1 Caltrans non-standard Special Provisions Pervious Concrete David Akers Feb 28, 2012
2 Section Paragraph Content 19 RSS B Changes title of the section B USAGE NOTES FOR PERVIOUS CONCRETE AND PERMEABLE INTERLOCKING BLOCKS Pervious pavement areas are not required to have 95% relative compaction C Areas under pervious pavement required to have 88 to 90% relative compaction May be used as often as needed according to the permeability of the underlying soil as determined during the design investigation. 26 Creates Class 4 Aggregate Base Use Class 4 AB when - A reservoir is required - Pavement will be loaded by any heavy vehicles Class 4 AB probably not required under bike or pedestrian paths for support Where required use - 6 in. over soil with R-value > 25 - otherwise use 8 in. minimum Pervious Concrete Pavement - sets paving requirements; requires that 90-7 also is used in special provisions 40-9 Permeable Interlocking Concrete Pavement - defines materials and placement requirements for PICP. Will normally have Class 4 AB under it.
3 ADD TO SECTION A 1. Use if: 1. Water is scarce 2. Compaction can be obtained without the use of water 3. Excessive compaction effort will not be required to meet the specified compaction Where water is scarce, material to be compacted to at least 90 percent must be compacted without adding water if the specified relative compaction can be obtained. 2. Use for areas paved with pervious concrete, permeable interlocking concrete pavers, or porous asphalt. Insert the minimum relative compaction of either "90" or "95" as recommended by the designer. Where an area is paved with pervious concrete, permeable interlocking concrete pavers, or porous asphalt, sections B and C do not apply. Obtain a relative compaction of at least percent. Obtain this relative compaction for the paved area plus 3 feet on each side. Obtain this relative compaction to a depth of at least 2.5 feet below the finished grade.
4 CHANGES TO B Add to section B: Item 2 of the 1st paragraph does not apply to. Use for areas paved with pervious concrete, permeable interlocking concrete pavers, or porous asphalt. Add to section B: Section B does not apply to areas paved with pervious concrete, permeable interlocking concrete pavers, and porous asphalt.
5 REPLACE SECTION C WITH C Relative Compaction, less than 95 Percent Except for areas paved with pervious concrete pavement or permeable interlocking concrete pavement, obtain a relative compaction of at least 90 percent. For areas paved with pervious concrete pavement or permeable interlocking concrete pavements, obtain a relative compaction of at least 88 percent and not more than 90 percent.
6 PERVIOUS PAVEMENT DESIGN - STRUCTURE Any pavement design program can be used Provided design strength limited to 3,000 psi compressive Lower strength reflects load transfer through aggregate to aggregate contact
7 RECOMMENDED MINIMUM PAVEMENT STRUCTURES Following designs are the minimum needed for structural adequacy and/or constructability. Check designs for hydraulic sufficiency; thicker design prevails. Class 4 AB thicknesses are structural minimums; greater thickness is permissible. Thicker Class 4 AB will be required when Pervious concrete is adjacent to a thick section of nonpermeable pavement, or If there is a high hydraulic storage requirement.
8 PEDESTRIAN AND BIKE PATHWAYS, OCCASIONAL LIGHT VEHICLE PERMITTED SIDEWALK EXCEPT AT DRIVEWAY Option foot pervious concrete on native soil Option 2 Permeable interlocking concrete pavement on native soil with a minimum 0.10 foot thick bedding layer.
9 MAINTENANCE VECHICLE PULL-OUT Option 1 Pervious Concrete 0.45 foot pervious concrete on 0.50 foot Class 4 AB. MVP must be outside shoulder area. If R-value is less than 25 add 0.20 foot base or reinforcing fabric. Grading plane of subgrade should be sloped away from shoulder at 2 percent or more. Option 2 Permeable Interlocking Pavement Permeable interlocking concrete pavement may be an option. Contact Pavement Program, Office of Concrete Pavement and Pavement Foundations for recommendations.
10 RECOVERY ZONE OUTSIDE SHOULDER AREA AND GORE AREA Within 10 feet of edge of shoulder 0.45 foot pervious concrete on 0.50 foot Class 2 or Class 4 AB. Beyond 10 feet from edge of shoulder 0.35 foot pervious concrete on native soil. Grading plane of subgrade and Class 2 AB should be sloped away from shoulder at 2 percent or more. Color treatment for pervious concrete is recommended so the pervious concrete looks like soil to minimize intentional trafficking.
11 SIDEWALK AT DRIVEWAY Option foot pervious concrete on 0.70 foot Class 4 AB Option 2 Permeable interlocking concrete pavement on 0.70 foot Class 4 AB.
12 SHOULDER OF MINOR HIGHWAY OR OFF-RAMP Contact Pavement Program, Office of Concrete Pavement and Pavement Foundation for recommendation.
13 MAINTENANCE ACCESS ROAD Option foot pervious concrete on 0.70 foot Class 4 AB Option 2 Permeable interlocking concrete pavement on 0.70 foot Class 4 AB.
14 PARKING AREA FOR PASSENGER VEHICLES INCLUDING TRAFFICKED AREA Option foot pervious concrete on 0.50 foot Class 4 AB. If R-value is less than 25 add 0.20 foot base or reinforcing fabric. Option 2 Permeable interlocking concrete pavement on 0.50 foot Class 4 AB. If R-value is less than 25 add 0.20 foot base or reinforcing fabric.
15 PARKING AREA FOR HEAVY VEHICLES (e.g. rest area on highway with AADTT > 3000) Option foot pervious concrete on 0.70 foot Class 4 AB on reinforcing fabric. Option 2 Permeable interlocking concrete pavement on 0.70 foot Class 4 AB on reinforcing fabric. Note In trafficked area with ADTT > 2000, use a non-permeable paving material. Water from non permeable area may flow to permeable area. Grading plane of subgrade below Class 4 AB must be below AB of adjacent pavement. Slope of grading plane of subgrade should be zero percent. Place filter fabric on vertical interface between base of non-pervious pavement and pervious structural section.
16 PERVIOUS PAVEMENT DESIGN - HYDRAULIC Based on maximum amount of interconnected voids Concrete not degraded by Placing crew walking through the concrete compressing the voids Balls of cement and aggregate in the placed concrete Given Infiltration rate of soil Storm size Tributary area
17 HYDRAULIC DESIGN Simple calculation 6 thick pervious concrete with 20% voids will hold 1.2 of water for a given area 7 thick aggregate base with 30% voids will hold 2.1 of water Total storm water contained = 3.6 Problems How long to completely drain the system? Is there tributary area draining into the pervious concrete?
18 TIME TO DRAIN THE SYSTEM Depends on the underlying base soil From Hydraulic Design of Pervious Concrete, EB303, PCA, Michael Leming, Rooney Malcolm, and Paul Tennis
19 TRIBUTARY AREA Pervious can accept storm water from hardscape, impervious pavement, or structures Maximize storm water capture with proper sloping of the paved areas
20 Example Parameters Thickness, in Available Storage, cf Results Soil Permeability Pervious Agg Base 24-Hr, % 5-Day, % 5-Day Exfiltration, cf Run-off, cf 5-Day Storage, cf Sandy soil, Loam, clay, silt, Clay, clay loam, Clay, clay loam, Pervious area Total drained area Total storage 48,000 sf 54,000 sf 4,800 cf - pervious only 25,200 cf - 21" of aggregate base 30,000 cf - total storage
21 Stage (inches above bottom of storage) Hourly rainfall (in) Example Exfiltration Rate 0.25 in/hr 0 of Aggregate Base 5-Day Exfiltration 11,200 cf Elapsed time (hr) Precip (in) Stage (in) Top gravel (in) Top Pavement (in) Pond limit (in) 4.0
22 Stage (inches above bottom of storage) Hourly rainfall (in) Example Exfiltration Rate 0.01 in/hr 0 of Aggregate Base 5-Day Exfiltration 11,200 cf Elapsed time (hr) 4.0 Precip (in) Stage (in) Top gravel (in) Top Pavement (in) Pond limit (in)
23 Stage (inches above bottom of storage) Hourly rainfall (in) Example Exfiltration Rate Aggregate Base 5-Day Exfiltration 4760 cf Run-off 5490 cf Storage 1000 cf Elapsed time (hr) 4.0 Precip (in) Stage (in) Top gravel (in) Top Pavement (in) Pond limit (in)
24 Stage (inches above bottom of storage) Hourly rainfall (in) Example Exfiltration Rate 0.01 in/hr 21 Aggregate Base 5-Day Exfiltration 4760 cf Run-off Storage 6490 cf Elapsed time (hr) 4.0 Precip (in) Stage (in) Top gravel (in) Top Pavement (in) Pond limit (in)
25 Example Parameters Thickness, in Available Storage, cf Results Soil Permeability Pervious Agg Base 24-Hr, % 5-Day, % 5-Day Exfiltration, cf Run-off, cf 5-Day Storage, cf Sandy soil, Loam, clay, silt, Clay, clay loam, Clay, clay loam, Pervious area Total drained area Total storage 48,000 sf 54,000 sf 4,800 cf - pervious only 25,200 cf - 21" of aggregate base 30,000 cf - total storage
26 Other Comments Use aggregate base even if hydraulic design does not need it Provides a non-rutting pavement foundation No recompaction required Choker courses are not required 10 to 12 is maximum practical single lift thickness
27 Design Entire Streets
28 Got Slope? Gain useable volume with stone base 40% porosity HDPE section
29 Draft Shoulder Use Design
Updates on Pervious Pavement Design and Construction. Jason T. Peterein, P.E. June 19, 2012
Updates on Pervious Pavement Design and Construction Jason T. Peterein, P.E. June 19, 2012 Program Outline Pervious Pavement Basics Pervious Pavement Construction Maintenance MSD Regulations Update Permeable
Porous Pavement Alternatives Cost Analysis
Porous Pavement Alternatives Cost Analysis Prepared by Century West Engineering for Metro This cost analysis compares the construction costs of six different types of pavement for three different scenarios.
Permeable Pavement Treatment Capacity
Permeable Pavement Treatment Capacity April 20 2011 This investigation will analyze the pollutant removal capacity of various types of permeable paving techniques. Daniel Sullivan Joseph Fleury Contents
Permeable Interlocking Concrete Pavements
Permeable Interlocking Concrete Pavements Program 000003 Revised 1-29-08 Permeable Interlocking Concrete Pavements This program is registered with the AIA/CES and ASLA CPE for continuing education professional
Pervious Pavers. By: Rich Lahren. Hebron Brick & Block Supply
Pervious Pavers By: Rich Lahren Hebron Brick & Block Supply Stormwater Management and Control Issues Past emphasis was on flood control Today s emphasis is also on pollution More impermeable areas are
Installing Porous Pavement Waukesha County Dept. of Parks & Land Use Storm Water BMP Design and Installation Workshop March 11, 2009
Installing Porous Pavement Waukesha County Dept. of Parks & Land Use Storm Water BMP Design and Installation Workshop March 11, 2009 Presented by Willie Gonwa, P.E., Ph.D. West Allis, Wisconsin Porous
AquaPaver & SF-Rima Permeable Interlocking Concrete Pavers
F.P.O. Need SF-Rima THE TREMRON GROUP Permeable Paver Guide AquaPaver & SF-Rima Permeable Interlocking Concrete Pavers MIAMI 11321 NW 112th Court Medley, FL 33178 800.567.1480 or 305.825.9000 Fax 305.823.6614
40-9 PERMEABLE INTERLOCKING CONCRETE PAVEMENT
40-9 PERMEABLE INTERLOCKING CONCRETE PAVEMENT 40-9.01 GENERAL 40-9.01A Summary Section 40-9 includes specifications for furnishing and installing concrete pavers for permeable interlocking concrete pavement
Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010
Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010 Background What are permeable interlocking concrete pavements (PICP)?
Guidelines for. Permeable Pavement
What is permeable pavement? Guidelines for Permeable Pavement When rainwater falls on conventional pavement, such as concrete, it accumulates and then flows across and off of this impervious surface as
Design, Construction and Maintenance of Permeable Pavements Case Studies and Technical Resources Robert Bowers, P. Eng.
Design, Construction and Maintenance of Permeable Pavements Case Studies and Technical Resources Robert Bowers, P. Eng. Source: CH2M Hill The Presenter Robert Bowers, P.Eng., LEED GA [email protected] Director
SPECIFICATIONS. INTERLOCKING CONCRETE POROUS PAVING UNITS or Permeable Interlocking Concrete Pavers (PICP)
SPECIFICATIONS INTERLOCKING CONCRETE POROUS PAVING UNITS or Permeable Interlocking Concrete Pavers (PICP) Part 1 General 1.1 CONFORMITY Conforms to the requirements of the general conditions of the contract.
Low Impact Development Permeable Paving
Low Impact Development Permeable Paving An education initiative funded by the Department of Ecology June 11, 2013 How to Participate in a Webinar chat send to host Polling box will appear at first poll
Permeable Pavement Operation & Maintanence Guide
Permeable Pavement Operation & Maintanence Guide Permeable pavement at Olympic Park, Waitakere Final Construction result What are permeable pavements? Permeable pavements are hard surface paving systems
DRAFT. 2.11 Pervious Pavement. Description
2.11 Pervious Pavement Figure 1 Porous Concrete at Indian Run Park in Dublin, Ohio. Description Pervious pavement systems consist of a permeable pavement surface layer and one or more underlying aggregate
SECTION 32 14 13.19 PERMEABLE INTERLOCKING CONCRETE PAVEMENT
PART 1 GENERAL 1.1 SECTION INCLUDES SECTION 32 14 13.19 PERMEABLE INTERLOCKING CONCRETE PAVEMENT A. The requirements for construction of permeable interlocking concrete pavement: 1. Install the interlocking
Sustainable Site Pavement Systems
Sustainable Site Pavement Systems Permeable Interlocking Concrete Pavement Training for Design Professionals ICPI Presentation #003 Presented by: Brent Davis - Design Consultant Belgard Engineered Solutions
Permeable Interlocking Concrete Pavements. The Stormwater Problem
Permeable Interlocking Concrete Pavements The Stormwater Problem 1 Stormwater Management Objectives Water Quantity Accommodate water volumes & peak flows Water Quality Control pollutant levels A Low Impact
Permeable Interlocking Concrete Pavements
Permeable Interlocking Concrete Pavements Rick Crooks, Director of Business Development Mutual Materials Co. Bellevue, WA 1-800-477-3008 [email protected] Stormwater Management Approaches: Restrict
SUDAS Revision Submittal Form
SUDAS Revision Submittal Form Status Date: As of 3/13/15 Topic: Permeable interlocking pavers Manual: Design & Specs Manual Location: Design Section 5L-1; Spec Section 7080 Requested Revision: Reason for
Permeable Pavement Construction Guide
Permeable Pavement Construction Guide Permeable pavement at Olympic Park, Waitakere Final Construction result What are permeable pavements? Permeable pavements are hard surface paving systems that reduce
Permeable Pavers. calstone.com. Permeable Interlocking Concrete Pavements (PICP s)
Permeable Pavers Permeable Interlocking Concrete Pavements (PICP s) CBC Title 24/ADA Compliant LEED Functional Optimum balance of surface infiltration and joint interlock Available in a 6 x 9 Quarry Stone
CONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT
Volkert Field Office 80 M Street SE, Suite 725 Washington, DC 20003 RIVERSMART WASHINGTON - CONSTRUCTION RIVERSMART MACFARLAND, RIVERSMART LAFAYETTE AND GREEN ALLEYS CHEVY CHASE D.C. Contract No.: DCKA-2013-C-0160
Permeable Interlocking Concrete Pavement (PICP) A Low Impact Development Tool Training for Schools and Universities
Permeable Interlocking Concrete Pavement (PICP) A Low Impact Development Tool Training for Schools and Universities Presented by: Interlocking Concrete Pavement Institute The Low Impact Development Center,
ALKS SIDEW II. TK TK TK TK TK TK TK TK 40 BOSTON COMPLETE STREETS GUIDELINES DRAFT - JULY 2011 BOSTON TRANSPORTATION DEPARTMENT
40 Sidewalk Materials Materials and Sidewalk Zones Permeable Pavement Accessibility The key components of sidewalk construction are material selection and installation. These two aspects should come together
LID-01 Permeable Paving Systems
Greenville County Technical Specification for LID-01 Permeable Paving Systems 1.0 Permeable Paving Systems 1.1 Description Permeable Paving Systems are a best management practice that captures stormwater
Advancements in Permeable Pavements
Advancements in Permeable Pavements Engineers Workshop Saint Vincent College March 14 & 15 2013 Permeable Pavements There are several different words that are used to describe a pavement that water drains
PP-1. Introduction. 4.2.4. Permeable Pavement (PP) 4.2.4. Permeable Pavement (PP)
PP-1. Introduction Permeable Pavements are alternative paving surfaces that capture and temporarily store the Target Treatment Volume (Tv) by filtering runoff through voids in the pavement surface into
Permeable Interlocking Concrete Pavement A Low Impact Development Tool. Training for Design Professionals
Permeable Interlocking Concrete Pavement A Low Impact Development Tool Training for Design Professionals Presented by: Interlocking Concrete Pavement Institute (ICPI) The Low Impact Development Center,
VA DEQ STORMWATER DESIGN SPECIFICATION NO. 7 PERMEABLE PAVEMENT. VERSION 2.0 January 1, 2013 SECTION 1: DESCRIPTION
VIRGINIA DEQ STORMWATER DESIGN SPECIFICATION No. 7 VERSION 2.0 January 1, 2013 SECTION 1: DESCRIPTION Permeable pavements are alternative paving surfaces that allow stormwater runoff to filter through
A Solution to Clogging of Porous Pavements
A Solution to Clogging of Porous Pavements Nilesh Shirke & Scott Shuler Colorado State University Fort Collins, Colorado Porous pavements are designed to allow moisture to flow through the surface into
Permeable Interlocking Concrete Pavements
Permeable Interlocking Concrete Pavements Rick Crooks, Director of Business Development Mutual Materials Co. Bellevue, WA 1-800-477-3008 [email protected] Stormwater Management Approaches: Restrict
SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)
SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) 55-1 GENERAL The Contractor shall perform all work required by the plans for construction of pipe for storm drains, precast polymer trench drains
APPENDIX F. RESIDENTIAL WATER QUALITY PLAN: ALLOWABLE BMP OPTIONS
APPENDIX F. RESIDENTIAL WATER QUALITY PLAN: ALLOWABLE BMP OPTIONS The following section provides descriptions, advantages, limitations, and schematics of allowable best management practices (BMPs) for
Underground Injection Control Storm Water Information
Underground Injection Control Storm Water Information Best Management Practices DEQ has reviewed the EPA definition of a subsurface fluid distribution system and the infiltration design best management
Guidelines for Control of Water Runoff on Small Lots. Revised 6/09
Guidelines for Control of Water Runoff on Small Lots Revised 6/09 Table of Contents Introduction and Purpose 3 Administrative Procedures 3 Plan Submittal Requirements 3 General Design Criteria 4 Dry Wells
Design and Construction of a Pavement for Tracked Military Vehicles
Design and Construction of a Pavement for Tracked Military Vehicles David K. Hein, P.Eng. Applied Research Associates, Inc. 5401 Eglinton Avenue West, Suite 105 Toronto, Ontario, Canada, M9C 5K6, Tel:
PICP Construction. Why PICPs The Big Picture. Key things to know about PICPs
PICP Construction Permeable Interlocking Concrete Pavement Presenter: Frank Gandora, President Creative Hardscape Why PICPs The Big Picture Germany was first to develop PICPs 2005 Clean Water Act Federal
Pervious Concrete Pavements: How to Reduce Demand on Your Stormwater System
Pervious Concrete Pavements: How to Reduce Demand on Your Stormwater System Jason Wimberly, EI, MCE Director of Technical Services Carolinas Ready Mixed Concrete Association Disclaimer This presentation
Pervious Pavement SYSTEMS THINKING. THE NEW DESIGN PROBLEM and the Role of the Civil Engineer. LOW IMPACT DEVELOPMENT Introduction
Pervious Pavement Options and Design Guidelines (with LID example projects) SYSTEMS THINKING Need to think differently about the problem Whole System Design Site & Project Relationships Integrated Design
CHAPTER 5. Storm Sewer
CHAPTER 5 Storm Sewer A. Introduction All proposed developments shall have a properly designed and constructed storm water conveyance system. This chapter deals only with the conveyance system. Storm water
Jon E. Zufelt, PhD, PE ERDC-CRREL Anchorage, Alaska
Jon E. Zufelt, PhD, PE ERDC-CRREL Anchorage, Alaska Outline Why am I here? What exactly am I going to talk about? Energy Independence and Security Act Permeable Pavements in Cold Regions White Paper for
SECTION 32 14 13.19 PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795)
SECTION 32 14 13.19 PERMEABLE INTERLOCKING CONCRETE PAVEMENT (1995 MasterFormat Section 02795) Note: This guide specification for U.S. applications describes construction of permeable interlocking concrete
Building Your Interlocking Concrete Pavement to Last a Lifetime
Building Your Interlocking Concrete Pavement to Last a Lifetime A Guide for Consumers Contents Building Your Interlocking Concrete Pavement to Last a Lifetime.... 3 What Does Installation Involve?....
Site Development Information Worksheet for single family residential development
Site Development Information Worksheet for single family residential development Project description: Address: Owner Name: Phone No. Date Signature & phone number of Individual who Completed this Worksheet
Dave Laurie, CTR. Sales Manager, Commercial Sales DESIGNED TO CONNECT
Dave Laurie, CTR Sales Manager, Commercial Sales DESIGNED TO CONNECT Permeable Pavements For Sustainable Development Agenda Unit paver technology Permeable Interlocking Concrete Paver - research, technical
Storm Drain Inlet Protection - IP
Storm Drain Inlet Protection - IP DEFINITION A temporary protective device formed around a storm drain drop inlet to trap sediment. PURPOSE To prevent sediment from entering storm drainage systems, prior
CASFM Stormwater Quality Field Trip June 23rd, 2011
CASFM Stormwater Quality Field Trip June 23rd, 2011 The 2011 CASFM Stormwater field trip included 42 attendees coming from as far south as Colorado Springs up to the Denver area and another 12 who joined
4.1. Permeable Pavement Systems
4.1. Permeable Pavement Systems Permeable Pavement provides the structural support of conventional pavement, but allows stormwater to drain directly through the surface into the underlying stone base and
SECTION 02795 UNI PERMEABLE INTERLOCKING CONCRETE PAVEMENT
SECTION 02795 UNI PERMEABLE INTERLOCKING CONCRETE PAVEMENT Note: This guide specification is intended for use in the U.S. It describes construction of permeable interlocking concrete pavers on a permeable,
1800 Washington Boulevard, Baltimore, MD 21230-1718 www.mde.maryland.gov 410-537-3000 800-633-6101 TTY Users 800-735-2258 Larry Hogan, Governor Boyd
ENVIRONMENTAL SITE DESIGN (ESD) REDEVELOPMENT EXAMPLES OCTOBER 2010 1800 Washington Boulevard, Baltimore, MD 21230-1718 www.mde.maryland.gov 410-537-3000 800-633-6101 TTY Users 800-735-2258 Larry Hogan,
Interlocking Concrete Pavement as an Alternative to Asphalt Concrete for Howard Road, Westley, California
Interlocking Concrete Pavement as an Alternative to Asphalt Concrete for Howard Road, Westley, California By Matt Machado, PE, LS, MBA Public Works Director for Stanislaus County and Ron Illium, PE Regional
C.3 Workshop Track 2: Sizing Calculations and Design Considerations for LID Treatment Measures
C.3 Workshop Track 2: Sizing Calculations and Design Considerations for LID Treatment Measures Jill Bicknell, P.E., EOA, Inc. Santa Clara Valley Urban Runoff Pollution Prevention Program Presentation Overview
Storm Water Runoff. Managing. A Self-Assessment Guide for Wisconsin Businesses. Storm water runoff is coming. This guide provides businesses
Managing Storm Water Runoff A Self-Assessment Guide for Wisconsin Businesses Storm water runoff is coming under increasing scrutiny as both a source of pollutants to our lakes and streams, and as a cause
SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 11/5/13)
Page 1 of 7 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised ) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular blocks
PERMEABLE INTERLOCKING CONCRETE PAVEMENT
[NOTE TO SPECIFICATION WRITER: This guide specification for the use of permeable interlocking concrete pavers for pedestrian and vehicular traffic application was developed based on the use of an open-graded
Permeable Pavement (1008)
Permeable Pavement (1008) Wisconsin Department of Natural Resources Conservation Practice Standard I. Definition A pavement system designed to achieve water quality and quantity benefits by allowing movement
Permeable Interlocking Concrete Pavement
Permeable Interlocking Concrete Pavement A Comparison Guide to Porous Asphalt and Pervious Concrete Permeable pavement is becoming a major tool for on-site stormwater management. Background The past century
AUSTRALIAN PAVING CENTRE
AUSTRALIAN PAVING CENTRE The Concept 02 The concept of Ecopave permeable paving is already well established in many countries where development threatens already over-stretched drainage and river systems.
NEUPAVE. Permeable Pavers. A Permeable Eco-Friendly Beauty
NEUPAVE Permeable Pavers A Permeable Eco-Friendly Beauty As the first in Malaysia to manufacture this new paving technology, is a paving alternative to more traditional types of hardscape flooring materials,
APPENDIX B DESIGN GUIDELINES FOR APPROVED TREATMENT METHODS
APPENDIX B DESIGN GUIDELINES FOR APPROVED TREATMENT METHODS PLANTER BOXES 1. Determine the impervious area contributing flow to the planter box (see Chapter 4.2). 2. Assumption: Typical soil infiltration
SECTION 32 14 00 PERVIOUS INTERLOCKING CERAMIC PAVERS
SECTION 32 14 00 PERVIOUS INTERLOCKING CERAMIC PAVERS Pervious interlocking pavers.doc Note: This guide specification for U.S. applications describes construction of permeable interlocking ceramic pavers
APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix.
Storm Drainage 13-C-1 APPENDIX C INLETS 1.0 Introduction The application and types of storm drainage inlets are presented in detail in this Appendix. 2.0 Inlet Locations Inlets are required at locations
Minimizes sediment and debris from entering storm drains that lead to waterways and watercourses.
4.5-p DRAIN INLET PROTECTION Alternative Names: DI protection, Drop Inlet Protection DESCRIPTION Storm drain inlet (DI) protection slows and ponds stormwater, and filters sediment and debris before it
SECTION 02400 - STORM DRAIN SYSTEM
SECTION 02400 - STORM DRAIN SYSTEM CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement And
Structural/Hydrologic Design & Maintenance of Permeable Interlocking Concrete Pavement
Structural/Hydrologic Design & Maintenance of Permeable Interlocking Concrete Pavement David R. Smith, Technical Director Interlocking Concrete Pavement InsCtute, Herndon, Virginia USA William F. Hunt,
SECTION 4Aggegate Subbase
The contractor shall moist-cure the completed Lime Treated Subbase for a minimum of days before allowing any traffic on the compacted surface. The contractor shall be responsible for repairing any damages
Final 1 st Edition January 2006 A GUIDELINE FOR THE DESIGN AND CONSTRUCTION OF ASPHALT PARKING LOTS IN COLORADO
Final 1 st Edition January 2006 A GUIDELINE FOR THE DESIGN AND CONSTRUCTION OF ASPHALT PARKING LOTS IN COLORADO This document was developed by the Colorado Asphalt Pavement Association (CAPA). It is intended
Pervious Pavement. An Infiltration BMP A LID Technique. Dan Huffman Vice President, National Resources National Ready Mixed Concrete Association
Pervious Pavement An Infiltration BMP A LID Technique Dan Huffman Vice President, National Resources National Ready Mixed Concrete Association Portland, Oregon 503-292-7729 [email protected] www.nrmca.org
Begin forwarded message:
From: To: Subject: Date: Attachments: Heather Scott Tully, Tania Fwd: Stalite Root Bridge Tuesday, November 17, 2015 8:58:01 AM Stalite_Root_Bridge_brochure[1].pdf Begin forwarded message: From: "Chuck
Civil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.
Design Guide Basis of Design This section applies to the design and installation of earthwork and backfill. Design Criteria No stockpiling of excavation materials is allowed unless the Geotechnical Engineer
Table 4.9 Storm Drain Inlet Protetion Applicable for
BMP C220: Storm Drain Inlet Protection Purpose To prevent coarse sediment from entering drainage systems prior to permanent stabilization of the disturbed area. Conditions of Use Type of Inlet Protection
DEVELOPMENT OF AN ASCE STANDARD FOR PERMEABLE INTERLOCKING CONCRETE PAVEMENT
DEVELOPMENT OF AN ASCE STANDARD FOR PERMEABLE INTERLOCKING CONCRETE PAVEMENT David K. Hein, P. Eng. Vice-President, Applied Research Associates Inc., 5401 Eglinton Avenue West, Suite 204, Toronto, ON,
C. Section 014510 TESTING LABORATORY SERVICE.
SECTION 014500 QUALITY CONTROL PART 1 GENERAL 1.01 RELATED REQUIREMENTS A. Drawings and General Provisions of Contract, including General and Special Conditions and other Division 1 Specification Sections,
CHAPTER 17: STORM SEWER STANDARDS. 17.00 Introduction. 17.01 Administration. 17.02 Standards 17.1
CHAPTER 17: STORM SEWER STANDARDS 17.00 Introduction 17.01 Administration 17.02 Standards 17.1 17.00 INTRODUCTION The purpose of this chapter is to provide guidance for the design and construction of storm
Division 2 Section 32 14 13.19 Section 02795
Note: The text must be edited to suit specific project requirements. It should be reviewed by a qualified civil or geotechnical engineer, or landscape architect familiar with the site conditions. Edit
SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS
SECTION 08000 STORM DRAINAGE 08010 DESIGN A. Location B. Sizing TABLE OF CONTENTS 08020 MATERIALS A. Pipe Materials B. Structure Materials C. Installation D. Inlets and Outlets 08030 INSPECTIONS AND TESTING
ARTICLE 16 Retention Best Management Practices
ARTICLE 16 Retention Best Management Practices T1600 Introduction This section provides guidance on a number of retention based stormwater BMP s that can be used to meet the Kane County 0.75-inch retention
Pervious Pavers: Where is the Perviousness?
Pervious Pavers: Where is the Perviousness? Elizabeth (Betsy) Pappas Research Hydraulic Engineer Chi-hua Huang Soil Scientist United States Department of Agriculture Agricultural Research Service National
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary
Item No. 432S Portland Cement Concrete Sidewalks. 432S.1 Description
Item No. 432S Portland Cement Concrete Sidewalks 432S.1 This item shall govern the construction of Portland cement concrete sidewalks (Standard Detail No. 432S-1), as herein specified, on an approved subgrade
APPENDIX B. I. Background Information
APPENDIX B GUIDELINES FOR IDENTIFYING AND REPAIRING LOCALIZED AREAS OF DISTRESS IN AC PAVEMENTS PRIOR TO CAPITAL PREVENTIVE MAINTENANCE OR REHABILITATION REPAIRS I. Background Information A. AC Pavement
CONCRETE SEGMENTAL RETAINING WALL SYSTEM
CONCRETE SEGMENTAL RETAINING WALL SYSTEM PART 1: GENERAL SPECIFICATIONS 1.01 Work Included A. Work shall consist of furnishing and constructing a Rockwood Classic 8 with PCS unit segmental retaining wall
SECTION 31 20 00 EARTH MOVING
SECTION 31 20 00 PART 1 - GENERAL 1.01 DESCRIPTION A. This Section describes the requirements for excavating, filling, and grading for earthwork at Parking Structure, new exit stair and as required to
BMP-7. A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet.
BMP-7 BMP: STORM DRAIN INLET PROTECTION Definition A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet. To prevent sediment from entering storm drainage systems