Peralta Community College District th Avenue Oakland, California Phone (510) Fax (510) Purchasing Department

Size: px
Start display at page:

Download "Peralta Community College District 501 5 th Avenue Oakland, California 94606 Phone (510) 466-7225 Fax (510) 587-7873 Purchasing Department"

Transcription

1 Peralta Community College District th Avenue Oakland, California Phone (510) Fax (510) Purchasing Department Date: October 18, 2011 ADDENDUM No. 10 RFP 11-12/01 Merritt College Science & Allied Health Center This Addendum modifies the original RFP Documents for the above RFP. Acknowledge receipt of this addendum in the space provided on the PROPOSAL FORM, Failure to do so may subject Bidder to disqualification. List of attachments: 1 page The original RFP Documents are updated by the information as follows: 1. RESPONSE REQUIRED BY: Q /Q.-302 shows cabinet type T48C. Per the casework legend on Q-002, there is no C" type for the tall cabinets. Please clarify what to provide for this cabinet. RESPONSE: Cabinets in 10/Q-302 are to be T48CS 2. RESPONSE REQUIRED BY: Q-304 3/Q-304, please provide detail 23/Q-301 as referenced at both the right and left sides of this elevation. RESPONSE: Detail 23 from Sheet Q-301 is attached. 3. RESPONSE REQUIRED BY: Q-202A Room 2105 on Q-202A, please clarify what material the countertop on the south wall is to be made from. Is it stainless steel to match the casework in this room? RESPONSE: Yes, the countertop will be stainless steel. RFP No /01 Addendum No. 10 Page 1 of 6

2 4. RESPONSE REQUIRED BY: Q-303 Elevations 2, 3 and 4 on Q-303, please clarify which spec section is responsible for the "Lighted Mineral Display Cases with Glass Shelving". Are these to be included under Display Cases or as part of Wood Lab Casework? RESPONSE: Elevations 2, 3 and 4 on Q-303 will be covered by Wood Laboratory Casework RESPONSE REQUIRED BY: Q-002 Please clarify what is required as part of the "FV" and "DDV" vent cabinets as shown on Q-002. It appears from this drawing that some type of electrical switch or outlet is shown above the cabinet doors. Are there any other special items that need to be incorporated into these cabinets? RESPONSE: FV ventilated cabinet is 35" tall (Z-11") DDV ventilated cabinet is 31" tall (2'-7") 6. RESPONSE REQUIRED BY: Q and 28/Q-301, please clarify which specification section is responsible for the framing below the wall cabinets. RESPONSE: These spaces are chases behind the base cabinets with wall cabinets above is responsible for any framing necessary to secure the cabinets to the wall. 7. RESPONSE REQUIRED BY: Q and ll /Q-305 show wall shelves (WS16) mounted on a window elevation. Please confirm that shelves are not required at these locations as there is no way to mount them to the windows. RESPONSE: In both locations shelves will be mounted on upright supports that are mounted to the table rather than to the wall. This type of shelf standard is commonly used on mobile laboratory tables or equipment carts. RFP No /01 Addendum No. 10 Page 2 of 6

3 8. RESPONSE REQUIRED BY: Q-308, Q-204A 14/Q-308, please confirm that the only part of this elevation that is to be stainless steel is the scullery sink. The floor plan for this room (4105) on Q-204A would seem to indicate that the entire west wall countertop is to be stainless steel, while the scullery sink is labeled as epoxy resin. RESPONSE: Correct. Only the scullery sink is stainless steel. All other counters on this wall are epoxy. 9. RESPONSE REQUIRED BY: A-201A For Additive Alternate No. 1, drawing A-201A, room 1120 lists 12 different genomics program areas that are to be included as part of the alternate price. For the following areas, there does not seem to be any Room Narratives, floor plans or other information included as part of Appendix B: areas 2,3,7,10 and 12. Please provide information for these missing areas. RESPONSE: The areas have slightly different names on Sheet A-201A and the Appendix B. Area 2 (Sheet A-201 A) Equipment Room = Part of the teaching lab page 2-19 Appendix B. Area 3 Sequencer Room = Sequencing Lab p Area 7 Warm Room = 37 degree Chamber Alcove p Area 10 Wash Room = Autoclave Room p Area 12 Office Space = approximately 330 nsf of faculty offices per the other faculty offices in the building. 10. RESPONSE REQUIRED BY: Appendix B For Additive Alternate No. 1, pages 2-4,2-19,2-24,2-30, 2-34,2-52,2-56 and 2-60 of Appendix B, please provide elevations or other information indicating what the required configurations are for all of the base, wall and tali lab cabinets in these rooms. Not enough information is given to adequately price these areas. RESPONSE: For the purpose of the Add Alternate, the casework in Appendix B will be Metal Laboratory Casework Section , with epoxy countertops. Price base cabinets as 50% drawers and 50% doors, two rows of adjustable reagent rack shelving over the island benches, and wall cabinets with glass doors where indicated. RFP No /01 Addendum No. 10 Page 3 of 6

4 11. RESPONSE REQUIRED BY: Appendix B For Additive Alternate No. 1, page 2-19 of Appendix B, please indicate what lab plumbing and electrical services are required at the two item 11 fume hoods. RESPONSE: Provide CW and a cup sink, and gas similar to the fume hoods in the building. 12. RESPONSE REQUIRED BY: Appendix B For Additive Alternate No. 1, page 2-24 of Appendix B, please indicate what lab plumbing and electrical services are required at the two item 10 fume hoods. RESPONSE: Provide CW and a cup sink, and gas similar to the other fume hoods in the building. 13. RESPONSE REQUIRED BY: Small Steam Autoclave The sterilizer cycle described is those for a hospital. Laboratory sterilizers typically have more flexibility of cycle programming and can also run liquid cycles. Please advise if the sterilizer should be healthcare sterilizers or laboratory sterilizer with liquid cycle capabilities. Please advise by addendum. RESPONSE: Sterilizer should be a laboratory sterilizer with liquid cycle capability. 14. RESPONSE REQUIRED BY: The specification for the tall glassware washer is based around a Healthcare Instrument Washer, Reliance Synergy Instrument Washer. Most instrument washers are not designed for glassware washing or have very limited capabilities. Please advise what is required - a glassware washer or an instrument washer. Please advise by addendum. RESPONSE: Provide glassware washer not instrument washer. RFP No /01 Addendum No. 10 Page 4 of 6

5 15. RESPONSE REQUIRED BY: Please advise if Dl water is available for final rinse of load for the washer. Please advise by addendum. RESPONSE: Yes. Plumbed RO/DI water will be available in the building. 16. RESPONSE REQUIRED BY: Is a dryer required for glassware processing? Please advise by addendum. RESPONSE: A glassware dryer is not needed. The glassware washer should have a drying cycle. 17. RESPONSE REQUIRED BY: Please advise if the glassware washer/instrument washer hard connected to the exhaust/ventilation system. Please advise by addendum. RESPONSE: The glassware washer will be ventilated by an indirect connection to the building exhaust system. 18. RESPONSE REQUIRED BY: 10/14/2011 Small Steam Autoclaves Specification Section specifies the autoclave is new and is Contractor Furnished. Drawing Q-001, Laboratory Plan Legend shows equipment dotted in is OF. The autoclave on drawing Q-204A, Room 4109 is dotted in as well as elevation 27/Q-307. Please advise if the autoclave is Contactor Furnished or Owner Furnished. Please advise by addendum. RESPONSE: The Autoclave is OF/CI as indicated in the equipment matrix in Appendix E. RFP No /01 Addendum No. 10 Page 5 of 6

6 19. RESPONSE REQUIRED BY: 10/14/2011 Specification Section specifies the glassware washer/dryer is new and is Contractor Furnished. Drawing Q- 001, Laboratory Plan Legend shows equipment dotted in is OF. The glassware washer on drawing Q-204A, Room 4109 is dotted in as well as elevation 27/Q-307. Please advise if the glassware washer is Contactor Furnished or Owner Furnished. Please advise by addendum. RESPONSE: The washer is OF/CI per the Equipment Matrix in Appendix E. 20. RESPONSE REQUIRED BY: 10/14/2011 Specification Section specifies the under counter glassware washer/dryer is new and is Contractor Furnished. Pages 3,6,16 of Preliminary Equipment list shows the under counter glassware washer as Owner Furnished/Contractor installed based on the color scheme; green. Please advise if the glassware washer is Contactor Furnished or Owner Furnished/Contractor Installed. Please advise by addendum. RESPONSE: The undercounter glassware washer will be OFCI per Appendix E. 21. RESPONSE REQUIRED BY: 10/14/2011 Specification Section, paragraph 2.2 specifies model G7835 for the under counter glassware washer/dryer. The Equipment Matrix lists model G7883CD for the under counter glassware washer. Please advise which model of glassware washer is required. Please advise by addendum. RESPONSE: The undercounter glasswasher will be Miele G7883CD. This item is OFCI per the equipment matrix in Appendix E. All other terms and conditions of RFP No /01 to remain the same. RFP No /01 Addendum No. 10 Page 6 of 6

7

Alpha System ADAPTABLE KEWAUNEE LABORATORY FURNITURE. encouraging new discovery

Alpha System ADAPTABLE KEWAUNEE LABORATORY FURNITURE. encouraging new discovery Alpha System ADAPTABLE LABORATORY FURNITURE KEWAUNEE encouraging new discovery Alpha 6 partition modules with Kemresin worktops. Minneapolis, Minnesota Alpha 6 partition modules with Alpha overhead service

More information

TURN-KEY LAB SPACE AVAILABLE

TURN-KEY LAB SPACE AVAILABLE TURN-KEY LAB SPACE AVAILABLE 910 CLOPPER ROAD LOCATION... Tech Park 270 910 Clopper Road BUILDING... 180,650 rentable square feet TURN-KEY LAB/OFFICE SPACE AVAILABLE Second Floor 9,800 SF 14,644 SF (can

More information

designed delivered installed

designed delivered installed designed delivered installed VWR Contour steel casework with epoxy resin worktops and VWR Atlas columns. 2 888.624.2432 vwr.com designed. Long-term functionality should be the ultimate aim when furnishing

More information

MSBA Guidelines for Science Labs

MSBA Guidelines for Science Labs Massachusetts School Building Authority Steven Grossman Chairman, State Treasurer Katherine Craven Executive Director MSBA Guidelines for Science Labs May 26, 2010 www.massschoolbuildings.org Introduction:

More information

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS NOTICE TO BIDDERS BID FORM INSTRUCTIONS TO BIDDERS CONTRACTOR S BID FOR PUBLIC WORK - FORM 96 MINORITY AND WOMEN S BUSINESS ENTERPRISE PARTICIPATION

More information

SPACE TYPE: LABORATORY (WET) FOR CHEMISTRY AND BIOLOGY

SPACE TYPE: LABORATORY (WET) FOR CHEMISTRY AND BIOLOGY SPACE TYPE: LABORATORY (WET) FOR CHEMISTRY AND BIOLOGY Construction Criteria The unit costs for (Wet) space types are based on the construction quality and design features in the following table. This

More information

RFQ # PR5006805 Replace Kitchen Equipment in the CGR

RFQ # PR5006805 Replace Kitchen Equipment in the CGR RFQ # PR5006805 Replace Kitchen Equipment in the CGR GENERAL The Consulate General of the United States of America has a requirement to furnish and install new kitchen equipment at the Consul General s

More information

North Carolina State University Emergency Facilities Closure Checklist- Part I

North Carolina State University Emergency Facilities Closure Checklist- Part I North Carolina State University Emergency Facilities Closure Checklist- Part I Unplanned or spontaneous events often disrupt daily operations on campus. In the event that an incident may interrupt your

More information

LAB BENCHES & SPECIALTY INSTRUCTOR'S BENCHES

LAB BENCHES & SPECIALTY INSTRUCTOR'S BENCHES INSTRUCTOR'S BENCHES Instructor's Desk 20000 (shown) 20001 (reversed) W: 63" (5'3") D : 30" 1-18" wide, 1 door sink cabinet 1-18" wide, 4 drawer storage cabinet 1-24" kneespace 1 epoxy sink (14" x 10"

More information

LABORATORY CASEWORK. Table of Contents. Laboratory Cabinetry and Specialties. ADVANTAGE laboratory. Series/Model Number Specification...

LABORATORY CASEWORK. Table of Contents. Laboratory Cabinetry and Specialties. ADVANTAGE laboratory. Series/Model Number Specification... PREVIOUS VIEW LABORATORY CASEWORK Laboratory Cabinetry and Specialties Table of Contents Series/Model Number Specification... 3 Perimeter Tables... 5 s... 6-9 Steel Legs... 6-7 Wood Legs... 8-9 Student

More information

Clear Creek Business Center 187,865 Sq. Ft. OFFICE/FLEX/INDUSTRIAL

Clear Creek Business Center 187,865 Sq. Ft. OFFICE/FLEX/INDUSTRIAL Clear Creek Business Center 187,865 Sq. Ft. OFFICE/FLEX/INDUSTRIAL 6800-6880 N. Broadway, Denver CO 80221 Lease rates & terms 6870 AVAILABLE 6860 6850 3.1 Acre Build-To-Suit Site 8 High-quality buildings

More information

Holz Choices & Specifications

Holz Choices & Specifications March 21, 2011 0. SALES AND DESIGN 1. UTILITIES AND PERMITS Holz Choices & Specifications 2. EXCAVATION AND LOT PREPARATION Job Beginning date of Monday May 2 nd, 2011 ALTERNATE: Garage walls as drawn

More information

Laboratory Design & Construction Guidelines

Laboratory Design & Construction Guidelines Laboratory Design & Construction Guidelines Department of Environmental Health & Safety EHS-M-35 Page 1 Issue Date: 03/01/10 General Health and Safety The USC Environmental Health and Safety Department

More information

PUBLIC RESTROOMS, DESIGN INTENT

PUBLIC RESTROOMS, DESIGN INTENT PUBLIC RESTROOMS, DESIGN INTENT 1.01 STRUCTURAL A. Where feasible, metal stud partitions will be constructed on a 6 high concrete curb. 1.02 MECHANICAL A. Restrooms will have a minimum of 15 air changes

More information

Design Questionnaire. Design & Style

Design Questionnaire. Design & Style Designing your kitchen requires not only deciding on décor and colors but also creating a space plan and choosing products that will allow your kitchen to function the way that best suits you. Answering

More information

EARLY CHILDHOOD EDUCATION September 30, 2010

EARLY CHILDHOOD EDUCATION September 30, 2010 EARLY CHILDHOOD EDUCATION September 30, 2010 I. PROGRAM REQUIREMENTS Refer to the project-specific Schedule of Spaces for student stations, square footage, and for any requirements that may differ from

More information

Subpart 1. Installation. All plumbing systems must be. installed and tested according to this chapter and chapter 4715,

Subpart 1. Installation. All plumbing systems must be. installed and tested according to this chapter and chapter 4715, 4658.4500 PLUMBING SYSTEMS; NEW CONSTRUCTION. Subpart 1. Installation. All plumbing systems must be installed and tested according to this chapter and chapter 4715, the Minnesota Plumbing Code. Subp. 2.

More information

2. The Laboratory Fume Hood Specification Catalog Select the style and size hoods appropriate for your layout and laboratory use.

2. The Laboratory Fume Hood Specification Catalog Select the style and size hoods appropriate for your layout and laboratory use. TABLE OF CONTENTS How to Specify... 3 Introduction to Fisher Hamilton Stainless Steel Laboratory Casework... 4 5 Stainless Steel Casework Options Menu... 6 Base Cabinets... 7 17 Sitting Height Cabinets...

More information

All Apartments River Village Community Bedroom Bathroom Kitchen Living Room Commons/Hallways/Stairwells Doors Windows

All Apartments River Village Community Bedroom Bathroom Kitchen Living Room Commons/Hallways/Stairwells Doors Windows All Apartments Paint cost per linear foot $3.79 Drywall repair per linear foot $10.25 Drywall repair with paint cost per linear foot $14.04 Flooring cost per square foot $8.95 Item Removal Fee (Per Item)

More information

ARTS AND CRAFTS 10.1.0. 5410 (open) 5412 (doors) H : 84" Tote Tray Storage. Damp Storage. Tote Tray Storage. Notebook Board Storage, Doors

ARTS AND CRAFTS 10.1.0. 5410 (open) 5412 (doors) H : 84 Tote Tray Storage. Damp Storage. Tote Tray Storage. Notebook Board Storage, Doors Drawing Board Storage, Open Drawing Board Storage, Doors Drawing Board Storage Notebook Storage, Open 1670 D : 23.25" holds 32 drawing boards 1 shelf, adjustable on 1¼" increments maximum board height

More information

CSTM 102 Spring 2013. Construction Documents to Contract Documents

CSTM 102 Spring 2013. Construction Documents to Contract Documents CSTM 102 Spring 2013 Construction Documents to Contract Documents The Construction Industry THE PROJECT TEAM A Project and a Client A Designer Constructors THE GAME PLAN Risk Management Scope of Work The

More information

Frequently Asked Questions about the District of Columbia School Health Nursing Program

Frequently Asked Questions about the District of Columbia School Health Nursing Program Government of the District of Columbia Department of Health Community Health Administration Frequently Asked Questions about the District of Columbia School Health Nursing Program The following questions

More information

Laboratory Safety and Environmental Health Assessment Program

Laboratory Safety and Environmental Health Assessment Program Laboratory Safety and Environmental Health Assessment Program Principal Investigators and Faculty are vital to the success of safety and environmental compliance programs in Colorado School of Mines research

More information

Decommissioning and clearance of laboratories

Decommissioning and clearance of laboratories Health and Safety Services Safety Note 65 Decommissioning and clearance of laboratories This Safety Note provides guidance to Schools on the decommissioning and clearance of laboratories prior to handing

More information

BOSTON COLLEGE ENVIRONMENTAL HEALTH AND SAFETY LABORATORY GUIDE FOR RENOVATIONS, REMODELS, MOVES AND TERMINATIONS

BOSTON COLLEGE ENVIRONMENTAL HEALTH AND SAFETY LABORATORY GUIDE FOR RENOVATIONS, REMODELS, MOVES AND TERMINATIONS BOSTON COLLEGE ENVIRONMENTAL HEALTH AND SAFETY LABORATORY GUIDE FOR RENOVATIONS, REMODELS, MOVES AND TERMINATIONS I. Policy for Termination of Laboratory Use of Hazardous Materials The Principal Investigator

More information

Autoclave Safety. Autoclaves are sterilizers using high pressure and high temperature steam. The potential safety risks for the operators are:

Autoclave Safety. Autoclaves are sterilizers using high pressure and high temperature steam. The potential safety risks for the operators are: Autoclave Safety Purpose: Sterilization refers to the complete killing of all living organisms, including spores. Common sterilization techniques include the application of wet heat, dry heat, chemicals,

More information

BUILDING NAMING RIGHTS

BUILDING NAMING RIGHTS NEW HEALTH SCIENCE BUILDING Davis Applied Technology College METHODSTUDIO INC. BUILDING NAMING RIGHTS NAMING RIGHTS OPPORTUNITIES Building Areas $500,000 Building Naming Right $100,000 LEED Gold Sponsorship

More information

ATTACHMENT A STRUCTURAL INTERIOR DESIGN (SID) REQUIREMENTS

ATTACHMENT A STRUCTURAL INTERIOR DESIGN (SID) REQUIREMENTS ATTACHMENT A STRUCTURAL INTERIOR DESIGN (SID) REQUIREMENTS 1.0 GENERAL INFORMATION Structural Interior Design includes all building related elements and components generally part of the building itself,

More information

ADDENDUM NO. THREE August 31, 2015

ADDENDUM NO. THREE August 31, 2015 ADDENDUM NO. THREE August 31, 2015 This Addendum forms a part of the contract Documents and modifies the original plans and specifications dated July 28, 2015. Acknowledge receipt of this Addendum on the

More information

PART-II (COMMERCIAL / PRICE BID) DESIGN, SUPPLY AND INSTALLATION OF CUSTOMIZED STEEL LAB FURNITURE.AT N.C.C.S., PUNE

PART-II (COMMERCIAL / PRICE BID) DESIGN, SUPPLY AND INSTALLATION OF CUSTOMIZED STEEL LAB FURNITURE.AT N.C.C.S., PUNE (An Autonomous Institution of the Department of Biotechnology, Govt. of India) N.C.C.S. Complex, Ganeshkhind, Pune University Campus, Pune 411007. PART-II (COMMERCIAL / PRICE BID) DESIGN, AND INSTALLATION

More information

Design Guide Durcon / Epoxy Resin Handbook / 2 2010 Durcon Incorporated. Printed in USA.

Design Guide Durcon / Epoxy Resin Handbook / 2 2010 Durcon Incorporated. Printed in USA. Durcon / Epoxy Resin Handbook / 2 INTRODUCTION...4 GENERAL PRACTICES...6 I. Drawing Requirements...6 II. Epoxy Formulation...7 III. Colors...7 IV. Edges...8 V. Surfaces...9 VI. Thickness... 12 VII. Joints...

More information

SPACE TYPES & REQUIREMENTS

SPACE TYPES & REQUIREMENTS SPACE TYPES & REQUIREMENTS Career and Technical Education (CTE) School Type: E M H 6 7 8 9 10 11 12 Adjacency Diagram Functional Area Descriptions Career and technical education (CTE), formerly professional

More information

STERILIZERS, LABORATORY DRYING OVENS

STERILIZERS, LABORATORY DRYING OVENS TS9026 TS9053 TS9135 TS9430 TS 9000 SERIES: STERILIZERS, LABORATORY DRYING OVENS Series TS9000 consists of four different cabinets available in sizes from 26 litres to 430 litres. Interior housing and

More information

Schedule of Maintenance Fees

Schedule of Maintenance Fees Schedule of Maintenance Fees Effective July 1, 2015 It is the policy of the Housing Authority of Murray not to charge for NORMAL wear and tear. However, the Housing Authority reserves the right in every

More information

Architectural Casework 06400-01. 1.01 Description of Work

Architectural Casework 06400-01. 1.01 Description of Work 06400-01 1.01 Description of Work A. Extent of each type of architectural millwork and casework as indicated on drawings. Types of architectural casework shall include both stained and plastic laminated

More information

GENERAL WIRING RULES FOR HOUSES

GENERAL WIRING RULES FOR HOUSES GENERAL WIRING RULES FOR HOUSES 1. Romex has to be installed in drilled holes in joists or studs even above suspended ceilings - No stapling to bottom edges of joists or studs. You may staple wire to flat

More information

Frost and Cooper Renovations

Frost and Cooper Renovations Barton Malow Company LIVONIA PUBLIC SCHOOLS Livonia, Michigan Frost and Cooper Renovations BID PACKAGE No. 1 ADDENDUM # 3 February 17, 2014 Barton Malow Company Frost and Cooper Renovations MEMORANDUM

More information

All bidders shall indicate in their bid/proposal that this Addendum has been received and considered in their bid proposal.

All bidders shall indicate in their bid/proposal that this Addendum has been received and considered in their bid proposal. Addendum #1 Fire Damage Repairs 4316 City View Terrace, Units A and B City View Terrace, OH5-13C, AMP 4 IFB #14-03 October 23, 2014 Greater Dayton Premier Management 400 Wayne Ave. Dayton, Ohio 45410 This

More information

2. What building projects are exempted? (permit not required)

2. What building projects are exempted? (permit not required) BUILDING AND SAFETY DEPARTMENT 1. What building projects require a permit? Following is a list of projects that require building permits based on Appendix chapter 1 of the California Building Code and

More information

Infection Control in the Dental Practice through Proper Sterilization

Infection Control in the Dental Practice through Proper Sterilization Midmark Corporation 60 Vista Drive P.O. Box 286 Versailles, Ohio 45380-0286 937-526-3662 midmark.com Infection Control in the Dental Practice through Proper Sterilization In today's world, the need for

More information

Custom DENTAL Cabinetry

Custom DENTAL Cabinetry Custom DENTAL Cabinetry Custom Designs and sizes available Buy Direct and Save Your Choice of 700+ Colors To Choose From Solid surface countertops available E s s E N t i A L C A b i N E t r y High-quality

More information

Bathroom Installation Guide

Bathroom Installation Guide Bathroom Installation Guide Step-by-step installation of your cabinets We do a lot of groundwork to make it as simple as possible for you to assemble and install your new bathroom furniture yourself. We

More information

TARRANT COUNTY PUBLIC HEALTH DEPARTMENT 817-321-4960 fax 817-321-4961 FOOD ESTABLISHMENT REVIEW APPLICATION

TARRANT COUNTY PUBLIC HEALTH DEPARTMENT 817-321-4960 fax 817-321-4961 FOOD ESTABLISHMENT REVIEW APPLICATION TARRANT COUNTY PUBLIC HEALTH DEPARTMENT 817-321-4960 fax 817-321-4961 FOOD ESTABLISHMENT REVIEW APPLICATION Date: NEW REMODEL Name of Establishment: Category: Restaurant Institution Daycare Retail Market

More information

REX JACOBSMA 877.739.2526 rex@jacobsma.com. P.O. BOX 1833 Paso Robles, California 93447 P: 805.239.3090 F: 805.239.9088 www.corvallisofficespace.

REX JACOBSMA 877.739.2526 rex@jacobsma.com. P.O. BOX 1833 Paso Robles, California 93447 P: 805.239.3090 F: 805.239.9088 www.corvallisofficespace. For Lease RESEARCH WAY TECHNOLOGY CENTER ABOUT THE PROPERTY LOCATION 4575 S. W. Research Way STRUCTURE & SIZE High-Tech Flex-Space for Offices, R&D, Assembly and Laboratory 103,200 SF on 9.16 Acres AVAILABLE

More information

Element D Services Plumbing

Element D Services Plumbing PART 1 - GENERAL 1.01 OVERVIEW A. This section addresses domestic cold, hot and hot water return distribution systems within and to five feet beyond building perimeter. PART 2 - DESIGN CRITERIA 2.01 GENERAL

More information

German engineering under high pressure

German engineering under high pressure German engineering under high pressure Over 25 years of experience as a manufacturer of sterilizers, autoclaves and lyophilization systems for laboratories, production and research Production-scale autoclaves

More information

Summit Series Single Section and Double Section Homes

Summit Series Single Section and Double Section Homes Single Section and Double Section Homes SM-01 All New 20 Wides Now Available! SM-08 Units shown with optional features SM-01-4814 42 Bedrooms 41 Bathrooms 648 Sq. Ft. SM-01-5214 42 Bedrooms 41 Bathrooms

More information

REQUIREMENT 5. Light Switches, Electrical Outlets, Thermostats, and Other Environmental Controls in Accessible Locations

REQUIREMENT 5. Light Switches, Electrical Outlets, Thermostats, and Other Environmental Controls in Accessible Locations Chapter Five: REQUIREMENT 5 Light Switches, Electrical Outlets, Thermostats, and Other Environmental Controls in Accessible Locations 5...covered multifamily dwellings with a building entrance on an accessible

More information

Recycled /Reusable Sharps Containers, Medical Waste Containers & Rx Containers And Sanitization Services Processing

Recycled /Reusable Sharps Containers, Medical Waste Containers & Rx Containers And Sanitization Services Processing PCM PRECISION & S.L. PLOTA COMPANY EST 1974 WWW.PCMMEDICALWASTERECYCLING.COM Reusable Containers/Medical Waste Tippers & Washers Recycled /Reusable Sharps Containers, Medical Waste Containers & Rx Containers

More information

HOW TO ESTIMATE THE COST OF A HIGH SCHOOL LABORATORY AT CONCEPTUAL LEVEL

HOW TO ESTIMATE THE COST OF A HIGH SCHOOL LABORATORY AT CONCEPTUAL LEVEL HOW TO ESTIMATE THE COST OF A HIGH SCHOOL LABORATORY AT CONCEPTUAL LEVEL Table of Contents Page Section 1: Introduction 3 Section 2: Types of Methods of Measurements 7 Section 3: Project Specific Factors

More information

KITCHEN AND BATH REMODELING BUILDING PERMIT REQUIREMENTS

KITCHEN AND BATH REMODELING BUILDING PERMIT REQUIREMENTS St. Louis County Department of Public Works Division of Code Enforcement KITCHEN AND BATH REMODELING BUILDING PERMIT REQUIREMENTS This guideline is intended to provide the homeowner/contractor with the

More information

47 Levencourt Way London SW8 1HR. Tenant: Eric Stevenson Prepared for: Elizabeth Collins

47 Levencourt Way London SW8 1HR. Tenant: Eric Stevenson Prepared for: Elizabeth Collins 47 Levencourt Way London SW8 1HR Prepared by: John Smith Date of Inspection: 16/03/12 Tenant: Eric Stevenson Prepared for: Elizabeth Collins Inventory & Check In Report Table of Contents Schedule of Conditions...

More information

ADDENDUM NO. 1. DATE: February 10, 2015 INVITATION FOR BID: IFB K150015033 1801 Commerce Road Renovations Project DATED: February 9, 2015

ADDENDUM NO. 1. DATE: February 10, 2015 INVITATION FOR BID: IFB K150015033 1801 Commerce Road Renovations Project DATED: February 9, 2015 ADDENDUM NO. 1 DATE: February 10, 2015 INVITATION FOR BID: IFB K150015033 1801 Commerce Road Renovations Project DATED: February 9, 2015 RECEIPT DATE: March 17, 2015 at 2:30 p.m. OPENING DATE: March 18,

More information

INVITATION FOR BIDS CCK-2139-16 PROJECT 2369.2 PEDIATRIC CRITICAL CARE RENOVATION PHASE 3 ADDENDUM #3 6-22-16

INVITATION FOR BIDS CCK-2139-16 PROJECT 2369.2 PEDIATRIC CRITICAL CARE RENOVATION PHASE 3 ADDENDUM #3 6-22-16 INVITATION FOR BIDS CCK-2139-16 PROJECT 2369.2 PEDIATRIC CRITICAL CARE RENOVATION PHASE 3 ADDENDUM #3 6-22-16 ATTENTION: This is not an order. Read all instructions, terms and conditions carefully. IMPORTANT:

More information

WASHROOM UPGRADE SIR CHARLES TUPPER BUILDING 2250 RIVERSIDE DRIVE, OTTAWA, ON SIR CHARLES TUPPER BUILDING A0.0 COVER SHEET / DRAWING LIST

WASHROOM UPGRADE SIR CHARLES TUPPER BUILDING 2250 RIVERSIDE DRIVE, OTTAWA, ON SIR CHARLES TUPPER BUILDING A0.0 COVER SHEET / DRAWING LIST 0 RIVERSIDE DRIVE, OTTAWA, ON A0.0 COVER SHEET / DRAWING LIST A0. LEGEND AND GENERAL NOTES A0. GENERAL NOTES A0. GENERAL NOTES A0. TYPICAL WASHROOM WALL/SINK SECTION A0. DETAIL - CONTROL JOINT A0. DETAIL

More information

PLASTIC CONTAINERS CONTAINER HOLDING TROLLEYS CONTAINER HOLDING CABINETS PLASTIC DRAWER UNITS DRAWER UNIT HOLDER SHELVES FOOD CONTAINERS

PLASTIC CONTAINERS CONTAINER HOLDING TROLLEYS CONTAINER HOLDING CABINETS PLASTIC DRAWER UNITS DRAWER UNIT HOLDER SHELVES FOOD CONTAINERS CONTAINER HOLDING TROLLEYS CONTAINER HOLDING CABINETS PLASTIC DRAWER UNITS DRAWER UNIT HOLDER SHELVES FOOD CONTAINERS INDUSTRIAL CONTAINERS 64 CONTAINER HOLDING TROLLEYS for the coloured containers always

More information

ORGANIC SAMPLE PREPARATION

ORGANIC SAMPLE PREPARATION ORGANIC SAMPLE PREPARATION W W W.LA BT E C H S R L.CO M WSPE MANUAL VACUUM MANIFOLD SPE Process control of the flow rate is critical to guarantee reproducible extractions. Differently then any other systems,

More information

UNH SAFETY AUDIT Office of Environmental Health and Safety

UNH SAFETY AUDIT Office of Environmental Health and Safety UNH SAFETY AUDIT Office of Environmental Health and Safety Administrative Information Customized for each location. Ensure contact information on door caution signs is up to date. Doors YES NO N/A 1. The

More information

Blood Collection and Processing SOP

Blood Collection and Processing SOP Brisbane Breast Bank Blood Collection and Processing SOP Breast Pathology Laboratory University of Queensland Centre for Clinical Research Blood Collection We collect 30ml of blood from patients who have

More information

Operating and Installation Instructions

Operating and Installation Instructions Operating and Installation Instructions System Drawer ESS 2062 To prevent accidents and en - US, CA appliance damage, read these instructions before installation or use. M.-Nr. 07 342 360 Contents IMPORTANT

More information

Oregon State Police Forensic Services Division

Oregon State Police Forensic Services Division Oregon State Police Forensic Services Division Pendleton Forensic Laboratory Facility Requirements December 31, 2015 Oregon State Police Pendleton Forensic Laboratory FACILITY REQUIREMENTS TABLE OF CONTENTS

More information

THE QUICK START QUICK START GUIDE

THE QUICK START QUICK START GUIDE THE QUICK START QUICK START GUIDE www.frontpointsecurity.com/support-overview WELCOME FRONTPOINT TO Thank you for choosing Frontpoint for your security needs! We re delighted to have you as a new customer

More information

PRINCIPAL INVESTIGATOR REGISTRATION FOR SELECT AGENTS

PRINCIPAL INVESTIGATOR REGISTRATION FOR SELECT AGENTS Page 1 of 5 PRINCIPAL INVESTIGATOR REGISTRATION FOR SELECT AGENTS In order to gain approval by the CDC for use of select biological agents the CDC requires, as part of their application procedure (Sections

More information

SECTION 11 78 13 MORTUARY REFRIGERATORS

SECTION 11 78 13 MORTUARY REFRIGERATORS PART 1 - GENERAL 1.1 DESCRIPTION SECTION 11 78 13 MORTUARY REFRIGERATORS SPEC WRITER NOTE: Delete between //---// if not applicable to project. Also delete any other item or paragraph not applicable in

More information

New Hanover County Schools Middle School Educational Specifications Media Center. Overview. Spatial Relationships

New Hanover County Schools Middle School Educational Specifications Media Center. Overview. Spatial Relationships Overview The will serve as the information hub of the school. The library and media program has as its major goal the physical and intellectual access to materials within and outside the physical facility.

More information

AUTOCLAVE STEAM STERILIZERS

AUTOCLAVE STEAM STERILIZERS AUTOCLAVE STEAM STERILIZERS (BENCH TOP) Image: HS-1606VD Hanshin Bench Top Steam Sterilizer Small and easy to operate Three preset sterilization cycles Adjustable cycle presets Rapid heat up times Option

More information

Bulletin 26-23-2 Receptacle requirements in kitchens of dwelling units Rule 26-712(d) Issued May 2012 Supersedes Bulletin 26-23-1 Scope

Bulletin 26-23-2 Receptacle requirements in kitchens of dwelling units Rule 26-712(d) Issued May 2012 Supersedes Bulletin 26-23-1 Scope 26-23-2 Ontario Electrical Safety Code - Bulletins Bulletin 26-23-2 Receptacle requirements in kitchens of dwelling units Rule 26-712(d) Issued May 2012 Supersedes Bulletin 26-23-1 Scope (1) Continuous

More information

NOTICE TO CONTRACTORS

NOTICE TO CONTRACTORS NOTICE TO CONTRACTORS Notice is hereby given that San Luis Obispo County Community College District, ( District ) is accepting sealed Informal Bidding Prequalification Applications and Formal Bidding Prequalification

More information

Frequently Asked Questions About the District of Columbia School Health Nursing Program

Frequently Asked Questions About the District of Columbia School Health Nursing Program GOVERNMENT OF THE DISTRICT OF COLUMBIA DEPARTMENT OF HEALTH Community Health Administration Frequently Asked Questions About the District of Columbia School Health Nursing Program The following questions

More information

WOODLAND HOMES BUILDING PROCESS A STEP BY STEP CONSTRUCTION GUIDE TO YOUR NEW HOME

WOODLAND HOMES BUILDING PROCESS A STEP BY STEP CONSTRUCTION GUIDE TO YOUR NEW HOME WOODLAND HOMES BUILDING PROCESS A STEP BY STEP CONSTRUCTION GUIDE TO YOUR NEW HOME 1 THE BUILDING PROCESS The focus of Woodland Homes building department is Quality, Service and Predictability. Through

More information

Thermostatic Equipment

Thermostatic Equipment Thermostatic Equipment comming soon (06/2015): Climatic Chambers with LED lighting Climatic Chambers with steam humidifier Peltier - Cooled Incubators Refrigerators with back - up system ultra - Low Freezers

More information

Addition and Renovation Northview Elementary School Design Development Manual

Addition and Renovation Northview Elementary School Design Development Manual PERU ELEMENTARY SCHOOL DISTRICT 124 Peru, La Salle County, Illinois Addition and Renovation Northview Elementary School Design Development Manual Healy Bender Project No. 10-3113-145 Tab 3 Sheet 3-1.00

More information

GETINGE GEW cgmp WASHER/DRYERS SECURING CRITICAL CLEANING IN THE MANUFACTURING ENVIRONMENT

GETINGE GEW cgmp WASHER/DRYERS SECURING CRITICAL CLEANING IN THE MANUFACTURING ENVIRONMENT GETINGE GEW cgmp WASHER/DRYERS SECURING CRITICAL CLEANING IN THE MANUFACTURING ENVIRONMENT 2 Getinge GEW cgmp EXPERIENCE TO RELY ON Getinge is uniquely capable of offering you complete sterile systems.

More information

Building Condition Assessment Report

Building Condition Assessment Report Building Condition Assessment Report Asset C3c - Oak Terrace Cottage 121 Address Riverview Lands, 2601 Lougheed Highway, Coquitlam, BC. V5C 4J2 Construction Year Size (Gross Floor Area) 1920. 2,553 Sq.Ft.

More information

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal.

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal. 2.02 DESIGN DEVELOPMENT PHASE GENERAL The Architect shall prepare the Design Development Documents from the approved Schematic Design. The Design Development Documents shall consist of drawings and other

More information

Product Catalogue (updated Feb. 2010)

Product Catalogue (updated Feb. 2010) Product Catalogue (updated Feb. 2010) 315 BROCK RD GREENSVILLE ON L9H 5H7 PHONE: 905-628-0766 FAX: 905-628-8277 www.efcomltd.com info@efcomltd.com 1 Table of Contents Tool Boxes... 3 Cylinder Enclosures

More information

KITCHEN INSTALLATION GUIDE

KITCHEN INSTALLATION GUIDE KITCHEN INSTALLATION GUIDE The step-by-step guide to installing your new kitchen right The materials and tools you ll need This brochure is your guide to preparing and installing your new kitchen. Inside

More information

BUILT-IN DISHWASHER INSTALLATION INSTRUCTIONS

BUILT-IN DISHWASHER INSTALLATION INSTRUCTIONS BUILT-IN DISHWASHER INSTALLATION INSTRUCTIONS PLEASE READ COMPLETE INSTRUCTIONS BEFORE YOU BEGIN LEAVE INSTALLATION INSTRUCTIONS AND USER'S GUIDE WITH OWNER ALL ELECTRIC WIRING AND PLUMBING MUST BE DONE

More information

SECTION 08 41 1 ALUMINUM FRAMED ENTRANCES and STOREFRONTS. System 402 Flush-Glazed Screw Spline Storefront

SECTION 08 41 1 ALUMINUM FRAMED ENTRANCES and STOREFRONTS. System 402 Flush-Glazed Screw Spline Storefront PART 1 GENERAL 1.01 Work Included SECTION 08 41 1 ALUMINUM FRAMED ENTRANCES and STOREFRONTS System 402 Flush-Glazed Screw Spline Storefront A. Furnish and install aluminum architectural storefront system

More information

Laboratory Line. Vertical and Bench-Top Life Science Autoclaves

Laboratory Line. Vertical and Bench-Top Life Science Autoclaves Laboratory Line Vertical and Bench-Top Life Science Autoclaves The Advanced Laboratory Line The Full Spectrum of Laboratory Sterilizers Sterilization in a laboratory environment has its unique requirements.

More information

TUTTNAUER OLD AUTOCLAVE OPERATING PROCEDURE

TUTTNAUER OLD AUTOCLAVE OPERATING PROCEDURE 1 of 6 TUTTNAUER OLD AUTOCLAVE OPERATING PROCEDURE Aim The aim of this operating procedure is to equip the user with the knowledge to safely and successfully operate the old pressure chamber. This autoclave

More information

2012 BIM Guidelines and Standards (Rev. 00) University at Albany

2012 BIM Guidelines and Standards (Rev. 00) University at Albany A. Building Information Modeling (BIM) Guidelines: The Office of AECM will require the submission of BIM modeling files as part of an electronic file submission to the AECM project manager as requested

More information

ASBESTOS BUILDING INSPECTION REPORT. for the. City of East Lansing Waste Water Treatment Plant East Lansing, Michigan 48823.

ASBESTOS BUILDING INSPECTION REPORT. for the. City of East Lansing Waste Water Treatment Plant East Lansing, Michigan 48823. ASBESTOS BUILDING INSPECTION REPORT for the City of East Lansing Waste Water Treatment Plant East Lansing, Michigan 48823 at the City of East Lansing Waste Water Treatment Plant and Woodingham Pump Station

More information

The UPLANDS at ORO VALLEY Sterling Features

The UPLANDS at ORO VALLEY Sterling Features The UPLANDS at ORO VALLEY Sterling Features STERLING FEATURES Enhanced Air Quality System 2x6 Exterior Walls in Living Area Engineered Post Tension Concrete Slab Dual Pane Low-E Windows Covered Patio Gated

More information

ADDENDUM # 1 To: 1112-909-62-3698 RFP for: Various Construction Maintenance & Repair Services

ADDENDUM # 1 To: 1112-909-62-3698 RFP for: Various Construction Maintenance & Repair Services 818 S. FLORES ST. SAN ANTONIO, TEXAS 78204 www.saha.org Procurement Department ADDENDUM # 1 To: 1112-909-62-3698 RFP for: Various Construction Maintenance & Repair Services Remove and replace in their

More information

REQUEST FOR PROPOSALS. Unit Make Ready Services for Public Housing for HOUSING AUTHORITY OF THE CITY OF MCKINNEY, TEXAS

REQUEST FOR PROPOSALS. Unit Make Ready Services for Public Housing for HOUSING AUTHORITY OF THE CITY OF MCKINNEY, TEXAS REQUEST FOR PROPOSALS Unit Make Ready Services for Public Housing for HOUSING AUTHORITY OF THE CITY OF MCKINNEY, TEXAS Date: 2/17/2015 (MHA) requests proposal for Unit Make Ready Services. All interested

More information

Archived. Gloves should be changed frequently during the analysis.

Archived. Gloves should be changed frequently during the analysis. Introduction Gloves and laboratory coats Small tools Specific clean-up and housekeeping procedures are used to help protect evidence samples from conditions and agents that might serve to destroy, deteriorate,

More information

Department: Manager: Safety Coordinator: Date:

Department: Manager: Safety Coordinator: Date: SAFETY and staff, regardless of hiring status or job position 1 1. Can staff name their department safety coordinator? 2. Is the Department Safety Binder current? 3. Do slip/trip hazards exist? 4. How

More information

How To Clean School Property For A School

How To Clean School Property For A School REQUEST FOR PROPOSAL FOR CLEANING SERVICES CESAR CHAVEZ ACADEMY DENVER Request for Proposal No. CCAD2014-04 Date of Issue: January 21, 2014 RETURN TO: CESAR CHAVEZ ACADEMY DENVER Kamini Patel, Executive

More information

STRUCTURAL ASSESSMENT REPORT BOLINAS MARINE STATION - BOLINAS, CALIFORNIA

STRUCTURAL ASSESSMENT REPORT BOLINAS MARINE STATION - BOLINAS, CALIFORNIA STRUCTURAL ASSESSMENT REPORT BOLINAS MARINE STATION - BOLINAS, CALIFORNIA College of Marin c/o Swinerton Management & Consulting P.O. Box 144003 835 College Avenue, Building MS-3 Kentfield, California

More information

Report Index PROPERTY DESCRIPTION 1 ELECTRICAL SYSTEM 2 COMMON INTERIOR AREAS 3 INTERIOR ROOMS 6 KITCHEN 8 BATHROOMS 10

Report Index PROPERTY DESCRIPTION 1 ELECTRICAL SYSTEM 2 COMMON INTERIOR AREAS 3 INTERIOR ROOMS 6 KITCHEN 8 BATHROOMS 10 Report Index PROPERTY DESCRIPTION 1 ELECTRICAL SYSTEM 2 COMMON INTERIOR AREAS 3 INTERIOR ROOMS 6 KITCHEN 8 BATHROOMS 10 PROPERTY DESCRIPTION PROPERTY INSPECTED: INSPECTION ADDRESS: 4722 Baltimore Avenue

More information

Cooktop Low-Profile Ventilation Hoods

Cooktop Low-Profile Ventilation Hoods INSTALLATION GUIDE Cooktop Low-Profile Ventilation Hoods Contents Wolf Cooktop Low-Profile Ventilation Hoods........ 3 Cooktop Low-Profile Hood Specifications.......... 4 Cooktop Low-Profile Hood Installation............

More information

Preformed Metal Roofing and Siding

Preformed Metal Roofing and Siding Page -1-1. GENERAL 1.1. Description This specification along with the drawings covers the furnishing of all material, products, equipment, accessories, tools, services, transportation, labor and supervision

More information

Element D Services Plumbing

Element D Services Plumbing Medical Vacuum and Gas PART 1 - GENERAL 1.01 OVERVIEW A. This section addresses medical vacuum, waste anesthetic gas disposal, compressed air, oxygen, nitrous oxide, nitrogen and carbon dioxide systems.

More information

Furniture Catalog. www.muji.com/us. DELIVERY FEES $ 40 / item (between 8am and 5pm*)

Furniture Catalog. www.muji.com/us. DELIVERY FEES $ 40 / item (between 8am and 5pm*) DELIVERY FEES First item Second item and thereafter $ 80 / item (between 8am and 5pm*) $ 40 / item (between 8am and 5pm*) STEEL UNIT SHELF (SUS) DESK SET and STEEL UNIT, SHELF (SUS) DESK AND SHELVING SET,

More information

5050 Capitol Avenue Dallas, TX 75206 phone: 214.827.9000 fax: 214.827.9001. info@stratadallas.com www.stratadallas.com

5050 Capitol Avenue Dallas, TX 75206 phone: 214.827.9000 fax: 214.827.9001. info@stratadallas.com www.stratadallas.com 5050 Capitol Avenue Dallas, TX 75206 phone: 214.827.9000 fax: 214.827.9001 info@stratadallas.com www.stratadallas.com Strata is conveniently situated at 5050 Capitol Avenue in downtown Dallas, at the heart

More information

New York, Dean. Price 182,500

New York, Dean. Price 182,500 New York, Dean Semi detached family home Three bedrooms Lounge Separate dining room Modern fitted kitchen Bathroom plus separate W.C. Gas central heating/ double glazed Drive plus garage Gardens front

More information

Company background and. portfolio overview

Company background and. portfolio overview Company background and portfolio overview A world leading company in infection control Steelco products are used daily in over 100 countries within the Healthcare, and Life Science sectors to provide the

More information

SYSTEM 1E LIQUID CHEMICAL STERILANT PROCESSING SYSTEM

SYSTEM 1E LIQUID CHEMICAL STERILANT PROCESSING SYSTEM SYSTEM 1E LIQUID CHEMICAL STERILANT PROCESSING SYSTEM APPLICATION For rapid, safe, standardized low-temperature liquid chemical sterilization of heat-sensitive critical and semi-critical devices. DESCRIPTION

More information

COST OF WORK FORM. Abbreviations: ea = each, LF = linear feet, SF = square feet, HSF = square feet of living area (including garage conversion space)

COST OF WORK FORM. Abbreviations: ea = each, LF = linear feet, SF = square feet, HSF = square feet of living area (including garage conversion space) COST OF WORK FORM All costs shown are estimates using base grade materials, taxes, and labor. For houses where a higher quality is indicated, the costs should be increased for work requiring upgraded materials.

More information