1 SOLAR ENERGY SYSTEMS ON NEW JERSEY LANDFILLS
2 Robert Confer, Bureau Chief Mary Anne Goldman, Spvg. Env. Engineer Bureau of Landfill & Hazardous Waste Permitting NJDEP Solid & Hazardous Waste Management Program Phone :
3 Approval Process Permit Readiness Checklist (Office of Permit Coordination and Environmental Review) (available to download at Pre-application Meeting (Determination of permits & other requirements) Landfill Disruption Approval (Must be obtained before initiation of site investigation) Site Investigation (To determine what specific closure requirements are needed prior to installation of solar energy system)
4 Approval Process Continued Site Remediation Program Process (Building on Landfills) (N.J.A.C. 7:26C & E) Landfill Closure Plan or Landfill Closure Plan Modification Construction (Closure activities, installation of solar panels, etc.) Post-Closure Submissions (As-built drawings, engineering certification, quarterly inspection & monitoring reports, etc.)
5 Landfill Closure N.J.A.C. 7:26-2A.9 Minimum capping requirements: Pre-1982 Landfills: Must be covered with at least 2 of clean soil. If site is lined, the landfill cap must have same permeability as the liner, per N.J.A.C. 7:26-2A.7(i). Add l requirements (i.e., leachate & gas mngt, run on/run off, etc.) on a case-bycase basis.
6 Minimum Capping Req ts continued NJAC 7:26-2A.7 Post 1982 Landfills: Final Cover - designed to minimize infiltration of liquids into the landfill throughout closure & post closure. Elements to be considered: Cover System Drainage (designed in conjunction with use of HELP Model to determine depth & type of layers, permeability of each layer, etc.)
7 Minimum Closure Req ts continued NJAC 7:26-2A.7 Slope Stability (stability analysis with F.S.>1.5 required) Materials: (Clay = 12 inches + 6 drainage layer + 12 compacted soil + 6 vegetative layer; geomembrane = 30 mils except HDPE = 60 mils + 12 drainage layer + 6 compacted soil + 6 ) Vegetative Layer: (Minimum 6 top soil; seeded, mulched, etc. in accordance with the Standards for Soil Erosion & Sediment Plan Control, N.J.A.C. 2:90
8 Closure & Post-Closure Plan Solid Waste Facility Permit Application Form Certified Soil Erosion & Sediment Control Plan Plans for Final Capping/Cover, Final Cover Vegetation & Final Cover Maintenance including a QA/QC Plan (N.J.A.C. 7:26-2A.7(i))
9 Closure & Post-Closure Plan continued Plans for Side Slopes & Maintenance of Side Slopes Plans for Stormwater Run-on/Run-off Controls & Maintenance of Controls (must be designed to protect the landfill from run-on/ run-off at a min. peak discharge of a 24-hour, 25-year storm, and in accordance the N.J.A.C. 7:26-2A.7(g)) Groundwater Monitoring Wells and Maintenance of Wells (in accordance with NJPDES regulations, N.J.A.C. 7:14A)
10 Closure & Post-Closure Plan continued Landfill Gas Venting & Evacuation System, Maintenance & Testing of Gas System (designed in accordance with N.J.A.C. 7:26-2A.7(f)) Leachate Collection & Control System and Operation & Maintenance of Leachate Collection & Control System (designed in accordance with N.J.A.C. 7:26-2A.7(d)) Facility Access Controls & Maintenance of Facility Access Controls (designed in accordance with N.J.A.C. 7:26-2A.8(b)25)
11 Closure & Post-Closure Plan continued Conformance of Site to the Surrounding Area (N.J.A.C. 7:26-2A.9(e)) Inspections (include items to be inspected, inspection form, and inspection schedule) Closure & Post-Closure Financial Plan sets forth the costs & expenses for implementation of the Landfill Closure & 30-year Post-Closure Period (N.J.A.C. 7:26-2A.9(f)) Plan Certification (N.J.A.C. 7:26-2A.9(d))
12 Closure Plan Modification Written description of proposed changes & supporting documentation Engineering plans signed & sealed by a N.J. P.E. Schedule for implementation
13 Permit Coordination One stop permitting process provides a single source of contact at DEP Determination of all required permits by full Departmental permitting team (Permit Identification Form) Early identification of any potential problems or issues (Readiness Checklist)
14 Considerations in the Design of Solar Energy Systems Settlement Effects of differential settlement on solar system; type and weight of foundation and solar energy system; weight of construction equipment; type, depth and age of waste, and; measures to minimize effects of settlement
15 Design Considerations Continued Side Slope Stability - cover system design; solar foundations; snow & ice loading Landfill Cover measures to prevent damage to cap during construction & methods of repair if needed; compliance with Landfill Disruption Approval, as per N.J.A.C. 7:26-2A.8(j)
16 Design Considerations Continued Stormwater/Run-off measures to minimize erosion & stormwater structures designed for expected higher flow Routine Cap Maintenance vegetation management; erosion inspections & cover maintenance; inspection & maintenance of gas & leachate collection systems; gas migration & surface monitoring, etc.
17 Other Permits/Approvals Land Use (Stream Encroachment, Wetlands, CAFRA, etc.) Air Pollution (venting of landfill gases equipment, as per N.J.A.C. 7:27-8.2(c)17) Well Drilling (needed for all wells within or outside of landfilled area) N J Pollutant Discharge Elimination System (NJPDES) (for surface & groundwater discharges)
18 Other Permits/Approvals continued New Jersey Highlands Council N J Pinelands Commission Green Acres Fish & Game
19 Stormwater Requirements Construction Activity Stormwater General Permit (5G3) (required when more than one (1) acre of land will be disturbed) Stormwater Run-off Quantity & Control Requirements* Minimum design & performance standards require compliance with one of the three standards listed below:
20 Stormwater Requirements continued 1.) Demonstrate through hydrologic & hydraulic analysis that post-construction runoff does not exceed preconstruction runoff for 2, 10 and 100-year storm events;
21 Stormwater Requirements continued 2.) Demonstrate through hydrologic & hydraulic analysis that postconstruction peak runoff does not exceed preconstruction peak runoff for 2, 10 and 100-year storm events & that any increased volume or change in timing will not result in increased flood damage at or downstream of the site;
22 Stormwater Requirements continued 3.) Design stormwater management measures so that the postconstruction peak runoff rates for the 2, 10 and 100-year storm events are 50, 75 and 80%, respectively, of the preconstruction peak runoff rates * New stormwater criteria are currently being developed. Until completed, approval of stormwater mngt systems will be done on a site-specific basis.
23 Stormwater Requirements continued Stormwater runoff must be calculated in accordance with the following methods: 1.) USDA Natural Resources Conservation Service (NRCS) methodology (description included in TR-55) 2.) Rational Method for peak flow & the Modified Rational Method for hydrograph computations (description included in Appendix A-9 of the Standards for Soil Erosion & Sediment Control in New Jersey )
24 Typical Solar Panel Installation
25 Issues to be Resolved 1.) Stormwater Management Criteria in some cases 2.) Groundwater Management & 3.) Methane Gas Control
26 Landfill Name P I # County Municipality Rated Solar Electric Output Generating Elements (MW) SOLAR RENEWABLE ENERGY PROJECTS ON NEW JERSEY LANDFILLS Project Status** Project Start Actions Required for Solar, Comments Disruption Permit Status 1 Solar Closure Application Status Closure & Post Closure Plan Status Closure Status Post Closure Status Project Complete End Usage 2 Contact Name & Telephone Number DEP Program* DEP Case Manager Solar Projects in: Operation 1 Pennsauken Camden Pennsauken 13,000 crystalline panels 2.1 Operating 2006 None Approved Operating 2006 Onsite John Londres, PCFACC BLHWP Ram Shah 2 Essex Chemical Gloucester Paulsboro 5,800 panels 0.3 Operating 2001 None NS NS Approved 1996 Properly closed 2002 Onsite John Burzichelli, Mayor BLHWP Mark Searfoss Under EPA as Rick Ricciardi, Marathon Engineering, Inc Rollins *** Gloucester Logan Twp. 6,580 crystaline panels 1.5 Operating 2010 NA NA NS NS RCRA Cor BLHWP Nick Nader 9705 rective Action No approved plan MW, rigid-top; Solar approved 4 NJMC 1-A Hudson Kearny 3.0 Operating 2009 Disruption NS asked for PC Plan in No as-built cert 2011 Grid Thomas Marturano, NJMC BLHWP Sanjay Shah 1.8MW, flexible-sides 11/18/10 Dis. Approval Simple Closure processed as Approved Ends 5 Edgeboro Middlesex East Brunswick 9,000 PV panels 5.0 Operating 2010 NS Approved 9/25/98 Properly closed 2011 Grid Jack Whitman, EDI, BLHWP Shwu-Mei Chen Disruption 11/18/10 12/31/26 Ends Stafford Ocean Stafford Operating 6.0 Operating 2011 closure plan modification NA Approved 8/5/10 Approved 10/26/06 Properly closed 2011 Onsite Ed Speitel, Walter's Group, Inc BLHWP Rob Nitche 6 5/5/ Design Approved 7 Delilah Road Atlantic Egg Harbor N/A 9.7 Approved 2011 Disruption. Need SRP sign-off Approved 1/5/12 NFA issued by SRP NA NA -- Grid John Egnor, Seashore Solar, Inc., BLHWP M. Gerchman 1/15/12 8 L & D Burlington Mt. Holly N/A 2.3 Approved 2011 Closure Plan modification NA Approved 10/2/11 Approved 2/10/92 Properly closed Ends Carl Januszkiewicz, Waste Mngt., BLHWP Saara Ali Approved 9 General Engines Gloucester West Deptford N/A N/A Approved 2010 Closure Plan modification Approved 5/12/11 Properly closed Pre Brett Taylor, W. Deptford Solar, BLHWP Saara Ali 5/12/11 Approved 10 Princeton Mercer Princeton 200 PV panels 1.0 Approved 2011 Closure Plan modification NA Approved 4/1/03 Not certified Mark Swyka, Cornerstone Eng., BLHWP Janis Hottinger 10/18/11 11 Bernards Somerset Bernards 8,215 PV panels 2.9 Approved 2011 Closure Plan modification NA Approved Approved 10/28/93 Properly closed Ends 5/28/ John Towle, First Energy, LLC, BLHWP Rob Nitche 15.9 Pre-Design Charles Gallub, Bellmawr Wfrt. Dev., LLC Bellmawr Camden Bellmawr N/A N/A Pre-design 2010 SRP Site N/A Ongoing OBR Timothy Bartle 2204 CP Mod. CP NOD issued 11/ 13 Wildwood Cape May Wildwood N/A N/A Pre-design 2010 N/A NS Received 3/29/11 Pending Lou Ferrara, Wildwood BLHWP Janis Hottinger /11. Applicant response req'd. Trevan Houser, Land Resource Sol., LLC Monroe Gloucester Monroe N/A 3.0 Pre-design 2010 SRP Site N/A NS OBR Timothy Bartle WDI Keyport Monmouth Keyport N/A 5.0 Pre-design 2010 SRP Site N/A NS Mark Bellin, Keyport Energy Group OBR Timothy Bartle Full Closure, Highlands & Land Approved Richard Bernardi, Strategic Partners, LLC Fenimore Morris Roxbury N/A 10.0 Predesign 2009 NS Approved 10/6/11 Ongoing -- Grid BLHWP M. A. Goldman Use Approvals Req'd 2/24/ Closure Plan Mod. - Highlands Approved Not 17 Mt. Arlington Morris Mt. Arlington N/A N/A Pre-design 2009 NS Approved 7/21/ Daren Phil BLHWP Rob Nitche Approval Req'd 5/27/11 implemented CP Mod. - Pinelands Approval 18 Southern Ocean Ocean Ocean Twp. 28,000 panels; 11 inverters 7.2 Pre-design 2009 NA NS Approved 2003 Properly closed Ends Grid Joseph Lachawiec, Mayor BLHWP M.A. Goldman Req'd 25.2 Preliminary Florence 19 Burlington Florence Twp. N/A N/A Preliminary 2012 Recontouring Approved 20 Galloway Atlantic Galloway N/A N/A Preliminary 2010 Closure Plan modification NA Ongoing - no final cert Dan Galletta BLHWP Rob Nitche 8/2/94 21 Kingsland Bergen Lyndhurst N/A N/A Preliminary 2009 SRP Site Thomas Marturano, NJMC OBR Timothy Bartle 22 NJMC 1-E Bergen Lyndhurst N/A N/A Preliminary 2009 Full Closure Plan NA NS Incomplete Thomas Marturano, NJMC BLHWP Sanjay Shah 15,120 PV panels; 7 23 Lumberton Burlington Lumberton 3.0 Preliminary 2009 Closure Plan modification NA NS Approved 11/1/95 Properly closed Jim Conway, Deputy Mayor BLHWP Rob Nitche inverters 24 Buena Vista Cumberland Buena 400 PV Panels 1.0 Preliminary 2011 NS NS NS NA NA NA Robert Potter, Project Navigator, LTD, BLHWP Ram Shah Properly closed 25 Commercial Cumberland Commercial N/A 2.0 Preliminary 2011 Closure Plan modification NA NS Approved 2/21/ Edward Dennis, RV&W Engineers, BLHWP Rob Nitche but no cert 26 Kinsleys Gloucester Deptford N/A N/A Preliminary 2010 Closure Plan modification NA NS Approved 9/1/92 Properly closed Ends 2/6/ Andy Mayer, Kinsleys LF, BLHWP Saara Ali Robt Hawthorne/ Gloucester National Park N/A 8.5 Preliminary 2011 Full Closure Plan Doing under RI NS NS -- Grid Josh Pills, National Park Boro, OBR Ron Wienkowski National Park Closure Approved thru 28 Erie Hudson Kearny N/A N/A Preliminary 2009 Closure Plan modification NA NS No as-built cert Thomas Marturano, NJMC BLHWP Sanjay Shah permit but no pc plan 29 ILR Middlesex Edison N/A 15.0 Preliminary 2011 Closure Plan modification NA NS Approved 5/17/88 Properly closed Ends Khaled Benslimane, Sadat Assoc., BLHWP Janis Hottinger 30 J. Manville-Dukes Somerset Hillsborough N/A 2.5 Preliminary 2011 Closure Plan modification NA NS Approved 12/6/96 Properly closed Ends 12/31/ Michael Amorosa, Somerset Co BLHWP Janis Hottinger 31 Ingersoll-Rand Warren Phillipsburg N/A N/A Preliminary 2010 SRP Site N/A NS pending OBR William Lindner 32.0 TOTAL: 73.1 MW **Project Status: Disruption Permit Status 1 End Usage 2 Preliminary Interest expressed; feasibility determined NS - Not submitted to date Onsite - Direct use of electricity at site or nearby Planning phase: Owner/contractor, consultants selected; meetings w/dep to discuss permits; issues Pre-design Issued - DEP Approval Issued Grid - Site connected to electric utility grid id'd Design Project scope finalized & designed; permits applied for & obtained; DEP approval imminent Pending - Under review by DEP -- - Unknown at this time Approved Closure Plan modification issued; construction imminent NOD - NOD issued by DEP; awaiting response Construction Active project installation (may include landfill closure work) Approved or Complete - All closure work done; Operating Construction complete; producing electricity as-built cert. approved P I # Program Interest Number: site identifier used in NJDEP'S NJEMS Permit Management System Incomplete - Insufficient submittal NA - Not applicable *** Currently owned by Bridgeport Disposal, LLC & Clean Harbors * BLHWP - Bureau of Landfill & Hazardous Waste *OBR - Office of Brownfields Permitting, Solid & Hazardous Waste Program Reuse, Site Remediation Program Contact: Robert Confer, Bureau Chief, Bureau of Landfill and Hazardous Waste Permitting (609) Timothy Bartle, Section Chief, Office of Brownfield Reuse (609) file locationv:\er\shw\data\landfillword\nj LF Energy Production\Solar Projects on NJ Landfills Updated June 15, 2012
27 Pennsauken Renewable Energy Park PPL Renewable Energy Consists of a 2.8 MW lfg to energy system and a 2.6 MW photovoltaic (solar) system Operational: June 2006 Provides electricity to Aluminum Shapes in Camden County
28 Pennsauken Renewable Energy Park
29 Pennsauken Renewable Energy Park
30 Pennsauken Renewable Energy Park
31 BP Essex Chemical Plant Solar panels located on closed gypsum landfill in southwest portion of a large industrial site in Paulsboro, New Jersey
32
33 DEP Contacts Landfill & Hazardous Waste Permitting Bob Confer, (609) Permit Coordination & Envt l Review Ruth Foster, (609) Brownfield Remediation & Reuse Tim Bartle, (609)
Guidance for Installation of Solar Renewable Energy Systems On Landfills in New Jersey (Updated January 8, 2013)
Guidance for Installation of Solar Renewable Energy Systems On Landfills in New Jersey (Updated January 8, 2013) A. Introduction Closed landfills may be suitable locations for renewable energy systems
Summary and Description of 2014 Enhancements to New Jersey Model Stormwater Control Ordinance for Municipalities
Summary and Description of 2014 Enhancements to New Jersey Model Stormwater Control Ordinance for Municipalities This document summarizes and provides explanation for the purpose and intent of major recommended
Low Impact Development Checklist
New Jersey Stormwater Best Management Practices Manual February 2004 A P P E N D I X A Low Impact Development Checklist A checklist for identifying nonstructural stormwater management strategies incorporated
APPLICATION PROCESS FOR LAND DISTURBING PERMIT
PREFACE: APPLICATION PROCESS FOR LAND DISTURBING PERMIT The property owner, developer and designated planners and engineers shall review the general development plans and detailed plans of the Local Issuing
Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans
APPENDIX IV Version: February 2, 2015 Sample DEQ Plan Submitter s Checklist for Stormwater Management Plans Please fill in all blanks and please reference the plan sheets/pages where the information may
Waste Handling & Disposal
Objectives Cover Contain Educate Reduce/Minimize Product Substitution Description Improper storage and handling of solid wastes can allow toxic compounds, oils and greases, heavy metals, nutrients, suspended
Flood Plain Reclamation to Enhance Resiliency Conserving Land in Urban New Jersey
Flood Plain Reclamation to Enhance Resiliency Conserving Land in Urban New Jersey Rutgers Cooperative Extension Water Resources Program Christopher C. Obropta, Ph.D., P.E. Email: [email protected]
Post Construction Stormwater Management Checklist Program
Post Construction Stormwater Management Checklist Program Anahid Damerau, CPESC, CPSWQ Christopher Smith, P.E. Department of Environmental Protection Stormwater Section Watershed Management Program The
Green Spaces to Improve Waterways and Communities
Green Spaces to Improve Waterways and Communities Thomas M. Evans, ASLA LEED AP Green Infrastructure Design Services Director Cleveland, Ohio Northern Michigan Green Infrastructure Conference June 4, 2015
AN AEM TOOL FOR THE EVALUATION OF UNDESIGNED WASTE STORAGE FACILITIES
AN AEM TOOL FOR THE EVALUATION OF UNDESIGNED WASTE STORAGE FACILITIES REFERENCE National Handbook of Conservation Practices Code NY313 Waste Storage Facility. INTRODUCTION CAFO permits require an Agricultural
CONSTRUCTION PERMIT SUBMITTAL CHECKLIST
LAS VEGAS VALLEY STORMWATER QUALITY MANAGEMENT PROGRAM CONSTRUCTION PERMIT SUBMITTAL CHECKLIST (Applies to all Grading Site Development Building and Encroachment Permits and plans including Final Parcel
NEW JERSEY CIVIL SERVICE COMMISSION PUBLIC SAFETY TESTING. Law Enforcement Status Report. July/August 2016
NEW JERSEY CIVIL SERVICE COMMISSION PUBLIC SAFETY TESTING Law Enforcement Status Report July/August 2016 ENTRY-LEVEL LAW ENFORCEMENT (LEE) In order to be considered for employment in an entry-level law
New Jersey Substance Abuse Monitoring System (NJ-SAMS) Substance Abuse Treatment Admissions 1/1/2013-12/31/2013 Resident of Cape May County
New Jersey Substance Abuse Monitoring System (NJ-SAMS) Substance Abuse Treatment Admissions 1/1/2013-12/31/2013 Resident of Cape May County Primary Drug Highest School Grade Completed Alcohol 733 31% Completed
STORMWATER MANAGEMENT CHECKLIST
STORMWATER MANAGEMENT CHECKLIST *This checklist must be completed and part of the Land Disturbing Permit submittal for review if the acreage disturbed is one (1) acre or more: I. SUPPORTING DATA Narrative
Environmental Guidelines for Preparation of an Environmental Management Plan
2013 Environmental Guidelines for Preparation of an Environmental Management Plan Environmental Management Division Environmental Protection Agency 3/13/2013 ENVIRONMENTAL GUIDELINES FOR PREPARATION OF
State of New Jersey Approved Wetlands Mitigation Banks
State of New Jersey Approved Wetlands Mitigation Banks as of 4/27/15 The table below lists each Watershed Management Area (WMA) HUC 8 with its corresponding mitigation bank(s). To receive more information
Floodplain Development Land Use Review
COMMUNITY DEVELOPMENT DEPARTMENT Planning Division P.O. Box 490 333 Broadalbin Street SW Albany, OR 97321 Phone 541-917-7550 Fax 541-791-0150 www.cityofalbany.net Floodplain Development Land Use Review
The Basics of Chapter 105 Waterways and Wetlands Permitting in PA
The Basics of Chapter 105 Waterways and Wetlands Permitting in PA April 17, 2013 Goal To develop a basic understanding of PA Department of Environmental Protection (DEP) and US Army Corps of Engineers
Prattsville Berm Removal Project. 1.0 Project Location
Prattsville Berm Removal Project 1.0 Project Location The project site is located between the New York State Route 23 Bridge over the Schoharie Creek and the Schoharie Reservoir. The restoration plan encompassed
How To Get A Stormwater Discharge Permit In A City Of Scottsdale
Environmental Regulations Guide Section 4 Pollution Prevention 4. 0 Pollution Prevention The Pollution Prevention Act (PPA) focuses on source reduction, i.e. on reducing the amount of pollution through
A Developer s Guide: Watershed-Wise Development
A Developer s Guide: Watershed-Wise Development Environmental Protection What is a watershed? It does not matter how far away you build from a creek, lake, or the ocean, you are in a watershed. Another
URBAN DRAINAGE CRITERIA
URBAN DRAINAGE CRITERIA I. Introduction This division contains guidelines for drainage system design and establishes a policy for recognized and established engineering design of storm drain facilities
Appendix C. Municipal Planning and Site Restoration Considerations
Appendix C Municipal Planning and Site Restoration Considerations 67 68 Appendix C - Municipal Planning and Site Restoration Considerations This appendix contains best practice standards for site planning
CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE
CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE The following template may be used as a general guide for development of a Stormwater Pollution Prevention Plan (SWPPP) for construction activities.
Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010
Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010 Background What are permeable interlocking concrete pavements (PICP)?
Higher Education Component New Jersey Economic Stimulus Act of 2009 A4048/S2299SCS (Roberts/Coutinho/Diegnan/Wisniewski/Lesniak)
Higher Education Component New Jersey Economic Stimulus Act of 2009 A4048/S2299SCS (Roberts/Coutinho/Diegnan/Wisniewski/Lesniak) The New Jersey Economic Stimulus Act of 2009, P.L. 2009, c. 90, makes various
ALL Residential Lead Abatement Contractors
was compiled from a voluntary survey, conducted by the Department of Community services in specific areas in. The presence of a contractor on the list should not be 34A & B LeadMasters, LLC (00434A) Lakewood,
TARP Section 2.2 Stormwater BMP Screening for Validation
Requirements for Final Certification of Manufactured Treatment Devices for Total Suspended Solids Removal Based on Field Testing Amendments to TARP Protocol DRAFT April 28, 2009 The New Jersey Stormwater
Section Nine POLICE EMPLOYEE DATA
Section Nine POLICE EMPLOYEE DATA 175 STATE OF NEW JERSEY FULL TIME POLICE EMPLOYEES 1999 Department Municipal Police County Police Universities and Colleges State Police Other State Agencies 1998 19,437
A. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems.
19. STORMWATER MANAGEMENT A. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems. The majority of the approximately ±500 acre Property
Permeable Interlocking Concrete Pavements
Permeable Interlocking Concrete Pavements Program 000003 Revised 1-29-08 Permeable Interlocking Concrete Pavements This program is registered with the AIA/CES and ASLA CPE for continuing education professional
Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department
Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth
Exposed Geomembrane Covers (EGCs) for Landfills
Exposed Geomembrane Covers (EGCs) for Landfills Majdi Othman, Ph.D., P.E. SC SWANA Conference 10 May 2013 Presentation Outline History of EGCs Evolution of EGCs Feasibility of EGCs Technical Regulatory
10/4/2012. 40 slide sample of Presentation. Key Principles to Current Stormwater Management
40 slide sample of Presentation Please contact [email protected] if you would like the complete presentation Key Principles to Current Stormwater Management Distributed Control Measures Integrated
Mine Plan of Operations Reclamation Bond Checklist
Mine Plan of Operations Reclamation Bond Checklist NOTE: This checklist is provided to assist the operator in calculating the engineering and environmental costs required to properly stabilize, reclaim,
LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT
LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT Introduction The purpose of this Public Environmental Report (PER) is to provide the Government
Referral Process for DDD Regional Clinical Services & Family Support
Referral Process for DDD Regional Clinical Services & Family Support COUNTY REGIONAL PSYCHOLOGIST REGIONAL NURSE REGIONAL BEHAVIORIST FAMILY SUPPORT ATLANTIC BERGEN William Peto 973-977-2111 [email protected]
Storm Water Management Requirements for Construction Projects Less than One Acre
Storm Water Management Requirements for Construction Projects Less than One Acre Purpose: UC Irvine s Phase II Small MS4 Storm Water Permit requires construction projects less than one acre in size to
1200 United Boulevard
MINISTRY OF ENVIRONMENT Thompson and Cariboo Regions 1259 Dalhousie Drive Kamloops BC V2C 5Z5 Telephone: (250) 371-6200 Fax: (250) 828-4000 OPERATIONAL CERTIFICATE FOR THE CACHE CREEK LANDFILL Under the
Solid Waste Treatment Facility Solid Waste Permit Application
Part One: Fees A check or money order for the appropriate fees must be submitted with the permit application. If the required fees are not included, the permit application will be returned to the applicant.
Lower Raritan Watershed Management Area Stormwater & Flooding Subcommittee Strategy Worksheet LRSW-S3C1
Strategy Name: Reduce Existing Potential for Flood Damages LRSW-S3C1. Develop and implement a program to: Minimize flood damages through the use of structural measures. Minimize flood damages through the
Solar Energy Engineering, Consulting & Permitting Services
Page 1 of 5 Solar Energy Engineering, Consulting & Permitting Services Atlantic Design Engineers, Inc. (Atlantic) is a multi-disciplinary consulting firm providing professional services since 1987 in civil
NPDES Industrial Stormwater Inspection Worksheet
NPDES Industrial Stormwater Inspection Worksheet General Information Inspection Type 1200-Z DEQ Inspector Name Mark Riedel, Bob Schwarz DEQ Permit No. 106959 Entry Time 10:00 AM Inspection Date 1/8/15
SITE-SPECIFIC BEST MANAGEMENT PRACTICES (BMP) PLAN REVIEW CHECKLIST
This checklist may be used by applicants for encroachment permits, and contractors in development of Site- Specific BMP Plans for projects. plan reviewers will use this checklist to review the Site-Specific
Environmental guidelines for preparation of an Environment Management Plan
Environmental guidelines for preparation of an Environment Management Plan Environment Protection Authority MAY 2013 Australian Capital Territory, Canberra 2013 This work is copyright. Apart from any use
FIVE-YEAR REVIEW REPORT MASON COUNTY LANDFILL SUPERFUND SITE LUDINGTON, MICHIGAN FEBRUARY, 2001
FIVE-YEAR REVIEW REPORT MASON COUNTY LANDFILL SUPERFUND SITE LUDINGTON, MICHIGAN FEBRUARY, 2001 I. INTRODUCTION Section 121(c) of the Comprehensive Environmental Response, Compensation and Liability Act
Well Site Spill Protection: Impacts, Trends and Technologies for Preventing Releases to Water Sources
Well Site Spill Protection: Impacts, Trends and Technologies for Preventing Releases to Water Sources Presented by: Tekla Taylor, R.G. and Archie Filshill, Ph.D. InterGEO Services, now a part of Golder
Call today to discuss your solar project: 518-636-0518 or [email protected]
WHO SHOULD CONSIDER APPLYING FOR A NYSERDA GRANT WITH GROSOLAR? WHAT IS THE INITIAL PROCESS? 1) Speak to grosolar about your high energy use or available property. LARGE POWER USERS such as Towns & Cities
Chapter 2 Stormwater Pollution Prevention Plan (SWPPP) for Park Operations
SWPPP for Park Operations 2 Chapter 2 Stormwater Pollution Prevention Plan (SWPPP) for Park Operations Bordered by Lake Washington & Lake Sammamish, the City of Bellevue has more than 60 miles of streams,
Appendix I: BMP Inspection Form CASQA SWPPP Template 91 January2011 BMP INSPECTION REPORT Date and Time of Inspection: Date Report Written: Inspection Type: (Circle one) Weekly Complete Parts I,II,III
Pervious Pavers. By: Rich Lahren. Hebron Brick & Block Supply
Pervious Pavers By: Rich Lahren Hebron Brick & Block Supply Stormwater Management and Control Issues Past emphasis was on flood control Today s emphasis is also on pollution More impermeable areas are
Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control
Town of Elkton & Cecil Soil Conservation District Checklist for Joint Agency Review Stormwater Management / Erosion and Sediment Control Project Name: Tax Map Parcel: Acreage: Plat: ADC Map & Grid Engineering
Challenging Sustainable Goals for Landscape Architects
Challenging Sustainable Goals for Landscape Architects By Barrett L. Kays 11, FASLA Sustainable goals need to challenge landscape architects, our clients, and the public to incrementally solve major environmental
Updates: LUR Rulemaking & FEMA Flood Mapping. Vince Mazzei, PE
Updates: LUR Rulemaking & FEMA Flood Mapping Vince Mazzei, PE New Jersey Department of Environmental Protection Division of Land Use Regulation February 11, 2015 Today s topics: Brief overview of NJ s
STORMWATER POLLUTION PREVENTION PLAN TEMPLATE. 1.0 SITE DESCRIPTION 1.1 Project Name and Location Date
STORMWATER POLLUTION PREVENTION PLAN TEMPLATE Disclaimer: This template was developed for guidance purposes only in an effort to assist Construction Storm Water permit applicants in meeting state and local
Operations and Maintenance Guidelines for Coal Ash Landfills Coal Ash Landfills are NOT the Same as Subtitle D Solid Waste Landfills
Operations and Maintenance Guidelines for Coal Ash Landfills Coal Ash Landfills are NOT the Same as Subtitle D Solid Waste Landfills 1. INTRODUCTION: 2011 World of Coal Ash (WOCA) Conference May 9-12,
Floodplain 8-Step Process in accordance with Executive Order 11988: Floodplain Management. New Jersey Department of Environmental Protection
Floodplain 8-Step Process in accordance with Executive Order 11988: Floodplain Management New Jersey Department of Environmental Protection U.S. Department of Housing and Urban Development Community Development
Number of Full-time Employees at New Jersey Colleges and Universities, Fall 2011
Number of Full-time Employees at New Jersey Colleges and Universities, Fall 2011 N.J. Institute of Technology 426 0 90 389 13 168 9 132 1,227 Rutgers, The State University 3,320 0 224 3,701 391 695 395
1800 Washington Boulevard, Baltimore, MD 21230-1718 www.mde.maryland.gov 410-537-3000 800-633-6101 TTY Users 800-735-2258 Larry Hogan, Governor Boyd
ENVIRONMENTAL SITE DESIGN (ESD) REDEVELOPMENT EXAMPLES OCTOBER 2010 1800 Washington Boulevard, Baltimore, MD 21230-1718 www.mde.maryland.gov 410-537-3000 800-633-6101 TTY Users 800-735-2258 Larry Hogan,
Operations and Maintenance Plan The Residences at Johnson Farm 189 Landham Road Sudbury, Massachusetts. Submitted to: Town of Sudbury
Operations and Maintenance Plan The Residences at Johnson Farm 189 Landham Road Sudbury, Massachusetts Submitted to: Town of Sudbury December 2011 Table of Contents 1.0 Introduction... 1 1.1 Responsibility...
Agua Hedionda Creek Flood Plain Information; Department of Army, Los Angeles District,
Bibliography Agua Hedionda Creek Flood Plain Information; Department of Army, Los Angeles District, California and Maps. US Army Corps of Engineers July 1973 pg. 24 Aqua Hedionda Lagoon Foundation Framework
New Jersey Substance Abuse Monitoring System (NJ-SAMS) Substance Abuse Treatment Admissions 1/1/2013-12/31/2013 Resident of Camden County
New Jersey Substance Abuse Monitoring System (NJ-SAMS) Substance Abuse Treatment Admissions 1/1/2013-12/31/2013 Resident of Camden County Primary Drug Highest School Grade Completed Alcohol 1,278 22% Completed
ALL AWARDS CONFERRED BY INSTITUTION AND GENDER, F.Y. 2008. Men Women Total NJ PUBLIC INSTITUTIONS Num Pct Num Pct Num Pct
ALL AWARDS CONFERRED BY INSTITUTION AND GENDER, F.Y. 2008 N.J. INSTITUTE OF TECHNOLOGY 1,461 74.2% 507 25.8% 1,968 100.0% RUTGERS,THE STATE UNIVERSITY 5,036 44.7% 6,238 55.3% 11,274 100.0% UNIV OF MEDICINE
Tuition and Required Fees, Academic Year 2012-2013
IN-DISTRICT* RATES NJ COMMUNITY COLLEGES Tuition Fees Total Tuition Tuition Fees Total Atlantic Cape Community College $3,060 $675 $3,735 $102.00 $1,224 $270 $1,494 Bergen Community College $3,857 $1,260
Compost-Based Stormwater Best Management Practices Using Compost to Improve Stormwater Management and Erosion Control On Roadsides
Compost-Based Stormwater Best Management Practices Using Compost to Improve Stormwater Management and Erosion Control On Roadsides Chris Newman US EPA Region 5 Chicago, IL Compost-Based BMPs Compost-based
SUPERIOR COURT OF NEW JERSEY CHANCERY DIVISION COUNTY PROBATE PART. [Caption: See Rule 4:83-3 for Probate Part Actions] CIVIL ACTION
SUPERIOR COURT OF NEW JERSEY CHANCERY DIVISION COUNTY PROBATE PART [Caption: See Rule 4:83-3 for Probate Part Actions] IN THE MATTER OF Docket No.: CIVIL ACTION ORDER TO SHOW CAUSE SUMMARY ACTION THIS
K. P. Catlett D. G. Adler U.S. Department of Energy, Oak Ridge, TN. P. D. Moss Science Applications International Corporation, Oak Ridge, TN
PREVENTING WASTE - SUPPORTING CLEANUP: POLLUTION PREVENTION USED IN CONJUNCTION WITH CERCLA ACTIVITIES AT BEAR CREEK VALLEY, OAK RIDGE RESERVATION, OAK RIDGE, TN K. P. Catlett D. G. Adler U.S. Department
How To Amend A Stormwater Ordinance
Regulatory Alternatives to Address Stormwater Management and Flooding in the Marlboro Street Study Area Alternative 1: Amend Existing Local Regulations This proposed alternative provides an incremental
How To Fix A Contaminated Landfill
September 5, 3013 Commissioner Bob Martin New Jersey Department of Environmental Protection 401 East State Street 7 th Floor, East Wing P.O. Box 402 Trenton, New Jersey 08625 RE: Remediation of the Rahway
COMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES. April 20, 2010 EXHIBIT 1
COMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES April 20, 2010 EXHIBIT 1 ELEMENT 4 WATER RESOURCES TABLE OF CONTENTS 4.1 INTRODUCTION 4.2 GOALS AND POLICIES 4.2.A General Goals and Policies 1 4.2.B
CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE
1008 STORM DRAINAGE (3/24/05) 1008.01 PURPOSE To minimize the amount of stormwater runoff resulting from development utilizing nonstructural controls where possible, maintain and improve water quality,
Amherst, Massachusetts: Impediments to Solar Installations on Closed Landfills
Amherst, Massachusetts: Impediments to Solar Installations on Closed Landfills by Robert Hersh 1 The proposed installation of solar photovoltaic arrays on the closed Amherst, Massachusetts municipal landfill
IAC 7/2/08 Agriculture and Land Stewardship[21] Ch 44, p.1
IAC 7/2/08 Agriculture and Land Stewardship[21] Ch 44, p.1 CHAPTER 44 ON-SITE CONTAINMENT OF PESTICIDES, FERTILIZERS AND SOIL CONDITIONERS [Prior to 7/27/88, see 21 Ch 9] PESTICIDES 21 44.1(206) Definitions.
Tuition and Required Fees, Academic Year 2014-2015
IN-DISTRICT* RATES NJ COMMUNITY COLLEGES Tuition Fees Total Tuition Tuition Fees Total Atlantic Cape Community College $3,390 $762 $4,152 $113.00 $1,356 $305 $1,661 Bergen Community College $3,977 $1,290
Helen Mercury Mine EE/CA OPINION OF PROBABLE COST
G Cost Estimates Helen Mercury Mine EE/CA Alternative 2: Limited Action 3 Minor Road Improvements 4 Clear & Grub diversion channel areas 5 Surveying 6 Cleanup & Demobilization 7 Pull back of material 8
Standard Operating Procedures Storm Drain System Maintenance
s Storm Drain System Maintenance SECTIONS 1. Storm Drain System Inspections 2. Storm Drain System Cleaning 3. Storm Drain System Repairs 4. Proper Disposal of Material Storm Sewer System Cleaning Directive
Charter Township of Lansing v. Lansing Board of Water & Light Media Kit. Press Release Timeline Additional Questions Glossary Map Acronym Guide
Charter Township of Lansing v. Lansing Board of Water & Light Media Kit Press Release Timeline Additional Questions Glossary Map Acronym Guide Media Contact: Kathleen Rodgers [email protected]
Activity Yes No N/A Notes
CE 2020 (Rev. 12/11) Page 1 of 5 PROJECT NAME AND SITE ADDRESS: CONTRACT NUMBER: ORACLE NUMBER: WDID NUMBER: CONTRACTOR NAME AND ADDRESS: PROJECT SITE RISK LEVEL: Risk Level 1 Risk Level 2 Risk Level 3
City of Beverly Hills Construction Stormwater Requirement Checklist
City of Beverly Hills Construction Stormwater Requirement Checklist Construction activities are required to retain sediments, non-stormwater runoff and all constructionrelated materials, wastes, spills,
Proposed (Concrete Cutting And Drilling) Environmental Management Plan
SAMPLE ENVIRONMENTAL MANAGEMENT PLAN This EMP is designed for (Concrete Cutting and drilling), however you may insert your business activities with only minor changes needed. This EMP should become part
Package Treatment Plant Policy and Procedure
Package Treatment Plant Policy and Procedure PURPOSE There has been increased interest in the use of package treatment plants for new development proposals in the County. Current review procedures are
SECTION A: LOCAL STORM WATER POLLUTION PREVENTION PLAN
INSTRUCTIONS FOR PREPARING THE LOCAL STORM WATER POLLUTION PREVENTION PLAN City of Hawthorne For sites between 1 and 5 acres As of March 10, 2003, EPA Phase II rules will supercede this document. The Local
Annual Standards and Specifications. Erosion and Sediment Control
Annual Standards and Specifications for Erosion and Sediment Control January 2012 Version: September 15, 2009 INTRODUCTION Virginia Commonwealth University (VCU), Annual Standards and Specifications for
APPENDIX I DEVELOPMENT PROCESS CHECKLIST
APPENDIX I DEVELOPMENT PROCESS CHECKLIST Bureau of Indian Affairs, Western Regional Office 400 N. 5 th St., Two AZ Center/Phoenix, AZ 85004/Telephone/website PRE-DEVELOPMENT PROCESS CHECKLIST This checklist