2011 Dodson Publications, Inc. Page 1 of 21 March 16, :33 AM

Size: px
Start display at page:

Download "2011 Dodson Publications, Inc. Page 1 of 21 March 16, 2012 8:33 AM"

Transcription

1 Roof Drainage Issues Designing Commercial Roof Systems In Compliance with the IBC Part 2: Roof Drainage Issues by John D. Shepherd, RRC, Shepherd Consulting Services (Editor s Note: John Shepherd is an RCI, Inc. Registered Roof Consultant and Registered Roof Observer, a Building Science Certified Thermographer, a Haag Certified Commercial and Residential Roof Inspector, and holds roofing licenses in both Calif. and Ariz. He is also actively involved in RCI, Inc. and the SoCal Chapter of RCI, and currently is a member of three committees including the RCI Inc Advocacy Committee, the SoCal Chapter of RCI Hawaii Winter Workshop Committee, and the ASTM D08 committee. You can reach Shepherd at jds@shepherdconsulting.com) After proper attachment and installation of the low-sloped roof assembly on a commercial building, it is this consultant s opinion that proper roof drainage is the singular most important issue that impacts a commercial roof system. Roof drainage issues appear to some degree or other on just about every low-sloped commercial reroof project I have inspected in my 40 plus years as a roofer, roofing contractor, and roofing consultant. Roof drainage issues also crop up in new construction projects and those not resolved during the original construction process will resurface during a reroof project. That said, while the focus of this article is on drainage issues related to reroofing projects, I have included a section on pre-construction inspections for new construction roof projects that I hope will slightly reduce the roofing contractor s future liability on new construction projects. With the exception of new construction projects, this article goes forward assuming that the reroofing project does not include the involvement of an architect, engineer, or register roof consultant. While I highly recommend that all reroofing projects have specifications and details 2011 Dodson Publications, Inc. Page 1 of 21 March 16, :33 AM

2 prepared for the specific project by one of these design professionals, I also understand that this is not the reality of the world we all live in. In the vast majority of cases, the roofing contractor has taken on the role as the designer of record (refer to Part I of this series in the November/December 2011 issue of Western Roofing for a more detailed discussion on the designer of record discussion). Design related decisions made by the roofing contractor, in his/her capacity as the prime contractor on the project, often include, but are not limited to: the project s overall scope of work, the type of materials to be installed, which roofing material manufacturer to use, how existing mechanical equipment and accessories will be addressed, addressing roof drainage problems (ponding water conditions, missing overflow drains, undersized crickets, etc.), how to deal with condensation and ventilation issues, whether skylights are to be re-used or replaced, determining what to do about areas with low base flashings, replacement of water damaged roof sheathing, and support members, etc. In this article I will discuss the typical roof drainage issues that a contractor will run into on a reroofing project including ponding water conditions, roof crickets and their impact on roof drainage, internal primary and overflow roof drains, through-wall scupper primary and overflow drains, raising and/or moving mechanical equipment, and penetrations in waterways. This article will also include requirements and definitions for roof drainage issues from the 2009 International Building Code (IBC) and provide some common sense ideas on resolving the problems referenced above. 2% Minimum Roof Slope Required The 2009 International Building Code (IBC) and most roofing material manufacturers required low-sloped roofs, often mischaracterized as flat roofs 2011 Dodson Publications, Inc. Page 2 of 21 March 16, :33 AM

3 even by experienced roofing contractors, to have a minimum 2% slope. Under IBC Section 1507 Requirements for Roof Coverings, the IBC requires that the, roofs shall have a design slope of a minimum of one-forth unit vertical in 12 units horizontal (2%) for drainage. In IBC Section % is listed as the minimum roof slope requirement for seven different roof systems including Standing Seam Metal Roof Panels (Section ), Builtup Roofs (Section ), Modified Bitumen Roofing (Section ), Thermoset Single-Ply Roofing (Section ), Thermoplastic Single-Ply Roofing (Section ), Sprayed Polyurethane Foam Roofing (Section ), and Liquid-Applied Coatings/Roofs (Section ). Based on these code requirements I will ask you each to consider two questions: 1) Does the 2% requirement also apply to the roof deck? 2) Is there any flexibility in the 2% requirement? The answer to #1 is yes and no, the answer to #2 is yes. Let me explain. Roof Slope Deck Requirement: When Section 1507 references steepsloped type roof system, it specifically references what the minimum deck slope shall be. However for low-sloped roof systems the code reference is specific that the roof shall have a design slope of a minimum of 2%. So how this is achieved on a reroof project is up to the contractor. If you have verified that the existing roof deck slope is a minimum of 2%, then the contractor can hypothetically install the new roofing system directly to the roof deck (this discussion excludes discussions on energy code requirements and specific materials that may be required to address fire-ratings of a roof system). However, if the roof deck does not have the required 2% slope then this slope must be achieved via either modifications of the actual roof deck or via addition of materials over the deck (tapered insulation, lightweight insulating concrete, etc.). Alternatively, slope can be achieved by using sprayed polyurethane foam, which as a roof system can address both the slope deficiencies and provide a waterproof roof assembly Dodson Publications, Inc. Page 3 of 21 March 16, :33 AM

4 The methodology for addressing roof slope issues on projects without the involvement of a design professional is really left up to the contractor, who hopefully was prudent enough to address the issues in the pre-bid stage and not after the roofing project is in progress. In the bid stage the contractor will have the time to adequately evaluate the options and decide whether they have the expertise to address the slope issues or recommend a design professional to the building owner (see more on the above referenced options later in this article). If decisions about slope modifications must be made after the roofing project has started, the options available become time dependent as the longer a roof is exposed the greater the risk of a weather related catastrophe occurring. When is a Slope of Less Than 2% Acceptable: Section 1510 Reroofing provides the one exception to the Section % roof slope rule. That exception, as listed under Section General, reads as follows: Reroofing shall not be required to meet the minimum design slope requirement of one-quarter unit vertical in 12 units horizontal (2% slope) in Section 1507 for roofs that provide positive roof drainage. (It is important to verify that the state or local jurisdiction the roof project is in has left this code section intact when the code was adopted.) So based on this code section, the contractor is not required to modify slopes of less than 2%, as long as the roof provides positive drainage. This code section now raises another question: What is Positive Roof Drainage? Thankfully the IBC anticipates this question and provides us with a definition for positive roof drainage. Before moving on I want to recommend that you always consider looking at either satellite images of the roof (via Google Earth or Bing) or roof images taken via fixed wing aircraft (Pictometry, Eagleview, etc.) of any building you are bidding on. Looking at such photographs prior to visiting the site will provide a general understanding of the building layout, roof top 2011 Dodson Publications, Inc. Page 4 of 21 March 16, :33 AM

5 objects, and whether there is any possible ponding water conditions (refer to photographs #1 and #2). Positive Roof Drainage & Ponding or Standing Water Conditions One of the most commonly mischaracterized conditions I have seen in low-sloped related defect litigation cases are those related to ponding or standing water conditions. For the last 20 plus years the so-called 48 hours rule was most often referenced with regards to defining what is ponding or standing water conditions on low-sloped roofs. However, for many of those years we (roofing contractors and consultants) depended on what the NRCA 1 and roofing material manufacturer s 2 had to say about ponding or standing water conditions. The building code had references to positive drainage however in the past it did not articulate what is positive drainage, and what is not. With the adoption of the IBC nationwide we in the Western states now have a clear legal definition for what is Positive Roof Drainage, and therefore a legal definition for what is ponding water on a low-sloped roof. IBC Section 1502 definitions defines Positive Roof Drainage as follows: The drainage condition in which consideration has been made for all loading deflections of the roof deck 3, and additional slope has been provided to ensure drainage of the roof within 48 hours of precipitation. This is a pretty direct statement: if all water from a rainfall is dissipated from the roof within 48 hours of the last rainfall, the 2% slope rule is not applicable on a reroofing project. This same statement is applicable to any so called ponding water areas on a roof. Let s discuss the ponding issue more in depth. First though some clarifications on my experience in this area. As a construction consultant, the majority of my business is working as an expert of construction defect litigation cases. Generally I am an expert on roofing, waterproofing, and deck issues, though 2011 Dodson Publications, Inc. Page 5 of 21 March 16, :33 AM

6 I also handle exterior wall issues as well (stucco, EFIS, siding, elastomeric paint, windows and doors, etc). Though I occasionally work as a plaintiff expert, I primarily work as a defense expert for either the developer or the subcontractor (roofing, sheet metal, waterproofing, decks). It is my experience as a roofing expert that has provided the basis for what I am about to say. In virtually every litigation case that I have worked on involving commercial roofing (low-sloped roof systems) the allegation of ponding water conditions is always on the defect list. Why, well it s an easy target. When the plaintiff s expert sees staining and/or an accumulation of dirt and debris in what appear to be low spots on a roof, typically in front of drains and scuppers, or adjacent to cricket waterways and large mechanical equipment, they automatically assume it s a ponding water condition. In most cases how I deal with this issue is I disagree with the allegation that ponding water is actually present, until someone actually performs a 48-hour ponding water test. At times when I am pretty certain that the water testing will confirm there are no ponding conditions, I will actually push for the water testing as part of any defense related testing. Now sometimes this condition is actually present on a roof and it is important to recognize it early in the litigation, or in the case of a reroofing project, prior to starting the roof construction. From a contractor s perspective you want to know if there are issues you need to address related to ponding that could void the manufacturer s warranty. So it is important to include some type of language in your proposal that includes the possibility of additional work being conducted to correct ponding conditions. It should include a reference to verify the adequacy of the roof slope and roof drainage via a 48-hour water test prior to removing the roofing, especially if your preliminary inspection leads you to suspect that ponding water conditions do exist. One thing that doesn t work is to put language in 2011 Dodson Publications, Inc. Page 6 of 21 March 16, :33 AM

7 your contract that you are not responsible for ponding water conditions. Regardless of what language you insert into your roofing contract, you are the roofing professional and the party that should be familiar with the building code requirements and the exclusions in the roofing material manufactures warranty. The average building owner or property manager is typically not aware of these issues until you inform them of these issues. So if you suspect ponding water conditions then push for a water test. If your client insists that the work be done and the ponding be ignored, you have to make a decision to either walk away from the project (before signing the contract) or risk ignoring the building codes and hope that nothing goes wrong later that brings attention to the warranty exclusion. The testing for ponding water is pretty simple. First check the weather and determine whether rainfall is eminent. Is so let the rain water the roof for you and then follow the below procedures. If no rain is predicted then you will need to run water on the roof. Start the testing by first sweeping up all loose debris from the waterways and in front and around internal roof drains and through-wall scuppers. Run the water over the roof until all little dips, birdbaths, and any suspected ponding area is covered with water. Note the time the water is turned off and then use spray paint (my preference) or chalk to mark the outline of each area holding water (refer to photograph #3). Return to the site 48-hours after you last turned off the water. If the roof is 100% dry, there are no ponding water areas, then the roof has positive slope as defined by the building code (refer to photograph #4). If there are small puddles of water on site-specific areas of the roof then, using a different color of marking paint, mark the perimeter of each remaining pond and then photograph the condition. Minor ponding water conditions can often be corrected with minor alterations to the roof slope. These include adding 2011 Dodson Publications, Inc. Page 7 of 21 March 16, :33 AM

8 Henry s Pond Patch, Siplast s Paraslope, or small amounts of tapered insulation to the location in question. If the water test identifies significant ponding conditions you still need to identify, mark and photograph the ponding conditions but now you need to have a serious discussion with the building owner about the options for addressing the ponding conditions. Addressing Serious Ponding Conditions There are a number of things that can be done to address serious ponding water conditions, however the extent and location of the ponding conditions is the key to the repair options. First, if the conditions are extensive and widespread, it is likely that a complete resloping of the roof may be required. Such resloping can be done with lumber and tapered 2x s, with light-weight insulating concrete, with tapered insulation and/or with spray-polyurethane foam. With the exception of the wood framing option, each of the choices can not only provide the positive slope needed, but also provide additional R-value for the buildings roof via the insulating aspects of the materials. The method and materials chosen for this task will depend on the structural integrity of the roof, costs, the needs of the building owner, and what the building is used for. If the building is primarily an office building the long term benefits of energy savings should be calculated for the building owner to assist in the methods used to address the inadequate slope issues. If the building is in California, you may already need to add insulation to the building to comply with the current energy codes so this becomes a win-win situation. With each of the choices above the roofing contractor should not try to go-it alone. With tapered insulation you can get design assistance from the tapered insulation manufacturers. While there is no direct cost for this service the indirect cost could be high and the manufacturer s design might 2011 Dodson Publications, Inc. Page 8 of 21 March 16, :33 AM

9 include more insulation than say a design done by a third part design professional. With regards to modifying the roof slope with tapered 2x s and plywood or light-weight insulating concrete, you will need to have a structural engineer determine if the building can handle the load. An architect or engineer should design the new wood deck. The light-weight insulation industry will provide design assistance for their product though, like the tapered insulation you need to have the design reviewed by a third party. Addressing Moderate Ponding Conditions The most common scenario related to a positive finding of ponding water conditions is that the condition is not minor, but not so extensive that the entire roof slope must be redone. In my experience I often found that the problems can be resolved using a combination of one or more remedies. This includes creating recessed sumps around ponding at roof drains and through-wall scuppers, adding additional roof drains and/or through-wall scuppers, adding tapered crickets on the upslope side of skylights and mechanical equipment, rebuilding the existing crickets to have a steeper slope and therefore more positive drainage, breaking up large crickets into smaller crickets, and adding additional roof drains and/or scuppers. On some commercial buildings tenant improvements or use changes in the building create roof drainage problems by locating mechanical equipment in the water-ways (refer to photographs #5 and 6). In these cases the only option is to relocate the equipment that is blocking the direct flow of water to roof drains. Again the choice of options used will depend on the specific needs and issues on the building. And each option brings about another set of questions to determine whether the option is actually viable Dodson Publications, Inc. Page 9 of 21 March 16, :33 AM

10 If the main area of ponding is along the waterways, and it is not caused by mechanical equipment, it is likely that the slope of the cricket is not double the roof slope. In this case the best solution to solve the drainage problems may be increasing the slope of the large crickets, if there is adequate room in the height of the parapet walls. However if the parapet wall is too low for such an adjustment, then look at breaking up large crickets to smaller crickets and adding roof drains or through-wall scupper drains as an alternative option. When it comes to roof penetrations and objects blocking the flow of water to the drains, you need to consider all options. When evaluating the relocation of mechanical equipment that has been set in the waterways first look at relocating the unit and the platform. But also consider the option of replacing a closed mechanical equipment platform with an opened frame support system that allows water to flow to the roof drains. Individual roof penetrations in waterways are often the source of future roof leaks and they should be moved out of the waterway if at all possible. Adding roof drains also provides its own complications. If you want to add internal roof drains, can they be added with only minimal impact on the interior of the building? For a warehouse type building adding the internal drains is easily doable. But in an office building adding an internal drain could cause a significant disruption to the building. Same goes for the adding of through-wall scupper drains. Is the intended location directly over a doorway or a window? Can downspouts be added? An important thing to remember is that if you add roof drains or through-wall scuppers you will also need to add overflow drains or scuppers. It is important that your sales team, or at least one key person on your staff, have a keen understanding of each option available, and how to apply the various options to issues found at your specific project. Also keep in mind that at some point you may cross a threshold where the cost of 2011 Dodson Publications, Inc. Page 10 of 21 March 16, :33 AM

11 addressing each ponding area becomes more expensive than a whole roof solution such as tapered insulation or even switching the roof system to an SPF system. Let s move on to talk about existing roof drains and scuppers. Verifying the Roof Has the Right Drain Size As a consultant I always conduct what I call a preliminary evaluation of the roof drain size for each specific roof area serviced by the roof drain to determine if the roof drains are the correct size for the area of roof and parapet walls being serviced by the roof drain. And I recommend that you the contractor consider doing the same. I do these calculations primarily to see if there are any red flags I need to caution my client about. However, I caution you that unless you are an architect or an engineer licensed in the state you are practicing, your calculations should used as an internal use document only and should not be sent out to the client. If I find the drains are undersized, I tell my client I am suspicious of the drain size and then recommend that the drains be analyzed by a licensed engineer or architect. The method of determining drain size for a given roof area is fairly simple: Roof Drawing: Create a roof drawing that includes roof drains, scuppers, crickets, ridge lines, etc. Identify the roof that sends water to each drain and mark off the areas on the drawing. Also measure the diameter of any internal roof drains and the area of any through-wall scupper drains. Calculate the Total Roof Area: Calculate the total roof and wall area service by each existing roof drain. Add 100% of the roof deck square footage and 50% of the parapet wall square footage to determine the total roof area serviced by each drain Dodson Publications, Inc. Page 11 of 21 March 16, :33 AM

12 Determine Rainfall Intensity: For the Western USA use figure on page 87 of the 2009 International Plumbing Code. Look on the figure and identify the geographical location of the building to be reroofed and determine the maximum hourly rainfall in inches for your geographical area. Select the Table Needed for the Next Step: For internal drains use Table (1) and for through-wall scupper drains use figure (2). Both are on page 90 of the 2009 IPC. Determine the Roof Area the Drain Can Handle: Find the rainfall intensity for your area (as obtained from figure ) along the top of the table and the diameter or the size along the left hand column and cross reference to determine the square foot area the buildings existing drains or scuppers can handle. Compare Existing to Design Requirements: If the existing roof area (and 50% of walls) is less than the design load for the specific drain then the existing drain or scupper is acceptable. If the roof area exceeds the drain design load then either the existing drains or through-wall scuppers must be enlarger or additional drains or scuppers must be installed. Requirement for Overflow Drains/Scuppers As far back as I can remember the various building codes have always required the installation of overflow drains and/or overflow scuppers in conjunction with the installation of primary drain system of internal roof drains and/or through-wall scupper drains. So I am still surprised by the number of buildings I have encountered over the last five years that do not have overflow drains or overflow scuppers (refer to photographs #5 and 6). In each case I made recommendations for adding overflow drains or scuppers. If you, the contractor, should come across a building without overflow drains or scuppers you also should make recommendations for adding the overflow drains or scuppers to your client Dodson Publications, Inc. Page 12 of 21 March 16, :33 AM

13 As with previous versions of the building code, 2009 IBC Section 1503 still required roof drainage systems to comply with the plumbing code. Section read as follows: Roof drainage. Design and installation of roof drainage systems shall comply with Section 1503 and the International Plumbing Code (in California that would read and the California Plumbing Code). And though the wording had changed, the code made it relatively simple for the contractor to determine if secondary roof drainage was required on any building scheduled to have the roof replaced. The 2009 IBC Section and IPC Section both read as follows, Secondary drainage required. Secondary (emergency) roof drains or scuppers shall be provided where the roof perimeter construction extends above the roof in such a manner that water will be entrapped if the primary drains allow buildup for any reason. Translation, if there are any parapet walls or any objects that would allow water to collect on the roof if the roof drain should become blocked, the roof must have overflow drains. This sounds straight forward enough. However the first question I often hear from the roofing contractor, especially in construction defect cases is, This building was built X number of years ago under a different code so why did I have to bring the roof and roof accessories into compliance with the current code? The answer is, because the building code says you have to. Section 1510 Reroofing, includes the following statement: General. Materials and methods of application used for recovering or replacing an existing roof covering shall comply with the requirements of Chapter 15. So as there are no exceptions, all of the roof drainage requirements listed in Chapter 15 would apply to a reroofing project. For clarity I think the requirement bears repeating. If any portion of the building could accumulate water if the primary drain becomes blocked, and the building 2011 Dodson Publications, Inc. Page 13 of 21 March 16, :33 AM

14 had no overflow drains or scuppers, then overflow drains or scuppers must be added during the roof replacement project. The choice of using overflow drains or overflow scuppers is one of both cost and access. Installing a through-wall overflow scupper could entail as little as cutting a hole in the parapet wall and inserting a through-wall scupper flashing. If concrete then little extra work is required. If woodframed and stucco covered then plaster and lath needs to be removed and replaced, and the hole needs to be framed to allow attachment for new lath around the area. Installing an internal overflow drain involves cutting through the roof deck, adding extra structural support as needed around the point where the drain penetrates the roof, and then running drainage pipe down the interior of the building. This is an easy fix, though more costly than a through-wall scupper in a concrete tilt-up wall, if the area below is a warehouse. It is a more difficult task, though still doable, if the area below was office space. Placement & Size of Overflow Drains Previous versions of the building code would reference internal drains but would defer to the plumbing code. And though the wording has been modified, IBC Section still directs the reader the IPC (or in the case of California, the California Plumbing Code) for roof drain issues. A search of the 2009 IPC finds two specific sections related to overflow drains including IPC Sections and Section is as follows: Separate systems required. Secondary roof drain systems shall have the endpoint of discharge separate from the primary system. Discharge shall be above grade, in a location that would normally be observed by the building occupants or maintenance personnel. Translation: the primary and overflow drain systems should not be using the same drain pipe system to drain water from the roof, and the discharge 2011 Dodson Publications, Inc. Page 14 of 21 March 16, :33 AM

15 point need to be highly visible so that if water is coming out of the overflow drain discharge point someone will know the primary drains are blocked. This section of the IPC may be the most overlooked section by any roofing contractor, which is not good as it could also be the most costly issue down the road if some existing condition does not comply with the code. I have had a half dozen roof collapse cases over the years and each was related to either the lack of an overflow drainage system, or as a result of a lack of code compliance with the overflow drainage system that was in place at the time the contractor installed the roof. Therefore it is my opinion that on each commercial building that has overflow drains, the contractor has two fundamental additional tasks. The first is to verify that that the overflow drain system is separate from the primary drain system by both a visual inspection from below the roof and by pouring water down the primary and secondary drains and document the discharge points of both (alternatively, the drains could be scoped with a camera by a plumber to provide a copy of the film to keep in the contractors file). The second must-do task for the contractor is to verify the location of all overflow drain discharge points and then verify that it is not hidden behind landscaping or some other object. If the discharge point is through a curb at a paved parking lot, the contractor should also determine if the discharge point opening has not been partially reduced in size by asphalt from a past paving of a parking lot. Section of the IPC is as follows: Sizing of secondary drains. Secondary (emergency) roof drain systems shall be sized in accordance with Section 1106 based on the rainfall rate for which the primary system is sized in Tables , and To determine the correct size of internal overflow drains, you use the same basic principal of drainage design steps used to determine if the existing roof drains were the correct size. The size of the overflow drains will be the same as the internal roof drains, if the 2011 Dodson Publications, Inc. Page 15 of 21 March 16, :33 AM

16 existing internal drains size meets the requirements for the geographical location and the roof area being services by the drain. Placement & Size of Overflow Scuppers In all previous versions of the building code it was easy to determine the size and placement location of a through-wall overflow scupper. The through-wall overflow scupper was to be three times the area of the primary roof drain or scupper and was to be set 2 above the surface of the roof drain or scupper. With the adoption of the 2009 IBC things related to through-wall scuppers are no longer so simplistic. There are four sections of the code to review for placement and sizing of scuppers including one section in Chapter 15 of the 2009 IBC and three sections in Chapter 11 of the IPC. Starting out in the plumbing code the first reference to scupper location is in Section which reads as follows: Parapet wall scupper location. Parapet wall roof drainage scupper and overflow scupper location shall comply with the requirements of the International Building Code. First up in IBC Chapter 15 is Section , which tells us when we need to install secondary drainage on a roof (this was discussed in more detail earlier in this article). Next up is Section , which reads as follows: Scuppers. When scuppers are used for secondary (emergency overflow) roof drainage, the quantity, size, location, and inlet elevation of the scuppers shall be sized to prevent the depth of ponding water from exceeding that for which the roof was designed as determined by Section Scuppers shall not have an opening dimension of less than 4 (102mm). The flow through the primary system shall not be considered when locating and sizing scuppers. Say what? Let me start with the back half of this code section. The second and third sentences are pretty clear: the scupper will have a minimum of a Dodson Publications, Inc. Page 16 of 21 March 16, :33 AM

17 opening dimension and the location and the size of the overflow scuppers are not based on the primary drain system. Obviously this is a major change from the past where the area of the overflow scupper was based on three times the area of the roof drain. However the first sentence raises some problems as it dictates that the size, quantity, and the location of the overflow drains is based on what will not exceed the design load of the roof, when it has X amount of water on it. At this point, unless you are an engineer, we (consultants, architects, and contractors) must turn to an engineer and say, What size, where, and how many. The engineer will need to calculate the load capacity of the existing roof deck (likely without the availability of original drawings) and then determine what size the overflow scuppers must be, how many are required, and where they should be installed. This requirement is supported by the 2009 IPC in section , which reads similar to : Sizing of secondary drains. Scuppers shall be sized to prevent the depth of ponding water from exceeding that for which the roof was designed as determined by Section Scuppers shall not have an opening dimension of less than 4 (102mm). The flow through the primary system shall not be considered when sizing the secondary roof drain system. Enough said on this part, things get a bit more complicated with the above reference to IPC section IPC Section reads as follows: Roof design. Roofs shall be designed for the maximum possible depth of water that will pond there on as determined by the relative levels of roof deck and overflow weirs, scuppers, edges, or serviceable drains in combination with the deflected structural elements. In determining the maximum possible depth of water, all primary roof drainage means shall be assumed to be blocked. This section tells me that it is not about the structural load capacity of one roof section when one drain is plugged. The IPC wants the engineer to determine 2011 Dodson Publications, Inc. Page 17 of 21 March 16, :33 AM

18 the maximum possible depth of water on the roof when all drains are plugged. Ouch. Lets recap what we just covered. I now know that I, or you the roofing contractor, can no longer just determine the size, location, or number of through-wall overflow scuppers to install on a building without overflow drains or scuppers, based on our years of experience and knowledge of a past simplistic, yet easy to use, building and plumbing code. Now an engineer needs to conduct a structural analysis of the roof in order to allow for the installation of through-wall overflow scuppers. I think the cost of installing internal overflow drains just might now be cheaper than installing through-wall overflow scuppers. Roof Crickets Roof drainage crickets are located on every commercial building I can ever remember being on. Crickets, made from either lumber, tapered insulation, or concrete, are generally constructed between roof drains and between a roof corner and a roof drain, with the overall number of crickets being dependent on the number of roof drains. In order to push water towards the roof drains, crickets typically have a slope that is twice or more than the slope of the main roof area. And when there are ponding water conditions on a roof I often find that the crickets are a contributing factor. Either the slope on the cricket is less than double that of the roof field and/or the crickets stop too far from the roof drains. Or in some cases the crickets installed do not comply with the cricket drainage design that were on the original construction drawings. On a new construction project that does not have a consultant involved or any third party inspections occurring, I want to encourage the roofing contractor to review the construction drawing and determine if the crickets built appear to be as designed. If not, I recommend you send 2011 Dodson Publications, Inc. Page 18 of 21 March 16, :33 AM

19 documentation of such to the general contractor informing them of the issue and the possible drainage problems that may arise in the future for which you might get blamed for. If the building ends up in litigation in the future and a roof consultant opines to ponding water conditions on the roof, your letter could save your firm money in the future litigation. On a reroofing project you are not usually going to have the luxury of having the original plans to review so when you inspect the cricket areas of the roof you need to look for the telltale signs of ponding water conditions. As mentioned earlier in this article, the modification of roof crickets to correct drainage problems is almost always doable, unless the parapet walls are too low. However, my preference for addressing poor drainage issues at wood framed crickets is to replace the large crickets with smaller crickets and add more roof drains. With concrete crickets you generally have to find a way to increase the slope of the crickets, which sometimes means adding some height (if allowable) to the parapet walls. Regardless of the solution, the one thing that will be required for cricket modifications is a structural analysis of the roof area in question. So again we hit an area where even when the roofing contractor is the prime contractor, there are things that cannot be addressed without assistance. Crickets on the upslope side of mechanical equipment and skylights are an area that can be addressed by the roofing contractor. It is rare for me to find a roof where these crickets were built large enough to drain off all the water from the upslope side of the object. Even though the water is often gone from the roof areas at each end of the cricket, I often find the roof membrane slightly more deteriorated at the cricket ends than the roof membrane in the field area of the roof. So on a reroof project, enlarge the crickets when you can. Closing 2011 Dodson Publications, Inc. Page 19 of 21 March 16, :33 AM

20 Identifying drainage issues and then presenting the appropriate solutions to correct the drainage deficiencies to the building owner prior to the start of a roofing project can save everyone time and money in the long run. The owner will have a roof that will not degrade early due to inadequate roof drainage and will have a less chance of leaking. The contractor will make more money on the project by being involved in the extra work needed to correct the roof drainage deficiencies, and will have a lower risk of being sued in the future if the deficiencies were ignored and the roof fails prematurely or if a consultant comes along a few years later and identifies the problems that should have been addressed. Also consider where level of expertise your firm has in dealing with roof drainage problems. Know your limitations, not just of what your firm can do, but also what your insurance will and will not cover. Carefully consider the level of design responsibility you want to take on. Be aware of the overall scope of the drainage issues to be addressed and when in doubt do the responsible thing and get a design professional involved. What do you do about the building owner who wants the roof installed, but doesn t want to pay to correct any of the roof drainage issues that are required by the building and/or plumbing code(s)? First off, when you present the options available to address the problem conditions, also include the specific section of the building or plumbing code that requires corrective action be taken. Get the support of a design professional, the local building official, and or the manufacturer s representative as needed to convince the owner of the need for addressing drainage issues. In the end, the prudent roofing contractor should walk away and not get involved in the project if the owner wants the reroof done without the needed corrections. However, I understand that in this economy many of you may choose to not walk away. If you find yourself in a situation where you don t want to walk away and the owner just wants the new roof installed, I suggest you at 2011 Dodson Publications, Inc. Page 20 of 21 March 16, :33 AM

21 least list the drainage issues that need to be addressed, and get the owner to sign a hold harmless agreement for these issues to limit your risk. You may also want to choose a roof system that has no ponding water exclusion and then try for a variance from the building department. In the end the choice is yours. I only hope that I have provided you with enough information to assist you in making the right choices. If you want to learn more about roof drainage issues I suggest you attend Roof Drainage What You Don t Know Can Hurt You! which is being presented by Phil Dregger, FRCI, RRC, PE of DNG Group at the June 27th RCI Region IV meeting in Las Vegas (as part of the 2012 WSRCA Convention). 1 Though often mischaracterized as standards, the NRCA s Roofing and Waterproofing manual are not standards, though they are an excellent reference source for learning about various roof decks, roofing systems, and evaluating roofing-related issues. However, when it comes to specific roof details, I find the lack of stucco related roof flashing details problematic and therefore usually look to the WSRCA details, which do include stucco related roof flashing details. 2 Today, most manufacturers have one or more products that are not negatively impacted by ponding water conditions and therefore they allow ponding water on some roofs, however the majority of each manufacturer s low-sloped roofing products still exclude damages from ponding water conditions. 3 We will not get into the structural references in this statement in this article Dodson Publications, Inc. Page 21 of 21 March 16, :33 AM

Low-slope reroofing guidelines

Low-slope reroofing guidelines Low-slope reroofing guidelines by Thomas Bollnow and Joan P. Crowe, AIA The NRCA Roofing and Waterproofing Manual, Fifth Edition, contains reroofing guidelines for steep- and low-slope roofing. The August

More information

How To Improve Roof Drainage

How To Improve Roof Drainage The Roof Drainage Epidemic Stewart M. Verhulst, M.S., P.E., M.ASCE 1 Marco A. Deleon, M.E., P.E., M.ASCE 2 Bradley L. East, M.S., M.ASCE 3 1 Nelson Architectural Engineers, Inc., 9701 Brodie Lane, Suite

More information

NRDCA 400 GUIDELINE FOR FIELD APPLICATION of LIGHTWEIGHT INSULATING CONCRETE REROOFING/RECOVER SYSTEMS

NRDCA 400 GUIDELINE FOR FIELD APPLICATION of LIGHTWEIGHT INSULATING CONCRETE REROOFING/RECOVER SYSTEMS NRDCA 400 GUIDELINE FOR FIELD APPLICATION of LIGHTWEIGHT INSULATING CONCRETE REROOFING/RECOVER SYSTEMS The (NRDCA) has prepared this document to provide customers and installers information that the industry

More information

Proper roof slope and drainage are important to prevent excessive water accumulation

Proper roof slope and drainage are important to prevent excessive water accumulation Proper roof slope and drainage are important to prevent excessive water accumulation by Jason P. Wilen, AIA, CDT, RRO P onding water sometimes occurs on membrane roof systems as a result of snow, rainfall

More information

CHAPTER VII. TITLE: STANDARDS FOR NEW ROOFING July 2015 CONSTRUCTION, RE-ROOFING CONSTRUCTION AND ROOFING SYSTEM GUARANTEE REQUIREMENTS

CHAPTER VII. TITLE: STANDARDS FOR NEW ROOFING July 2015 CONSTRUCTION, RE-ROOFING CONSTRUCTION AND ROOFING SYSTEM GUARANTEE REQUIREMENTS TITLE: STANDARDS FOR NEW ROOFING CONSTRUCTION, RE-ROOFING CONSTRUCTION AND ROOFING SYSTEM GUARANTEE REQUIREMENTS Responsible Organization: Office of Facilities Planning Instructions: This Manual supersedes

More information

Dollars & Sense of Compliance!

Dollars & Sense of Compliance! CRCA s 29 th Annual Trade Show Oakbrook k Terrace, IL January 19 20, 2012 Dollars & Sense of Compliance! Mark S. Graham Associate ExecutiveDirector Director, Technical Services National Roofing Contractors

More information

Commercial Roof Management

Commercial Roof Management Disclaimer: This material is designed and intended for general informational purposes only, and is not intended, nor shall it be construed or relied upon, as specific legal advice. Roof damage is a leading

More information

SINGLE FAMILY RESIDENCE HURRICANE MITIGATION APPLICATION

SINGLE FAMILY RESIDENCE HURRICANE MITIGATION APPLICATION SINGLE FAMILY RESIDENCE HURRICANE MITIGATION APPLICATION As of October 1, 2007, this mitigation form must be submitted as part of the roofing permit application package. Secondary water barrier (if applicable)

More information

CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN 55110 Fax: 651-429-8503. Re-Roofing: Asphalt Shingles

CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN 55110 Fax: 651-429-8503. Re-Roofing: Asphalt Shingles CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN 55110 Fax: 651-429-8503 Re-Roofing: Asphalt Shingles This is a summary of the standard requirements based on the

More information

TARRANT COUNTY DETAIL STANDARDS

TARRANT COUNTY DETAIL STANDARDS TARRANT COUNTY DETAIL STANDARDS 1. Standard Coping 2. Coping at End Wall 3. Standard Sheet Metal Engagement Details 4. Gravel Guard 5. Gravel Guard Wall Termination 6. Gravel Guard, Gutter, and Downspout

More information

CHAPTER 11 STORM DRAINAGE

CHAPTER 11 STORM DRAINAGE CHAPTER 11 STORM DRAINAGE SECTION 11 GENERAL 11.1 Scope. The provisions of this chapter shall govern the materials, design, construction and installation of storm drainage. 11.2 Where required. All roofs,

More information

Waterproofing Problems: A Simple Explanation, A Simple Solution

Waterproofing Problems: A Simple Explanation, A Simple Solution Waterproofing Problems: A Simple Explanation, A Simple Solution The purpose of this paper is to point out the underlying causes of waterproofing problems and simple means of preventing them. Such problems

More information

Page & Turnbull imagining change in historic environments through design, research, and technology

Page & Turnbull imagining change in historic environments through design, research, and technology DCI+SDE STRUCTURAL EVALUATIONS OFFICE BUILDING, TOOL SHED & WATER TANK, AND BLACKSMITH & MACHINE SHOP BUILDINGS SAN FRANCISCO, CALIFORNIA [14290] PRIMARY PROJECT CONTACT: H. Ruth Todd, FAIA, AICP, LEED

More information

Exterior Elevated Elements Inspection Guidelines

Exterior Elevated Elements Inspection Guidelines Exterior Elevated Elements Inspection Guidelines Planning and Development 1. Guideline Purpose These guidelines are intended to assist practicing professionals in complying with Berkeley Municipal Code

More information

Roof Inspection. Summary Report

Roof Inspection. Summary Report www.real-estate-inspections.com Roof Inspection Summary Report Subject Property Prepared for: File Number: Client in Detroit 05-15-RF-004 Inspector: Craig Milliken, PE # 32779 CPM Real Estate Inspections,

More information

APPLICATION INFORMATION FOR RESIDENTIAL ROOFING AND RESIDENTIAL ROOFING PACKET

APPLICATION INFORMATION FOR RESIDENTIAL ROOFING AND RESIDENTIAL ROOFING PACKET Environmental Protection and Growth Management Department PERMITTING, LICENSING AND CONSUMER PROTECTION DIVISION 1 N. University Drive, Box #302 Plantation, Florida 33324 954-765-4400 www.broward.org/permittingandlicensing

More information

Inspecting to a higher standard.

Inspecting to a higher standard. Inspecting to a higher standard. Rob Hopkin Silver Spring, MD 20902 Monday, June 2, 2014 ProTec Inspection Services Inc. 19736 Selby Ave Poolesville, MD 20837 301-972-8531 www.protec-inspections.com rob@protec-inspections.com

More information

Rooftop Matters. 2 0 1 2 Benchmark Report. Executive Summary

Rooftop Matters. 2 0 1 2 Benchmark Report. Executive Summary The 2012 Benchmark Report is our initial survey covering results from roof inspections and service calls over a six-month period. Our intention is to update these results annually in order to provide meaningful

More information

Roof Condition Analysis

Roof Condition Analysis Roof Condition Analysis Prepared for: J.W. Nelson John Evans Middle School - Gym Dome 2900 15th Avenue Greeley, Colorado Prepared by: Gregory Ham Coastal Specified Products 5252 Sherman Street Denver,

More information

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000 RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000 SECTION R905 REQUIREMENTS FOR ROOF COVERINGS R905.1 Roof covering application. Roof coverings

More information

Final inspections are completed by site visit only. Access to fenced yards shall be planned.

Final inspections are completed by site visit only. Access to fenced yards shall be planned. ROOFING RESIDENTIAL BUILDING INSPECTIONS DEPARTMENT www.ci.blaine.mn.us This handout is intended only as a guide and is based in part on the 2015 Minnesota State Building Code, Blaine City ordinances,

More information

If you are a web registered user of ArlingontPermits.com you may also request an inspection at:

If you are a web registered user of ArlingontPermits.com you may also request an inspection at: TECHNICAL BULLETIN Community Development & Planning, Building Inspections TOPIC: Permits & Inspections for Roofing Replacement Effective November 1, 2011 Revised This Technical Bulletin will provide contractors

More information

INSTALLATION OF A BAY WINDOW

INSTALLATION OF A BAY WINDOW INSTALLATION OF A BAY WINDOW Installation of a Bay Window These instructions relate to the replacement of an existing bay window or replacement of a straight window with a new bay window, in an opening

More information

CHAPTER 11 STORM DRAINAGE

CHAPTER 11 STORM DRAINAGE CHAPTER STORM DRAINAGE SECTION PC 0 GENERAL 0. Scope. The provisions of this chapter shall govern the materials, design, construction and installation of storm drainage. Storm water discharge shall be

More information

Georgia State University. Urban Life Building Roof Replacement

Georgia State University. Urban Life Building Roof Replacement ENGINEERING AND ENVIRONMENTAL 140 DECATUR STREET SE, ATLANTA, GA 30303 GEORGIA STATE UNIVERSITY - FACILITIES DESIGN & CONSTRUCTION 34 BROAD STREET, SUITE 100 ATLANTA, GA 30303 DRAWING INDEX A-0 PROJECT

More information

UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Architectural. Roofing. Basis of Design

UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Architectural. Roofing. Basis of Design Basis of Design This section applies to roofing membranes, flashing and accessories. Design Criteria Adhere to the standards and details of the latest editions of the National Contractors Association (NRCA)

More information

Architectural Inspection Site Structures

Architectural Inspection Site Structures 0141 Freestanding Shelters Open air shelters not attached to the building. Bike rack shelter with bike racks: This 8'x30' structure is located on the north east side of the building on the wooded landscape

More information

Roof Inspection Report 3840 Greenway Circle, Lawrence Kansas, 66046 Sauer-Danfoss Building

Roof Inspection Report 3840 Greenway Circle, Lawrence Kansas, 66046 Sauer-Danfoss Building Roof Inspection Report 3840 Greenway Circle, Lawrence Kansas, 66046 Sauer-Danfoss Building Prepared For: Ms Marilyn Bittenbender Colliers International 805 New Hampshire St Lawrence Kansas, 66046 Prepared

More information

RECOATING AND RENEWING SPF ROOFING SYSTEMS

RECOATING AND RENEWING SPF ROOFING SYSTEMS RECOATING AND RENEWING SPF ROOFING SYSTEMS Procedures, Regional Differences and type of coating systems Bruce Schenke Premium Spray Products REASONS TO RECOAT/RENEW Add a new coating layer to renew the

More information

Warranty Information TABLE OF CONTENTS PROCEDURES FOR WARRANTY 2

Warranty Information TABLE OF CONTENTS PROCEDURES FOR WARRANTY 2 Warranty Information TABLE OF CONTENTS PROCEDURES FOR WARRANTY 2 PROTECTING YOUR DURO-LAST ROOFING 3 Safety Measures 3 Inspection 3 Maintenance Program 4 Sealants 4 Drainage 4 Parapets Walls 4 Building

More information

TITLE: MASONRY PARAPET WALLS AND FLAT ROOF REQUIREMENTS 11/1/09

TITLE: MASONRY PARAPET WALLS AND FLAT ROOF REQUIREMENTS 11/1/09 TITLE: MASONRY PARAPET WALLS AND FLAT ROOF REQUIREMENTS 11/1/09 PMT GUIDE # 10 Book of Order Section G-10.0102o: "The session is responsible for the mission and government of the particular church. It

More information

Preventing Ice Dams on Roofs

Preventing Ice Dams on Roofs Preventing Ice Dams on Roofs Facility Manager November/December 2005 When a roof leaks, facility managers inevitably receive complaints from building occupants. If it is winter, ice dams are often the

More information

ELIGIBLE REPAIR PROJECT PARAMETERS

ELIGIBLE REPAIR PROJECT PARAMETERS THE DISTRICT MUNICIPALITY OF MUSKOKA ONTARIO RENOVATES PROGRAM FOR HOMEOWNERS ELIGIBLE REPAIR PROJECT PARAMETERS 1. To have your project considered and payment processed, all projects requiring a Building

More information

Roofing 101 - Signs that Your Roof Needs Repair/Replacement

Roofing 101 - Signs that Your Roof Needs Repair/Replacement By: Cherie Martel Roofing 101 - Signs that Your Roof Needs Repair/Replacement 1. Tell us a little bit about your company and its foundation. In 1963, Samuel T. Martel began a small family run roofing company,

More information

Residential Roofing Guide

Residential Roofing Guide Residential Roofing Guide TABLE OF CONTENTS Building Detail and Accessories...... 1 Panel Introduction and Handling...... 2 Cutting and Trimming.... 3 Roof Preparation..... 3 Roof Slope..... 3 Re-roofing...

More information

Home Inspection Report

Home Inspection Report 4949 Brownsboro Rd Suite 293 Louisville, KY 40223 (502) 414-1440 tripleainspections@gmail.com Inspected By: William Carter, HI-1956 Home Inspection Report Prepared For: Edward Cullen Property Address:

More information

Delving into drains. Reprinted with permission from PROFESSIONAL ROOFING magazine. December 2012 by the National Roofing Contractors Association.

Delving into drains. Reprinted with permission from PROFESSIONAL ROOFING magazine. December 2012 by the National Roofing Contractors Association. Delving into drains Reprinted with permission from PROFESSIONAL ROOFING magazine. December 2012 by the National Roofing Contractors Association. Installing retrofit roof drains can help you increase sales

More information

!!! !!!! !!! !!! !!! !!! !!!!!!!!! Table of Contents! Section 1: Most Common Types of Flat Roofing! Section 2: Better Understand Your Flat Roof!

!!! !!!! !!! !!! !!! !!! !!!!!!!!! Table of Contents! Section 1: Most Common Types of Flat Roofing! Section 2: Better Understand Your Flat Roof! Table of Contents Section 1: Most Common Types of Flat Roofing Section 2: Better Understand Your Flat Roof Section 3: Flat Roofing Cost in 2015: Four Factors that Dictate Section 4: Planning A Flat Roofing

More information

Basement & Foundation Damage

Basement & Foundation Damage Basement & Foundation Damage Please note-this presentation is only intended to be used as a basic educational tool and is by no means all encompassing. Each property should be treated on a case by case

More information

Sun Windows General Information Sun New Construction Window Installation Instructions

Sun Windows General Information Sun New Construction Window Installation Instructions Sun Windows General Information Section 1 G F H H H A. Apply Weather Resistive Barrier B. Apply Sill Flashing Tape C. Place Waterproof Sill Shims D. Caulk Back of Nail Fin Sides & Top, Set Window, Fasten

More information

Drainage of rainwater has

Drainage of rainwater has Drainage of rainwater has long been considered an essential attribute for the proper performance of any roof system. Long-term and excessive accumulation of water will contribute to the deterioration of

More information

Better Budgeting: Roof Management Plans Help Estimate Costs

Better Budgeting: Roof Management Plans Help Estimate Costs Better Budgeting: Roof Management Plans Help Estimate Costs Inside ASHE Summer 2015 Depending upon the complexity of a hospital roof, the average cost for a replacement roof can range from $15 to $40 per

More information

www.citiesinspection.com October 5, 2015 Dear Client,

www.citiesinspection.com October 5, 2015 Dear Client, www.citiesinspection.com October 5, 2015 Dear Client, On 9/14/2015, Cities Inspection Service, Inc. completed a building inspection of the property located at 123 Oak Street, Someplace, Minnesota for you.

More information

University of California - Santa Barbara West Campus Point Faculty Housing

University of California - Santa Barbara West Campus Point Faculty Housing University of California - Santa Barbara West Campus Point Faculty Housing Reconstruction Guidelines and Considerations to Correct Exterior Building Envelope Weatherproofing Defects and Recommended Upgrades

More information

CITY OF BELL PROFESSIONAL CONSULTING SERVICES FOR ROOF REPAIRS TO CITY OWNED FACILITIES

CITY OF BELL PROFESSIONAL CONSULTING SERVICES FOR ROOF REPAIRS TO CITY OWNED FACILITIES CITY OF BELL 6330 PINE AVENUE BELL, CA 90201 PH: (323) 588-6211 FAX: (323) 771-9473 CITY OF BELL PROFESSIONAL CONSULTING SERVICES FOR ROOF REPAIRS TO CITY OWNED FACILITIES I. INTRODUCTION City of Bell

More information

The existing roof angle change terminations and flashings when sound and intact can be reused.

The existing roof angle change terminations and flashings when sound and intact can be reused. January 2, 2015 Summary Specification Re-Skinning an Existing Roof Maintenance and Repair Warranty Upgrade for Up to 30 Years Re-Skinning Over an Existing Roof with a New C-EPDM Membrane Using The Existing

More information

FOUNDATION INSULATING SYSTEM, INCLUDING WATERPROOFING AND DAMP PROOFING

FOUNDATION INSULATING SYSTEM, INCLUDING WATERPROOFING AND DAMP PROOFING FOUNDATION INSULATING SYSTEM, INCLUDING WATERPROOFING AND DAMP PROOFING insulation installed on foundation walls must be separated from the building interior with a code approved thermal barrier. Foam

More information

Hartsfield-Jackson Atlanta International Airport s

Hartsfield-Jackson Atlanta International Airport s Hartsfield-Jackson Atlanta International Airport s 2008-09 Closed Projects (Posted 1/6/2009) FC-3007000038C: MISCELLANEOUS BUILT-UP ROOF AND SINGLE PLY ROOF REPAIRS AT H-JAIA Furnish all labor, equipment,

More information

Roof Inspection. Summary Report

Roof Inspection. Summary Report Phone: (561) 866 9956 www.real-estate-inspections.com Roof Inspection Summary Report Subject Property File Number: 05-15-RF-002 Inspector: Craig Milliken, PE CPM Real Estate Inspections, Inc. Date of Inspection:

More information

How To Repair A House

How To Repair A House Assessing Structural Damages Please note-this presentation is only intended to be used as a basic educational tool and is by no means all encompassing. Each property should be treated on a case by case

More information

Maintenance & Inspection Guide

Maintenance & Inspection Guide ADDRESSING THE NEEDS OF OUR CUSTOMERS AND THE ENVIRONMENT ONE high Performance roofing SOLUTION AT A TIME. Maintenance & Inspection Guide TABLE OF CONTENTS Topic: Page: I. Introduction 1 II. Maintenance

More information

Commercial Roof Inspection Form

Commercial Roof Inspection Form Inspection Date: Inspector: Building Information Building ID: No.: Used For: Year Roof Applied: Building Description: Permanent Temporary Building Type: Retail Industrial Residential Building Name: Building

More information

Lighthouse Engineering, L.L.C.

Lighthouse Engineering, L.L.C. Registered Engineering Firm (F: 9334) Phone: 214-577-1077 Fax: 214-224-0549 Website: www.lighthouseeng.com Email: Office@LighthouseEng.com Thursday, September 04, 2014 TO: Our Client RE: Initial Engineering

More information

Residential Foundations and Basements

Residential Foundations and Basements Residential Foundations and Basements Disclaimer All of the following information is based on the 2006 International Residential Code with Kentucky Amendments. As some information is paraphrased, article

More information

bout your HOUSE before you start Renovating Your Basement Moisture Problems

bout your HOUSE before you start Renovating Your Basement Moisture Problems A bout your HOUSE before you start Renovating Your Basement Moisture Problems CE 28 c Condensation of cold surfaces, efflorescence Water leak in corner on floor Mold and decay on floor joists and sill

More information

Water Damage & Repair

Water Damage & Repair Water Damage & Repair Chinatown Preservation Talks 2015 James Engler, P.A Glenn Mason, AIA Mason Architects Program Outline Terminology & Waterproofing Basics Discussion of why this is important Below

More information

WINDOW AND DOOR REPLACEMENT REQUIREMENTS

WINDOW AND DOOR REPLACEMENT REQUIREMENTS WINDOW AND DOOR REPLACEMENT REQUIREMENTS Should you have any questions after reading the following information, please call the Building Inspection Department at 651-439-4439 to discuss the topics of concern.

More information

Roof Repair Project Report. Fairbank Complex 40 Fairbank Road Sudbury, Massachusetts. February 14, 2014. RBA Project No. 2014007.00.

Roof Repair Project Report. Fairbank Complex 40 Fairbank Road Sudbury, Massachusetts. February 14, 2014. RBA Project No. 2014007.00. Report Fairbank Complex 40 Fairbank Road RBA Project No. 2014007.00 Prepared by: 33 Center Street, 2 nd Floor Burlington, MA Tel: 781-273-1537 Fax: 781-273-1695 TABLE OF CONTENTS Roof Repair Project Report...

More information

Water Management & Damage Prevention:

Water Management & Damage Prevention: Water Management & Damage Prevention: A Guide for Homeowners This article provides homeowners with basic information to make these decisions and take the appropriate actions to keep their homes dry and

More information

Williamson and Associates, Inc. Report of Building Exterior Condition Evaluation, dated January 2 nd, 2013. (68 pages)

Williamson and Associates, Inc. Report of Building Exterior Condition Evaluation, dated January 2 nd, 2013. (68 pages) INNOVATIVE BUILDING AND ARCHITECTURE CONSULTANTS Mr. Bud Hall Senior Vice President of construction Turnberry Associates 19501 Biscayne Boulevard, Suite 400 Aventura, FL 33180 Subject: The Nashville Hilton

More information

COMMERCIAL BUILDING APPLICATIONS

COMMERCIAL BUILDING APPLICATIONS EXPANDED POLYSTYRENE FOR COMMERCIAL BUILDING APPLICATIONS www.falconfoam.com Commercial Building Ap Expanded Polystyrene Insulation Falcon Foam leads the commercial building industry with products that

More information

May 5, 2010. Client Client Address. Re: Inspection Address, Chicago, Illinois. Dear Mr. Client,

May 5, 2010. Client Client Address. Re: Inspection Address, Chicago, Illinois. Dear Mr. Client, PROPERTY INSPECTION PROFESSIONALS May 5, 2010 Client Client Address Re: Inspection Address, Chicago, Illinois Dear Mr. Client, On May 4, 2010, Tomacor completed a property inspection of the above referenced

More information

Clear Fork Valley Local School District. Roofing Repairs Spring/Summer 2015

Clear Fork Valley Local School District. Roofing Repairs Spring/Summer 2015 Clear Fork Valley Local School District Roofing Repairs Spring/Summer 2015 Instructions to Bidders: Public Notice To Bidders (ORC 3313.46) Notice is hereby given that sealed bids will be received at the

More information

ROOF INSPECTION & MAINTENANCE

ROOF INSPECTION & MAINTENANCE Physical Plant Administration Facilities Maintenance Department ROOF INSPECTION & MAINTENANCE All roofs require periodic inspection and maintenance in order to perform as designed and to provide a long

More information

Getting The Most Out of Your Roof Asset. Program #099 PM

Getting The Most Out of Your Roof Asset. Program #099 PM Getting The Most Out of Your Roof Asset Program #099 PM Garland 12 Steps: Specifications, Inspections, Details, Field Support Budget vs. Desired Life Expectancy Reduction of Liability Resource Staying

More information

Chapter 3 Pre-Installation, Foundations and Piers

Chapter 3 Pre-Installation, Foundations and Piers Chapter 3 Pre-Installation, Foundations and Piers 3-1 Pre-Installation Establishes the minimum requirements for the siting, design, materials, access, and installation of manufactured dwellings, accessory

More information

Waterproofing and interior insulation for basements takes new twist in technology.

Waterproofing and interior insulation for basements takes new twist in technology. Waterproofing and interior insulation for basements takes new twist in technology. Free report reveals how to stop all call backs for basements for the life of the structure by installing these 3 low cost

More information

STANDARD REQUIREMENTS FOR BONDING OR MECHANICAL ATTACHMENT OF INSULATION PANELS AND MECHANICAL ATTACHMENT OF ANCHOR AND/OR BASE SHEETS TO SUBSTRATES

STANDARD REQUIREMENTS FOR BONDING OR MECHANICAL ATTACHMENT OF INSULATION PANELS AND MECHANICAL ATTACHMENT OF ANCHOR AND/OR BASE SHEETS TO SUBSTRATES ROOFING APPLICATION STANDARD (RAS) No. 117 STANDARD REQUIREMENTS FOR BONDING OR MECHANICAL ATTACHMENT OF INSULATION PANELS AND MECHANICAL ATTACHMENT OF ANCHOR AND/OR BASE SHEETS TO SUBSTRATES Scope 1.1.

More information

Foundation. Foundation

Foundation. Foundation Moisture Aside from structural concerns, the most important consideration for foundation design is moisture. No client wants a wet basement. No client wants a damp basement. No client wants mold in their

More information

Structure Survey Findings:

Structure Survey Findings: Structure Survey Findings: Visible portions of the following were observed: foundations; structure to walls, columns, floors, roofs, overhang posts, and columns; attached or firmly abutting decks, balconies,

More information

HEB 38 BLANCO AND WEST AVENUE FLUID APPLIED EPDM RUBBER ROOF RECOVERY SYSTEM APPLICATION

HEB 38 BLANCO AND WEST AVENUE FLUID APPLIED EPDM RUBBER ROOF RECOVERY SYSTEM APPLICATION HEB 38 BLANCO AND WEST AVENUE FLUID APPLIED EPDM RUBBER ROOF RECOVERY SYSTEM APPLICATION David Marut TEST CASE REPORT July 1, 2014 Case Study Pro Guard EPDM Super Coat Liquid Rubber Membrane Roof System

More information

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal.

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal. 2.02 DESIGN DEVELOPMENT PHASE GENERAL The Architect shall prepare the Design Development Documents from the approved Schematic Design. The Design Development Documents shall consist of drawings and other

More information

ABOVE ALL, IT S A ROOF SERVICED BY THE JAMES MYERS COMPANY

ABOVE ALL, IT S A ROOF SERVICED BY THE JAMES MYERS COMPANY ABOVE ALL, IT S A ROOF SERVICED BY THE JAMES MYERS COMPANY BEAM A Premiere Roof Asset Management Program WITH BEAM WE CAN HELP YOU MAINTAIN AND PROTECT THE ROOF THAT PROTECTS YOU. A FRAGILE BARRIER Consider

More information

Crescent Valley High School Roof Investigation

Crescent Valley High School Roof Investigation Crescent Valley High School Roof Investigation Project: Corvallis School District Crescent Valley High School Roof Date: July 26, 2011 Report By: Rowell Brokaw Architects: Mark Young, AIA, Chris Andrejko

More information

September 3, 2009. Ric Boyd, Public Works Director Ketchikan Gateway Borough 344 Front St. Ketchikan, AK 99901

September 3, 2009. Ric Boyd, Public Works Director Ketchikan Gateway Borough 344 Front St. Ketchikan, AK 99901 September 3, 2009 Ric Boyd, Public Works Director Ketchikan Gateway Borough 344 Front St. Ketchikan, AK 99901 RE: Ketchikan Gateway Borough Gateway Recreation Center Roof Observations and Intrusive Inspections

More information

What to Do About Your Roof and How to Hire a Roofing Contractor

What to Do About Your Roof and How to Hire a Roofing Contractor ROOFI NG What to Do About Your Roof and How to Hire a Roofing Contractor On those rare occasions when it rains in Arizona and you have a leak, you may wonder if you need a brand new roof, especially if

More information

Bituminous Sheet Flat Roofs: Their repair and maintenance

Bituminous Sheet Flat Roofs: Their repair and maintenance Bituminous Sheet Flat Roofs: Their repair and maintenance Flat roof covered in sheets of bituminous felt Introduction Whilst flat roofs are often regarded as inferior to their pitched counterparts and

More information

ROOF ASSEMBLIES CHAPTER 9

ROOF ASSEMBLIES CHAPTER 9 CHAPTER 9 ROOF ASSEMBLIES SECTION R901 GENERAL R901.1 Scope. The provisions of this chapter shall govern the design, materials, construction and quality of roof assemblies. SECTION R902 ROOF CLASSIFICATION

More information

CLIENT. Inspection Report. 271 Front St. Alert Bay, B.C. Island Building Inspections V ANCOUVER I SLAND B. C.

CLIENT. Inspection Report. 271 Front St. Alert Bay, B.C. Island Building Inspections V ANCOUVER I SLAND B. C. CLIENT Inspection Report 271 Front St. Alert Bay, B.C. Island Building Inspections 2013 V ANCOUVER I SLAND B. C. Elevation Photos For the Property at 271 Front Street Alert Bay, BC ELEVATION PICTURES Front

More information

CARLISLE OWNER S MANUAL

CARLISLE OWNER S MANUAL Investing in Solutions for Over 45 Years For over 45 years Carlisle Construction Materials Incorporated (CCM) has been creating solutions for the construction industry. Beginning with single-ply roofing

More information

SELF-INSPECTION CHECKLIST Maintain Your Roof and Identify Potential Issues With Bloom s Comprehensive Self-Inspection Guide

SELF-INSPECTION CHECKLIST Maintain Your Roof and Identify Potential Issues With Bloom s Comprehensive Self-Inspection Guide SELF-INSPECTION CHECKLIST Maintain Your Roof and Identify Potential Issues With Bloom s Comprehensive Self-Inspection Guide Inspection Questions? Call Bloom At 800-483-9932 www.bloomroofing.com DISCLAIMER

More information

Mark Cramer Inspection Services, Inc.

Mark Cramer Inspection Services, Inc. Mark Cramer Inspection Services, Inc. 492 Twentieth Avenue, Indian Rocks Beach, FL 34635-2970 (727) 595-4211 Fax (727) 596-7583 Certified Member #12085 American Society of Home Inspectors Construction

More information

THERMAL AND MOISTURE PROTECTION 07100. WATERPROOFING

THERMAL AND MOISTURE PROTECTION 07100. WATERPROOFING DIVISION 7 THERMAL AND MOISTURE PROTECTION 07100. WATERPROOFING 07110. MEMBRANE WATERPROOFING: The following are minimum requirements to assure adequately designed waterproofed floors for machine and equipment

More information

October 30, 2014. Mr. & Mrs. Daniel Vick 101 Southwind Cove Benton, AR. Report of Findings, Structural Investigation, Benton, Arkansas, Dear Mr.

October 30, 2014. Mr. & Mrs. Daniel Vick 101 Southwind Cove Benton, AR. Report of Findings, Structural Investigation, Benton, Arkansas, Dear Mr. 117 S. Market St. Benton, AR 72015 * 501-315-2626 * Fax 501-315-0024 October 30, 2014 Mr. & Mrs. Daniel Vick 101 Southwind Cove Benton, AR Re: Report of Findings,, Benton, Arkansas, Dear Mr. Vick: This

More information

Storage Store the siding in a dry and ventilated area. Do not place it directly on the ground. Always cover the siding after a day s work.

Storage Store the siding in a dry and ventilated area. Do not place it directly on the ground. Always cover the siding after a day s work. Installation Guide Before you begin, take the time to read this entire guide to clearly understand the requirements and steps to follow for proper installation. Warning Do not install defective material.

More information

1. Adhered KEE membrane roofing system. 2. Mechanically fastened KEE membrane roofing system.

1. Adhered KEE membrane roofing system. 2. Mechanically fastened KEE membrane roofing system. SECTION 075416 - PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Adhered KEE membrane roofing system. 2. Mechanically fastened KEE membrane roofing system. 1.2 PERFORMANCE REQUIREMENTS A. Solar Reflectance

More information

Property Condition Assessment

Property Condition Assessment Property Condition Assessment Business, Wisconsin Inspection Date: 8/2009 Prepared For: Business Owner Report Number: TD999909 Prepared By: Shamrock Building Inspection Consultants LLC N29 W29951 Shel-Mar

More information

ROOF INSPECTION REPORT

ROOF INSPECTION REPORT ROOF INSPECTION REPORT Date: October 9, 2012 Requesting Firm: FIRST CHOICE INSPECTIONS Santiago Salazar Address: 447 Chilberg Court, San Jose, CA 95133 Phone #: 408-771-7563 Roof Inspected At: 1465 Gerlach

More information

PETERSONS WATERFRONT CONDOMINIUMS

PETERSONS WATERFRONT CONDOMINIUMS CONSULT DESIGN CONSTRUCT PETERSONS WATERFRONT CONDOMINIUMS 103 Park Street Chelan, Washington Findings Summary Report Prepared for: Petersons Waterfront Condominium Association March 21, 2014 J2 Project

More information

ROOFING APPLICATION STANDARD (RAS) No. 150 PRESCRIPTIVE BUR REQUIREMENTS

ROOFING APPLICATION STANDARD (RAS) No. 150 PRESCRIPTIVE BUR REQUIREMENTS ROOFING APPLICATION STANDARD (RAS) No. 150 PRESCRIPTIVE BUR REQUIREMENTS 1. 2. 3. 3.0 Scope 1.1 This application standard shall be used where the authority having jurisdiction has adopted its use, and

More information

keep moisture in check by getting fairly hot and facilitating downward time the sun came out, Then, after installation roof no longer got very

keep moisture in check by getting fairly hot and facilitating downward time the sun came out, Then, after installation roof no longer got very Cool Roofs Cause Condensation Fact or Fiction? by Phil Dregger, PE, RRC, Technical Roof Services, Inc. (Editor s Note: Phil Dregger is a professional engineer, registered roof consultant, author, and fellow

More information

ROOF CONSTRUCTION Roof Styles Gable Roof Hip Roof Gambrel Roof

ROOF CONSTRUCTION Roof Styles Gable Roof Hip Roof Gambrel Roof ROOF CONSTRUCTION The overall appearance of a building is greatly affected by the roof lines and the roofing materials. The designer has many standard designs to choose from and should be able to find

More information

metal Duil~ing manufacturers Association

metal Duil~ing manufacturers Association metal Duil~ing manufacturers Association ApplicatiDns metal Building Systems Conventional Buildings Retrofit Roofing Projects l~e Perfect Cover.One of the most important technological advances in building

More information

UPDATE October 8, 2012 Chicago Roofing Contractors Association CHICAGOLAND S ROOFING, INSULATION, AIR-BARRIER REQUIREMENTS

UPDATE October 8, 2012 Chicago Roofing Contractors Association CHICAGOLAND S ROOFING, INSULATION, AIR-BARRIER REQUIREMENTS UPDATE October 8, 2012 Chicago Roofing Contractors Association CHICAGOLAND S ROOFING, INSULATION, AIR-BARRIER REQUIREMENTS Executive Summary: There is a proposal at the Joint Committee on Administrative

More information

Air-Conditioning, Heating, and Refrigeration Institute. Sheet Metal and Air-Conditioning Contractors National Association

Air-Conditioning, Heating, and Refrigeration Institute. Sheet Metal and Air-Conditioning Contractors National Association Air-Conditioning, Heating, and Refrigeration Institute Sheet Metal and Air-Conditioning Contractors National Association GUIDELINE B-1997 ACKNOWLEDGEMENT These guidelines for Roof Mounted Outdoor Air-

More information

Record of Work Experiences Trade Qualifier or Pre-Apprenticeship Credits ROOFER

Record of Work Experiences Trade Qualifier or Pre-Apprenticeship Credits ROOFER Department of Advanced Education and Skills Apprenticeship and Trades Certification Division Record of Work Experiences Trade Qualifier or Pre-Apprenticeship Credits ROOFER Note to Apprenticeship Applicants

More information

Rehab Inspection Report Page 1

Rehab Inspection Report Page 1 Rehab Inspection Report Page 1 Home Address: Construction Style: Number of bedrooms Square footage: Value of offer: Estimated rehab cost: Value of resale: Orientation of house: N S E W Note: orientation

More information

Water Damage During Construction

Water Damage During Construction Allianz Global Corporate & Specialty Americas Water Damage During Construction May 2012 A Contractor s Loss Prevention Guide Water damage losses are a major cause of loss during construction and represent

More information

bout your HOUSE before you start Repairing And Replacing Materials Exterior Walls

bout your HOUSE before you start Repairing And Replacing Materials Exterior Walls A bout your HOUSE before you start Repairing And Replacing Materials Exterior Walls CE 28 h Exterior finish materials are expected to protect the house from the elements while providing an attractive appearance.

More information

Presentation Agenda. Introduction. Types of Flooding Identifying Flood Risks Property Improvements Additional Resources.

Presentation Agenda. Introduction. Types of Flooding Identifying Flood Risks Property Improvements Additional Resources. Presentation Agenda Introduction Types of Flooding Identifying Flood Risks Property Improvements Additional Resources Discussion / Q&A 4 RainReady Home an initiative of RainReady is an initiative of the

More information