1 Columbus State Community College MASTER PLANNING Current State Facilities and Utilities Assessment November 2011
2
3 Columbus State Community College MASTER PLANNING EXISTING UTILITIES AND FACILITIES ASSESSMENT Introduction This report presents the current state assessment of the existing Columbus and Delaware Campus and facilities utility infrastructure including water, sanitary sewer, storm drainage, gas, and electrical systems. Analyzing current state utilities and facilities information is critical in assessing existing infrastructure needs and evaluating the capacity of utilities to support projected campus growth. This information was collected as part of the data gathering phase of the master planning process. Detailed recommendations for improvement of these utilities or facilities are not in the scope of the study and hence not included in the report. Generally, the utility systems on Columbus Campus have adequate capacity to serve the existing development and support future growth. Further study and additional coordination with the appropriate Utility Owners (City of Columbus, Columbia Gas, etc) will be required as the master plan is further developed. The Delaware Campus utility systems generally perform adequately for the existing development and have been sized for the future expansion of the campus to the west. As the present master plan develops, and development plans are actualized, further study of the utility systems will be required for the Delaware Campus. Maintaining and expanding the sustainable features of the Delaware Campus s stormwater management system should be a high priority. Existing Utilities Assessment Assessment Methodology Municipal and utility company index maps, existing master plans, review of existing Columbus State facility assessment documents and drawings, and conversations with College staff were instrumental in acquiring the information necessary to prepare this infrastructure assessment. For the Columbus Campus, water distribution maps, sanitary sewer maps, storm sewer maps and detailed engineering drawings were acquired from the City of Columbus Division of Power and Water (DOPW) and Division of Sewerage and Drainage (DOSD) for analysis and inclusion in the report. Utility maps for the Delaware Campus were acquired from the College. Columbia Gas of Ohio provided maps of its natural gas distribution network for both campuses. 1
4 Water Distribution The City of Columbus DOPW owns and maintains the Columbus Campus existing water distribution system shown on Exhibit 1. The various Columbus Campus buildings are individually metered and connected to the DOPW mains via private water service lines. Based on conversations with DOPW personnel and analysis of their existing documents, no major water facility improvement projects are planned in the near future. The existing system has adequate capacity and flow as it is serves directly from the Dublin Road Water Plant. A recent DOPW Master Plan did not identify any DOPW owned water mains in the Columbus Campus that required significant improvements. In general, based on discussions with Columbus State personnel, DOPW engineers, and review of existing documentation, the water distribution system provides adequate and reliable water distribution to campus irrigation and building supply needs. The Delaware Campus water distribution system (existing and future) is shown in the schematic diagram below. The existing system has adequate capacity and flow for not only the existing campus and building supply needs, but to accept future expansion to the west. Delaware Campus water distribution system schematic diagram 2
5 Sanitary and Storm Sewer The Columbus Campus sanitary, storm, and combined sewers are a combination of private and public systems owned and maintained jointly by Columbus State and the City of Columbus DOSD. The sewer facilities (pipes, manholes, and catch basins) located within private property (parking lots, court yard areas, etc) are currently maintained by Columbus State facilities maintenance personnel. The sewer facilities within the public right of way are owned and maintained by DOSD. The Columbus Campus existing sanitary and storm sewer system maps are shown on Exhibit 2. Based on discussions with various DOSD staff, the City does not have any major sewer projects planned within the Columbus Campus in the near future. A Sewer Separation Study prepared for DOSD in 1976 and revised in 1986 identifies combined sewer systems on the Columbus State campus that were planned for separation in the future. Although these studies exist, DOSD personnel have indicated there are no plans to perform these separation projects in the near future. The combined sewer mains are clearly shown in the attached Exhibit 2. The existing sanitary sewer system for Columbus Campus appears to have adequate capacity to serve the Campus needs. A full sanitary sewer study may be required in the future to evaluate the infrastructure needs based on the completed master plan. DOSD records show no significant stormwater flooding complaints in the Columbus Campus area. There are adequate storm sewer inlets and piping available to intercept and convey rainwater runoff for the typical rainfall event. Less frequent and heavy rainfall events with peak bursts cause short term localized flooding on several Columbus Campus streets. Long duration rainfall events without peak bursts are conveyed successfully by the existing storm water management system without causing significant flooding. Based on discussions with Columbus State personnel, DOSD engineers, and review of existing documentation, the storm and combined sewer system provides adequate and reliable rainwater conveyance from the Columbus Campus. 3
6 The Delaware Campus sanitary and storm sewer systems were designed to support future expansion on the over 108-acre site. Sustainable stormwater features such as vegetated bioswales which capture runoff from building rooftops and parking lots are incorporated into the overall stormwater infrastructure for this campus. A regional water quality retention pond with deep and shallow water areas intercepts stormwater runoff from the entire campus prior to releasing it to the municipal storm system adjacent to US Route 23. Delaware Campus Storm and Sanitary Sewer schematic diagram 4
7 Natural Gas The natural gas system serving both the Columbus and Delaware Campuses is a private utility owned and operated by Columbia Gas of Ohio (COH). The COH low, medium, and high pressure gas mains in the vicinity of the Columbus campus are shown on Exhibit 3. Internal to the campus, Columbus State gas service lines are fed from the COH mains to individual buildings. It appears metering is done at the individual buildings. All operation and maintenance of the natural gas system is performed by COH. The low pressure and medium pressure systems are clearly differentiated in the Exhibit. Based on and telephone correspondence with Columbia Gas, the low pressure gas mains at the southwest quadrant of the Columbus Campus are planned for total replacement in the next years. Delaware Campus Natural Gas system schematic diagram Electric The City of Columbus Department of Public Utilities provides power to the Columbus Campus and owns and maintains the service transformers. American Electric Power (AEP) provides power to the Delaware campus. 5
8 Existing Facilities Assessment Assessment Methodology Review of existing Columbus State facility assessment documents, and conversations with College staff were instrumental in acquiring data necessary to provide current state assessment of the existing building systems. Detailed recommendations for improvement of these systems are not in the scope of this report. Additional facilities information gathered from existing documentation prepared by Columbus State Facilities staff, anecdotal knowledge of users/facilities, and physical observations are documented in the attached Exhibit 4: Building Status Matrix. Electrical systems As noted previously, the City of Columbus Department of Public Utilities provides power to the Columbus Campus and owns and maintains the service transformers. AEP provides power to the Delaware campus. Emergency power is provided by both diesel and natural gas generators and generally serves life safety systems and is adequate, but it is desired to extend emergency power to 384 N. Sixth (Vet Tech) to protect the animals. According to Columbus State Facilities staff, the electrical systems in the existing buildings are generally well maintained and based on our cursory walk- through are acceptable for the current use. Some distribution equipment is original to their respective buildings and is beyond its useful life according to industry standards. The lighting systems are generally good or adequate although several building s systems have been identified as poor by the staff either due to their low energy efficiency or inadequate illumination levels. Based on extensive energy audits, including the October 2008 Energy Efficiency Plan, it is expected that most of the buildings identified as poor will be removed from this poor status upon completion of the recommendations in the Plan. Facilities information gathered from existing documentation, anecdotal knowledge of users/facilities, and physical observations are documented in the attached Exhibit 4: Building Status Matrix. A more detailed assessment of the buildings electrical systems is not included in the scope of this report. 6
9 Mechanical Systems There are several Columbus Campus buildings that have been upgraded to utilize high efficiency boilers and variable frequency drives where applicable. However, there are also several buildings that have HVAC equipment that is at the end of its useful life that should be replaced with new high efficiency boilers and fans and pumps with variable frequency drives. In some cases there is existing equipment that has oversized equipment that is causing controls issues during part load conditions. Any upgrade should have new load calculations performed to ensure that actual load conditions are used to size any replacement equipment. The controls systems across campus have been standardized on Johnson Controls in all but a few buildings. We recommend that gathering the information from the entire campus through centralized monitoring be implemented to take advantage of the standardization of controls systems type. Facilities information gathered from existing documentation, anecdotal knowledge of users/facilities, and physical observations are documented in the attached Exhibit 4: Building Status Matrix. A more detailed assessment of the buildings HVAC systems is not included in the scope of this report. 7
10
11
12
13 EXHIBIT 4: COLUMBUS STATE COMMUNITY COLLEGE BUILDING FACILITIES ASSESSMENT MATRIX 12/1/2011 Building Campus/Center Location Year Built Square Footage Year Renovated Primary Purpose Renovation < 5 Years List of renovations last 5 years. Brief listing of renovations. Brief Overall Systems Assessment Boiler Cooling Tower Chiller Other HVAC Fire Protection Power Distribution Lighting Fire Alarm Emergency Power Information Technology (Voice/Data) Roof Windows Flooring Ceilings Paint COLUMBUS BUILDINGS OVER 10,000SF 1 Parking Garage Columbus ,680 NA NA NA NA Fully Good NA NA NA NA NA NA NA NA Stair Treads Lobbies Corridors Common Areas Restrooms Furniture 2 Nestor Hall Columbus ,228 Cooling tower, boilers, and VAV boxes need upgrade or replacement. VFD installed on air handlers, and DDC upgraded entire bldg. Poor Poor Adequate Poor Fully Good Natural Gas Poor Poor Good Poor Good Good Poor Adequate 3 Workforce Dev. Ctr. Columbus ,264 y Problems with leaking windows in several areas. Good Good Good Good Fully Good Good Poor Good Good Good Good Good Good 4 Delaware Hall Columbus ,900 Fitness Center added in 2009, Public Safety partially renovated. 5 Union Hall Columbus ,000 Currently undergoing complete renovation Boilers replaced Cooling tower replaced Air Handlers original equip. need replaced with DDC and VFDs. Roof needs replaced. Automotive dept is in this building. ADA ramp issues. Athletic facilities Cooling tower schedule for replacement. Air handlers(all) need rehabed and vfd's installed. Good Good Good Poor Partially Adequate Diesel Natural Gas Poor Adequate Adequate Poor Good Good Poor Adequate Good Poor Adequate Poor Fully Poor Poor Good Poor Poor Poor Poor Poor Good 6 Davidson Hall Columbus ,890 Boilers needing replaced next 5 years. Adequate Adequate Good Good Fully Good Adequate Poor Adequate Poor Good Good Good Good Good Poor Good Good Good Good Good Good 7 Ctr. For Technolgy & Learning Columbus ,959 Good NA Good Good Fully Good Natural Gas 8 Eibling Hall Columbus , Instruction 1st and 4th Floors renovated, Lighting fixtures being updated as renovatitons happen. HVAC controls upgraded to DDC at the air handlers only. 1st and 4th floors rehabed with DDC controls. Heating &cooling comes through tunnel. Tunnel integrity requires investigation. Piping in tunnel likely in adequate condition. 9 Columbus Hall ERC Columbus ,523 y Boilers, cooling tower scheduled for replacement. Need VFD on air handler. NA NA NA Adequate Not complete Poor Adequate Good Adequate Good Adequate Adequate Poor Adequate Poor Poor Good Poor Fully Good Natural Gas Excellent Good Good Good Good Good Good Good 10 Rhodes/Madison Columbus ,092 Cosmetic Renovations completed and in progress 11 Franklin Hall Columbus ,008 2nd floor, offices, and auditorium renovated in the last 5 years ( ) Madison needs roof replaced. NA Good Good Good Fully Good Diesel Boilers replaced Cooling tower, unit vents and air handlers need replaced. Solar panels and infrastructure exists on roof but not utilized. Good Poor Good Poor Fully Adequate Diesel Poor Good Good Good Good Good Good Good Adequate Adequate Adequate Poor Good Good Poor Good 12 Aquinas Hall Columbus ,216 Still has asbestos. Roof replacement Boilers replaced Grd., 1st and 3rd. floors HVAC and controls upgraded last 5 years. Restrooms 2nd and 3rd floors need renovated. Elevator has issues. Building envelope issues. Good NA NA Adequate Partially Good Diesel Good Adequate Adequate Poor Good Good Poor Good 13 Discovery Exchange Book. Columbus ,098 y NA NA NA Good Fully Good Adequate Good Good Adequate Good Good Good Good 14 Physical Plant Columbus ,965 NA NA NA Good Fully Good No Good Good Good NA Good Good Good Good 15 Child Dev. Ctr. Columbus ,175 y NA NA NA Good Fully Good Good Good Good Good Good Good Good Good 16 OP Gallo (Warehouse) 164 N. Grant Columbus ,200 Lighting upgrade - energy efficient. Garage door inadequate for loading/unloading operations. NA NA NA Adequate Fully Poor No Adequate NA Adequate NA NA Adequate Adequate NA /370 N. Sixth (SX) Columbus ,735 Art studion/machine/hr NA NA NA Adequate Fully Good No Good Good Adequate NA Poor Poor Good Good N. Sixth Columbus ,520 Poor NA Good Good Fully Good No Poor Good Good Good Good Good Adequate Good N. Grant Columbus ,040 HVAC controls and equipment improperly engineered, need evaluated and replaced. Heavily utilized building (day and night) NA NA NA Poor Fully Poor No Adequate Adequate Poor NA Adequate Adequate Adequate Good Cleveland - Center for Teaching and Learning (CT) Columbus ,422 y Renovated Boiler needs replaced because of efficiency Poor NA Adequate Adequate Fully Good No Good Good Good NA Good Good Good Good COLUMBUS BUILDINGS UNDER 10,000SF Total Square Feet 1,379, N. Grant Columbus ,460 NA NA NA Good Fully Good No Poor Good Good NA Good NA Adequate Good 356 N. Grant Columbus ,820 y Renovated 2008 NA NA NA Good Fully Good No Good Good Good NA Good NA Good Good 400 Grove Columbus ,700 Grounds Project (a storage shed) NA NA NA Adequate No Adequate No Poor NA Poor NA NA NA Poor Adequate 192 N. Grant Columbus ,440 Trades (welding, carpentry) NA NA NA Adequate Fully Poor No Adequate Adequate Poor NA NA NA Poor NA TIC (Telephone Info Ctr.) Columbus ,326 Temp./Perm. Trailer NA NA NA Adequate Adequate Adequate Adequate Adequate NA NA NA Adequate Adequate 385 E. Naghten Columbus ,760 NA NA NA Adequate Fully Adequate No Adequate Adequate Adequate NA NA NA Poor NA BUILDINGS AT OTHER CAMPUSES, CENTERS, AND/ OR LEASED SPACE 750 Long Street Columbus y Leased Space in King-Lincoln District Fully Fully Moeller Hall Delaware ,429 y Good Good Good Good Fully Good Fully Natural Gas Good Good Good Good Good Good Good Good Delaware Admin. Bldg. Delaware 8,638 y NA NA NA Adequate Fully Adequate Fully No Good Poor Adequate NA Adequate Adequate Adequate Good Plant Bldg. Delaware Delaware 5,394 y NA NA NA Adequate Fully Poor Fully No Adequate NA Poor NA NA NA Adequate NA Bolton Field Bolton ,261 Boilers replaced All HVAC controls and devices need replaced. Lighting in hanger needs upgraded. Overall Bolton is a very energy inefficient. Poor Adequate Adequate Poor Fully Poor Fully Diesel Good Adequate Adequate NA Good Good Good Adequate Dublin Center Dublin ,844 NA NA NA Adequate Fully Adequate Fully No Poor Poor Poor NA Poor Poor Poor Adequate Gahanna Clark Hall Gahanna y Fully Fully Electrical Trades Ctr. Goodale/ Columbus y Fully Fully Adequate Adequate SE Center Southeast ,000 NA NA TBD Good Fully Good Fully No Good Good Good NA Good Good Good Good Westerville Site Westerville ,000 HVAC units engineered issues NA NA NA Poor Fully Good Fully No Good Good Good NA Good Good Good Good
NEW JERSEY CENTER OF EXCELLENCE
Overview NEW JERSEY Page 1 The Plant (CUP) provides electricity via a cogeneration system, chilled water for environmental cooling, steam for heating, and compressed air primarily for HVAC control Serves
Building Description Project Description Estimated Cost Notes Total Deferred
Building Description Project Description Estimated Cost Notes Total Deferred Athletic Fields & Grounds Baseball dugouts 125,000 Surface level/inground? Relamp Baseball field 16,000 Relamp Softball field
Presentation to Senate Select Committee on Government Facilities: Deferred Maintenance for State Supported Living Centers and State Hospitals
Presentation to Senate Select Committee on Government Facilities: Deferred Maintenance for State Supported Living Centers and State Hospitals Les Butler Associate Commissioner for Business and Regional
CyberFortress Data Center at Innovation Park Infrastructure and Topology Guide. Innovation Park Charlotte. NC 28262. DRAFT V0.
Innovation Park Charlotte. NC 28262 DRAFT V0.1 Page 2 CyberFortress Data Center at Innovation Park BECO South purchased Innovation Park in March 2010 and immediately launched a dramatic top-to-bottom $30M
All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal.
2.02 DESIGN DEVELOPMENT PHASE GENERAL The Architect shall prepare the Design Development Documents from the approved Schematic Design. The Design Development Documents shall consist of drawings and other
Cherokee Trail High School 25901 East Arapahoe Road Aurora, Colorado 80016
Cherokee Trail High School 25901 East Arapahoe Road Aurora, Colorado 80016 Year Opened 2003 Current Square Footage 391,000 Site Acreage 86.22 cherokeetrail.cherrycreekschools.org $279,200 Asphalt and concrete
DRAPER ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1953 BUILDING AREA 54,000 SF CURRENT PROGRAM CAPACITY 250 ENROLLMENT 2008 84 WARD 8 PROPOSED PROGRAM CAPACITY 325 Site Plan DRAPER - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5
GREEN SCHOOLS CASE STUDY. West Wing Elementary
GREEN SCHOOLS CASE STUDY School School name: School Deer Valley Union School District Address: 26716 N. High Desert Drive, Peoria, Arizona Contact: Jerry Cipriano Phone number: 602-467-5131 General location:
Description of Project Statewide Student Data Warehouse
Description of Project Statewide Student Data Warehouse The Department of Education (DE) uses Rebuild Iowa Infrastructure Fund funding to support critical components of Iowa s Statewide Longitudinal Data
Energy Management Performance Contract
Energy Management Performance Contract March 18, 2013 1 Agenda Johnson Control Team Introduction to Performance Contracting Project Timeline Energy Baseline Energy Conservation Measures (ECM s) Traditional
A Guide to Green Roofs on Existing School Buildings
A Guide to Green Roofs on Existing School Buildings What is a Green Roof? What does it do? Green Roofs can mean different things. It can include vegetative plantings, solar thermal installations, solar
Engineering. 2006 2007 2007 2008 2008 2008 Major Service Actual Budget Projected Request Executive Adopted
Engineering Agency Number: 53 Budget Function: Public Works and Transportation The Engineering Division is responsible for the design, supervision and inspection of all street, highway, sidewalk and bike
Schematic Design Presentation S. Dallas Dance, Superintendent October 22, 2013 OVERLEA HIGH SCHOOL
Schematic Design Presentation S. Dallas Dance, Superintendent October 22, 2013 0 Overlea High School - Facility Summary Facility Opened: Auditorium Addition: Activity Room Addition: School Rated Capacity
NYC Department of Education Building Condition Assessment Survey 2014-2015 BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 10004
School: InspectionId Asset Data Inspection Type Building Assessment Survey 204-205 BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 0004 Time In Last Edited 255 MECHANICAL 205-05-8 09:00AM
Overview. PG&E and Energy Efficiency. CA Energy Efficiency Regulatory & Policy Roadmap. Financing Options for Efficiency & Demand Response
Overcoming Financial Barriers to Energy Efficiency April 6, 2010 Overview PG&E and Energy Efficiency CA Energy Efficiency Regulatory & Policy Roadmap Financing Options for Efficiency & Demand Response
Columbus State Community College Master Plan. A Flexible Framework.
Columbus State Community College Master Plan A Flexible Framework. The Master Planning Process Initiated fall 2011 to coincide with major construction and planning projects adjacent to the Columbus Campus,
PLUMMER ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1959 BUILDING AREA 69,400 SF CURRENT PROGRAM CAPACITY 481 ENROLLMENT 2008 228 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan PLUMMER - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
Facility Assessment for. 11801 East Main Street, Huntley, IL
Facility Assessment for 11801 East Main Street, Huntley, IL July 12, 2012 Prepared by: Dewberry Architects Inc. 25 S. Grove Avenue, Suite 500 Elgin, IL 60120 (847) 695-5840 The Village of Huntley requested
2 STEPS TO CONDUCTING YOUR HVAC ASSESSMENT
Presentation Synopsis Heating, Ventilating and Air Conditioning Building Condition Assessment Vancouver, B.C. Prepared for: EPIC Prepared by: Douglas Spratt, P.Eng Douglas Spratt & Associates Ltd. www.dspratt-associates.com
MARYLAND AVENUE BACKUPS DURING AUGUST 31, 2014 STORM EVENT COMMUNITY OUTREACH
MARYLAND AVENUE BACKUPS DURING AUGUST 31, 2014 STORM EVENT COMMUNITY OUTREACH MARYLAND AVENUE BACKUPS COMMUNITY OUTREACH MEETING AGENDA Introductions History of PWSA Actions August 31 Storm Impacts Short
Total Building Commissioning: Case Study of the U.S. District Courthouse in Salt Lake City, Utah, USA
Total Building Commissioning: Case Study of the U.S. District Courthouse in Salt Lake City, Utah, USA Boggarm S. Setty, P.E., Fellow ASHRAE Setty & Associates, Ltd. 3040 Williams Drive, Suite 600, Fairfax,
5. Environmental Analysis
5.11 The potential for adverse impacts on utilities and service systems was evaluated based on information concerning current service levels and the ability of the service providers to accommodate the
Scituate Public Facilities Master Plan Final Report to the Board of Selectmen
Scituate Public Facilities Master Plan Final Report to the Board of Selectmen Assessment and Recommendations November 18, 2014 by Scituate Public Facilities Master Planning Committee AGENDA Objectives
Extreme Wet Weather in Brookfield. How to Keep Your Basement Dry During Heavy Rains and Floods
Extreme Wet Weather in Brookfield How to Keep Your Basement Dry During Heavy Rains and Floods Relating Stormwater Drainage to Sewer Backups Brookfield has two separate sewer systems Storm sewer system
Mechanical, Plumbing, and Fire Protection Conditions
Mechanical, Plumbing, and Fire Protection Conditions Mechanical Conditions The mechanical systems within the building consist of a combination of the original 1926 systems and renovations that occurred
ecmar SECTION INSTRUCTIONS: Sanitary Sewer Collection Systems
ecmar SECTION INSTRUCTIONS: Sanitary Sewer Collection Systems Please see the DEFINITIONS of terms at the end of this section. If you have any questions about these definitions, do not understand a question,
Maryland. American Recovery and Reinvestment Act. 158 DoD Projects ($ 65.8M) Completed or Under Way by August 31, 2009
Maryland American Recovery and Reinvestment Act 158 DoD Projects ($ 65.8M) Completed or Under Way by August 31, 2009 Project Title Component Installation Repair Building 316 Electrical, HVAC, Plumbing,
ALBUQUERQUE PUBLIC SCHOOLS Facility Design & Construction / Maintenance & Operations
ALBUQUERQUE PUBLIC SCHOOLS Facility Design & Construction / Maintenance & Operations MECHANICAL SYSTEMS DESIGN STANDARDS Appendix A RECOMMENDED HVAC SYSTEMS BY TYPE OF SPACE Matt Higgins Valentin Lucero
Schedule B to By-law 33-2009
Amended by By-law 8-2016 Note: This consolidation is prepared for convenience only. For accurate reference the original by-laws should be reviewed. Floor Area Calculation Floor area shall: Schedule B to
Portland s Financial District. Overview FOR SALE RETAIL/OFFICE BUILDING 6-8 CITY CENTER, PORTLAND, MAINE
FOR SALE RETAIL/OFFICE BUILDING Portland s Financial District Overview 6-8 City Center is a well know 4-story retail and office building with a mix of granite and brick architecture and interesting interior
Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department
Land Disturbance, Erosion Control and Stormwater Management Checklist Walworth County Land Conservation Department The following checklist is designed to assist the applicant in complying with the Walworth
BUNKER HILL ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1970 BUILDING AREA 98,200 SF CURRENT PROGRAM CAPACITY 332 ENROLLMENT 2008 387 WARD 5 PROPOSED PROGRAM CAPACITY 750 Site Plan BUNKER HILL - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
Iron Hill Corporate Center Newark, DE
Iron Hill Corporate Center Newark, DE Delaware s Premier Suburban Office Park Contact: John Kaczowka (302) 661-6709 or Brian Hopkins (302) 661-6712 Total Project Size 463,085 RSF Red Wing Built in 1988
PARKVILLE HIGH SCHOOL LIMITED RENOVATION
PARKVILLE HIGH SCHOOL LIMITED RENOVATION DESIGN BRIEFING For Dr. Joe A. Hairston BALTIMORE COUNTY PUBLIC SCHOOLS August 11, 2009 Smolen 3 Emr + Associates Architects 1355 Piccard Drive, Suite 200 Rockville,
SECTION XI OPINION OF PROBABLE COST
SECTION XI OPINION OF PROBABLE COST OPINION OF PROPABLE COSTS HARBOR ISLAND THE PAVILION 1) Provide a sprinkler system for the entire building. 8000 SF X $15/SF $120,000 2) Remove and replace existing
HOUSING QUALITY STANDARDS (HQS)
HOUSING QUALITY STANDARDS (HQS) HQS INSPECTIONS Part II Site Inspections 24 CFR 982.401 & 405 1si Rev. 4-20-06 General Conditions All doors and windows accessible to the outside, must have a workable lock.
STATE UNIVERSITY OF NEW YORK UNIVERSITY AT BUFFALO 2015 CAMPUS STATEMENT
STATE UNIVERSITY OF NEW YORK UNIVERSITY AT BUFFALO 2015 CAMPUS STATEMENT The University at Buffalo Medical School was established in downtown Buffalo, New York in 1846. Later additional schools were added
School Construction Authority Architecture & Engineering
SCOPING GUIDELINES 1.0 GENERAL GUIDELINES 2.0 BUILDING ENVELOPE SCOPING GUIDELINES 3.0 CATEGORIES AND COMPONENTS: The Flood Elimination/Below Grade Capital Category may include some or all of the following
PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE
REGION OF PEEL PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE Storm Sewer Design Criteria REVISED July 2009 PUBLIC WORKS STORM SEWER DESIGN CRITERIA TABLE OF CONTENTS 1.0
Chicago Public Schools
Ames Middle School 1920 N Hamlin Ave 1997 Completed The scope of this project is to construct a new school $16,913,379 2014 Construction The intent of this project is to expand existing Ames middle school
COOK PHYSICAL SCIENCE BUILDING RENOVATIONS. Engineering & Architectural Services CONCEPT DESIGN MAY 11, 2012. BVH Project No.
COOK PHYSICAL SCIENCE BUILDING RENOVATIONS Civil Structural Mechanical Electrical Technology Engineering & Architectural Services CONCEPT DESIGN Commissioning 50 Griffin Road South Bloomfield, CT 06002
STATE OF SOUTH CAROLINA RESIDENTIAL PROPERTY CONDITION DISCLOSURE STATEMENT
STATE OF SOUTH CAROLINA RESIDENTIAL PROPERTY CONDITION DISCLOSURE STATEMENT The South Carolina Code of Laws (Title 27, Chapter 50, Article 1) requires that an owner of residential real property (single
Sustainable Features. High-performance HVAC. High-performance Envelope Green Roof Day-Lighting Bicycle Infrastructure
Sustainable Features High-performance HVAC High-performance Envelope Green Roof Day-Lighting Bicycle Infrastructure Sustainable Landscaping Recycled and Regional Materials Storm-water Management District
Home Drainage & Causes of Basement Flooding. Water
Home Drainage & Causes of Basement Flooding Understanding Drainage There are two separate sewer systems Eavestroughs & Downspout Road Property Line Floor Drain Catch basin Access Cover Weeping Tile House
2.4 Hardcopy submittals shall be provided at adequate size so that all notes are readable.
DESIGN EQUIEMENTS POJECT DELIVEABLES CHECKLISTS GENEAL INFOMATION 1.1 The following is a checklist to be used as a guide for the required deliverables for the Schematic Design phase. 1.2 Schematic Design
Energy Audit Data Collection Form
SAVING ENERGY IN COMMERCIAL BUILDINGS Energy Audit Data Collection Form Site Data Building Name Address Building Square Footage (ft 2 ) Age of Building (years) Date of Last Major Renovation Purpose of
Virginia. American Recovery and Reinvestment Act. 83 DoD Projects ($ 75.7M) Completed or Under Way by August 31, 2009
Virginia American Recovery and Reinvestment Act 83 DoD Projects ($ 75.7M) Completed or Under Way by August 31, 2009 Project Title Component Installation Repair/Replace Bathrooms in Wilcox Barracks Army
HAMILTON SCHOOL. 1401 Brentwood Parkway, N.E., Washington, DC INITIAL YEAR BUILT 1968 BUILDING AREA
INITIAL YEAR BUILT 1968 BUILDING AREA 187,700 SF CURRENT PROGRAM CAPACITY N/A ENROLLMENT 2008 129 WARD 5 PROPOSED PROGRAM CAPACITY N/A Site Plan HAMILTON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
Design Consultant (Electrical Services) Design Deliverables and Responsibilities Allocation (Stage E+)
Design Consultant (Electrical Services) Design Deliverables and Responsibilities Allocation (Stage E+) 1. In addition to the information scheduled below, the pre-tender designer is responsible for: (i)
UPDATED FUNCTIONAL SERVICING and STORMWATER MANAGEMENT REPORT
TRAFALGAR ENGINEERING LTD. #1-481 Morden Road Oakville Ontario L6K 3W6 UPDATED FUNCTIONAL SERVICING and STORMWATER MANAGEMENT REPORT Fernbrook Homes (Bronte 15) Limited 3059/3047 Lakeshore Road West TOWN
Datacenter Site Selection Checklist
Checklist Use this checklist to aid in the process of selecting a new site for the data center. When visiting potential building sites, print the checklist off and take it along to record impressions and
CITY OF HIGHLAND PARK, ILLINOIS Stormwater Management Fact Sheet
CITY OF HIGHLAND PARK, ILLINOIS Stormwater Management Fact Sheet WHAT IS STORMWATER MANAGEMENT? Stormwater management is the method for channeling rainfall through pipes and sewers away from property to
BUILDING ASSESSMENT QUESTIONNAIRE. B. TENANTS Is there more than one tenant in the building? YES
Department of Health and Human Services, Division of Public Health Occupational and Environmental Epidemiology Branch 1912 Mail Service Center, Raleigh, North Carolina 27699-1912 BUILDING ASSESSMENT QUESTIONNAIRE
Upper Southampton Township Department of Licenses and Inspections 939 Street Rd. Southampton, Pa. 18966 Phone: 215-322-9700 Fax: 215-322-5842
Upper Southampton Township Department of Licenses and Inspections 939 Street Rd. Southampton, Pa. 18966 Phone: 215-322-9700 Fax: 215-322-5842 APPLICATION for ZONING and BUILDING PERMIT APPLICATION INSTRUCTIONS:
The fees listed below are stand-alone fees. Additional Developemnt Review or Stormwater fees may apply. 1.0. Fee Activity
MINOR & MISCELLANEOUS PERMITS The fees listed below are stand-alone fees. Additional Developemnt Review or Stormwater fees may apply. 1.0 Fee Activity Fee Description Fee 50% REDUCED FEES FOR SINGLE FAMILY
Micromanagement of Stormwater in a Combined Sewer Community for Wet Weather Control The Skokie Experience
Micromanagement of Stormwater in a Combined Sewer Community for Wet Weather Control The Skokie Experience Robert W. Carr 1 * and Stuart G. Walesh 2 1 Water Resources Modeling, LLC, 4144 S. Lipton Ave,
CENTRAL OHIO NORTHEAST OHIO
CENTRAL OHIO Military Defense Supply Center Columbus Warehouse upgrades Columbus 1,000,000 Military Defense Supply Center Columbus Fire protection Columbus 500,000 Military Defense Supply Center Columbus
Harmon Court 1128 Harmon Place Minneapolis, Minnesota
Harmon Court 1128 Harmon Place Minneapolis, Minnesota Building Specifications Location 1128 Harmon Place Minneapolis, Minnesota 55403 Building Size 31,350 rentable square feet 3 office floors Year Built
City of Green Bay Department of Public Works Engineering Department
City of Green Bay Department of Public Works Engineering Department The Difference Between Sanitary & Storm Sewers Contact Information: Department of Public Works City Hall 100 North Jefferson Street,
NORTH PENN HIGH SCHOOL RENOVATIONS
NORTH PENN HIGH SCHOOL RENOVTIONS PRELIMINRY SCOPE, BUDGET & PHSING CONSIDERTIONS 401 EST HNCOCK STREET LNSDLE, P 19446 PREPRED BY BONNETT SSOCITES INCORPORTED 220 BLDWIN TOWER, 1510 CHESTER PIKE EDDYSTONE,
How To Check For A Deficiency
UPCS in Pictures The following pictures are not all inclusive nor does it cover every deficiency. The pictures, however are some of the most commonly cited deficiencies on REAC inspections. Erosion The
Data Center Due Diligence List
Data Center Due Diligence List Name and address of site facility Date constructed Building owner/date purchased by current owner Name of previous owner Adjacent Property Descriptions North South East West
3901 Calverton Boulevard Beltsville, Maryland
3901 Calverton Boulevard Beltsville, Maryland GHP Office Realty One West Red Oak Lane White Plains, New York 10604 Phone: 914.642.9300 Fax: 914.642.9301 ghpoffice.com 3901 CALVERTON BOULEVARD, BELTSVILLE,
When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:
When is a Permit Required? The most common types of projects that require permits are: -New Houses or buildings -Room Additions or Expansions -Structural repairs, remodeling and alterations -Accessory
Commissioning - Construction Documents (Page 1 of 6)
Commissioning - Construction Documents (Page 1 of 6) A. General Information Climate Zone: Building Type: Conditioned Area (sf): Reviewer's Name: Reviewer's Agency: Note: Design Review for each system/subsystem
Facilities Construction and Maintenance. Charlotte County, Florida
Facilities Construction and Maintenance Charlotte County, Florida When did you last use a Charlotte County government service, and what was that service? Facilities Construction and Maintenance is an internal-service
Office Space for Lease 1523 11th St, DeWitt
Office Space for Lease 1523 11th St, DeWitt Suite A $1150.00 per month 1200 sq ft, large open office area, break room, bathroom, storage and separate utilities. Additional office space available. Suite
Bond Referendum Presentation. Dr. Ralph P. Ferrie, Superintendent of Schools May 12, 2014
Bond Referendum Presentation Dr. Ralph P. Ferrie, Superintendent of Schools May 12, 2014 Mr. David Fowler President Floral Park- Bellerose Mr. David Del Santo Vice-President New Hyde Park Garden City Park
Design and Construction Design Phase Deliverables
Design and Construction Design Phase Deliverables Notes: 1. The Architect or Engineer of record shall submit this document along with the deliverables for the project at the end of each design phase for
City of Riverside. Building & Safety Division Phone: (951) 826-5697 www.riversideca.gov
Building & Safety Division Phone: (951) 826-5697 www.riversideca.gov BUILDING PERMIT & PLAN CHECK FEES The attached sheets will assist you in calculating an estimate of the fees for your building project.
REAL OPERATING COST SAVINGS FROM RETRO- COMMISSIONING OPPORTUNITIES FOR SAVINGS IN ACADEMIC MEDICAL CENTERS
REAL OPERATING COST SAVINGS FROM RETRO- COMMISSIONING OPPORTUNITIES FOR SAVINGS IN ACADEMIC MEDICAL CENTERS Ken L. Hansen P.E. University of Nebraska Medical Center [email protected] 402-559- 5301 402-630-
HOUSTON ELEMENTARY SCHOOL
INITIAL YEAR BUILT 1962 BUILDING AREA 59,900 SF CURRENT PROGRAM CAPACITY 507 ENROLLMENT 2008 291 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan HOUSTON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION
Columbia University Master Planning & Optimization
Columbia University Master Planning & Optimization February 20, 2014 Mr. Frank Martino Vice President, Operations 1 Agenda Columbia University Campus District Energy Overview Evolution of Columbia s District
CHAPTER 8 HVAC (Heating, Ventilation, and Air-Conditioning)
CHAPTER 8 HVAC (Heating, Ventilation, and Air-Conditioning) Objectives Survey current HVAC system(s), operating procedures, and maintenance schedule. Analyze results of energy audit for HVAC system(s)
Table of Contents ALPHABETIZED LIST OF CIP PROJECTS... 1 CIP 5 YEAR SUMMARY BY CATEGORY... 18 SMART CITY CIP 5 YEAR SUMMARY BY VISION...
Table of Contents ALPHABETIZED LIST OF CIP PROJECTS... 1 CIP 5 YEAR SUMMARY BY VISION... 5 CIP 5 YEAR SUMMARY BY CATEGORY... 18 SMART CITY CIP 5 YEAR SUMMARY BY VISION... 33 CAPITAL IMPROVEMENT PROJECTS
Case Studies in Existing Building Audits
Case Studies in Existing Building Audits Erica Brabon Steven Winter Associates, Inc. 307 7 th Ave., NY, NY [email protected] Who we are Steven Winter Associates, Inc. (SWA) is a 37 yearold architecture
Topics for Today. Order of Magnitude Mechanical Estimating. Order of Magnitude Estimate Goal. Project Delivery Methods. Questions for Client
Order of Magnitude Mechanical Estimating Justin Apprill, P.E. Topics for Today Estimate Goals A Concept for Accurate Conceptual Estimating HVAC Systems Common System Types and Rules of Thumb Pricing Example
250 St Georges Tce, Perth, WA (QV1)
250 St Georges Tce, Perth, WA (QV1) Building Profile Building Construction date 1991 Refurbishment date Owner Building Size Refurbishment Team Building Management Awards Ratings QV.1, 250 St Georges Terrace,
Facilities Operations Customer Service Standards WORK ORDER PRIORITIES
Facilities Operations Customer Service Standards WORK ORDER PRIORITIES In order to provide fair and consistent maintenance service to all University faculty, staff and students, a work priority system
Angelo State University Construction Report
May 12, 2009 Angelo State University Construction Report Modular buildings will temporarily house ASU staff during the Hardeman renovation starting this fall. Prepared for: John Russell, Director of Planning
Capital Projects Town Hall Meeting
Capital Projects Town Hall Meeting Planning, Architectural & Engineering Services September 15, 2014 Agenda Project Updates Recently Completed and in Construction Projects in Design Projects in Planning
89 Avenue Road GP Ltd. Functional Servicing and Stormwater Management Report for 89 Avenue Road Re-Development City of Toronto
89 Avenue Road GP Ltd. Functional Servicing and Stormwater Management Report for 89 Avenue Road Re-Development City of Toronto Prepared By: R.J. Burnside & Associates Limited 6990 Creditview Road, Unit
100 Locust Avenue, Berkeley Heights, New Jersey P R O P E R T Y O F F E R I N G
100 Locust Avenue, Berkeley Heights, New Jersey P R O P E R T Y O F F E R I N G The Opportunity Jones Lang LaSalle, Inc. (the Broker ) is please to offer the fee simple interest in 100 Locust Avenue (the
Kansas City s Overflow Control Program
Kansas City s Overflow Control Program Kansas City Water Services Water Wastewater Stormwater 2 Water Services Department 1000 Positions 835 Employees 3 Utilities FY 13/14 Budget = $307 million Water Wastewater