water Pollution Management: The detailed calculation of waste water generation, water Balance and its treatment is scheme is given as below: Estimation of effluent generation: - Basis of total water demand of the project is given as below: Sr. No. Particular Ratio Effluent generation 1. Domestic effluent 90% m 3 / Day 2. From Flushing 100% m 3 / Day Total effluent m 3 / Day Recycling of treated effluent: - Most of the treated effluent will be utilized within the project for flushing, washing and horticulture purpose. Quantum is given as below: Sr. No. Particular Quantity 1. Flushing m 3 / Day 2. Washing 25.0 m 3 / Day 3. Horticulture 40.0 m 3 / Day Total effluent m 3 / Day Page No.: 25
29 Water Balance chart: - Following picture depict the water balance of the proposed activity. Sewage Treatment Plant: - It is proposed to construct Sewage Treatment Plant, having capacity to treat 425 m3/ day of effluent. Technical brief of the STP is given as below: Brief of STP: - Only source of waste water generation will be sanitary waste water which will be treated in STP with Moving bed Bio-Reactor technology. The treated waste water will be utilized for non-potable purposes like Toilet flushing & gardening. Page No.: 26
30 During construction of Complex, Dual Plumbing system will be done. Two separate water tanks will be provided for storing Treated wastewater & another for fresh water. Separate pipeline system will be provided to treated wastewater tank to pump the water for toilet flushing & gardening purposes. There by net water withdrawal will be reduced. Process Description BAR SCREEN: The influent passes through an in-line screen for removal of coarse suspended solids. These screens would be manual. Oil and Grease trap: Complete oil and grease trap with siphon arrangement to arrest all oil contents in the trap will be provided. This trap will have specific RCC partition with underflow arrangement to trap oil contents in each chamber. In last chamber there will be a siphon arrangement as outlet for sewage. The tarp oil contents can be cleaned manually. There can be a provision of oil skimmer application on higher volume of oil contents. Collection cum Equalization: The oil free water is then collected in a collection cum equalization tank to meet the peak hour s requirement and to get a homogenous mixture. Equalization tank helps in sedimentation of grit in the absence of grit chamber. An aeration grid can be provided to keep the suspended matter in suspension and to avoid septic conditions. Aeration Reactors: The influent from the equalization tank(s) is pumped to packaged system. The treatment occurs in various aerobic chambers provided in the system. The system will have the flexibility of varying the sequence of aerobic chambers Page No.: 27
31 depending upon flow rates. MBBR technology will be adopted in the aeration reactors. Tube Settlers: The wastewater from bioreactors will be pumped to a Tube settler so as to settle out the solids. A chemical dosing system will be provided before Tube settler to aid in solid settling. The supernatant from the tube settler will be fed to surge tank whereas the sludge will be sent to sludge drying bed. A part of sludge is re-circulated as MLSS to aeration tank. Disinfection: Clarified water is fed to the chlorine contact tank or surge tank. A chlorination system will dose chlorine on a continuous basis. This tank will also act as housing tank for filter feed pumps. Pressure Sand Filter: The disinfected water will then be passed through Pressure sand filter (PSF) to reduce suspended load and turbidity, BOD, colours, odour and fine particles. It finally polishes the treated water and also reduces the residual chlorine. The wastewater so treated can be utilized for gardening or for flushing and recycling. The backwash from the MMF unit will be fed back into the collection tank. Sludge Drying Bed: A proportion of sludge from the clarifier and bioreactor is pumped via the hydro cyclone into the sludge holding tanks/ Sludge drying beds (SDB). Supernatant from the sludge holding tanks is decanted and returned to collection tank for re-processing. A part of sludge is periodically re-circulated as MLSS to bioreactors. Page No.: 28
32 Process Flow sheet of STP: - Raw Sewage SCREENING Oil & Grease Trap Sewage Collection cum Equalization Tank Sludge Drying Bed/ Slurry Collection Tank MBB REACTOR TUBE SETTLER Sludge SURGE TANK DISINFECTION PRESSURE SAND FILTER ACTIVATED CARBON FILTER FINAL COLLECTION (WILL BE USED FOR GARDENING, FLUSHING ETC.) Solid Waste Management: It is estimated that about kg of solid waste will be generated from the proposed building project. This comprises of biodegradable and nonbiodegradable. The categorized quantification of the wastes is given as below: Sr. No. Category Capacity (Nos.) / Area (acres) Waste Generation (Kg/day/capita) Waste generated (kg/day) RESIDENTIAL 1. Residents kg/person Staff kg/person Visitors kg/person Landscape Waste 1.05 Acres 0.1 kg/acres 0.21 Total waste collection (Source: For Waste Collection, Chapter 3, Table 3.6, Page no. 49, of Central Public Health & Environment Engineering Organization, Ministry of Urban Development, (Government of India, May 2000) Page No.: 29
33 Sr. No. Type of Waste Quantity of Waste 1. Compostable-Wet/food waste 60% of total waste) Kg/day 2. Recyclable 30% of total waste) Kg/day 3. Inert of total Waste) Kg/day Solid Waste ( Kg / Day) Wet / Food Waste ( Kg / Day) Recyclable Waste ( Kg / Day) Insert Waste ( Kg / Day) Green Bins Blue Bins Grey Bins Onsite Composting Manure for Green Area To be sold to Recyclers on regular basis To be disposed off through Govt. Authorized agencies to landfill site Collection and Segregation of waste 1. A door to door collection system will be provided for collection of domestic & commercial waste from project site 2. Local vendors will be hired for waste collection and management 3. Separate colored bins for dry recyclables wet compostable and inert waste will be provided 4. Litter bin will also be provided in open areas like parks etc. Treatment of Waste Bio-Degradable wastes a. Bio-degradable waste will be treated in Organic Waste Converter to convert it into manure which can later be used for landscaping b. STP sludge is proposed to be used for horticultural purposes as manure. Recyclable wastes Recyclable wastes like paper, plastic, metals etc. will be sold off to authorized recyclables. Page No.: 30
34 Disposal Inert fraction of waste will be sent through authorized vendor for disposal. Apart from the municipal waste, E-waste comprising of rejected CFL, bulbs, laptops, TV sets, computers etc will be generated. This waste will be insignificant in initial stage. These will be sold to authorized vendors on regular basis. Very less quantity of used oil will be generated from the DG set and will be sold to authorized vendors on regular basis Noise Level Management Silent type DG sets will be provided. The DG sets would be mounted on the anti vibration pads to restrict the vibration. There will be slight increase in traffic noise due to the proposed project. However the Noise levels will be within the standards prescribed by CPCB / CECB. Hence there will not be any impact on Noise environment due to the proposed project Land Environment All the pavements in the site area will be grass paved, which will mitigate the dust generation from the vehicles. Vehicle speed in the complex area will be reduced which will reduce the emissions. Greenbelt will be developed in the complex area which will acts as sink for the emissions. Hence there will not be any deposition of pollutants in the surrounding area. The sanitary waste water generated from the complex will be treated in STP with Moving Bed Bio-reactor system. Treated waste water will be reused for non-potable purposes like flushing and greenbelt development. Remaining treated waste water will be discharged into the municipal drain The solid waste generated from the complex will be disposed as per norms. Page No.: 31
35 Hence there will not be any impact on land environment due to the proposed complex Recommendations a) Landscaping will be done at periphery of the compound wall Green Belt Development Green belt will be developed all around the complex area Out of the total site area, m 2 of area will be allocated for greenbelt development The tree species to be selected for the plantation are pollutant tolerant, fast growing, wind firm, deep rooted. Page No.: 32
Environmental Management Plan
Environmental Management Plan ENVIRONMENTAL MANAGEMENT PLAN An Environmental Management Plan is prepared for construction phase, post construction phase (commissioning & operation) and for post project
TERMS OF REFERENCE. BEFORE CONSTRUCTION: Sl No TOR RESPONSE 1. Legalities of the land: Is the land The Project is clear from all angles.
TERMS OF REFERENCE Name of the Project: M/s Suadela Constructions Pvt. Ltd. Address: Sy.No. 321/2B(P),321/2C(P),322/1,323/1(P),323/1(P),323/3,323/4,323/5(P), 323/6,323/7,325/1(P),325/2,327,328/1,328/2(P),328/3,328/4,330,331,332/2
ENVIRONMENTAL MANAGEMENT PLAN. Nilaya Hills/ Heights Promoted by M/s RBS Developers (Group Housing & Commercial Building Project)
ENVIRONMENTAL MANAGEMENT PLAN Of Nilaya Hills/ Heights Promoted by M/s RBS Developers (Group Housing & Commercial Building Project) at Khasra Nos. 1353Min,1354Min,1355, 1356, 1358, 1357, 1587 Ka, 1587Kha,
WASTEWATER TREATMENT OBJECTIVES
WASTEWATER TREATMENT OBJECTIVES The student will do the following: 1. Define wastewater and list components of wastewater. 2. Describe the function of a wastewater treatment plant. 3. Create a wastewater
Environment Management Plan. of M/s Mahananda Spa & Resorts Pvt. Ltd.
Environment Management Plan of At Khasra No. 605 PTC Road, Village & Tehsil Narender Nagar, District Tehri Garhwal (Uttarakhand) Brief Features of the Project: Name of the Project Hotel & Resort Project
EMP for Pirangut Project Tal Mulshi Pune ANNEXURE 15 ENVIRONMENT MANAGEMENT PLAN
ANNEXURE 15 ENVIRONMENT MANAGEMENT PLAN Pact Real Estate Pvt. Ltd proposes at Construction project at Pirangut. Proposed project of Construction project is coming up in Pirangut, Tal. Mulshi. This area
M/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED. REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At
M/s SANGHVI GRUHA NIRMAN PVT. LTD. PROPOSED REDEVELOPMENT OF BUILDING (JANKI BHAVAN) At Final Plot No. 1274, situated at T.P.S. IV, Mahim, Hatiskar Marg, Prabhadevi, Mumbai 400 025. EXECUTIVE SUMMARY PREPARED
Oasis Clearwater ENVIRONMENTAL SYSTEMS WASTEWATER TREATMENT ENGINEERS
Oasis Clearwater ENVIRONMENTAL SYSTEMS WASTEWATER TREATMENT ENGINEERS The evolution continues in decentralised wastewater technology... The Process Decentralised wastewater treatment systems are defined
septic systems What is a Septic System? How does a Septic System Work?
septic systems What is a Septic System? A septic system is a private sewage treatment system. They are common in rural areas where there are no municipal sewage pipes for homes, farms, businesses or other
SEPTIC TANK SYSTEMS. Single purpose septic tank receives toilet wastes (blackwater) or sullage (greywater) only.
SEPTIC TANK SYSTEMS There are three common types of septic tank systems in Tasmania Single purpose septic tank receives toilet wastes (blackwater) or sullage (greywater) only. Dual purpose (or all-waste)
A HOMEOWNERS GUIDE ON-SITE SEWAGE MANAGEMENT SYSTEMS
GEORGIA DEPARTMENT OF HUMAN RESOURCES ENVIRONMENTAL HEALTH SECTION A HOMEOWNERS GUIDE TO ON-SITE SEWAGE MANAGEMENT SYSTEMS March 12, 2002 WHAT IS AN ON-SITE SEWAGE MANAGEMENT SYSTEM An on-site sewage management
Executable EMP for Residential & Commercial Project by Ms. Abisky Ritkriti Keshavnagar LLP
Executable EMP for Residential & Commercial Project by Ms. Abisky Ritkriti Keshavnagar LLP Project Location: S.No. 8/3/2, 8/3/3, Mundhwa, Tal- Haveli, Dist- Pune. Project Details: 1 Plot Area 14200 sqm
On Site Sewage System Maintenance Inspections. March 2011. Building and Development Branch Ministry of Municipal Affairs and Housing
On Site Sewage System Maintenance Inspections March 2011 Building and Development Branch Ministry of Municipal Affairs and Housing Introduction The Building Code Act, 1992 and Building Code (Ontario Regulation
Best Management Practices
for The City of Paso Robles is required to implement a Phase II Municipal Water Program in order to reduce or eliminate the pollutants that enter our waterways from both storm water and non-storm water
MARICOPA COUNTY ENVIRONMENTAL HEALTH CODE CHAPTER II SEWAGE AND WASTES SECTION 8
MARICOPA COUNTY ENVIRONMENTAL HEALTH CODE CHAPTER II SEWAGE AND WASTES SECTION 8 ONSITE WASTEWATER TREATMENT FACILITIES REGULATION 1. Definitions a. Aggregate means a clean graded hard rock, volcanic rock,
Sustainable Resource Management Ltd
6.0 Predicted nvironmental Impacts 6. Stages and Impacts Considered An nvironmental Impact Analysis has been carried out whereby all the possible environmental, socio economic and health & safety aspects
Proposed Terms of Reference for EIA studies
1 Proposed Terms of Reference for EIA studies Base line data collection will be collected for the Post-Monsoon season 2016 (September to November 2016) in study area and 10 kms radius from project site.
PROPAK AquaBio Complete Water Restoration Systems
PROPAK AquaBio Complete Water Restoration Systems Conserving natural resources and lowering operating expenses is no longer an option, it is a necessity. Water, sewer and discharge fees are continuing
Environmental Site Inspection Checklist
Note : This form is designed for general use and may not be exhaustive. Modifications and additions may be necessary to suit individual projects and to address specific environmental issues and associated
Guidance on applying for approval of installation of a commercial onsite wastewater system
Guidance on applying for approval of installation of a commercial onsite wastewater system This factsheet is designed to assist you to complete an Application to construct or install an apparatus for the
How To Conduct An Environmental Impact Assessment
Proposed Terms of Reference for EIA studies 1. Introduction The proposed expansion of Bulk Drugs & Intermediates manufacturing unit by M/s. Sri Krishna Pharmaceuticals Limited (Unit V). is located at Plot
Florida Department of Environmental Protection
Florida Department of Environmental Protection Background Mobile vehicle and equipment washing involves washing at a location where vehicles are based (such as a trucking company, warehouse, bus station,
TERMS OF REFERENCE FOR SCOPING OF EIA STUDY
TERMS OF REFERENCE FOR SCOPING OF EIA STUDY Ours project is a proposed large scale unit and categorized as 5(h)-B as per the EIA notification 2006 of MoEFCC, New Delhi and subsequent amendments. Looking
31. ECO-INFO -- SEPTIC SAFE PROTECT YOUR HEALTH AND ENVIRONMENT YOUR SEPTIC PUMP-OUT SYSTEM with SELF ASSESSMENT TROUBLE SHOOTING GUIDE
31. ECO-INFO -- SEPTIC SAFE PROTECT YOUR HEALTH AND ENVIRONMENT YOUR SEPTIC PUMP-OUT SYSTEM with SELF ASSESSMENT TROUBLE SHOOTING GUIDE Edited 21/12/01 Wyong Shire Council has many non sewered areas that
ENVIRONMENTAL MANAGEMENT PLAN :-
ENVIRONMENTAL MANAGEMENT PLAN :- The Environment Management Plan (EMP) is required to ensure sustainable development in the area of the proposed project. Hence it needs to be all encompassive plan for
Looking after your Septic Tank System
Looking after your Septic Tank System Name: Bought to you by Address: File this in your property file. 0800 TO FLUSH Call 0800 TO FLUSH 1 What do you know about your septic tank system? Just like your
City of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements
City of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements Overview of the City s Construction Storm Water Program The City of Paso Robles is committed to protecting
ALL YOU NEED TO KNOW...
ALL YOU NEED TO KNOW... What do you know about your septic tank system? For the purposes of this booklet, a septic tank system refers to any kind of on-site sewage management system including traditional
Construction Management Statement. Residential development at Bywell House, St Mary s Hill, Ascot
Construction Management Statement Residential development at Bywell House, St Mary s Hill, Ascot Parking of Vehicles of Site Personnel, Operatives and Visitors Site staff, visitors to the development and
Introduction to Waste Treatment Technologies. Contents. Household waste
Contents Introduction to waste treatment technologies 3 Section 1: The treatment of recyclable waste 4 Bulking facilities 5 Materials Reclamation Facility (MRF) 6 Reuse and recycling centres 8 Composting
ENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN FOR VILLAGE TEHSIL DISTRICT AREA MINERAL : Makrohar : Mada : Singrauli (M.P.) : 1.00 hect : Metal Stone KHASRA No : 176,178 PRODUCTION CAP : 15375 Cu.mt/year Metal Stone APPLICANT
SEPTIC SYSTEMS. 1. Building sewer connects the building plumbing to the septic tank.
SEPTIC SYSTEMS Who Has A Septic System? Approximately 30 percent of Connecticut s population is served by on-site subsurface sewage disposal systems (a.k.a. septic systems). This means a large percentage
Compliance to the Environmental Clearance Conditions Sl, No Specific Conditions Compliance to the conditions 1 The gaseous emissions (S0x, NOx,.& HCL) particulate The gaseous emissions (S0x, NOx,.& matter
16. Storm water drainage
16. Storm water drainage There are three principal ways to dispose of rainwater from roofs, courtyards and paved areas: storm water sewers, soakaways and collection in storage tanks. Storm water sewers,
Policy and Regulations Faridabad (India)
Policy and Regulations Faridabad (2009) Policy and Regulations Faridabad (India) 1.1 Policies No specific regulations have been framed for addressing the management of plastic waste, and it is thus governed
Temporary Batch Plants
Categories EC SE TC WE NS WM Erosion Control Sediment Control Tracking Control Wind Erosion Control Non-Stormwater Management Control Waste Management and Materials Pollution Control Legend: Primary Category
ENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN OF M/s Baghel Infrastructure Pvt. Ltd. AT Khasra No 1203/1 Vill- Makrohar, Tehsil-Mada, District-Singrauli (M.P.) Production Capacity: 8158Cu.mt/year Metal Stone Area 1.00 Hectare
Waste & Recycling. Planning Guidance on Waste & Recycling Storage and Collection. Development & Enterprise FOR INTERNAL USE ONLY.
Waste & Recycling Planning Guidance on Waste & Recycling Storage and Collection October 2011 Development & Enterprise FOR INTERNAL USE ONLY Contents 01 Introduction 3 02 General guidelines 3 03 Individual
What Is An On-Lot Sewage Disposal System?
What Is An On-Lot Sewage Disposal System? Most rural homes and communities in Monroe County are not served by a public sewer system. In order to dispose of the wastewater (sewage) generated by homes and
Maintenance Guidelines For Homeowners
ON-SITE WASTEWATER SYSTEMS Maintenance Guidelines For Homeowners PROTECTING YOUR HEALTH, YOUR ENVIRONMENT, YOUR INVESTMENT PRODUCED BY: SWANS-SIG The Small Wastewater And Natural Systems Special Interest
ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS
ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS PREPARED BY: DEPARTMENT OF ENVIRONMENT AND LANDS INDUSTRIAL ENVIRONMENTAL ENGINEERING DIVISION APRIL 16, 1992 - TABLE OF
2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited
(IV) Proposed Terms of Reference for EIA Studies Project Category Project Proponent Location Paraspani Thermal Power Plant (2x800 MW) Coal based Thermal Power Project A [1(d) Thermal Power Plant 500 MW]
PLUMBING MAINTENANCE WORK FOR TOILETS IN HEAD OFFICE, SUPPLYCO ESTIMATE
Sl.No. PLUMBING MAINTENANCE WORK FOR TOILETS IN HEAD OFFICE, SUPPLYCO ESTIMATE Description of item Qty Unit Rate Amount 1 Demolishing tile work/cement concrete/( carefully taking out the closet and other
Improper storage of fuel on construction sites will increase the risk of water pollution that may occur as a result of leaks or spills.
WQ-10 Best Management Practice (BMP) Water Quality Protection Guideline Secondary Containment Design Standards Fuel Storage on Construction Sites According to the EPA, the majority of water pollution in
CONCEPTUAL PLAN. CENTRAL PUBLIC WORKS DEPARTMENT (CPWD) GPOA Project Division Near Rajiv Nagar Thana Aashiyana Digha Road PATNA 800 025 FOR
Annexure - I CONCEPTUAL PLAN. FOR GENERAL POOL RESIDENTIAL ACCOMMODATION (GPRA) (A Project of Ministry of Urban Development, Govt. of India) DIGHA, PATNA - 800025 OF CENTRAL PUBLIC WORKS DEPARTMENT (CPWD)
DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS
DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS Phase I MS4 permits require continuous updating of the stormwater system inventory owned and operated by the MS4. They also include inspection
Sewerage Management System for Reduction of River Pollution
Sewerage Management System for Reduction of River Pollution Peter Hartwig Germany Content page: 1 Introduction 1 2 Total emissions 3 3 Discharge from the wastewater treatment plants 4 4 Discharge from
DOMESTIC WASTEWATER SYSTEMS
Environmental PROTECTION Systems DOMESTIC WASTEWATER SYSTEMS Highest quality sewage treatment systems from the name you can trust Hynds Aerated Wastewater Systems Hynds Lifestyle Systems are an elite range
POLLUTION PREVENTION FACT SHEET: AUTOMOBILE MAINTENANCE
POLLUTION PREVENTION FACT SHEET: AUTOMOBILE MAINTENANCE Description This pollution prevention measure involves creating a program of targeted outreach and training for businesses involved in automobile
ENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN OF Shri Kuldeep Choudhary AT Khasra No.Part of 112 Vill.-Golpura, Tehsil-Gandhwani, District-Dhar (M.P.) Production Capacity: 4543 Cu.mt/year Basalt Stone&4543 Cu.mt/year Murram
CITY OF ST. CA THARINE S. cn- Olc.4 BY-LAW NO. WHEREAS the Council of the Corporation of the City of St. Catharines, is
~: ~,,' " CITY OF ST. CA THARINE S BY-LAW NO. cn- Olc.4 A By-law to regulate sanitary and storm drainage. WHEREAS the Council of the Corporation of the City of St. Catharines, is authorized by the provisions
Development of Organic Waste Treatment Facilities, Phase 2
ENVIRONMENTAL PROTECTION DEPARTMENT Development of Organic Waste Treatment Facilities, Phase 2 Project Profile April 2011 CONTENTS 1 PURPOSE OF PROJECT PROFILE... 3 2 BASIC INFORMATION... 3 2.1 Project
GUIDELINE FOR MUNICIPAL MANAGEMENT PRACTICES FOR STREET SWEEPINGS & CATCH BASIN CLEANINGS
GUIDELINE FOR MUNICIPAL MANAGEMENT PRACTICES FOR STREET SWEEPINGS & CATCH BASIN CLEANINGS STATE OF CONNECTICUT August 2007 DEPARTMENT OF ENVIRONMENTAL PROTECTION 79 Elm Street, Hartford, CT 06106-5127
Homeowner s Guide to Maintaining a Sewage Treatment System
Homeowner s Guide to Maintaining a Sewage Treatment System Warren County Combined Health District 416 South East Street Lebanon, OH 45036 513-695-1220 Sewage Treatment Systems Septic Tank and Soil Absorption
Affordable and Reliable. Wastewater. &Rainwater Solutions for Domestic & Commercial Applications FREE. Delivery. On-site advice.
Affordable and Reliable Wastewater &Rainwater Solutions for Domestic & Commercial Applications On-site advice available FREE Delivery Wastewater &Rainwater When budget matters - Count on Clearwater Solutions
IC24. DISPOSAL OF WASTEWATER GENERATED BY MOBILE BUSINESSES AND OUTDOOR ACTIVITIES
IC24. DISPOSAL OF WASTEWATER GENERATED BY MOBILE BUSINESSES AND OUTDOOR ACTIVITIES BEST MANAGEMENT PRACTICES (BMP) A BMP is a technique, measure, or structural control that is used for a given set of conditions
Advanced Wastewater Treatment and Disposal Systems. Water and Wastewater Utility Operation and
Advanced Wastewater Treatment and Disposal Systems Water and Wastewater Utility Operation and Management for Tribes Preliminary Treatment Primary Treatment Secondary Treatment Tertiary Treatment Disinfection
Septic Records and Maintenance Guidelines
1 Septic Records and Maintenance Guidelines Proper design, installation, and maintenance of your septic system will maximize your system's life. It will prevent failures that can be unsightly, foul-smelling,
The Ministry of Environment and Forest says No Discharge from Red Mud Pond in Lanjigarh
The Ministry of Environment and Forest says No Discharge from Red Mud Pond in Lanjigarh In response to allegations raised by certain groups claiming leakage from the Red Mud Pond at the Alumina refinery
Waste Management. GUIDANCE NOTES FOR DEVELOPERS AND LANDLORDS ON THE STORAGE & COLLECTION OF DOMESTIC REFUSE AND RECYCLING (December 2012)
Waste Management GUIDANCE NOTES FOR DEVELOPERS AND LANDLORDS ON THE STORAGE & COLLECTION OF DOMESTIC REFUSE AND RECYCLING (December 2012) 1. Introduction The aim of this guide is to inform developers of
Environment Impact Assessment of Thermal Power Plant for Sustainable Development
International Journal of Environmental Engineering and Management. ISSN 2231-1319, Volume 4, Number 6 (2013), pp. 567-572 Research India Publications http://www.ripublication.com/ ijeem.htm Environment
Indiana State Department of Health Construction Guidelines for Gravity and Flood-Dose Trench Onsite Systems
Indiana State Department of Health Construction Guidelines for Gravity and Flood-Dose Trench Onsite Systems The septic tank-absorption field sewage treatment system is composed of two major elements; the
Waste Handling & Disposal
Objectives Cover Contain Educate Reduce/Minimize Product Substitution Description Improper storage and handling of solid wastes can allow toxic compounds, oils and greases, heavy metals, nutrients, suspended
Environment Management Plan
Environment Management Plan FOR Quarry Lease of Crusher Stone Area 1.437Hectare, Kh. No. 40/8 KA AT Village: BHAWANDA, Tehsil: SEONI MALWA Distt HOSHANGABAD (M. P.) Proponent M/S JYORI CONSTRUCTION COMPANY
Preventing Storm Water Pollution: What We Can Do
Preventing Storm Water Pollution: What We Can Do ~Employee Training Series~ Streets and Drainage Maintenance PREPARED IN COOPERATION WITH THE Texas Commission on Environmental Quality AND U.S. ENVIRONMENTAL
CERTIFIED SEPTIC EVALUATION PREPARED FOR MATT HASHEM 1673 MT. MAJOR HWY, ALTON, NH 03810
DATE: May 31, 2013 N.H. LICENSED DESIGNER OF SUBSURFACE DISPOSAL SYSTEMS 216 Hill Road Phone & Fax: 934-6206 Franklin, NH 03235 Cell: 393-3085 CERTIFIED SEPTIC EVALUATION PREPARED FOR MATT HASHEM 1673
CITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES
CITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES INTRODUCTION What is a Construction Management Plan? The City of Vincent requires careful management of construction involving excavation and retention
Project Details-Minor Minerals (Other Than Sand)
Project Details-Minor Minerals (Other Than Sand) Sr. No. Details Particulars ABOUT THE PROPOSAL 1. Name Of lease Holder M/s. Kirtikumar Samji Sengani 23 0'27.43"N 69 24'10.21"E 2. Location address Survey
FORM-1 A 1. LAND ENVIRONMENT
FORM-1A. FORM-1 A 1. LAND ENVIRONMENT 1.1 Will the existing land use get significantly altered from the project that is not consistent with the surroundings? (Proposed land use must conform to the approved
PRODUCT SELECTOR Pollution Control, Pumping and Rainwater Harvesting Systems
PRODUCT SELECTOR Pollution Control, Pumping and Rainwater Harvesting Systems PACKAGE SEWAGE TREATMENT SYSTEM Clearwater treatment plants are ideal for single houses and employ the well proven aerobic biological
William E. Dunn Water Reclamation Facility. Facility Overview & Information
William E. Dunn Water Reclamation Facility Facility Overview & Information General Area Served: Plant History Facility Highlights Northern Pinellas County St. Joseph Sound to East Lake Road (E/W) Tampa
Small Wastewater Treatment Systems
Small Wastewater Treatment Systems By Michael Albanese, P.Eng. H2FLOW EQUIPMENT INC. www.h2flow.com Why do you need one? Typical Reasons Enviromental Regulations New Development Failing Septic Systems
ENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN The Environment Management Plan (EMP) would consist of all mitigation measures for each component of the environment due to the activities increased during the construction,
Chapter 2 Stormwater Pollution Prevention Plan (SWPPP) for Park Operations
SWPPP for Park Operations 2 Chapter 2 Stormwater Pollution Prevention Plan (SWPPP) for Park Operations Bordered by Lake Washington & Lake Sammamish, the City of Bellevue has more than 60 miles of streams,
Environment Management Plan. Residential & Commercial project
For Residential & Commercial project at S. No. 44 (P), 45 (P) & 46 (p), Village Balewadi, Tehsil Haveli, District Pune Contents Introduction... 3 1.1 During construction phase... 3 1.2 During operation
CREATING A GREEN FUTURE THROUGH WATER REMEDIATION
CREATING A GREEN FUTURE THROUGH WATER REMEDIATION Cornerstone Principles for Conducting Business Active Treatment Systems, Inc. goes to great lengths to instill in every employee the importance of ethical
Site Visit Report. MEAT PROCESSING FACILITY COD Reduction. Industrial Assistance Section Assessment Team
N.C. Division of Pollution Prevention and Environmental Assistance North Carolina Department of Environment and Natural Resources Site Visit Report MEAT PROCESSING FACILITY COD Reduction Industrial Assistance
Household waste & recycling storage requirements
South Gloucestershire Council Guidance for Developers on Household waste & recycling storage requirements INTRODUCTION As part of the Council s aim to improve the quality of life for residents as well
BEST MANAGEMENT PRACTICES (BMPs)... What are They? GOOD HOUSEKEEPING PRACTICES Your Business Should Employ
BEST MANAGEMENT PRACTICES (BMPs)... What are They? CLEAN STREETS MEAN CLEAN STREAMS Inexpensive to implement and easy to use, BMPs help you to do your share to protect the environment. The term Best Management
TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN
1. GENERAL TERMS OF REFERENCE FOR THE RAPID EIA STUDY FOR SHIVKAR LIGNITE BLOCK, DIST. BARMER, RAJASTHAN The main objective of the EIA study is to assess the positive and negative impacts likely to accrue
Septic System. Responsibility! Is Your. You should know that:
Southwest Florida Water Management District Septic System Your Is Your Responsibility! PIPE SEPTIC TANK DRAIN FIELD SOIL You should know that: As a homeowner you re responsible for maintaining your septic
HUBER Vacuum Rotation Membrane VRM Bioreactor
HUBER Vacuum Rotation Membrane VRM Bioreactor VRM The rotating plate membrane for clean water applications. The future-oriented solution designed for the ever increasing requirements in wastewater treatment
GUIDELINES FOR LEACHATE CONTROL
GUIDELINES FOR LEACHATE CONTROL The term leachate refers to liquids that migrate from the waste carrying dissolved or suspended contaminants. Leachate results from precipitation entering the landfill and
Managing Floor Drains and Flammable Traps
Managing Floor Drains and Flammable Traps Contents: Problem... 1 Solution... 2 Maintenance... 2 Waste Management Options... 2 For More Information... 4 BMP Chart... 5 This fact sheet discusses recommended
ENVIRONMENT MANAGEMENT PLAN
ENVIRONMENT MANAGEMENT PLAN ENVIrONMENT MaNaGEMENT plan 1. INTRODUCTION: Shri Ratilal Ravji Solanki have a Blacktrap mining lease project for an area of 1.00.00 Ha located on Survey no. 984 paiki, Village:
(IV) Proposed Terms of Reference for EIA Studies
ENVIRONMENT CLERNCE FOR EXPNSION OF 1X600 MW SUPER CRITICL THERML POWER PLNT BY DDITION 2X800 MW UNIT (PHSE II) IN RIGRH DISTRICT IN CHHTTISGRH STTE (IV) Proposed Terms of Reference for EI Studies Project
Environment Management Plan
Environment Management Plan FOR Mining of Crusher Stone Area 2.000 Hectare, Khasra No. 42/2 Village AT THANWARI Tehsil District State SEONI SEONI MADHYA PRADESH Proponent SHRI LAKHAN LAL S/O SHRI CHETAN
PAINT REMOVAL SYSTEM PAINT REMOVAL SPECIFICATION SAFE WORK METHOD STATEMENT FOR LEAD PAINT REMOVAL
PAINT REMOVAL SYSTEM PAINT REMOVAL SPECIFICATION SAFE WORK METHOD STATEMENT FOR LEAD PAINT REMOVAL CONTENTS: 1.0 AWARENESS AND PRECAUTION 2.0 TEST SAMPLING & REMOVAL EVALUATION 3.0 SITE EVALUATION 4.0
TABLE AM-01-1 QUICK REFERENCE FOR DISPOSAL ALTERNATIVES
TABLE AM-01-1 QUICK REFERENCE FOR DISPOSAL ALTERNATIVES All of the waste products on this chart are prohibited from discharge to the storm drain system. Use this matrix to decide which alternative disposal
Help protect our special places by maintaining your septic tank
Help protect our special places by maintaining your septic tank BC3136 A septic tank guide Help protect our special places Rural Auckland is a special place, but the remoteness also means that many homes
INDEX. Introduction 3. The Septic System 3. What Does The Septic Tank Do? 4. Where It All Goes 5. Problems 7. Some Dontʼs 8
1 INDEX Introduction 3 The Septic System 3 What Does The Septic Tank Do? 4 Where It All Goes 5 Problems 7 Some Dontʼs 8 Management of Your On-Site System 9 Tank Maintenance 9 Disposal Field Area 10 Appendix
How Your Vehicle Service Facility Can Prevent Stormwater Pollution
TIPS FOR A CLEANER BAY How Your Vehicle Service Facility Can Prevent Stormwater Pollution alameda county YOU CAN PREVENT WATER POLLUTION! Storm drains flow directly into creeks and the Bay without any
Pervious Pavers. By: Rich Lahren. Hebron Brick & Block Supply
Pervious Pavers By: Rich Lahren Hebron Brick & Block Supply Stormwater Management and Control Issues Past emphasis was on flood control Today s emphasis is also on pollution More impermeable areas are
MLD: Domestic Maritime Transport Project
Environmental Monitoring Report Project Number: 37265 December 2010 MLD: Prepared by Japan Port Consultants Co., Ltd. Malé, Maldives For Ministry of Finance and Treasury Ministry of Transport and Communication
SUSTAINABLE URBAN DRAINAGE SYSTEMS
overflow can lead into a permeable conveyance system to increase further the benefit and reduce the need for pipe systems. Pollutant removal rates have been shown to be high, with some pollutants being
Frequently Asked Questions about Septic Systems
What is a septic tank? Where is my septic tank located? Do septic tanks last forever? What should and should not go into my septic tank? How can I tell if my septic tank is working properly? Why should
6. Principles of effective plumbing systems
6. Principles of effective plumbing systems This chapter summarizes the aims and objectives of a good local plumbing system that is, the drinking-water supply that serves a building and the system for