1 Adapting to climate change, Reducing poverty a German Financial Cooperation project in Khulna The KfW-ADB City Region Development Project Peter Rooney Christian Schönhofen Monika Wiebusch Bonn, June 3, 2011
2 Khulna Bangladesh`s third city 2
3 Khulna a poor city affected by climate change Characteristics: About 1 million inhabitants 3rd city in Bangladesh, 40% poor Increasing urbanization Challenges: Stagnating poverty rates, low growth rates Inadequate infrastructure for economic development and poverty reduction Inadequate infrastructure to cope with current and future climatic conditions Annually affected by flooding, low elevation More extreme weather events expected National climate strategies need for infrastructure improvement 3
4 From the challenges of Khulna to a development project 2009 CDIA multi-sector study; Mayor of Khulna addresses German DC 2010 ADB Feasibility Study for City Region Development Project (CRDP), special study on Water Sector & Climate Change; German DC provides funds to support Khulna with road/transport infrastructure 2011 Additional CDIA study Pro-poor & Green Urban Transport in Khulna ; Joint ADB/KfW appraisal mission; 2015 Estimated completion of ADB/KfW project 4
5 ADB/KfW City Region Development Project Overview Major multi-sector infrastructure investment programme in the Dhaka city and Khulna city regions Capacity Building of municipalities in urban planning, tax collection, public participation and human resource management Phased investments linked to improvements in local governance (performance based funding) Total Investment USD 185 Mill. (ADB/GOB/KfW) Long-standing ADB/KfW cooperation with Local Government Engineering Department (LGED) 5
6 ADB/KfW City Region Development Project Project components in Khulna First phase projects in Khulna plus drainage (ADB) roads/transport (KfW), Capacity Building for KCC Performance based second phase also including energy efficiency, urban centers, solid waste handling, and water supply projects 6
7 City Region Development Project KfW-component in Khulna 1/3 Strengthening resilience of road and transport infrastructure to extreme weather events Road network development with focus on provision of drainage Improving road function as river embankment / flood protection Other embankment protection e.g. at ferry river crossings Coordination with ADB funded drainage measures joint impact on making Khulna resilient to climate change 1. Adaptation to climate change 7
8 City Region Development Project KfW-component in Khulna 2/3 2. Taking account of Urban Poor Increased Social safeguards in project planning and implementation Improvement of links to poor areas (synergy with UNDP project) Support to non-motorized transport (lane separation, footpaths, road safety measures) 8
9 City Region Development Project KfW-component in Khulna 3/3 3. Promoting public and non-motorized transport Improved lane separation and other simple traffic management measures Improvement of bus stations and ferry ghats Improvement of pedestrian access to public transport 9
10 City Region Development Project Objectives and Impact in Khulna Project objective (KfW component) Sustainable utilization of climate-adapted and pro-poor road and transport infrastructure, based on effective regional and urban planning Overall development-policy objective Living conditions for the city population have sustainably improved with enhanced growth potential and environmental sustainability 10
11 Contact Christian Schönhofen KfW Bankengruppe Project Manager Palmengartenstraße 5 9 KfW Bankengruppe Frankfurt am Main Peter Rooney Senior Civil Engineer Tel KfW Bankengruppe Fax Monika Wiebusch Sector Economist KfW Bankengruppe [email protected] [email protected] [email protected] KfW Thema der Präsentation Ort Datum 11
12 Thank you for your attention
Comments of KfW Entwicklungsbank on World Bank Group Environment Strategy Concept Note
Comments of KfW Entwicklungsbank on World Bank Group Environment Strategy Concept Note KfW Competence Centre for Environment and Sustainability Dr. Karl Ludwig Brockmann DIE Bonn, 26.1.2010 Objectives
Water Projects in German Development Cooperation Finance matters!
Water Projects in German Development Cooperation Finance matters! Overview KfW Entwicklungsbank - Who we are KfW Entwicklungsbank and R&D in the water sector Finance as core challenge 23 60 Years of KfW
CDIA Strategy and Action Plan for Pro-poor Urban Infrastructure Development 2011-2012. July 2011 Final Version CDIA
CDIA Strategy and Action Plan for Pro-poor Urban Infrastructure Development 2011-2012 July 2011 Final Version CDIA Cities Development Initiative for Asia TABLE OF CONTENTS TABLE OF CONTENTS... I ACRONYMS...
KfW Development Bank. German Financial Cooperation with Developing Countries. Bank aus Verantwortung
KfW Development Bank German Financial Cooperation with Developing Countries Bank aus Verantwortung More than 60 years of KfW Financing with a public mission Promotional bank of the Federal Republic of
State of Decision Making in Indonesia - A Case Study
Session II: From Planning to Investment Defining Bankable projects Capacity Development for Improved Urban Infrastructure Preparation and Financing Joris van Etten Capacity Development Coordinator, Cities
LONDON INFRASTRUCTURE PLAN 2050 BUILDING A BIGGER AND BETTER LONDON
LONDON INFRASTRUCTURE PLAN 2050 BUILDING A BIGGER AND BETTER LONDON GROWTH We estimate that London s population became bigger than ever in February 2015. We reached a population of 8.6 million people,
Paving the Way for Municipal Finance -National and International Perspectives-
Stand: 23.03.2015 International Financing Conference Making Finance work for Cities Public Finance Stakeholders Summit May 20 th and May 21 st 2015, City Cube, Berlin International issues: Financial capacity
CLIMATE RISK MANAGEMENT IN ADB PROJECTS
4. Identification of Adaptation Options The most viable adaptation options or climateproofing measures are identified in consultation with the executing agencies or project sponsors, and are integrated
Helsinki Metropolitan Area Adaptation Strategy Susanna Kankaanpää Helsinki Region Environmental Services Authority
Helsinki Metropolitan Area Adaptation Strategy Susanna Kankaanpää Helsinki Region Environmental Services Authority Resilient Cities 2013 31.5.2013 Helsinki Metropolitan Area Helsinki, Espoo, Vantaa, Kauniainen
Managing Extreme Weather at Transport for London. ARCC Assembly - 12 June 2014 Helen Woolston, Transport for London Sustainability Coordinator
Managing Extreme Weather at Transport for London ARCC Assembly - 12 June 2014 Helen Woolston, Transport for London Sustainability Coordinator Slide list (wont show) Long Term Climate Change 1. What TfL
PROJECT PREPARATORY TECHNICAL ASSISTANCE
A. Justification PROJECT PREPARATORY TECHNICAL ASSISTANCE 1. The Government of Azerbaijan, the Ministry of Transport and Baku Metro Company requested ADB to help improving its urban transport system and
Experiences with the KfW program Energy Efficient Renewal of Urban Areas
Experiences with the KfW program Energy Efficient Renewal of Urban Areas Integrated Concepts for Urban Areas Conference Vilnius, 24/25 September 2015 Dr. Kay Pöhler Vice President Product Management Infrastructure
Rotterdam. Climate Change Adaptation Strategy ROTTERDAM WORLD POR T WORLD CITY ROTTERDAM WORLD
otterdam Climate Change daptation Strategy OM WOL O WOL CIY OM WOL otterdam Climate Change daptation Strategy Our climate is changing. s a global port city in the utch delta, otterdam will notice the effects
The Local Government Self- Assessment Tool. Taking stock, celebrating achievements and planning for DRR in Addis Ababa
The Local Government Self- Assessment Tool Taking stock, celebrating achievements and planning for DRR in Addis Ababa Background Throughout history, disaster events have disrupted urban life. With more
Financing sustainable and resilient water and sanitation infrastructure in African cities
Financing sustainable and resilient water and sanitation infrastructure in African cities The issue The 2015 Addis Ababa Action Agenda recognises the critical need to provide sustainable and resilient
German Financing of Vocational Education Projects in China
German Financing of Vocational Education Projects in China Mr. Jens B. Bessai (Head of Division) KfW Beijing, September 16, 2014 Bank aus Verantwortung Introduction to KfW Financing with a public mission
Greater Dhaka Sustainable Urban Transport Project
Bangladesh: Greater Dhaka Sustainable Urban Transport Project Project Name Greater Dhaka Sustainable Urban Transport Project Project Number 42169-013 Country Project Status Project Type / Modality of Assistance
Integrated Public Transport Control Systems Information Day
Integrated Public Transport Control Systems Information Day www.wyg.com creative minds safe hands Tender Procedure 1 Integrated Package Electronic Ticketing AVL / RTPI On-bus CCTV Intersection CCTV / Bus
Permanent Secretary Office of Environmental Services Lagos State Ministry of the Environment At. Dar es Salaam, Tanzania
By Permanent Secretary Office of Environmental Services Lagos State Ministry of the Environment At Dar es Salaam, Tanzania 1 LAGOS STATE WITHIN THE CONTEXT OF THE 36NOS FEDERATING STATES OF NIGERIA LAGOS
Media Tour to Germany s KfW Energy efficiency Programme
Media Tour to Germany s KfW Energy efficiency Programme Introduction of KfW Bankengruppe 8 th November 2012 Bank aus Verantwortung More than 60 years of KfW Financing with a public mission Promotional
Smart Sustainable City of Nuremberg Energy strategy and ongoing activities Dr. Peter Pluschke, Deputy Mayor for Environment and Health
Smart Sustainable City of Nuremberg Energy strategy and ongoing activities Dr. Peter Pluschke, Deputy Mayor for Environment and Health Slide 1 What is the motivation for the city council to sign the Green
KfW Kommunalbank. New Funding for Integrated Urban Development and Energetic Refurbishment: Urban Energy Efficiency Rehabilitation Grant
KfW Kommunalbank New Funding for Integrated Urban Development and Energetic Refurbishment: Urban Energy Efficiency Rehabilitation Grant Dr. Kay Pöhler KfW Bankengruppe, Germany Urb.Energy Final Conference
Kingdom of Thailand: Strengthening Integrated Water and Flood Management Implementation
Technical Assistance Report Project Number: 46231 Policy and Advisory Technical Assistance (PATA) December 2012 Kingdom of Thailand: Strengthening Integrated Water and Flood Management Implementation (Financed
Sustainable Mobility in Almada
RUSE, Redirecting Urban Areas Development Towards Sustainable Energy Sustainable Mobility in Almada Carlos Sousa AGENEAL, Local Energy Management Agency of Almada Almada, 17th November 2005 Transport Sector
Comprehensive Risk Assessment for Urban and National Resilience
1 Comprehensive Risk Assessment for Urban and National Resilience KFW International Symposium, Frankfurt, Germany 13 November Elizabeth Longworth, Director United Nations Office for Disaster Risk Reduction
TRANSBOUNDARY WATER RESOURCES MANAGEMENT IN THE VOLTA BASIN
TRANSBOUNDARY WATER RESOURCES MANAGEMENT IN THE VOLTA BASIN 8 th WORLD GENERAL ASSEMBLY, INBO, DAKAR, (SENEGAL) 20 23 JANUARY 2010 Dr. Charles BINEY, Ag. Executive Director, Volta Basin Authority, Ouagadougou
Mobility Management for Companies
Regina Luedert, 2MOVE2 Measure Leader S7.01 Mobility Information and Service Centre Stuttgart Municipality of Stuttgart / Germany Stuttgart / Germany 600,000 inhabitants Centre of the metropolitan Region
Flood damage assessment and estimation of flood resilience indexes
Flood damage assessment and estimation of flood resilience indexes Barcelona case study Marc Velasco CETaqua Workshop CORFU Barcelona Flood resilience in urban areas the CORFU project Cornellà de Llobregat,
Student Seminar Building climate resilient cities: Exploring theories, practices and prospects 16-17 Feb 2015
Student Seminar Building climate resilient cities: Exploring theories, practices and prospects 16-17 Feb 2015 Database Management System for coastal cities Rozita Singh, Research Associate, Sustainable
Training Program on Urban Climate Change Resilience 20-22 April, 2015 Database Management System for coastal cities
Training Program on Urban Climate Change Resilience 20-22 April, 2015 Database Management System for coastal cities Rozita Singh, Research Associate, Sustainable Habitat Division, TERI Why Data? Infrastructure
Guideline for Stress Testing the Climate Resilience of Urban Areas
Netherlands Ministry of Infrastructure and Environment Delta Programme Urban Development and Reconstruction Guideline for Stress Testing the Climate Resilience of Urban Areas Extended summary Version 1.0
FINAL PROJECT REPORT. "Emergency Preparedness and Response Disaster Risk Management" Content. 1. General Project Information
FINAL PROJECT REPORT "Emergency Preparedness and Response Disaster Risk Management" 1. General Project Information Country, project title, project number, and period Budget originally requested and actually
Climate Change Adaptation Strategy for the Helsinki Metropolitan Area. Susanna Kankaanpää HSY
Climate Change Adaptation Strategy for the Helsinki Metropolitan Area Susanna Kankaanpää HSY 12.5.2011 Contents of the presentation: 1. Helsinki Metropolitan Area and HSY 2. Context of the Adaptation Strategy
Modelling of Urban Flooding in Dhaka City
Modelling of Urban Flooding in Dhaka City Chusit Apirumanekul*, Ole Mark* *Water Engineering & Management, Asian Inst. of Technology, PO Box 4, Klong Luang, Pathumthani 12120, Thailand Abstract Flooding
TERMS OF REFERENCE. Project Management Consultant for Assam Urban Infrastructure Project (Assam)
TERMS OF REFERENCE Project Management Consultant for Assam Urban Infrastructure Project (Assam) 1. Background The Assam Urban Infrastructure Project (AUIP) aims at integrating different Urban Subsectors
Planning Guidelines for Rural Road Master Plan
Planning Guidelines for Rural Road Master Plan (Guideline on GIS Application for Rural Road Development) Strengthening of Activities in Rural Development Engineering Center Project (RDEC-2) Local Government
Flood risk assessment through a detailed 1D/2D coupled model
CORFU Project Barcelona Case Study Final Workshop 19 th of May 2014 Flood risk assessment through a detailed 1D/2D coupled model Beniamino Russo Aqualogy Urban Drainage Direction Introduction and general
DIRECTIONS IN DEVELOPMENT Environment and Sustainable Development. Building Urban Resilience. Principles, Tools, and Practice
DIRECTIONS IN DEVELOPMENT Environment and Sustainable Development Building Urban Resilience Principles, Tools, and Practice Abhas K. Jha,Todd W. Miner, and Zuzana Stanton-Geddes, Editors Australian THE
Sustainability guidelines of KfW Bankengruppe. The sustainability guidelines of KfW Bankengruppe consist of three interdependent elements:
The sustainability guidelines of KfW Bankengruppe consist of three interdependent elements: The sustainability mission statement defines the guiding framework for joint action and work. The sustainability
Water Supply & Sanitation in Rural Armenia
Water Supply & Sanitation in Rural Armenia Armenian Women for Health and Healthy Environment Elena Manvelyan, MD. PhD Workshop on equitable access to water Paris, 5-65 6 July 2007 Armenia Area: 29.750
Memorandum of Understanding. between. the Federal Ministry for Economic Cooperation and Development of the Federal. Republic of Germany,
R^>l' 7 ál è I Bundesminisleritim für ^ % I ^ W Deutsche GeseUschaft DlVIt, ^ F I wirtschaftliche Zusammenarbeil i j l,#_ f^r Internationale und Eniwicklung ^ M I JM H Zusammenarbeit (GIZ) GmbH I olunteers
"Project Formulation Survey" under the Governmental Commission on the Projects for ODA Overseas Economic Cooperation in FY2012.
"Project Formulation Survey" under the Governmental Commission on the Projects for ODA Overseas Economic Cooperation in FY2012 Summary Report People s Republic of Bangladesh Development for Package of
Country and Regional Reports on GEOSS-related Activities. Ms. Taniya Koswatta Coordinator, APN Secretariat
Country and Regional Reports on GEOSS-related Activities Ms. Taniya Koswatta Coordinator, APN Secretariat What is APN An inter-governmental network of 22 countries in the Asia- Pacific to foster global
IASC Inter-Agency Standing Committee
IASC Inter-Agency Standing Committee Global Health Cluster Guidance Note Promotion and Advocacy for Stronger National and Local Capacities in Health Emergency Preparedness and Risk Reduction 1. Background
The development of a flood damage assessment tool for urban areas
The development of a flood damage assessment tool for urban areas Michael Hammond, A. S. Chen, S. Djordjević, D. Butler, D. M. Khan, S. M. M. Rahman, A. K. E. Haque, O. Mark Urban Drainage Modelling Conference,
Developing Capacities for Risk Management and Resilience
Developing Capacities for Risk Management and Resilience Dr. Kishan Khoday Regional Cluster Leader Climate Change & Resilience UNDP Regional Center in Cairo ([email protected]) 0 Context As noted
Promoting Energy Efficiency in housing. KfW s experience and best practice
Promoting Energy Efficiency in housing KfW s experience and best practice KfW Bankengruppe Financing with a public mission Promotional bank of the Federal Republic of Germany Founded in 1948 as Kreditanstalt
Indonesia Solar Loan (ISL) Programme: Lessons learned for Solar PV project development
Lessons learned for Solar PV project development Marjan Stojiljkovic FS-UNEP Collaborating Centre for Climate and Sustainable Energy Finance GIZ Workshop, March 7th, 2012 Berlin, Germany F r a n k f u
PLANNING APPLICATION: 12/00056/APP
PLANNING APPLICATION: 12/00056/APP In the event that a recommendation on this planning application is overturned the Committee is reminded of the advice contained on the front page of the agenda for Reports
Workshop. Micro and Small Enterprise Upgrading: Insights from Egypt, India and the Philippines. 28 November 2012, Bonn
Workshop Micro and Small Enterprise Upgrading: Insights from Egypt, India and the Philippines 28 November 2012, Bonn Micro and Small Enterprise Upgrading: Insights from Egypt, India and the Philippines
SECTOR ASSESSMENT (SUMMARY): WATER SUPPLY AND OTHER MUNICIPAL INFRASTRUCTURE AND SERVICES 1. 1. Sector Performance, Problems, and Opportunities
Country Partnership Strategy: Kyrgyz Republic, 2013 2017 SECTOR ASSESSMENT (SUMMARY): WATER SUPPLY AND OTHER MUNICIPAL INFRASTRUCTURE AND SERVICES 1 Sector Road Map 1. Sector Performance, Problems, and
AARHUS LIGHT RAIL PROJECT
AARHUS LIGHT RAIL PROJECT Integrating Land Use and Public Transportation Planning Workshop, 10 October, 2012 Ole Sørensen Project Manager Light Rail Secretariat Established in 2007 by 8 municipalities
City Plan Part 1 Sustainability Appraisal Summary February 2012
City Plan Part 1 Sustainability Appraisal Summary February 2012 1.0 Introduction The Council is in the process of preparing its new Local Plan in consultation with the public, developers, landowners and
Informal Meeting of EU Ministers Responsible for Territorial Cohesion and Urban Matters. Declaration of Ministers towards the EU Urban Agenda
Informal Meeting of EU Ministers Responsible for Territorial Cohesion and Urban Matters Preamble Declaration of Ministers towards the EU Urban Agenda Riga, 10 June 2015 On 10 June 2015, in Riga (Latvia),
KfW Financing education, the foundation for future economic growth
KfW Financing education, the foundation for future economic growth Investment Plan for Europe and Education: Joint Event European Commission and European Investment Bank Kerstin Kiehl First Vice President,
4.5. ECOCITY Trnava. Concepts for ECOCITY model settlements. Figure 4.5.1 ECOCITY Trnava site analysis
4.5. ECOCITY Trnava 4.5.1 General information The ECOCITY Trnava case study deals with the ecological renewal of the urban centre of a mediumsized town with a valuable historic heritage and considerable
UN-Habitat - CRPP CORFU Workshop 19 May, 2014
1 UN-Habitat - CRPP CORFU Workshop 19 May, 2014 Overview What is urban resilience? Clarity of definition = clarity of purpose Value Principles Resilience vs. DRR What is the systems and multihazards approach?
Government of the People s Republic of Bangladesh Ministry of Communications Roads and Highways Department PAVEMENT INVENTORY SURVEY MANUAL
Government of the People s Republic of Bangladesh Ministry of Communications PAVEMENT INVENTORY SURVEY MANUAL MAY 2005 TABLE OF CONTENTS 1. INTRODUCTION... 3 2. ROAD NUMBERING... 4 2.1 OBJECTIVE...4 2.2
Financing Possibilities for PV Power Plant Project in Indonesia
A LEADING CATALYST IN FACILITATING INDONESIA S INFRASTRUCTURE DEVELOPMENT Financing Possibilities for PV Power Plant Project in Indonesia Jakarta, 5 May 2014 Edwin Syahruzad Head of Financing & Investment
Basements and Deep Building Construction Policy 2014
Basements and Deep Building Construction Policy 2014 APPROVAL Council / CEO 27 October 2014 VERSION NO: Version 1.0 TRIM REF: 14/67838 REVIEW 30/10/2019 RESPONSIBLE EXECUTIVE General Manager City Assets
Connectivity - Not Simply Bridging the Gaps
Connectivity - Not Simply Bridging the Gaps Brenda AU Head of Energizing Kowloon East Office 10 March 2015 發 展 局 Development Bureau Energizing Kowloon East Office 2 Background Hong Kong Special Administrative
German Approach to Integrated Urban Development within the EU
German Approach to Integrated Urban Development within the EU - Results from previous (current) programming period (2007-2013) - Goals for the future (2014-2020) Dr Mario Kremling, isw Institute by order
FINANCIAL ANALYSIS. A. Introduction and Methodology
Coastal Towns Environmental Infrastructure Project (RRP BAN 44212) FINANCIAL ANALYSIS A. Introduction and Methodology 1. The Coastal Towns Environmental Infrastructure project finances basic urban service
Tamil Nadu would provide to its residents, high quality infrastructure all over the State comparable with the best in the world
Tamil Vision 2023 The vision for Tamil for 2023 is to become India s most prosperous progressive State with no poverty, where its people enjoy all the basic services of a modern society live in harmonious
Young thinking on future Smart Transport
2011-10-04 Young thinking on future Smart Transport Ideas and illustrations by Students at Thorildsplan College Fariba Daryani, City av Stockholm, Sweden Major challenges concerning traffic and transport
Advancing Disaster Risk Reduction to Enhance Sustainable Development in a Changing World 20 June -1 July 2016, UN Campus, Bonn
CALL FOR APPLICATIONS Announcement UNITED NATIONS UNIVERSITY Institute for Environment and Human Security Intensive Summer Course 2016 Advancing Disaster Risk Reduction to Enhance Sustainable Development
WORKSHOP ON CHALLENGES OF URBANISATION IN INDIA WITH FOCUS ON SOLID WASTE MANAGEMENT
WORKSHOP ON CHALLENGES OF URBANISATION IN INDIA WITH FOCUS ON SOLID WASTE MANAGEMENT VENUE: ADMINISTRATIVE STAFF COLLEGE,GUWAHATI ASSAM-29 th & 30 th APRIL 2013 BY Dr. MILIND RAMTEKE, IAS CHIEF EXECUTIVE
Strategic Plan 2012-2022
DISTRICT COUNCIL OF THE COPPER COAST Strategic Plan 2012-2022 Moving Toward 2022 2 3 Contents Our Vision... 7 Our Mission... 7 Our Values... 7 Strategic Plan Graphical Representation... 8 Social Objective
TERMS OF REFERENCE 1 BACKGROUND. 1.1 About WSUP. 1.2 WSUP s approach to gender
TERMS OF REFERENCE December 2015 Developing a comprehensive outline of real-life examples and projects to demonstrate the extent to which the specific WASH needs, preferences and rights of women and girls
Deutsche Asset & Wealth Management. Environmental & Social Capital
Environmental & Social Capital Agenda 1 Introduction to Environmental & Social Capital 2 Investment Manager Mandates: Fund overview 2.1 Africa Agriculture and Trade Investment Fund 2.2 European Energy
Disaster risk reduction & emergency response for WASH
February 2009 WSSCC Reference Note Disaster risk reduction & emergency response for WASH The Water Supply and Sanitation Collaborative Council (WSSCC) is a global multi-stakeholder partnership organisation
Jyväskylä - an attractive centre of growth
Jyväskylä - an attractive centre of growth One of the fastest growing cities in Finland, current population 136 000 Annual population growth of 1 1.5 % Estimated population in 2030: 149 000 2nd most popular
Partnership in Environmental Governance. Swedish Environmental Protection Agency
Partnership in Environmental Governance Swedish Environmental Protection Agency ISBN 978-91-620-8495-0. PRINT: CM Gruppen, Stockholm, 10-11. PRODUCTION: Swedish EPA. DESIGN: Peter Hönig. PHOTO: SXC if
Shifting agendas: response to resilience - The role of the engineer in disaster risk reduction
Shifting agendas: response to resilience The role of the engineer in disaster risk reduction The Institution of Civil Engineers 9th Brunel International Lecture Series London School of Economics - 4th
Investing in Smart Cities
Investing in Smart Cities The European Investment Bank (EIB) is the financial arm of the European Union (EU) and is owned by its 28 Member States. Founded in 1958, it operates in the 28 EU Member States
Montenegrin Road Towards Carbon Neutral Tourism
The New Green Age: Montenegrin Road Towards Carbon Neutral Tourism Ms. Jelena Janjusevic, PhD Manager of the Centre for Sustainable Development, UNDP SUSTAINABLE AND COMPETITIVE HOTELS THROUGH ENERGY INNOVATION
UNEP recommendations to KURA on Improving Safety and Reducing Congestion on UN Avenue (7 October 2009; revised 23 November 2009)
UNEP recommendations to KURA on Improving Safety and Reducing Congestion on UN Avenue (7 October 2009; revised 23 November 2009) UN Avenue extends for 2 km between Limuru Road and Ruaka Road (Runda Roundabout).
GOVERNMENT OF MALAWI NATIONAL DISASTER RISK MANAGEMENT POLICY
GOVERNMENT OF MALAWI NATIONAL DISASTER RISK MANAGEMENT POLICY 2015 For further information, contact: The Secretary and Commissioner for Disaster Management Affairs Private Bag 336 Lilongwe 3 Malawi Physical
2. Emergency Response. 3. Financial Issues. 4. Report Recommendations
1 Agenda 1. Introduction 2. Emergency Response 3. Financial Issues 4. Report Recommendations 2 Thank you to Toronto Residents and Businesses 3 Thank you to City Divisions 311 Office of Emergency Management
CITY OF GRANTS PASS ORGANIZATIONAL CHART
CITY OF GRANTS PASS ORGANIZATIONAL CHART PUBLIC SAFETY Bill Landis Police Division Fire Rescue Division Support Division CITIZENS Population 34,855 MAYOR (1) COUNCIL (8) ELECTED - 4 Year Terms COMMITTEES