1 Key Considerations for MANAGING EVALUATIONS Authors: (Brief Reference Guide) Dr. Rita Sonko, Addis Berhanu and Rodwell Shamu Pact South Africa June P age
2 This publication is made possible by the generous support of the American people through the United States Agency for International Development (USAID). The contents are the responsibility of the authors and do not necessarily reflect the views of USAID or the United States Government. 2 P age
3 Pact Inc. Washington, DC Pact 1828 L Street, NW, Suite 300 Washington, DC First Edition, June by Pact All rights reserved Pact is committed to sharing high- quality learning tools and materials with development practitioners throughout the world. Pact demonstrates this commitment by publishing and disseminating books, papers, CD- ROMs and other knowledge resources that represent the best intellectual capital of Pact and its trusted partners. 3 P age
4 OVERVIEW There is a growing appreciation within the development community of the merits of conducting evaluations, and the fact that evaluation is a powerful tool for learning about what works, what does not and the reasons (WorldBank, 2006). As a result, there is increasing investment in evaluation by development actors including efforts to strengthen the quality of evaluations being undertaken. The purpose of this guide is to provide ideas and suggestions on practical considerations and steps in ensuring that evaluations are commissioned and managed effectively. Many of the suggestions are based on practical experience by evaluation managers in the field. KEY CONSIDERATIONS FOR MANAGING EVALUATIONS Managing evaluation starts firstly with gaining consensus on when, what and how to evaluate the program, project or policy. Whose role it is to lead this process really depends on the organizational context and structure. However, monitoring and evaluation (M&E) professionals should be at the forefront of raising awareness about the role and value of evaluations, and working towards creating awareness on evaluation needs in the organization. The following are key points for consideration in ensuring that evaluations are commissioned and managed effectively. 1- Defining the Scope of the Evaluation It is usually helpful to adopt a relatively strict definition of the scope of the evaluation right at the start. Determining what is important and to whom and identifying the essentials to include in the evaluation is significant. This is guided by analyzing the information needs of the program s major stakeholders, as well as identifying the resources available for the evaluation. Experience has shown that during the evaluation process stakeholders may wish to examine almost everything. It is therefore critical that evaluations are focused on those aspects that are determined to be most strategic to evaluate. The evaluation questions that are identified following a consultative process with stakeholders should be the guiding reference in defining the scope of the evaluation. It is also important to consider the different phases and associated activities in conducting an evaluation. It is essential that the evaluation manager and the team understand and document the different steps. The guide below provides a summary of the key activities of the evaluation process. 4 P age
5 KEY PHASES IN CONDUCTING EVALUATION ACTIVITIES (WorldBank, 2006) Phase A: Planning the Evaluation Determine the purpose of the evaluation Identify evaluation goals and objectives Decide on the type of evaluation Review existing information of the program documents including monitoring information Describe the program Develop/refine conceptual framework Assess your own strengths and limitations Put together an evaluation team including stakeholders (based on their competencies and skills) Phase B: Selecting Appropriate Evaluation Methods Formulate evaluation questions and sub- questions Decide on the appropriate evaluation design (methodology for data collection, sample selection and size) Develop an evaluation schedule Develop a budget for the evaluation Phase C: Collecting and Analyzing Information Develop data collection instruments Pre- test data collection instruments Undertake data collection activities Analyze data Interpret the data Phase D: Reporting Findings Write the draft report; share it with stakeholders and revise as needed Complete the final evaluation report Decide on communication strategies for sharing the evaluation results Disseminate evaluation results Meet with project stakeholders to discuss and follow- up on findings Phase E: Implementing Evaluation Recommendations Develop a new/revised implementation plan in partnership with stakeholders Monitor the implementation of evaluation recommendations and report regularly on the implementation progress Plan the next evaluation 5 P age
6 2- Assessing Readiness for Evaluation Once the need for an evaluation has been established, it is important to assess whether or not an evaluation is feasible at this time. Is the project or program able and ready to conduct the evaluation? Judgement must be made based on the context in the organization including the resources available, the likely availability of information essential to the evaluation and the probability that the results of the evaluation could influence change. The International Union for Conservation of Nature (IUCN) offers useful criteria for assessing the feasibility of conducting an evaluation. CRITERIA FOR ASSESSING THE FEASIBILITY OF EVALUATION Timing and stakeholder availability Are there competing demands on staff and other stakeholders right now? Will the people that need to participate in the evaluation be able to do so at this time? Are there other matters that are more pressing? Programme and project design elements Are the objectives, outputs and activities clear enough to be able to evaluate progress, results and impact? Available information Is there adequate information to engage in an evaluation? Financial considerations Are sufficient funds available for the evaluation? Can you raise additional resources? Is the evaluation cost- effective? Are the benefits greater than the costs? Utility Is there a high probability that the evaluation exercise will be used to improve the project or programme? Source: IUCN (2004). Managing Evaluations: A Guide for IUCN Programme and Project Managers, page P age
7 3- Budgeting for the Evaluation Evaluation requires adequate resources and it is important that the budgeting process is comprehensive and covers the various costs related to the evaluation. It is also advisable that when planning a project, budget lines specific to evaluation activities should be included. Some of the costs include personnel, staff time, transportation, logistical costs, volunteers or beneficiaries transportation and sometimes accommodation. The following points emphasize aspects of a good evaluation budget: Relevant program staff should be involved in the budgeting process or consulted about the budget and should be encouraged to give feedback. Cost all elements of the evaluation activities, including volunteers, community activities and time. Include personnel to lead the evaluation activities. Calculate reasonable amount of time to complete evaluation activities. Evaluation and budget activities should be agreed upon by both staff and project donors. Appendix 1 provides a template for planning staff and consultants time or Level of Effort (LoE) in implementing evaluation activities, including a budget line item in each area. This level of detail is essential in enabling managers to budget sufficiently for both internal and external human resources for any given evaluation. A) Who Does the Budgeting? Budgeting of evaluation activities usually is done by project staff responsible for the evaluation activities (This may be an M&E officer or a project coordinator). However, the evaluation budget should be prepared in consultation with other project staff and stakeholders to ensure that appropriate activities and costs are included. B) When to Prepare the Evaluation Budget The evaluation budget should be prepared at the time of planning and drawing budgets for all other program activities. This will help to harmonize costs and activities and suggest which activities can be jointly implemented to avoid duplication and waste of resources. C) How Much Should Be Budgeted for Evaluation? The amount depends on the various needs for evaluation, the complexity of the project, what activities will be implemented, the tools needed, and the capacity needs of the project officers. Some considerations include: Various Donors recommend different budget thresholds for Evaluation; however these tend to range between 3-10% of the overall program budget. It s also important to note that donors tend to have varying policies on what the evaluation budget should cover. Some include all monitoring and evaluation activities while others consider this as budget for only formal evaluations and might consider a separate allocation for monitoring activities. 7 P age
8 The amount of money and time that is available for overall project activities Source of funding; whether the resources are locally raised or donor funded The objectives and scope of the evaluation; whether it is a small- scale or large- scale evaluation Travel costs involved Materials and resources required: paper, photocopying, note books, fuel, telephones, communication, computer hardware and software Person conducting the evaluation (internal program officer or external evaluator) and the skills of that person Participation by community members, leaders and volunteers and if they will need allowances to be paid for their involvement Staff time and labor input of the program people that will be involved D) Obstacles to Good Budgeting for Evaluation There are factors that can inhibit good budgeting for evaluation activities. Projects need to be conscious of these for effective evaluation budgets: Lack of adequate knowledge on the value of evaluation in the project/program life cycle. Some program managers/staff are not aware of what evaluation is and what activities should to be budgeted for under evaluation Minimal priority given to evaluation activities Lack of budgeting skills among project staff and the M&E officers Limited local and donor funding for evaluation activities Organizational structure of the project when M&E/project staff are not involved in the planning and budgeting for project activities, including evaluation activities 4- Selecting an Evaluation Team The evaluation team appropriate for a given evaluation should be determined by the evaluation s rational and overall purpose. Given the wide range of evaluation subjects for any project, program or policy, it is important to determine what needs to be undertaken by internal evaluators versus those that would be best suited for external evaluation. External evaluations have the advantage of being generally viewed as more objective as the evaluator is independent and not part of the program delivery team. This is, however, not necessarily what is most needed if, for instance, the organization wishes to undertake process evaluations to understand how program operations are working in the field. In such cases, an internal team comprising of the program team including field staff would be in a better position to implement a cost effective- evaluation. 8 P age
9 There are several options for conducting evaluation activities, including: Contracting an external evaluator Using both internal and external personnel Using program personnel EVALUATION TEAM MEMBERS SKILLS NEEDED BY THE EVALUATION TEAM ROLES AND SKILLS Evaluation director/team leader Responsible for coordinating the planning and implementation of evaluation activities. This includes supervising project staff and the evaluation team. S/he must have sound knowledge and experience in evaluation, including data analysis and interpretation, and writing and editing of reports. Specialist in the field related to the project. e.g., if the program is HIV/AIDS- related, you would need an HV/AIDS Specialist Guides the planning and implementation of the specific requirements of the program area. Provides technical support, and helps develop sound recommendations. S/he must have in- depth expertise in the area of the program. Program staff members Responsible for implementing the program, but because they are critical stakeholders in the process, they should be included in the evaluation planning, analysis and interpretation processes. Field team may include program staff and other stakeholders including supervisors and interviewers Ideally, all members of the team should be recruited early to enable them to participate in various aspects of the evaluation activities. How the team is comprised and the number of members depends on local resources and the skill set of each person. Community members, who may include program participants and other stakeholders representing community structures or who are interested in the program They also should be recruited early so that they can participate in all stages of the evaluation. Research shows that involving community members in evaluations may result in obtaining better quality data, findings more likely to be used, fostering greater ownership of the M&E processes and the program overall, and developing M&E skills. However, not everyone can be involved in all parts. Whom to involve, how, and in which parts of the evaluation depends on the purpose of the evaluation and available resources. 9 P age
10 Managing the Solicitation Process for External Evaluators The solicitation process often starts with developing and publishing the call for expression of interest- see example in Appendix II. This is usually the first communication that is sent out to the general public (open competition) or to selected potential consultants (limited competition), to let them to know about your organizations intention to undertake an evaluation. In most cases, due to donor solicitation requirements, this call must be published in a newspaper to enable potential consultants to learn about the opportunity. Competitive bidding often prevails over other less complicated options because it is the modus operandi or best suited for demonstrating transparency, for being fiscally responsible and for encouraging competition based on substantive criteria (OECD, 2006). The call for expression of interest must include clear instructions on the application procedure and what steps will be taken to select the best applicant. It is usually a good idea to include multiple rounds in the selection process in such a way that limits excessive time investment for reviewing lengthy submissions. The initial call usually only includes requests to submit a letter of intent and CVs, which are assessed to identify the best 8-10 applicants based on their qualifications and experience. Only these selected 8-10 applicants are then provided with the detailed TOR and requested to participate in the Request for Proposal (RFP) process. The RFP process must include clear guidelines (through the detailed TOR) about how the best proposal will be determined. The selection team/committee usually comprised of key stakeholders whose roles include reviewing all the applications and selecting the most suitable consultant or team to undertake the evaluation. Selecting team members requires a wide range of skills so that they can undertake a comprehensive review of applications and determine which applicant is best suited to meet the needs of the evaluation. Key Questions when Reviewing Bids from Consultant Consortia Is the consortium a reasonable size (not more than 3 organizations as a general rule)? Is the composition if the consortium based on complementary experience, expertise and knowledge? Is there a tactical notion involved that members are selected because of their country of origin? Have different members of the consortium already worked together in comparable settings? Have consortium members agreed on the approach to the methodology and division of labor? Are tasks, duties, responsibilities and income divided in a transparent and fair manner? Has a system of quality assurance been agreed to guarantee adherence to stipulated standards? Are the administration and financial management of the evaluation scattered across the consortium or are they concentrated in the hands of one partners as should be the case? Source: OECD guidelines for managing joint evaluations. Box 7, Page P age
11 Skills required may include, but are not limited, to the following: Evaluation technical expertise, such as evaluation design, data collection and analysis, and report writing Key programmatic- technical skills related to the program being evaluated Programmatic field experience Financial management Contract management Selection Criteria The selection criteria for the wining proposal must be determined upfront and included in the TOR in order to ensure transparency and consistency in the selection process. Specific guidance should be provided to the selection team on how to apply the scoring system. Decision processes for selecting team members should be fully documented in a standardized manner. Some of the common challenges /pitfalls in the solicitation process include: Failure to adhere to a full and open competitive process by unjustifiably soliciting applications from only a few individuals Failure to communicate any changes in the scope or guidance provided to all applicants in order to ensure that they all have the same information and opportunity to respond The selection team members not having the same understanding of the scoring procedure Under- budgeting the time needed to review submissions and communicate outcomes 5- Developing Comprehensive Terms of Reference (TOR) Development of a detailed terms of reference is a critical component and one worth spending a fair amount of time on to ensure that it is done properly. The TOR provides detailed information about the scope of the evaluation, and is usually the basis on which potential evaluators determine the development of a detailed evaluation plan. The TOR is a key element in the evaluation process as it helps to clarify the reasons for the evaluation, flags issues that have become apparent, indicates the general depth and scope required, and clarifies any imperatives for the evaluators (IUCN, 2004). The TOR should be developed after consulting a range of stakeholders in order to ensure that there is general agreement about the evaluation purpose, key objectives and evaluation questions. Below is a sample outline of a TOR. The amount of detail provided in the TOR will depend on how much information is available and on how much influence those commissioning the evaluation want and the way in which the evaluation is designed and conducted. 11 P age
12 TERMS OF REFERENCE OUTLINE I. Introduction A. Background to the Evaluation B. Brief Description of the Program C. Program Objectives and Expected Outcomes/Existing Performance Data II. III. IV. Purpose of the Evaluation A. Key Audiences and Uses B. Purpose and Evaluation Objectives Illustrative Evaluation Questions and Possible Indicators Illustrative Evaluation Methodology A. Evaluation Design and Approach B. Sources of Data and Data Collection Methods C. Sampling Strategy D. Data Analysis Procedures V. Evaluation Team This includes the size, qualifications and skills, language proficiency, areas of technical competence, in- country experience, evaluation methods and data collection skills, facilitation skills, gender analysis skills and participation of stakeholders required by the evaluation team. VI. VII. VIII. IX. Illustrative Scope of Work (SOW) with Key Activities and Deliverables Include an outline for the SOW, including key activities that the consultants will undertake as well as the corresponding deliverables. Administrative and Logistical Support This section includes a description of roles and responsibilities with regards to logistical aspects of managing the evaluation such as scheduling appointments, making travel arrangements. Also included here is a brief description of what resources will be provided to the evaluation team such as the provision of office space, transportation and equipment. Timeframes This provides a brief overview of the general schedule and timing of the evaluation (duration, phasing). Reporting and Dissemination Requirements/Deliverables This includes the evaluation plan, draft report, final report, debriefing in- country and with regional and HQ staff, and PowerPoint presentation. X. Budget This includes the estimated total amount of funds available (or range) for the evaluation. This enables bidding firms to develop a detailed budget as part of their proposal submission. 12 P age
13 Key Considerations for Managing Consultants It is essential that the most appropriate contracting mechanism is identified and used. These may include time and material contracts, fixed price contracts or cost reimbursement contracts. The choice often depends on a number of factors such as the length and scope of the contract, and the abilities and experience of the contractor to manage logistics related to the evaluation. For time and material or cost reimbursement contracts, close monitoring of the budget throughout the lifecycle of the evaluation is essential. These contracting mechanisms are commonly used in instances where costs haven t been fully established or where the organization commissioning the evaluation prefers to directly manage the budget. In the case of fixed price contracts, the detailed budget is negotiated upfront and approved. This negates the need for budget monitoring by the commissioners of the evaluation and all amounts agreed to, are payable to the contractor on submission of deliverables. In developing the evaluator s contract, it s essential to ensure that all standard provisions for contracting are included and that very specific deliverables and timeframes are set in the scope of work. Consultants often have overlapping contracts and in some instances more than one contract in a given time period. In such situations, the consultant will usually do more for the client who follows up closely on the deliverables. Approval of deliverables prior to payment is essential and provides a means for ensuring quality of the final products. It is important to ensure that expectations are clear from the beginning and that systems for tracking progress of the work are established as part of the contract. This could for instance include deliverables that reflect status of the evaluation process: Submission of an evaluation plan, which includes a refinement of the evaluation s objectives, the evaluation questions, and plans and schedule for collecting and analysing data and reporting on the results Submission of field tools prior to undertaking data collection Submission of a field report after data collection Submission of a preliminary data analysis report It is advisable that managers conduct regular checks on the consultant(s) as the evaluation is underway. For long projects, a reporting template outlining clear timeframes is strongly recommended. This must be instituted right from the beginning of the project so as to align expectations. In instances where strict deadlines must be adhered to, offering the consultant office space for the few days of desk review work, report writing and other office functions may prove useful. 13 P age
14 Appendix I: Planning and Budgeting Staff Time Level of Effort (LOE) for the Evaluation 1. Initial Evaluation Conceptualization and Development of TOR Consult major stakeholder groups Task Pact staff Estimated LOE Consultant Develop evaluation purpose, objectives and questions Develop the TOR Solicit evaluation consultants Develop the detailed evaluation plan including data collection instruments [Other] Subtotal 2. Preparing for and Undertaking Data Collection Task Prepare for data collection; contact stakeholders and schedule appointments Estimated LOE Pact staff Consultant Develop data collection instruments, include pilot testing Training field staff on the data collection Oversee data collectors; ensure the quality of data collection [Other] Subtotal 3. Managing Data Design of data entry screen and codebook Task Pact staff Estimated LOE Consultant Train and oversee data entry personnel and data entry Enter data Manage data quality [Other] Subtotal Total 14 P age
15 4. Preparing for and Undertaking Data Analysis Task Plan for data analysis; identify type of analysis for key variables Estimated LOE Pact staff Consultant Prepare the data; include data cleaning, coding and organize the data into a data master set Tabulate data, run data analysis Interpret finding and formulate conclusions and recommendations [Other] Subtotal 5. Reporting and Dissemination Task Develop draft report for review and feedback Estimated LOE Pact staff Consultant Write final evaluation report Prepare to disseminate evaluation findings Host dissemination workshops, meetings, etc. [Other] Subtotal Grand Total 15 P age
16 Appendix II: Example of a Call for Expression of Interest Call for Expression of Interest to Undertake an Evaluation for the Pact SA HIV/AIDS Grant Management Program I. Background: On February 1, 2004 Pact initiated a Rapid Response HIV/AIDS Grants program for South Africa in support of USAID s strategic objective of Increased Use of HIV/AIDS and Other Primary Health Care Services. The Rapid Response HIV/AIDS Program focused on providing grant award and administration services that allowed the U.S. Mission to South Africa to increase the resources available to local organizations implementing programs which addressed key technical focus areas of the President s Emergency Plan for AIDS (PEPFAR). The overall goal sought was to Reduce the impact of HIV/AIDS and improve health care for South Africans Pact, as recipient of the Associate Award, provided USAID/South Africa with a multi- layer program of high quality grants management; targeted, appropriate technical assistance and capacity building; and results reporting, capturing the grant making processes and sub- grantee performance data. The program was slated to run thru September 30, The main program results hypothesis is that the combined effect of grant making and capacity building should result in improved grantee competences to deliver more efficient and high quality programs at a large enough scale that leads to improved prevention practices as well as increased health, emotional and economic well- being of PLWHA and OVC. These changes should result in reduced HIV/AIDS prevalence and improved quality of life and survival of PLWHA and OVC among the target population. The evaluation seeks to determine the extent to which Pact s grant making and capacity building services enhanced the capability of grantees to implement more efficient, high quality and scalable HIV and AIDS programs. II. Key Evaluation Questions The 3 key broad evaluation questions include the following, a. What key features of the Pact SA grant management program enhanced or prohibited successful implementation and achievement of the key program objectives? b. What were the key results, strengths and weaknesses of the capacity development processes implemented by Pact SA under the grant management program? c. What key elements in the Pact SA internal management structure and systems contributed (positively or negatively) to achievement or failure to achieve program results over the implementation period? III. Evaluation Team The evaluation team (Consulting firms or Consortiums/joint venture partnerships) should comprise of individuals with the following expertise Extensive development evaluation experience with substantial work experience in the African context HIV/AIDS programs and grant management expertise Familiarity/experience with the South African HIV/AIDS context, particularly the NGO sector Extensive experience with working with the US government and particularly USAID funded programs Extensive experience with USAID rules and regulations for grants and financial management Wide- ranging Capacity development expertise Vast qualitative research expertise Vast quantitative research experience including statistical expertise IV. Assignment timeframes: The assignment is for a days duration, spread between mid- April and August The Evaluation will include extensive travel to the field as well as interviews with key stakeholders in Pretoria and Washington DC. V. Application Processes: Interested consultants are required to submit a letter of interest including their evaluation profile and experience along with their resumes and references. Based on this, Pact will select candidates that best meet minimum qualifications and experience requirements. The deadline for initial submissions is 9 th April 2009 The selected candidate consultants will be notified by 13 th April and provided with a draft terms of reference based on which they will develop a brief evaluation proposal and budget for submission by 17 th April. Pact s technical review committee will select the winning proposal and notify constituted by Pact. The proposal should include the evaluation methodology, data collection processes as well as a preliminary work plan for completing the work and deliver the outputs. The winning proposal will be selected and consultant(s) notified by 24 th April Interested consultants should submit their initial letter of interest and resume to the MERL Manager at [email protected] no later than 9 th April Only candidates selected for submission of the evaluation proposals will be contacted. 16 P age
17 REFERENCES 1- The World Bank Independent Evaluation Group (2006). Conducting Quality Evaluations under Budget, Time and Data Constraints. 2- International Union for Conservation of Nature and Natural Resources - IUCN (2004). Managing Evaluations: A Guide for IUCN Programme and Project Managers. IUCN, Gland, Switzerland and Cambridge, UK. 3- Organization for Economic Co- operation and Development - OECD (2006). DAC Evaluation series: Guidance for Managing Joint Evaluations. 17 P age
Guidance Note on Developing Terms of Reference (ToR) for Evaluations
Evaluation Guidance Note Series UNIFEM Evaluation Unit October 2009 Guidance Note on Developing Terms of Reference (ToR) for Evaluations Terms of Reference (ToR) What? Why? And How? These guidelines aim
SCOPE OF WORK. Social Work Organizational Development Specialist OVERVIEW OF VOLUNTEER ASSIGNMENT
SCOPE OF WORK Country: Host Site: Partner Organization: Assignment title: Length of assignment: Lusaka, Zambia Social Workers Association of Zambia Zambia Rising Project Social Work Organizational Development
QUAๆASSURANCE IN FINANCIAL AUDITING
Table of contents Subject Page no. A: CHAPTERS Foreword 5 Section 1: Overview of the Handbook 6 Section 2: Quality Control and Quality Assurance 8 2. Quality, quality control and quality assurance 9 2.1
Request for Information RFI-674-16-000100
Request for Information RFI-674-16-000100 PERFORMANCE: Practical Education Research For Optimal Reading and Management: Analyze, Collaborate, Evaluate Issuance Date: April 14, 2016 Closing Date and Time:
Current Employment Opportunities Full Time Staff. Current Vacancies: I. Senior Project Manager / Project Manager... 2
Current Vacancies: I. Senior Project Manager / Project Manager... 2 I. Senior Project Manager / Project Manager Introduction Maxwell Stamp PLC (MSP) is recognised as one of the world s leading development
Terms of Reference for LEAP II Final Evaluation Consultant
UNESCO Office Kabul, Afghanistan November 2015 Terms of Reference for LEAP II Final Evaluation Consultant Post Title: Final Evaluation Specialist Organization: UNESCO Office Kabul Location: Kabul, Afghanistan
REQUEST FOR EXPRESSION OF INTEREST FOR HIRING THREE(3) EXPERT COACHES NO. 010/NCBS-BTC/S/2015-2016
REPUBLIC OF RWANDA NATIONAL CAPACITY BUILDING SECRETARIAT- NCBS P. O. Box 7367 Kigali Rwanda Email: [email protected] Web site: www.ncbs.gov.rw REQUEST FOR EXPRESSION OF INTEREST FOR HIRING THREE(3) EXPERT
All South African citizens and permanent residents with valid work permits at the time of application.
Reference No.: 674-15-1014 Position/Salary Range: Open To: Location: Project Development Specialist Monitoring, Evaluation and Learning FSN-12: R563,713.00 R789, 191.00 (Full performance - Basic Salary)
UNOCHA MYANMAR - VACANCY ANNOUNCEMENT
United Nations B U R E A U D E L A C O O R D I N AT I O N D E S A F FA I R E S H U M A N I T A I R E S Nations Unies O F F I C E F O R T H E C O O R D I N AT I O N O F H U M A N I TA R I A N A F FA I R
Vacancy Notice No. 2015/011
Vacancy Notice No. 2015/011 Everyone Counts: Join the UNFPA team in Myanmar Are you interested in being part of a multi-cultural team delivering a world where every pregnancy is wanted, every birth is
Accredited Continuing Medical Education and Continuing Education for Clinicians
Accredited Continuing Medical Education and Continuing Education for Clinicians REQUEST FOR PROPOSAL RFP # PCO-ACME&CEC2014 August 5, 2014 KEY DATES Request for Proposal Released August 5, 2014 Deadline
Checklist for Reviewing Scopes of Work for Performance Evaluations
Checklist for Reviewing Scopes of Work for Performance Evaluations Use the Evaluation Scope of Work (SOW) Checklist to review and strengthen SOW during the evaluation planning stage. In most cases you
A flexible structure and global reach means that we can quickly respond to our partners' needs, while offering the benefits of economies of scale.
DISCLAIMER: The screening of your application will be conducted based on the information in your profile. Before applying, we strongly suggest that you review your profile to ensure completeness, especially
PROJECT AUDIENCE REQUEST FOR PROPOSAL: Business Plan
CONTENTS Introduction Proposal Submission deadline Background Summary of Goals Project Details o Business Plan Participants Financial Planning o Business structure/leadership model Framework Board governance/structure
The overall aim for this project is To improve the way that the University currently manages its research publications data
Project Plan Overview of Project 1. Background The I-WIRE project will develop a workflow and toolset, integrated into a portal environment, for the submission, indexing, and re-purposing of research outputs
UoD IT Job Description
UoD IT Job Description Role: Projects Portfolio Manager HERA Grade: 8 Responsible to: Director of IT Accountable for: Day to day leadership of team members and assigned workload Key Relationships: Management
ACE PROJECT M&E CONSULTANCY
ASSOCIATION OF AFRICAN UNIVERSITIES ASSOCIATION DES UNIVERSITÉS AFRICAINES ACE PROJECT M&E CONSULTANCY BACKGROUND The Association of African Universities has received financing from the World Bank toward
TOR. Developing Database System for the NGOs Directorate. National Consultant. 180 days (over a period of 6 months)
TOR Developing Database System for the NGOs Directorate National Consultant Period of assignment/services: Duty Station: 180 days (over a period of 6 months) Baghdad Estimated Starting Date: 1 May Contract
Controlling Our Critical Path: A CDOT Guide to Better Project Management Practices
: A CDOT Guide to Better Project Management Practices Project Management practices have been a part of the CDOT culture for many years. However, with a transitioning workforce and increasing demands, it
PUBLIC FINANCIAL MANAGEMENT IMPROVEMENT AND CONSOLIDATION PROJECT (PMICP)
PUBLIC FINANCIAL MANAGEMENT IMPROVEMENT AND CONSOLIDATION PROJECT (PMICP) TERMS OF REFERENCE FOR INFORMATION EDUCATION, COMMUNICATIONS AND CHANGE MANAGEMENT OFFICER 1.0 BACKGROUND 1.1 The Public Financial
Monitoring, Evaluation and Learning Plan
Monitoring, Evaluation and Learning Plan Cap-Net International Network for Capacity Building in Sustainable Water Management November 2009 The purpose of this document is to improve learning from the Cap-Net
Job Opportunities. Date: March 6, 2015. Application deadline: March 16, 2015. Duty station: AFENET Secretariat
Job Opportunities Date: March 6, 2015 Application deadline: March 16, 2015 Duty station: AFENET Secretariat BACKGROUND: The African Field Epidemiology Network (AFENET) is a not for profit, networking alliance
INDIVIDUAL CONSULTANT PROCUREMENT NOTICE. Description of the assignment: National Expert on Public Finance (Open to Thai National only)
INDIVIDUAL CONSULTANT PROCUREMENT NOTICE Date: 1 July 2015 Country: UNDP CO Thailand Description of the assignment: National Expert on Public Finance (Open to Thai National only) Project name: UNDP CO-Thailand
Finding the Right People for Your Program Evaluation Team: Evaluator and Planning Team Job Descriptions
: Evaluator and Planning Team Job Descriptions I. Overview II. Sample Evaluator Job Description III. Evaluator Competencies IV. Recruiting members of your strategic evaluation planning team V. Recruiting
NGO Self-assessment through a SWOT exercise
NGO Self-assessment through a SWOT exercise Step 1: Analyse your NGO s Capacity > page 2 Step 2: Do the SWOT Exercise > page 5 Step 3: Make a Strategic Plan > page 8 Step 4: Implement, Monitor, Evaluate
For Conducting Comprehensive Data Quality Audit among Health Facilities supported by EGPAF Mozambique
REQUEST FOR PROPOSALS #03485 For Conducting Comprehensive Data Quality Audit among Health Facilities supported by EGPAF Mozambique in support of ELIZABETH GLASER PEDIATRIC AIDS FOUNDATION (EGPAF) Firm
LEGAL SERVICES CORPORATION REQUEST FOR PROPOSAL FOR DEVELOPMENT OF E-LEARNING TRAINING COURSE
LEGAL SERVICES CORPORATION REQUEST FOR PROPOSAL FOR DEVELOPMENT OF E-LEARNING TRAINING COURSE OCTOBER 14, 2015 INTRODUCTION Legal Services Corporation (LSC) invites your company to submit a proposal for
Terms of Reference Concurrent Monitoring of Mid Day Meal (MDM) in Odisha
Terms of Reference Concurrent Monitoring of Mid Day Meal (MDM) in Odisha 1. Background The Government of India has initiated a number of social welfare flagship schemes to enable improving status of human
Call for Expression of Interest Consultant
Assessing the way forward for Eco-Industrial Parks The United Nations Environment Programme (UNEP) is looking for a consultant to carry out an analytical baseline study of past and existing technical approaches
ASSAM POWER GENERATION CORPORATION LIMITED
ASSAM POWER GENERATION CORPORATION LIMITED Notice Inviting Expression of Interest for Consultancy in connection of Assam Power Sector Investment Program financed by ADB NIT No. NIT/PMU/05 of 2014-15 Director
Rwanda Governance Board Ikigo cy Igihugu Gishinzwe Imiyoborere Office Rwandais de la Gouvernance JOB ANNOUNCEMENT
Rwanda Governance Board Ikigo cy Igihugu Gishinzwe Imiyoborere Office Rwandais de la Gouvernance JOB ANNOUNCEMENT Reference made to the Cabinet resolution of 15th December 2014 which approved the new structure,
Final Project Evaluation
Version 13.03.06 project UNDP 00037059 / EC 08.ACP.MOZ.014-1 Final Project Evaluation UNDP 00037059 / EC 08.ACP.MOZ.014-1 Enterprise Mozambique Project Terms of Reference 1. PROJECT S BACKGROUND INFORMATION
Public Health Analyst, Myanmar
Public Health Analyst, Myanmar Vacancy code VA/2015/B5506/8444 Position title Public Health Analyst Department/office AEMO, MMOH, Myanmar Duty station Yangon, Myanmar Contract type Local ICA Specialist
Inter-American Development Bank KNOWLEDGE AND LEARNING SECTOR (KNL) TECHNICAL NOTES. No. IDB-TN-421 AFTER ACTION REVIEW
Inter-American Development Bank KNOWLEDGE AND LEARNING SECTOR (KNL) TECHNICAL NOTES AFTER ACTION REVIEW No. IDB-TN-421 June 2012 AFTER ACTION REVIEW Inter-American Development Bank 2012 http://www.iadb.org
REQUEST FOR QUOTES (RFQ) HEALTH COVERAGE ANALYST/PROJECT MANAGER
REQUEST FOR QUOTES (RFQ) HEALTH COVERAGE ANALYST/PROJECT MANAGER Applications Due: Tuesday, June 16, 2015, 12:00 pm I. BACKGROUND The San Mateo County Health System (Health System) mission is to help residents
Responsibility I Assessing Individual and Community Needs for Health Education
CHE Competencies Starting in the early 1990s, three national professional organizations the Society for Public Health Education, the American Association for Health Education, and the American Alliance
MBA Project Handbook
MBA Project Handbook Contents: Section1: General Information... 3 Section 2: Stake Holders... 6 Section 3: MBA Project Lifecycle... 11 Section 4: Grading Plan... 16 1 Purpose of the Document Purpose of
Capacity Assessment Indicator. Means of Measurement. Instructions. Score As an As a training. As a research institution organisation (0-5) (0-5) (0-5)
Assessing an Organization s in Health Communication: A Six Cs Approach [11/12 Version] Name & location of organization: Date: Scoring: 0 = no capacity, 5 = full capacity Category Assessment Indicator As
Children s Bureau Child and Family Services Reviews Program Improvement Plan Instructions and Matrix
Children s Bureau Child and Family Services Reviews Program Improvement Plan Instructions and Matrix October 2007 DRAFT The format of this document was modified in November 2013; however, the content remains
Title: President/CEO. Location: Washington, DC. Reports to: Board of Directors. Position Summary:
Title: President/CEO Location: Washington, DC Reports to: Board of Directors Position Summary: The President/CEO of Africare has primary responsibility for the leadership and growth of this 40- year-old,
Vacancy Notice No. 2015/009
Vacancy Notice No. 2015/009 Everyone Counts: Join the UNFPA team in Myanmar Are you interested in being part of a multi-cultural team delivering a world where every pregnancy is wanted, every birth is
Ghana AIDS Commission. Terms of Reference Data Quality Assessment 2014
Ghana AIDS Commission Terms of Reference Data Quality Assessment 2014 SUMMARY OF SERVICES REQUIRED The Ghana AIDS Commission (GAC) wishes to procure the services of a consultant to conduct a data quality
PRO-NET 2000. A Publication of Building Professional Development Partnerships for Adult Educators Project. April 2002
Professional Development Coordinator Competencies and Sample Indicators for the Improvement of Adult Education Programs A Publication of Building Professional Development Partnerships for Adult Educators
Current Employment Opportunities Full Time Staff
Current Vacancies: I. Senior Project Manager - Project Management Unit (PMU)... 2 II. Human Development and Social Inclusion Consultant and Senior Consultant... 6 I. Senior Project Manager - Project Management
Guide to choosing a Consultant
Guide to choosing a Consultant Contents 1. Background: about this resource... 1 2. The process of selecting, engaging and managing consultants... 1 Stage 1: Do we really need a consultant or contractor
Organizational Capacity Assessment for Community-Based Organizations. New Partners Initiative Technical Assistance (NuPITA) Project
Organizational Capacity Assessment for Community-Based Organizations New Partners Initiative Technical Assistance (NuPITA) Project June 2012 The New Partners Initiative Technical Assistance (NuPITA) project
JHU CCP Zambia Chief of Party
JHU CCP Zambia Chief of Party General Job Description The Johns Hopkins Bloomberg School of Public Health Center for Communication Programs (JHU CCP) seeks a Chief of Party to provide strategic leadership
Sustainability & Transferability Plan
QUALOBSTER SUSTAINABILITY & TRANSFERABILITY PLAN Qualobster Quality Assurance in Learning Organisation in the Banking and Financial Sector in Europe LU/07/LLP-LdV/TOI/156005 Sustainability & Transferability
Youth Business International. Monitoring Evaluation and Learning Consultancy
Youth Business International Monitoring Evaluation and Learning Consultancy Youth Business International (YBI) is recruiting an experienced Monitoring, Evaluation and Learning Consultant to work on two
Request for Proposals Executive Search and Human Resources Development services
Request for Proposals Executive Search and Human Resources Development services 1. Background The International Union for Conservation of Nature, IUCN, hereby invites Proposals from executive search firms/management
PRINCIPLES FOR EVALUATION OF DEVELOPMENT ASSISTANCE
PRINCIPLES FOR EVALUATION OF DEVELOPMENT ASSISTANCE DEVELOPMENT ASSISTANCE COMMITTEE PARIS, 1991 DAC Principles for Evaluation of Development Assistance Development Assistance Committee Abstract: The following
1.0 BACKGROUND 2.0 OBJECTIVE OF ASSIGNMENT
TERMS OF REFERENCE FOR IFMIS PROJECT MANAGER AT THE PUBLIC FINANCIAL MANAGEMENT IMPROVEMENT AND CONSOLIDATION PROJECT, MINISTRY OF FINANCE AND ECONOMIC DEVELOPMENT 1.0 BACKGROUND 1.1 The Public Financial
TERMS OF REFERENCE. Assessing and Strengthening Legal Awareness Raising Initiatives with Youth Bhutan National Legal Institute (BNLI)
TERMS OF REFERENCE Assessing and Strengthening Legal Awareness Raising Initiatives with Youth Bhutan National Legal Institute (BNLI) 1 Contracting Agency: Coordinating Agency: Place: United Nations Development
Programme Specification and Curriculum Map for MA Global Governance and Public Policy
Programme Specification and Curriculum Map for MA Global Governance and Public Policy 1. Programme title MA / PGDip / PG Cert Global Governance and Public Policy: International Development 2. Awarding
Timor- Leste. United Nations Development Programme. Vacancy Announcement
United Nations Development Programme Timor- Leste Vacancy Announcement Project Title: Strengthening Capacities for Disaster Risk Management in Timor Leste Post Title: National Administration and Finance
HEAD OF POLICY AND ADVOCACY
JOB DESCRIPTION JOB TITLE: DEPARTEMENT: LOCATION: REPORTING TO: COUNTRY REPRESENTATIVE - SENEGAL PAN- AFRICAN PROGRAMME DAKAR, SENEGAL HEAD OF POLICY AND ADVOCACY BACKGROUND & ORGANISATIONAL CONTEXT ACORD
Vacancy Announcement (SVNMM066)
Vacancy Announcement (SVNMM066) The International Organization for Migration (IOM) office in Yangon, a Geneva based international organization with over 150 offices world wide, is seeking qualified professionals
Best Practice in Design of Public-Private Partnerships (PPPs) for Social Infrastructure, particularly in Health Care and Education
EMAIL [email protected] WEB www.fosterinfrastructure.com Best Practice in Design of Public-Private Partnerships (PPPs) for Social Infrastructure, particularly in Health Care and Education
Creating a Network to Support the LGBT Community
Funding Opportunity Title: S-ND-POL-15-001 CFDA Number: 19.345 Department of State Bureau of Democracy, Human Rights and Labor Date Opened: 8/4/2015 Contact: Political Grant Applications Manager, U.S.
RAOB / ANBO. POSITION DESCRIPTION Closing Date: 24 September 2014
RAOB / ANBO POSITION DESCRIPTION Closing Date: 24 September 2014 Project: Strengthening the institutions for transboundary water management in Africa (SITWA) Position Title: ANBO/GWP/SITWA Project Manager
Request for Proposals for consulting services: Independent review of the ICANN Address Supporting Organization (ASO)
Request for Proposals for consulting services: Independent review of the ICANN Address Supporting Organization (ASO) Deadline for applications: 31-January-2011 ASO review ToR Page 1/10 1 Instructions to
TOR - Consultancy Announcement Final Evaluation of the Cash assistance and recovery support project (CARSP)
TOR - Consultancy Announcement Final Evaluation of the Cash assistance and recovery support project (CARSP) Organization Project Position type Adeso African Development Solutions and ACTED - Agency for
FOR USE WITH PPP PROJECTS 1 SAMPLE GUIDELINES FOR PRE-QUALIFICATION AND COMPETITIVE BIDDING PROCESS 2
FOR USE WITH PPP PROJECTS 1 SAMPLE GUIDELINES FOR PRE-QUALIFICATION AND COMPETITIVE BIDDING PROCESS 2 1. PRE-QUALIFICATION 1.1 The requirements for pre-qualifications will be reasonable and efficient and
Advertisement on Behalf of Ministry of Industry. Terms of Reference. Development of Industry Information System (IIS)
Advertisement on Behalf of Ministry of Industry Terms of Reference Development of Industry Information System GENERAL INFORMATION Services/Work Description: Development of Industry Information System (IIS)
Terms of Reference for a Short Term Consultancy to Develop Training Materials and Conduct Training on HIV M&E in Zanzibar
Zanzibar AIDS Commission Terms of Reference for a Short Term Consultancy to Develop Training Materials and Conduct Training on HIV M&E in Zanzibar Revision: 9 March 2006 1. BACKGROUND: HOW THE ZAC S ROLE
TERMS OF REFERENCE 1 BACKGROUND. 1.1 About WSUP. 1.2 WSUP s approach to gender
TERMS OF REFERENCE December 2015 Developing a comprehensive outline of real-life examples and projects to demonstrate the extent to which the specific WASH needs, preferences and rights of women and girls
Building a Strategic Workforce Planning Capability at the U.S. Census Bureau 1
Building a Strategic Workforce Planning Capability at the U.S. Census Bureau 1 Joanne Crane, Sally Obenski, and Jonathan Basirico, U.S. Census Bureau, and Colleen Woodard, Federal Technology Services,
OFFICE OF INSPECTOR GENERAL
OFFICE OF INSPECTOR GENERAL AUDIT OF THE PROCUREMENT PROCESS FOR A NATIONAL IDENTIFICATION CARD AND PASSPORT SYSTEM FINANCED BY THE MILLENNIUM CHALLENGE CORPORATION AND MONITORED BY USAID/PARAGUAY AUDIT
Section 7. Terms of Reference
APPENDIX-A TERMS OF REFERENCE UNION-LEVEL TECHNICAL ASSISTANCE TO PROVIDE INSTITUTIONAL SUPPORT TO THE MYANMAR NATIONAL COMMUNITY DRIVEN DEVELOPMENT PROJECT I. INTRODUCTION IDA GRANT H814MM FY 2013-16
TADAT TAX ADMINISTRATION DIAGNOSTIC ASSESSMENT TOOL PROGRAM DOCUMENT
TADAT TAX ADMINISTRATION DIAGNOSTIC ASSESSMENT TOOL PROGRAM DOCUMENT December 2013 Multi-donor Trust Fund -For- A TAX ADMINISTRATION DIAGNOSTIC ASSESSMENT TOOL (TADAT) PROGRAM DOCUMENT DECEMBER 2013 ii
Develop and maintain systems of internal controls to ensure appropriate spending and to safeguard financial assets of the network.
Director of Finance Organization Position Title Reporting To Category Status Duty Station Closing Date Start Date Application Submission African Institute for Mathematical Sciences Next Einstein Initiative
TERMS OF REFERENCE. Development of Referral Pathway guidelines on health services for children detected with impairments or disabilities
TERMS OF REFERENCE I. GENERAL OVERVIEW: Title of Program: Title of Project: Title of Consultancy: Mother and Child Health (MCH) Inclusive Healthcare (IHP) Development of Referral Pathway guidelines on
The Embassy of Sweden in Addis Abeba
Ref. No.UM2015/11212/ADDI The Embassy of Sweden in Addis Abeba Invites Tenderers Regarding Framework Agreement for Local Audit Services The Embassy intends to enter into contract with not more than three
Step 1: Analyze Data. 1.1 Organize
A private sector assessment combines quantitative and qualitative methods to increase knowledge about the private health sector. In the analytic phase, the team organizes and examines information amassed
TERMS OF REFERENCE. National Business Operations Strategy (BoS) Consultant. PROCUREMENT NOTICE No. UNDP/IC/2013/008
TERMS OF REFERENCE National Business Operations Strategy (BoS) Consultant PROCUREMENT NOTICE No. UNDP/IC/2013/008 Country: Monrovia, Liberia with travel to UN joint field offices at the county level where
THE TOWN OF UNIVERSITY PARK REQUEST FOR BID PROPOSALS FOR AN. EVALUATION CONSULTANT for ENERGY EFFICIENCY PROGRAM and SOCIAL MARKETING
THE TOWN OF UNIVERSITY PARK REQUEST FOR BID PROPOSALS FOR AN EVALUATION CONSULTANT for ENERGY EFFICIENCY PROGRAM and SOCIAL MARKETING CONTRACT UP-2012-02 Issued by: Town of University Park STEP UP Program
Teaching and Learning Methods
Programme Specification (Postgraduate) Date amended: 1. Programme Title (EdD) 2. Awarding body or institution University of Leicester 3. a) Mode of Study part time b) Type of Study postgraduate research
pm4dev, 2007 management for development series Introduction to Project Management PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS
pm4dev, 2007 management for development series Introduction to Project Management PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS PROJECT MANAGEMENT FOR DEVELOPMENT ORGANIZATIONS A methodology to manage
The U.S. President s Emergency Plan for AIDS Relief (PEPFAR) PPP Incentive Fund Round 3 Guidance & Application Packet
The U.S. President s Emergency Plan for AIDS Relief (PEPFAR) PPP Incentive Fund December 2013 Contents 1. Overview...3 2. What is a PPP?...3 3. Overview of the PPP Incentive Fund Round 3...4 3.1 Tiered
How To Teach The Cambridge Philosophy Course
Programme Specifications MASTER OF PHILOSOPHY PUBLIC POLICY 1 Awarding body University of Cambridge 2 Teaching institution Department of Politics and International Relations 3 Accreditation details None
United Nations Core Values: Integrity, Professionalism, Respect for Diversity
DISCLAIMER: The screening of your application will be conducted based on the information in your profile. Before applying, we strongly suggest that you review your profile to ensure completeness, especially
ADVERTISEMENT. Markets for Change / M4C Communications and Monitoring & Evaluation Officer (SC SB-4)
ADVERTISEMENT Vacancy Announcement No. 2016/11 The UN Women Fiji Multi Country Office (MCO) seek to recruit a suitably qualified Solomon Islands national for the following position to be based in Honiara,
STRATEGIC REVIEW OF HUMAN RESOURCE MANAGEMENT IN UNICEF. Terms of Reference July 20 2005
1. Background STRATEGIC REVIEW OF HUMAN RESOURCE MANAGEMENT IN UNICEF Terms of Reference July 20 2005 UNICEF has decided to undertake a Strategic Review of its approach to and performance in Human Resource
2.1 STAGE 1 PROJECT PROCUREMENT STRATEGY
APM Procurement Guide : Draft7_RevA_Chapter 2.1_Project Procurement Strategy_Jan12 1 2.1 STAGE 1 PROJECT PROCUREMENT STRATEGY In this stage, the project definition is developed so that decisions can be
PROPOSAL ACRONYM - ETN / EID / EJD (delete as appropriate and include as header on each page) START PAGE MARIE SKŁODOWSKA-CURIE ACTIONS
START PAGE MARIE SKŁODOWSKA-CURIE ACTIONS Innovative Training Networks (ITN) Call: H2020-MSCA-ITN-2015 PART B PROPOSAL ACRONYM This proposal is to be evaluated as: [ETN] [EID] [EJD] [delete as appropriate]
The Committee of Sponsoring Organizations of the Treadway Commission
The Committee of Sponsoring Organizations of the Treadway Commission Request for Proposal to Develop Additional Application Guidance on Monitoring, Including Tools and Techniques October 17, 2006 The Committee
The Communications Audit NEVER MORE RELEVANT, NEVER MORE VALUABLE:
WHITE PAPER The Communications Audit NEVER MORE RELEVANT, NEVER MORE VALUABLE: VALUE PROPOSITION OBJECTIVES METHODOLOGY BY GARY DOLZALL CHIEF COMMUNICATIONS OFFICER I. INTRODUCTION: THE VALUE PROPOSITION
PARTICIPATORY SELF-EVALUATION REPORTS: GUIDELINES FOR PROJECT MANAGERS
PARTICIPATORY SELF-EVALUATION REPORTS: GUIDELINES FOR PROJECT MANAGERS 1 Table of Contents Background A. Criteria B. Definition C. Rationale D. Initiator E. Timing F. Planning G. Involvement of the Independent
Job Profile. Component Manager, Deepening Democracy Democratic Governance Facility (Senior Adviser (N1)) Uganda
Job Profile Component Manager, Deepening Democracy Democratic Governance Facility (Senior Adviser (N1)) Uganda Reference number: DK-00237-2016/UGA.01-W 1. Preliminary 1.1. Short background: In 2011, eight
REQUEST FOR PROPOSAL. Provision of Content for the Digital Business Academy. Issued by: Tech City UK
REQUEST FOR PROPOSAL Provision of Content for the Digital Business Academy Issued by: Tech City UK Date of issue: 23 February 2015 This document is an invitation for proposals to provide content for s
University of Wisconsin Platteville IT Governance Model Final Report Executive Summary
University of Wisconsin Platteville IT Governance Model Final Report Executive Summary February 2013 Project Objectives & Approach Objectives: Build on the efforts of the Technology Oversight Planning
TERMS OF REFERENCE INTEGRATED SOCIAL PROTECTION AND LABOUR PROJECT Social Marketing Parenting Consultant
TERMS OF REFERENCE INTEGRATED SOCIAL PROTECTION AND LABOUR PROJECT Social Marketing Parenting Consultant BACKGROUND SOCIAL SAFETY NET REFORM IN JAMAICA In 2000, Jamaica embarked on a programme to reform
UNSOLICITED PROPOSALS
UNSOLICITED PROPOSALS GUIDE FOR SUBMISSION AND ASSESSMENT January 2012 CONTENTS 1 PREMIER S STATEMENT 3 2 INTRODUCTION 3 3 GUIDING PRINCIPLES 5 3.1 OPTIMISE OUTCOMES 5 3.2 ASSESSMENT CRITERIA 5 3.3 PROBITY
FY 2016 ANNUAL PERFORMANCE PLAN
FY 2016 ANNUAL PERFORMANCE PLAN NSF s FY 2016 Performance Plan reflects NSF s priorities as identified through its planning and budget process. The table below provides a summary of NSF s performance goals
FY 2015 Senior Professional (SP) Performance Appraisal System Opening Guidance
Office of Executive Resources Office of the Chief Human Capital Officer U.S. Department of Energy FY 2015 Senior Professional (SP) Performance Appraisal System Opening Guidance Table of Contents Contents
Technical guidance note for Global Fund HIV proposals in Round 11
Technical guidance note for Global Fund HIV proposals in Round 11 UNAIDS I World Health Organization I August 2011 Rationale for including the development of a system in the proposal With the global momentum