Premium flat 167 Twinson (P 9576) (formerly O-Wall) Technical file. Roofline & Cladding. Cladding premium.

Size: px
Start display at page:

Download "Premium flat 167 Twinson (P 9576) (formerly O-Wall) Technical file. Roofline & Cladding. Cladding premium. www.deceuninck.com"

Transcription

1 Premium flat 167 Twinson (P 9576) (formerly O-Wall) Technical file Cladding premium Roofline & Cladding 01/02/2012

2 23/03/2011 V 1.1: Update chapter Length: replace colour 65 by /01/2012 V 1.2: Update data sheet Twinson (2.4/1-2 v3). Adding aluminium finishing profile P9566. Adding connection piece P9573. Adding building details (chapter Examples). Change O-Wall into premium flat 167 Twinson (P 9576). 31/01/2012 V 1.2: Adding colour 65 for aluminium finishing profiles. 1/02/2012 Deceuninckpremium flat 167 Twinson (P 9576)

3 Contents: 1 General: 1.1 Material & benefits 1.2 Colours 1.3 Machining & safety precautions 1.4 Twinson recycling 1.5 Warranty 1.6 Storage & transport 2 System properties: 2.1 Profile overview 2.2 Length 2.3 Product properties 2.4 Technical file 2.5 Certificates 3 Installation: 3.1 Horizontal installation 3.2 Vertical installation 4 Examples: 5 Maintenance guidelines: 5.1 Maintenance 5.2 Cleaning & care 01/02/ V1.2 - DEC/ENG - published work ' Deceuninck ' All rights reserved. This document contains proprietary and confidential information, do not copy or disclose this information without the express written consent of Deceuninck. Deceuninck reserves the right to change this drawing and any associated documents. 1/02/2012 Deceuninckpremium flat 167 Twinson (P 9576)

4 Premium flat 167 Twinson (P 9576) (formerly O-Wall) General 1.1 Material & benefits 1.2 Colours 1.3 Machining & safety precautions 1.4 Twinson recycling 1.5 Warranty 1.6 Storage & transport Cladding premium Roofline & Cladding 01/02/2012- V1.2

5 1.1 Material & benefits Best of both worlds: Welcome to the world of Twinson, where nature and technology go hand in hand. Twinson is made of wood and PVC. By combining the advantages of both materials in a single new material, Twinson offers the best of both worlds: the natural appearance and warm feel of wood, and the ease of maintenance and durability of PVC. Twinson is 100% recyclable. Whats more, with its PEFC certification, Twinson is an environmentally friendly alternative to tropical hardwood. While tropical hardwood is only available from endangered rain forests, Twinson contains pinewood that grows quickly in continuously replanted forests. natural appearance low maintenance durable water resistant resistant to insects does not split environmentally friendly (100% recyclable) splinter free PEFC certified About PEFC: The international non-profit organisation PEFC is dedicated to sustainable forest management. With more than 200 million hectares of certified forest, PEFC is the largest certification system in the world. PEFC ensures that the number of trees harvested is not greater than the number replanted, and that biodiversity is retained. Essential here is respect for the natural habitat of fauna and flora, as well as for the soil and climate. 1/02/2012 Deceuninckpremium flat 167 Twinson (P 9576) V /1

6 1.2 Colours Twinson cladding premium profiles and finishing trims are available in 3 different natural colours. With Twinson, you can transform your house into a stylishly finished environment that you can enjoy for years to come. Twinson cladding premium colours: 502 liquorice black 504 bark brown 505 turf brown The colour samples are reproductions and can deviate from the originals. The large inset shows the natural colour which the Twinson cladding premium will change to over time. Twinson contains wood fibres, susceptible to differences in colour and appearance. As soon as the product is exposed to sun and rain, these fibres will undergo a natural aging process and will be subject to colour changes. After a couple of months, the final patina will be obtained. Planks should be mixed prior to installation to gain a natural effect. 1/02/2012 Deceuninckpremium flat 167 Twinson (P 9576) V /1

7 1.3 Machining & safety precautions Machining: General: almost the same range of tools as for wood. Specific tools/machining: Glass paper, sandpaper, wire brush or steel wool. Drills: HSS metal drills During drilling: for best result do not apply heavy pressure. Periodically lift the bit to clear the shavings. Cutting: use a carbide teeth saw blade. Thin blade. Number of teeth: minimum 80. Burrs can be removed with glass paper or steel wool Safety precautions: When using electrical devices for machining the Twinson profiles, we recommend wearing a dust mask and safety goggles. There are no specific measures necessary to process Twinson as there are no dangerous particles being released during processing Proposed sawing blocks: NOT SUPPLIED BY DECEUNINCK Block 1 24 P9565: block P9567: block 2 29 Block 2 29 min P9570: block 1+2 P9566: block 1+2 1/02/2012 Deceuninckpremium flat 167 Twinson (P 9576) V /1

8 1.4 Twinson recycling An important aspect of sustainable building is the lifetime expectancy of the materials and the impact that they have on the environment. There is no sense of using an environmentally friendly building material if the durability can not be guaranteed. That is why Deceuninck has created the Twinson bag. The intention is that after installation all the Twinson cut-offs are collected in the special Twinson bag. This material can be returned to Deceuninck to be recycled, enabling us to have a closed loop recycling system. To guarantee that the next generation of Twinson profiles are not polluted with saw dust, aluminium or other material we ask you to only put Twinson cut-offs in the bag. Close the bag before returning it to Deceuninck. Maximum weight of 30kg. 1/02/2012 Deceuninckpremium flat 167 Twinson (P 9576) V /1

9 1.5 Warranty 1/02/2012 Deceuninckpremium flat 167 Twinson (P 9576) V /1

10 1/02/2012 Deceuninckpremium flat 167 Twinson (P 9576) V /2

11 1.6 Storage & transport Store profiles or stillages containing profiles inside: In a dry and ventilated environment, away from direct exposure to sunlight. Stock and transport the profiles horizontally. Handle long profiles by 2 persons ( > 2 m). Unload the profiles with care. Ensure that the profiles are secured during transportation, Twinson profiles can easily slide over each other and this can leave shiny tracks and burrs on to the profiles. Distance between supports maximum 0.8 m. Profiles or stillages partially stored outside will result in differences in colour on the profiles. The parts of the profiles that are exposed to the elements (rain, UV) will incur some weathering and change in colour. Afterwards, when they are completely exposed outside, the normal weathering process will continue. 6m max. 0.5m max. 0.8m 1/02/2012 Deceuninckpremium flat 167 Twinson (P 9576) V /1

12 Premium flat 167 Twinson (P 9576) (formerly O-Wall) System properties 2.1 Profile overview 2.2 Length 2.3 Product properties 2.4 Technical file 2.5 Certificates Cladding premium Roofline & Cladding 01/02/2012- V1.2

13 2.1 Profile overview > 10 kg/m 9570 Kits: > 200 x > 210 x > 1 x bit R2 (P9516) > 40 x > 90 x > 1 x bit R2 (P9516) > 20 x > 21 x /02/2012 Deceuninckpremium flat 167 Twinson (P 9576) V /1

14 2.1.1 Profile sheet P9576: /02/2012 Deceuninckpremium flat 167 Twinson (P 9576) V /2

15 2.1.2 Profile sheet P9562/P9568: Y Ix: 0.39 cm4 Iy: 1.41 cm4 X 1/02/2012 Deceuninckpremium flat 167 Twinson (P 9576) V /3

16 2.1.3 Profile sheet P9564/P9571: Y Ix: 2.25 cm4 Iy: 2.25 cm4 X 1/02/2012 Deceuninckpremium flat 167 Twinson (P 9576) V /4

17 2.1.4 Profile sheet P9565: Y Ix: 1.21 cm4 Iy: 3.24 cm4 X 1/02/2012 Deceuninckpremium flat 167 Twinson (P 9576) V /5

18 2.1.5 Profile sheet P9567: Y Ix: 9.62 cm4 Iy: 3.83 cm4 X /02/2012 Deceuninckpremium flat 167 Twinson (P 9576) V /6

19 2.1.6 Profile sheet P9569: Y Ix: 9.48 cm4 Iy: 1.06 cm4 X /02/2012 Deceuninckpremium flat 167 Twinson (P 9576) V /7

20 2.1.7 Profile sheet P9570: Y Ix: 4.03 cm4 Iy: 6.42 cm4 X /02/2012 Deceuninckpremium flat 167 Twinson (P 9576) V /8

21 2.1.8 Profile sheet P9566: Y Ix: 3.47 cm4 Iy: 3.47 cm4 X 1/02/2012 Deceuninckpremium flat 167 Twinson (P 9576) V /9

22 2.2 Length COLOUR liquorice black 3 m / 6 m 3 m 3 m 504 bark brown 3 m / 6 m 3 m 3 m 505 turf brown 3 m / 6 m 3 m 3 m COLOUR aluminium 3 m - 3 m black anodized - 3 m - 3 m 3 m 3 m 3 m 3 m 3 m 65 silver anodized - 3 m - 3 m 3 m 3 m 3 m 3 m 3 m 66 brown anodized - 3 m - 3 m 3 m 3 m 3 m 3 m 3 m 1/02/2012 Deceuninckpremium flat 167 Twinson (P 9576) V /1

23 2.3 Product properties Looks and functionality: A buildings appearance is determined in part by its facade. With Deceuninck premium flat 167 Twinson, looks and functionality go hand in hand. Flat 167 outdoor wall covering can be part of a total insulation concept or simply function as finish. Flat 167 covering is not only suitable for cladding outdoor walls, but also bay windows, dormers and eaves. The result is always a pleasure to behold. Integrated ventilation: With a ventilated - and thus breathing - outer wall, air circulation ensures the efficient discharge of moisture and heat, making possible a healthy indoor climate. Can be combined perfectly with insulation: Thanks to its limited thickness, flat 167 is suitable not only for new construction but also for renovations. A well insulated outdoor wall contributes to lower heating costs and reduced CO2 emissions, for new constructions as well as renovations. Thus, it is an energy and cost-saving solution. Quick and easy to install: The tongue and groove system, and the specially developed patented concealed clips make it quick and easy to install the outdoor wall covering. Simple to work with and process: No special tools are needed for installing and processing the wall covering. Standard tools are all that is needed. Flat 167 is available in 3 and 6-metre lengths. Robust: Exceptionally strong and robust thanks to its double-walled construction. Down to the last detail: For a perfect finish, a complete assortment of profiles has been created. Unique material: Thanks to Twinsons unique composition, flat 167 outdoor wall covering has all the advantages of the materials from which it is made: splinter free, durable, water resistant, natural look 1/02/2012 Deceuninckpremium flat 167 Twinson (P 9576) V /1

24 2.4 Technical file Deceuninck Twinson products meet strict quality standards and are manufactured in accordance with established ISO 9000 quality management system procedures. date: 01/12/2011 version: v3 1/02/2012 Deceuninckpremium flat 167 Twinson (P 9576) V /1

25 date: 01/12/2011 version: v3 1/02/2012 Deceuninckpremium flat 167 Twinson (P 9576) V /2

26 Premium flat 167 Twinson (P 9576) (formerly O-Wall) Installation 3.1 Horizontal installation System assembly Understruture Expansion allowance Finishing 3.2 Vertical installation System assembly Understructure Expansion allowance Finishing Base rules Substructure: - Min. dimensions treated wood 30 mm deep by 40 mm wide. - Always min. 3 battens per plank on a distance of max. 500 mm hart to hart. - Always place extra or wider batten next to the finishing profiles for close fixation with the clips. Expansion: - In any case a free expansion of 3mm/m must be foreseen between: - Planks - Planks and finishing - Any fixed object - Use the P9488 to fix the plank to the substucture - Use 2x P9595 to fix the plank in the middle to have an even distribution of the expansion on both sides. (or in case of vertical installation, one on the bottom) - Always use an aluminium profile over the full length to keep the profile in place when clips cannot be used (top of installation, cut-off above window,...) Ventilation: - A good ventilation of 100 cm opening per meter cladding on bottom and on top of installation and windows is required. This opening is integrated in our start, end and window finishing profiles. (P9567, P9569 & P9570) Cladding premium Roofline & Cladding 01/02/2012- V1.2

27 3.1 Horizontal installation System assembly: Step 1: The supports 4 Step 2: Aluminium finishing profiles Step 3: Main profiles (Twinson planks P9576) + upper aluminium finishing profiles Step 4: Twinson finishing profiles /02/2012 Deceuninckpremium flat 167 Twinson (P 9576) V /1

28 3.1.2 Understructure: A. General rules: Twinson has to be installed on a solid and levelled structure. The dimensions of the battens required minimum 30mm (depth) by 40mm (width). This is to ensure that the recommended P9593 fixings are adequate to support the lead of the premium flat 167 Twinson (P 9576) profiles and to allow adequate ventilation Distance between the battens have to be kept to a maximum of 50cm. If the width of the cladding is 50cm or less, use a minimum of 3 battens. Impregnated wood is advised. Where necessary we advise using a moisture barrier to protect the wall against moisture. The moisture barrier has to be applied between the battens and the supporting wall. max 500mm max 500mm R Q Ensure screws are countersunc. NOTES: Keep in mind that if you are using finishing profiles you have to place additional battens. (more information in the chapter: finishing profiles) Ensure the understructure is of good quality and craftsmanship and is in accordance with local codes of practice or legislation. 1/02/2012 Deceuninckpremium flat 167 Twinson (P 9576) V /2

29 B. Without insulation: See general rules. moisture barrier impregnated wood direction of ventilation 1/02/2012 Deceuninckpremium flat 167 Twinson (P 9576) V /3

30 C. With insulation: Follow same basic rules as without insulation. The illustration underneath is an example of one of the many types of insulation solutions. There are many different insulation materials on the market with their specificities and fixing methods. The same applies for the fixing of your battens into the wall/structure. We advise contacting the respective companies to help you with specifying your insulation and fixing system. General guidelines however have to be followed. impregnated wood moisture barrier insulation direction of ventilation 1/02/2012 Deceuninckpremium flat 167 Twinson (P 9576) V /4

31 3.1.3 Expansion rules: Twinson contains wood fibres and is therefore subject to moisture content, leading to potential expansion. This is allowed for in our system providing our installation guidelines are follewed. The standard is 10mm elongation space unless specified otherwise. A. P9588: The clip P9588 holds the plank P9576 in place while allowing it to elongate freely whilst also absorbing the width elongation. The clip P9588 is easily clipped to the plank P9576 and positioned on every batten. After positioning, the clip is screwed to the batten with the P9593. (Both available in the kit 9488) B. P9595: To ensure that the elongation of the plank is symmetrical on both sides we developed the P9595 which spaces the planks evenly while allowing width elongation C. General expansion rules: To ensure the elongation in length is managed by the system you can follow one of the 2 following rules depending on the installation. Length facade cladding: =6m For installations upto 6 metres you can use max. one full length. On both sides you have to allow 10mm for the length elongation of the profile. This elongation is not visible, it is hidden underneath the Twinson finishing profiles. (for more information see chapter finishing profiles) To ensure that the elongation of the profiles is identical on both sides, fix the plank in the middle or nearest beam with 2 clips P9595, one on each side of the batten. Front view: A B ˇ 500mm Ł = = max. 6m Legend: = clip P9588 = clip P9595 ˇ = blocked = direction of elongation Ł 1/02/2012 Deceuninckpremium flat 167 Twinson (P 9576) V /5

32 If you have a wall of more than 6m and you want to work with full lengths, you can use 2 x P9568 & P9562 back to back and start a new module of max. 1 length of 6m. Front view: A B C 500mm ˇ ˇ Ł Ł = = max. 6m max. 6m A Top view: B Top view: 10 C Top view: /02/2012 Deceuninckpremium flat 167 Twinson (P 9576) V /6

33 Length facade cladding: > 6m For installations more than 6m or a multiple of planks installed on the same height after each other you will need to leave a gap of 10mm between the planks. This allows the planks to elongate freely. The length of one plank should never exceed 3m. Otherwise the gap of 10mm will not be enough. To insure that the elongation of the profiles is identical on both sides, fix the plank in the middle or nearest beam with 2 clips P9595, one on each side of the batten. Front view: A D 500mm ˇ ˇ Ł 10mm 10mm Ł 10mm = = max. 3m Option 1: connection piece P9573. This piece takes the necessary 10mm elongation space into account. D P9573 Top view: D P9573 Front view: screws are hidden marks 12 Assembly of P9573: marks 2 1/02/2012 Deceuninckpremium flat 167 Twinson (P 9576) V /7

34 Option 2: clip P9588. Using this option for the joint, it is necessary to protect the battens to insure the life span. This can easily be done with a flexible lipless seal (or other depending on the width of the batten). Try to have an overlap of 10mm on both sides. See D A Top view: D P9588 Top view: D P9588 Front view: screws are visible /02/2012 Deceuninckpremium flat 167 Twinson (P 9576) V /8

35 3.1.4 Finishing: A. Start of installation: We strongly recommend to start with the P9567. We advise starting at a height of minimum 30 cm from the ground to avoid stains from splashing raindrops and dirt. 1 Start of sill: For example: stone cills, bricks Install the starter profile P9567 directly onto the stone cill. The ventilation is allowed for within the design of the start profile. The profile has to be fixed every 50cm. Make sure that the screws are countersunk otherwise the cladding profiles will not fit into the starter profile P9567. Slide the plank P9576 into the P9567. R Q Q Stainless steel /02/2012 Deceuninckpremium flat 167 Twinson (P 9576) V /9

36 2 Starting at different/variable heights: R Q Q Stainless steel /02/2012 Deceuninckpremium flat 167 Twinson (P 9576) V /10

37 B Sides: The finishing trims on the ends consists of the aluminium profile P9562 in combination with the Twinson finishing profile P9568. As an alternative to the Twinson finishing, you may also use the P9572 for a complete aluminium finishing (see chapter Examples). SEQUENCE OF ASSEMBLY Step 1 Ensure that you place an additional batten adjacent where you will fix the finishing profile. This is necessary to ensure that you can fix a clip P9588 close to the finishing profile. Failure to do this compromises the fixed distance between the planks. Next take your starter profile P9567 and place the aluminium P9562 above the starter profile. The profile must be fixed every 50 cm. (3.1/9) For a quick installation, allow an extra 5mm expansion gap between the top finishing profile and the aluminium finishing profile at the sides. 80 Top finishing profile P9569: see chapter Top of installation. Step 2 Install planks (P9576) and follow the requirements regarding expansion. Allowing 10 mm between the edge of the plank P9576 and the edge of the aluminium profile P /02/2012 Deceuninckpremium flat 167 Twinson (P 9576) V /11

38 If there are windows on the elevation, you first need to finish off before installing the planks. (see chapter window finishing) Step 3 Cut the Twinson profile P9568 to the right length (bear in mind that you need to allow 3mm/m expansion space for proper elongation) and clip it gently into the aluminium P9562 using your hands. 1/02/2012 Deceuninckpremium flat 167 Twinson (P 9576) V /12

39 C Inner corner: The finishing on the sides consists of a pair of the aluminium profiles P9562 in combination with the Twinson finishing profile P9568. As an alternative to the Twinson finishing you may also use the P9566 for a complete aluminium finishing (see chapter Examples). SEQUENCE OF ASSEMBLY Step 1 Ensure that you place an additional batten adjacent to the finishing profile. This is necessary to ensure that you can fix a clip P9588 close to the finishing profile. Failure to do this compromises the fixed distance between the planks. Next put your starter profile P9567 then place the aluminium P9562 above the starter profile. Ensure you position them so that both P9568 Twinson clips can fit in (see drawing top view). The profile must be fixed every 50 cm /02/2012 Deceuninckpremium flat 167 Twinson (P 9576) V /13

40 Step 2 Install planks (P9576) and follow the guidelines in chapter expansion rules (3.1/5-3.1/8). Ensure that you keep 10 mm between the edge of the plank P9576 and the edge of the aluminium profile P9562. If there are windows on the elevation, you first need to finish off before installing the planks. Step 3 Cut the Twinson profile P9568 to the right length (bear in mind that you need to allow 3mm/m expansion space for proper elongation) and clip it gently into the aluminium P9562 using your hands. 1/02/2012 Deceuninckpremium flat 167 Twinson (P 9576) V /14

41 D Outer corner: The finishing on the sides consists of the aluminium profile P9564 in combination with the Twinson finishing profile P9571. As an alternative to the Twinson finishing you may also use the P9566 for a complete aluminium finishing (see chapter Examples). SEQUENCE OF ASSEMBLY Step 1 Ensure that you place an additional batten adjacent to the finishing profile. This is necessary to insure that you can fix a clip P9588 close to the finishing profile. Failure to do this compromises the fixed distance between the planks. Next put your starter profile P9567 then place the aluminium P9564 above the starter profile. Ensure you position them so that both P9568 Twinson clips can fit in (see drawing top view). The profile must be fixed every 50 cm sequentially on both sides /02/2012 Deceuninckpremium flat 167 Twinson (P 9576) V /15

42 Step 2 Install planks (P9576) and follow the guidelines in chapter expansion rules (3.1/5-3.1/8). Ensure that you keep 10 mm between the edge of the plank P9576 and the edge of the aluminium profile P9564. If there are windows on the elevation, you first need to finish off before installing the planks. (see chapter window finishing) Step 3 Cut the Twinson profile P9571 to the right length (bear in mind that you need to allow 3 mm/m expansion space for proper elongation) and clip it gently into the aluminium P9564 using your hands. 1/02/2012 Deceuninckpremium flat 167 Twinson (P 9576) V /16

43 E Top of installation: As with the starter profile, the P9569 allows ventilation for your installation. Ensure there is nothing obstructing the perforated zone preventing the air to circulate freely. SEQUENCE OF ASSEMBLY Step 1 Cut the profile P9576 along its length so that you have minimum 40 mm left between the plank P9576 and the edge of the top of the cladding (for example roof edge). An additional 10 mm is required to manouvre the plank over the clip P P /02/2012 Deceuninckpremium flat 167 Twinson (P 9576) V /17

44 Step 2 Place the aluminium finishing profile P9569 over the plank P9576 and slide them both over the last P9588 clips. Œ X = height of plank A i To avoid movement of the plank, use some pieces of the P9471 to maintain the plank in its position. 26 P9471 X = (A - 16 mm) X = min. 70 mm X = max. 160 mm A = min. 85 mm 2 Step 3 Push the aluminium finishing profile P9569 back upwards and fix at every 50 cm with a screw through the perforated holes. Ø 10 Œ 3 i To avoid any visability of the battens, paint the top of the battens or use an EPDM strip. 1/02/2012 Deceuninckpremium flat 167 Twinson (P 9576) V /18

45 F Window: When installing planks make sure you always first start with the finishing around the window. There are 2 posibilities: 1 Overall depth = 160 mm 2 Overall depth > 160 mm 1 Overall depth = 160mm: one plank is sufficient D STEP BY STEP PLAN Step 1 Overall depth (D) 1 2 Step 2 Step 3 Step 4 Step 5 1/02/2012 Deceuninckpremium flat 167 Twinson (P 9576) V /19

46 SEQUENCE OF ASSEMBLY Step 1 Start by installing the aluminium finishing profile P9569 under the window-sill. Ensure you allow 10 mm lengthways between the P9569 and the cut out of the plank P9576 to ensure the necessary elongation space. (for installation of the P9569 see chapter finishing top of installation on page 3.1/17) L L +20 mm OPTIONAL: The aluminium profile P9572 can be used to finish the cut out of the plank but you will need to install an extra batten. Cut out NOTE: If the wall is longer than 6m, install the planks with an weep hole. (see chapter expansion rules on page 3.1/5-3.1/8) 1/02/2012 Deceuninckpremium flat 167 Twinson (P 9576) V /20

47 Step 2: Different possibilities of finishing: A: with P2761 Overal depth = 160mm i Pieces of the P9471 can be used to maintain some positioning of the profile. B: with P9572 = Optional Overal depth = 160mm /02/2012 Deceuninckpremium flat 167 Twinson (P 9576) V /21

48 Cut the starter profiles P2761 to the right length and fix them around the window. For correct positioning of the P2761 leave 20 mm between the window and the edge of the P2761. Countersink the screws into the P2761 to ensure easy passage of the plank. Step 3 Cut out the planks taking into account the need for expansion. Optional: For a proper finishing we propose using a round sealing profile (P9471) with a diameter of 15 mm. Do not use silicone to close the gap! Doing this can leave stains on your Twinson profiles. Do not assemble the planks until completing step 4. 3mm/m expansion: 3mm/m expansion: 3mm/m Ł 3mm/m Ł P9471 (OPTIONAL) expansion: 3mm/m P9471 (OPTIONAL) 3mm/m expansion: 3mm/m Ł 3mm/m Ł 1/02/2012 Deceuninckpremium flat 167 Twinson (P 9576) V /22

49 Step 4 Above the window use aluminium finishing profile P9570 with integrated ventilation and drip detail. On the sides of the window use aluminium finishing profile P9565. Remember to put an additional batten next to the P9565 to be able to fix the plank P9576 with the clip P9588. Cut the aluminium profiles to the right length with mitre return. Finally slide the planks mentioned in step 3 into the aluminium finishing profiles and assemble sequentially. The aluminium finishing profiles need to be fixed every 50 cm. Detail Detail Side view i NOTE: It is necessary to make an extra cut off of the P9570 top aluminium profile on both sides, otherwise the Twinson planks installed on the sides cannot be put into place. i Pieces of the P9471 can be used to maintain some positioning of the profile. Step 5 Now you can continue installing the planks around the window. Be sure to always leave 10 mm between the aluminium P9565 profiles and the P9576 to allow for expansion overall depth = 160mm 10 Nice to know: in the aluminium P9565 profile there is a detail on 10 mm of the edge of the profile to help you with the positioning of the planks on the correct distance needed for expansion. 10 1/02/2012 Deceuninckpremium flat 167 Twinson (P 9576) V /23

50 2 Overall depth > 160mm: different planks are necessary D Overall depth (D) STEP BY STEP PLAN Step 1 Step Step 3 Step 4 Step 5 1/02/2012 Deceuninckpremium flat 167 Twinson (P 9576) V /24

51 SEQUENCE OF ASSEMBLY Step 1 Begin by installing the aluminium finishing profile P9569 under the window-sill. Ensure you leave 10 mm lengthways between the P9569 and the cut out of the plank P9576 to ensure the necessary expansion space. (for installation of the P9569 see chapter finishing top of installation on page 3.1/17) L L +20 mm OPTIONAL: The aluminium profile P9572 can be used to finish the cut out of the plank but you need to install an extra batten. Cut out NOTE: If the wall is longer than 6m, install the planks with a weep hole. (see chapter expansion rules on page 3.1/5-3.1/8) 1/02/2012 Deceuninckpremium flat 167 Twinson (P 9576) V /25

52 Step 2: finishing with P9572 3mm/m overal depth > 160 mm 10mm Cut the starter profiles P9572 to the right length and install them around the window. Countersink the screws into the P9572 to ensure easy passage of the plank. Detail A 1/02/2012 Deceuninckpremium flat 167 Twinson (P 9576) V /26

53 Detail A Step 3 Install the planks whilst taking into account the needed expansion. Ł 3mm/m 5mm Ł Slide the planks into the aluminium finishing profiles to finish of the top of window. Use the clips P9588 to keep the exact distance between the planks. 1/02/2012 Deceuninckpremium flat 167 Twinson (P 9576) V /27

54 i i Pieces of the P9471 can be used to maintain some positioning of the profile. Step 4 At the top of the window use the aluminium finishing profile P9570 with integrated ventilation and drip detail. On the sides of the window use the aluminium finishing profile P9565. Cut the aluminium profiles to the right length with mitre return and assemble sequentially. The aluminium finishing profiles need to be fixed every 50 cm. 1 2 Detail, next page 1/02/2012 Deceuninckpremium flat 167 Twinson (P 9576) V /28

55 Detail NOTE: It is necessary to make an extra cut out in the P9570 top aluminium profile on both sides, otherwise the Twinson planks installed on the sides cannot be slotted into place. 2 1 Step 5 Continue installing the planks around the window. Be sure to leave 10 mm between the aluminium P9565 profiles and the P9576 to ensure expansion. Detail Nice to know: in the aluminium P9565 profile there is a detail on 10 mm of the edge of the profile to help you with the positioning of the planks on the correct distance needed for expansion. 10 1/02/2012 Deceuninckpremium flat 167 Twinson (P 9576) V /29

56 3.2 Vertical installation System assembly: Step 1: The supports Step 2: Aluminium finishing profiles Step 3: Main profiles (Twinson planks P9576) + upper aluminium finishing profiles Step 4: Twinson finishing profiles 1/02/2012 Deceuninckpremium flat 167 Twinson (P 9576) V /1

57 3.2.2 Understructure: A General rules: Twinson has to be installed on a solid and levelled structure. The dimensions of the battens required are minimum 30 mm (depth) by 40 mm (width). This is to ensure that the recommended P9593 fixings are adequate to support the load of the premium flat 167 Twinson (P 9576) profiles and to allow adequate ventilation To be sure ventilation is adequate you need to use double battens. Please allow ventilation between the last batten and the highest point of the installation. Distance between the battens have to be kept to a maximum of 50 cm. If the heigth of the cladding is 50 cm or less, use a minimum of 3 battens. Impregnated wood is advised. Where necessary we advise using a moisture barrier to protect the wall against moisture. The moisture barrier has to be applied between the battens and the supporting wall. R max 500m m Q max 500m m Ensure screws are countersunc. NOTES: Keep in mind that if you are using finishing profiles you may have to place additional battens. (more information in the chapter: finishing profiles) Ensure the understructure is of good quality and craftsmanship and is in accordance with local codes of practice or legislation. 1/02/2012 Deceuninckpremium flat 167 Twinson (P 9576) V /2

58 B Without insulation: See general rules. moisture barrier impregnated wood direction of ventilation 1/02/2012 Deceuninckpremium flat 167 Twinson (P 9576) V /3

59 C With insulation: Follow same basic rules as without insulation. The illustration underneath is an example of one of the many types of insulation solutions. There are many different insulation materials on the market with their specificities and fixing methods. The same applies for the fixing of your battens into the wall/structure. We advise contacting the respective companies to help you with specifing your insulation and fixing system. General guidelines however have to be followed. moisture barrier impregnated wood insulation impregnated wood direction of ventilation 1/02/2012 Deceuninckpremium flat 167 Twinson (P 9576) V /4

60 3.2.3 Expansion rules for vertical cladding: Twinson contains wood fibres and is therefore subject to moisture content leading to potential expansion and contraction. This is allowed for in our system providing our installation guidelines are followed. A P9588: The clip P9588 holds the plank P9576 in place while allowing it to elongate freely whilst also absorbing the width elongation. The clip P9588 is easily clipped to the plank P9576 and positioned on the batten. After positioning, the clip is screwed to the batten with the P9593. (Both available in the kit 9488) The plank has to be fixed with te clip every 50 cm B P9595: To ensure that the direction of the elongation can be controlled, we developed the P9595 who blocks the planks evenly while allowing width elongation C General expansion rules: To ensure the required expansion is allowed for, see below: Length: modules of 3 m: Because of the elongation and weight is in the same direction, the maximal length of 1 module is max. 3 m. To go larger you can start a new module on top using the starter profile P9567 to make the junction. For proper elongation you need to leave a gap of 10 mm on top of the profile. For finishing the top of the cladding we recommend using the P9569 to ensure proper ventilation of the profiles. 1/02/2012 Deceuninckpremium flat 167 Twinson (P 9576) V /5

61 Front view: E Side view: E D max. 3m ˇ 10mm 40mm Side view: D max. 3m 500mm 10mm Side view: C ˇ C Legend: = clip P mm = clip P9595 ˇ = blocked = direction of elongation Ł 35mm 1/02/2012 Deceuninckpremium flat 167 Twinson (P 9576) V /6

62 3.2.4 Finishing: A General: visual aspect To avoid colour differences avoid changing mounting direction of the planks in the same surface. R Q 1/02/2012 Deceuninckpremium flat 167 Twinson (P 9576) V /7

63 B Start of installation: We strongly recommend to start with the aluminium starter profile P9567. We advise starting at a height of minimum 30 cm from the ground to avoid stains from splashing raindrops and dirt. This profile is handy for a gradient. 1 Start at sill: For example: stone cill, bricks Install the starter profile P9567 directly on the granite. The ventilation is allowed for within the design of the start profile. The profile has to be fixed every 50 cm. Make sure that the screws are countersunk otherwise the cladding profiles will not fit into the starter profile P9567. An extra batten is needed at the bottom to fix the clip P9588 to ensure a proper fixing of the plank. To start on the sides you need to use the P2761. Note: The end profile at the top as well as the aluminium profiles on the sides have to be fixed before inserting the plank P9576. R Q Q 35mm Stainless steel 1/02/2012 Deceuninckpremium flat 167 Twinson (P 9576) V /8

64 C Sides: The finishing trims on the ends consists of the aluminium profile P9562 in combination with the Twinson finishing profile P9568. As an alternative to the Twinson finishing you may also use the P9572 for a complete aluminium finishing (see chapter Examples). C1 Starting from a side: SEQUENCE OF ASSEMBLY Step 1 Start placing your starter profile P9567 (see chapter start of installation on page 3.2/8). Next fix the end profile P9569 or the P9567 if you are to completing a number of modules. Cut the P9562 to the right length and fix every 50 cm. Use starter profile P2761 next to the P9562 to insure proper positioning of the plank. 1/02/2012 Deceuninckpremium flat 167 Twinson (P 9576) V /9

65 Step 2 Install your planks (P9576) and follow the guidelines in chapter expansion rules on page 3.2/5. If there are windows on the elevation, you first need to finish off before installing the planks. (see chapter window finishing on page 3.2/17) Step 3 Cut the Twinson profile P9568 to the right length (bear in mind that you need to allow 3mm/m expansion space for proper elongation) and clip it gently into the aluminium P9562 using your hands. 1/02/2012 Deceuninckpremium flat 167 Twinson (P 9576) V /10

66 C2 Ending on a side: In most situations you will have to end with a cut off plank. Allow a space of 10 mm between the plank and the aluminium finishing profile P9562 in order to clip the plank P9576 over the P9588 clip. Once the plank is placed over the P9588 clip you will have a gap of 10 mm between the edge of the aluminium finishing profile P9562 and the plank P9576. We advise using packing blocks of 10 mm or a sealing strip (P9471) in order to maintain an even gap between the planks. In order to allow expansion of the last plank, do not screw! As an alternative to the Twinson finishing you may also use the P9572 in combination with the P9471 for a complete aluminium finishing. 1/02/2012 Deceuninckpremium flat 167 Twinson (P 9576) V /11

67 D Inner corner: The finishing on the sides consists of a pair of the aluminium profiles P9562 in combination with the Twinson finishing profile P9568. As an alternative to the Twinson finishing you may also use the P9566 in combination with the P9471 for a complete aluminium finishing. SEQUENCE OF ASSEMBLY Step 1 First install your starter profile P9567 and the end profile P9569 (see chapter start of installation on page 3.2/8 + finishing top on page 3.2/16), then place the aluminium P9562 above the starter profile. Ensure you position them so that both P9568 clips can fit in (see drawing top view). The aluminium profile has to be fixed every 50 cm /02/2012 Deceuninckpremium flat 167 Twinson (P 9576) V /12

68 Step 2 Installing towards the corner. (see chapter sides on page 3.2/9) Step 3 Cut the Twinson profile P9568 to the right length (bear in mind that you need to allow 3mm/m expansion space for proper elongation) and clip it gently into the aluminium P9562 in a sequential way using your hands. 1/02/2012 Deceuninckpremium flat 167 Twinson (P 9576) V /13

69 E Outer corner: The finishing on the sides consists of a pair of the aluminium profile P9564 in combination with the Twinson finishing profile P9571. As an alternative to the Twinson finishing you may also use the P9566 in combination with the P9471 for a complete aluminium finishing (see chapter Examples). SEQUENCE OF ASSEMBLY Step 1 First put your starter and end profile (see chapter start on page 3.2/8 + top of installation on page 3.2/16) then place the aluminium P9564 above the starter profile (P9567). The profile P9564 needs to be fixed every 50 mm sequentially on both sides /02/2012 Deceuninckpremium flat 167 Twinson (P 9576) V /14

70 Step 2 Install planks (P9576) and follow the guidelines in chapter expansion rules on page 3.2/5. Ensure that you keep 10 mm between the edge of the plank P9576 and the edge of the aluminium profile P9564. It is also necessary to use packing blocks or a sealing strip (P9471) to keep the profiles in place. (see installation sides on page 3.2/9) If there are windows on the elevation, you first need to finish off before installing the planks. (see chapter window finishing on page 3.2/17) Step 3 Cut the Twinson profile P9571 to the right length (bear in mind that you need to allow 3mm/m expansion space for proper elongation) and clip it gently into the aluminium P9564 using your hands. 1/02/2012 Deceuninckpremium flat 167 Twinson (P 9576) V /15

71 F Top of installation: As with the starter profile, the P9569 allows ventilation for your installation. Ensure there is nothing obstructing the perforated zone preventing the air to circulate freely. SEQUENCE OF ASSEMBLY Step 1 Due to the fact you are using horizontal battens you will need to leave 40 mm between the edge of the highest batten and the roof or drip moulding. This will ensure the ventilation is not blocked. 10mm 40mm Step 2 Cut the profile to the right length. For corners we advise mitre cutting the profile. Position the profile at the top of your installation. This can be the edge of a flat roof or dripmoulding. Make sure in all cases that the P9569 is fully covered. Fix the P9569 every 50 cm and do not forget to countersink the screws otherwise the planks will not fit in. R Q Q 1/02/2012 Deceuninckpremium flat 167 Twinson (P 9576) V /16

72 G Window: When installing planks make sure you always start with the finishing around the window. There are 2 posibilities: 1 Overall depth = 160 mm 2 Overall depth > 160 mm 1 Overall depth = 160mm: one plank is sufficient D STEP BY STEP PLAN Step 1 Overall depth (D) 1 2 Step 2 Step Step 4 Step /02/2012 Deceuninckpremium flat 167 Twinson (P 9576) V /17

73 SEQUENCE OF ASSEMBLY Step 1 Start by installing the aluminium finishing profile P9569 under the window-sill. Ensure you allow 10 mm lengthways between the P9569 and the cut out of the plank P9576 to ensure the necessary elongation space. (for installation of the P9569 see finishing top of installation on page 3.2/16) 10 mm L Step 2: finishing with P9572 Trim the finishing profiles P9572 to the right length and install them around the window. Top view: LEFT SIDE of window: i overal depth = 160mm 12mm Side view: ABOVE the window: leave 10mm ventilation opening between the battens! i Pieces of the P9471 can be used to maintain positioning of the profile overall depth = 160mm i 16 1/02/2012 Deceuninckpremium flat 167 Twinson (P 9576) V /18

74 Top view: RIGHT SIDE of window: overal depth = 160mm Step 3 At the sides of the window use the aluminium finishing profile P9565. Put an additional batten for the P9565 to maintain proper fixing of the profile. Above the window use the aluminium finishing profile P9570 with integrated ventilation and drip detail. Cut the aluminium profiles to size with mitre return. Glue the left P9565 to the batten after installing the last plank, then screw the top and right aluminium finishing profiles and fix them every 50 cm last Twinson plank 1 detail (next page) 2 3 1/02/2012 Deceuninckpremium flat 167 Twinson (P 9576) V /19

75 Detail NOTE: It is necessary to make an extra cut out in the P9570 top aluminium profile at each end, otherwise the planks cannot be put into place. 2 1 i Pieces of the P9471 can be used to maintain positioning of the profile. Top view: LEFT SIDE -> GLUE Side view: TOP SIDE -> SCREW Top view: RIGHT SIDE -> SCREW 12 1 i 3 Step 4 Now continue installing the planks around the window Top view: LEFT/RIGHT SIDE of window: (*) (*) (*) 16 X X - 16mm 12mm i 1/02/2012 Deceuninckpremium flat 167 Twinson (P 9576) V /20

76 (*) Repeat for left and right side of the window, except for gluing/screwing of the finishing profile Side view: ABOVE of window: i Pieces of the P9471 can be used to maintain some positioning of the profile. 10 X - 16mm 16 X i Cut out the planks taking into account the need for expansion. Optional: For a proper finish we propose using a round sealing profile (P9471) with a diameter of 15 mm. Do not use silicone to close the gap! Doing this can leave stains on your Twinson profiles. expansion: 3mm/m P9471 (OPTIONAL) 3mm/m expansion: 3mm/m Ł 3mm/m Ł Step 5 Continue installing the planks to the wall. 1/02/2012 Deceuninckpremium flat 167 Twinson (P 9576) V /21

77 2 Overall depth > 160mm: different planks are necessary D Overall depth (D) STEP BY STEP PLAN Step 1 Step Step 3 Step Step 5 1/02/2012 Deceuninckpremium flat 167 Twinson (P 9576) V /22

78 SEQUENCE OF ASSEMBLY Step 1 Begin by installing the aluminium finishing profile P9569 under the window-sill. Ensure you leave 10mm lengthways between the P9569 and the cut out of the plank P9576 to ensure the necessary expansion. (for installation of the P9569 see chapter finishing top of installation on page 3.2/16). 10 mm L Step 2: finishing with P9572 Cut the finishing profiles P9572 to the right length and install them around the window. Top view: LEFT SIDE of window: overal depth > 160mm 12mm 12mm 1/02/2012 Deceuninckpremium flat 167 Twinson (P 9576) V /23

79 Side view: ABOVE the window: overall depth > 160mm 3mm/m i i Pieces of the P9471 can be used to maintain some positioning of the profile. Top view: RIGHT SIDE of window: overal depth > 160mm 12mm 1/02/2012 Deceuninckpremium flat 167 Twinson (P 9576) V /24

80 Step 3 For the sides of the window use aluminium finishing profile P9565. Put an additional batten next to the P9565 to maintain a proper fixing of the plank P9576 with the clip P9588. Above the window use aluminium finishing profile P9570 with integrated ventilation and drip detail. Cut the aluminium profiles to length with mitre return. Glue the left P9565 to the batten after installing the last plank, then screw the top and right aluminium finishing profiles and fix at every 50 cm. Detail A Detail A (see next page) detail A detail A last Twinson plank detail B /02/2012 Deceuninckpremium flat 167 Twinson (P 9576) V /25

81 Detail B NOTE: It is necessary to make an extra cut out in the P9570 top aluminium profile on both sides, otherwise the Twinson planks installed on the sides cannot be slotted into place. 2 1 i Pieces of the P9471 can be used to maintain positioning of the profile. Top view: LEFT SIDE -> GLUE Side view: TOP SIDE -> SCREW Top view: RIGHT SIDE -> SCREW 12 1 i 3 Step 4 Continue installing the planks around the window. 2 2 detail C 1 3 detail C 1/02/2012 Deceuninckpremium flat 167 Twinson (P 9576) V /26

82 Top view: LEFT/RIGHT SIDE of window: i (*) (*) (*) X = height of plank = A - 14mm A X = A - 14mm 12 (*) Repeat for left and right side of the window, except for gluing/screwing of the finishing profile Side view: ABOVE of window: 10 i Pieces of the P9471 can be used to maintain positioning of the profile. 3mm/m Cut out the planks taking into account the need for expansion. Optional: For a proper finish we propose using a round sealing profile (P9471) with a diameter of 15 mm. Do not use silicone to close the gap! Doing this can leave stains on your Twinson profiles. i P9471 (OPTIONAL) 3mm/m expansion: 3mm/m 10mm Ł 1/02/2012 Deceuninckpremium flat 167 Twinson (P 9576) V /27

83 Step 5 Continue installing the planks. 1/02/2012 Deceuninckpremium flat 167 Twinson (P 9576) V /28

84 Premium flat 167 Twinson (P 9576) (formerly O-Wall) Examples 4.1 Soffits 4.2 Spotlights 4.3 Rainwater drainage 4.4 Aluminium finishing Cladding premium Roofline & Cladding 01/02/2012- V1.2

85 4.1 Soffits Edge of aluminium roofing fascia bitumen i 9588 In this application the intermadiate distance is 300 mm instead of 500mm. ventilation beams every 300mm ventilation i i Pieces of the P9471 can be used to maintain some positioning of the profile. 1/02/2012 Deceuninckpremium flat 167 Twinson (P 9576) V /1

86 4.2 Spotlights Light weight decking spotlights: Light weight Decking lights must to be installed between the batten supports and centrally in the middle of one plank. Installing lights that overlap different planks could lead to extra tension due to expansion which in turn may lead to deformation of the planks and/or damage to the lights. Positioning the decking lights in the middle of the planks between the battens is the best method of avoiding blocking the expansion. The temperature of the casing of the decking light should not exceed 60 C, please refer to the manufacturer for guidance Q R Heavy weight decking spotlights: Heavy decking lights should be fixed directly to a sufficient, reinforced under structure. In this case the spot needs to be considered as a fixed object so an expansion space of 10mm around the light is needed. Additional battens will be needed next to the light to fix the plank with the clip P9588 as close as possible. The temperature of the casing of the decking light should not exceed 60 C. Please refer to the manufacturer for guidance. R Q /02/2012 Deceuninckpremium flat 167 Twinson (P 9576) V /1

87 4.3 Rainwater drainage: Horizontal installation: Side view: Front view: detail A 2 rainwater-pipe clip band rainpipe 10 detail A rainwater-pipe clip band rainpipe detail A 1/02/2012 Deceuninckpremium flat 167 Twinson (P 9576) V /1

88 4.3.2 Vertical installation: Side view: Front view: detail A 2 10 rainwater-pipe clip band rainwater-pipe clip band rainpipe rainpipe detail A detail A 1/02/2012 Deceuninckpremium flat 167 Twinson (P 9576) V /2

89 4.4 Aluminium finishing: Horizontal installation: A Sides with P9572 (alternative for P9562): Front view: Side view: i i i P9569 P P9569 P9572 P9572 P9572 A A P9567 P9567 P9567 Top view: Section A - A 10 i i Pre-drill all aluminium finishing profiles. 1/02/2012 Deceuninckpremium flat 167 Twinson (P 9576) V /1

90 4.4.1 Horizontal installation: B Internal corner P9566 (alternative for P9562): Top view: i C External corner P9566 (alternative for P9564): Top view: i 10 i Pre-drill all aluminium finishing profiles. 1/02/2012 Deceuninckpremium flat 167 Twinson (P 9576) V /2

RELAZZO DECKING THE TERRACE. INSTALLATION GUIDE. Construction Automotive Industry. REHAU R20680 EN 05.2015 www.rehau.com/relazzo

RELAZZO DECKING THE TERRACE. INSTALLATION GUIDE. Construction Automotive Industry. REHAU R20680 EN 05.2015 www.rehau.com/relazzo Construction Automotive Industry RELAZZO DECKING THE TERRACE. INSTALLATION GUIDE REHAU R20680 EN 05.2015 www.rehau.com/relazzo Scan the QR code and learn more: RELAZZO DECKING THE TERRACE. Installation

More information

Barewood Octagon and Elongated Windows Installation Instructions

Barewood Octagon and Elongated Windows Installation Instructions Step-by-step instructions to a beautiful window. Measuring and Installation of your new window from Century Specialty Windows couldn't be easier with our step-by-step instructions. Quality, function and

More information

Storage Store the siding in a dry and ventilated area. Do not place it directly on the ground. Always cover the siding after a day s work.

Storage Store the siding in a dry and ventilated area. Do not place it directly on the ground. Always cover the siding after a day s work. Installation Guide Before you begin, take the time to read this entire guide to clearly understand the requirements and steps to follow for proper installation. Warning Do not install defective material.

More information

DECKING INSTALLATION, CARE & MAINTENANCE INSTRUCTIONS. 866.729.2378 MOISTURESHIELD.COM limited lifetime warranty 866.729.2378 WWW.MOISTURESHIELD.

DECKING INSTALLATION, CARE & MAINTENANCE INSTRUCTIONS. 866.729.2378 MOISTURESHIELD.COM limited lifetime warranty 866.729.2378 WWW.MOISTURESHIELD. DECKING INSTALLATION, CARE & MAINTENANCE INSTRUCTIONS 866.729.2378 MOISTURESHIELD.COM limited lifetime warranty Welcome To The Even Greater Outdoors. Congratulations on choosing MoistureShield for your

More information

HfHMD uses LP SmartSide siding and trim.

HfHMD uses LP SmartSide siding and trim. HfHMD uses LP SmartSide siding and trim. These products are: More durable than cement fiber board. Much more volunteer-friendly to install. When installed correctly, have a 5/50- year pro-rated warranty.

More information

!!!!!! !!! Decra Plus DPSW010 DPSTW011 DPSW012 DPSW013 DPSW014 DPSW015 DPSW016 DPSW020 DPSW021 DPSW024 DPSW030 DPSW031 DPSW035 DPSW030 DPSW031 DPSW035

!!!!!! !!! Decra Plus DPSW010 DPSTW011 DPSW012 DPSW013 DPSW014 DPSW015 DPSW016 DPSW020 DPSW021 DPSW024 DPSW030 DPSW031 DPSW035 DPSW030 DPSW031 DPSW035 Decra Plus Drawing no DPSW010 DPSTW011 DPSW012 DPSW013 DPSW014 DPSW015 Description Shown In Decra Brochure Most Commonly Used Detail t~êã=oççñ=b~îéë=aéí~áä=b~îéë=lîéêü~åö=táíü=fåëìä~íéç=c~ëåá~=~åç=pçññáí

More information

After reading this lesson you will be able to: 12.3 IMPORTANCE OF ROOF 12.4 TYPES OF ROOF IN A HOUSE

After reading this lesson you will be able to: 12.3 IMPORTANCE OF ROOF 12.4 TYPES OF ROOF IN A HOUSE 86 :: Certificate in Construction Supervision (CIVIL) 12 ROOF 12.1 INTRODUCTION The structure provided to cover the house surface (floor) is known as roof. For different situation and requirement, it is

More information

Window Installation Instructions

Window Installation Instructions Caution The correct installation methods of windows in full frame or insert applications is critical towards achieving the tested performance of the window and longterm enjoyment and energy savings for

More information

Lenntech. 1000 psi End port pressure vessels 2.5. User s Guide to: Phoenix Vessel Technology Limited. Model number: 1503

Lenntech. 1000 psi End port pressure vessels 2.5. User s Guide to: Phoenix Vessel Technology Limited. Model number: 1503 1 User s Guide to: Phoenix Vessel Technology Limited 1000 psi End port pressure vessels 2.5. Model number: 1503 Lenntech info@lenntech.com Tel. +31-152-610-900 www.lenntech.com Fax. +31-152-616-289 Phoenix

More information

CHARISMA SHOWER/TUB DOOR INSTALLATION INSTRUCTIONS

CHARISMA SHOWER/TUB DOOR INSTALLATION INSTRUCTIONS CHARISMA SHOWER/TUB DOOR INSTALLATION INSTRUCTIONS IMPORTANT DreamLine reserves the right to alter, modify or redesign products at any time without prior notice. For the latest up-to-date technical drawings,

More information

Brick Veneer Construction

Brick Veneer Construction Brick Veneer Construction Check list of suggested tools & support items Claw hammer Tape measure 3/4" [19 or 20] Wood chisel Wood or plastic shims Pry bar Utility knife Caulking and caulking gun Power

More information

Please calculate with around 5% more square meters than needed because you will have material loss due to cutting and sorting.

Please calculate with around 5% more square meters than needed because you will have material loss due to cutting and sorting. 1. TEKA Soft Loc Installation Guide Thank you for having chosen TEKA Parquet. To guarantee a constant quality product TEKA engineered hardwood flooring is made out of selected wood species and runs only

More information

Linea Weatherboard DIRECT FIX CONCRETE SLAB AND SOFFIT FIGURE 1

Linea Weatherboard DIRECT FIX CONCRETE SLAB AND SOFFIT FIGURE 1 Top plate Stud Soffit lining 45mm min nog Fix scotia bead Building underlay/james Hardie rigid air barrier Soffit Detail Building underlay/james Hardie rigid air barrier Bottom plate 25mm wide cant strip.

More information

CERTIFICATE NAME OF PRODUCT MANUFACTURER PRODUCT DESCRIPTION CERTIFICATION PROCEDURE. No VTT C-6044-10 Date of issue 11.10.2010, Updated July 1, 2011

CERTIFICATE NAME OF PRODUCT MANUFACTURER PRODUCT DESCRIPTION CERTIFICATION PROCEDURE. No VTT C-6044-10 Date of issue 11.10.2010, Updated July 1, 2011 CERTIFICATE NAME OF PRODUCT No VTT C-6044-10 Date of issue 11.10.2010, Updated July 1, 2011 H-CONTROL REFLEX+ reflective insulating vapour control layer for roof and wall applications MANUFACTURER ACTIS

More information

Terrace / Terrace+ Technical file

Terrace / Terrace+ Technical file Terrace / Terrace+ Technical file Terrace Outdoor Living www.deceuninck.com 04/05/2012 - V2.1 05/04/2011 V 1.1: Grammatical modifications 06/06/2011 V 1.1: Correction P-number P9494 overview Terrace+ (1.2/2)

More information

1.2.1 1.1.8 PRODUCTBLADEN GT ROCKPANEL STRUCTURE

1.2.1 1.1.8 PRODUCTBLADEN GT ROCKPANEL STRUCTURE 1..1 1.1.8 PRODUCTBLADEN SHEETS GT page 1 to 6 Rockpanel Structure is a very durable panel with a lightly textured finish, specially developed for use in cladding, fascia, soffit applications. The basic

More information

INSTALLATION INSTRUCTIONS for Bifold Doors (JII103)

INSTALLATION INSTRUCTIONS for Bifold Doors (JII103) Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for premium composite, hollow and solid core molded Bifold Doors. Bifolds are designed for fast

More information

Schlüter -KERDI-BOARD Substrate, structural panel, bonded waterproofing

Schlüter -KERDI-BOARD Substrate, structural panel, bonded waterproofing Substrate, structural panel, bonded waterproofing The universal substrate for tiles Perfect covering No matter whether you work with mosaics or large format tiles, an absolutely level substrate with straight

More information

K2 STONE NATURAL VENEER

K2 STONE NATURAL VENEER INTRODUCTION WHAT IS K2 NATURAL THINSTONE VENEER? Natural K2 Stone veneer is real stone, cut 1 inch thick, making it light enough to be installed as a veneer. Sometimes referred to as thin veneer, thin

More information

Installing Window and Door Mouldings

Installing Window and Door Mouldings Installing Window and Door Mouldings About Window and Door Mouldings The trim around windows and doors greatly influences the look and style of your interior. They also bridge the gaps and cover spaces

More information

Vinyl Brick Mould Field Installation Instructions All Vinyl and Vinyl Clad Windows

Vinyl Brick Mould Field Installation Instructions All Vinyl and Vinyl Clad Windows Vinyl Brick Mould Field Installation Instructions All Vinyl and Vinyl Clad Windows Viewed from the exterior. IMPORTANT: Please read before you begin installation. TABLE OF CONTENTS AND TOOL / MATERIAL

More information

Installation Instructions

Installation Instructions Installation Instructions READ BEFORE INSTALLING UNIT For Low Profile Window Air Conditioner INSTALLATION WARNINGS AND CAUTION Carefully read the installation manual before beginning. Follow each step

More information

Confort 26. Sliding Systems. Sapa Building System

Confort 26. Sliding Systems. Sapa Building System Confort 26 Sliding Systems Sapa Building System Confort 26 is Sapa s thermally insulated sliding system for windows and doors. Available as two- and three-rail solution. Among its features, there are

More information

Isola Steel Gutters Strength and design for extreme climate!

Isola Steel Gutters Strength and design for extreme climate! Isola Steel Gutters Strength and design for extreme climate! Dry and healthy buildings Isola Steel Gutters Steeled against wind and weath The four seasons Wide temperature variations and highly variable

More information

Installation Instructions For Slider Casement Air Conditioners

Installation Instructions For Slider Casement Air Conditioners Installation Instructions For Slider Casement Air Conditioners NOTE: These instructions describe installation in a typical wood framed window with a wood SLIDE-BY sash, or installation in a metal CASEMENT

More information

Residential Roofing Guide

Residential Roofing Guide Residential Roofing Guide TABLE OF CONTENTS Building Detail and Accessories...... 1 Panel Introduction and Handling...... 2 Cutting and Trimming.... 3 Roof Preparation..... 3 Roof Slope..... 3 Re-roofing...

More information

Façade panels for interior cladding on a wooden supporting structure

Façade panels for interior cladding on a wooden supporting structure 1 General These application instructions are specifically intended for the fastening of EURO PANELS OVERSEAS N.V. façade panels as decorative interior wall cladding on a wooden supporting structure. A

More information

Gate Leg Drop Leaf Table Plans

Gate Leg Drop Leaf Table Plans Preparing the table top blanks: Cut and glue enough 3/4 stock to make three panels 40 long by 24 wide (they will be cut to final size at a later time). While the glue dries we will work on the legs. Preparing

More information

Confort 160. Sliding Systems. Sapa Building System

Confort 160. Sliding Systems. Sapa Building System Confort 160 Sliding Systems Sapa Building System Confort 160 is a high performance thermally insulated sliding window system, with a user-friendly slide action. The system, which has an attractive aesthetic

More information

Installation Instructions

Installation Instructions READ BEFORE INSTALLING UNIT For Slider Casement Air Conditioners To avoid risk of personal injury, property damage, or product damage due to the weight of this device and sharp edges that may be exposed:

More information

Installation Manual for STANDING SEAM ROOFING

Installation Manual for STANDING SEAM ROOFING Installation Manual for STANDING SEAM ROOFING Absolute Steel Toll Free 877-833-3237 / Phone 480-768-1618 / Fax 480-768-1514 www.metalroofingsource.com Standing Seam features approximately one-inch high

More information

Sliding and Folding Door Fittings Sliding Door Accessories

Sliding and Folding Door Fittings Sliding Door Accessories Sliding door lock Toplock For 1- and 2-leaf sliding doors Suitable for toughened safty glass and laminated sheet glass Suitable for DIN left and DIN right Max. weight per door leaf 120 kg For glass thickness:

More information

NRG 75 CRF NRG GREENBOARD WALL SYSTEM

NRG 75 CRF NRG GREENBOARD WALL SYSTEM NRG GREENBOARD WALL SYSTEM NRG Energy Efficient Building Systems is pleased to announce a revolution in lightweight cladding systems. NRG Building Systems is the first and only company to achieve CodeMark

More information

How to Build Your Own CornHole Game

How to Build Your Own CornHole Game How to Build Your Own CornHole Game DIMENSIONS Here is a diagram with the basic measurements for the Cornhole board game. SUPPLIES 1/2 thick sheet of plywood one 4 x4 or two 2 x4 s 8 long 2 4 s (4) 4 1/2

More information

Wren Kitchens Installation Tips... 3. Carefully check your kitchen delivery... 4. Measuring out and marking up... 5. Fitting the base cabinets...

Wren Kitchens Installation Tips... 3. Carefully check your kitchen delivery... 4. Measuring out and marking up... 5. Fitting the base cabinets... tra 1 Index Wren Kitchens Installation Tips... 3 Carefully check your kitchen delivery... 4 Measuring out and marking up... 5 Fitting the base cabinets... 6 Fitting the corner cabinets... 7 The 972mm or

More information

Basement Window Installation Guide Hopper and Sliding

Basement Window Installation Guide Hopper and Sliding Basement Window Installation Guide Hopper and Sliding americancraftsmanwindows.com Project Requirements: Installation must comply with all applicable building codes. Existing window frame, wall and weatherresistant

More information

When considering Roof drainage design the following should be taken into account:

When considering Roof drainage design the following should be taken into account: Roof Drainage Design The primary objective of a gutter or spouting system is to remove water from the roof catchment area and channel that water to the ground drainage. Water ingress can have detrimental

More information

Clad Direct Glaze Window Installation Instructions

Clad Direct Glaze Window Installation Instructions Clad Direct Glaze Window Installation Instructions Sill flashing and sealing: 2. An overview of the proper flashing sequence is shown in figure 1. Please read entire installation instructions carefully

More information

WINDOW INSTALLATION GUIDE FOR NEW CONSTRUCTION - WOOD FRAMING

WINDOW INSTALLATION GUIDE FOR NEW CONSTRUCTION - WOOD FRAMING WINDOW INSTALLATION GUIDE FOR NEW CONSTRUCTION - WOOD FRAMING IMPORTANT NOTICES AND INFORMATION Read these instructions in their entirety prior to installing windows. Any local building code requirements

More information

CEILING SYSTEMS. CI/SfB (35) Xy April 2006. [Between us, ideas become reality.] ULTIMA CANOPY. Data sheet. Acoustic performance meets High Design

CEILING SYSTEMS. CI/SfB (35) Xy April 2006. [Between us, ideas become reality.] ULTIMA CANOPY. Data sheet. Acoustic performance meets High Design CEILING SYSTEMS [Between us, ideas become reality.] CI/SfB (35) Xy April 2006 ULTIMA CANOPY Data sheet Acoustic performance meets High Design ULTIMA CANOPY Installation Instructions I. GENERAL 1. Product

More information

39HQ Airovision Air Handling Units

39HQ Airovision Air Handling Units 39HQ Airovision Air Handling Units Mounting instructions CONTENTS 1 - TRANSPORT AND LIFTING INSTRUCTIONS... 3 1.1 - General... 3 1.2 - Transport and storage... 3 1.3 - Roof edge protection during transport

More information

Installation Guide of Sunrise Solartech PV Modules. Term 2013. Contents. Purpose of this guide. General. Safety precaution for installing a solar

Installation Guide of Sunrise Solartech PV Modules. Term 2013. Contents. Purpose of this guide. General. Safety precaution for installing a solar Installation Guide of Sunrise Solartech PV Modules Term 2013 Contents Purpose of this guide General Safety precaution for installing a solar Photovoltaic system Product Identification Mechanical Installation

More information

Installation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows

Installation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows Installation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows americancraftsmanwindows.com Project Requirements: Read

More information

March 14, 2007. Installation of Bay, Bow and Garden Windows

March 14, 2007. Installation of Bay, Bow and Garden Windows March 14, 2007 Re: Installation of Bay, Bow and Garden Windows Attached are the Atrium Companies, Inc recommendation for the installation of bay, bow and garden windows. These instructions were developed

More information

HORIZONTAL INSTALLATION

HORIZONTAL INSTALLATION THERMO/SOLAR Žiar s.r.o. MANUAL FOR INSTALLATION PV SUPPORTING FRAMES HORIZONTAL INSTALLATION Technical alternation reserved A1410 1 12/2014 CONTENT ORD.NO. PAGE Mounting information 3 Mounting, flat roof

More information

Epdm Flat Roofing Systems

Epdm Flat Roofing Systems Epdm Flat Roofing Systems EDPM can be fully bonded, loose laid and ballasted or mechanically attached depending on the existing roof and its proposed usage. This applies to roofs to be refurbished and

More information

The WANZ Guide to Window Installation

The WANZ Guide to Window Installation The WANZ Guide to Window Installation as described in E2/AS1 Amendment 5 Ver. 1.1 Page 2 of 74 Contents Overview Page 5 Objective Page 5 Scope Page 5 Opening Preparation Page 7 Step P1 Preliminary Check

More information

Rooflight INSTALLATION INSTRUCTIONS

Rooflight INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS Rooflight These instructions should be used for: Installing Permanent Trickle Ventilation: Constructing & Waterproofing a Timber Upstand Curb: Installing & Waterproofing Proprietary

More information

Replacement Window Installation Guide Non-Impact & Impact Resistant Windows without Nailing Fin

Replacement Window Installation Guide Non-Impact & Impact Resistant Windows without Nailing Fin Replacement Window Installation Guide Non-Impact & Impact Resistant Windows without Nailing Fin americancraftsmanwindows.com Project Requirements: Failure to follow these instructions may void product

More information

Sun Windows General Information Sun New Construction Window Installation Instructions

Sun Windows General Information Sun New Construction Window Installation Instructions Sun Windows General Information Section 1 G F H H H A. Apply Weather Resistive Barrier B. Apply Sill Flashing Tape C. Place Waterproof Sill Shims D. Caulk Back of Nail Fin Sides & Top, Set Window, Fasten

More information

Euro Oak Installation

Euro Oak Installation STYLE TIMBER FLOOR Bring your life in style Euro Oak Installation Before Starting Installation Your floor has been manufactured with the best possible care. However we would still advise you to check the

More information

Re-board Accessories

Re-board Accessories Re-board Accessories Plastic Screws Plastic screws specially developed for 16 mm Re-board, but works with most thicknesses. A special version comes with a loop for hanging (only available in transparent

More information

Stair Parts Installation. Tricks

Stair Parts Installation. Tricks Stair Parts Installation Tips & Tricks Introduction Your DIY staircase guide Welcome to the Stairpart home installation guide. Your stairway is both a functional and focal point in your home, so keeping

More information

Installation Detailed installation instructions are provided which should be strictly followed.

Installation Detailed installation instructions are provided which should be strictly followed. Specification System 6 The Metal Technology Thermally-Broken Vertical Slide Window has been designed in such a way that its'attractive and clean lines will enhance all types of residential and commercial

More information

Active and Passive Sash Replacement

Active and Passive Sash Replacement for Andersen Gliding Windows Read all instructions carefully before attempting this procedure. If you have any questions about your ability to complete the procedure, call Andersen at 1-888-888-7020 for

More information

WATERPROOFING OF WET ROOMS

WATERPROOFING OF WET ROOMS WATERPROOFING OF WET ROOMS Waterproofing under tiles For longterm enjoyment of a wetroom area a complete and resistant waterproofing system is an important precondition. Most tiles are by themselves waterproof

More information

INSTRUCTION FOR ASSEMBLY. 150x180 v Traditional sauna cabin

INSTRUCTION FOR ASSEMBLY. 150x180 v Traditional sauna cabin INSTRUCTION FOR ASSEMBLY 150x180 v Traditional sauna cabin 1. SAUNA PLAN 1800 LIGHT UNDER THE BENCH VENTILATION OUTLET UPPER BENCH 600 1500 LOWER BENCH 400 700 1656 956 HEATER 366 381 690 815 Light switch

More information

Profiles in stock Standard catalogue. Discover the possibilities with aluminium profiles from Sapa

Profiles in stock Standard catalogue. Discover the possibilities with aluminium profiles from Sapa Profiles in stock Standard catalogue Discover the possibilities with aluminium from Sapa You can create your own profile or you can choose from a wide selection of standard. Delivery: 1 2 weeks for standard

More information

NEW ELECTRICAL SUBSTATION Building 300 SECTION 07 53 23 ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK

NEW ELECTRICAL SUBSTATION Building 300 SECTION 07 53 23 ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK PART 1 GENERAL 1.1 REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to within

More information

SUPER SHED. Indoor shelter for your outdoor tools.

SUPER SHED. Indoor shelter for your outdoor tools. SUPER SHED Indoor shelter for your outdoor tools. Not everyone needs a garden shed. But, if you've no more space on your garage wall for that new leaf rake, if you can't find your potting trowel because

More information

HALE PET DOOR INSTALLATION INSTRUCTIONS HALE STANDARD PANEL MODEL

HALE PET DOOR INSTALLATION INSTRUCTIONS HALE STANDARD PANEL MODEL HALE PET DOOR INSTALLATION INSTRUCTIONS HALE STANDARD PANEL MODEL Please read these instructions carefully and completely before attempting to install Hale Pet Doors; they will guide you through the steps

More information

Cedar Cottage Doghouse Plans

Cedar Cottage Doghouse Plans Overlapping cedar shingles add an element of charm to this medium size doghouse. The walls, floor, and trim are constructed of solid cedar, making it naturally weather resistant and provides excellent

More information

Cavity Drain R20 is manufactured from1.0mm thick black high density polyethylene with studs approximately 20mm high.

Cavity Drain R20 is manufactured from1.0mm thick black high density polyethylene with studs approximately 20mm high. CI/SfB Tn6 L6813 September 2013 RIW CAVITY DRAIN R20 R20 is manufactured from1.0mm thick black high density polyethylene with studs approximately 20mm high. Other systems are available for specific uses,

More information

Asphalt Shingle Application Requirements

Asphalt Shingle Application Requirements Alberta Allied Roofing Association Asphalt Shingle Application Requirements Section 1 Roof Decks 1.1 General Asphalt Shingles are not permitted to be installed directly over rigid insulation. When Asphalt

More information

Plaisance 50. Windows and doors. Sapa Building System

Plaisance 50. Windows and doors. Sapa Building System Plaisance 50 Windows and doors Sapa Building System Plaisance 50 is a non-thermally broken system for aluminium windows and doors with a building depth. The system offers a wide range of inward and outward

More information

Ubiflex. Non-lead flashing system

Ubiflex. Non-lead flashing system Ubiflex Non-lead flashing system Ubiflex non-lead flashing Ubiflex is a non-lead waterproof flashing material which can be used in most applications where lead is traditionally used to provide a weatherproof

More information

Fixing guide April 2016

Fixing guide April 2016 Fixing guide April 2016 INTRODUCTION Cedral Lap and Cedral Click The ideal, low maintenance, rot-free alternative to traditional cladding. With the visual appeal of natural timber, simplicity of installation

More information

Installation Window Building In Details

Installation Window Building In Details Installation Window Building In Details INSTALLATION Photo courtesy of Rowe Aluminium DATE: NOVEMBER 2009 REPLACES: AUGUST 2003 INSTALLATION Installation Replaces: Scale: NOT TO SCALE Vantage snap-on couplers

More information

Saferand easierinstallation

Saferand easierinstallation EN 85-07 Saferand easierinstallation IföSigninstallationsystem andifösignbuilt-incistern www.ifosanitar.com/sign Aneffectivesolution withmanyadvantages. Ifö Sign installation system makes life a little

More information

50AI01oe 02/15. Labko GRP cesspools. Instructions for installation, operation and maintenance

50AI01oe 02/15. Labko GRP cesspools. Instructions for installation, operation and maintenance 02/15 Labko GRP cesspools Instructions for installation, operation and maintenance Reliable solutions Wastewater treatment systems Contents 1 LABKO CESSPOOLS... 3 1.1 GENERAL... 3 1.2 IMPORTANT TO KNOW

More information

SHINGLE APPLICATION GUIDE

SHINGLE APPLICATION GUIDE SHINGLE APPLICATION GUIDE CONTENTS 01. General conditions 01. Material requirements 02. Terms 07. Estimating shingle requirements 08. Roof preparation 10.Shingle application E version 2006 GENERAL CONDITIONS

More information

MGB Chrome Bumper Conversion

MGB Chrome Bumper Conversion MGB Chrome Bumper Conversion Installation Instructions For 1974 1/2-1980 MGB This kit requires cutting, welding, and painting. Professional installation recommended. Note: Every MGB body is slightly different

More information

Installation Instructions

Installation Instructions READ BEFORE INSTALLING UNIT For Through-the-Wall Air Conditioners To avoid risk of personal injury, property damage, or product damage due to the weight of this device and sharp edges that may be exposed:

More information

Fire Preventive and Fireproof Performance Test and Evaluation Procedure Manual

Fire Preventive and Fireproof Performance Test and Evaluation Procedure Manual BR BO-01-02 Effective from June 1, 2000 Revision: March 26, 2002 Fire Preventive and Fireproof Performance Test and Evaluation Procedure Manual (Unofficial Manual) Technical Appraisal Department, Building

More information

Guidelines for Earthquake Bracing of Residential Water Heaters

Guidelines for Earthquake Bracing of Residential Water Heaters Guidelines for Earthquake Bracing of Residential Water Heaters Department of General Services Division of the State Architect 1102 Q Street, Suite 5100 Sacramento, CA 95814 Phone: (916) 324-7099 Fax: (916)

More information

How To Build A Gambrel Roof And A Gable End Roof

How To Build A Gambrel Roof And A Gable End Roof Dutch Gable or Gambrel Roof and The Scotch Valley The folowing pages are an extract from Carp 12 text TAFE NSW Construction and Transport Division 71 HIP and VALLEY ROOFING GAMBREL / DUTCH GABLE The effect

More information

0800 30 50 90 www.bamboodirect.co.nz

0800 30 50 90 www.bamboodirect.co.nz Guide To Bamboo Flooring 1. Frequently Asked Questions 2. Installation Tips 3. Maintaining your Bamboo Floor 4. Why Bamboo Direct? COPYRIGHT 2009 BAMBOO DIRECT Frequently Asked Questions 1. Are Bamboo

More information

INSTALLATION OF A BAY WINDOW

INSTALLATION OF A BAY WINDOW INSTALLATION OF A BAY WINDOW Installation of a Bay Window These instructions relate to the replacement of an existing bay window or replacement of a straight window with a new bay window, in an opening

More information

Elo Touch Solutions Wall-mounting Kit for the 5501L IDS Touchmonitors

Elo Touch Solutions Wall-mounting Kit for the 5501L IDS Touchmonitors Installation Manual Elo Touch Solutions Wall-mounting Kit for the 5501L IDS Touchmonitors SW602206 Rev B Table of Contents Chapter 1: Safety Warning... 3 Chapter 2: Kit Contents... 4 Included in Kit...

More information

The WANZ Guide to Window Installation

The WANZ Guide to Window Installation The WANZ Guide to Window Installation as described in E2/AS1 Amendment 5 2 of 60 Contents Overview 5 Objective 5 Scope 5 Opening Preparation 7 Step P1 Preliminary Check 8 Step P2 Cut the Underlay 9 Step

More information

Facades That Last Longer

Facades That Last Longer Facades That Last Longer A Smarter Way James Hardie is a world-leading manufacturer of fibre cement building materials. Founded in 1888 with an enduring set of values, we have grown to generate a turnover

More information

How-To-build guide timber windows

How-To-build guide timber windows How-To-build guide timber windows What you can build using this guide This guide shows you how to install a factory-made timber casement window into a house with a weatherboard cladding. Casement windows

More information

Cardok Sàrl CP37 CH-1295 Tannay Switzerland Phone: 0041 22 77 66 051 info@cardok.com

Cardok Sàrl CP37 CH-1295 Tannay Switzerland Phone: 0041 22 77 66 051 info@cardok.com CARDOK CARLIFT Fast access to underground garages Fast, Silent, Discreet, Design, High-Tech Installation to replace an access ramp on private property Dimensions: (Built to measure, all dimensions can

More information

IMPORTANT INSTALLATION GUIDE VALENCIA SQUARE CORNER SHOWER READ ALL INSTRUCTIONS CAREFULLY BEFORE STARTING THE INSTALLATION

IMPORTANT INSTALLATION GUIDE VALENCIA SQUARE CORNER SHOWER READ ALL INSTRUCTIONS CAREFULLY BEFORE STARTING THE INSTALLATION INSTALLATION GUIDE VALENCIA SQUARE CORNER SHOWER SEALANT REQUIRED TO COMPLETE THIS INSTALLATION: (Not supplied) Sika Sikasil NG (Arctic White) To seal the WHITE shower door and returns to the shower tray.

More information

PANELIZED HOME INSTALLATION GUIDELINE

PANELIZED HOME INSTALLATION GUIDELINE PANELIZED HOME INSTALLATION GUIDELINE A typical home package will be constructed of Snap-N-Lock Insulated Panels clad with steel skins. 4" panels will be used for the walls, and 6" panels for the roof.

More information

WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12

WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12 WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12 87 88 GOOD INDUSTRY PRACTICES 12 WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12.1 BACKGROUND Most roofs in Singapore are constructed using reinforced

More information

I-Line - Snap-On Feature

I-Line - Snap-On Feature Oct 2012 I-Line - Snap-On Feature DATA SHEET Snap-On features - Guaranteed truelines every time Bailey I-Line Snap-On is an architectural cladding feature offering creative possibilities for architects

More information

T A B L E T 1 T E S T S A N D I N S P E C T I O N C A B L E P C U T A N D P C U T - A

T A B L E T 1 T E S T S A N D I N S P E C T I O N C A B L E P C U T A N D P C U T - A T A B L E T 1 1 of 7 Tests & Inspection Cable PCUT & PCUT-A (Table T1) T E S T S A N D I N S P E C T I O N C A B L E P C U T A N D P C U T - A No. Test Scale MOC Requirements G 20:10:001:01 Defined Test

More information

FLOOR MAINTENANCE GUIDE EXPECTATIONS AVOIDING PROBLEMS

FLOOR MAINTENANCE GUIDE EXPECTATIONS AVOIDING PROBLEMS No. 8 Brands Hatch Close Kyalami Business Park Kyalami Tel: 011 466 0701 Fax: 011 466 2919 Email: nici@forestflooring.co.za FLOOR MAINTENANCE GUIDE EXPECTATIONS AVOIDING PROBLEMS Please keep this folder

More information

Go-kart for little race-drivers

Go-kart for little race-drivers Go-kart for little race-drivers Drill and drive. Go-kart What it lacks in speed, it more than makes up for in fun: the go-kart will excite little race-drivers. 1 Introduction It s only a go-kart, but it

More information

We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden window unit.

We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden window unit. Important Information for New Construction Installations Attention Installer! We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden

More information

Premier & Deluxe 3-Season Room Sliding Glass Door

Premier & Deluxe 3-Season Room Sliding Glass Door DTSSGD-11 Premier & Deluxe 3-Season Room Sliding Glass Door Installation Instructions Screen Door Seal Left Side Track Top Track Assembly Right Side Track Right Side Trim Sliding Glass Door Sliding Screen

More information

Installation guide for the SafeLine type anchorage device. Tested in compliance with EN 795: 1996. No.: SE-...

Installation guide for the SafeLine type anchorage device. Tested in compliance with EN 795: 1996. No.: SE-... Installation guide for the SafeLine type anchorage device Tested in compliance with EN 795: 1996 No.: SE-... Version: 09.10.2008 SE 67 Subject to technical alterations! Contents 1. General information

More information

DE Frame with C Series Sidelight

DE Frame with C Series Sidelight TOOLS REQUIRED Tape measure 6' magnetic level 3' magnetic level Screw gun with clutch adjusted #2 phillips tip #3 phillips tip Screwdriver (used to adjust frame on will using oval slots) Pry Bar Powder

More information

19 DYNAmax Free Standing Server C A B I N E T s

19 DYNAmax Free Standing Server C A B I N E T s 9 DYNAmax Free Standing Server C A B I N E T s 9 DYNAmax Free Standing Server Cabinets FAMILY W=600mm and W=800mm DYNAmax Series Free Standing Server Cabinets DYNAmax series Servering Enclosures, provide

More information

CILINDRO 40 design SLIDE Studio

CILINDRO 40 design SLIDE Studio CILINDRO 40 design SLIDE Studio Dimensioni: Ø 30 h 40 cm Peso: 2 Kg Imballaggio: 32 x 32 x 42 cm Volume imballaggio: 0,043 m 3 Dimensions: Ø 30 h 40 cm Poids: 2 Kg Emballage: 32 x 32 x 42 cm Volume emballage:

More information

GLOBO 30 HANGING design SLIDE Studio

GLOBO 30 HANGING design SLIDE Studio GLOBO 30 HANGING design SLIDE Studio Anno di produzione: 1999 Dimensioni: Ø 30 cm Peso: 1,2 Kg Imballaggio: 31 x 31 x 31 cm Volume imballaggio: 0,03 m 3 Année de production: 1999 Dimensions: Ø 30 cm Poids:

More information

Installation, operation and maintenance manual TX 35A

Installation, operation and maintenance manual TX 35A Installation, operation and maintenance manual TX 35A Rev.10 may 2012 Page 1 of 18 1.0.0 Table of contents INSTALLATION, OPERATION AND MAINTENANCE MANUAL...1 1.0.0 TABLE OF CONTENTS...2 2.0.0 ILLUSTRATIONS...2

More information

WHI 90-Minute Rated Veneered Door Frame Installation Instructions

WHI 90-Minute Rated Veneered Door Frame Installation Instructions No. 940-03-10 INSTALLATION INSTRUCTIONS 90 MINUTE RATED VENEERED DOOR FRAME DOOR REQUIREMENTS: Consult the door manufacturer to make sure that the doors are qualified for the hardware to be installed,

More information

INSTALLATION INSTRUCTIONS for Premium Pocket Windows (JII022) IMPoRtaNt INFoRMatIoN & glossary. safety & HaNdlINg

INSTALLATION INSTRUCTIONS for Premium Pocket Windows (JII022) IMPoRtaNt INFoRMatIoN & glossary. safety & HaNdlINg Thank you for selecting JeLd-weN products. Attached are JeLd-weN s recommended installation instructions for pocket (replacement) double-hung, casement, awning, picture or transom windows, designed to

More information