Flood damage assessment and estimation of flood resilience indexes
|
|
|
- Myrtle Hood
- 10 years ago
- Views:
Transcription
1 Flood damage assessment and estimation of flood resilience indexes Barcelona case study Marc Velasco CETaqua Workshop CORFU Barcelona Flood resilience in urban areas the CORFU project Cornellà de Llobregat, Monday 19th of May 2014
2 Outline Objectives Barcelona case study Damage assessment methodology Data CBA methodology Results Conclusions
3 Objectives Establish a framework to accurately assess flood damages in urban areas Assess damages for the current state and future scenarios Implement adaptation strategies to cope with future impacts Prioritize the strategies via a cost-benefit analysis (CBA) Include the intangible benefits of the strategies by using the Flood Resilience Index (FRI)
4 Barcelona case study Collserola mountain Besós River Llobregat River High gradients Runoff preferred direction Low gradients and critical points FLOODS Mediterranean sea
5 Barcelona case study Location: Mediterranean Area, NE Spain Inhabitants/Area/People Density: 1,621,000 inhab. within an area of Km 2 with a density of 15,980 inhab./ Km 2 (19,200 inhab./ Km 2 not considering Collserola mountain). Morphology and land use: high slopes in the upper part of the city and flat and impervious areas near the cost. Climatology/Rainfall patterns: Average annual precipitations: 600 mm. Heavy rainfall with high intensities (Maximum intensity in 5 min is 205 mm/h for a 10 yr return period and 50% of annual precipitation can occur in only 2 or 3 events causing flash flood events). Raval District: Very vulnerable district with a people density of 44,000 inhab./km 2. Spot susceptible to flooding as demonstrated by historical data. Traditional 1D sewer models do not detect flooding problems as demonstrated by historic data
6 Damage assessment methodology Risk = Hazard Exposure Vulnerability Risk Hazard Vulnerability is defined as the susceptibility of the exposed structures/people at contact with the damaging natural event. This factor measures the extent to which the subject matter could be affected by the hazard
7 Damages types Damage assessment methodology Direct Indirect Tangible Physical damage to assets Loss of production, traffic disruption Intangible Fatalities, injuries Psychological trauma, increased vulnerability of survivors
8 Damage assessment methodology To obtain direct tangible damages the following are needed: depth damage curves flood depth maps land use maps The methodology proposed follows these steps: Simulation of three flood events to obtain the flood depths in the area Assign a water depth to each building Interpolate this value in the depth damage curve to obtain the relative cost Multiply the relative cost by the area, obtaining the total damage value per each block Sum of all the blocks damages to obtain the total damages of each event Calculation of the EAD by weighting the damages of each event with its probability
9 Damage ( /m 2 ) Barcelona methodology Damage 0 0 0,5 1 1,5 2 2,5 3 Water depth (m) 2 1. Assign DDC to land-use type 2. Introduce the depth to obtain relative damage 3. Multiply the relative damage by the corresponding surface
10 Depth damage curves No existing curves in Spain Lack of actual damage data Few land use types in the case study area Synthetic relative curves Curves for only six different land use types Buildings Contents
11 Data: depth damage curves Synthetic relative curves Buildings In collaboration with local appraisers Types of buildings (classified by the map characteristics) Residential Commercial Hotels and leisure Public and cultural buildings Contents Using the FloReTo data Types of uses Residential Commercial Hotels and leisure Public and cultural buildings Warehouses and parkings Sites of interest Creation of a single curve
12 Data: depth damage curves Buildings Contents Calibration of the curves has been finalized, using: Surveys of the event occurred in 30/07/2011 to validate some qualitative features of the curves Actual damage data from the Spanish re-assurance (CCS) has been collected to undertake a spatial and quanititive validation
13 Data: depth damage curves Validation with actual damage data, from 31/07/2011 Spatial patterns are very similar in terms of affected area Total damages are in the same order of magnitude Simulated: 750,002.9 Actual: 340,472.9 Future calibration of the curves should focus on average values Oversestimation can be explained by: Non-reported damages Protection measures applied
14 Flood maps Post processing of flood maps is required Conversion of the 1D-2D model outputs From depths in the streets to depths in the buildings
15 Land use maps Catastro (National land-registry) Geoportal (Municipal spatial database) Information at a block size Number of floors Land-use area of each type per floor
16 CBA methodology Following a DPSIR approach, adaptation strategies are implemented Drivers Economic growth Urban growth Climate change Adaptation measures Mitigation measures Responses Pressures Urbanisation Drainage networks Precipitation Damage values Resilience level Impacts States 2D hydraulic models Damage models
17 CBA methodology Scenarios Combinations of changes in climate and adaptive capacity level are considered in 6 adaptation scenarios Socioeconomic scenario is kept constant in order to properly assess the results of the CBA Combined scenario Climate scenario Socioeconomic scenario Adaptive capacity Business as usual 1 Pessimistic Medium None Adaptation 1 Pessimistic Medium Low Adaptation 2 Pessimistic Medium Medium Adaptation 3 Pessimistic Medium High Business as usual 2 Optimistic Medium None Adaptation 4 Optimistic Medium Low Adaptation 5 Optimistic Medium Medium Adaptation 6 Optimistic Medium High
18 CBA methodology Damages for BAU scenarios Damages for adaptation scenarios Calculation of benefits and costs Cost benefit analysis (CBA) Benefits are calculated as reductions of damages (EAD) Costs include the CAPEX and OPEX for 50 years A discount rate of 4% is used to work with present values
19 Adaptation strategies Adaptation strategies will be implemented to cope with the impacts of climate change Adaptation 1: Non-structural Affecting the damage curves or land-use situation Adaptation 2: SUDS and green roofs Adaptation 3: Structural Affecting the drainage network
20 Results Flood maps With return periods of 1 year, 10 years and 100 years, for the baseline, BAU1 and Adaptation 3 scenarios
21 Results Flood maps With return periods of 1 year, 10 years and 100 years, for the baseline, BAU1 and Adaptation 3 scenarios
22 Results Flood maps With return periods of 1 year, 10 years and 100 years, for the baseline, BAU1 and Adaptation 3 scenarios
23 Results Damage maps For the baseline and BAU1 and adaptaion 3 scenarios
24 Results Damage maps For the baseline and BAU1 and adaptaion 3 scenarios
25 Results Damage maps For the baseline and BAU1 and adaptaion 3 scenarios
26 Results Expected Anual Damage EAD is an estimate of the average flood damages computed over a number of years It is generally obtained by simulating several events of different return periods and calculating the damages for each case EAD is the area under the probability damage curve, and hence a minimum of three events are needed
27 Results Expected Anual Damage Return period (years) Probability EAD Damages baseline (2010) 78,846 1,615,738 19,156,196 1,697,300 Damages BAU1 (2050) 211,846 8,369,323 45,642,494 6,292,058 Damages adaptation 1 (2050) 0 3,266,670 35,461,156 3,212,754 Damages adaptation 2 (2050) 56,143 6,398,101 44,402,370 5,190,431 Damages adaptation 3 (2050) 7, ,258 10,478, ,915 Damages BAU2 (2050) 131,654 2,718,048 32,400,065 2,862,681 Damages adaptation 4 (2050) 0 191,470 23,773,122 1,164,568 Damages adaptation 5 (2050) TBC TBC TBC TBC Damages adaptation 6 (2050) 5,818 71,540 3,253, ,427
28 Results Expected Anual Damage
29 Results Cost benefit analysis In order to be able to compare costs and benefits of the adaptation measures, the CBA is based on the Total Present Values (DR = 4%) EAD is used to express the annual benefits Total cost of adaptation is annualized through its useful life Scenario TPV of EAD ( ) Benefits ( ) Costs ( ) Net benefits ( ) BAU1 63,698, Adaptation 1 35,683,499 28,015,417 2,021,439 25,993,978 Adaptation 2 53,676,361 10,022,555 3,355,548 6,667,007 Adaptation 3 15,246,604 48,452,312 46,231,149 2,221,162 BAU2 42,538, Adaptation 4 20,975,184 21,563,195 2,021,439 19,541,755 Adaptation 5 6,187,114 36,351,264 3,355,548 32,995,716 Adaptation 6 8,529,029 34,009,350 46,231,149-12,221,800
30 Results Cost benefit analysis In order to be able to compare costs and benefits of the adaptation measures, the CBA is based on the Total Present Values (DR = 4%) EAD is used to express the annual benefits Total cost of adaptation is annualized through its useful life
31 Flood Resilience Index In order to include other intangible indexes, an index called Flood Resilience Index has been created Dimension Dimension index FRI Natural 3.50 Social 2.14 Economic 3.11 Institutional Physical 3.40 Physical Natural Social Institutional Economic
32 Flood Resilience Index In the Barcelona case study, the FRI includes impacts to assets, pedestrians and vehicular circulation Conversion from damages to Risk buildings Risk buildings = K damage Human vulnerability level Formulation *,** Low (D+C+F)/3 < 1.5 Medium 1.5 < (D+C+F)/3 < 2.5 High (D+C+F)/3 > 2.5 *In case there is a critical building is in the subdistrict area, 0.5 must be added to the average value of (D+C+F)/3. **When an EWS is implemented, the vulnerability of the subdistrict will be reduced by a given factor. Vehicular vulnerability level Vehicular flow intensity (VFI) (vehicles in 24h) Low VFI < 5000 Medium 5000 VFI High VFI > RI = (Risk buildings + Risk pedestrians + Risk vehicles )/3
33 Flood Resilience Index In the Barcelona case study, the FRI includes impacts to assets, pedestrians and vehicular circulation RI = (Risk buildings + Risk pedestrians + Risk vehicles )/3 Risk Index T1 T10 T100 RI < 3 < 3 < 3 0 Very low < 3 < Very low < Low Medium High Very high Very high Scenario RI Difference Weight Value BAU1 4 Adaptation Adaptation Adaptation FRI 2.1 Weight = f (cost of the strategy, environmental impact) W A1 + W A2 + W A3 = 1 W A1 = (1/Cost A1 ) + EI low W A2 = (1/Cost A2 ) + EI medium W A3 = (1/Cost A3 ) + EI high
34 Conclusions DDC have been created for the case study area Calibration and validation process has lead to a set of curves that are able to accurately represent the damages of the area The methodology followed is able to determine the EAD of the area in a straightforward way The EAD of the several scenarios is easily obtained once these are simulated The comparison of baseline and business as usual scenarios highlights the need for the implementation of adaptation strategies The results of implementing the several adaptation measures have been assessed via a cost benefit analysis Strategies with lower investments generally have higher net benefits In order to include some other intangible impacts, the FRI has been created. Other impacts can be included in this index, being able to prioritize strategies not only in economic terms
35 Marc Velasco Beniamino Russo
36 CORFU Team Research on the CORFU (Collaborative research on flood resilience in urban areas) project was funded by the European Commission through Framework Programme 7, Grant Number
Flood risk assessment through a detailed 1D/2D coupled model
CORFU Project Barcelona Case Study Final Workshop 19 th of May 2014 Flood risk assessment through a detailed 1D/2D coupled model Beniamino Russo Aqualogy Urban Drainage Direction Introduction and general
Flood Damage Model Case Study Results
Work Package: Document Name: WP3 Impact Assessment Flood Damage Model Case Study Results Date: 11 August 2014 Report Number: D3.4 Revision Number: 2 Deliverable Number: D3.4 Due date for deliverable: 31
Flood damage assessment for urban growth scenarios. A. S. Chen, M. J. Hammond, S. Djordjević, D. Butler
Flood damage assessment for urban growth scenarios A. S. Chen, M. J. Hammond, S. Djordjević, D. Butler Outline Introduction Methodology Assessment tool Conclusions Introduction Drivers and pressures Flood
Climate vulnerability assessment Risks from urban flooding Interactive science and policy assessment
Climate vulnerability assessment Risks from urban flooding Interactive science and policy assessment Flood risk from extreme precipitation in Copenhagen - Modelling results Per Skougaard Kaspersen, DTU
The development of a flood damage assessment tool for urban areas
The development of a flood damage assessment tool for urban areas Michael Hammond, A. S. Chen, S. Djordjević, D. Butler, D. M. Khan, S. M. M. Rahman, A. K. E. Haque, O. Mark Urban Drainage Modelling Conference,
DEFINING RISK AND ITS ROLE IN DISASTER MANAGEMENT
DEFINING RISK AND ITS ROLE IN DISASTER MANAGEMENT Niru Nirupama Associate Professor and Graduate Program Director Disaster & Emergency Management York University Toronto Since 2005 2000-02 Hazard or threat
FLOOD RISK RECENT TRENDS AND POLICY RESPONSES
FLOOD RISK RECENT TRENDS AND POLICY RESPONSES DEVELOPING WESTMINSTER S LOCAL PLAN Booklet No. 2 LDF Consultation - CMP Revision November 2013 INTRODUCTION CLLR ROBERT DAVIS Westminster is at risk of flooding
2 ND SEPTEMBER 2014. Report of the Bi-Borough Executive Director for Transport and Technical Services
London Borough of Hammersmith & Fulham COMMUNITY SAFETY, ENVIRONMENT & RESIDENTS SERVICES POLICY & ACCOUNTABILITY COMMITTEE 2 ND SEPTEMBER 2014 SURFACE WATER MANAGEMENT PLAN (SWMP) Report of the Bi-Borough
Guideline for Stress Testing the Climate Resilience of Urban Areas
Netherlands Ministry of Infrastructure and Environment Delta Programme Urban Development and Reconstruction Guideline for Stress Testing the Climate Resilience of Urban Areas Extended summary Version 1.0
Appendix A Flood Damages Assessment
Appendix A Flood Damages Assessment 106 GHD Report for Bundaberg Regional Council - Floodplain Action Plan, 41/26909 10. Flood Damages Assessment Methodology An important part of assessing flooding impact
Climate resilient infrastructure 2014-2020
resilient infrastructure 2014-2020 Presented by Claus Kondrup, DG JASPERS Platform Workshop on Adaptation and Risk Management, Brussels, 21-22 October 2014 Territorial climate impacts Geography matters,
City of London Climate Change Adaptation Strategy Dealing with Extreme Rainfall Events
City of London Climate Change Adaptation Strategy Dealing with Extreme Rainfall Events May 29, 2014 Presented by: Berta Krichker M.Eng., FEC, P.Eng. Manager of Stormwater Unit Environmental and Engineering
Bolton s Flood Risk Management Strategy
Bolton s Flood Risk Management Strategy www.bolton.gov.uk Public Summary Bolton s Flood Risk Management Strategy Public Summary Introduction Over 5.5 million properties in England and Wales are at risk
Risk and vulnerability assessment of the build environment in a dynamic changing society
Risk and vulnerability assessment of the build environment in a dynamic changing society Limnei Nie SINTEF Building and infrastructure, P.O.Box 124 Blindern, NO-0314 Oslo, Norway. [email protected]
LONDON INFRASTRUCTURE PLAN 2050 BUILDING A BIGGER AND BETTER LONDON
LONDON INFRASTRUCTURE PLAN 2050 BUILDING A BIGGER AND BETTER LONDON GROWTH We estimate that London s population became bigger than ever in February 2015. We reached a population of 8.6 million people,
Contents. Specific and total risk. Definition of risk. How to express risk? Multi-hazard Risk Assessment. Risk types
Contents Multi-hazard Risk Assessment Cees van Westen United Nations University ITC School for Disaster Geo- Information Management International Institute for Geo-Information Science and Earth Observation
Municipal Risk Assessment Tool
Municipal Risk Assessment Tool ICLR, Basement Flooding Symposium May 26, 2011 Robert Tremblay Director, Research Introduction Risk is changing. Both insurers and municipalities, need for tools to better
Managing Extreme Weather at Transport for London. ARCC Assembly - 12 June 2014 Helen Woolston, Transport for London Sustainability Coordinator
Managing Extreme Weather at Transport for London ARCC Assembly - 12 June 2014 Helen Woolston, Transport for London Sustainability Coordinator Slide list (wont show) Long Term Climate Change 1. What TfL
The development of a flood damage assessment tool for urban areas
The development of a flood damage assessment tool for urban areas Michael J. Hammond 1, Albert S. Chen 2, Slobodan Djordjević 3, David Butler 4, David M. Khan 5, S. M. M. Rahman 6, A.K. E. Haque 7, O.
How To Understand And Understand The Flood Risk Of Hoang Long River In Phuon Vietnam
FLOOD HAZARD AND RISK ASSESSMENT OF HOANG LONG RIVER BASIN, VIETNAM VU Thanh Tu 1, Tawatchai TINGSANCHALI 2 1 Water Resources University, Assistant Professor, 175 Tay Son Street, Dong Da District, Hanoi,
EUROPEAN COMMISSION. Better Regulation "Toolbox" This Toolbox complements the Better Regulation Guideline presented in in SWD(2015) 111
EUROPEAN COMMISSION Better Regulation "Toolbox" This Toolbox complements the Better Regulation Guideline presented in in SWD(2015) 111 It is presented here in the form of a single document and structured
Integrated Local Flood Management and Drainage Strategy OVERVIEW
Integrated Local Flood Management and Drainage Strategy OVERVIEW Flooding is a natural phenomenon. In urban areas where drainage relies on pipe networks, open channels and creeks, flooding can cause infrastructure
Disaster Risk Assessment:
Disaster Risk Assessment: Disaster Risk Mapping Dr. Jianping Yan Disaster Risk Assessment Specialist Session Outline Essentials on Risk Mapping Map scale, grid size, aggregation unit Requirements for Risk
Catchment Scale Processes and River Restoration. Dr Jenny Mant [email protected]. The River Restoration Centre therrc.co.uk
Catchment Scale Processes and River Restoration Dr Jenny Mant [email protected] The River Restoration Centre therrc.co.uk 3 Main Catchment Elements Hydrology Energy associated with the flow of water affects
Managing sewer flood risk
Managing sewer flood risk J. Ryu 1 *, D. Butler 2 1 Environmental and Water Resource Engineering, Department of Civil and Environmental Engineering, Imperial College, London, SW7 2AZ, UK 2 Centre for Water
BEST PRACTICE GUIDELINES FOR FLOOD RISK ASSESSMENT IN THE LOWER MEKONG RIVER BASIN
Paper 3-4-3 BEST PRACTICE GUIDELINES FOR FLOOD RISK ASSESSMENT IN THE LOWER MEKONG RIVER BASIN GERT SLUIMER 1, HENK OGINK 2, FERDINAND DIERMANSE 2, FRANK KEUKELAAR 1, BAS JONKMAN 1, TRAN KIM THANH 3 AND
Building a Spatial Database for Earthquake Risk Assessment and Management in the Caribbean
Building a Spatial Database for Earthquake Risk Assessment and Management in the Caribbean Jacob Opadeyi and Rehanna Jadoo Department of Geomatics Engineering and Land Management, The University of the
FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY
FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY London Rd. WATERLOOVILE FOR McCarthy & Stone Ltd. July 2010 Such Salinger Peters Ltd 30558-1- Flood Risk Assessment & Drainage Strategy Contents Paragraph Page
Flash Flood Science. Chapter 2. What Is in This Chapter? Flash Flood Processes
Chapter 2 Flash Flood Science A flash flood is generally defined as a rapid onset flood of short duration with a relatively high peak discharge (World Meteorological Organization). The American Meteorological
INSTALLATION OF AN AUTOMATED EARLY WARNING SYSTEM FOR ANNOTTO BAY
TERMS OF REFERENCE INSTALLATION OF AN AUTOMATED EARLY WARNING SYSTEM FOR ANNOTTO BAY A Community Disaster Risk Reduction Project funded through the Building Disaster Resilient Communities Project (ODPEM)
Flood Damage Assessment in Taipei City, Taiwan
Flood Damage Assessment in Taipei City, Taiwan Ming-Hsi Hsu 1, Meng-Yuan Tsai, Yi-Chieh Lin 3, Albert S. Chen 4, Michael J. Hammond 5, Slobodan Djordjević 6 & David Butler 7 1 National Taiwan University,
Homes and Environment Scrutiny Committee. (Environment & Transport)
REPORT TO: REPORT NO: Homes and Environment Scrutiny Committee HHPPE/89/15S DATE: 9 September 2015 LEAD MEMBER: Councillor David A Bithell (Environment & Transport) CONTACT OFFICER: Neil Taunt (Tel: 729734)
Belmont Forum Collaborative Research Action on Mountains as Sentinels of Change
Belmont Forum Collaborative Research Action on Mountains as Sentinels of Change 1. Background and rationale Mountains exist in many regions of the world and are home to a significant fraction of the world
Operational methodology to assess flood damages in Europe
IIASA-DPRI 2008 Operational methodology to assess flood damages in Europe Contributors: Nicola Lugeri, Carlo Lavalle, Elisabetta Genovese 1 Focus of ADAM work on extremes Types Floods, Heat-wave, Drought
Costs for Green Infrastructure and Stormwater Controls
Costs for Green Infrastructure and Stormwater Controls August 5, 2015 Bob Newport U.S. EPA Region 5 (Chicago Office) Topics to be Covered EPA data collection and cost analysis focused on postconstruction
London Borough of Merton Local Flood Risk Management Strategy
Local Flood Risk Management Strategy Summary 2014-2020 Introduction In response to the severe flooding across large parts of England and Wales in summer 2007, the Government has recently enacted the Flood
NEW DEVELOPMENT AND EMERGENCY FLOOD PLANS
23 NEW DEVELOPMENT AND EMERGENCY FLOOD PLANS Turn page Northamptonshire Flood Toolkit This guidance has been developed to support applicants and developers who are required or encouraged to produce and
APPENDIX B Understanding the FEMA Benefit-Cost Analysis Process
ENGINEERING PRINCIPLES AND PRACTICES APPENDIX B Understanding the FEMA Benefit-Cost Analysis Process The Stafford Act authorizes the President to establish a program to provide technical and financial
National Disaster Management Institute
National Disaster Management Institute CONTENTS one Cause of Urban Flood Disaster two Urban Flood Damage Case three Disaster Prevention Measures for Future Urban Flood four NDMI s Measures & Strategy for
Module 6 : Quantity Estimation of Storm Water. Lecture 6 : Quantity Estimation of Storm Water
1 P age Module 6 : Quantity Estimation of Storm Water Lecture 6 : Quantity Estimation of Storm Water 2 P age 6.1 Factors Affecting the Quantity of Stormwater The surface run-off resulting after precipitation
Climate Change Adaptation in London. Alex Nickson, Policy & Programmes Manager Climate Change Adaptation & Water, Greater London Authority
Climate Change Adaptation in London Alex Nickson, Policy & Programmes Manager Climate Change Adaptation & Water, Greater London Authority Why adapt? We are not very well adapted to our existing climate
Objective 4: Enhanced community education, flood awareness and preparedness
Objective 4: Enhanced community education, flood awareness and preparedness Understanding the extent and full impacts of flooding is essential for planning for potential future pressures on the drainage
Probabilistic Risk Assessment Studies in Yemen
Probabilistic Risk Assessment Studies in Yemen The catastrophic risk analysis quantifies the risks of hazard, exposure, vulnerability, and loss, thus providing the decision maker with the necessary information
chapter 9 conduct a climate change
CONDUCT A CLIMATE RESILIENCY STUDY The following chapters recommend how to reach CRC Milestone Two, Conduct a Climate Resiliency Study. 2 MILESTONE Chapter 8: Conduct a Climate Change Vulnerability Assessment
ESTIMATING THE COSTS OF EMERGENCY SERVICES DURING FLOOD EVENTS
C. Pfurtscheller R. Schwarze ESTIMATING THE COSTS OF EMERGENCY SERVICES DURING FLOOD EVENTS Funding Project Management Coordination Agenda Introduction Emergency costs State of the art Flooding of 2005
Creating the environment for business
1. Introduction 1.1 Introduction to Water Cycle Strategies (WCS) 1.1.1 Background The water cycle describes the pathways and processes through which water moves through the natural and built environment,
Argonne National Laboratory
Argonne National Laboratory Using Climate Data to Inform Critical Infrastructure Resilience and Urban Sustainability Decisionmaking National Academy of Sciences Roundtable on Science and Technology for
Appendix C Asset Risk Model Data
Appendix C Asset Risk Model Data S:\ADV JOBS\48305 ENV WAIKATO\027 THAMES COAST FLOOD RISK\6000 - DELIVERABLES\FINAL REPORT\APPENDIX C.DOC\16-JUL-03 Contents Appendix C Asset Risk Model Data Asset Risk
Title: Guiding Models and Norm Study for Water Storage: A new way of thinking?
Tools Title: Guiding Models and Norm Study for Water Storage: A new way of thinking? Keywords: Regional; communication; inundation; stakeholder engagement; water management; spatial planning Audience:
The Provincial Plan (PTC) is a general spatial planning tool approved in 2002 an actually under the decennial revision set by law.
The Province of Genoa is a Public Authority acting at an intermediate level between municipalities and Liguria Region, and incorporates the territory of 67 municipalities. The main role is promoting and
Standardized Runoff Index (SRI)
Standardized Runoff Index (SRI) Adolfo Mérida Abril Javier Gras Treviño Contents 1. About the SRI SRI in the world Methodology 2. Comments made in Athens on SRI factsheet 3. Last modifications of the factsheet
An approach to the model-based spatial assessment of damages caused by urban floods Z. Vojinovic 1 *, J.C.W. Ediriweera 2 and A.K.
An approach to the model-based spatial assessment of damages caused by urban floods Z. Vojinovic 1 *, J.C.W. Ediriweera 2 and A.K. Fikri 3 1/2/3 Department of Hydroinformatics and Knowledge Management,
URBAN FLOOD RISK MANAGEMENT X X X X X X X X X X X X X. A Tool for Integrated Flood Management X X X X X X
World Meteorological Organization URBAN FLOOD RISK MANAGEMENT X X X X X X X X X X X X X A Tool for Integrated Flood Management X X X X X X ASSOCIATED PROGRAMME ON FLOOD MANAGEMENT March 2008 The Associated
FLOODALERT: A SIMPLIFIED RADAR-BASED EWS FOR URBAN FLOOD WARNING
11 th International Conference on Hydroinformatics HIC 2014, New York City, USA FLOODALERT: A SIMPLIFIED RADAR-BASED EWS FOR URBAN FLOOD WARNING XAVIER LLORT (1), RAFAEL SÁNCHEZ-DIEZMA (1), ÁLVARO RODRÍGUEZ
CITY OF HIGHLAND PARK, ILLINOIS Stormwater Management Fact Sheet
CITY OF HIGHLAND PARK, ILLINOIS Stormwater Management Fact Sheet WHAT IS STORMWATER MANAGEMENT? Stormwater management is the method for channeling rainfall through pipes and sewers away from property to
2010 MTEF: Budgeting for infrastructure and capital expenditure guidelines
2010 MTEF: Budgeting for infrastructure and capital expenditure guidelines Introduction The guidelines below provide departments and entities with information to make budget submissions for capital projects
How To Amend A Stormwater Ordinance
Regulatory Alternatives to Address Stormwater Management and Flooding in the Marlboro Street Study Area Alternative 1: Amend Existing Local Regulations This proposed alternative provides an incremental
NAPA COUNTY WATERSHED SYMPOSIUM
Planning, Building, and Environmental Services NAPA VALLEY GROWTH NAPA COUNTY WATERSHED SYMPOSIUM Plunging Forward May 15, 2015 1 YOU CAN T CROSS THE SEA MERELY BY STANDING AND STARING AT THE WATER. Rabindranath
CCI-HYDR Perturbation Tool. A climate change tool for generating perturbed time series for the Belgian climate MANUAL, JANUARY 2009
CCI-HYDR project (contract SD/CP/03A) for: Programme SSD «Science for a Sustainable Development» MANUAL, JANUARY 2009 CCI-HYDR Perturbation Tool A climate change tool for generating perturbed time series
Assessing the benefits of reducing the risk of flooding from sewers
Middlesex University Flood Hazard Research Centre Assessing the benefits of reducing the risk of flooding from sewers Colin Green and Theresa Wilson 1 Table of contents Executive Summary 2 1. Introduction
Polypipe Continuing Professional Development. Rainwater Harvesting In The Sustainable Environment
Polypipe Continuing Professional Development Rainwater Harvesting In The Sustainable Environment Introduction to Polypipe Terrain Aims and Objectives The Sustainable Environment The Concept of Rainwater
G3-Giornate Giovani GNRAC Quartiere Fieristico di Ferrara, 21 Settembre 2012
3 SALONE SULLA TUTELA DELLA COSTA COAST PROTECTION EXHIBITION 2 ND EDITION G3-Giornate Giovani GNRAC Quartiere Fieristico di Coastal vulnerability assessment to climate change. CVI Index application to
Abaya-Chamo Lakes Physical and Water Resources Characteristics, including Scenarios and Impacts
LARS 2007 Catchment and Lake Research Abaya-Chamo Lakes Physical and Water Resources Characteristics, including Scenarios and Impacts Seleshi Bekele Awulachew International Water Management Institute Introduction
Types of flood risk. What is flash flooding? 3/16/2010. GG22A: GEOSPHERE & HYDROSPHERE Hydrology. Main types of climatically influenced flooding:
GG22A: GEOSPHERE & HYDROSPHERE Hydrology Types of flood risk Main types of climatically influenced flooding: 1. Flash (rapid-onset) 2. Lowland (slow-rise) 3. Coastal (not covered here) But! Causal factors
District Disaster Risk Management Planning
District Disaster Risk Management Planning GUIDELINES JULY 2007 National Disaster Management Authority 1. Introduction Notifications for establishment of the District Disaster Management Authorities (DDMAs)
The AIR Inland Flood Model for the United States In Spring 2011, heavy rainfall and snowmelt produced massive flooding along the Mississippi River,
The AIR Inland Flood Model for the United States In Spring 2011, heavy rainfall and snowmelt produced massive flooding along the Mississippi River, inundating huge swaths of land across seven states. As
4. Environmental Impacts Assessment and Remediation Targets
4. Environmental Impacts Assessment and Remediation Targets 4.1 Environmental Impacts Significant additional development in the Alder Creek watershed is not anticipated at this time; however, there are
PLANNING APPLICATION: 12/00056/APP
PLANNING APPLICATION: 12/00056/APP In the event that a recommendation on this planning application is overturned the Committee is reminded of the advice contained on the front page of the agenda for Reports
Cambridge House, Henry Street, Bath BA1 1UR
Flood Risk Assessment Cambridge House, Henry Street, Bath BA1 1UR For Full Planning application to BANES Council June 2011 Introduction This report is prepared as requested by B&NES to accompany the planning
How To Calculate Flood Damage Potential In European Landscape
Background/Introduction RISK ANALYSIS MODULE 3, CASE STUDY 2 Flood Damage Potential at European Scale By Dr. Peter Burek There is good reason to be concerned about the growth of flood losses in Europe.
THE NAIROBI WORK PROGRAMME ON IMPACTS, VULNERABILITY AND ADAPTATION TO CLIMATE CHANGE UNFCCC THE NINE WORK AREAS OF THE NAIROBI WORK PROGRAMME
ON IMPACTS, VULNERABILITY AND ADAPTATION TO CLIMATE CHANGE 1 METHODS AND TOOLS WHAT IS? The Nairobi work programme, under the United Nations Framework Convention on Climate Change (), aims to assist countries
Environment Agency 2014 All rights reserved. This document may be reproduced with prior permission of the Environment Agency.
Flood and coastal erosion risk management Long-term investment scenarios (LTIS) 2014 We are the Environment Agency. We protect and improve the environment and make it a better place for people and wildlife.
Ruimtelijke planning in tijden van klimaatsverandering
Ruimtelijke planning in tijden van klimaatsverandering Eric Koomen Vrije Universiteit Amsterdam/ Geodan Next Nascholingscursus Water, rivieren en GIS' 3 april 2008 Outline Climate change climate and land
The Local Government Self- Assessment Tool. Taking stock, celebrating achievements and planning for DRR in Addis Ababa
The Local Government Self- Assessment Tool Taking stock, celebrating achievements and planning for DRR in Addis Ababa Background Throughout history, disaster events have disrupted urban life. With more
Angel V. Martínez & Antonio Amengual
Angel V. Martínez & Antonio Amengual This research is part of an EU-funded project called: Roadside Infrastructure for Safer European Roads Included inside the 5th Framework Programme INTRODUCTION ROADSIDE
Modelling of Urban Flooding in Dhaka City
Modelling of Urban Flooding in Dhaka City Chusit Apirumanekul*, Ole Mark* *Water Engineering & Management, Asian Inst. of Technology, PO Box 4, Klong Luang, Pathumthani 12120, Thailand Abstract Flooding
HAZARD VULNERABILITY & RISK ASSESSMENT
Hazard Vulnerability Analysis Purpose and Scope A Hazard Vulnerability Analysis (HVA) evaluates risk associated with a specific hazard. During this analysis, the hazard is evaluated for its probability
Groundwater Flooding: a UK Perspective
Groundwater Flooding: a UK Perspective David Macdonald British Geological Survey Maclean Building Crowmarsh Gifford Wallingford OX10 8BB Tel 01491 838800 NERC All rights reserved Talk outline Definition
Including Climate Change Risks in Prioritization for Asset Management. Emily Grenzke CH2M HILL, Transit and Sustainability Washington, DC
Including Climate Change Risks in Prioritization for Asset Management Emily Grenzke CH2M HILL, Transit and Sustainability Washington, DC The impacts of climate change are felt across all transit asset
TERRITORIAL PLANNING FOR THE MANAGEMENT OF RISK IN EUROPE
, Territorial págs. Planning 383-388 for the Management of Risk in Europe TERRITORIAL PLANNING FOR THE MANAGEMENT OF RISK IN EUROPE Mark Fleischhauer, Stefan Greiving & Sylvia Wanczura Universität Dortmund
Climate Change and Infrastructure Planning Ahead
Climate Change and Infrastructure Planning Ahead Climate Change and Infrastructure Planning Ahead Infrastructure the physical facilities that support our society, such as buildings, roads, railways, ports
Hydraulic efficiency of macro-inlets
Hydraulic efficiency of macro-inlets Efficacité hydraulique des grands avaloirs à grilles Manuel Gómez Valentín, Beniamino Russo FLUMEN Research Group Technical University of Catalonia, Jordi Girona 1-3,
Real-time modelling of surface water flooding hazard and impact at countrywide scales
Real-time modelling of surface water flooding hazard and impact at countrywide scales Steven Cole 1, Robert Moore 1, Paul Mattingley 1,Timothy Aldridge 2, Jon Millard 3,4 and Stefan Laeger 5 BHS National
Guidance on the use of sustainable drainage systems (SUDS) and an overview of the adoption policy introduced by
Guidance on the use of sustainable drainage systems (SUDS) and an overview of the adoption policy introduced by Easy guide to Sustainable drainage systems 02 Contents Page Introduction 05 Purpose of this
APPENDIX 1 Floodplain Management Strategies & Guidelines
APPENDIX 1 Floodplain Management Strategies & Guidelines A. Port Phillip Flood Management Plan (2012) B. Draft Flood Management Strategy Port Phillip and Westernport (2015) C. Revised Draft Victorian Floodplain
AZ EGER-PATAK HIDROLÓGIAI VIZSGÁLATA, A FELSZÍNI VÍZKÉSZLETEK VÁRHATÓ VÁLTOZÁSÁBÓL ADÓDÓ MÓDOSULÁSOK AZ ÉGHAJLATVÁLTOZÁS HATÁSÁRA
AZ EGER-PATAK HIDROLÓGIAI VIZSGÁLATA, A FELSZÍNI VÍZKÉSZLETEK VÁRHATÓ VÁLTOZÁSÁBÓL ADÓDÓ MÓDOSULÁSOK AZ ÉGHAJLATVÁLTOZÁS HATÁSÁRA GÁBOR KEVE 1, GÉZA HAJNAL 2, KATALIN BENE 3, PÉTER TORMA 4 EXTRAPOLATING
CORRELATIONS BETWEEN RAINFALL DATA AND INSURANCE DAMAGE DATA ON PLUVIAL FLOODING IN THE NETHERLANDS
10 th International Conference on Hydroinformatics HIC 2012, Hamburg, GERMANY CORRELATIONS BETWEEN RAINFALL DATA AND INSURANCE DAMAGE DATA ON PLUVIAL FLOODING IN THE NETHERLANDS SPEKKERS, M.H. (1), TEN
DESIGN OF STORM WATER DETENTION POND
Yunnan Chuxiong Urban Environment Improvement Project (RRP PRC 45507) DESIGN OF STORM WATER DETENTION POND A. Background 1. Chuxiong Yi Autonomous Prefecture (Chuxiong prefecture) is located at about 160
The Rational Method. David B. Thompson Civil Engineering Deptartment Texas Tech University. Draft: 20 September 2006
The David B. Thompson Civil Engineering Deptartment Texas Tech University Draft: 20 September 2006 1. Introduction For hydraulic designs on very small watersheds, a complete hydrograph of runoff is not