1 East Palo Alto, Menlo Park, Palo Alto, San Mateo County Flood Control District, and the Santa Clara Valley Water District Design Services for the Reconfiguration of Palo Alto Municipal Golf Course to Mitigate Impacts of the San Francisquito Creek Flood Protection and Ecosystem Restoration Capital Project, Highway 101 to San Francisco Bay REQUEST FOR PROPOSALS This Request for Proposals is being jointly released by the City of Palo Alto, Community Services Department (herein The City ) and the San Francisquito Creek Joint Powers Authority (herein SFCJPA ). The SFCJPA is a government agency serving residents in a 45-square-mile watershed that includes the cities of Palo Alto, East Palo Alto and Menlo Park, and portions of the counties of San Mateo and Santa Clara. The SFCJPA and The City are seeking qualified consultants to perform design services for the reconfiguration of several holes of the Palo Alto Municipal Golf Course to accommodate a new levee that will be built as part of the San Francisquito Creek Flood Protection and Ecosystem Restoration Capital Project. In this document, reference to the project shall mean the flood protection and ecosystem restoration project. Reference to the design shall mean the preparation of plan sets and specifications for the golf course reconfiguration. The SFCJPA is the fiscal agent and will hold this contract. In this role, the SFCJPA shall manage the administration of this contract, and it shall approve all work products. The City owns much of the lands on which the project will take place, including the Golf Course, which it operates. The City will advise the SFCJPA on all matters related to golf course design, and will manage the public outreach and City approval process specific to that design. The purpose of the Project is to provide the flood protection elements needed to protect homes, businesses, and other facilities in the cities of Palo Alto and East Palo Alto downstream of Highway 101. The intent of the Project is to provide conveyance of the one-percent (1%) design flood flow through the area of consideration from the downstream face of East Bayshore Road to San Francisco Bay. During the design of the project, it became clear that the alignment of a new levee to be constructed along the golf course will need to encroach significantly on to lands that are currently used for golf. In order to mitigate this impact, the City and the SFCJPA wish to reconfigure several holes to utilize underused space between existing holes to preserve the operations, overall length and rating of the golf course, ensure continued safe playing conditions for golfers and safety of users of the proposed Project levee trail (with respect to potential exposure to errant golf balls), and to find opportunities to improve the golf experience when possible and reasonable. The final work products from this contract shall be plans, specifications, and cost estimates to reconfigure the golf course lands and associated facilities to accommodate the Project. The Consultant shall work with the City, SFCJPA and its member agencies, and the public to develop a feasible design that is desirable and that meets the needs of the City. Close coordination, through the City, will be required with the Golfing Advisory Committee, a volunteer body which is chaired and administered by the City. The design shall also be subject to review and approval by the City s Parks and Recreation Commission, Architectural Review Board, Planning and Transportation Commission, and City Council. 1

2 Qualified consultants should have demonstrated and verifiable experience and expertise in golf course design, relocation of irrigation facilities, public outreach, project management, and construction plans and specifications preparation. Prospective consultants are encouraged to communicate within the proposal their specific: municipal golf course design Bay Area-specific projects working in saline, high-groundwater site conditions, including turf maintenance design PROPOSALS MUST BE RECEIVED BY: Friday, May 20, 2011 at 2:00 pm local time to: Kevin Murray, Project Manager San Francisquito Creek Joint Powers Authority 1231 Hoover Street Menlo Park, CA phone: Please include four hard copies and one electronic copy on a CD. Submittals are to be limited to 20 pages, font size 11, including any supporting materials. Introduction and Background The San Francisquito Creek watershed encompasses a 45-square-mile basin, extending from Skyline Boulevard to San Francisco Bay. The watershed includes public lands and numerous private landowners in the cities of East Palo Alto, Menlo Park, Palo Alto, Portola Valley and Woodside, unincorporated areas of San Mateo and Santa Clara counties, and Stanford University. The creek represents the boundary between the two counties in the lower watershed. The last relatively unaltered urban creek system in the South Bay, San Francisquito Creek begins at the confluence of Corte Madera Creek and Bear Creek, just below Searsville Dam in Stanford University s Jasper Ridge Biological Preserve. The mouth of the creek opens to the San Francisco Bay adjacent to the Palo Alto Airport and the Baylands Nature Preserve. The system contains over 71 miles of creek bed; the main stem is 14 miles long. The lower reach of the creek runs through urbanized areas. In 1998 the creek overbanked, causing $28 million in documented damage to homes and businesses in Palo Alto, East Palo Alto, and Menlo Park. Other significant flooding and high-flow events have occurred in 1955, 1958, 1982, 2002 and In response to the 1998 event, local jurisdictions formed the San Francisquito Creek Joint Powers Authority (JPA) in May of 1999 as a new government agency empowered to protect and maintain San Francisquito Creek and its environs. Founding members of the JPA are the cities of East Palo Alto, Menlo Park and Palo Alto, the Santa Clara Valley Water District and the San Mateo County Flood Control District. In early 2009, the SFCJPA hired a hydrologic consultant firm to conduct a preliminary technical analysis on several candidate alternatives intended to determine feasibility, hydraulic performance, and develop preliminary cost estimates for a preferred alternative that would provide the flood protection and ecosystem restoration elements sought by the SFCJPA for the creek reach between Highway 101 and San Francisco Bay. 2

3 In 2010 design and environmental planning began on the Project. Project design is currently at the 60% level of development. The proposed levee alignment and encroachment onto the golf course is shown on Attachment 1 to this RFP, Project Features. Conceptual alternatives for reconfiguration of the golf course necessitated by the levee realignment have been contemplated by the City, SFCJPA, and the SFCJPA s design consultant on the Project and will likely involve changes to holes 12, 13, 14, 15, 16, 17, and possibly 4, as shown in Attachment 2 to this RFP, PAGC Aerial. Modifications to holes not directly impacted by the levee realignment will be required in order to maintain minimum separation distances between fairways as required for golfer safety. Given the anticipated scale of the changes that will be needed within the golf course, in January 2011, SFCJPA and City staff concurred that a golf course designer should be secured under a separate contract in order to maintain fairness and transparency in the consultant selection process for this significant element of the Project. The Palo Alto Municipal Golf Course was constructed in the mid 1950 s on approximately 170 acres of flat former salt-marsh and bay fill. The course was designed by noted golf course architect William R. Bell of Pasadena, California. The Golf Course was designed as an 18-hole facility with a par of 72. The Golf Course is a classic 18-hole championship course that measures over 6,800 yards from the back tees. The facility includes a large practice putting green, a three building Eichler-designed clubhouse/golf shop complex and parking lot. In the mid 1970 s, improvements were made to replace the clubhouse buildings. At that time, holes 3, 10, 11, & 18 were also renovated under the direction of golf architect Robert Trent Jones, Jr. Further improvements were made to the Palo Alto Golf Course in The improvements included rebuilding Greens # 4, 5, 7, 8, 11, 13, 15, 16, rebuilding new Tees on # 4, 7, 13, 15, rebuilding Fairways on #4, 7, 13, 15, 16, new storm drain station along with drainage and 35 catch basins throughout the course, new irrigation system, and a new irrigation pump station. The Golf Course is located on a relatively flat site which ranges in elevation from 4.4 feet below to 7.5 feet above sea level. In 2008 the City of Palo Alto conducted a Golf Course operational study that describes in detail the conditions of the Golf Course, future needs and opportunities. This study can be viewed at the following link: Prospective Consultants are encouraged to review Attachment 3 to this RFP, Golf Course Planning Principles to ascertain the general needs of the final design, and to attend a pre-proposal workshop on Monday, May 9, 2011, 11:30am to 1:00pm in the Golf Course s Bay Café, 1875 Embarcadero Road, Palo Alto, CA Project Schedule: This project will begin with contract execution on approximately June 15, 2011 and be completed by December 15, Proposal Requirements: Each proposal should contain the following: a cover letter with contact information; title page and table of contents; organizational chart of the project team, as applicable; statement of approach to the project, and any suggested modifications to the Project Tasks; project schedule; itemized fee schedule; list of team members that will be assigned to the project, their role on the project, and experience in their area of expertise. description of previously completed projects of similar scope, and two references (per individual) regarding those experiences. list of any subcontractors, their role, and personnel assigned to the project. 3

4 SFCJPA and City staff will evaluate the proposals provided in response to this RFP based on the following criteria: quality and completeness of proposal; quality of the solution, goods and/or services to be provided and responsiveness to the stated project objectives; experience, including the experience of staff to be assigned to the project, the engagements of similar scope and complexity; cost to the SFCJPA; ability to perform the work within the time specified; creativity in recommendations for improving the playability/enjoyment of the course and its environment Consultant Selection Process Timeline: RFP Issuance May 2, 2011 Pre-Proposal Workshop May 9, 2011 Proposals Due May 20, 2011 Interviews May 25, 2011 Consultant Selection June 1, 2011 Contract Negotiations June 2 June 10 Pre-Contract meeting June 14, 2011 Contract Execution June 15,

5 SCOPE OF WORK The SFCJPA is the Lead Agency for the Project and will administer this contract. Supporting the SFCJPA will be its member agencies, including the City of Palo Alto, primarily through its Community Services Department but also as needed through the City s Planning Department and Public Works Department, which will provide technical support, reviews, and Quality Assurance/Quality Control in accordance with City policies and processes. Reference to the SFCJPA or the City is to agency staff; reference to the SFCJPA Board or City Council is to the elected governing bodies of the agencies. The SFCJPA will make all background information and reports available to the contracted Consultant. The Consultant will also be required to work closely with the design and environmental planning consultants currently under contract with the SFCJPA for the Bay-101 Flood Protection and Ecosystem Restoration Project (Project) on San Francisquito Creek. The Consultant shall perform design services for the various project elements listed below. The Consultant selected will be encouraged to review the scope and make recommendations for changes or additions to improve efficiency, cut costs, or produce a better product. Task 1 Design Management The Consultant shall meet with the City and SFCJPA to review the scope of work, schedule, design standards, environmental mitigation measures, and Plans Specifications and Cost Estimates (PS&E) requirements for the Design. The Consultant shall provide project management services to assure delivery of the Design on schedule, within budget, and according to established quality control goals. The Consultant shall provide a written narrative progress report with each monthly invoice, detailing the major milestones achieved and the percentage of each major task performed (and cumulative percentages completed) during the subject billing period. The Consultant shall participate in a Public Outreach Program by providing technical support and presentation materials, answering questions from meeting participants and presenting concepts and proposed plans. It is anticipated that the Environmental Impact Report (EIR) for the Project will evaluate the environmental impacts of the construction activities on the golf course resulting from the Design. As such, close coordination with the SFCJPA s Environmental Consultant will be important to insure that the Design and the Project are successful. The Proposals shall include preparation for (including written and graphic presentation materials) and attendance at the following required meetings, in addition to any additional meetings recommended by the Proposer: Golf Course Advisory Committee (3 meetings) Parks and Recreation Commission (2 meetings) Architectural Review Board (2 meetings) Planning and Transportation Commission (2 meetings) City Council (1 meeting) Deliverables: Design Schedule Contract Administration and Invoicing Attendance at 10 public meetings Summaries of comments received at public meetings 5

6 Task 2 Design Development The PS&E package shall be submitted at 30%, 60%, 90%, and 100% stages of completion of PS&E. The intent of intermediate submittals is to define the project for review by the SFCJPA, the City, and the Golf Advisory Committee and to allow for major comments prior to the investment of significant design effort in the design details. The plans shall be presented for review and input to the Parks and Recreation Commission, Architectural Review Board, and Planning and Transportation Commission at the 30% design stage. The plans shall be presented for review by the Parks and Recreation Commission, Architectural Review Board, and Planning and Transportation Commission (and referred to City Council for approval) at the 90% design stage. The Consultant shall prepare working drawings based on the review and comments received at the 90% stage. In addition to the design packages, the Consultant will work with City staff, golf professional Brad Lozares and the Golf Advisory Committee to develop a plan and or/design for maximizing usage and revenue for continuing play during construction. As design progresses, the professional opinion of the Consultant will be sought as to the best approach. The Consultant will be expected to work with City staff to develop locations for temporary tees, greens or other features needed to best accommodate play during construction. Additional design fees for this work shall be established if deemed necessary to maximize playability and revenue generation during construction. Deliverables: 30% PS&E 60% PS&E 90% PS&E 100% PS&E Task 4 Bid and Construction Support BIDDING PHASE The Consultant shall assist the City and SFCJPA during the bidding period as required. The Golf Course elements of the Project may or may not be bid with the flood protection and ecological restoration elements of the Project. The SFCJPA s Project Design consultant will provide bid support for the Project. Consultant shall provide consultation to the SFCJPA in the interpretation of the golf course design elements of the Project. CONSTRUCTION PHASE Consultant shall perform the following tasks: Attend pre-construction conference Provide clarifications/interpretations of plans and specifications. Perform shop drawing review and submittal reviews as requested. Assist SFCJPA or other designated construction administrator with the preparation of contract change orders. Perform periodic site visitations and review of construction activities as requested. Provide recommendations for changes required by design discrepancies, utility conflicts, or other unforeseen circumstances, which may develop during construction. Provide assistance to final walk-through inspection. Deliverables: Meeting attendance as above Responses to Requests for Information Change orders Reviews of shop drawings Conflict resolutions with recommendations 6

7 Potential Supplemental Work The City of Palo Alto may wish to engage the selected consultant in design work beyond the 6 to 7 holes impacted by the flood control work. Any such design work beyond flood control mitigation will be negotiated between the City of Palo Alto and the Golf Course designer and would be considered through a supplemental agreement between the City and the Consultant. GENERAL CONDITIONS: Survey Datum All coordinates are based on the California State Plane Coordinate System of 1983, Zone 3; North American Datum of 1983 (NAD83) and North American Vertical Datum of 1988 (NAVD88). Specification Format All specifications shall be prepared in Caltrans format. Ownership The SFCJPA, for itself and such others as it deems appropriate, will have unlimited rights to all information and materials developed and submitted to the SFCJPA under this contract, including but not limited to any reports, listings and other items pertaining to the work and services as well as any copyrights. Unlimited rights under this contract include the rights to use, duplicate or disclose text, data, drawings and information, in whole or in part, in any manner and for any purpose whatsoever without compensation to or approval from the Consultant. The SFCJPA will at all reasonable times have the right to inspect the work and will have access and right to make copies of the above mentioned items. 7

8 Attachment 1 8

9 Attachment 2 PAGC Layout 9

10 Attachment 3 GOLF COURSE PLANNING PRINCIPLES The information provided herein is a compilation from various sources within the golf professional sector to be used as a design guidance tool from lessons learned to assist during the design process. It is not intended to be a compete list of all considerations for the Palo Alto Golf Course project but rather a list of important considerations. GENERAL PLANNING Priority should be placed on playing conditions which are user friendly can safely accommodate a large number of rounds of golf, and be easily maintained and attractive. The vast majority of patrons demonstrate average proficiency with only about 2% to 3% being accomplished golfers. Accordingly, the course should be designed with wide landing areas and gentle green surrounds making it user friendly to mid and high handicappers who comprise the majority of our patrons, and also provide challenging opportunities to low handicappers. The design should also acknowledge the tendency of the majority of golfers (predominantly right handed players) slicing the ball or playing to the right of their intended target. The course should be designed to provide good turf and playing conditions with a minimum of hand work and/or maintenance. New golf course layout should incorporate a creative routing which is environmentally sensitive. Greens and following tees should be in close proximity to one another to allow golfers to walk the course and accelerate play. Safety of golfers with regard to avoiding errant shots should receive strong consideration. All slopes around greens, tees, bunkers, and mounds should be no greater than 5:1. Cut and fill slopes in fairways, roughs, and non-use areas should not exceed 3:1. Man-made grades shall taper into the natural grades. HOLE LENGTH PLANNING: The preferable golf course design length for a regulation 18 hole par 72 course ranges in length from 7,000 yards from the championship tees to 5,500 yards from the forward tees. An 18 hole course will usually include four (4) par 5 holes, four (4) par 3 holes and ten (10) par 4 holes. Par 3 holes should be as follows two holes between yards and 2 holes between Par 5 holes should be as follows: two holes between yards and 2 holes between yards. Par 4 holes of yards should be avoided and increased to a maximum of 445 yards. The first and tenth holes should be easy get away holes to expedite play off the opening tees. Holes should grow increasingly difficult to play as the round proceeds and end with an easier finishing hole. Holes # 1,9,10, and 18 should not be par 3 holes. Holes of like par should vary in length and direction of play. Consecutive par 5 or par 3 holes should be avoided. 10

11 TEES: Tee complexes should include 3-4 sets of tees per hole. The minimum surface area of 8,000 square feet should be used for par 4 and 5 holes and 10,000 square feet on par 3 holes. Short holes which require an iron tee shot should be larger due to the amount of abuse they will receive. The forward and rear tees should be smaller in size (30% of the total tee surface) and 70% of the tee surface equally distributed between the middle tee(s). The course length from the back tee should be about 7,000 yards, 6,000-6,500 from the middle tees and about 5,500 from the front tees. All tees should be slightly elevated. Teeing surfaces shall be level from side to side. All tees should have a 11/2% fall in the direction of play. On holes that play uphill, this slope will be from front to back. On holes that play downhill, the slope shall be from back to front. Do not have multiple tees unless land constraints dictate this due to the increase in maintenance time. Slopes around teeing surfaces shall not exceed 5:1. Construct tee sub-grades with at least 1% pitch to allow for sub-surface drainage. Finished surface grades shall be flat from side to side. All tee tops shall have a 4" thick native sand cap root zone for improved drainage purposes. Sod all slopes on new tees. Tees should be constructed with no trees within 60' of the base of the tee on the east, south, and west to promote air circulation for healthy turf growth. GREENS: The green is the heart of the golf course. Each green should have a putting surface of 6,000-8,000 square feet depending on the length of the hole. The shape of the green will depend upon the strategy of the design, area geography, location and size of the bunkers, and the length of the shot playing to the green. Poor drainage contributes to more turf trouble on the greens than any other factor. Therefore greens should be shaped so the surface slopes to drain in two or more directions. A variety of pin placements must be accommodated to minimize wear and maintenance to the greens. Undulations on the green should begin in the mounding around the perimeter working subtlety into the green. Severe undulations should be avoided. 11

12 Greens and surrounds shall be constructed to accommodate triplex mowing equipment. Slope on pinable areas shall not exceed 4%. Green construction should follow USGA guidelines. The final soil mixture percolation rate should be a minimum of 5 inches per hour. Part of the USGA green construction is a sub-surface drainage system. A removable vent drain cap shall be provided at the upper ends of all main sub-surface drain lines to permit air input and flushing of the line in the future. Greens should be constructed with no trees within 90' of the base on the east, south, and west to promote air circulation for healthy turf growth. FAIRWAYS and ROUGHS: Fairway landing areas should generally be about yards wide. A yardstick of fairway widths is as follows: yards from the tee the width should be yards wide: yards from the tee the width should be yards wide: yards from the tee the width should be yards wide. Fairways should not be flat in appearance, but should have minor undulations to provide visual interest as well as facilitate drainage. The minimum surface grade on fairways shall be 3% to provide proper drainage. Any area that cannot be properly surfaced drained shall be drained utilizing a catch basin or drainage trenches with 4 inch perforated drainage pipe in a gravel bed extending to ditches, wetlands or other non-play areas. Provide at least 6 inches of topsoil in fairways, inches around features (i.e. bunkers, aprons, etc.) and 4 inches of topsoil in roughs. All debris and stones 1 inch or larger in diameter shall be removed. Be selective of the types of new trees planted or the existing trees incorporated within the fairway design due to debris or leaves dropped by the tree which may increase maintenance, slow play, or detract from the course appearance. BUNKERS: Judiciously place bunkers due to the maintenance required. Some golf course managers are eliminating sand bunkers on existing courses that have little impact on play or converting some to grass bunkers which are easier to maintain. Construct bunkers in such a manner to reduce hand labor required to maintain the bunkers. All fairway sand bunkers shall be clearly visible from tees. All bunkers shall be properly drained to prevent ponding water. Provide sub-surface drainage systems consisting of rigid tile and sub-drain for all greens and bunkers in accordance with USGA recommendations. Wrap drain lines within bunkers with filter fabric to prevent infiltration of solids which could compromise the drain system. All bunkers shall drain to daylight and out of play areas. Do not construct bunkers below the elevation of the fairway to ensure proper drainage. Bunkers which are a long iron shot from the green should be shallower and have a minimal lip. 12

13 Bunkers which are a short iron shot from the green can be deeper and have more of a lip. Avoid drainage from greens into bunkers through the use of swales between the green and bunker. Drainage within bunkers especially around greens should be removed with drain tiles connected into the green drainage system. CART PATHS: Cart paths should be laid-out in a manner which is safe, visually pleasing, and if possible serves two holes to reduce the initial installation cost and reduces future maintenance. Cart paths shall be at least 8 feet wide. In areas of heavier cart congestion such as adjacent to tees and greens consideration should be given to wider cart paths. Cart paths constructed with asphalt shall be at least a 2" asphalt surface course over a minimum 4" gravel base. Concrete cart paths shall be 4" thick on compacted sub-grade. Provide cart path curbs adjacent to all greens and tees to keep carts on the paths and reduce turf wear. Holes with turn-around adjacent to tee boxes or greens should be sized appropriately to eliminate turf wear due to tight turning radius. Set paving flush with adjacent ground to allow the flow of surface water over pavements. Bridges for golf carts shall be a minimum of 6' wide and support a loads of at least two tons. Bridges which provide access for golf maintenance equipment/golf carts shall be 10' wide and support loads of five tons. Bridges should be visually compatible with the rest of the golf course. IRRIGATION: The irrigation system design shall be prepared by a certified sprinkler system consultant/designer with demonstrated experience in golf course planning and design. The design process shall consider the soil characteristics, humidity and rainfall characteristics, prevailing winds and their effect on adequate coverage, water supply source and economics. The sprinkler consultant shall design an irrigation system based on the existing environmental characteristics which addresses the line sizing and spacing, head spacing/size, pump location/size to ensure adequate coverage of all areas to be irrigated based upon the funding available. Each sprinkler head covers a circular spray area with the heaviest distribution of water being at the center neatest the sprinkler head, with gradual reduction to the peripheral circumference of the spray. To obtain an even distribution of water, it is necessary to overlap the spray areas of adjacent sprinklers. Most manufacturers recommend a head spacing to obtain an even water distribution. In lieu of the manufactures recommended spacing, the following is suggested: - 60% of diameter of coverage where wind is 0-5 mph - 50% of diameter of coverage where wind is 5-10 mph - 40% of diameter of coverage where wind is over 10 mph There are various water sources which should be considered for irrigation purposes during golf course development. They are ponds, lakes, wells, water main, and grey water ( sewerage treatment plant water). 13

14 Do not exceed 5 feet per second flow of water through any section of pipe. Do not exceed manufactures recommended flow velocities. Consider during the planning stage of a new course or the expansion of an existing course the adequacy of the irrigation water source. When expanding a golf course, the irrigation system components should be manufactured by the same company which manufactured the system and components for the original system. Sprinkler system components shall be provided by recognized golf course sprinkler system manufacturers with easily accessible service and parts distributors. All non-ferrous utilities shall have copper tracer wires permanently affixed to the pipe. All utility trenches shall be marked with buried tape 6 to 12 inches below grade. The tape shall indicate the type of utility. If budget allows provide metal distance tags on all fairway sprinkler heads measured to the center of the green out to 250 yards from the green. With the rising costs of water, deliberate effort should be made minimize water use without compromising the greens and core laying areas. Use of natural grasses that do not require irrigations in peripheral areas should be considered 14

Appendix To Operational Review and Recommendations For Juniper Golf Course

Appendix To Operational Review and Recommendations For Juniper Golf Course Appendix To Operational Review and Recommendations For Juniper Golf Course Prepared For: City of Redmond Attn: David Brandt 716 SW Evergreen Street Redmond, OR 97756 Prepared By: 1150 South U.S. Highway

More information

COAL CREEK GOLF COURSE

COAL CREEK GOLF COURSE COAL CREEK GOLF COURSE SEPTEMBER, 2013 STORM DAMAGE AND GOLF COURSE IMPROVEMENT REPORT PREPARED FOR: Mr. Joe Stevens, Director City of Louisville Parks and Recreation Louisville, Colorado October 4, 2013

More information

SECTION 02400 - STORM DRAIN SYSTEM

SECTION 02400 - STORM DRAIN SYSTEM SECTION 02400 - STORM DRAIN SYSTEM CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement And

More information

DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS

DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS DESCRIPTION OF STORMWATER STRUCTURAL CONTROLS IN MS4 PERMITS Phase I MS4 permits require continuous updating of the stormwater system inventory owned and operated by the MS4. They also include inspection

More information

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth

More information

CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT

CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT Page 1 CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT CIVIC CENTRE 2141 MAJOR MACKENZIE DRIVE MAPLE ONTARIO L6A 1T1 905-832-2281 Page 2 SECTION 1 - GENERAL OBJECTIVES To provide

More information

Index. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1

Index. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1 6 Index inlet protection excavated drop inlet protection (Temporary) 6.50.1 HARDWARE CLOTH AND GRAVEL INLET PROTECTION Block and gravel inlet Protection (Temporary) sod drop inlet protection ROCK DOUGHNUT

More information

Request for Proposals July 13, 2015

Request for Proposals July 13, 2015 Maintenance and Skilled Trades Division Request for Proposals July 13, 2015 District Wide Pavement Assessment The East Bay Regional Park District ( District ) is soliciting proposals from consultants to

More information

CHAPTER 17: STORM SEWER STANDARDS. 17.00 Introduction. 17.01 Administration. 17.02 Standards 17.1

CHAPTER 17: STORM SEWER STANDARDS. 17.00 Introduction. 17.01 Administration. 17.02 Standards 17.1 CHAPTER 17: STORM SEWER STANDARDS 17.00 Introduction 17.01 Administration 17.02 Standards 17.1 17.00 INTRODUCTION The purpose of this chapter is to provide guidance for the design and construction of storm

More information

ORDINANCE NO. 2013 -

ORDINANCE NO. 2013 - ORDINANCE NO. 2013 - AN ORDINANCE OF BREVARD COUNTY, FLORIDA AMENDING CHAPTER 62, LAND DEVELOPMENT REGULATIONS SECTION 62-2891, LOT DRAINAGE, AND CHAPTER 22 BUILDINGS AND BUILDING REGULATIONS, SECTION

More information

3.4 DRAINAGE PLAN. 3.4.1 Characteristics of Existing Drainages. 3.4.2 Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN

3.4 DRAINAGE PLAN. 3.4.1 Characteristics of Existing Drainages. 3.4.2 Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN 3.4 DRAINAGE PLAN This section describes the existing onsite drainage characteristics and improvements proposed within this Specific Plan. Following this description, drainage plan development standards

More information

The Kahkwa Club Master Plan for Golf Course Restoration and Improvements Revised June 1, 2009

The Kahkwa Club Master Plan for Golf Course Restoration and Improvements Revised June 1, 2009 The Kahkwa Club Master Plan for Golf Course Restoration and Improvements Revised June 1, 2009 The Kahkwa Club Master Plan for Golf Course Restoration and Improvements Revised May 19, 2009 Goals and Objectives

More information

LS 2540 SEWER LATERALS AND INSPECTION TEES

LS 2540 SEWER LATERALS AND INSPECTION TEES LS 2540 SEWER LATERALS AND INSPECTION TEES A. Summary B. Submittals C. Site Information D. Sewer Pipe and Fittings E. Lateral Locations F. Lateral Installation G. Inspection Tee Installation H. Removal

More information

Outlet stabilization structure

Outlet stabilization structure Overview of Sedimentation and Erosion Control Practices Practice no. 6.41 Outlet stabilization structure Erosion at the outlet of channels, culverts, and other structures is common, and can cause structural

More information

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE 1008 STORM DRAINAGE (3/24/05) 1008.01 PURPOSE To minimize the amount of stormwater runoff resulting from development utilizing nonstructural controls where possible, maintain and improve water quality,

More information

A Developer s Guide: Watershed-Wise Development

A Developer s Guide: Watershed-Wise Development A Developer s Guide: Watershed-Wise Development Environmental Protection What is a watershed? It does not matter how far away you build from a creek, lake, or the ocean, you are in a watershed. Another

More information

March 2008. Prepared by: Irvine Ranch Water District. 15600 Sand Canyon Avenue. Irvine, CA 92618. Contact: Natalie Likens (949) 453-5633

March 2008. Prepared by: Irvine Ranch Water District. 15600 Sand Canyon Avenue. Irvine, CA 92618. Contact: Natalie Likens (949) 453-5633 ADDENDUM TO THE MICHELSON WATER RECLAMATION PLANT PHASE 2 & 3 CAPACITY EXPANSION PROJECT FEBRUARY 2006 FINAL ENVIRONMENTAL IMPACT REPORT AND THE SAN JOAQUIN FRESHWATER MARSH ENHANCEMENT PLAN REVISED SEPTEMBER

More information

Summary of Potential Storm Drain Projects and Programs

Summary of Potential Storm Drain Projects and Programs Summary of Potential Storm Drain Projects and Programs CAPITAL IMPROVMENTS PUMP STATION UPGRADES The storm runoff from a large portion of Palo Alto cannot flow by gravity into one of the local creeks.

More information

Travel Time. Computation of travel time and time of concentration. Factors affecting time of concentration. Surface roughness

Travel Time. Computation of travel time and time of concentration. Factors affecting time of concentration. Surface roughness 3 Chapter 3 of Concentration and Travel Time Time of Concentration and Travel Time Travel time ( T t ) is the time it takes water to travel from one location to another in a watershed. T t is a component

More information

Table 4.9 Storm Drain Inlet Protetion Applicable for

Table 4.9 Storm Drain Inlet Protetion Applicable for BMP C220: Storm Drain Inlet Protection Purpose To prevent coarse sediment from entering drainage systems prior to permanent stabilization of the disturbed area. Conditions of Use Type of Inlet Protection

More information

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix.

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix. Storm Drainage 13-C-1 APPENDIX C INLETS 1.0 Introduction The application and types of storm drainage inlets are presented in detail in this Appendix. 2.0 Inlet Locations Inlets are required at locations

More information

1.7.0 Floodplain Modification Criteria

1.7.0 Floodplain Modification Criteria 1.7.0 Floodplain Modification Criteria 1.7.1 Introduction These guidelines set out standards for evaluating and processing proposed modifications of the 100- year floodplain with the following objectives:

More information

CITY UTILITIES DESIGN STANDARDS MANUAL

CITY UTILITIES DESIGN STANDARDS MANUAL CITY UTILITIES DESIGN STANDARDS MANUAL Book 2 (SW) SW9 June 2015 SW9.01 Purpose This Chapter provides information for the design of open channels for the conveyance of stormwater in the City of Fort Wayne.

More information

Sims Bayou Federal Flood Damage Reduction Project

Sims Bayou Federal Flood Damage Reduction Project Sims Bayou Federal Flood Damage Reduction Project A. Gene Rushing, Jr., P.E., PMP HCFCD Project Manager January 15, 2014 Harris County s Watersheds Historical Flooding in Harris County 1929 1935 HCFCD

More information

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (SSBMP) PLAN/STORM WATER POLLUTION PREVENTION PLAN (SWPPP) REVIEW CHECKLIST

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (SSBMP) PLAN/STORM WATER POLLUTION PREVENTION PLAN (SWPPP) REVIEW CHECKLIST This checklist may be used by applicants for encroachment permits, and contractors in development of Site Specific Best Management Practice (SSBMP) Plans or Storm Water Pollution Prevention Plans (SWPPP)

More information

Recommendations for future developments

Recommendations for future developments C Recommendations for future developments C.1 Reducing flood risk through site layout and design C.1.1 C.1.2 Flood risk should be considered at an early stage in deciding the layout and design of a site

More information

CHAPTER 8 CIVIL DESIGN

CHAPTER 8 CIVIL DESIGN CHAPTER 8 CIVIL DESIGN A. GENERAL This Chapter includes standards and design considerations for other civil engineering design in structural, drainage and utilities. Design considerations for electrical

More information

piles of debris that accumulate after a rain such as leaves, trash, twigs, etc., water stains on fences and buildings, or salts extruded on bricks,

piles of debris that accumulate after a rain such as leaves, trash, twigs, etc., water stains on fences and buildings, or salts extruded on bricks, Extension Education Center 423 Griffing Avenue, Suite 100 Riverhead, New York 11901-3071 t. 631.727.7850 f. 631.727.7130 ASSESSING DRAINAGE PROBLEMS How can you tell the difference between a drainage problem

More information

Environmental Case Study Decatur, Georgia, DeKalb County A Suburban Creek Resists Channelization

Environmental Case Study Decatur, Georgia, DeKalb County A Suburban Creek Resists Channelization Introduction A visual examination of Doolittle Creek in a highly developed suburban county in Georgia yielded telltale signs of a creek whose original streambed had been altered. Examination of official

More information

SUSTAINABLE URBAN DRAINAGE SYSTEMS

SUSTAINABLE URBAN DRAINAGE SYSTEMS overflow can lead into a permeable conveyance system to increase further the benefit and reduce the need for pipe systems. Pollutant removal rates have been shown to be high, with some pollutants being

More information

Guidelines for Control of Water Runoff on Small Lots. Revised 6/09

Guidelines for Control of Water Runoff on Small Lots. Revised 6/09 Guidelines for Control of Water Runoff on Small Lots Revised 6/09 Table of Contents Introduction and Purpose 3 Administrative Procedures 3 Plan Submittal Requirements 3 General Design Criteria 4 Dry Wells

More information

A. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems.

A. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems. 19. STORMWATER MANAGEMENT A. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems. The majority of the approximately ±500 acre Property

More information

Drainage A Crucial Component for Athletic Field Performance. Part Three: Sub-Surface Installed Drainage Systems

Drainage A Crucial Component for Athletic Field Performance. Part Three: Sub-Surface Installed Drainage Systems www.stma.org Drainage A Crucial Component for Athletic Field Performance Part Three: Sub-Surface Installed Drainage Systems Water is applied to maintained turfgrass areas by irrigation or precipitation.

More information

Storm Drain Inlet Protection - IP

Storm Drain Inlet Protection - IP Storm Drain Inlet Protection - IP DEFINITION A temporary protective device formed around a storm drain drop inlet to trap sediment. PURPOSE To prevent sediment from entering storm drainage systems, prior

More information

BASSETT CREEK VALLEY MASTER PLAN OPEN HOUSE

BASSETT CREEK VALLEY MASTER PLAN OPEN HOUSE BASSETT CREEK VALLEY MASTER PLAN OPEN HOUSE February 23, 2006 PROJECT INTRODUCTION Project Area 230 acres $50 million estimated market value (approximately) 50 acres parkland 100 residences (estimated)

More information

Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control

Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control Project Name: Tax Map Parcel: Acreage: Plat: ADC Map & Grid Engineering

More information

Civil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.

Civil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition. Design Guide Basis of Design This section applies to the design and installation of earthwork and backfill. Design Criteria No stockpiling of excavation materials is allowed unless the Geotechnical Engineer

More information

SECTION 33 41 13 PUBLIC STORM UTILITY DRAINAGE PIPING

SECTION 33 41 13 PUBLIC STORM UTILITY DRAINAGE PIPING SECTION 33 41 13 PUBLIC STORM PART 1 - GENERAL 1.01 SECTION INCLUDES A. Storm drainage piping, fittings, and accessories at proposed station areas and locations other than under and immediately adjacent

More information

SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS

SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS SECTION 08000 STORM DRAINAGE 08010 DESIGN A. Location B. Sizing TABLE OF CONTENTS 08020 MATERIALS A. Pipe Materials B. Structure Materials C. Installation D. Inlets and Outlets 08030 INSPECTIONS AND TESTING

More information

BMP-7. A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet.

BMP-7. A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet. BMP-7 BMP: STORM DRAIN INLET PROTECTION Definition A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet. To prevent sediment from entering storm drainage systems

More information

Caltrans non-standard Special Provisions Pervious Concrete. David Akers Feb 28, 2012

Caltrans non-standard Special Provisions Pervious Concrete. David Akers Feb 28, 2012 Caltrans non-standard Special Provisions Pervious Concrete David Akers Feb 28, 2012 Section Paragraph Content 19 RSS 19-5.03B Changes title of the section 19-5.03B USAGE NOTES FOR PERVIOUS CONCRETE AND

More information

Minimizes sediment and debris from entering storm drains that lead to waterways and watercourses.

Minimizes sediment and debris from entering storm drains that lead to waterways and watercourses. 4.5-p DRAIN INLET PROTECTION Alternative Names: DI protection, Drop Inlet Protection DESCRIPTION Storm drain inlet (DI) protection slows and ponds stormwater, and filters sediment and debris before it

More information

CHAPTER 5. Storm Sewer

CHAPTER 5. Storm Sewer CHAPTER 5 Storm Sewer A. Introduction All proposed developments shall have a properly designed and constructed storm water conveyance system. This chapter deals only with the conveyance system. Storm water

More information

Architectural Processing and Inspections for Home Mortgage Insurance

Architectural Processing and Inspections for Home Mortgage Insurance Page 1 of 5 [Text Only] Architectural Processing and Inspections for Home Mortgage Insurance Directive Number: 4145.1 SITE GRADING AND DRAINAGE GUIDELINES Construction complaints and structural defect

More information

SEWER LINE EXTENSION DESIGN CHECKLIST

SEWER LINE EXTENSION DESIGN CHECKLIST SEWER LINE EXTENSION DESIGN CHECKLIST SWLE# Utilities Staff Date DISCLAIMER - This checklist is provided to Consulting Engineers for the express purpose of assisting them in compiling design plans for

More information

GREEN INFRASTRUCTURE DESIGNS BIOSWALE/HYBRID DITCH

GREEN INFRASTRUCTURE DESIGNS BIOSWALE/HYBRID DITCH GREEN INFRASTRUCTURE DESIGNS BIOSWALE/HYBRID DITCH JULY 2015 BIOSWALE/HYBRID DITCH SCALABLE TOOL AND DESIGN TEMPLATE This tool and associated design files are one section of a larger toolkit: Green Infrastructure

More information

City of Shelbyville Site Inspection Checklist

City of Shelbyville Site Inspection Checklist City of Shelbyville Site Inspection Checklist General Information Project Name: KYR10 Permit Number: Date: Project Location: Contractor: Conractor Representative: Inspector's Name: Title: Signature : Weather

More information

URBAN DRAINAGE CRITERIA

URBAN DRAINAGE CRITERIA URBAN DRAINAGE CRITERIA I. Introduction This division contains guidelines for drainage system design and establishes a policy for recognized and established engineering design of storm drain facilities

More information

RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas http://www.mass.gov/dep/water/laws/policies.

RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas http://www.mass.gov/dep/water/laws/policies. RIPRAP From Massachusetts Erosion and Sediment Control Guidelines for Urban and Suburban Areas http://www.mass.gov/dep/water/laws/policies.htm#storm Definition: A permanent, erosion-resistant ground cover

More information

AN INITIATIVE TO IMPROVE

AN INITIATIVE TO IMPROVE L OW E R C A R M E L R I V E R A N D L AG O O N F L O O D P L A I N R E S TO R AT I O N A N D E N H A N C E M E N T P R O J E C T AN INITIATIVE TO IMPROVE FLOOD PROTECTION RESTORE AND PROTECT RIPARIAN

More information

Low Impact Development Checklist

Low Impact Development Checklist New Jersey Stormwater Best Management Practices Manual February 2004 A P P E N D I X A Low Impact Development Checklist A checklist for identifying nonstructural stormwater management strategies incorporated

More information

1800 Washington Boulevard, Baltimore, MD 21230-1718 www.mde.maryland.gov 410-537-3000 800-633-6101 TTY Users 800-735-2258 Larry Hogan, Governor Boyd

1800 Washington Boulevard, Baltimore, MD 21230-1718 www.mde.maryland.gov 410-537-3000 800-633-6101 TTY Users 800-735-2258 Larry Hogan, Governor Boyd ENVIRONMENTAL SITE DESIGN (ESD) REDEVELOPMENT EXAMPLES OCTOBER 2010 1800 Washington Boulevard, Baltimore, MD 21230-1718 www.mde.maryland.gov 410-537-3000 800-633-6101 TTY Users 800-735-2258 Larry Hogan,

More information

SE-10 STORM DRAIN INLET PROTECTION. Objectives

SE-10 STORM DRAIN INLET PROTECTION. Objectives STORM DRAIN INLET PROTECTION SE-10 Objectives Erosion Control - EC Sediment Control - SE Tracking Control - TC Wind Erosion Control - WE Non-Storm Water Management - NS Waste and Materials Management -

More information

G3 GRANT LID RETROFIT FOR THE ASHLAND MUNICIPAL PARKING LOT

G3 GRANT LID RETROFIT FOR THE ASHLAND MUNICIPAL PARKING LOT G3 GRANT LID RETROFIT FOR THE ASHLAND MUNICIPAL PARKING LOT GREEN STREETS GREEN JOBS GREEN TOWNS PROJECT INFORMATION: Location: Ashland, VA Project Type: Design and Construction Restoration Practice: Bioretention,

More information

PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013

PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013 PLANNED UNIT DEVELOPMENT & SIDEWALK WAIVER REQUEST STAFF REPORT Date: November 7, 2013 NAME LOCATION Audubon Properties, LLC. 4700 & 4960 Dauphin Island Parkway West side of Dauphin Island Parkway, 580

More information

C.3 Workshop Track 2: Sizing Calculations and Design Considerations for LID Treatment Measures

C.3 Workshop Track 2: Sizing Calculations and Design Considerations for LID Treatment Measures C.3 Workshop Track 2: Sizing Calculations and Design Considerations for LID Treatment Measures Jill Bicknell, P.E., EOA, Inc. Santa Clara Valley Urban Runoff Pollution Prevention Program Presentation Overview

More information

DESCRIPTION OF WORK:

DESCRIPTION OF WORK: DEPARTMENT OF PUBLIC WORKS COUNTY OF HENRICO P.O. BOX 27032 RICHMOND, VIRGINIA 23273 PERMIT NO. One (1) copy of application and four (4) copies of plans are hereby made to the Director of Public Works

More information

ECONOMIC ANALYSIS FLOOD DAMAGE REDUCTION. Lower Carmel River Floodplain Restoration and Enhancement Project

ECONOMIC ANALYSIS FLOOD DAMAGE REDUCTION. Lower Carmel River Floodplain Restoration and Enhancement Project ECONOMIC ANALYSIS FLOOD DAMAGE REDUCTION Lower Carmel River Floodplain Restoration and Enhancement Project I. Description of the Project and its Relationship to Other Projects in the Proposal The Lower

More information

NOTICE OF PREPARATION

NOTICE OF PREPARATION PLANNING DIVISION CITY OF SUNNYVALE P.O. BOX 3707 SUNNYVALE, CA 94088-3707 NOTICE OF PREPARATION TO: Responsible, Trustee, and Other Interested Public Agencies FROM: Sunnyvale Community Development 456

More information

Toronto's New Soil and Tree-based Standards for Boulevards

Toronto's New Soil and Tree-based Standards for Boulevards 2013 ISA Annual Meeting Toronto, August 3-7, 2013 Toronto's New Soil and Tree-based Standards for Boulevards Extended Abstract May 16, 2013 Introduction In 2012, the city of Toronto embarked on a process

More information

Construction Site Inspection Checklist for OHC000004 By making use of some simple Best Management Practices (BMPs) a construction site operator can

Construction Site Inspection Checklist for OHC000004 By making use of some simple Best Management Practices (BMPs) a construction site operator can Construction Site Inspection Checklist for OHC000004 By making use of some simple Best Management Practices (BMPs) a construction site operator can do his or her share to protect Ohio's water resources

More information

Specifications for Residential Property Owners Connection to New Public Sewer

Specifications for Residential Property Owners Connection to New Public Sewer Specifications for Residential Property Owners Connection to New Public Sewer Spalding Tract property owners are required to connect to the community sewer system when construction is complete and the

More information

Appendix A. Lists of Accomplishments and Project Costs. UMRWD 10 Year Plan Update. Appendix A UPPER MINNESOTA RIVER WATERSHED DISTRICT

Appendix A. Lists of Accomplishments and Project Costs. UMRWD 10 Year Plan Update. Appendix A UPPER MINNESOTA RIVER WATERSHED DISTRICT UPPER MINNESOTA RIVER WATERSHED DISTRICT Lists of Accomplishments and Project Costs 10 Year Plan Update UMRWD 10 Year Plan Update Page A 1 UMRWD LIST OF ACCOMPLISHMENTS Since its inception in 1967, the

More information

Sample Punch List. Garth Ruffner Landscape Architect (916) 797-2576. Page 1 of 5

Sample Punch List. Garth Ruffner Landscape Architect (916) 797-2576. Page 1 of 5 Sample Punch List This document is provided primarily for landscape contractors who have not previously worked with Garth and would like to know what issues are frequently addressed by site observation

More information

Glen Hills Area: Septic System and Public Sewer Q & A Information Sheet Page 1

Glen Hills Area: Septic System and Public Sewer Q & A Information Sheet Page 1 Glen Hills Area: Septic System and Public Sewer Q & A Information Sheet Page 1 The Montgomery County Dept. of Environmental Protection, in cooperation with the Dept. of Permitting Services and the Washington

More information

Prattsville Berm Removal Project. 1.0 Project Location

Prattsville Berm Removal Project. 1.0 Project Location Prattsville Berm Removal Project 1.0 Project Location The project site is located between the New York State Route 23 Bridge over the Schoharie Creek and the Schoharie Reservoir. The restoration plan encompassed

More information

Water Conservation and the State s New Green Building Code for Residential Construction

Water Conservation and the State s New Green Building Code for Residential Construction Water Conservation and the State s New Green Building Code for Residential Construction Silver Sponsors Media Sponsors Certified Sponsors Solano County Water Agency Zone 7 Water Agency Founding Partners

More information

Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010

Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010 Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010 Background What are permeable interlocking concrete pavements (PICP)?

More information

Planning, Health and Environment Division

Planning, Health and Environment Division 18 Planning, Health and Environment Division A Planning Guide to Sustainable Drainage Systems Introduction Working in co-operation with the Environment Agency, Severn Trent Water Ltd., the Highway Authority

More information

720 Contour Grading. General. References. Resources. Definitions

720 Contour Grading. General. References. Resources. Definitions 720 Contour Grading General Contour grading directs water to a desired point, prevents erosion, provides noise deflection, provides visual fit of the facility into the landscape, and protects desirable

More information

The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.

The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified. Section 33 0200- Page 1 of 4 PART 1 - GENERAL 1.1 DESCRIPTION OF WORK The work of this Section includes furnishing and installing Reinforced Concrete Pressure Pipe as shown on the Drawings and as specified.

More information

PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE

PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE Storm Sewer Design Criteria REVISED July 2009 PUBLIC WORKS STORM SEWER DESIGN CRITERIA TABLE OF CONTENTS 1.0

More information

Emergency Spillways (Sediment basins)

Emergency Spillways (Sediment basins) Emergency Spillways (Sediment basins) DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short-Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1]

More information

SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions.

SECTION LS 2530 SANITARY SEWERS. A. General: Submit the following in accordance with The General Conditions. SECTION LS 2530 SANITARY SEWERS PART 1 GENERAL 1.1 SUBMITTALS A. General: Submit the following in accordance with The General Conditions. 1. Product data for drainage piping specialties. 2. Shop drawings

More information

Drainage Analysis for the McKownville Area

Drainage Analysis for the McKownville Area Drainage Analysis for the McKownville Area Town of Guilderland Albany County, New York Prepared by: DELAWARE ENGINEERING, P.C. 28 Madison Avenue Extension Albany, New York 12203 June 2010 Town of Guilderland

More information

WESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, 2015 1512-SPP-24 & 1512-ODP-24

WESTFIELD-WASHINGTON ADVISORY PLAN COMMISSION December 7, 2015 1512-SPP-24 & 1512-ODP-24 Petition Number: Subject Site Address: Petitioner: Request: East side of Oak Road, north of 151 st Street Langston Development Co. Primary Plat and Overall Development Plan amendment review for Mapleridge

More information

THE CORPORATION OF THE CITY OF GUELPH. THEREFORE the council of the Corporation of the City of Guelph enacts as follows:

THE CORPORATION OF THE CITY OF GUELPH. THEREFORE the council of the Corporation of the City of Guelph enacts as follows: THE CORPORATION OF THE CITY OF GUELPH By-law (1993)-14515 A by-law respecting storm water disposal from private property in the City of Guelph, to amend By-law (1987)-12602 and to adopt Municipal Code

More information

Underground Injection Control Storm Water Information

Underground Injection Control Storm Water Information Underground Injection Control Storm Water Information Best Management Practices DEQ has reviewed the EPA definition of a subsurface fluid distribution system and the infiltration design best management

More information

Greater Los Angeles County Region

Greater Los Angeles County Region Attachment 6 Greater Los Angeles County Region IRWM Implementation Grant Proposal Monitoring, Assessment, and Attachment 6 consists of the following items: Monitoring, Assessment, and. The purpose of this

More information

HCP Team Meeting. November 18, 2015. icfi.com

HCP Team Meeting. November 18, 2015. icfi.com HCP Team Meeting November 18, 2015 icfi.com 1 Welcome and Introductions Where are we in the HCP process Hydrology modeling update Native fish survey Fish translocation Finalize covered activities Next

More information

SECTION 5 DRAFTING STANDARDS

SECTION 5 DRAFTING STANDARDS SECTION 5 DRAFTING STANDARDS 1 SECTION FIVE TABLE OF CONTENTS Description Page TABLE OF CONTENTS... 5-2 GENERAL... 5-3 DRAFTING STANDARDS... 5-5 DRAFTING MINIMUM REQUIREMENTS HANDOUT... 5-8 2 GENERAL 1.

More information

Indiana State Department of Health Construction Guidelines for Gravity and Flood-Dose Trench Onsite Systems

Indiana State Department of Health Construction Guidelines for Gravity and Flood-Dose Trench Onsite Systems Indiana State Department of Health Construction Guidelines for Gravity and Flood-Dose Trench Onsite Systems The septic tank-absorption field sewage treatment system is composed of two major elements; the

More information

5.14 Floodplains and Drainage/Hydrology

5.14 Floodplains and Drainage/Hydrology I-70 East Final EIS 5.14 Floodplains and Drainage/Hydrology 5.14 Floodplains and Drainage/Hydrology This section discusses floodplain and drainage/hydrology resources and explains why they are important

More information

Harris County Flood Control District. Policy, Criteria, and Procedure Manual

Harris County Flood Control District. Policy, Criteria, and Procedure Manual Harris County Flood Control District Policy, Criteria, and Procedure Manual For Approval and Acceptance of Infrastructure General Review October 10, 2003 Draft Please Provide Written Comments to the HCFCD

More information

OSU Extension FACT SHEET

OSU Extension FACT SHEET OHIO STATE UNIVERSITY EXTENSION! OSU Extension FACT SHEET Ohio State University Extension, 2120 Fyffe Road, Columbus, OH 43210 Shale Oil and Gas Development Fact Sheet Series A Landowner s Guide to Understanding

More information

PIPELINE ROUTING PERMIT. For A NATURAL GAS PIPELINE DAKOTA AND RAMSEY COUNTIES ISSUED TO NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY

PIPELINE ROUTING PERMIT. For A NATURAL GAS PIPELINE DAKOTA AND RAMSEY COUNTIES ISSUED TO NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY PIPELINE ROUTING PERMIT For A NATURAL GAS PIPELINE IN DAKOTA AND RAMSEY COUNTIES ISSUED TO NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY PUC DOCKET No. G002/GP-05-1706 In accordance with the requirements

More information

NEVADA IRRIGATION DISTRICT DEVELOPER REQUIREMENTS FOR TREATED WATER SYSTEM EXTENSIONS GENERAL

NEVADA IRRIGATION DISTRICT DEVELOPER REQUIREMENTS FOR TREATED WATER SYSTEM EXTENSIONS GENERAL NEVADA IRRIGATION DISTRICT DEVELOPER REQUIREMENTS FOR TREATED WATER SYSTEM EXTENSIONS GENERAL An owner requesting treated water service to lands which do not otherwise have service available must comply

More information

EFFECTIVE FEBRUARY 2014. note: drainage permit required to call for a dampproof inspection

EFFECTIVE FEBRUARY 2014. note: drainage permit required to call for a dampproof inspection EFFECTIVE FEBRUARY 2014 note: drainage permit required to call for a dampproof inspection 1. ROOF DRAINS/DECK DRAINS (INTERIOR ) All roof and deck drains within the perimeter of the building shall be APPROVED

More information

DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES 33 00 00 SITE UTILITIES

DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES 33 00 00 SITE UTILITIES SECTION INCLUDES Domestic Water Fire Water Service Water Well Sanitary Sewer Storm Drains Foundation Drainage RELATED SECTIONS 03 30 00 Concrete 21 00 00 Fire Suppression - Sprinklers 22 00 00 Plumbing

More information

Small Dam Repair The Stone Lake Dam Story. Joe Barron, P.E. SynTerra formerly the Fletcher Group, Inc. 148 River St. Suite 220 Greenville, S.C.

Small Dam Repair The Stone Lake Dam Story. Joe Barron, P.E. SynTerra formerly the Fletcher Group, Inc. 148 River St. Suite 220 Greenville, S.C. Small Dam Repair The Stone Lake Dam Story Joe Barron, P.E. SynTerra formerly the Fletcher Group, Inc. 148 River St. Suite 220 Greenville, S.C. 29601 1 Historical background of Stone Lake A series of three

More information

3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.

3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees. The following shall serve as the minimum requirements for contractors performing work in relation to the Authority s potable water and sanitary sewer system(s), appurtenances and service connections. General:

More information

Basic Hydrology. Time of Concentration Methodology

Basic Hydrology. Time of Concentration Methodology Basic Hydrology Time of Concentration Methodology By: Paul Schiariti, P.E., CPESC Mercer County Soil Conservation District What is the Time of Concentration? The time it takes for runoff to travel from

More information

City of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements

City of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements City of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements Overview of the City s Construction Storm Water Program The City of Paso Robles is committed to protecting

More information

SECTION 13 REPLACEMENT AND CLEANUP 13.01 SCOPE OF WORK

SECTION 13 REPLACEMENT AND CLEANUP 13.01 SCOPE OF WORK 13.01 SCOPE OF WORK Under this item, the Contractor will restore all lawns, trees, gardens, landscape plantings, sidewalks, ramps, trails, fences, commercial signs, water courses and sand, gravel, dirt,

More information

Cost of Service Studies For the San Antonio, California Water District

Cost of Service Studies For the San Antonio, California Water District REQUEST FOR PROPOSALS TO PROVIDE: CONSULTING SERVICES TO THE SAN LORENZO VALLEY WATER DISTRICT PROJECT TITLE: ENTERPRISE WIDE COST OF SERVICE FINANCIAL STUDY RESPONSE DUE BEFORE 3:00 P.M. ON JANUARY 15,

More information

CHAPTER 11 STORM DRAINAGE

CHAPTER 11 STORM DRAINAGE CHAPTER STORM DRAINAGE SECTION PC 0 GENERAL 0. Scope. The provisions of this chapter shall govern the materials, design, construction and installation of storm drainage. Storm water discharge shall be

More information

APPENDIX F. RESIDENTIAL WATER QUALITY PLAN: ALLOWABLE BMP OPTIONS

APPENDIX F. RESIDENTIAL WATER QUALITY PLAN: ALLOWABLE BMP OPTIONS APPENDIX F. RESIDENTIAL WATER QUALITY PLAN: ALLOWABLE BMP OPTIONS The following section provides descriptions, advantages, limitations, and schematics of allowable best management practices (BMPs) for

More information

PRIVATE TREATMENT CONTROL BMP OPERATION AND MAINTENANCE VERIFICATION FORM BIORETENTION FACILITIES, VEGETATED SWALES & HIGHER RATE BIOFILTERS

PRIVATE TREATMENT CONTROL BMP OPERATION AND MAINTENANCE VERIFICATION FORM BIORETENTION FACILITIES, VEGETATED SWALES & HIGHER RATE BIOFILTERS BIORETENTION FACILITIES, VEGETATED SWALES & HIGHER RATE BIOFILTERS Check here for Address or phone number change the fiscal year (July 1 June 30), and date(s) maintenance was performed. Under Inspection,

More information

Floodplain Development Land Use Review

Floodplain Development Land Use Review COMMUNITY DEVELOPMENT DEPARTMENT Planning Division P.O. Box 490 333 Broadalbin Street SW Albany, OR 97321 Phone 541-917-7550 Fax 541-791-0150 www.cityofalbany.net Floodplain Development Land Use Review

More information

Soil and Materials Engineers, Inc. Mark J. Quimby Project Consultant

Soil and Materials Engineers, Inc. Mark J. Quimby Project Consultant Soil and Materials Engineers, Inc. Mark J. Quimby Project Consultant Michigan Indiana Ohio www.sme-usa.com consultants in the environment, geosciences and materials OVERVIEW Site Description and History

More information