AC : USING BUILDING INFORMATION MODELING TO TEACH MECHANICAL, ELECTRICAL, AND PLUMBING COORDINATION
|
|
|
- Alvin Clarke
- 10 years ago
- Views:
Transcription
1 AC : USING BUILDING INFORMATION MODELING TO TEACH MECHANICAL, ELECTRICAL, AND PLUMBING COORDINATION Thomas Korman, California Polytechnic State University Lonny Simonian, California Polytechnic State University American Society for Engineering Education, 2010 Page
2 Abstract Using Building Information Modeling to Teach Mechanical, Electrical, and Plumbing Coordination The coordination of mechanical, electrical, and plumbing (MEP) systems has become a major challenge for project delivery teams. The MEP coordination process involves locating equipment and routing Heating, Ventilating, and Air-Conditioning (HVAC) duct, pipe, electrical raceway, and fire protection systems in a manner that satisfies many different types of constraints. For the past several years MEP coordination has involved sequentially comparing and overlaying drawings from multiple trades, in which representatives from each MEP trade work together to detect, and eliminate spatial and functional interferences between MEP systems. This multi-discipline effort is time-consuming and expensive. With the recent development of Building Information Modeling (BIM) this process has been able to evolve with the software technology thus enabling new teaching methods. This paper demonstrates how BIM technology can be used to teach students how to perform the MEP coordination process using a work process utilizing modeling software and information technology. Introduction and Background In recent years, there has been increasing consideration given to integrated curricula by construction engineering and management faculty and industry advisors. According to Hauck and Jackson 5 each proposal has tried to address core problems associated with an overly segmented curriculum and the lack of project based learning in different ways. A model proposed by Hauck and Jackson 5 attempts to teach construction management as a series of labs integrating the various construction management courses into an active, applied learning experience. Their integrated curriculum proposal for the construction management department is centered on the creation of seven projectbased seminars. They are as follows: Fundamentals of Construction Management Residential Construction Methods Commercial Building Construction Methods Heavy Civil Construction Methods Specialty Contracting Construction Methods Construction Jobsite Management Interdisciplinary Project Management A new curriculum recently adopted at California Polytechnic State University, San Luis Obispo (Cal Poly) is based on a model similar to that proposed by Hauck and Jackson 5. Students receive six (6) quarter-hours of lab credit for a total of sixteen (16) contact hours per week. Similar to a studio in an architecture curriculum, each seminar is taught in a dedicated lab filled with models, samples, contracts, marketing documents, specifications, estimating guides, computer references, and other tools appropriate to that market sector, all available to students in that seminar. Page
3 The concept for the specialty contracting construction management seminar was to emphasize the work of specialty contractors who fabricate and install mechanical, electrical, and plumbing (MEP) systems. Their work is characterized by the construction industry as being specialized and requiring a considerable amount of coordination to locate equipment and route connecting elements for each system to avoid physical interferences, ensure system functionality, and remain in compliance with differing types of criteria 6. During the academic year, a pilot lab course was developed and offered at Cal Poly for construction management and engineering students. The course curriculum focused on integrating the course content of mechanical electrical and plumbing systems with regard to design, construction, and coordination issues commonly found among specialty contractors. As noted above, the integrated curriculum model described by Hauck and Jackson 5 has the potential to provide tremendous opportunities to engage teaching strategies far beyond the common lecture approach typically utilized in many single subject courses. Various methodologies such as cooperative learning require students to be active participants in their own education 2. Therefore, to take advantage of the studio-laboratory format of the integrated curriculum, an in-depth laboratory exercise was developed focusing on the use of Building Information Modeling (BIM) technology as a tool to perform MEP coordination in order to enhance student learning. The following sections describe the design of laboratory exercise, including the learning objectives and outcomes assessments. Mechanical Electrical and Plumbing Coordination MEP systems are the active systems of a building that temper the building environment, distribute electric energy, allow communication, enable critical manufacturing process, provide water and dispose of waste 8. MEP systems have increased in scope on many types of projects, due to the increased requirements by building users. With the need for increased functionality of these systems, projects now include much more than the traditional MEP systems. The active systems of a building can cost up to 60 percent of the total building cost 8 and their scope now includes additional systems such as fire detection/protection, controls, process piping, and telephone/datacom. Although many of these systems seem similar in nature, different specialty contractors often install them. MEP coordination is defined as the arrangement of the building system components that must fit within the constraints of the building architecture and structure. MEP coordination is a critical activity for efficient construction and acceptable system operation. Building systems must fit within the constraints of the envelope defined by the architectural and structural systems, and meet performance expectations for comfort and safety. The MEP coordination process involves defining the locations for components of building systems, in what are often congested spaces, to avoid interferences and to comply with diverse design and operations criteria. The level of difficulty associated with this process directly relates to the complexity and number of building systems in a facility 7. Ideally, the result of a coordination effort is the most economical arrangement that meets critical design criteria and performance specifications. Many construction industry professionals have cited MEP coordination as one of the most challenging tasks encountered in the delivery process for construction projects 9. Page
4 In the past, there has been a wide variation in the level of technology used in the MEP coordination process. At the low-tech end of the spectrum, specialty contractors drafted plan-views on translucent media and prepare section-views when necessary. At the other extreme, progressive contractors have used three-dimensional (3-D) computer-aided-design (CAD) software to improve the process. With the recent development of BIM technology software, the process has gravitated toward the use of BIM technology as BIM is becoming standard practice now for large-scale projects and is able to provide more efficient coordination, scheduling, and cost estimating. BIM has been defined as the process of creating an intelligent and computable 3-D data set and sharing the data among the various types of professionals within the design and construction team. BIM technology enables the designer, engineer and builder to visualize the entire scope of a building project in 3-D and as well as attached schedule and cost data to the 3-D model and therefore is ideal for being able to assist improve the collaboration among project participants. Designers and builders can plan-out, in precise detail, the location and clearances needed for a complete and successful project. Therefore, the authors idea was to utilize BIM technology software to enhance student-learning experience as is relates to MEP coordination. MEP Coordination Laboratory Exercise: Learning Objectives MEP coordination is only one link in the chain of coordination events. It is the arrangement of various building system components, which are critical to the building functioning properly. The MEP coordination process involves defining the exact location for each building system component throughout the building to comply with diverse design and operations criteria. Often specialty contractors must arrange components in congested areas to avoid interferences with the architecture, structure, or other building system components. The process is a multi-disciplinary effort with input from many people. Iterative in nature, the process requires many revisions. This process occurs only after engineers have completed preliminary design drawings and results in a final set of coordination drawings. The current practice for MEP coordination is for design consultants, or design-build contractors who perform design, to design each MEP system independently. They prepare diagrammatic drawings indicating desired equipment locations and routing paths for their system. With this background for each type of system, coordination takes place by sequentially overlaying and comparing each system 6. This involves all the specialty contractors, including HVAC, process piping, plumbing, electrical, fire protection, controls, etc. The integrated course described above was designed to introduce students to the scope and impact of MEP systems for buildings, which included heating, ventilation, air-conditioning, plumbing, and fire protection, while the electrical systems include power, grounding, lighting, communication, and fire detection. Page
5 The MEP coordination laboratory exercise was designed to expose students to the detailed knowledge of the active building systems which form a key part of buildings and plants. The approach taken was to analyze the need, scope, design, and construction of these systems as well as address the design-construction integration issues for each system. Therefore, the MEP coordination laboratory exercise was developed and presented with the following learning objectives: Define the need and purpose for active MEP building systems Describe how building systems work, how they are designed, how they fit with architectural and structural systems, and what they include Enhance collaboration and communication between participants in a project Describe how building systems are built, how long it takes, how much it costs Recognize shared knowledge of building systems for design-construction integration Analyze a system design, estimate materials and components used, and create installation work packages for building systems MEP Coordination Process: Teaching Methodology In a typical course section offering, student count ranges from 20 to 24 students. Therefore the teaching methodology centered on creating student work groups of 3 to 4, each representing a different MEP system. The methodology selected to teach the MEP coordination process, utilizing BIM technology software, began with the student work groups being provided with project documents (electronically) in 2-D format (dwg, pdf, etc) and a project description from which the model is required to be built from. The student work groups are then required to produce a model of their system in 3-D. Using a software integration tool, the system models are merged into a common 3-D CAD model, where a clash detection software application is then activated to identify physical interferences. Within the software integration tool, the CAD model can then be modified to resolve interferences. Following the resolution of all interferences, separate drawings for fabrication and installation are then produced for each system 6. There are many good 3-D graphical representation software programs that the designer and builder can use to model their project. Graphisoft s ArchiCAD allows one to draw in 3-D or import a 2- D drawing and create a 3-D model. This program allows you to toggle back and forth from 2-D to 3-D with the click of a mouse. Autodesk s AutoCAD is a 2-D drafting program coupled with Revit creating the 3-D model. Bentley s MicroStation, Vico s Constructor, and Tekla Structures are other powerful 3-D modeling programs. There are also many examples of BIM technology software integration tools. These are considered to the Rosetta Stones that are able to interpret many of the modeling tools mentioned above. Autodesk s NavisWorks is a software program that interprets all of the other software programs used by various subs and engineers. NavisWorks has the potential to unlock and or interpret the other 2-D CAD drawings. The program identifies the clashes and the individual specialty contractors need to revisit their own software programs and revise them in order to resubmit. NavisWorks will then reanalyze the new composite model; ideally, there are fewer or no clashes Page
6 remaining. Other integration tools include Solibri and Ideate. The suggested methodology presented to the student work groups to follow begins with the HVAC sheet metal to be compared against the structure, sanitary drainage, process piping, water distraction, and electrical. HVAC sheet metal is used as a base because it has the largest components, primarily composed of large ductwork and variable-air-volume (VAV) boxes. It is often the hardest to relocate because the large duct sizes restrict the routing to a few locations where adequate space is available. The sanitary drainage system is recommended to be compared next. This includes all horizontal graded waste lines, vertical soil stacks, and vent lines. The requirement to slope all graded lines and waste lines to allow for gravity flow gives the plumbing system the next highest level of priority after the HVAC dry system. The gravity drain lines typically slope 1/8 inch for every foot. This requirement forces the drain lines to compete with the large HVAC dry ducts at the higher elevations because they must start as high as possible to maintain the grade without falling below the ceiling tiles. Engineers route HVAC dry ducts at higher elevations because of their large volume. The HVAC process piping is next, which includes heating and cooling water lines. These piping lines feed directly into the HVAC sheet metal to heat and cool air at various interface points. The HVAC sheet metal and HVAC process piping systems work together and must be tightly coordinated. Routing of the HVAC wet system is based on the HVAC dry system routing and location. Where manufacturing process piping is included in a building structure, it would be coordinated following the HVAC process piping system. Most manufacturing process piping systems are pressure-driven and thus can yield to larger building system components and gravity-driven system lines that are more difficult to re-route due to the risk of affecting their functionality. In cases where a special routing is required for process piping to function at its optimal performance level, engineers assign priority to the manufacturing process-piping system. Where fire protection piping system is included in the building structure, it would be coordinated following the manufacturing process piping system. This is a pressure-driven system; however, the fire protection main lines must be slightly graded to allow scheduled draining as required by operations and maintenance. This complicates the coordination of the main lines. Specialty contractors are advised to compare drawings individually with HVAC sheet metal, HVAC process piping, and sanitary drainage systems. Water distribution piping is recommended to be compared next. This includes potable hot and cold water distribution plumbing lines. Water distribution systems are pressure-driven systems and therefore are easier to re-route around larger components. Consideration of the electrical system follows the water distribution system. Engineers consider the electrical system to be one of the more flexible systems because the components are generally smaller and installers can easily route electrical conduit in the field. The control systems and Page
7 telephone/datacom systems should be coordinated last if a CAD file is produced for them. The control system is the most flexible because of its smaller diameter tubing and conductors. Components in the control system run along-side other systems, such as HVAC dry and process piping. Representatives from each of the student work groups then hold a series of meetings to coordinate their drawings by defining the final routing for each system. Common constraints for the student work groups to consider in routing MEP systems are corridors, openings in shear walls, and architectural requirements, such as ceiling type and interstitial space. Each trade initially routes their system to their own advantage. This includes decreasing overall length, routing close to support points, choosing prime locations for major components, and locating system runs to facilitate the construction needs of their own trade. During coordination meetings, the participating student work groups compare preliminary routing for their systems to identify and resolve conflicts. They also decide which trade(s) will revise their design and submit requests for information (RFI) regarding problems that require an engineering resolution. Deliverables of the project include the following: the building information model, coordinated utility relocation plan, constructability/discrepancy report, and survey/layout points. The student groups are required to submit the deliverables in native format, as well as a Navisworks TM Document), 3D DWG, or IFC for Model and PDF for all other documents. The student work groups are also required to present their results at the end of the project as well as demonstrate the model, the processes, and how it is incorporated into the deliverables. MEP Coordination Challenges: Outcomes Assessment Integrating the course content of MEP systems for construction management students is one approach to help change students and future constructors thinking to look at MEP systems as a whole, rather than as independent systems, which helps to enhance and reinforce learning by arranging content around overlapping concepts and themes 1. The increased use of the BIM technology software in the classroom is able to reinforce connection points between the multiple systems. The student work groups using BIM technology emulated the MEP coordination process where representatives from each specialty construction trade work together to detect, and eliminate, spatial and functional interferences between MEP systems 9. To accomplish the laboratory goals, the students were forced to consider design, construction, and operations and maintenance criteria in order to achieve proper functioning systems. Compared to students being taught via the traditional lecture mode, the cooperative environment provided a forum in which a deeper understanding of the material could take place and motivation could be placed on learning and achieving a common goal 3. The use of BIM technology software encompasses many of the seven principles of good practice for education by encouraging contact between students and faculty, developing reciprocity and cooperation among students, encouraging active learning, giving prompt feedback, and respecting diverse talents and ways of learning. It allowed an enhanced level of student-faculty contact by allowing the students and faculty to work together in a fashion other than the traditional lecturer-listener relationship that is most commonly Page
8 found. It encouraged students to work with their peers and the faculty member to achieve the above listed learning outcomes. It also encouraged active learning by experimentation and gave students prompt feedback by allowing students to identify interferences throughout the coordination laboratory exercise. It also allowed students to learn in a multitude of ways by allowing students of all learning styles to develop from the laboratory experience. From our observations kinesthetic learners benefited from the data entry, visual learners benefited from being able to observe the clash detections, and auditory learners benefited from working in student groups by either giving or receiving instructions and negotiating coordination changes. Discussion and Recommendations for Future Implementations MEP coordination has become a major challenge for projects. The need for MEP coordination has grown out of the lack of detailed design provided for fabrication and installation of building systems. The current conditions in the design and construction industry drive current practice for MEP coordination and create an opportunity for improvement. MEP coordination requires considerable time from scarce experts who have specialized knowledge about the design, construction, operation, and maintenance of these systems. Thus, the current work process offers major opportunities to improve, and BIM provides a foundation in which the process can be improved. There are many challenges in teaching MEP coordination to students using the current work process; however, BIM technology software provides a new method of instruction. As described above, effective MEP coordination requires recalling and integrating knowledge regarding design, construction, operations, and maintenance of each MEP system. Missing from BIM models is that knowledge regarding each system. A revised work process utilizing BIM still requires individuals to meet and share knowledge regarding their system. Currently, BIM can only assist in resolving physical conflicts; however, coordination must satisfy critical design criteria, evaluate constructability issues, and address operations and maintenance concerns. During coordination, trades must consider all aspects from design, construction, and operations and maintenance. Currently, it is difficult to integrate construction knowledge, and operations and maintenance into the MEP coordination process. Often the parties involved do not take the opportunity to align goals and define requirements. In addition, constructability issues are not considered part of the MEP design consultants scope of work, and designers must make assumptions about constructability or ignore the issue totally. Furthermore, there is a lack of understanding between the different MEP trades. Each discipline focuses on its own design and construction requirements. Failing to consider the big picture, many MEP contractors are unaware of unique installation requirements for other trades and are reluctant to learn more about or consider each other s systems. Implementing a revised work process that uses information technology that is able to integrate a number of knowledge bases design criteria, construction, operations, and maintenance into a BIM system could provide valuable insight to engineers and construction personnel assisting them in resolving coordination problems for multiple MEP systems. Page
9 Acknowledgments We would like to thank and acknowledge the College of Architecture and Environmental Design and the construction management department for providing a dedicated lab and classroom space to implement the integrated mechanical and electrical course for specialty construction as well as Bergelectric for their donation of electrical materials used in the interactive learning stations. In addition, we would like to thank and acknowledge Hal Johnston, Professor of Construction Management at Cal Poly, who encouraged the active learning and lab activities to foster student learning. Bibliography 1. Bonds, C.; Cox, C. III; and Gantt-Bonds, L. Curriculum Wholeness through Synergistic Teaching. The Clearing House 66/4 (1993): Bonwell, C.C. and Eison, J.A. Active Learning: Creating Excitement in the Classroom. ASHE-ERIC Higher Education Report No. 1, George Washington University, Felder, R.M. and Brent, R. Cooperative Learning in Technical Courses: Procedures, Pitfalls, and Payoffs. ERIC Document Reproduction Service Report ED , Hanna, Awad S., Russell, Jeffery S., Gotzion, Timothy W., and Nordheim, Erik V., Impact of Change Orders for Mechanical Construction, Journal of Construction Engineering and Management, Volume 125, No. 5., May/June 1999, pp Hauck, Allan J. and Jackson, Barbara J., Design and Implementation of an Integrated Construction, ASC Annual Conference Proceedings, Cincinnati, Ohio, April Korman, Thomas M., and Tatum, C.B. "Prototype Tool for MEP Coordination" ASCE Journal of Computing in Civil Engineering, January/February 2006 issue (vol 20, no. 1, pp 38). 7. Riley, David and Sanvido, Victor, Space Planning for Mechanical, Electrical Plumbing and Fire Protection Trades in Multi-story Building Construction, Proceedings of the 5th ASCE Construction Congress, Minneapolis, MN, October 4-8, 1997, pp Tao, William K. Y., and Janis, Richard R., Mechanical and Electrical Systems in Buildings, Prentice Hall, Columbus, Tatum, C.B. and Korman, Thomas M., "Coordinating Building Systems: Process and Knowledge," ASCE Journal of Architectural Engineering, December 2000 issue (vol. 6, no. 4, pp. 116). Page
Building Information Modelling (BIM); How it Improves Building Performance. R.P. Kumanayake Lecturer, Department of Civil Engineering
Building Information Modelling (BIM); How it Improves Building Performance R.P. Kumanayake Lecturer, Department of Civil Engineering R.M.P.S. Bandara Lecturer, Department of Mechanical Engineering Faculty
The use of BIM in plumbing projects creates deeper project knowledge, delivers a more robust product, and can reduce total project costs.
BIM for plumbing design The use of BIM in plumbing projects creates deeper project knowledge, delivers a more robust product, and can reduce total project costs. BY JUNCHENG (JAMES) YANG, PE, CPD, LEED
Certified Instructors & Curriculum
Our Promise. TPM is dedicated to provide the most extensive and high-quality training programs to help you maximize your investment. Although the investment in time and money may seem substantial, it will
2012 BIM Guidelines and Standards (Rev. 00) University at Albany
A. Building Information Modeling (BIM) Guidelines: The Office of AECM will require the submission of BIM modeling files as part of an electronic file submission to the AECM project manager as requested
Revit MEP. Autodesk Navisworks
What is BIM? Autodesk BIM is an intelligent model-based process that helps owners and service providers achieve business results by enabling more accurate, accessible, and actionable insight throughout
School Building Authority of West Virginia BUILDING INFORMATION MODELING (BIM) EXECUTION PLAN SBA FORM 191
School Building Authority of West Virginia BUILDING INFORMATION MODELING (BIM) EXECUTION PLAN SBA FORM 191 Section 1: General 1.0 Alignment with Organizational Vision In the space provided below, read
Evaluation of Building Information Modeling (BIM) Estimating Methods in Construction Education
Evaluation of Building Information Modeling (BIM) Estimating Methods in Construction Education Keith E. Sylvester, Ph.D. and Charlotte Dietrich, Undergraduate Student East Carolina University Greenville,
3D AND 4D MODELING FOR DESIGN AND CONSTRUCTION COORDINATION: ISSUES AND LESSONS LEARNED
3D AND 4D MODELING FOR DESIGN AND CONSTRUCTION COORDINATION: ISSUES AND LESSONS LEARNED SUBMITTED: September 2006 REVISED: July 2007 PUBLISHED: July 2007 at http://itcon.org/2007/26/ EDITOR: B-C Björk
Performance by design. Autodesk Revit MEP
Performance by design. Autodesk Revit MEP Step up to the challenge. Autodesk Revit MEP software helps mechanical, electrical, and plumbing engineering firms meet the heightened demands of today s global
Autodesk Revit LEARNING PATH BUILDING DESIGN SUITE
Autodesk Revit LEARNING PATH FUNDAMENTALS Duration: 3 days Cost: R5 500 (excl VAT) Revit MEP Duration: 3 days Cost: R5 500 (excl VAT) Revit Structure Duration: 3 days Cost: R5 500 (excl VAT) REVIT ADVANCED
AC 2012-3090: THE METHOD OF COVERING MEP SCOPE IN AN ESTI- MATING COURSE
AC 2012-3090: THE METHOD OF COVERING MEP SCOPE IN AN ESTI- MATING COURSE Dr. Suat Gunhan, University of Texas, San Antonio Suat Gunhan received both his bachelor s of architecture and master s of science
Olilo's AEC Design Services. SrinSoft Inc, Partners of
Olilo's AEC Design Services SrinSoft Inc, Partners of Olilo provides design services that include design and analysis, cost estimation, 3D modeling, 2D drafting, conversion from 2D to 2D, quantity take-off,
How To Design A Bim Project
BIM Virtual Construction & Integrated Project Delivery Randy LaNear BIM Manager Barnhart - Heery Synonyms & Related Terms Integrated Practice Integrated Project Delivery Virtual Building (Environment)
The Shorten AutoCAD the road solution for mechanical, electrical, to done. and plumbing engineering. AutoCAD AutoCAD.
The Shorten AutoCAD the road solution for mechanical, electrical, to done. and plumbing engineering. AutoCAD AutoCAD Civil 3D MEP 2009 More Productivity, Same Skills Michigan-based Peter Basso Associates
Collaborating Across Disciplines with Revit Architecture, MEP, and Structure
Collaborating Across Disciplines with Revit Architecture, MEP, and Structure David Cohn AB104-3 Are you ready to take the next step and use building information modeling to share data across the entire
Industrial Case Study of Electronic Design, Cost and Schedule Integration
Industrial Case Study of Electronic Design, Cost and Schedule Integration Sheryl Staub 1, Martin Fischer 2 and Melody Spradlin 3 1 Project Engineer, Hathaway/Dinwiddie Construction Group Santa Clara, CA
Structural BIM Technology Certificate Program
Structural BIM Technology Certificate Program Program Description 160 Credit Hours of Instruction Program Completion Time - 6 Months Upon Completion VDCI/cadteacher Technology Certificate Awarded STRUCTURAL
Civil Engineering Design
ES050 Introductory Engineering Design and Innovation Studio Civil Engineering Design Prof. Jon Southen November 18, 2009 Goals and Objectives of this lecture Provide introduction to engineering design
Performance by design. Autodesk Revit MEP
Performance by design. Autodesk Revit MEP Step up to the challenge. Autodesk Revit MEP software helps mechanical, electrical and plumbing engineering firms meet the heightened demands of today s global
Building Information Modeling/Vertical Digital Construction: Teaching Strategies and Preparing Students for the Workforce
Building Information Modeling/Vertical Digital Construction: Teaching Strategies and Preparing Students for the Workforce Sofia Vidalis Associate Professor of Civil Engineering at Penn State Harrisburg
OPEN ITEMS LIST - CONSTRUCTION Project Name: East Central Middle School - Jackson County CLA#: 11003
OPEN ITEMS LIST - CONSTRUCTION Project Name: East Central Middle School - Jackson County CLA#: 11003 No. Discipline Sent to Name Item Date Noted Date Resolved How item was resolved Electrical Contractor
Digital Arts (Visualization) Technology Certificate Program
Digital Arts (Visualization) Technology Certificate Program Program Description 184 Course Hours of Instruction Program Completion Time - 9 Months Upon Completion VDCI Technology Certificate Awarded DIGITAL
Using Autodesk Fabrication Software from TSI
Using Autodesk Fabrication Software from TSI Photo courtesy of Lend Lease COMPANY BACKGROUND Walsh Mechanical Contractors is a full service, commercial mechanical contractor serving Eastern New England,
A WORKFLOW ANALYSIS FOR BIM SOFTWARE: ARCHITECTURAL AND MECHANICAL ENGINEERING DEPARTMENT OF ARUP TURKEY
ISTANBUL TECHNICAL UNIVERSITY FACULTY OF ARCHITECTURE DEPARTMENT OF DESIGN COMPUTING BIM 2037 / BUILDING INFORMATION MODELS INSTRUCTOR: Salih OFLUOĞLU A WORKFLOW ANALYSIS FOR BIM SOFTWARE: ARCHITECTURAL
Transition to 3D Fabrication Workflows
Autodesk Autodesk Fabrication Solutions Transition to 3D Fabrication Workflows Autodesk is committed to the use of Building Information Modeling (BIM) to drive integrated and connected data across the
Master of Interior Architecture Program
Course Title: Degree Offered (in full): (abbr.): Master of Interior Architecture Program Master of Interior Architecture Program Master of Interior Architecture M.I.A. Responsible Organization The Interior
Design Development Quality Management Phase Checklist Project Phase Checklist Series
Best Practices Design Checklist Project Phase Checklist Series Contributed by Micheal J. Lough, AIA, Principal, Integral Consulting The AIA collects and disseminates Best Practices as a service to AIA
Training Engineers for Managing Intelligent HVAC Systems in Modern Office Buildings
Training Engineers for Managing Intelligent HVAC Systems in Modern Office Buildings Bethany Robinson, Matthew Knowles, and Jian-Qiao Sun, University of California, Merced ABSTRACT In today s changing climate
CME 405 Building Information Modeling for Construction Management 3 Credits (3 Lecture Hours)
CME 405 Building Information Modeling for Construction Management 3 Credits (3 Lecture Hours) Lecture Meets in 154 Baker Hall, Monday, Wednesday, and Fridays 9:30-10:25 AM Instructor Paul Crovella 219
BIM Project Management Professional (PMP) Technology Certificate Program
BIM Project Management Professional (PMP) Technology Certificate Program Program Description 164 Credit Hours of Instruction Program Completion Time - 6 Months Upon Completion VDCI/cadteacher Technology
LACCD Building Information Modeling Standards For Design-Bid Build Projects
LACCD Building Information Modeling Standards For Design-Bid Build Projects (LACCD BIMS) Interim Version 2.0 Prepared by: September 9, 2009 TABLE OF CONTENTS 1. INTRODUCTION 1 1.1. Overview 1.2. Main Objectives
Exceptional... Everytime!
Oil & Gas Exceptional... Everytime! Oil & Gas Industry With each Team Leader possessing 10 20 Years experience, BAR Engineering not only contributes high level engineering expertise, but also the practical
THE APPLICATION OF MEP SYSTEMS INSTALLATION FOR INTERFACE INTEGRATION IN BUILDING CONSTRUCTION
Journal of Marine Science and Technology, Vol. 21, No. 1, pp. 15-23 (2013) 15 DOI: 10.6119/JMST-011-0708-1 THE APPLICATION OF MEP SYSTEMS INSTALLATION FOR INTERFACE INTEGRATION IN BUILDING CONSTRUCTION
SECTION 00 0110 TABLE OF CONTENTS. H. 00 2115.01 - Proposed Material, Product or Equipment Substitution Request
SECTION 00 0110 PROCUREMENT AND CONTRACTING REQUIREMENTS 1.1 DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS A. 00 0101 - Project Title Page B. 00 0105 - Certifications Page C. 00 0110 - Table
BIM: FOR PROJECT MANAGERS. 2011 CSI Southwest Region Conference Program 1B 8:45am 11:00am
BIM: FOR PROJECT MANAGERS ANA BAKER BRANDON GARRETT 2011 CSI Southwest Region Conference Program 1B 8:45am 11:00am 1 2 3 4 BIM Overview BIM Level of Development Evolution of the Drawing Process BIM Workflow
Design Consultant (Electrical Services) Design Deliverables and Responsibilities Allocation (Stage E+)
Design Consultant (Electrical Services) Design Deliverables and Responsibilities Allocation (Stage E+) 1. In addition to the information scheduled below, the pre-tender designer is responsible for: (i)
What s New in Autodesk Revit 2014
Building Design Suite 2014 What s New in Revit 2014 * Revit 2014 software is only available as part of the Building Design Suite 2014 Premium and Ultimate Editions. New & Enhanced Features Platform & For
Get to know your Autodesk Design and Creation Suites 2014
Get to know your Design and Creation Suites 2014 Design and Creation Suites 2014 offer more tools and cloud services so you can take advantage of smoother workflows, better access to project information,
All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal.
2.02 DESIGN DEVELOPMENT PHASE GENERAL The Architect shall prepare the Design Development Documents from the approved Schematic Design. The Design Development Documents shall consist of drawings and other
Streamline your design-to-cost processes with Autodesk Navisworks
Quantification in Autodesk Navisworks 2015 Streamline your design-to-cost processes with Autodesk Navisworks Contents Overcome data disarray....................................................................................
Interoperable Learning Leveraging Building Information Modeling (BIM) in Construction Management and Structural Engineering Education
Interoperable Learning Leveraging Building Information Modeling (BIM) in Construction Management and Structural Engineering Education Eric L. Richards and Caroline M. Clevenger, PhD Colorado State University
ST. MONICA FOOD PANTRY HOUSTON, TEXAS
PROJECT MANUAL FOR ST. MONICA FOOD PANTRY HOUSTON, TEXAS OWNER: ST. MONICA CATHOLIC CHURCH 8421 W. MONTGOMERY ROAD HOUSTON, TEXAS 77088 ARCHITECT: C SIX ARCHITECTURE, LLC 4606 F.M. 1960 WEST, STE 400 HOUSTON,
BIM GUIDE. Developed for
BIM GUIDE Developed for BIM GUIDE Protocols and Project Execution Plan 1 Table of Contents.. Objective... P. 4.. Roles & Responsibilities... P. 5.. Contract Strategies... P. 8.. Level of Development...
Feasibility Analysis of Initiating Building Information Modeling (BIM) for HVAC systems by General Contractors
Feasibility Analysis of Initiating Building Information Modeling (BIM) for HVAC systems by General Contractors Hussein Abaza, Ph.D. Southern Polytechnic State University, 1100 South Marietta Parkway, Marietta
SRISHTI TECHNICAL SERVICES L.L.C
SRISHTI TECHNICAL SERVICES L.L.C Coming under SRISHTI Group. is a team of experienced and qualified skilled specialists that provide expertise in Interior fit outs & BIM along with having a full qualified
Building Services Engineering Technician
Building Services Engineering Technician A competent Building Services Engineering Technician is expected to be able to demonstrate the following skills and competences: Systems design in the building
ENGINEERING, TECHNOLOGY, AND DESIGN
ENGINEERING, TECHNOLOGY, AND DESIGN The Engineering, Technology and Design Department fosters student learning that will develop 21st century competencies in a constantly changing technological environment.
Schematic Design: Quality Management Phase Checklist Project Phase Checklist Series
Best Practices : Project Phase Series Contributed by Micheal J. Lough, AIA, Principal, Integral Consulting The AIA collects and disseminates Best Practices as a service to AIA members without endorsement
BIM and Lean Construction Can BIM remove waste from construction processes?
Tekla European BIM Forum 2014 BIM and Lean Construction Can BIM remove waste from construction processes? Assoc. Professor Rafael Sacks What is Lean Construction? Waste in construction? Lean and BIM Synergies
Survey Results and Further Issues in Construction Automation Education
327 Survey Results and Further Issues in Construction Automation Education Dr. R. Navon Lecturer, Faculty of Civil Engineering Senior Research Engineer, National Building Research Institute Technion -
Supplemental Questionnaire CIVIL AND ARCHITECTURAL DRAFTING AND DESIGN INSTRUCTOR FULL-TIME #14-57
Supplemental Questionnaire CIVIL AND ARCHITECTURAL DRAFTING AND DESIGN INSTRUCTOR FULL-TIME #14-57 Please note: It is your responsibility to make sure that all requested information is provided on this
An Assessment of the Graphic Communications Skills Needed by Construction Management Graduates
Paper ID #14207 An Assessment of the Graphic Communications Skills Needed by Construction Management Graduates Dr. Joseph A Wright P.E., University of Wisconsin Stout Joseph A. Wright has 21 years as a
BIM and Digital Fabrication
REVIT BUILDING INFORMATION MODELING BIM and Digital Fabrication This whitepaper examines how structural building information models are being used for the digital fabrication of structural steel and the
NEW YORK CITY DEPARTMENT OF DESIGN + CONSTRUCTION
NEW YORK CITY DEPARTMENT OF DESIGN + CONSTRUCTION July 2012 BIM Guidelines Michael R. Bloomberg, Mayor David J. Burney, FAIA, Commissioner David Resnick, AIA, Deputy Commissioner TABLE OF Contents Message
Free Examples of plant layout drawing
Free layout examples; a wide variety of industrial layouts, within different facility types. Principles of plant layout and design will apply widely. Free Examples of plant layout drawing Principles of
Head: The new space race
Head: The new space race Intro: Since 2010, NCC BCA Section J Deemed-To-Satisfy requirements for limiting the power used by HVAC fan and pump motors has resulted in an increase to system duct and pipe
Occupancy: Assembly (A-3) and Business -Includes offices, seminar rooms, classrooms, and café facility. Duke University Medical School
Introduction Background The Duke School of Nursing building offers a new three-story state of the art facility that has helped strengthen the quality and integrity of the School of Nursing at Duke. The
1. INTRODUCTION. SUBMITTED: September 2007 REVISED: March 2008 PUBLISHED: June 2008 EDITORS: T. Olofsson, G. Lee & C. Eastman
BENEFITS AND LESSONS LEARNED OF IMPLEMENTING BUILDING VIRTUAL DESIGN AND CONSTRUCTION (VDC) TECHNOLOGIES FOR COORDINATION OF MECHANICAL, ELECTRICAL, AND PLUMBING (MEP) SYSTEMS ON A LARGE HEALTHCARE PROJECT
Building Information Modeling (BIM) Requirements for PT Projects Today s Capabilities for a BIM based Design
Building Information Modeling (BIM) Requirements for PT Projects Today s Capabilities for a BIM based Design Florian Aalami CEO ADAPT Corporation [email protected] What is BIM? The ability to model
Programs of Study. Architecture and Construction
AIR CONDITIONING & REFRIGERATION 117 Associate in Applied Science Degree (A.A.S.) 62 Credit Hours (CH) The A.A.S. in Air Conditioning and Refrigeration studies the design, selection, maintenance, testing
Effective Collaboration using Revit Structure and AutoCAD MEP
REVIT STRUCTURE Effective Collaboration using Revit Structure and AutoCAD MEP This white paper explains how structural engineers using Revit Structure software and mechanical/electrical/plumbing (MEP)
IMPLEMENTATION OF BUILDING INFORMATION MODELING (BIM) INTO EXISTING ARCHITECTURE AND CONSTRUCTION EDUCATIONAL CURRICULUM
IMPLEMENTATION OF BUILDING INFORMATION MODELING (BIM) INTO EXISTING ARCHITECTURE AND CONSTRUCTION EDUCATIONAL CURRICULUM By MAYA M. JOANNIDES A THESIS PRESENTED TO THE GRADUATE SCHOOL OF THE UNIVERSITY
Using Formative Writing Assignments to Enhance Student Learning in a First Year Chemistry Class
6th WSEAS International Conference on EDUCATION and EDUCATIONAL TECHNOLOGY, Italy, November 21-23, 2007 110 Using Formative Writing Assignments to Enhance Student Learning in a First Year Chemistry Class
AC 2011-96: IMPLEMENTING BUILDING INFORMATION MODELING IN CONSTRUCTION ENGINEERING CURRICULA
AC 2011-96: IMPLEMENTING BUILDING INFORMATION MODELING IN CONSTRUCTION ENGINEERING CURRICULA Don Chen, University of North Carolina, Charlotte Professional Preparation Iowa State University, Ames, Iowa
Essays on Teaching Excellence. Emerging Trends in College Teaching for the 21st Century
Essays on Teaching Excellence Toward the Best in the Academy Volume 6, Number 6, 1994-95 A publication of The Professional & Organizational Development Network in Higher Education (www.podnetwork.org).
Building Information Modeling for MEP Engineering. Revit MEP 2008
Building Information Modeling for MEP Engineering Revit MEP 2008 Design Intuitively with Tools That Work the Way Engineers Think Revit MEP software is an intuitive design tool that works the way engineers
AC 2007-2230: DEVELOPING STUDENT DESIGN AND PROFESSIONAL SKILLS IN AN UNDERGRADUATE BIOMEDICAL ENGINEERING CURRICULUM
AC 2007-2230: DEVELOPING STUDENT DESIGN AND PROFESSIONAL SKILLS IN AN UNDERGRADUATE BIOMEDICAL ENGINEERING CURRICULUM Donna Ebenstein, Bucknell University Joseph Tranquillo, Bucknell University Daniel
OPEN BIM Collaboration Pilot: The Faith Lutheran College Secondary School
OPEN BIM Collaboration Pilot: The Faith Lutheran College Secondary School Fulton Trotter Architects Overview The Faith Lutheran College Secondary School is located in the suburb of Plainland one hour West
BUILDING INFORMATION MODELING SCOPE OF SERVICES AND REQUIREMENTS FOR CONSTRUCTION CONTRACTOR IN A DESIGN- BID-BUILD PROCESS
BUILDING INFORMATION MODELING SCOPE OF SERVICES AND REQUIREMENTS FOR CONSTRUCTION CONTRACTOR IN A DESIGN- BID-BUILD PROCESS Final Version March 16, 2011 TABLE OF CONTENTS Page Contents 1. Introduction...
Asbestos Procedures. Asbestos Products
Asbestos Procedures Asbestos Products Where is asbestos known to be located on The Evergreen State College? Please see Appendix A for a list of known asbestos containing materials located on the Olympia
BIM. Building Intelligent Models For Better Information Management. By: Sean Arbic
BIM Building Intelligent Models For Better Information Management By: Sean Arbic Many people, from various design disciplines, call CAD Masters everyday regarding BIM. What is BIM? Why is BIM so important?
BIM UNDERSTANDING THE PROCESS The State of the Art Tool in Design and Construction SPONSORED BY SAME, DC POST IN ASSOCIATION WITH ACEC M/W
BIM UNDERSTANDING THE PROCESS The State of the Art Tool in Design and Construction SPONSORED BY SAME, DC POST IN ASSOCIATION WITH ACEC M/W Insanity: doing the same thing over and over again and expecting
d e n v e r a r t m u s e u m
d e n v e r a r t m u s e u m The Denver Art Museum Expansion will be a dramatic addition to the downtown Denver skyline and will help place Denver among the top art centers in the nation. The new addition
Construction layout and scanning solutions for the MEP contractor
Middle East Construction layout and scanning solutions for the MEP contractor Trimble Field Solutions Trimble Robotic Total Stations and 3D scanners allow you to both layout your MEP services as designed,
SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM
Shepherd University Board of Governors June 9, 2005 Agenda Item No. 9 SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM In 1994 construction began on the Byrd Science and
PROJECT REQUIREMENT, PR 20 VIRTUAL DESIGN & CONSTRUCTION (VDC), BUILDING INFORMATION MODEL (BIM)
PROJECT REQUIREMENT, PR 20 VIRTUAL DESIGN & CONSTRUCTION (VDC), BUILDING INFORMATION MODEL (BIM) A. GENERAL: 1. Summary: Design/Builder will employ VDC and BIM tools to facilitate the construction, coordination,
Construction Management
2015-2017 Cal Poly Catalog 1 Construction Management Building 186, Room A100 Phone: 805.756.1323 Department Head: Allan J. Hauck http://www.construction.calpoly.edu/ Academic Programs Program name Construction
Linbeck Construction used the Last Planner system of production control on a $22 million remodel of the Chemistry Building at Rice University.
Linbeck Construction used the Last Planner system of production control on a $22 million remodel of the Chemistry Building at Rice University. This was one of four innovative practices was described by
GRAND RAPIDS COMMUNITY COLLEGE Program of Study HVAC Technology 2012
GRAND RAPIDS COMMUNITY COLLEGE Program of Study HVAC Technology 2012 1 TABLE OF CONTENTS Table of Contents... 2 Introduction... 3 Purpose... 3 Team Members... 3 Step 1 Intake and Assessment... 4 Step 2
CRITERIA FOR ACCREDITING ENGINEERING TECHNOLOGY PROGRAMS
CRITERIA FOR ACCREDITING ENGINEERING TECHNOLOGY PROGRAMS Effective for Evaluations During the 2011-2012 Accreditation Cycle Incorporates all changes approved by the ABET Board of Directors as of October
Electronic Documents: Enhancing Construction Management Courses. Introduction
Kevin R Miller University of Florida Gainesville, FL Jay P. Christofferson, Ph.D. Brigham Young University Provo, UT Construction plans and specification (construction documents) should be incorporated
AUTOMATED CONSTRUCTION PLANNING FOR MULTI-STORY BUILDINGS
AUTOMATED CONSTRUCTION PLANNING FOR MULTI-STORY BUILDINGS Tang-Hung Nguyen 1 ABSTRACT This paper outlines a computer-based framework that can assist construction planners and schedulers in automatically
RESOURCE GUIDE. A guide for implementing Building Information Modeling in State of Maryland and Washington DC public school construction projects
BIM RESOURCE GUIDE A guide for implementing Building Information Modeling in State of Maryland and Washington DC public school construction projects First Draft May 213 ASBO MD/DC BIM COMMITTEE MEMBERS
SECTION 3: ANNEX J UNC CHARLOTTE ILM IMPLEMENTATION PLAN (New Section)
University of North Carolina at Charlotte Design and Construction Manual Section 3, Annex J UNC Charlotte ILM Implementation Plan SECTION 3: ANNEX J UNC CHARLOTTE ILM IMPLEMENTATION PLAN (New Section)
Phased Building Information Management (BIM) and Modeling Implementation Plan. David J. Gutierrez, AIA September, 2014
Phased Building Information Management (BIM) and Modeling Implementation Plan David J. Gutierrez, AIA September, 2014 1 Current State: Design and construction data is not shared, maintained, or updated
Electrical. This section applies to the design and installation of building power distribution systems.
Basis of Design This section applies to the design and installation of building power distribution systems. Design Criteria This section contains the architectural, structural and mechanical provisions
CRITERIA FOR ACCREDITING ENGINEERING TECHNOLOGY PROGRAMS
CRITERIA FOR ACCREDITING ENGINEERING TECHNOLOGY PROGRAMS Effective for Reviews During the 2015-2016 Accreditation Cycle Incorporates all changes approved by the ABET Board of Directors as of November 1,
Developing Higher Level Thinking
Abstract Limbach, Barbara Chadron State College Waugh, Wendy Chadron State College This paper identifies an interdisciplinary, five-step process, built upon existing theory and best practices in cognitive
Sub-Bid Contractor Update Statement. Tab A - Invitation for Bids. Tab B - Instructions to Bidders
INTRODUCTORY INFORMATION TABLE OF CONTENTS 00 0101 PROJECT TITLE PAGE PROCUREMENT REQUIREMENTS (PROJECT MANUAL) Tab A - Invitation for Bids Tab B - Instructions to Bidders Tab C Bid Form for General Bids