AWE Aldermaston and Burghfi eld

Size: px
Start display at page:

Download "AWE Aldermaston and Burghfi eld"

Transcription

1 AWE Aldermaston and Burghfi eld Site Development Context Plan (SDCP) Update (SDCP08)

2 The Government made clear last year its commitment to maintaining the effectiveness and safety of the nuclear deterrent including making the necessary investment in the facilities at the Atomic Weapons Establishment and Aldermaston and Burghfi eld. To that end agreement has been reached with AWE Management Limited (AWE ML) to take forward a programme of investment in sustaining key skills and facilities at the Atomic Weapons Establishment. This will include the provision of necessary extra supporting infrastructure. Local Planning Authorities will be consulted on this work in the normal way, under the provisions of the Planning and Compulsory Purchase act The purpose of the investment of some 350 million over each of the next three years is to ensure that we can maintain the existing Trident warhead stockpile throughout its intended in-service life. In the absence of the ability to undertake live nuclear testing given that the UK has signed and ratifi ed the Comprehensive Test Ban Treaty, it is necessary to invest in the facilities at AWE which will provide assurance that the existing Trident warhead stockpile is reliable and safe John Reid Secretary of State for Defence 19th July 2005

3 summary In July 2005 the Government announced an investment programme to secure the replacement and refurbishment of the ageing facilities at AWE Aldermaston and AWE Burghfi eld. A Site Development Context Plan (SDCP) was subsequently published in November This identifi ed the principal, physical components of this programme and the way in which they are proposed to be accommodated at the sites. The SDCP was accompanied by a Strategic Sustainability Appraisal (SSA) that identifi ed the main environmental and related issues that are likely to arise in the course of implementation of the programme. Both documents provided the context in which elements of the programme would be brought forward over the following three years. The programme as a whole is expected to be completed by This document is the fi rst update of the 2005 SDCP that incorporates progress made and some new developments. The two documents are referred to as SDCP05 and SDCP08 Since November 2005 considerable progress has been made. At Aldermaston the Orion Laser facility is under construction. Work on a new offi ce campus has also commenced with fi rst occupations expected in mid 2009 In the context of the latter project signifi cant resources have been secured principally in respect of transport related improvements that will have signifi cant benefi ts for the local community. In the Aldermaston Eastern Area a proposal consolidating existing explosive activities received planning permission in February At AWE Burghfi eld consent was granted for a small scale component manufacturing facility in November Various other ancillary projects have also been completed including temporary offi ce accommodation and computer facilities. Proposals for further, schemes are in preparation. Since the publication of SDCP05, the removal of Crown Immunity in June 2006 has also brought the AWE sites within the scope of normal planning controls. All relevant projects will thus now be the subject of planning applications and a number of proposals have already been considered and approved through this process. West Berkshire Council s consistent performance in relation to the determination of applications has been a major factor in the success of the programme to date. The processes and procedures that are in place to maintain these high standards have proved to be an excellent framework for preparing and considering individual applications on the AWE sites. In accordance with the commitment in the SDCP05, this document updates the position. Whilst the programme remains fundamentally unchanged, there have been some refi nements that include a minor adjustment in the location of one project and the introduction of one new build project where the previously planned refurbishment of existing facilities was not feasible. The opportunity has also been taken to update the two framework plans including the addition of more detailed information where projects are suffi ciently advanced. As indicated in SDCP05, whilst there will inevitably be impacts, there will also be benefi ts arising from implementation of the programme. This has proved to be the case. Measures introduced to minimise the impact of issues such as construction, have been effective and positive benefi ts in terms of improved presentation of the Aldermaston site and various transport related initiatives are already making a noticeable difference.

4 contents 1 INTRODUCTION 1 2 THE PROGRAMME 4 3. OPPORTUNITIES AND CONSTRAINTS 10 4 LAND USE PRINCIPLES AND STRATEGIES 15 5 DEVELOPMENT SEQUENCE 18

5 1. introduction background 1.1 The Atomic Weapons Establishment (AWE) is located at sites at Aldermaston, Burghfi eld and Blacknest in the administrative area of West Berkshire. AWE has played a central role in national defence for more than 50 years and is responsible for the entire life cycle of the United Kingdom s nuclear warheads, from initial research and design, through component manufacture and assembly, to in-service support and fi nal decommissioning and disposal. 1.2 AWE plc manages and operates the Atomic Weapons Establishment on behalf of the Secretary of State for Defence under a 25-year contract that commenced in April AWE s core mission is to build and maintain the warheads for the submarine-launched Trident ballistic missile system that today forms the United Kingdom s sole nuclear deterrent. AWE is also required to maintain a capability to design a successor warhead to Trident should it ever be required in the future. 1.4 In July 2004, the then Secretary of State for Defence affi rmed to Parliament the UK Government s commitment to maintaining the safety and effectiveness of the current nuclear deterrent, including making the necessary investment at AWE, and to keeping open options for the future. 1.5 In July 2005 a three-year investment programme, amounting to extra average annual expenditure of some 350m was announced in order to:- maintain the existing Trident warhead stockpile throughout its intended service life. In the absence of the ability to undertake live nuclear testing given that the UK has signed and ratified the Comprehensive Test Ban Treaty, it is necessary to invest in the facilities at AWE which will provide assurance that the existing Trident warhead stockpile is reliable and safe. 1.6 The Secretary of State also confi rmed that the Local Planning Authority would be consulted in the normal way on the land-use aspects of the programme in the context of current planning legislation. 1.7 Since this announcement, all AWE sites have been brought within the scope of general planning legislation following the removal of Crown Immunity in June This major change has been a signifi cant infl uence in relation to the implementation of the investment programme. The transition to full engagement with the main stream planning system has been successfully achieved with benefi cial results in relation to AWE s operational activities and its relations with stakeholders. page 1

6 1. introduction page 2 aim 1.8 In November 2005 AWE published the fi rst Site Development Context Plan (SDCP), the primary purpose of which was to defi ne the broad parameters of the Government s investment programme in land use terms and facilitate early discussion and consultation with the relevant planning authorities and other stakeholders. 1.9 The fi rst SDCP included a 10 year Illustrative Site Development Framework Plans for each of the two principal sites at Aldermaston and Burghfi eld. These plans set out the principal land-use proposals that were the subject of the investment programme at an end date of No specifi c, signifi cant proposals are involved in respect of the much smaller AWE Blacknest site An accompanying Strategic Sustainability Appraisal (SSA) was also published at the same time as the SDCP. This describes the key areas of potential effects on the environment and those who live and work around the site. The SSA also identifi es how these issues will be addressed and managed by AWE as the programme progresses Significant progress has been made since the publication of these documents. This fi rst update of the SDCP reviews this progress against the aims and objectives of the original document and sets out some minor changes principally in relation to the timing of specifi c projects. To distinguish between the original SDCP and this update they are referred to as SDCP05 and SDCP08 respectively As the SSA is a fi xed reference for future, more detailed work it does not require updating in the same way as the SDCP. It remains as the high level framework in relation to sustainability against which more specifi c work is being undertaken that also relates to AWE s wider commitment to improve the sustainability of the sites and the associated operational activity. A summary of the initiatives that are aimed at addressing the issues identifi ed in the SSA is set out in paragraphs 2.21 and 2.22 below The SDCP and SSA represented the fi rst step in a continuous review process to ensure that the context for more detailed proposals is up to date and the likely overall impact of the investment programme can be assessed at all relevant stages.

7 1. introduction historical development document format 1.14 Very briefl y, the history of development at Aldermaston and Burghfi eld is as follows. Pre 1939 the Aldermaston site was a mediaeval deer park known as Aldermaston Common and Burghfield was predominantly farming land both sites were initially requisitioned by the Ministry of Supply, with Aldermaston ultimately operating as a base for the US Army Air Force Troop Carrier Groups and Burghfield becoming an Ordnance Factory both sites were selected to support the UK Atomic Weapons Programme with Aldermaston primarily involved in research and Burghfield producing various component parts and assembling the weapons. Direct employment at both sites is estimated to have peaked at around 6000 people Site Development Strategy Plan (SDSP) published including transfer of all activity to AWE Aldermaston decision to retain AWE Burghfield for operational reasons SDCP08 follows the same basic format as SDCP05. Section 2 briefl y describes the nature of the overall programme and identifi es its key components. It also sets out the progress in relation to the programme as identifi ed in SDCP05 and some minor changes to the location and scale of some of the projects as well as setting out progress made in relation to the issues identifi ed in the SSA Section 3 re-visits the key constraints and opportunities that have infl uenced the general approach to both sites and the specifi c proposals, including those related to landscape, transport, legacy and sustainability considerations and addresses their continued relevance Section 4 addresses the land use principles that have been applied in formulating the illustrative framework plans and the way in which the implementation of specifi c projects is following those principles Section 5 explains the intended sequencing of new development which will be the subject of further planning applications to West Berkshire Council as the programme rolls forward Secretary of State announces investment programme to modernise existing facilities Crown Immunity removed from AWE sites requiring planning applications to be submitted for most development projects. page 3

8 2.the programme page 4 introduction 2.1 The overall approach to the modernisation of AWE Aldermaston and AWE Burghfi eld put forward in this programme is based on refurbishing and replacing facilities constructed principally in the 1950s and 60s. 2.2 The key elements of this approach are:- Improving standards of design Enhancing environmental performance Reducing environmental impact Managing traffic Maximising community benefits 2.3 The programme involves the re-use of previously developed or brownfi eld sites in accordance with one of the major themes of Government Policy. 2.6 Both sites have a long history of positive co-existence with the local community and provide signifi cant employment and other economic benefi ts. Following the removal of Crown Immunity, West Berkshire Council elected members have become key decision makers as it is they, as the Local Planning Authority, who determine planning applications. This change has been a positive one to the extent that decisions in respect of AWE development are now made at the local level in the same way as all other planning proposals. West Berkshire s excellent record in determining planning applications within relevant timescales and the processes and procedures that are in place to achieve this have also been major factors in the success of programme implementation to date. 2.4 This re-use needs to be achieved whilst maintaining continuity in relation to the activities and processes occurring on the sites and having regard to important issues such as decommissioning, safety and security which are all carried out in the context of nuclear site licences and other stringent controls. 2.5 These factors support the view that there is no practicable or sustainable alternative to AWE s continued presence at Aldermaston and Burghfi eld.

9 2.the programme previous proposals 2.7 In SDCP05 reference is made to the previous Site Development Strategy Plan (SDSP) as the context for the document. The SDCP has proved to be a robust framework for the implementation of the AWE investment programme and, as such, now represents the principal basis for moving forward. 2.8 The components of the programme remain set in the context of the same safety, operational and environmental principles that lie behind all aspects of AWE site development. As set out in SDCP05 they can be placed under the following fi ve main headings:- Manufacturing/production Testing/research Computing/communications Offices and business support accommodation Environmental proposals and programmes 2.9 In addition AWE will continue an on-going programme of modernisation of the service infrastructure within both sites. For example, the long-term aim remains to remove the majority of the above ground steam supply system. Some 2 km has been already been removed. principal programme components 2.10 The main elements of the programme have been split into those requiring new buildings and those involving signifi cant in situ refurbishment of existing buildings and plant. As far as the latter are concerned, the framework plans only show the major examples to indicate where there will be signifi cant construction and related activity. More minor refurbishments will take place at both sites over the period to 2015 and these will be taken into account in arriving at estimates of overall construction related activity and associated traffi c movements Where refurbishment involves material changes to the appearance of any building or plant, individual applications will be submitted The principal new build elements in the programme are set out in the following tables (A Aldermaston, B Burghfi eld) Their general, proposed locations are shown on the respective framework plans AWE1 (Aldermaston) and AWE2 (Burghfi eld) which accompany this document Where projects have been completed since the publication of SDCP05 or are under construction, a note is included to that effect and the framework plans have been updated to include the footprints of the buildings. page 5

10 2.the programme page 6 new build projects Manufacturing/Production Reference (See Illustrative Framework plans for site locations) Testing/Research Location Indicative floor space (m2) Indicative height (m) (building only) Status 1 A 13, Relocated 2 A 8, Programmed 09 3 A 4, Permitted 4 A 1, Programmed 10 on 5 B 3, Programmed 10 on 6 B 1, Permitted 7 B 12, Programmed 08 7a B 10, Programmed 08 Proposal Location Indicative floor space (m2) Indicative height (m) building only Status 8 A 2, U construction 9 A 3, Programmed A 15, Programmed B Programmed 10 on 12 B 9, Programmed 10 on Computing/Communications Proposal Location Indicative floorspace (m2) Indicative height (m) (building only) Status 13 A 4, Programmed 10 on 14 A Complete 15 A Complete

11 2.the programme Offi ce and Support Accommodation Proposal Location Indicative floorspace (m2) Indicative height (m) (building only) Status 16 A 21, U Construction 17 A 12, Programmed 10 on 18 A 9, Complete 19 A Complete 20 A 1500 spaces approx. N/A U Construction, Partially complete 21 A 500 spaces approx. N/A U Construction Partially complete Environmental proposals and programmes Proposal Location Indicative fl oorspace (m2) Indicative height (m) (building only) Status 22 A N/A N/A Programmed A/B N/A N/A Programmed 10 page The principal changes since SDCP05 are as follows:- The commencement of construction of the Orion laser at Aldermaston (Project 8) following detailed approval. The granting of detailed planning permission for two phases of office accommodation at Aldermaston (project 16) and commencement of construction. The relocation of project 1 at Aldermaston to a position slightly to the west of its previous location to relate it to the approved project 16 building. The addition of a further conventional manufacturing facility proposal at Burghfield in the north eastern part of the site as an alternative to refurbishment of existing buildings (project 7a). The completion of the computing and temporary office facilities of Aldermaston (projects 14, 15 and 18). Commencement of the rationalised car park provision of Aldermaston (projects 20 and 21) In addition, there have been other minor developments, such as new dog kennels at Burghfi eld, not specifi cally related to the investment programme.

12 2.the programme page 8 employment 2.17 Most of any additional direct employment is still expected to arise in the context of the proposed offi ce accommodation at Aldermaston, the majority of which is programmed for completion during For both Burghfi eld and Aldermaston, it is also still envisaged that the implementation of the programme will not lead to levels of direct employment greater than those associated with the sites in the past The construction process will obviously involve employment levels over and above the operational workforce whilst building occurs. The impact of the construction process itself and the additional employment it involves will be assessed and managed in accordance with a co-ordinated overall strategy for both sites Increased employment and the activity associated with construction will involve signifi cant economic benefi ts particularly in respect of the local community In addition to the principal new build projects and the major refurbishments, further studies will be undertaken in the early part of the programme focused on the western part of the Aldermaston site. These studies will deal primarily with the future use and operation of the West Gate and the area utilised by the Recreation Society. These are both related to the potential for creating a higher quality entrance to the Aldermaston site. further studies 2.21 SDCP05 indicated that, in addition to the principal new build projects and major refurbishments, further studies and assessments would be undertaken to support the programme and address the issues identifi ed in the SSA A great deal has been achieved in this regard since 2005, notably in relation to transport and construction related issues. These include:- A preliminary evaluation of the overall transport implications of the SDCP. A travel plan for all AWE sites. Architectural Design Principles. A Code of Construction Practice. A surface water strategy for AWE Aldermaston. An energy strategy for AWE Aldermaston and Burghfield Work is also well advanced in relation to the following exercises:- Heritage management. Biodiversity. Recreation. Boundary Assessment. Strategic Landscaping. Integrated Waste Strategy 2.24 This series of completed and emerging supporting studies has been invaluable in ensuring that planning applications submitted to West Berkshire Council are comprehensive and capable of positive determination within the relevant timescales. The completion of an extensive range of environmental strategies and related initiatives has also proved to be invaluable in supporting and developing AWE s existing sustainable management measures.

13 2.the programme a dynamic programme 2.25 Inevitably, with a project of this complexity, there are likely to be modifi cations and variations to the schedule of proposals and the associated framework plans as the programme develops. However, the overall context for the proposals represented in this document is not expected to change materially If other developments come forward outside the context of the programme set out in this document, the local planning authority and other key stakeholders will be involved at an early stage SDCP05 also suggested that there were likely to be modifi cations and variations to the schedule of proposals and the associated framework plans as the programme develops. As outlined in the preceding paragraphs and the accompanying tables, some minor modifi cations have indeed occurred. However, these do not affect the nature of the overall programme that has not materially changed and the principal stakeholders have been kept fully advised in respect of any refi nements as they have arisen AWE will continue to review the detail of the programme and keep key stakeholders informed of any additional alterations that may be required. These will be incorporated in further SDCP updates as necessary and appropriate. page 9

14 3.opportunities &constraints page 10 introduction 3.1 The accompanying plans (AWE3 and AWE4) reproduced directly from SDCP05 show the principal opportunities and constraints affecting both sites. Given their respective locations and characteristics Aldermaston and Burghfi eld give rise to different issues and challenges. site specifi c constraints and opportunities Aldermaston 3.2 Aldermaston can be divided into three broad functional areas. The eastern part of the site to the east of the main north south access road (Griffi n Road) is principally devoted to activity associated with conventional explosives and is currently licensed by the Ministry of Defence Ordnance Safety Group (DOSG). These arrangements will become the responsibility of the Health and Safety Executive (HSE) from April To the west of Griffi n Road the site splits generally in to two areas. To the north is the Nuclear Storage and Processing Area (NSPA). This is devoted mainly to the nuclear aspects of the site s activities and is subject to additional levels of security. 3.4 To the south the area is principally characterised by business support activities including the majority of the existing offi ce accommodation on the site. This is referred to below as the Business Support Zone. The area of this zone within which most redevelopment is proposed is referred to as the West End. 3.5 For a variety of operational and practical reasons there is little scope or need to depart from the overall land-use pattern at Aldermaston. Indeed, there is merit in seeking to accentuate and reinforce these distinctions. Aldermaston Business Support Zone 3.6 For the Business Support Zone there is a signifi cant opportunity to improve the presentation and image of the site without unduly compromising its historic layout. In this latter regard, Aldermaston is unique in land use terms. It has evolved in a particular historical context rooted in the 1950s and 60s and it is considered important to retain the overall character of the area whilst at the same time taking the opportunity to maintain and develop the world class status of its scientifi c and engineering community. 3.7 The construction of the Orion laser and the new offi ce accommodation are already contributing to an increased feeling of quality and identity in the western part of the Aldermaston site. Aldermaston NSPA 3.8 The primary considerations relating to this area must be focused on safety, security and operational effi ciency. Inevitably, therefore, the area will continue to have a functional appearance. Aldermaston Eastern Area 3.9 Constraints in this part of the site are also dominated by safety, security and the need to maintain functional continuity during construction This creates a potentially complex picture related to the Safeguarding Areas (SAs) that must be maintained around buildings licensed to process and handle explosives. The amount and type of material involved and the nature of the buildings in which they are located defi nes the extent of the SA and the number of people permitted within it.

15 3.opportunities &constraints general issues 3.11 This means that during the project period, maximum fl exibility must be maintained to move material and activities within the licensed area to minimise the restrictions associated with SAs. In addition, in the context of the current regulatory regime the licensed area could not be signifi cantly reduced without prejudicing the implementation of the proposed new facilities and the overall operation of the area Restricted access to the eastern area does however have the benefi t that, in nature conservation terms, it includes some valuable habitats With appropriate management there is the potential opportunity to protect and enhance these resources, both now and in the long term, without affecting operational capability. Burghfield 3.14 A signifi cant site-specifi c constraint at Burghfi eld arises from its past history as a location for the processing and production of conventional explosives and munitions. This legacy will require a long-term programme of characterisation and subsequent clearance which is already under way In addition, any new buildings needs to be located in close proximity to the existing assembly facilities to ensure continuity of operations and appropriate levels of security at all stages. Traffi c and Transportation 3.16 A survey was undertaken in the context of the SDCP05 of the existing work force to assist in the formulation of a travel plan and inform development of the SDCP and the SSA For both Aldermaston and Burghfi eld it is fully recognised that transportation, including access, is a signifi cant and important issue, particularly during the construction period. Whilst the latter involves temporary impacts, construction will occur over an extended period and will require careful management and control. Further work on this has been undertaken since the publication of SDCP05 with the development of the Code of Construction Practice (COCP). This provides a robust framework for the management of construction activity and is being successfully applied Since the publication of SDCP05 individual Transport Assessments have also been prepared for specifi c projects in the context of an overview of the effects of the programme as a whole in transport terms In addition, a Travel Plan has been prepared with a commitment on the part of AWE to implement a range of measures aimed principally at reducing use of the private car. These measures include:- Sustainable transport choices for staff, contractors and visitors. Improved accessibility to the development by walking, cycling, passenger transport and car sharing; and A reduction in the need to travel, especially alone by car; and page 11 A reduction in vehicular movements within the sites.

16 3.opportunities &constraints page These objectives fully accord with national, regional and local planning policies and are linked closely to the planning permission granted for additional offi ce accommodation at Aldermaston in March 2007 (project 16). This consent also delivers a comprehensive package of physical, off-site enhancements aimed at improving highway safety and making it easier for pedestrians and cyclists to access the site. Landscape 3.21 A Landscape and Vegetation Appraisal has been undertaken for both sites. Further detailed assessment is being undertaken of the individual elements of the project Aldermaston is a large site which has few immediately recognisable reference points or landmarks. The industrial nature of many of the buildings and the homogeneity of much of the mid 20th century architecture can also be confusing for those trying to navigate the site and who do not already know it well. The site is evident in views from some public viewpoints, visible within a well wooded landscape context In this regard there is an opportunity to enhance the legibility of the site through the design and treatment of the open space network and also improve the quality of the external environment through the introduction of additional structure planting and upgrading the hard landscape materials. A site wide landscape strategy has been prepared to guide and inform both improvements to the site landscape infrastructure and the implementation of landscape associated with individual projects For operational and security reasons the boundary fences will remain clearly visible. As opportunities arise the site boundary planting is being supplemented and renewed to retain and enhance landscape enclosure. As with AWE Aldermaston, a site wide landscape strategy is the context for individual schemes Overall, the programme will continue to address opportunities within the sites to:- Respond to and enhance the existing local landscape setting. Maintain existing landscape character. Maintain existing landscape features. Reinforce landscape structure. Improve landscape structure through additional planting and upgrading the approach to hard surface treatment. Retain, where possible, all important and healthy trees. To provide additional boundary planting where appropriate. Ensure that all future planting, in the context of any future development or landscape management, is of a sufficient scale, to significantly enhance the landscape context of both sites. Achieve a more attractive and high quality external presentation whilst ensuring that security is maintained Burghfi eld is smaller although it too lacks clear reference points. This will become less of an issue, however, as the current operational area contracts and the grid pattern of access ways that characterises the site becomes less dominant.

17 3.opportunities &constraints page 13 Sustainability 3.27 Signifi cant opportunities were identified in SDCP05 to meet wider sustainability objectives as the development programme for Aldermaston and Burghfi eld proceeds. The current building stock is generally ineffi cient in relation to energy consumption and other infrastructure such as the above ground steam distribution system which will require replacement. In addition the SSA identifi ed a range of strategies that would be developed to further the aims of AWE s corporate approach to sustainability. Considerable progress has been made in this regard that is no reaping real benefi ts in respect of areas such as energy use, surface water management and travel and movement The development programme will involve signifi cant improvements to the ageing utility infrastructure. The following opportunities are being addressed in respect of all development and infrastructure proposals: Maintaining the status of both sites as good neighbours within their host communities including maximising economic and social benefits. Providing employees with modern and attractive facilities that are safe, comfortable and an aid to recruiting high quality staff. Continuing to minimise the impact on the environment of operational and construction activity. Continuing an on-going programme of decommissioning, demolition and decontamination consistent with the above principles. Signifi cant progress has been made in all these areas. The introduction of the Code of Construction Practice (COCP) has been a major step forward in maintaining an appropriate relationship between construction, the environment and the community. The provision of further, high quality offi ce accommodation in buildings designed to high levels of energy effi ciency also represents substantial progress towards making AWE s operations more sustainable. With the increased emphasis on climate change since SDCP05 this issue will become more important as the programme proceeds. Demolition and Decommissioning 3.30 There are few examples of contamination arising from the operation of either site in the context of their current or historical uses and none which signifi cantly constrain the implementation of the investment programme Since the beginning of 2003, AWE has demolished more than 100 facilities on both sites. This leaves over 1100 buildings on the Aldermaston site and over 360 at Burghfi eld, many of which date back to the 1940s. Surveys continue to identify further buildings for demolition. Since the publication of SDCP05 demolition has continued As the programme proceeds, and indeed beyond 2015, there will be signifi cant opportunities where practical to continue the decommissioning and demolition that will improve the appearance of both sites as well as reducing maintenance and utility costs. In the meantime, any new fl oorspace created is being offset against the cessation of the use and eventual clearance of older, more dispersed buildings During demolition work great care is taken to minimise the environmental impact and avoid disruption to neighbours. Wherever possible, material resulting from demolition is being re-used within the sites to avoid unnecessary traffi c movements and conserve natural resources.

18 3.opportunities &constraints page 14 The community 3.34 AWE enjoys a close relationship with the local community and the established liaison arrangements continue to work effectively. The removal of Crown Immunity in particular has necessitated a close working relationship with West Berkshire as Local Planning Authority as AWE seeks to meet challenging programming objectives. The fact that West Berkshire is one of the best performing authorities in the country in terms of the determination of planning applications has been a major factor in the progress made since Every effort will continue to be made to keep local people informed and to implement the investment programme in a way that minimises the impact on the host community. The Local Liaison Committee (LLC) is an important forum for providing information on the programme and identifying key issues from the community based stakeholders.

19 4.land use principals&strategies Aldermaston General Approach 4.1 The overall approach to the Aldermaston site depicted on the accompanying revised framework plan (AWE1) is to recognise and reinforce the functional split as set out in SDCP(05). Aldermaston - Business Support Zone/West End 4.2 New offi ce accommodation is being provided between the two main access roads in the high quality campus style form envisaged in SDCP05. The detailed design and orientation of the buildings has also created the opportunity to relocate project 1 to the east of the new offi ces to create a more coherent urban design approach in conjunction with the Orion laser. As previously proposed, the eastern section of the Business Support Zone will be retained in its current form and layout for the foreseeable future refl ecting the development of Aldermaston in the 1950s and 60s. 4.3 Work on the car parking areas to the south of the Business Support Zone has also commenced. The aim remains to create a pedestrian priority area linking the car parking area to the new development to the north and to generally improve the public realm as proposed in SDCP Work is also continuing to re-examine the role of the West Gate in relation to the potential for creating a new gateway to the site and how that may relate to the use of the existing Recreation Society facilities. This will need to have regard to junction improvements to the existing access points at the West Gate associated with the planning permission for the new offi ce accommodation. 4.5 Overall, signifi cant progress has been made towards achieving the objective of creating a high quality focus at the western end of the Business Support Zone. The Orion laser and the new offi ce accommodation are set to transform the appearance and presentation of the site in this area, providing a solid platform for further development and environmental improvements in this area. Aldermaston NSPA 4.6 The most appropriate location for new buildings in this area is in its southern section. Within the NSPA there are three major refurbishments proposed. The remainder of this part of the NSPA is affected by an on going de-commissioning programme, which does not facilitate redevelopment within the programme timescale. Aldermaston Eastern Area 4.7 As proposed in SDCP05 all conventional explosive related activity is to be consolidated on the Aldermaston site. Overall, the aim is to concentrate facilities with the largest potential explosive inventories in the centre of the licensed area. Project 3, which received full planning permission in February 2008 will bring together most of the signifi cant activity in the area in the context of a new landscape management plan for the area as a whole. In the light of the current regulatory regime, uses that involve smaller or non existent SAs can be located on the periphery. The general principle must nevertheless be to maintain maximum dispersal and keep SAs contained within the licensed area boundary as much as possible. 4.8 Within the operational constraints operating within the eastern area, there is an opportunity for some additional tree planting in the context of an overall management plan. Many of the existing scattered birch trees are now over mature. Proposals for planting groups of mixed predominantly deciduous trees are being developed to compliment the heathland and woodland character of the area. page 15

20 4.land use principals&strategies page 16 Burghfi eld General Approach 4.9 Management plans for the eastern area will be prepared to support planning applications to ensure the existing landscape and habitat resources are protected, supplemented and enhanced where possible. In particular, a grass cutting management regime will be explored which, taking into account the regulatory requirements, allows the original heath land habitat to be restored wherever possible The overall approach to Burghfi eld (Plan AWE2) involves the consolidation of operational uses in the northern part of the site, progressive characterisation and subsequent clearance and decontamination of the remainder of the site generally working from north to south. This remediation work will extend beyond At present AWE s high precision manufacturing capability is spread across a number of individual facilities at Burghfi eld and Aldermaston. It had originally been intended that future requirements in relation to this aspect of AWE s existing operation would be met by refurbishing existing buildings at both sites. However, following further detailed consideration of the matter it has been concluded that a new build approach is likely to be a more cost effective solution. A proposed new consolidated facility has thus been incorporated in to the SDCP. The location for this new building is in the north eastern corner of the Burghfi eld site Whilst the site is set within a well established landscape network, and therefore limited in views from the wider landscape, opportunities have been identifi ed for additional planting to reinforce the site s enclosure, especially along the western edge. common issues Demolition and Clearance 4.13 A signifi cant amount of demolition will be required to facilitate new building and the refurbishment of some facilities on both sites. Given the levels of construction activity that are likely over the project period, signifi cant clearance work not directly related to the implementation of the investment programme will need to be carefully managed.

21 4.land use principals&strategies 4.14 The framework plan identifi es specifi c, longer term clearance areas at Aldermaston where the aim is to eventually remove existing buildings and structures. These proposals will be kept under review in the light of progress on the main construction and refurbishment programme. Transport 4.15 The Transport Strategy will involve the adoption of demand management through more control of on-site parking, the implementation of a travel plan and by managing movements both on and off site Development of a travel plan has progressed for all AWE sites 4.17 Key elements of the strategy include:- Introducing a gate and parking permit system that allocates drivers to a specific car park and a gate. This is most relevant at Aldermaston and has already been implemented at Portland House. Consolidating car parking in specific locations as shown on the illustrative framework plans. An overall gate access strategy taking into account operational, movement and security considerations The local authority and all relevant stakeholders will be closely involved in the process of developing and implementing the strategy. Landscape Strategy 4.19 As indicated above, there is a clear need for substantial landscaping in key locations to reinforce the urban design principles, setting the development into a coherent and high quality landscape structure. Construction 4.20 The framework plans have been prepared on the basis that construction activity would be contained within both sites in terms of compounds and laydown areas. In this regard potential areas at both Aldermaston and Burghfi eld are identifi ed on the respective plans In addition construction related traffi c movements require detailed management, both within and outside the site, having regard to impact on the relevant highway networks, security and operational continuity. This has involved defi ning temporary self-contained construction areas that are subject to specifi c arrangements in the context of the Code of Construction Practice. Confirming dedicated gates for construction traffic and associated management. Reducing Single Occupancy Vehicles (SOV) (through car sharing, bus travel, improved walking/ cycling links and adoption of flexible working where possible). Staff and community consultation at an early stage of the process of implementing travel initiatives. page 17

22 5. development sequence page 18 approach 5.1 The confi rmation of the development programme will involve the submission of further planning applications to West Berkshire over the next three years. Experience to date has demonstrated that detailed, pre-application discussions are an essential part of the process and these will continue as proposals are prepared and submitted in sequence. The broad timing of application submission is as follows: Project 7a mid 2008 Project 7 late 2008 Project 2 - early 2009 Projects 9/10 mid 2009 Projects 1,4, ,17 late 2009 on 5.2 AWE will continue to keep the programme updated in further revisions to the SDCP as necessary and appropriate.

23

24 AWE Aldermaston and Burghfi eld Site Development Context Plan (SDCP) Update (SDCP08) EDMS 1/80137/D12/B/SD2005

APPLICATION FOR PLANNING PERMISSION FOR A SOIL TREATMENT FACILITY AT KINGS CLIFFE LANDFILL SITE, STAMFORD, NORTHAMPTONSHIRE

APPLICATION FOR PLANNING PERMISSION FOR A SOIL TREATMENT FACILITY AT KINGS CLIFFE LANDFILL SITE, STAMFORD, NORTHAMPTONSHIRE APPLICATION FOR PLANNING PERMISSION FOR A SOIL TREATMENT FACILITY AT KINGS CLIFFE LANDFILL SITE, STAMFORD, NORTHAMPTONSHIRE DESIGN AND ACCESS STATEMENT Report Reference: AU/KC/SPH/1449/01/D&A/FIN Baddesley

More information

Report to Planning applications committee Item Date 6 March 2014 Head of planning services

Report to Planning applications committee Item Date 6 March 2014 Head of planning services Report to Planning applications committee Item Date 6 March 2014 Report of Head of planning services 4(7) Subject 13/02051/F Former Wellesley First School Wellesley Avenue North Norwich NR1 4NT Description:

More information

Draft New Museums Site Development Framework Supplementary Planning Document SUSTAINABILITY APPRAISAL SCREENING REPORT

Draft New Museums Site Development Framework Supplementary Planning Document SUSTAINABILITY APPRAISAL SCREENING REPORT Draft New Museums Site Development Framework Supplementary Planning Document SUSTAINABILITY APPRAISAL SCREENING REPORT MAY 2015 1 Contents 1 INTRODUCTION 3 2 DRAFT NEW MUSEUMS SITE SPD 4 3 STRATEGIC ENVIRONMENTAL

More information

ACRE, Federation of Petroleum Suppliers, and Citizen s Advice

ACRE, Federation of Petroleum Suppliers, and Citizen s Advice ACRE, Federation of Petroleum Suppliers, and Citizen s Advice Contents Heating Oil Suppliers Advantages of Oil Buying Groups Case studies Points to consider before setting up an oil buying group Purchasing

More information

Development proposals will require to demonstrate, according to scale, type and location, that they:-

Development proposals will require to demonstrate, according to scale, type and location, that they:- Appendix 2 : Relevant Development Plan Policies Angus Local Plan Review 2009 Policy S1 : Development Boundaries (a) Within development boundaries proposals for new development on sites not allocated on

More information

Richmond upon Thames College. Draft Planning Brief. May 2008

Richmond upon Thames College. Draft Planning Brief. May 2008 Richmond upon Thames College Draft Planning Brief May 2008 1. Introduction 1.1 The purpose of this Planning Brief is to establish a development framework for the proposed comprehensive redevelopment of

More information

Key Facts. Passenger growth at the airport is projected to grow to approximately 3 million passengers per annum by 2030.

Key Facts. Passenger growth at the airport is projected to grow to approximately 3 million passengers per annum by 2030. Bournemouth Airport & Business Park 7 7 Bournemouth Airport & Business Park Introduction 7.1 Bournemouth Airport is a key asset for the region, one of the UK s fastest growing regional airports and is

More information

Proposed Sports Hall at. Oldfield School. Kelston Road. Bath BA1 9AB. Construction Management Plan June 2011 Rev A

Proposed Sports Hall at. Oldfield School. Kelston Road. Bath BA1 9AB. Construction Management Plan June 2011 Rev A Proposed Sports Hall at Oldfield School Kelston Road Bath BA1 9AB Construction Management Plan June 2011 Rev A CONTENTS 1.0 Introduction 2.0 Site Location 3.0 Proposed Development 4.0 Construction Management

More information

Glossop Design & Place Making Strategy

Glossop Design & Place Making Strategy Supplementary Planning Document to the High Peak Local Plan June 2011 Design Brief for the Town Hall Complex GILLESPIES I GERALD EVE Reproduced from the Ordnance Survey map with the permission of Ordnance

More information

information Records Management Checklist business people security preservation accountability Foreword Introduction Purpose of the checklist

information Records Management Checklist business people security preservation accountability Foreword Introduction Purpose of the checklist Records Management Checklist Foreword We fi rst developed the Records Management Checklist in 2008 to complement our performance audit Records Management in the Victorian Public Sector. At that time the

More information

Proposed Sports Hall at. Oldfield School. Kelston Road. Bath BA1 9AB. Construction Management Plan June 2011

Proposed Sports Hall at. Oldfield School. Kelston Road. Bath BA1 9AB. Construction Management Plan June 2011 Proposed Sports Hall at Oldfield School Kelston Road Bath BA1 9AB Construction Management Plan June 2011 CONTENTS 1.0 Introduction 2.0 Site Location 3.0 Proposed Development 4.0 Construction Management

More information

4 Alternatives and Design Evolution

4 Alternatives and Design Evolution 4 Introduction 4.1 This Chapter describes the considerations and constraints influencing the siting, layout and massing of the Development. It also describes the main alternatives to the Development that

More information

Liquid Effluent Treatment Plant (LETP) Land Clean-Up

Liquid Effluent Treatment Plant (LETP) Land Clean-Up Liquid Effluent Treatment Plant (LETP) Land Clean-Up Frequently Asked Questions What is proposed? Magnox Ltd is proposing to remove the redundant Liquid Effluent Treatment Plant (LETP) at Harwell and to

More information

Erection of replacement warehouse building and erection of two buildings in connection with builder s merchants

Erection of replacement warehouse building and erection of two buildings in connection with builder s merchants Plan: O 02/00708/FUL Thames Ward (A) Address: Development: Applicant: London Works, Ripple Road, Barking Erection of replacement warehouse building and erection of two buildings in connection with builder

More information

USAGE AND PUBLIC REPORTING GUIDELINES FOR THE GREEN GRID S INFRASTRUCTURE METRICS (PUE/DCIE)

USAGE AND PUBLIC REPORTING GUIDELINES FOR THE GREEN GRID S INFRASTRUCTURE METRICS (PUE/DCIE) WHITE PAPER #22 USAGE AND PUBLIC REPORTING GUIDELINES FOR THE GREEN GRID S INFRASTRUCTURE METRICS (PUE/DCIE) EDITORS: JON HAAS, INTEL JAMIE FROEDGE, EMERSON NETWORK POWER CONTRIBUTORS: JOHN PFLUEGER, DELL

More information

Site Deliverability Statement Alternative Site at: Bridge Road, Old St Mellons

Site Deliverability Statement Alternative Site at: Bridge Road, Old St Mellons Site Deliverability Statement Alternative Site at: Bridge Road, Old St Mellons Representor Number 1135 AS(N)4 Persimmon Homes 9 th February 2015 Contents Site Deliverability Statement Alternative Site

More information

A new Garden Neighbourhood for West Guildford An opportunity for Smart Growth. university of surrey November 2013

A new Garden Neighbourhood for West Guildford An opportunity for Smart Growth. university of surrey November 2013 A new Garden Neighbourhood for West Guildford An opportunity for Smart Growth university of surrey November 2013 A new Garden Neighbourhood for West Guildford Preface Since the County and Borough Councils

More information

The Roaches Asset Management Review. Draft Objectives for External Consultation. Fundamental Principles

The Roaches Asset Management Review. Draft Objectives for External Consultation. Fundamental Principles The Roaches Asset Management Review Draft Objectives for External Consultation Fundamental Principles the area of land under review is the Roaches Estate and Gradbach Car Park as shown on the attached

More information

Advice can also be sought from specific specialist officers in the Council.

Advice can also be sought from specific specialist officers in the Council. Canterbury City Council Validation of Planning Applications Guidance note 2010: Introduction Up to date advice on the validation of planning applications is contained in the CLG Guidance on information

More information

Planning should achieve high quality urban design and architecture that: Contributes positively to local urban character and sense of place.

Planning should achieve high quality urban design and architecture that: Contributes positively to local urban character and sense of place. 15 BUILT ENVIRONMENT AND HERITAGE 15/07/2013 VC100 Planning should ensure all new land use and development appropriately responds to its landscape, valued built form and cultural context, and protect places

More information

Environment Committee 11 January 2016

Environment Committee 11 January 2016 Environment Committee 11 January 2016 Title Whole Life Costing of Footway Maintenance Treatments and Scheme Prioritisation Report of Wards Status Urgent Key Enclosures Commissioning Director, Environment

More information

Business Change Mandate (Including Budget Mandates) Proposal Number: B18 Title: Strategic Property Review

Business Change Mandate (Including Budget Mandates) Proposal Number: B18 Title: Strategic Property Review Business Change Mandate (Including Budget Mandates) Proposal Number: B18 Title: Strategic Property Review All information requested must be completed on the proposed mandate to enable the Cabinet to decide

More information

DEVELOPMENT BRIEF FOR LAND AT ALLOA ROAD, TULLIBODY

DEVELOPMENT BRIEF FOR LAND AT ALLOA ROAD, TULLIBODY DEVELOPMENT BRIEF FOR LAND AT ALLOA ROAD, TULLIBODY 1.0 Introduction and Purpose 1.1 Clackmannanshire Council is seeking to dispose of a site at Alloa Road, Tullibody for redevelopment. The site extends

More information

Construction Traffic Management Plan

Construction Traffic Management Plan Introduction This (CTMP) has been prepared in order to discharge Condition 20 of planning permission ref 07/02879/EFUL for the enabling site works associated with the wider Bath Western Riverside development.

More information

DEVELOPMENT MANAGEMENT

DEVELOPMENT MANAGEMENT DEVELOPMENT MANAGEMENT Sub Heading Sub Heading 2 march 2012 PRE APPLICATION ADVICE SERVICE FOR PLANNING APPLICATIONS Introduction CONTACT DETAILS Telephone 0191 433 3416 / 0191 433 3426 Fax 0191 477 8422

More information

THE TOWN AND COUNTRY PLANNING ACT 1990 Grant of Planning Permission

THE TOWN AND COUNTRY PLANNING ACT 1990 Grant of Planning Permission Civic Offices Havant Hampshire PO9 2AX Tel (023)9247 4174 Fax(023)9244 6588 DX50005 Havant www.havant.gov.uk To: ADP Architects Ltd Richmond Court 94 Botley Road Park Gate Southampton, Hants SO311BA For:

More information

Design for Independent Schools

Design for Independent Schools Design for Independent Schools Developing Your School Re-Format is an award-winning architecture and design studio which has been specialising in buildings for the education sector for twenty years. We

More information

AGENT(S) / APPLICANT(S): AGENT Dave Dickerson, DK Architects. APPLICANT Halton Housing Trust. DEVELOPMENT PLAN ALLOCATION: Greenspace.

AGENT(S) / APPLICANT(S): AGENT Dave Dickerson, DK Architects. APPLICANT Halton Housing Trust. DEVELOPMENT PLAN ALLOCATION: Greenspace. APPLICATION NO: 14/00168/FUL LOCATION: Land to the west of 19 Crow Wood Lane, Widnes. PROPOSAL: Proposed erection of 10 no. 1 bedroom apartments with individual access doors arranged in 2no. 2 storey height

More information

Chapter Summary. 5 options were shortlisted; one for comprehensive refurbishment of the existing hospital and four new build variants

Chapter Summary. 5 options were shortlisted; one for comprehensive refurbishment of the existing hospital and four new build variants 5 Option Appraisal 5.1 Overview Chapter Summary A long list of 12 options was identified 5 options were shortlisted; one for comprehensive refurbishment of the existing hospital and four new build variants

More information

Slums and informal settlements An evidence-based approach to sustainable upgrading and development

Slums and informal settlements An evidence-based approach to sustainable upgrading and development Slums and informal settlements An evidence-based approach to sustainable upgrading and development 1 billion people currently live in slums, this is set to double over the next 30 years. Slums are a physical

More information

1 Welcome. The exhibition comprises a series of boards which provide some background information to show you our initial ideas for the site.

1 Welcome. The exhibition comprises a series of boards which provide some background information to show you our initial ideas for the site. 1 Welcome Thank you for taking the time to attend this public exhibition of our proposals for residential development on Land at Daws Farm, Back Road, Writtle (site shown opposite). The exhibition comprises

More information

Subject: APPLICATION 10/02650/CA. DEMOLITION OF YOUTH CLUB, DEEPDALE LANE, BOSTON SPA, WETHERBY.

Subject: APPLICATION 10/02650/CA. DEMOLITION OF YOUTH CLUB, DEEPDALE LANE, BOSTON SPA, WETHERBY. Originator: Victoria Hinchliff Walker Tel: 39 51343 Report of the Chief Planning Officer PLANS PANEL EAST Date: 28 th October 2010 Subject: APPLICATION 10/02650/CA. DEMOLITION OF YOUTH CLUB, DEEPDALE LANE,

More information

Mount Browne (Surrey Police Head Quarters), Sandy Lane, Guildford Vision Statement. November 2013. with

Mount Browne (Surrey Police Head Quarters), Sandy Lane, Guildford Vision Statement. November 2013. with Mount Browne (Surrey Police Head Quarters), Sandy Lane, Guildford Vision Statement November 2013 with Tibbalds Planning & Urban Design 19 Maltings Place 169 Tower Bridge Road London SE1 3JB Telephone 020

More information

Neighbourhood Planning Guidance Note 20 Guide to settlement boundaries

Neighbourhood Planning Guidance Note 20 Guide to settlement boundaries Neighbourhood Planning Guidance Note 20 Guide to settlement boundaries April 2013 - Revised January 2014 Settlement boundaries are a well utilised planning tool for guiding, controlling and identifying

More information

Contingent Workforce Program Management: Global Considerations for the Manufacturing Industry

Contingent Workforce Program Management: Global Considerations for the Manufacturing Industry A ManpowerGroup TM Solutions TAPFIN Technical Brief Contingent Workforce Program Management: Global Considerations for the Manufacturing Industry Contingent Workforce Program Management: Global Considerations

More information

National Planning Policy for Waste

National Planning Policy for Waste National Planning Policy for Waste October 2014 Department for Communities and Local Government Crown copyright, 2014 Copyright in the typographical arrangement rests with the Crown. You may re-use this

More information

Project Management and the Organisational Strategy

Project Management and the Organisational Strategy Project Management and the Organisational Strategy An ESI International White Paper Tel: +44 (0) 20 7017 7100 www.esi-emea.com Table of Contents Project Management and the Organisational Strategy 2 An

More information

LANDSCAPE AND DEVELOPMENT CHECKLIST FOR MONMOUTHSHIRE COUNTY COUNCIL

LANDSCAPE AND DEVELOPMENT CHECKLIST FOR MONMOUTHSHIRE COUNTY COUNCIL LANDSCAPE AND DEVELOPMENT CHECKLIST FOR MONMOUTHSHIRE COUNTY COUNCIL 1 Introduction It is to the advantage of the developer to treat the environmental aspects of development proposals seriously and take

More information

Camden Development Policies

Camden Development Policies Camden Local Development Framework Camden Development Policies Adoption version 2010 1 CAMDEN LOCAL DEVELOPMENT FRAMEWORK CAMDEN DEVELOPMENT POLICIES Camden Development Policies 2010 Introduction 1. Location

More information

SPORT DEVELOPMENT STRATEGIC PLAN 2013-2016

SPORT DEVELOPMENT STRATEGIC PLAN 2013-2016 SPORT DEVELOPMENT STRATEGIC PLAN 2013-2016 INTRODUCTION THE STRATEGIC PLANNING PROCESS FOR SASK SPORT ENGAGED ITS ACTIVE AND AFFILIATE MEMBERSHIP AND FIRST NATIONS AND MÉTIS COMMUNITIES FOR IDEAS AND RECOMMENDATIONS

More information

National and Major Developments

National and Major Developments National and Major Developments An Agency Joint Statement on Pre-application Engagement A Joint Statement by Architecture and Design Scotland, Forestry Commission Scotland, Historic Scotland, Scottish

More information

Records Management Checklist. preservation. accountability. information. security. peoplep. A tool to improve records management

Records Management Checklist. preservation. accountability. information. security. peoplep. A tool to improve records management Records Management Checklist preservation accountability information security busine ess peoplep A tool to improve records management preservation people security business Foreword accountability information

More information

Development Layout Design

Development Layout Design Development Layout Design General Design Considerations for Adoptable Highways Version 1 June 2012 Transportation, Waste and Environment Service Issue and Revisions Record Revision Date Originator Purpose

More information

THE WELL MANAGED ORGANISATION GUIDELINES FOR BOARDS

THE WELL MANAGED ORGANISATION GUIDELINES FOR BOARDS MINISTERIAL TASK FORCE ON HEALTH, SAFETY AND PRODUCTIVITY THE WELL MANAGED ORGANISATION GUIDELINES FOR BOARDS SEPTEMBER 2006 THE WELL MANAGED ORGANISATION - GUIDELINES FOR BOARDS Workplace absence and

More information

Guidance on Non-Material Amendments and Minor Material Amendments

Guidance on Non-Material Amendments and Minor Material Amendments Minerals and Waste Forum Implementation Planning Advisory Group Guidance on Non-Material Amendments and Minor Material Amendments April 2012 1 Non-Material Amendments and Minor Material Amendments 1) Non-material

More information

Page 1 of 24. To present the Asset Management Policy 2014 for Council adoption.

Page 1 of 24. To present the Asset Management Policy 2014 for Council adoption. Page 1 of 24 COMMUNITY AND SERVICES SPECIAL COMMITTEE REPORT 9 DECEMBER 2104 AGENDA ITEM 6.1 ASSET MANAGEMENT POLICY 2014 REVIEW Director: Manager: Ian Butterworth Director Infrastructure and Engineering

More information

Price Optimization. For New Business Profit and Growth

Price Optimization. For New Business Profit and Growth Property & Casualty Insurance Price Optimization For New Business Profit and Growth By Angel Marin and Thomas Bayley Non-life companies want to maximize profits from new business. Price optimization can

More information

Helping over-indebted consumers

Helping over-indebted consumers REPORT BY THE COMPTROLLER AND AUDITOR GENERAL HC 292 SESSION 2009 2010 4 FEBRUARY 2010 Business, Innovation and Skills Helping over-indebted consumers 4 Summary Helping over-indebted consumers Summary

More information

AS 4708:2013. Interpretation of Requirements relating to the Recovery of Forest Products from a Water Body

AS 4708:2013. Interpretation of Requirements relating to the Recovery of Forest Products from a Water Body AS 4708:2013 Interpretation of Requirements relating to the Recovery of Forest Products from a Water Body BACKGROUND Australian Forestry Standard Limited has been asked for an interpretation of the Australian

More information

Significant investment and improvement of infrastructure and transport networks, delivered at no cost and no risk

Significant investment and improvement of infrastructure and transport networks, delivered at no cost and no risk December 2014 FACT SHEET: TRANSPORT AND INFRASTRUCTURE Significant investment and improvement of infrastructure and transport networks, delivered at no cost and no risk The Gold Coast Integrated Resort

More information

National Competency Standards for the Nurse Practitioner

National Competency Standards for the Nurse Practitioner National Competency Standards for the INTRODUCTION DEFINITION OF NURSE PRACTITIONER COMPETENCY STANDARDS FOR NURSE PRACTITIONER NURSE PRACTITIONER FRAMEWORK GLOSSARY OF TERMS Introduction The Australian

More information

Rural dwellings including bed and breakfast accommodation

Rural dwellings including bed and breakfast accommodation MORNINGTON PENINSULA SHIRE COUNCIL - INTERIM POLICY - JUNE 2011 Rural dwellings including bed and breakfast accommodation This policy applies to the use and development of land for a dwelling, including

More information

Construction Traffic Management Plan

Construction Traffic Management Plan Construction Traffic Management Plan Proposed Additional Accommodation for SWDPLS Shinners Bridge Dartington Produced for and on behalf of Built Environments Team Devon County Council NPS South West Ltd

More information

Third party use of customer lists

Third party use of customer lists May 2006 slaughter and may marketing: part 4 Third party use of customer lists Rob Sumroy, Partner In the fi rst article in this series we considered the legislative and regulatory framework that direct

More information

Stage. service. Procure a solution. management. communication

Stage. service. Procure a solution. management. communication Stage 4 communication management service Procure a solution Confi rm a procurement approach and select suppliers that offer best overall value for money (including risk and reward trade-offs). Key better

More information

Welcome Welcome to the public exhibition for development at Bowman Field. This exhibition provides an overview of the proposals for the site.

Welcome Welcome to the public exhibition for development at Bowman Field. This exhibition provides an overview of the proposals for the site. Welcome Welcome to the public exhibition for development at Bowman Field. This exhibition provides an overview of the proposals for the site. Background & Planning Context The Site The site is an area

More information

3.0 Planning Policies

3.0 Planning Policies 3.0 Planning Policies 3.1 National Policy 3.1.1 Government Planning Policy Guidance Notes (PPGs), and Planning Policy Statements (PPSs) provide the background to most aspects of the planning system. The

More information

Welcome & background. www.theperfumefactory.info

Welcome & background. www.theperfumefactory.info Welcome & background Essential Living welcomes you to this community involvement event introducing the proposed redevelopment of The Perfume Factory, North Acton. EXISTING SITE PLAN AERIAL VIEW OF SITE

More information

Chapter 2 Spatial Portrait

Chapter 2 Spatial Portrait 15 November 2013 Dear Julie Fylde Local Plan to 2030 Part 1 Preferred Options Thank you for the opportunity to meet with you on 9 October in respect of the above mentioned document. As discussed at the

More information

Construction Logistics Plan Guidance

Construction Logistics Plan Guidance Construction Logistics Plan Guidance For planners MAYOR OF LONDON Transport for London Section 1 Introduction Contents Section 1 Introduction 3 Section 2 Policy background 6 Section 3 Typical contents

More information

Design Guidance for Perimeter Fencing at Schools for Nottinghamshire County Council

Design Guidance for Perimeter Fencing at Schools for Nottinghamshire County Council APPENDIX 1 Design Guidance for Perimeter Fencing at Schools for Nottinghamshire County Council Introduction: The purpose of this guide is to set out some parameters for assessing planning applications

More information

TRAFFIC MANAGEMENT PLAN

TRAFFIC MANAGEMENT PLAN TRAFFIC MANAGEMENT PLAN For: The construction and operation of a Photovoltaic (PV) Facility in Dabenoris, South Africa Prepared for: Alternative Energy Solutions (Pty) Ltd PO Box 4939 Tygervalley, South

More information

approval of matters specified in conditions; and The Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2013

approval of matters specified in conditions; and The Town and Country Planning (Development Management Procedure) (Scotland) Regulations 2013 Application for: planning permission; planning permission in principle; further applications; approval of matters specified in conditions; and mineral workings (if the planning authority do not have a

More information

Development Management Officer Report Committee Application. Summary

Development Management Officer Report Committee Application. Summary Development Management Officer Report Committee Application Summary Committee Meeting Date: 15 Dec 2015 Item Number: Application ID: Z/2014/0978/F Target Date: 31 st October 2014 Proposal: Single storey

More information

Construction of a pedestrian footbridge between Chiswick Business Park and Bollo Lane/Colonial Drive.

Construction of a pedestrian footbridge between Chiswick Business Park and Bollo Lane/Colonial Drive. planning report D&P/2857b/01 30 November 2015 Bollo Lane, Chiswick Business Park and Colonial Drive, Chiswick in the London Borough of Ealing planning application no. PP/2015/5442 Strategic planning application

More information

Planning Application Non Technical Summary. Planning Application Document A May 2013. Defence College of Technical Training Lyneham

Planning Application Non Technical Summary. Planning Application Document A May 2013. Defence College of Technical Training Lyneham Planning Application Non Technical Summary Planning Application Document A May 2013 Defence College of Technical Training Lyneham 2 Defence College of Technical Training, Lyneham Integrating Technical

More information

Solar Panels to be Affixed to the Roof of an Existing Warehouse Unit

Solar Panels to be Affixed to the Roof of an Existing Warehouse Unit Application No: 11/1683N Location: Proposal: Applicant: Expiry Date: UNIT DC 360, FOURTH AVENUE, CREWE Solar Panels to be Affixed to the Roof of an Existing Warehouse Unit Mr A Fornal, Juwi Renewable Energies

More information

Contents. 1.0 Introduction 3. 2.0 Project definition 5. 3.0 Project brief 10. 4.0 Accommodation guidelines 15. 1.1 Objective 4

Contents. 1.0 Introduction 3. 2.0 Project definition 5. 3.0 Project brief 10. 4.0 Accommodation guidelines 15. 1.1 Objective 4 Contents 1.0 Introduction 3 1.1 Objective 4 1.2 Competencies and resources required 4 1.3 Scope 4 1.4 Related documents 5 2.0 Project definition 5 2.1 Pre-design studies 7 3.0 Project brief 10 4.0 Accommodation

More information

Relevant Planning History P/2006/1070: Demolition of building and construction of supermarket and 14 2 bed flats. Withdrawn.

Relevant Planning History P/2006/1070: Demolition of building and construction of supermarket and 14 2 bed flats. Withdrawn. P/2010/1404/MPA St Marychurch Ward Former G A Insurance Buildng, Greenway Road/St Marychurch Road, St Marychurch Torquay Demolition of former G A building; formation of up to 7 retail units for purposes

More information

Joint position on the Consultation Paper on the Green Paper on the future of the VAT Towards a simpler, more robust and efficient VAT system

Joint position on the Consultation Paper on the Green Paper on the future of the VAT Towards a simpler, more robust and efficient VAT system Brussels, 31 May 2011 Joint position on the Consultation Paper on the Green Paper on the future of the VAT Towards a simpler, more robust and efficient VAT system COM(2010) 695 final Introduction Conscious

More information

Galloper Wind Farm Project. Traffic Management Plan May 2013 Draft v1 Document Reference GWF/TMP/100513. Galloper Wind Farm Limited

Galloper Wind Farm Project. Traffic Management Plan May 2013 Draft v1 Document Reference GWF/TMP/100513. Galloper Wind Farm Limited Galloper Wind Farm Project Traffic Management Plan May 2013 Draft v1 Document Reference GWF/TMP/100513 Galloper Wind Farm Limited Document title Galloper Wind Farm Project Traffic Management Plan Status

More information

1. Purpose and scope. 2. SEPA's role in hydropower and planning

1. Purpose and scope. 2. SEPA's role in hydropower and planning Page no: 1 of 10 1. Purpose and scope 1.1 The purpose of this note is to provide guidance on the approach that we will take when dealing with hydropower development management consultations. We welcome

More information

Design & Access Statement : Proposed Internal Devlopment & External Plant to Data Centre Facility, 35 Imperial Way, Croydon.

Design & Access Statement : Proposed Internal Devlopment & External Plant to Data Centre Facility, 35 Imperial Way, Croydon. Design & Access Statement : Proposed Internal Devlopment & External Plant to Data Centre Facility, ARC-RP-A-002 Prepared by ARCMC Ltd July 2012: Issue A Contents 1. Introduction 2. Application Proposal

More information

Business Life Insurance Procurement Plans - County Level Planning

Business Life Insurance Procurement Plans - County Level Planning Signs & Street Furniture Lifecycle Management Plan Contents: 13.1 Introduction 13.2 Inventory 13.3 Condition Assessment 13.4 Service Standards (Maintenance Management) 13.5 Performance Monitoring 13.6

More information

PROPOSED PLANNING SCHEME AMENDMENT FOR FORMER CARLTON AND UNITED BREWERIES SITE, CARLTON

PROPOSED PLANNING SCHEME AMENDMENT FOR FORMER CARLTON AND UNITED BREWERIES SITE, CARLTON Page 1 of 57 PLANNING COMMITTEE REPORT Agenda Item 5.4 PROPOSED PLANNING SCHEME AMENDMENT FOR FORMER CARLTON AND UNITED BREWERIES SITE, CARLTON 4 September 2007 Division Sustainability and Regulatory Services

More information

CONSTRUCTION TRAFFIC MANAGEMENT PLAN (CTMP)

CONSTRUCTION TRAFFIC MANAGEMENT PLAN (CTMP) CONSTRUCTION TRAFFIC MANAGEMENT PLAN (CTMP) [Colston Budd Hunt & Kafes Pty Ltd AS AMENDED BY City of Sydney] 23 March 2010 1. PREAMBLE 1.1 This document constitutes the Demolition and Traffic Management

More information

A Product of Hard Work LIVELINK

A Product of Hard Work LIVELINK A Product of Hard Work LIVELINK Advanced technology At JCB we are constantly looking at new, innovative ways to help you get the most out of your machine. Our latest development is JCB LiveLink, an advanced

More information

How To Develop The Kingsgate Business Centre

How To Develop The Kingsgate Business Centre Kingsgate Business Centre Employment Report Introduction The subject property comprises serviced offices arranged over two floors within a building in the north side of Kingsgate Road. It is served by

More information

Supplementary Guidance Stiùireadh Leasachail. Managing Waste in New Developments A Stiùireadh Sgudal ann an Leasachaidhean Ùra

Supplementary Guidance Stiùireadh Leasachail. Managing Waste in New Developments A Stiùireadh Sgudal ann an Leasachaidhean Ùra Supplementary Guidance Stiùireadh Leasachail Managing Waste in New Developments A Stiùireadh Sgudal ann an Leasachaidhean Ùra March 2013 Managing Waste in New Developments Supplementary Guidance Contents

More information

CLEAN GREEN & SUSTAINABLE NS1439215

CLEAN GREEN & SUSTAINABLE NS1439215 CLEAN GREEN & SUSTAINABLE NS1439215 1 Contents 2 Introduction Strategic Alignment 1 - Energy Efficiency 2 - Water Management 3 - Fleet and Plant Management 4 - Carbon Offsets 5 - Waste Management Everything

More information

Environmental Impact Assessment of Forestry Projects

Environmental Impact Assessment of Forestry Projects Environmental Impact Assessment of Forestry Projects Flow chart of EIA process Developer submits grant application FC screens when sufficient info received, normally at "Proposal Submit stage Developer

More information

Los Angeles Union Station, CA Sustainable Neighborhood Assessment. April 22-23, 2014

Los Angeles Union Station, CA Sustainable Neighborhood Assessment. April 22-23, 2014 Los Angeles Union Station, CA Sustainable Neighborhood Assessment April 22-23, 2014 Sustainable Neighborhood Assessment Through the Sustainable Neighborhood Assessment Tool developed by Global future development

More information

74 Rivington Street. Planning Statement JULY 2013 DP9. 100 Pall Mall. London SW1Y 5NQ. Tel: 020 7004 1700. Fax: 020 7004 1790

74 Rivington Street. Planning Statement JULY 2013 DP9. 100 Pall Mall. London SW1Y 5NQ. Tel: 020 7004 1700. Fax: 020 7004 1790 74 Rivington Street Planning Statement JULY 2013 DP9 100 Pall Mall London SW1Y 5NQ Tel: 020 7004 1700 Fax: 020 7004 1790 CONTENTS Page 1.0 Introduction 1 2.0 Site Description 2 3.0 The Proposed Development

More information

LONDON BOROUGH OF HAVERING

LONDON BOROUGH OF HAVERING LONDON BOROUGH OF HAVERING CORPORATE ASSET MANAGEMENT PLAN 2015-2019 Sections LONDON BOROUGH OF HAVERING CORPORATE ASSET MANAGEMENT PLAN CONTENTS 1 Introduction and Context 2 Corporate Vision 3 Policy

More information

Queens Park. Revised Draft Master Plan

Queens Park. Revised Draft Master Plan Queens Park Nature-Based Accommodation Revised Draft Master Plan Disclaimer This publication may be of assistance to you but the Great Ocean Road Coast Committee do not guarantee that it is without flaw

More information

Environmental Guidelines for Preparation of an Environmental Management Plan

Environmental Guidelines for Preparation of an Environmental Management Plan 2013 Environmental Guidelines for Preparation of an Environmental Management Plan Environmental Management Division Environmental Protection Agency 3/13/2013 ENVIRONMENTAL GUIDELINES FOR PREPARATION OF

More information

abcde Buckinghamshire County Council Report to: Development Control Committee AGENDA ITEM 8 Date 9 April 2002

abcde Buckinghamshire County Council Report to: Development Control Committee AGENDA ITEM 8 Date 9 April 2002 abcde Report to: Buckinghamshire County Council Development Control Committee AGENDA ITEM 8 Date 9 April 2002 Title Author Electoral Divisions Affected Recommendation Resources Appraisal Proposed Demolition

More information

Alternatives and Design Evolution: Planning Application 1 - RBKC

Alternatives and Design Evolution: Planning Application 1 - RBKC 3 Alternatives and Design Evolution: Planning Application 1 - RBKC Design Freeze Draft One (January 2011) Figure 3-19 3.82 The design freeze draft one was a point in time in the evolution of the Masterplan

More information

Bedford s Network Management Strategy (2011 2021) November 2010

Bedford s Network Management Strategy (2011 2021) November 2010 Bedford s Network Management Strategy (2011 2021) November 2010 Page 1 of 13 1. Introduction 1.1. The Bedford Borough Council Network Management Strategy has been developed to support local and national

More information

10.1 WILL HEY FARM WATFORD LANE NEW MILLS RETENSION OF NEW STABLE BLOCK, SAND PADDOCK AND ASSOCIATED EARTHWORKS AND LANDSCAPING (FULL - MINOR)

10.1 WILL HEY FARM WATFORD LANE NEW MILLS RETENSION OF NEW STABLE BLOCK, SAND PADDOCK AND ASSOCIATED EARTHWORKS AND LANDSCAPING (FULL - MINOR) HPK/2012/0207 03/04/2012 WILL HEY FARM WATFORD LANE NEW MILLS MR & MRS M WILSON KIRSTY WILSON EQUINE AND WILL HEY FARM BED & BREAKFAST RETENSION OF NEW STABLE BLOCK, SAND PADDOCK AND ASSOCIATED EARTHWORKS

More information

05 AREA/SITE SPECIFIC GUIDELINES

05 AREA/SITE SPECIFIC GUIDELINES 05 AREA/SITE SPECIFIC GUIDELINES Site 1 - Glass Yard The leisure centre that is currently located on this site should move to a more central location in the town centre close to the existing public squares.

More information

6 Streetscape character 6.1

6 Streetscape character 6.1 6 6.1 6 Streetscape character Introduction Transport interchanges The TLRN is the strategic road network for London and varies in character across the capital. The variation of the land use across London

More information

28.0 Development Permit Area #2 (Neighbourhood District)

28.0 Development Permit Area #2 (Neighbourhood District) 28.0 Development Permit Area #2 (Neighbourhood District) Goals and Objectives To provide a guide for infill and new development in the Neighbourhood District. To outline the nature, form and character

More information

TRANSPORT ASSESSMENT GUIDANCE

TRANSPORT ASSESSMENT GUIDANCE TRANSPORT ASSESSMENT GUIDANCE Contents 1 INTRODUCTION...1 Purpose of the Guidance...1 Policy Context...1 Who Should Read This Document?...2 Structure of Guidance...3 2 ASSESSMENT PRINCIPLES AND PROCESS...4

More information

LEWES DISTRICT AND SOUTH DOWNS NATIONAL PARK AUTHORITY LEWES DISTRICT JOINT CORE STRATEGY INDEPENDENT EXAMINATION

LEWES DISTRICT AND SOUTH DOWNS NATIONAL PARK AUTHORITY LEWES DISTRICT JOINT CORE STRATEGY INDEPENDENT EXAMINATION 1 LEWES DISTRICT AND SOUTH DOWNS NATIONAL PARK AUTHORITY LEWES DISTRICT JOINT CORE STRATEGY INDEPENDENT EXAMINATION STATEMENT BY CROUDACE STRATEGIC LIMITED ISSUES 7 AND 8 STRATEGIC SITES (POLICIES SP5/SP6)

More information

ESOMAR WORLD RESEARCH CODES & GUIDELINES CUSTOMER SATISFACTION

ESOMAR WORLD RESEARCH CODES & GUIDELINES CUSTOMER SATISFACTION CUSTOMER SATISFACTION STUDIES All ESOMAR world research codes and guidelines, including latest updates, are available online at www.esomar.org Copyright ESOMAR 2003 Latest reprint: 2005 CUSTOMER SATISFACTION

More information

Draft Strategy. Published January 2016 for Consultation

Draft Strategy. Published January 2016 for Consultation Draft Strategy Published January 2016 for Consultation 1 Introduction to the Consultation How to Respond In this consultation, the NDA wants to hear from members of the public, nuclear regulators, employees

More information

Slough Borough Council. Highway Asset Management Strategy

Slough Borough Council. Highway Asset Management Strategy Slough Borough Council Highway Asset Management Strategy OUR AMBITION USING RESOURCES WISELY By 2019 the Council s income and the value of its assets will be maximised 1 Key Priorities 1.1 We understand

More information

PEAK DISTRICT NATIONAL PARK AUTHORITY ENVIRONMENTAL MANAGEMENT ANNUAL PERFORMANCE REPORT 2013/2014

PEAK DISTRICT NATIONAL PARK AUTHORITY ENVIRONMENTAL MANAGEMENT ANNUAL PERFORMANCE REPORT 2013/2014 2009/10 2010/11 2011/12 2012/13 2013/14 2014/15 2015/16 2016/17 Carbon emissions (kgco2) Page 1 PEAK DISTRICT NATIONAL PARK AUTHORITY ENVIRONMENTAL MANAGEMENT ANNUAL PERFORMANCE REPORT 2013/2014 1. INTRODUCTION

More information

PLANNING SUPPORT STATEMENT. 29 Fernshaw Road, London SW10 0TG MRS. GAIL TAYLOR & MRS. KAREN HOWES. Prepared For TR/6570

PLANNING SUPPORT STATEMENT. 29 Fernshaw Road, London SW10 0TG MRS. GAIL TAYLOR & MRS. KAREN HOWES. Prepared For TR/6570 PLANNING SUPPORT STATEMENT 29 Fernshaw Road, London SW10 0TG Prepared For MRS. GAIL TAYLOR & MRS. KAREN HOWES November 2012 Contents 1 INTRODUCTION 1 THE APPLICATION PROPERTY AND SURROUNDING AREA 1 RELEVANT

More information