The fees listed below are stand-alone fees. Additional Developemnt Review or Stormwater fees may apply Fee Activity

Size: px
Start display at page:

Download "The fees listed below are stand-alone fees. Additional Developemnt Review or Stormwater fees may apply. 1.0. Fee Activity"

Transcription

1 MINOR & MISCELLANEOUS PERMITS The fees listed below are stand-alone fees. Additional Developemnt Review or Stormwater fees may apply. 1.0 Fee Activity Fee Description Fee 50% REDUCED FEES FOR SINGLE FAMILY RESIDENTIAL ENERGY SAVING UPGRADES Electrical service upgrade each $ 108 Electric car charging system each $ 108 Firepalce Insert/upgrade each $ 287 Furnace/heater replacement each $ 108 Graywater/Rainwater Harvesting System each $ 66 Insulation/energy upgrade per project $ 104 Re-roof with added ventilation per project $ 104 Solar photovoltaic system per project $ 149 Water heater replacement each $ 108 Window retrofits (non-structural only) per project $ 174 MINOR COMMERCIAL AND RESIDENTIAL IMPROVEMENT PROJECTS Balcony/Porch/Deck first 300 s.f. per project $ 980 ea add'l 100 s.f per project $ 100 Canopy / Awning per project $ 340 Cellular Tower / Antenna First Antenna / Tower each $ 806 each add'l antenna/ tower each $ 88 Antenna/Tower w/ Equipment Shelter each $ 587 Commercial Access Upgrade (ADA Compliance) Site-work such as Ramps or Exterior each $ 1,052 Upgrades such as reception counter, registers, signage, etc. each $ 842 Commercial Coach Installation each $ 1,397 Demolition Interior or garage - utlity building per project $ 398 Entire Building, residence or commercial per project $ 697 Dry rot/termite Repair per project $ 207 Fence or Non-Engineered Wall per project $ 599 Fireplace Retrofit / Chimney Repair per project $ 573 Flag, Light, or Sign Pole - Install / Replace per project $ 713 Foundation Replace / New (includes piles, piers, or foundation-only systems under existing or partial construction) per project $ 1,195 Foundation Repair (includes piles, piers, or foundation-only systems under existing or partial construction) per project $ 597 Garage Conversion First 500 s.f. per project $ 796 Ea add'l 100 s.f. per project $ 100 Grading 1,000 CY or less per project $ 697 1,001-10,000 CY per project $ 896 >10,001 CY per project $ 1,095 Paint Booth per project $ 896 Partition per project $ 666 Patio Cover Open per project $ 599 Enclosed per project $ 1,045 Pool / Spa - Commercial per project $ 995 Pool / Spa - Residential per project $ 796 Re-Roof - Residential per project $ 207 Re-Roof - Commercial First 300 s.f. per project $ 398 Ea add'l 100 s.f. per project $ 100 Misc Page 1 of 4

2 MINOR & MISCELLANEOUS PERMITS The fees listed below are stand-alone fees. Additional Developemnt Review or Stormwater fees may apply. 1.0 Fee Activity Fee Description Fee Roof Structure Replacement First 300 s.f. per project $ 896 Ea add'l 100 s.f. per project $ 120 Retaining Wall Engineered per project First 100 l.f. per project $ 1,095 Ea add'l 100 l.f. per project $ 100 Non-Engineered per project $ 699 Stair Repair / Replace per project $ 896 Shear Wall / Steel Support Column - stand alone (not part of a building permit) per project $ 796 Siding / Stucco per project $ 378 Sign Wall per project $ 299 Monument per project $ 532 Solar / PV System - Commercial / Multi-family per project $ 697 Store Front/Façade Alterations: Minor per project $ 896 T-Bbar Ceiling/Furred Ceiling - stand alone (not part of a building permit) per project $ 597 Trash Enclosure per project $ 995 Vapor Recovery Systems / Service Station Upgrades (up to 3) per project $ 498 Window / Door - Non-Structural First 10 windows / doors per project $ 348 each add'l 10 windows/doors per project $ 17 Window / Door - Structural First 10 windows / doors per project $ 514 each add'l 10 windows/doors per project $ 67 Minor Repairs (for items otherwise not listed, for the purpose of reconstruction, renewal, or maintenance of any part of an existing structure - requiring not more than two inspections) per project $ 273 Minor Code Corrections per project $ 207 Minor Lease Space Improvements Prior to Tenant Improvement per project $ 1,195 MECHANICAL, PLUMBING AND ELECTRICAL PERMITS (Not associated with an existing building permit) ADMINISTRATIVE AND MISC. FEES Minimum Permit Issuance (includes travel and documentation) $ 215 Appeal of Building Official Decision per project $ 995 Handicap Board of Appeals per project $ 995 Fire Permit Handling Fee per project $ 398 Supplemental Plan Check per project $ 199 Supplemental Inspection per project $ 199 After Hours Inspection (Scheduled, 2 hour minimum) per project $ 398 Preliminary Project Consultation / Code Analysis (per hour) per project $ 199 Misc Page 2 of 4

3 MINOR & MISCELLANEOUS PERMITS The fees listed below are stand-alone fees. Additional Developemnt Review or Stormwater fees may apply. 1.0 Fee Activity Fee Description Fee MECHANICAL PERMIT FEES Stand Alone Mechanical Plan Check (per 1/2 hour) $ 100 UNIT FEES: A/C (Residential) - each $ 66 Furnaces (F.A.U., Floor) $ 66 Heater (Wall) $ 66 Refrigeration Compressor/Condenser $ 83 Boiler $ 83 Chiller $ 83 Heat Pump (Package unit) $ 50 Heater (Unit, Radiant, etc.) $ 50 Air Handler $ 50 Duct Work only $ 50 Evaporative Cooler $ 50 Make-up Air System $ 50 Vent Fan (Single Duct) - each $ 50 Exhaust Hood and Duct (Residential) $ 50 Exhaust Hood - Type I (Commercial Grease Hood) $ 100 Exhaust Hood - Type II (Commercial Steam Hood) $ 66 Walk-in Box/Refrigerator Coil $ 66 Miscellaneous Mechanical Items NOS (not otherwise specified) $ 66 Other Mechanical Inspections (per hour) $ 199 Mechanical Volume and Current Fee Analysis $ 61 PLUMBING/GAS PERMIT FEES Stand Alone Plumbing Plan Check (hourly rate) $ 199 UNIT FEES: Fixtures (each) $ 50 Gas System Replace/Repair/Extend (First Outlet) $ 50 Gas Outlets (Each Additional) $ 7 Building Sewer $ 66 Grease Trap $ 50 Water Heater (First Heater) $ 66 Water Heater (Each Additional Heater) $ 17 Water Pipe Repair/Replacement $ 50 Drain-Vent Repair/Alterations $ 50 Solar Water System Fixtures (solar panels, tanks, water treatment equipment) $ 66 Graywater Systems (each) $ 133 Miscellaneous Plumbing Items NOS $ 66 Other Plumbing and Gas Inspections (per hour) $ 199 Plumbing Volume and Current Fee Analysis $ 60 Misc Page 3 of 4

4 MINOR & MISCELLANEOUS PERMITS The fees listed below are stand-alone fees. Additional Developemnt Review or Stormwater fees may apply. 1.0 Fee Activity Fee Description Fee ELECTRICAL PERMIT FEES Stand Alone Electrical Plan Check (per 1/2 hour) $ 100 Add/Replace Service (not over 200 amps) $ 66 Add/Replace Service (over 200 amps) $ 100 New/Altered Circuits 15 or 20 amp - Each 10 circuits (or fraction thereof) $ or 40 amp circuits (each) $ to 175 amp circuits (each) $ amp and larger circuits (each) $ 50 Temporary Service (each) $ 50 Generator Installation (each) $ 76 Miscellaneous Electrical Items NOS $ 66 Other Electrical Inspections (per hour) $ 199 Electrical Volume and Current Fee Analysis $ 61 OTHER Seismic Strengthening of Unreinforced Masonry Building **Remains at $40 per resolution $ 40 Code Enforcement Fee $ 323 Construction Tax $ 150 STORMWATER PLAN REVIEW & INSPECTION Minor Projects: Non-structural commercial TI s, residential remodels and residential additions less than 500 SF and U occupancies (Garages and storage sheds) all with minimal grading activity $ 261 Moderate Projects: Structural Commercial TI s and additions up to 5,000 sf, Residential additions over 500 SF, Change of Occupancy all with site grading work less than 1 acre $ 1,643 Major Projects: New SFR s, New Commercial Buildings (additions over 5,000 SF), projects with parcels of 1 acre or more $ 3,484 Misc Page 4 of 4

5 New Construction Fee Schedule - Plan Check Fees 1.03 Effective 7/1/12 Fire Rating Type I, II Fire Rating Type IIA, III Fire Rating Type IIB, IV, VB Commercial Uses - Structural (All newly constructed, added, or structurally remodeled space for non-residential occupancies classified as CBC Group A, B, E, F, H, I, M, or other commercial occupancies not specifically addressed elsewhere in this Fee Schedule) 500 per project $ 2,514 $ 1.67 $ 2,095 $ 1.39 $ 1,676 $ ,000 per project $ 10,058 $ 0.50 $ 8,382 $ 0.41 $ 6,705 $ ,000 per project $ 12,573 $ 0.18 $ 10,477 $ 0.15 $ 8,382 $ ,000 per project $ 20,117 $ 0.10 $ 16,764 $ 0.08 $ 13,411 $ 100,000 per project $ 25,146 $ 0.25 $ 20,955 $ 0.20 $ 16,764 $ 0.16 Commercial Residential and Multifamily Residential Uses - (All newly constructed, added, or structurally remodeled space for residential occupancies classified as CBC Group R (except R-3), or other residential occupancies not specifically addressed elsewhere in this Fee Schedule) 500 per project $ 2,766 $ 1.84 $ 2,305 $ 1.53 $ 1,844 $ ,000 per project $ 11,064 $ 0.55 $ 9,220 $ 0.46 $ 7,376 $ ,000 per project $ 13,830 $ 0.20 $ 11,525 $ 0.17 $ 9,220 $ ,000 per project $ 22,128 $ 0.11 $ 18,440 $ 0.09 $ 14,752 $ ,000 per project $ 27,661 $ 0.27 $ 23,051 $ 0.23 $ 18,440 $ 0.17 Duplicate Floor Plan Review - Commercial Residential and Multifamily Residential Uses 500 per project $ 1,825 $ 0.40 $ 1,521 $ 0.33 $ 1,217 $ ,000 per project $ 3,651 $ 0.14 $ 3,042 $ 0.12 $ 2,434 $ ,000 per project $ 4,381 $ 0.02 $ 3,651 $ 0.02 $ 2,921 $ ,000 per project $ 5,476 $ 0.03 $ 4,564 $ 0.03 $ 3,651 $ ,000 per project $ 7,302 $ 0.07 $ 6,085 $ $ 4,868 $ 0.04 Low and Moderate Hazard Storage - (All newly constructed, added, or structurally remodeled space for storage occupancies classified as CBC Group S, or other storage occupancies not specifically addressed elsewhere in this Fee Schedule) 500 per project $ 2,514 $ 1.67 $ 2,095 $ 1.39 $ 1,676 $ ,000 per project $ 10,058 $ 0.50 $ 8,382 $ 0.41 $ 6,705 $ ,000 per project $ 12,573 $ 0.18 $ 10,477 $ 0.15 $ 8,382 $ ,000 per project $ 20,117 $ 0.10 $ 16,764 $ 0.08 $ 13,411 $ 100,000 per project $ 25,146 $ 0.25 $ 20,955 $ 0.20 $ 16,764 $ 0.16 Attached Accessory and Utility Uses - (All newly constructed, added, or structurally remodeled space for utility and accessory occupancies classified as CBC Group U, or other utility and accessory occupancies not specifically addressed elsewhere in this Fee Schedule) 200 per project $ 640 $ 1.45 $ 534 $ 1.21 $ 427 $ per project $ 931 $ 1.35 $ 776 $ 1.12 $ 621 $ per project $ 1,203 $ 0.30 $ 1,002 $ 0.25 $ 802 $ ,000 per project $ 1,323 $ 0.24 $ 1,102 $ 0.20 $ 882 $ ,000 per project $ 1,804 $ 0.60 $ 1,503 $ 0.50 $ 1,203 $ 0.38 Detached Accessory and Utility Uses - (All newly constructed, added, or structurally remodeled space for utility and accessory occupancies classified as CBC Group U, or other utility and accessory occupancies not specifically addressed elsewhere in this Fee Schedule) 200 per project $ 640 $ 1.45 $ 534 $ 1.21 $ 427 $ per project $ 931 $ 1.35 $ 776 $ 1.12 $ 621 $ per project $ 1,203 $ 0.30 $ 1,002 $ 0.25 $ 802 $ ,000 per project $ 1,323 $ 0.24 $ 1,102 $ 0.20 $ 882 $ ,000 per project $ 1,804 $ 0.60 $ 1,503 $ 0.50 $ 1,203 $ 0.38 Shell Buildings for all Commercial Uses - (The enclosure for all newly constructed, added, or structurally remodeled space for non-residential occupancies classified as CBC Group A, B, E, F, H, I, M, or other commercial occupancies not specifically addressed elsewhere in this Fee Schedule where the interior is not completed or occupiable) 500 per project $ 1,508 $ 1.00 $ 1,257 $ 0.83 $ 1,005 $ ,000 per project $ 6,035 $ 0.30 $ 5,029 $ 0.25 $ 4,023 $ ,000 per project $ 7,543 $ 0.11 $ 6,286 $ 0.09 $ 5,029 $ ,000 per project $ 12,070 $ $ 10,058 $ 0.05 $ 8,046 $ ,000 per project $ 15,087 $ 0.15 $ 12,573 $ 0.12 $ 10,058 $ 0.09 Commercial Tenant Improvement - Non Structural - (Non-structurally remodeled space for non-residential occupancies classified as CBC Group A, B, E, F, H, I, M, or other commercial occupancies not specifically addressed elsewhere in this Fee Schedule where the structure is not altered) 500 per project $ 1,257 $ 0.83 $ 1,047 $ 0.69 $ 838 $ ,000 per project $ 5,029 $ 0.25 $ 4,191 $ 0.20 $ 3,352 $ ,000 per project $ 6,286 $ 0.09 $ 5,238 $ 0.07 $ 4,191 $ 50,000 per project $ 10,058 $ 0.05 $ 8,382 $ 0.04 $ 6,705 $ ,000 per project $ 12,573 $ 0.12 $ 10,477 $ 0.10 $ 8,382 $ 0.08 Commercial Residential and Multifamily Residential Remodels - Non Structural - (Non-Structurally remodeled space for residential occupancies classified as CBC Group R (except R-3), or other residential occupancies not specifically addressed elsewhere in this Fee Schedule) 500 per project $ 1,308 $ 0.87 $ 1,090 $ 0.72 $ 872 $ ,000 per project $ 5,235 $ 0.26 $ 4,362 $ 0.21 $ 3,490 $ ,000 per project $ 6,544 $ 0.09 $ 5,453 $ 0.08 $ 4,362 $ 50,000 per project $ 10,470 $ 0.05 $ 8,725 $ 0.04 $ 6,980 $ ,000 per project $ 13,088 $ 0.13 $ 10,906 $ 0.10 $ 8,725 $ 0.08 PlanCheck 12 13, 1 of 2

6 New Construction Fee Schedule - Plan Check Fees 1.03 Effective 7/1/12 Fire Rating Type I, II Fire Rating Type IIA, III Fire Rating Type IIB, IV, VB Single Family Dwellings and Duplexes - (All newly constructed space for residential occupancies classified as CBC Group R-3, including custom builds and model homes for tract master plans, or other similar residential occupancies not specifically addressed elsewhere in this Fee Schedule) 1,000 per project $ 2,997 $ 1.99 $ 2,498 $ 1.66 $ 1,998 $ ,500 per project $ 5,995 $ 0.39 $ 4,996 $ 0.33 $ 3,997 $ ,000 per project $ 6,595 $ 0.44 $ 5,496 $ 0.37 $ 4,396 $ ,000 per project $ 7,494 $ 0.74 $ 6,245 $ 0.62 $ 4,996 $ ,000 per project $ 8,993 $ 1.12 $ 7,494 $ 0.93 $ 5,995 $ 0.74 Duplicate Floor Plan Review - Single Family Dwellings and Duplexes 1,000 per project $ 968 $ 0.64 $ 807 $ 0.53 $ 645 $ ,500 per project $ 1,937 $ 0.12 $ 1,614 $ 0.10 $ 1,291 $ ,000 per project $ 2,131 $ 0.14 $ 1,776 $ 0.12 $ 1,420 $ ,000 per project $ 2,421 $ 0.24 $ 2,018 $ 0.20 $ 1,614 $ ,000 per project $ 2,906 $ 0.36 $ 2,421 $ 0.30 $ 1,937 $ 0.24 Duplicate Floor Plan Review - Attached or Detached Accessory and Utility Uses 200 per project $ 192 $ 0.43 $ 160 $ 0.36 $ 128 $ per project $ 279 $ 0.40 $ 232 $ 0.33 $ 186 $ per project $ 360 $ 0.09 $ 300 $ 0.07 $ 240 $ 1,000 per project $ 397 $ 0.07 $ 330 $ $ 264 $ ,000 per project $ 541 $ 0.18 $ 451 $ 0.15 $ 360 $ 0.12 Structural Residential Remodels and Additions - (All newly constructed additions to, or structurally remodeled areas of, residential occupancies classified as CBC Group R-3, or other similar residential occupancies not specifically addressed elsewhere in this Fee Schedule) 100 per project $ 824 $ 1.98 $ 687 $ 1.65 $ 549 $ per project $ 1,618 $ 3.23 $ 1,348 $ 2.69 $ 1,079 $ ,000 per project $ 3,237 $ 0.64 $ 2,697 $ 0.53 $ 2,158 $ ,500 per project $ 3,560 $ 0.64 $ 2,967 $ 0.53 $ 2,373 $ ,000 per project $ 3,884 $ 1.94 $ 3,237 $ 1.61 $ 2,589 $ 1.29 Non-Structural Residential Remodels and Additions - (All newly constructed additions to, or non-structurally remodeled areas of, residential occupancies classified as CBC Group R-3, or other similar residential occupancies not specifically addressed elsewhere in this Fee Schedule) 100 per project $ 591 $ 0.41 $ 493 $ 0.34 $ 394 $ per project $ 759 $ 1.32 $ 632 $ 1.10 $ 506 $ ,000 per project $ 1,420 $ 0.28 $ 1,183 $ 0.23 $ 946 $ ,500 per project $ 1,562 $ 0.28 $ 1,301 $ 0.23 $ 1,041 $ ,000 per project $ 1,704 $ 0.85 $ 1,420 $ 0.71 $ 1,136 $ 0.56 Site Improvements - This includes substantial development of private parking lots which are processed separate of the structure and include any combination of the following: Underground utilities, parking lot lighting, accessible path of travel analysis, grading, drainage and compliance with the City's parking and driveway standards. 500 per project $ 848 $ 0.56 $ 706 $ 0.47 $ 565 $ ,000 per project $ 3,392 $ 0.16 $ 2,826 $ 0.14 $ 2,261 $ ,000 per project $ 4,240 $ $ 3,533 $ 0.05 $ 2,826 $ ,000 per project $ 6,784 $ 0.03 $ 5,653 $ 0.02 $ 4,523 $ ,000 per project $ 8,480 $ 0.08 $ 7,067 $ 0.07 $ 5,653 $ 0.05 $ - $ - $ - $ - $ - $ - PlanCheck 12 13, 2 of 2

7 New Construction Fee Schedule - Inspection Fees Effective 7/1/ Fire Rating Type I, II Fire Rating Type IIA, III Fire Rating Type IIB, IV, VB Commercial Uses - Structural (All newly constructed, added, or structurally remodeled space for non-residential occupancies classified as CBC Group A, B, E, F, H, I, M, or other commercial occupancies not specifically addressed elsewhere in this Fee Schedule) 500 per project $ 2,024 $ 1.35 $ 1,687 $ 1.12 $ 1,350 $ ,000 per project $ 8,097 $ 1.21 $ 6,748 $ 1.01 $ 5,398 $ ,000 per project $ 14,170 $ 0.15 $ 11,809 $ 0.13 $ 9,447 $ ,000 per project $ 20,243 $ 0.16 $ 16,870 $ 0.13 $ 13,496 $ ,000 per project $ 28,341 $ 0.28 $ 23,617 $ 0.24 $ 18,894 $ 0.18 Commercial Residential and Multifamily Residential Uses - (All newly constructed, added, or structurally remodeled space for residential occupancies classified as CBC Group R (except R-3), or other residential occupancies not specifically addressed elsewhere in this Fee Schedule) 500 per project $ 3,037 $ 2.02 $ 2,530 $ 1.69 $ 2,024 $ ,000 per project $ 12,146 $ 1.82 $ 10,122 $ 1.52 $ 8,097 $ ,000 per project $ 21,256 $ 0.23 $ 17,713 $ 0.19 $ 14,170 $ ,000 per project $ 30,365 $ 0.24 $ 25,304 $ 0.20 $ 20,243 $ ,000 per project $ 42,511 $ 0.43 $ 35,426 $ 0.35 $ 28,341 $ 0.28 Duplicate Floor Plan Review - Commercial Residential and Multifamily Residential Uses 500 per project $ 1,826 $ 0.41 $ 1,521 $ 0.34 $ 1,217 $ ,000 per project $ 3,651 $ 0.15 $ 3,043 $ 0.12 $ 2,434 $ ,000 per project $ 4,382 $ 0.03 $ 3,651 $ 0.02 $ 2,921 $ ,000 per project $ 5,477 $ 0.04 $ 4,564 $ 0.03 $ 3,651 $ ,000 per project $ 7,303 $ 0.07 $ 6,085 $ $ 4,868 $ 0.28 Low and Moderate Hazard Storage - (All newly constructed, added, or structurally remodeled space for storage occupancies classified as CBC Group S, or other storage occupancies not specifically addressed elsewhere in this Fee Schedule) 500 per project $ 2,024 $ 1.35 $ 1,687 $ 1.12 $ 1,350 $ ,000 per project $ 8,097 $ 1.21 $ 6,748 $ 1.01 $ 5,398 $ ,000 per project $ 14,170 $ 0.15 $ 11,809 $ 0.13 $ 9,447 $ ,000 per project $ 20,243 $ 0.16 $ 16,870 $ 0.13 $ 13,496 $ ,000 per project $ 28,341 $ 0.28 $ 23,617 $ 0.24 $ 18,894 $ 0.18 Attached Accessory and Utility Uses - (All newly constructed, added, or structurally remodeled space for utility and accessory occupancies classified as CBC Group U, or other utility and accessory occupancies not specifically addressed elsewhere in this Fee Schedule) 200 per project $ 1,581 $ 0.77 $ 1,318 $ 0.64 $ 1,054 $ per project $ 1,735 $ 4.24 $ 1,446 $ 3.53 $ 1,156 $ per project $ 2,583 $ 1.27 $ 2,152 $ 1.06 $ 1,722 $ ,000 per project $ 3,091 $ 1.03 $ 2,576 $ 0.86 $ 2,061 $ ,000 per project $ 5,145 $ 1.72 $ 4,288 $ 1.43 $ 3,430 $ 1.14 Detached Accessory and Utility Uses - (All newly constructed, added, or structurally remodeled space for utility and accessory occupancies classified as CBC Group U, or other utility and accessory occupancies not specifically addressed elsewhere in this Fee Schedule) 200 per project $ 1,449 $ 0.60 $ 1,207 $ 0.50 $ 966 $ per project $ 1,569 $ 3.98 $ 1,307 $ 3.32 $ 1,046 $ per project $ 2,366 $ 1.18 $ 1,971 $ 0.99 $ 1,577 $ ,000 per project $ 2,839 $ 0.95 $ 2,366 $ 0.79 $ 1,892 $ ,000 per project $ 4,731 $ 1.60 $ 3,943 $ 1.31 $ 3,154 $ 1.05 Shell Buildings for all Commercial Uses - (The enclosure for all newly constructed, added, or structurally remodeled space for non-residential occupancies classified as CBC Group A, B, E, F, H, I, M, or other commercial occupancies not specifically addressed elsewhere in this Fee Schedule where the interior is not completed or occupiable) 500 per project $ 1,297 $ 0.79 $ 1,081 $ 0.66 $ 865 $ ,000 per project $ 4,858 $ 0.73 $ 4,049 $ 0.61 $ 3,239 $ ,000 per project $ 8,502 $ 0.09 $ 7,085 $ 0.08 $ 5,668 $ 50,000 per project $ 12,146 $ 0.10 $ 10,122 $ 0.08 $ 8,097 $ 100,000 per project $ 17,005 $ 0.17 $ 14,170 $ 0.14 $ 11,336 $ 0.12 Inspect 12 13, 1 of 2

8 New Construction Fee Schedule - Inspection Fees Effective 7/1/ Fire Rating Type I, II Fire Rating Type IIA, III Fire Rating Type IIB, IV, VB Commercial Tenant Improvement - Non Structural - (Non-structurally remodeled space for non-residential occupancies classified as CBC Group A, B, E, F, H, I, M, or other commercial occupancies not specifically addressed elsewhere in this Fee Schedule where the structure is not altered) 500 per project $ 962 $ 0.69 $ 802 $ 0.57 $ 642 $ ,000 per project $ 4,049 $ 0.61 $ 3,374 $ 0.51 $ 2,699 $ ,000 per project $ 7,085 $ 0.08 $ 5,904 $ $ 4,723 $ ,000 per project $ 10,122 $ 0.08 $ 8,435 $ 0.07 $ 6,748 $ ,000 per project $ 14,170 $ 0.14 $ 11,809 $ 0.12 $ 9,447 $ 0.09 Commercial Residential and Multifamily Residential Remodels - Non Structural - (Non-Structurally remodeled space for residential occupancies classified as CBC Group R (except R-3), or other residential occupancies not specifically addressed elsewhere in this Fee Schedule) 500 per project $ 972 $ 0.65 $ 810 $ 0.54 $ 648 $ ,000 per project $ 3,886 $ 0.58 $ 3,238 $ 0.49 $ 2,591 $ ,000 per project $ 6,801 $ 0.07 $ 5,667 $ $ 4,534 $ ,000 per project $ 9,715 $ 0.08 $ 8,096 $ $ 6,477 $ ,000 per project $ 13,601 $ 0.14 $ 11,334 $ 0.11 $ 9,067 $ 0.09 Single Family Dwellings and Duplexes - (All newly constructed space for residential occupancies classified as CBC Group R-3, including custom builds and model homes for tract master plans, or other similar residential occupancies not specifically addressed elsewhere in this Fee Schedule) 1,000 per project $ 3,036 $ 2.02 $ 2,530 $ 1.69 $ 2,024 $ ,500 per project $ 6,071 $ 1.01 $ 5,060 $ 0.84 $ 4,048 $ ,000 per project $ 7,589 $ 2.28 $ 6,324 $ 1.90 $ 5,060 $ ,000 per project $ 12,143 $ 3.04 $ 10,119 $ 2.53 $ 8,095 $ ,000 per project $ 18,214 $ 2.28 $ 15,179 $ 1.90 $ 12,143 $ 1.52 Duplicate Floor Plan Review - Single Family Dwellings and Duplexes 1,000 per project $ 3,036 $ 2.02 $ 2,530 $ 1.69 $ 2,024 $ ,500 per project $ 6,071 $ 1.01 $ 5,060 $ 0.84 $ 4,048 $ ,000 per project $ 7,589 $ 2.28 $ 6,324 $ 1.90 $ 5,060 $ ,000 per project $ 12,143 $ 3.04 $ 10,119 $ 2.53 $ 8,095 $ ,000 per project $ 18,214 $ 2.28 $ 15,179 $ 1.90 $ 12,143 $ 1.52 Duplicate Floor Plan Review - Attached or Detached Accessory and Utility Uses 200 per project $ 1,449 $ 0.60 $ 1,207 $ 0.50 $ 966 $ per project $ 1,569 $ 3.98 $ 1,307 $ 3.32 $ 1,046 $ per project $ 2,366 $ 1.18 $ 1,971 $ 0.99 $ 1,577 $ ,000 per project $ 2,839 $ 0.95 $ 2,366 $ 0.79 $ 1,892 $ ,000 per project $ 4,731 $ 1.58 $ 3,943 $ 1.31 $ 3,154 $ 1.05 Structural Residential Remodels and Additions - (All newly constructed additions to, or structurally remodeled areas of, residential occupancies classified as CBC Group R-3, or other similar residential occupancies not specifically addressed elsewhere in this Fee Schedule) 100 per project $ 1,201 $ 2.74 $ 1,001 $ 2.29 $ 801 $ per project $ 2,298 $ 2.30 $ 1,915 $ 1.92 $ 1,532 $ ,000 per project $ 3,447 $ 2.30 $ 2,873 $ 1.92 $ 2,298 $ ,500 per project $ 4,596 $ 2.30 $ 3,830 $ 1.92 $ 3,064 $ ,000 per project $ 5,746 $ 2.87 $ 4,788 $ 2.39 $ 3,830 $ 1.92 Non-Structural Residential Remodels and Additions - (All newly constructed additions to, or non-structurally remodeled areas of, residential occupancies classified as CBC Group R-3, or other similar residential occupancies not specifically addressed elsewhere in this Fee Schedule) $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ per project $ 1,093 $ 2.73 $ 911 $ 2.28 $ 729 $ per project $ 2,186 $ 2.19 $ 1,821 $ 1.82 $ 1,457 $ ,000 per project $ 3,279 $ 2.19 $ 2,732 $ 1.82 $ 2,186 $ ,500 per project $ 4,371 $ 2.19 $ 3,643 $ 1.82 $ 2,914 $ ,000 per project $ 5,464 $ 2.73 $ 4,554 $ 2.28 $ 3,643 $ 1.82 Site Improvements - This includes substantial development of private parking lots which are processed separate of the structure and include any combination of the following: Underground utilities, parking lot lighting, accessible path of travel analysis, grading, drainage and compliance with the City's parking and driveway standards. $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ per project $ 671 $ 0.45 $ 559 $ 0.37 $ 447 $ ,000 per project $ 2,682 $ 0.40 $ 2,235 $ 0.34 $ 1,788 $ ,000 per project $ 4,694 $ 0.05 $ 3,912 $ 0.04 $ 3,129 $ ,000 per project $ 6,706 $ 0.05 $ 5,588 $ 0.04 $ 4,471 $ ,000 per project $ 9,388 $ 0.09 $ 7,823 $ 0.08 $ 6,259 $ $ - $ - $ - $ - $ - $ - Inspect 12 13, 2 of 2

9 MINOR & MISCELLANEOUS PERMITS The fees listed below are stand-alone fees. Additional Developemnt Review or Stormwater fees may apply Fee Activity Fee Description Fee 50% REDUCED FEES FOR SINGLE FAMILY RESIDENTIAL ENERGY SAVING UPGRADES Electrical service upgrade each $ 110 Electric car charging system each $ 110 Firepalce Insert/upgrade each $ 292 Furnace/heater replacement each $ 110 Graywater/Rainwater Harvesting System each $ 67 Insulation/energy upgrade per project $ 106 Re-roof with added ventilation per project $ 106 Solar photovoltaic system per project $ 152 Water heater replacement each $ 110 Window retrofits (non-structural only) per project $ 177 MINOR COMMERCIAL AND RESIDENTIAL IMPROVEMENT PROJECTS Balcony/Porch/Deck first 300 s.f. per project $ 997 ea add'l 100 s.f per project $ 102 Canopy / Awning per project $ 346 Cellular Tower / Antenna First Antenna / Tower each $ 820 each add'l antenna/ tower each $ 89 Antenna/Tower w/ Equipment Shelter each $ 597 Commercial Access Upgrade (ADA Compliance) Site-work such as Ramps or Exterior each $ 1,070 Upgrades such as reception counter, registers, signage, etc. each $ 856 Commercial Coach Installation each $ 1,421 Demolition Interior or garage - utlity building per project $ 405 Entire Building, residence or commercial per project $ 709 Dry rot/termite Repair per project $ 211 Fence or Non-Engineered Wall per project $ 609 Fireplace Retrofit / Chimney Repair per project $ 583 Flag, Light, or Sign Pole - Install / Replace per project $ 725 Foundation Replace / New (includes piles, piers, or foundation-only systems under existing or partial construction) per project $ 1,215 Foundation Repair (includes piles, piers, or foundation-only systems under existing or partial construction) per project $ 607 Garage Conversion First 500 s.f. per project $ 810 Ea add'l 100 s.f. per project $ 102 Grading 1,000 CY or less per project $ 709 1,001-10,000 CY per project $ 911 >10,001 CY per project $ 1,114 Paint Booth per project $ 911 Partition per project $ 677 Patio Cover Open per project $ 609 Enclosed per project $ 1,063 Misc Page 1 of 5

10 MINOR & MISCELLANEOUS PERMITS The fees listed below are stand-alone fees. Additional Developemnt Review or Stormwater fees may apply Fee Activity Fee Description Fee Pool / Spa - Commercial per project $ 1,012 Pool / Spa - Residential per project $ 810 Re-Roof - Residential per project $ 211 Re-Roof - Commercial First 300 s.f. per project $ 405 Ea add'l 100 s.f. per project $ 102 Roof Structure Replacement First 300 s.f. per project $ 911 Ea add'l 100 s.f. per project $ 122 Retaining Wall Engineered per project First 100 l.f. per project $ 1,114 Ea add'l 100 l.f. per project $ 102 Non-Engineered per project $ 711 Stair Repair / Replace per project $ 911 Shear Wall / Steel Support Column - stand alone (not part of a building permit) per project $ 810 Siding / Stucco per project $ 384 Sign Wall per project $ 304 Monument per project $ 541 Solar / PV System - Commercial / Multi-family per project $ 709 Store Front/Façade Alterations: Minor per project $ 911 T-Bbar Ceiling/Furred Ceiling - stand alone (not part of a building permit) per project $ 607 Trash Enclosure per project $ 1,012 Vapor Recovery Systems / Service Station Upgrades (up to 3) per project $ 506 Window / Door - Non-Structural First 10 windows / doors per project $ 354 each add'l 10 windows/doors per project $ 17 Window / Door - Structural First 10 windows / doors per project $ 523 each add'l 10 windows/doors per project $ 68 Minor Repairs (for items otherwise not listed, for the purpose of reconstruction, renewal, or maintenance of any part of an existing structure - requiring not more than two inspections) per project $ 278 Minor Code Corrections per project $ 211 Minor Lease Space Improvements Prior to Tenant Improvement per project $ 1,215 Misc Page 2 of 5

11 MINOR & MISCELLANEOUS PERMITS The fees listed below are stand-alone fees. Additional Developemnt Review or Stormwater fees may apply Fee Activity Fee Description Fee MECHANICAL, PLUMBING AND ELECTRICAL PERMITS (Not associated with an existing building permit) ADMINISTRATIVE AND MISC. FEES Minimum Permit Issuance (includes travel and documentation) $ 219 Appeal of Building Official Decision per project $ 1,012 Handicap Board of Appeals per project $ 1,012 Fire Permit Handling Fee per project $ 405 Supplemental Plan Check per project $ 202 Supplemental Inspection per project $ 202 After Hours Inspection (Scheduled, 2 hour minimum) per project $ 405 Preliminary Project Consultation / Code Analysis (per hour) per project $ 202 MECHANICAL PERMIT FEES Stand Alone Mechanical Plan Check (per 1/2 hour) $ 102 UNIT FEES: A/C (Residential) - each $ 67 Furnaces (F.A.U., Floor) $ 67 Heater (Wall) $ 67 Refrigeration Compressor/Condenser $ 84 Boiler $ 84 Chiller $ 84 Heat Pump (Package unit) $ 51 Heater (Unit, Radiant, etc.) $ 51 Air Handler $ 51 Duct Work only $ 51 Evaporative Cooler $ 51 Make-up Air System $ 51 Vent Fan (Single Duct) - each $ 51 Exhaust Hood and Duct (Residential) $ 51 Exhaust Hood - Type I (Commercial Grease Hood) $ 102 Exhaust Hood - Type II (Commercial Steam Hood) $ 67 Walk-in Box/Refrigerator Coil $ 67 Miscellaneous Mechanical Items NOS (not otherwise specified) $ 67 Other Mechanical Inspections (per hour) $ 202 Mechanical Volume and Current Fee Analysis $ 62 Misc Page 3 of 5

12 MINOR & MISCELLANEOUS PERMITS The fees listed below are stand-alone fees. Additional Developemnt Review or Stormwater fees may apply Fee Activity Fee Description Fee PLUMBING/GAS PERMIT FEES Stand Alone Plumbing Plan Check (hourly rate) $ 202 UNIT FEES: Fixtures (each) $ 51 Gas System Replace/Repair/Extend (First Outlet) $ 51 Gas Outlets (Each Additional) $ 7 Building Sewer $ 67 Grease Trap $ 51 Water Heater (First Heater) $ 67 Water Heater (Each Additional Heater) $ 17 Water Pipe Repair/Replacement $ 51 Drain-Vent Repair/Alterations $ 51 Solar Water System Fixtures (solar panels, tanks, water treatment equipment) $ 67 Graywater Systems (each) $ 135 Miscellaneous Plumbing Items NOS $ 67 Other Plumbing and Gas Inspections (per hour) $ 202 Plumbing Volume and Current Fee Analysis $ 61 Misc Page 4 of 5

13 MINOR & MISCELLANEOUS PERMITS The fees listed below are stand-alone fees. Additional Developemnt Review or Stormwater fees may apply Fee Activity Fee Description Fee ELECTRICAL PERMIT FEES Stand Alone Electrical Plan Check (per 1/2 hour) $ 102 Add/Replace Service (not over 200 amps) $ 67 Add/Replace Service (over 200 amps) $ 102 New/Altered Circuits 15 or 20 amp - Each 10 circuits (or fraction thereof) $ or 40 amp circuits (each) $ to 175 amp circuits (each) $ amp and larger circuits (each) $ 51 Temporary Service (each) $ 51 Generator Installation (each) $ 77 Miscellaneous Electrical Items NOS $ 67 Other Electrical Inspections (per hour) $ 202 Electrical Volume and Current Fee Analysis $ 62 OTHER Seismic Strengthening of Unreinforced Masonry Building **Remains at $40 per resolution $ 40 Code Enforcement Fee $ 328 Construction Tax **This fee does not increase by CPI $ 150 STORMWATER PLAN REVIEW & INSPECTION Minor Projects: Non-structural commercial TI s, residential remodels and residential additions less than 500 SF and U occupancies (Garages and storage sheds) all with minimal grading activity $ 265 Moderate Projects: Structural Commercial TI s and additions up to 5,000 sf, Residential additions over 500 SF, Change of Occupancy all with site grading work less than 1 acre $ 1,671 Major Projects: New SFR s, New Commercial Buildings (additions over 5,000 SF), projects with parcels of 1 acre or more $ 3,543 Misc Page 5 of 5

14 New Construction Fee Schedule - Plan Check Fees Effective 7/1/13 Fire Rating Type IA, IB Fire Rating Type VA, IIA, IIIA Fire Rating Type IIB, IIIB, VB, IV Commercial Uses - Structural (All newly constructed, added, or structurally remodeled space for non-residential occupancies classified as CBC Group A, B, E, F, H, I, M, or other commercial occupancies not specifically addressed elsewhere in this Fee Schedule) 500 per project $ 2,557 $ 1.70 $ 2,131 $ 1.41 $ 1,704 $ ,000 per project $ 10,229 $ 0.51 $ 8,524 $ 0.42 $ 6,819 $ ,000 per project $ 12,787 $ 0.18 $ 10,655 $ 0.15 $ 8,524 $ ,000 per project $ 20,459 $ 0.10 $ 17,049 $ 0.08 $ 13,639 $ 100,000 per project $ 25,573 $ 0.25 $ 21,311 $ 0.20 $ 17,049 $ 0.16 Commercial Residential and Multifamily Residential Uses - (All newly constructed, added, or structurally remodeled space for residential occupancies classified as CBC Group R (except R-3), or other residential occupancies not specifically addressed elsewhere in this Fee Schedule) 500 per project $ 2,813 $ 1.87 $ 2,344 $ 1.56 $ 1,875 $ ,000 per project $ 11,252 $ 0.56 $ 9,377 $ 0.47 $ 7,501 $ ,000 per project $ 14,065 $ 0.20 $ 11,721 $ 0.17 $ 9,377 $ ,000 per project $ 22,504 $ 0.11 $ 18,753 $ 0.09 $ 15,003 $ ,000 per project $ 28,131 $ 0.27 $ 23,443 $ 0.23 $ 18,753 $ 0.17 Duplicate Floor Plan Review - Commercial Residential and Multifamily Residential Uses 500 per project $ 1,856 $ 0.41 $ 1,547 $ 0.34 $ 1,238 $ ,000 per project $ 3,713 $ 0.14 $ 3,094 $ 0.12 $ 2,475 $ ,000 per project $ 4,455 $ 0.02 $ 3,713 $ 0.02 $ 2,971 $ ,000 per project $ 5,569 $ 0.03 $ 4,642 $ 0.03 $ 3,713 $ ,000 per project $ 7,426 $ 0.07 $ 6,188 $ $ 4,951 $ 0.04 Low and Moderate Hazard Storage - (All newly constructed, added, or structurally remodeled space for storage occupancies classified as CBC Group S, or other storage occupancies not specifically addressed elsewhere in this Fee Schedule) 500 per project $ 2,557 $ 1.70 $ 2,131 $ 1.41 $ 1,704 $ ,000 per project $ 10,229 $ 0.51 $ 8,524 $ 0.42 $ 6,819 $ ,000 per project $ 12,787 $ 0.18 $ 10,655 $ 0.15 $ 8,524 $ ,000 per project $ 20,459 $ 0.10 $ 17,049 $ 0.08 $ 13,639 $ 100,000 per project $ 25,573 $ 0.25 $ 21,311 $ 0.20 $ 17,049 $ 0.16 Attached Accessory and Utility Uses - (All newly constructed, added, or structurally remodeled space for utility and accessory occupancies classified as CBC Group U, or other utility and accessory occupancies not specifically addressed elsewhere in this Fee Schedule) 200 per project $ 651 $ 1.47 $ 543 $ 1.23 $ 434 $ per project $ 947 $ 1.37 $ 789 $ 1.14 $ 632 $ per project $ 1,223 $ 0.31 $ 1,019 $ 0.25 $ 816 $ ,000 per project $ 1,345 $ 0.24 $ 1,121 $ 0.20 $ 897 $ ,000 per project $ 1,835 $ 0.61 $ 1,529 $ 0.51 $ 1,223 $ 0.39 Detached Accessory and Utility Uses - (All newly constructed, added, or structurally remodeled space for utility and accessory occupancies classified as CBC Group U, or other utility and accessory occupancies not specifically addressed elsewhere in this Fee Schedule) 200 per project $ 651 $ 1.47 $ 543 $ 1.23 $ 434 $ per project $ 947 $ 1.37 $ 789 $ 1.14 $ 632 $ per project $ 1,223 $ 0.31 $ 1,019 $ 0.25 $ 816 $ ,000 per project $ 1,345 $ 0.24 $ 1,121 $ 0.20 $ 897 $ ,000 per project $ 1,835 $ 0.61 $ 1,529 $ 0.51 $ 1,223 $ 0.39 Shell Buildings for all Commercial Uses - (The enclosure for all newly constructed, added, or structurally remodeled space for non-residential occupancies classified as CBC Group A, B, E, F, H, I, M, or other commercial occupancies not specifically addressed elsewhere in this Fee Schedule where the interior is not completed or occupiable) 500 per project $ 1,534 $ 1.02 $ 1,278 $ 0.84 $ 1,022 $ ,000 per project $ 6,138 $ 0.31 $ 5,114 $ 0.25 $ 4,091 $ ,000 per project $ 7,671 $ 0.11 $ 6,393 $ 0.09 $ 5,114 $ ,000 per project $ 12,275 $ $ 10,229 $ 0.05 $ 8,183 $ ,000 per project $ 15,343 $ 0.15 $ 12,787 $ 0.12 $ 10,229 $ 0.09 Commercial Tenant Improvement - Non Structural - (Non-structurally remodeled space for non-residential occupancies classified as CBC Group A, B, E, F, H, I, M, or other commercial occupancies not specifically addressed elsewhere in this Fee Schedule where the structure is not altered) 500 per project $ 1,278 $ 0.84 $ 1,065 $ 0.70 $ 852 $ ,000 per project $ 5,114 $ 0.25 $ 4,262 $ 0.20 $ 3,409 $ ,000 per project $ 6,393 $ 0.09 $ 5,327 $ 0.07 $ 4,262 $ 50,000 per project $ 10,229 $ 0.05 $ 8,524 $ 0.04 $ 6,819 $ ,000 per project $ 12,787 $ 0.12 $ 10,655 $ 0.10 $ 8,524 $ 0.08 PlanCheck 13 14, 1 of 2

15 New Construction Fee Schedule - Plan Check Fees Effective 7/1/13 Fire Rating Type IA, IB Fire Rating Type VA, IIA, IIIA Fire Rating Type IIB, IIIB, VB, IV Commercial Residential and Multifamily Residential Remodels - Non Structural - (Non-Structurally remodeled space for residential occupancies classified as CBC Group R (except R-3), or other residential occupancies not specifically addressed elsewhere in this Fee Schedule) 500 per project $ 1,330 $ 0.88 $ 1,109 $ 0.73 $ 887 $ ,000 per project $ 5,324 $ 0.26 $ 4,436 $ 0.21 $ 3,549 $ ,000 per project $ 6,655 $ 0.09 $ 5,546 $ 0.08 $ 4,436 $ 50,000 per project $ 10,648 $ 0.05 $ 8,873 $ 0.04 $ 7,099 $ ,000 per project $ 13,310 $ 0.13 $ 11,091 $ 0.10 $ 8,873 $ 0.08 Single Family Dwellings and Duplexes - (All newly constructed space for residential occupancies classified as CBC Group R-3, including custom builds and model homes for tract master plans, or other similar residential occupancies not specifically addressed elsewhere in this Fee Schedule) 1,000 per project $ 3,048 $ 2.02 $ 2,540 $ 1.69 $ 2,032 $ ,500 per project $ 6,097 $ 0.40 $ 5,081 $ 0.34 $ 4,065 $ ,000 per project $ 6,707 $ 0.45 $ 5,589 $ 0.38 $ 4,471 $ ,000 per project $ 7,621 $ 0.75 $ 6,351 $ 0.63 $ 5,081 $ ,000 per project $ 9,146 $ 1.14 $ 7,621 $ 0.95 $ 6,097 $ 0.75 Duplicate Floor Plan Review - Single Family Dwellings and Duplexes 1,000 per project $ 984 $ 0.65 $ 821 $ 0.54 $ 656 $ ,500 per project $ 1,970 $ 0.12 $ 1,641 $ 0.10 $ 1,313 $ ,000 per project $ 2,167 $ 0.14 $ 1,806 $ 0.12 $ 1,444 $ ,000 per project $ 2,462 $ 0.24 $ 2,052 $ 0.20 $ 1,641 $ ,000 per project $ 2,955 $ 0.37 $ 2,462 $ 0.31 $ 1,970 $ 0.24 Duplicate Floor Plan Review - Attached or Detached Accessory and Utility Uses 200 per project $ 195 $ 0.44 $ 163 $ 0.37 $ 130 $ per project $ 284 $ 0.41 $ 236 $ 0.34 $ 189 $ per project $ 366 $ 0.09 $ 305 $ 0.07 $ 244 $ 1,000 per project $ 404 $ 0.07 $ 336 $ $ 268 $ ,000 per project $ 550 $ 0.18 $ 459 $ 0.15 $ 366 $ 0.12 Structural Residential Remodels and Additions - (All newly constructed additions to, or structurally remodeled areas of, residential occupancies classified as CBC Group R-3, or other similar residential occupancies not specifically addressed elsewhere in this Fee Schedule) 100 per project $ 838 $ 2.01 $ 699 $ 1.68 $ 558 $ per project $ 1,646 $ 3.28 $ 1,371 $ 2.74 $ 1,097 $ ,000 per project $ 3,292 $ 0.65 $ 2,743 $ 0.54 $ 2,195 $ ,500 per project $ 3,621 $ 0.65 $ 3,017 $ 0.54 $ 2,413 $ ,000 per project $ 3,950 $ 1.97 $ 3,292 $ 1.64 $ 2,633 $ 1.31 Non-Structural Residential Remodels and Additions - (All newly constructed additions to, or non-structurally remodeled areas of, residential occupancies classified as CBC Group R-3, or other similar residential occupancies not specifically addressed elsewhere in this Fee Schedule) 100 per project $ 601 $ 0.42 $ 501 $ 0.35 $ 401 $ per project $ 772 $ 1.34 $ 643 $ 1.12 $ 515 $ ,000 per project $ 1,444 $ 0.28 $ 1,203 $ 0.23 $ 962 $ ,500 per project $ 1,589 $ 0.28 $ 1,323 $ 0.23 $ 1,059 $ ,000 per project $ 1,733 $ 0.86 $ 1,444 $ 0.72 $ 1,155 $ 0.57 Site Improvements - This includes substantial development of private parking lots which are processed separate of the structure and include any combination of the following: Underground utilities, parking lot lighting, accessible path of travel analysis, grading, drainage and compliance with the City's parking and driveway standards. 500 per project $ 862 $ 0.57 $ 718 $ 0.48 $ 575 $ ,000 per project $ 3,450 $ 0.16 $ 2,874 $ 0.14 $ 2,299 $ ,000 per project $ 4,312 $ $ 3,593 $ 0.05 $ 2,874 $ ,000 per project $ 6,899 $ 0.03 $ 5,749 $ 0.02 $ 4,600 $ ,000 per project $ 8,624 $ 0.08 $ 7,187 $ 0.07 $ 5,749 $ 0.05 PlanCheck 13 14, 2 of 2

16 New Construction Fee Schedule - Inspection Fees Effective 7/1/ Fire Rating Type IA, IB Fire Rating Type VA, IIA, IIIA Fire Rating Type IIB, IIIB, VB, IV Commercial Uses - Structural (All newly constructed, added, or structurally remodeled space for non-residential occupancies classified as CBC Group A, B, E, F, H, I, M, or other commercial occupancies not specifically addressed elsewhere in this Fee Schedule) 500 per project $ 2,058 $ 1.37 $ 1,716 $ 1.14 $ 1,373 $ ,000 per project $ 8,235 $ 1.23 $ 6,863 $ 1.03 $ 5,490 $ ,000 per project $ 14,411 $ 0.15 $ 12,010 $ 0.13 $ 9,608 $ ,000 per project $ 20,587 $ 0.16 $ 17,157 $ 0.13 $ 13,725 $ ,000 per project $ 28,823 $ 0.28 $ 24,018 $ 0.24 $ 19,215 $ 0.18 Commercial Residential and Multifamily Residential Uses - (All newly constructed, added, or structurally remodeled space for residential occupancies classified as CBC Group R (except R-3), or other residential occupancies not specifically addressed elsewhere in this Fee Schedule) 500 per project $ 3,089 $ 2.05 $ 2,573 $ 1.72 $ 2,058 $ ,000 per project $ 12,352 $ 1.85 $ 10,294 $ 1.55 $ 8,235 $ ,000 per project $ 21,617 $ 0.23 $ 18,014 $ 0.19 $ 14,411 $ ,000 per project $ 30,881 $ 0.24 $ 25,734 $ 0.20 $ 20,587 $ ,000 per project $ 43,234 $ 0.44 $ 36,028 $ 0.36 $ 28,823 $ 0.28 Duplicate Floor Plan Review - Commercial Residential and Multifamily Residential Uses 500 per project $ 1,857 $ 0.42 $ 1,547 $ 0.35 $ 1,238 $ ,000 per project $ 3,713 $ 0.15 $ 3,095 $ 0.12 $ 2,475 $ ,000 per project $ 4,456 $ 0.03 $ 3,713 $ 0.02 $ 2,971 $ ,000 per project $ 5,570 $ 0.04 $ 4,642 $ 0.03 $ 3,713 $ ,000 per project $ 7,427 $ 0.07 $ 6,188 $ $ 4,951 $ 0.28 Low and Moderate Hazard Storage - (All newly constructed, added, or structurally remodeled space for storage occupancies classified as CBC Group S, or other storage occupancies not specifically addressed elsewhere in this Fee Schedule) 500 per project $ 2,059 $ 1.37 $ 1,716 $ 1.14 $ 1,373 $ ,000 per project $ 8,235 $ 1.23 $ 6,863 $ 1.03 $ 5,490 $ ,000 per project $ 14,411 $ 0.15 $ 12,009 $ 0.13 $ 9,608 $ ,000 per project $ 20,588 $ 0.16 $ 17,156 $ 0.14 $ 13,725 $ ,000 per project $ 28,823 $ 0.29 $ 24,019 $ 0.24 $ 19,215 $ 0.19 Attached Accessory and Utility Uses - (All newly constructed, added, or structurally remodeled space for utility and accessory occupancies classified as CBC Group U, or other utility and accessory occupancies not specifically addressed elsewhere in this Fee Schedule) 200 per project $ 1,608 $ 0.78 $ 1,340 $ 0.65 $ 1,072 $ per project $ 1,764 $ 4.31 $ 1,470 $ 3.59 $ 1,176 $ per project $ 2,626 $ 1.29 $ 2,189 $ 1.08 $ 1,751 $ ,000 per project $ 3,144 $ 1.05 $ 2,620 $ 0.87 $ 2,096 $ ,000 per project $ 5,233 $ 1.75 $ 4,361 $ 1.45 $ 3,489 $ 1.16 Detached Accessory and Utility Uses - (All newly constructed, added, or structurally remodeled space for utility and accessory occupancies classified as CBC Group U, or other utility and accessory occupancies not specifically addressed elsewhere in this Fee Schedule) 200 per project $ 1,474 $ 0.61 $ 1,228 $ 0.51 $ 982 $ per project $ 1,596 $ 4.05 $ 1,329 $ 3.38 $ 1,064 $ per project $ 2,406 $ 1.20 $ 2,005 $ 1.01 $ 1,604 $ ,000 per project $ 2,887 $ 0.97 $ 2,406 $ 0.80 $ 1,924 $ ,000 per project $ 4,811 $ 1.63 $ 4,010 $ 1.33 $ 3,208 $ 1.07 Shell Buildings for all Commercial Uses - (The enclosure for all newly constructed, added, or structurally remodeled space for non-residential occupancies classified as CBC Group A, B, E, F, H, I, M, or other commercial occupancies not specifically addressed elsewhere in this Fee Schedule where the interior is not completed or occupiable) 500 per project $ 1,319 $ 0.80 $ 1,099 $ 0.67 $ 880 $ ,000 per project $ 4,941 $ 0.74 $ 4,118 $ 0.62 $ 3,294 $ ,000 per project $ 8,647 $ 0.09 $ 7,205 $ 0.08 $ 5,764 $ 50,000 per project $ 12,353 $ 0.10 $ 10,294 $ 0.08 $ 8,235 $ 100,000 per project $ 17,294 $ 0.17 $ 14,411 $ 0.14 $ 11,529 $ 0.12 Inspect 13 14, 1 of 2

17 New Construction Fee Schedule - Inspection Fees Effective 7/1/ Fire Rating Type IA, IB Fire Rating Type VA, IIA, IIIA Fire Rating Type IIB, IIIB, VB, IV Commercial Tenant Improvement - Non Structural - (Non-structurally remodeled space for non-residential occupancies classified as CBC Group A, B, E, F, H, I, M, or other commercial occupancies not specifically addressed elsewhere in this Fee Schedule where the structure is not altered) 500 per project $ 978 $ 0.70 $ 816 $ 0.58 $ 653 $ ,000 per project $ 4,118 $ 0.62 $ 3,431 $ 0.52 $ 2,745 $ ,000 per project $ 7,205 $ 0.08 $ 6,005 $ $ 4,803 $ ,000 per project $ 10,294 $ 0.08 $ 8,578 $ 0.07 $ 6,863 $ ,000 per project $ 14,411 $ 0.14 $ 12,009 $ 0.12 $ 9,608 $ 0.09 Commercial Residential and Multifamily Residential Remodels - Non Structural - (Non-Structurally remodeled space for residential occupancies classified as CBC Group R (except R-3), or other residential occupancies not specifically addressed elsewhere in this Fee Schedule) 500 per project $ 989 $ 0.66 $ 824 $ 0.55 $ 659 $ ,000 per project $ 3,952 $ 0.59 $ 3,293 $ 0.50 $ 2,635 $ ,000 per project $ 6,917 $ 0.07 $ 5,763 $ $ 4,611 $ ,000 per project $ 9,880 $ 0.08 $ 8,234 $ $ 6,587 $ ,000 per project $ 13,832 $ 0.14 $ 11,527 $ 0.11 $ 9,221 $ 0.09 Single Family Dwellings and Duplexes - (All newly constructed space for residential occupancies classified as CBC Group R-3, including custom builds and model homes for tract master plans, or other similar residential occupancies not specifically addressed elsewhere in this Fee Schedule) 1,000 per project $ 3,088 $ 2.05 $ 2,573 $ 1.72 $ 2,058 $ ,500 per project $ 6,174 $ 1.03 $ 5,146 $ 0.85 $ 4,117 $ ,000 per project $ 7,718 $ 2.32 $ 6,432 $ 1.93 $ 5,146 $ ,000 per project $ 12,349 $ 3.09 $ 10,291 $ 2.57 $ 8,233 $ ,000 per project $ 18,524 $ 2.32 $ 15,437 $ 1.93 $ 12,349 $ 1.55 Duplicate Floor Plan Review - Single Family Dwellings and Duplexes 1,000 per project $ 3,088 $ 2.05 $ 2,573 $ 1.72 $ 2,058 $ ,500 per project $ 6,174 $ 1.03 $ 5,146 $ 0.85 $ 4,117 $ ,000 per project $ 7,718 $ 2.32 $ 6,432 $ 1.93 $ 5,146 $ ,000 per project $ 12,349 $ 3.09 $ 10,291 $ 2.57 $ 8,233 $ ,000 per project $ 18,524 $ 2.32 $ 15,437 $ 1.93 $ 12,349 $ 1.55 Duplicate Floor Plan Review - Attached or Detached Accessory and Utility Uses 200 per project $ 1,474 $ 0.61 $ 1,228 $ 0.51 $ 982 $ per project $ 1,596 $ 4.05 $ 1,329 $ 3.38 $ 1,064 $ per project $ 2,406 $ 1.20 $ 2,005 $ 1.01 $ 1,604 $ ,000 per project $ 2,887 $ 0.97 $ 2,406 $ 0.80 $ 1,924 $ ,000 per project $ 4,811 $ 1.61 $ 4,010 $ 1.33 $ 3,208 $ 1.07 Structural Residential Remodels and Additions - (All newly constructed additions to, or structurally remodeled areas of, residential occupancies classified as CBC Group R-3, or other similar residential occupancies not specifically addressed elsewhere in this Fee Schedule) 100 per project $ 1,221 $ 2.79 $ 1,018 $ 2.33 $ 815 $ per project $ 2,337 $ 2.34 $ 1,948 $ 1.95 $ 1,558 $ ,000 per project $ 3,506 $ 2.34 $ 2,922 $ 1.95 $ 2,337 $ ,500 per project $ 4,674 $ 2.34 $ 3,895 $ 1.95 $ 3,116 $ ,000 per project $ 5,844 $ 2.92 $ 4,869 $ 2.43 $ 3,895 $ 1.95 Non-Structural Residential Remodels and Additions - (All newly constructed additions to, or non-structurally remodeled areas of, residential occupancies classified as CBC Group R-3, or other similar residential occupancies not specifically addressed elsewhere in this Fee Schedule) 100 per project $ 1,112 $ 2.78 $ 926 $ 2.32 $ 741 $ per project $ 2,223 $ 2.23 $ 1,852 $ 1.85 $ 1,482 $ ,000 per project $ 3,335 $ 2.23 $ 2,778 $ 1.85 $ 2,223 $ ,500 per project $ 4,445 $ 2.23 $ 3,705 $ 1.85 $ 2,964 $ ,000 per project $ 5,557 $ 2.78 $ 4,631 $ 2.32 $ 3,705 $ 1.85 Site Improvements - This includes substantial development of private parking lots which are processed separate of the structure and include any combination of the following: Underground utilities, parking lot lighting, accessible path of travel analysis, grading, drainage and compliance with the City's parking and driveway standards. 500 per project $ 682 $ 0.46 $ 569 $ 0.38 $ 455 $ ,000 per project $ 2,728 $ 0.41 $ 2,273 $ 0.35 $ 1,818 $ ,000 per project $ 4,774 $ 0.05 $ 3,979 $ 0.04 $ 3,182 $ ,000 per project $ 6,820 $ 0.05 $ 5,683 $ 0.04 $ 4,547 $ ,000 per project $ 9,548 $ 0.09 $ 7,956 $ 0.08 $ 6,365 $ Inspect 13 14, 2 of 2

18 MINOR & MISCELLANEOUS PERMITS The fees listed below are stand-alone fees. Additional Development Review or Stormwater fees may apply. Fee Activity Fee Description Proposed Fee Current Fee 50% REDUCED FEES FOR SINGLE FAMILY RESIDENTIAL ENERGY SAVING UPGRADES Electrical service upgrade each $ 112 $ 110 Electric car charging system each $ 112 $ 110 Firepalce Insert/upgrade each $ 299 $ 292 Furnace/heater replacement each $ 112 $ 110 Graywater/Rainwater Harvesting System each $ 69 $ 67 Insulation/energy upgrade per project $ 108 $ 106 Re-roof with added ventilation per project $ 108 $ 106 Solar photovoltaic system per project $ 155 $ 152 Water heater replacement each $ 112 $ 110 Window retrofits (non-structural only) per project $ 181 $ 177 MINOR COMMERCIAL AND RESIDENTIAL IMPROVEMENT PROJECTS Balcony/Porch/Deck first 300 s.f. per project $ 1,020 $ 997 ea add'l 100 s.f per project $ 104 $ 102 Canopy / Awning per project $ 354 $ 346 Cellular Tower / Antenna First Antenna / Tower each $ 839 $ 820 each add'l antenna/ tower each $ 92 $ 89 Antenna/Tower w/ Equipment Shelter each $ 611 $ 597 Commercial Access Upgrade (ADA Compliance) Site-work such as Ramps or Exterior each $ 1,094 $ 1,070 Upgrades such as reception counter, registers, signage, etc. each $ 876 $ 856 Commercial Coach Installation each $ 1,453 $ 1,421 Demolition Interior or garage - utlity building per project $ 414 $ 405 Entire Building, residence or commercial per project $ 725 $ 709 Dry rot/termite Repair per project $ 215 $ 211 Fence or Non-Engineered Wall per project $ 623 $ 609 Fireplace Retrofit / Chimney Repair per project $ 596 $ 583 Flag, Light, or Sign Pole - Install / Replace per project $ 742 $ 725 Foundation Replace / New (includes piles, piers, or foundation-only systems under existing or partial construction) per project $ 1,243 $ 1,215 Misc Page 1 of 6

19 MINOR & MISCELLANEOUS PERMITS The fees listed below are stand-alone fees. Additional Development Review or Stormwater fees may apply. Fee Activity Fee Description Proposed Fee Current Fee MINOR COMMERCIAL AND RESIDENTIAL IMPROVEMENT PROJECTS, continued Foundation Repair (includes piles, piers, or foundation-only systems under existing or partial construction) per project $ 621 $ 607 Garage Conversion First 500 s.f. per project $ 828 $ 810 Ea add'l 100 s.f. per project $ 104 $ 102 Grading 1,000 CY or less per project $ 725 $ 709 1,001-10,000 CY per project $ 932 $ 911 >10,001 CY per project $ 1,139 $ 1,114 Paint Booth per project $ 932 $ 911 Partition per project $ 693 $ 677 Patio Cover Open per project $ 623 $ 609 Enclosed per project $ 1,087 $ 1,063 Pool / Spa - Commercial per project $ 1,035 $ 1,012 Pool / Spa - Residential per project $ 828 $ 810 Re-Roof - Residential per project $ 215 $ 211 Re-Roof - Commercial First 300 s.f. per project $ 414 $ 405 Ea add'l 100 s.f. per project $ 104 $ 102 Roof Structure Replacement First 300 s.f. per project $ 932 $ 911 Ea add'l 100 s.f. per project $ 125 $ 122 Retaining Wall Engineered per project First 100 l.f. per project $ 1,139 $ 1,114 Ea add'l 100 l.f. per project $ 104 $ 102 Non-Engineered per project $ 727 $ 711 Stair Repair / Replace per project $ 932 $ 911 Shear Wall / Steel Support Column - stand alone (not part of a building permit) per project $ 828 $ 810 Siding / Stucco per project $ 393 $ 384 Misc Page 2 of 6

20 MINOR & MISCELLANEOUS PERMITS The fees listed below are stand-alone fees. Additional Development Review or Stormwater fees may apply. Fee Activity Fee Description Proposed Fee Current Fee MINOR COMMERCIAL AND RESIDENTIAL IMPROVEMENT PROJECTS, continued Sign Wall per project $ 311 $ 304 Monument per project $ 553 $ 541 Solar / PV System - Commercial / Multi-family per project $ 725 $ 709 Store Front/Façade Alterations: Minor per project $ 932 $ 911 T-Bbar Ceiling/Furred Ceiling - stand alone (not part of a building permit) per project $ 621 $ 607 Trash Enclosure per project $ 1,035 $ 1,012 Vapor Recovery Systems / Service Station Upgrades (up to 3) per project $ 518 $ 506 Window / Door - Non-Structural First 10 windows / doors per project $ 362 $ 354 each add'l 10 windows/doors per project $ 18 $ 17 Window / Door - Structural First 10 windows / doors per project $ 535 $ 523 each add'l 10 windows/doors per project $ 70 $ 68 Minor Repairs (for items otherwise not listed, for the purpose of reconstruction, renewal, or maintenance of any part of an existing structure - requiring not more than two inspections) per project $ 284 $ 278 Minor Code Corrections per project $ 215 $ 211 Minor Lease Space Improvements Prior to Tenant Improvement per project $ 1,243 $ 1,215 MECHANICAL, PLUMBING AND ELECTRICAL PERMITS (Not associated with an existing building permit) ADMINISTRATIVE AND MISC. FEES Minimum Permit Issuance (includes travel and documentation) $ 224 $ 219 Appeal of Building Official Decision per project $ 1,035 $ 1,012 Handicap Board of Appeals per project $ 1,035 $ 1,012 Fire Permit Handling Fee per project $ 414 $ 405 Supplemental Plan Check per project $ 207 $ 202 Supplemental Inspection per project $ 207 $ 202 After Hours Inspection (Scheduled, 2 hour minimum) per project $ 414 $ 405 Preliminary Project Consultation / Code Analysis (per hour) per project $ 207 $ 202 Misc Page 3 of 6

BASE PERMIT FEE x.80 = PLAN CHECK FEE*: $ BASE PERMIT FEE x.10 = MECHANICAL INSPECTION FEE: $ BASE PERMIT FEE x.12 = ENERGY CODE REVIEW FEE: $

BASE PERMIT FEE x.80 = PLAN CHECK FEE*: $ BASE PERMIT FEE x.10 = MECHANICAL INSPECTION FEE: $ BASE PERMIT FEE x.12 = ENERGY CODE REVIEW FEE: $ Development Services Department A. Building Permit Fees For New Construction, Tenant Improvements and Residential Remodels For Production Homes See Page 2 TOTAL VALUATION (Materials and Labor) FEE $1 to

More information

Building Division Fee Schedule

Building Division Fee Schedule Building Division Fee Schedule No. Service Name Fee COMMERCIAL COMMERCIAL WITHOUT INTERIOR % of Calculated Fee PC Commercial without interior improvement. - 5,000 sq.ft. $,864 20 INSP Commercial without

More information

WHEN IS A PERMIT REQUIRED?

WHEN IS A PERMIT REQUIRED? WHEN IS A PERMIT REQUIRED? Any owner, builder, contractor, or other authorized agent who intends to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure,

More information

Schedule B to By-law 33-2009

Schedule B to By-law 33-2009 Amended by By-law 8-2016 Note: This consolidation is prepared for convenience only. For accurate reference the original by-laws should be reviewed. Floor Area Calculation Floor area shall: Schedule B to

More information

City of Riverside. Building & Safety Division Phone: (951) 826-5697 www.riversideca.gov

City of Riverside. Building & Safety Division Phone: (951) 826-5697 www.riversideca.gov Building & Safety Division Phone: (951) 826-5697 www.riversideca.gov BUILDING PERMIT & PLAN CHECK FEES The attached sheets will assist you in calculating an estimate of the fees for your building project.

More information

Schedule B to By-law 33-2009 Part A Fees Payable for Permits

Schedule B to By-law 33-2009 Part A Fees Payable for Permits Floor Area Calculation Floor area shall: Part A Fees Payable for Permits (Effective January 1, 2015) a) be calculated by measuring to the outer face of exterior walls and to the centre of party walls or

More information

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are: When is a Permit Required? The most common types of projects that require permits are: -New Houses or buildings -Room Additions or Expansions -Structural repairs, remodeling and alterations -Accessory

More information

BUILDING PERMITS. Santa Rosa County Building Inspection

BUILDING PERMITS. Santa Rosa County Building Inspection BUILDING PERMITS Calculation Based on Under Roof Area New Construction First 5,000 sq. ft. Each additional hundred sq. ft. up to 10,000 sq. ft. Each additional hundred sq. ft. up to 25,000 sq. ft. Each

More information

DPIE FY2016 Fee Schedule (Effective July 1, 2015)

DPIE FY2016 Fee Schedule (Effective July 1, 2015) ADA Chairlift/Vertical Lift (Exterior) $115 $50 + Grading Fee + Construction Cost x 0.008 + ADA Chairlift/Vertical Lift (Interior) $115 $50 + Construction Addition Residential $340 $50 + sq. ft. x BVD

More information

BUILDING DIVISION CONSTRUCTION PERMIT FEES

BUILDING DIVISION CONSTRUCTION PERMIT FEES www.polk-county.net BUILDING DIVISION CONSTRUCTION PERMIT FEES Growth Management Department Building Division 330 W. Church St. Bartow, Florida 33881-9005 863-534-6080 Fax 863-534-6016 All Construction

More information

In an effort to improve the city s building permit and inspection processes the building permit fee schedule has been revised and updated.

In an effort to improve the city s building permit and inspection processes the building permit fee schedule has been revised and updated. Smart Processing is a City of Norfolk initiative to provide exceptional customer service by ensuring businesses and citizens have a seamless experience while going through the city s processes. In an effort

More information

Building Permits: When are they required?

Building Permits: When are they required? Building Permits: When are they required? Generally, you need to obtain a building permit from the City whenever you construct, enlarge, alter, repair, move, remove, improve, convert, or demolish a building

More information

EXPRESS PERMITS (No Plan Check Required)

EXPRESS PERMITS (No Plan Check Required) EXPRESS PERMITS (No Plan Check Required) Following are the lists of different types of construction for which an express permit can be issued. Express permits can be issued where work does not require

More information

HOMEOWNER S PERMIT GUIDE

HOMEOWNER S PERMIT GUIDE HOMEOWNER S PERMIT GUIDE WHEN IS A PERMIT REQUIRED? Department of Development and Permits 306 Cedar Road, City Hall 2 nd Floor P.O. Box 15225 Chesapeake, VA 23328 Phone: (757) 382-6018 Fax: (757) 382-8448

More information

BUILDING CODE MANUAL COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS BUILDING AND SAFETY DIVISION Based on the 2014 LACBC

BUILDING CODE MANUAL COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS BUILDING AND SAFETY DIVISION Based on the 2014 LACBC BUILDING CODE MANUAL COUNTY OF LOS ANGELES DEPARTMENT OF PUBLIC WORKS BUILDING AND SAFETY DIVISION Based on the 2014 LACBC #145 106.4 Article 3 04-01-14 Page 1 of 7 PLUMBING FIXTURE REPLACEMENT ISSUE:

More information

SCHEDULE A BY-LAW B-6 CLASSES OF PERMITS AND FEES

SCHEDULE A BY-LAW B-6 CLASSES OF PERMITS AND FEES 1. CALCULATION OF PERMIT FEES SCHEDULE A BY-LAW B-6 CLASSES OF PERMITS AND FEES Permit fees shall be calculated based on the formula given below, unless otherwise specified in this schedule: Permit Fee

More information

Guideline for Implementation of California Civil Code Sections 1101.1 1101.8 Water-Conserving Plumbing Fixtures

Guideline for Implementation of California Civil Code Sections 1101.1 1101.8 Water-Conserving Plumbing Fixtures Guideline for Implementation of California Civil Code Sections 1101.1 1101.8 Water-Conserving Plumbing Fixtures Information Bulletin No. IB-021 Effective: January 1, 2014 By: Chief Building Official For

More information

A. Under Section 553.73(9), Florida Statutes, the following buildings and structures are exempt from compliance with the Florida Building Code:

A. Under Section 553.73(9), Florida Statutes, the following buildings and structures are exempt from compliance with the Florida Building Code: MIAMI-DADE COUNTY BUILDING DEPARTMENT PERMIT EXEMPTIONS Please note that the exemptions listed in this section are from Florida Building Code requirements only. Other State and County regulatory departments

More information

2. What building projects are exempted? (permit not required)

2. What building projects are exempted? (permit not required) BUILDING AND SAFETY DEPARTMENT 1. What building projects require a permit? Following is a list of projects that require building permits based on Appendix chapter 1 of the California Building Code and

More information

Special Inspection/Re Inspection, all Divisions $100.00 per hour, one hour minimum

Special Inspection/Re Inspection, all Divisions $100.00 per hour, one hour minimum Community Development Department 408 Spokane St. Post Falls, ID 83854 Ph: 208 773 8708 Fax: 208 773 2505 www.postfallsidaho.org BUILDING S Building Plan Check (Paid at Plan Submittal) Residential $150.00

More information

Plumbing Fixture Replacement (SB 407) for Existing Single-Family Residential, Multifamily Residential and Commercial Buildings

Plumbing Fixture Replacement (SB 407) for Existing Single-Family Residential, Multifamily Residential and Commercial Buildings Community Development Department Building Division 39550 Liberty Street, PO Box 5006, CA 94537-5006 510-494-4460 ph www.fremont.gov Plumbing Fixture Replacement (SB 407) for Existing Single-Family Residential,

More information

The City of Basehor, Kansas

The City of Basehor, Kansas The City of Basehor, Kansas Residential and Miscellaneous Permits This list provides general information regarding permit requirements for various residential construction and maintenance activities. The

More information

A Residential Owner s Guide to PERMITS. Elgin CITY OF PLANNING & NEIGHBORHOOD SERVICES

A Residential Owner s Guide to PERMITS. Elgin CITY OF PLANNING & NEIGHBORHOOD SERVICES A Residential Owner s Guide to PERMITS CITY OF Elgin PLANNING & NEIGHBORHOOD SERVICES CITY OF Elgin A Residential Owner s Guide Welcome! This booklet has been prepared to provide residential property owners

More information

County of San Diego, Planning & Development Services BUILDING CONSTRUCTION PERMIT FEES BUILDING DIVISION

County of San Diego, Planning & Development Services BUILDING CONSTRUCTION PERMIT FEES BUILDING DIVISION County of San Diego, Planning & Development Services BUILDING CONSTRUCTION PERMIT FEES BUILDING DIVISION (Effective 09/15/2013) The following fees shall be paid to the Planning & Development Services for

More information

PROJECT SUMMARY. Scope of work details: (If phased construction, please see plan submittal guidelines.)

PROJECT SUMMARY. Scope of work details: (If phased construction, please see plan submittal guidelines.) APPENDIX B BUILDING CODE SUMMARY FOR ALL COMMERCIAL FIRE RESTORATION PROJECTS (EXCEPT 1 AND 2-FAMILY DWELLINGS AND TOWNHOUSES) (Reproduce the following data on the building plans sheet 1 or 2) Name of

More information

SECTION 105 PERMITS. 2. Fences not over 6 feet (1829 mm) high. 3. Oil derricks.

SECTION 105 PERMITS. 2. Fences not over 6 feet (1829 mm) high. 3. Oil derricks. SECTION 105 PERMITS 105.1 Required. Any owner or authorized agent who intends to construct, enlarge, alter, repair, move, demolish, or change the occupancy of a building or structure, or to erect, install,

More information

C I T Y O F P E A R S A L L

C I T Y O F P E A R S A L L The Largest City Between San Antonio and Laredo COMMUNITY DEVELOPMENT C I T Y O F P E A R S A L L A Business-Friendly, Family-Oriented Community Building Department Application Information (Please read

More information

ARTICLE 22: FEE SCHEDULE

ARTICLE 22: FEE SCHEDULE for annexation. The following fees shall be submitted to the City of Grand Prairie, upon the passage of a resolution by the City Council calling public hearings for annexation of such area, said fee to

More information

BUILDING INSPECTION DEPARTMENT www.ci.garland.tx.us FEE SCHEDULE CHAPTER 30 ARTICLE XV. Effective October 1, 2011

BUILDING INSPECTION DEPARTMENT www.ci.garland.tx.us FEE SCHEDULE CHAPTER 30 ARTICLE XV. Effective October 1, 2011 BUILDING INSPECTION DEPARTMENT www.ci.garland.tx.us FEE SCHEDULE CHAPTER 30 ARTICLE XV Effective October 1, 2011 The following fees shall be charged when issuing either combined permits or individual permits

More information

APPLICATION FOR NEW CONSTRUCTION

APPLICATION FOR NEW CONSTRUCTION CITY OF ELKINS 401 DAVIS AVE ELKINS WV 26241 Date Pd: Receipt #: Session #: PHIL ISNER BLDG INSPECTOR / CODE ENFORCEMENT OFFICER 304-636-1414 Ext 1431 APP. DATE APPLICATION FOR NEW CONSTRUCTION APPLICANT

More information

Building Permit, Fire Inspection and Operating Permit Fee Schedule

Building Permit, Fire Inspection and Operating Permit Fee Schedule Chenango County Code Enforcement Building Permit, Fire Inspection and Operating Permit Fee Schedule Building Permit Exceptions: Buildings being used solely for the purpose of agriculture. As per Agricultural,

More information

CONSTRUCTION PERMIT APPLICATION AND INSTRUCTIONS (Permit Application follows instructions)

CONSTRUCTION PERMIT APPLICATION AND INSTRUCTIONS (Permit Application follows instructions) CONSTRUCTION PERMIT APPLICATION AND INSTRUCTIONS (Permit Application follows instructions) When is a permit required? Section 403.42 and Section 403.62 of the Uniform Construction Code states: Any owner

More information

Upper Southampton Township Department of Licenses and Inspections 939 Street Rd. Southampton, Pa. 18966 Phone: 215-322-9700 Fax: 215-322-5842

Upper Southampton Township Department of Licenses and Inspections 939 Street Rd. Southampton, Pa. 18966 Phone: 215-322-9700 Fax: 215-322-5842 Upper Southampton Township Department of Licenses and Inspections 939 Street Rd. Southampton, Pa. 18966 Phone: 215-322-9700 Fax: 215-322-5842 APPLICATION for ZONING and BUILDING PERMIT APPLICATION INSTRUCTIONS:

More information

Presentation to Senate Select Committee on Government Facilities: Deferred Maintenance for State Supported Living Centers and State Hospitals

Presentation to Senate Select Committee on Government Facilities: Deferred Maintenance for State Supported Living Centers and State Hospitals Presentation to Senate Select Committee on Government Facilities: Deferred Maintenance for State Supported Living Centers and State Hospitals Les Butler Associate Commissioner for Business and Regional

More information

APPENDIX E: CAPITAL NEEDS SUMMARY

APPENDIX E: CAPITAL NEEDS SUMMARY APPENDIX E: CAPITAL NEEDS SUMMARY Building A Foundation Hall Building to be replaced ARCHITECTURAL Roof Repair North Structural Wall Repair Flooring Repairs Ceiling Repairs Lighting Repairs Lighting Repairs

More information

2016 BUILDING PERMIT FEES*

2016 BUILDING PERMIT FEES* 2016 PERMIT FEES* Fees are based on the cost of construction and shall be based on a value not less than the value determined using the Building Valuation Data Report published by ICC. Application Fee

More information

SECTION 00 0110 TABLE OF CONTENTS. H. 00 2115.01 - Proposed Material, Product or Equipment Substitution Request

SECTION 00 0110 TABLE OF CONTENTS. H. 00 2115.01 - Proposed Material, Product or Equipment Substitution Request SECTION 00 0110 PROCUREMENT AND CONTRACTING REQUIREMENTS 1.1 DIVISION 00 -- PROCUREMENT AND CONTRACTING REQUIREMENTS A. 00 0101 - Project Title Page B. 00 0105 - Certifications Page C. 00 0110 - Table

More information

PERMITS REQUIRED & PERMIT EXEMPTIONS

PERMITS REQUIRED & PERMIT EXEMPTIONS PERMITS REQUIRED & PERMIT EXEMPTIONS This guideline is intended to assist the applicant in determining what types of construction work require a permit. The 1997 California Uniform Administrative Code,

More information

D Sample Notices to Property Owners, Sample Affidavits, and Other Material

D Sample Notices to Property Owners, Sample Affidavits, and Other Material D Sample Notices to Property Owners, Sample Affidavits, and Other Material These samples are offered to illustrate specific points in the Desk Reference. States and communities should examine them carefully

More information

OPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY

OPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY Cost Code # Description Cost Code # Description 01 00 00.001 General Requirements 02 00 00.001 Existing Conditions 01 31 19.13.001 Preconstruction Meetings 02 21 00.001 Surveys 01 32 33.001 Photographic

More information

Building Code Inspections and Fees

Building Code Inspections and Fees St. Mary s County Department of Land Use & Growth Management Customer Assistance Guide 22 Building Code Inspections and Fees May 10, 2014 This guide is intended to assist in the proper construction sequence

More information

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage Property Address: Company Name: Contractor Name: Contractor Address: City: State: Zip: License Number: Phone Number

More information

9770 CULVER BOULEVARD CULVER CITY, CA 90232-0507 www.culvercity.org. Incidental improvements: improvements that do not qualify as minor or

9770 CULVER BOULEVARD CULVER CITY, CA 90232-0507 www.culvercity.org. Incidental improvements: improvements that do not qualify as minor or 9770 CULVER BOULEVARD CULVER CITY, CA 90232-0507 www.culvercity.org Construction Permitting Guidelines for Businesses Moving into Existing Buildings in Culver City If your business is moving into an existing

More information

SCC NO. 1580 AN ORDINANCE OF THE SACRAMENTO COUNTY CODE RELATING TO CONSTRUCTION PERMIT FEES

SCC NO. 1580 AN ORDINANCE OF THE SACRAMENTO COUNTY CODE RELATING TO CONSTRUCTION PERMIT FEES SCC NO. 1580 AN ORDINANCE OF THE SACRAMENTO COUNTY CODE RELATING TO CONSTRUCTION PERMIT FEES The Board of Supervisors of the County of Sacramento, State of California, ordains as follows: SECTION 1. Section

More information

CITY OF TWO RIVERS Inspections Department

CITY OF TWO RIVERS Inspections Department CITY OF TWO RIVERS Inspections Department City of Two Rivers Inspections Dept 1717 E Park St PO Box 87 Two Rivers WI 54241-0087 Customers of the City of Two Rivers, Effective October 11, 2013 The Department

More information

Owner: Phone # Mailing Address: Contractor: Phone # Fax #

Owner: Phone # Mailing Address: Contractor: Phone # Fax # CITY OF EASTON BUREAU OF CODES AND INSPECTIONS 2 nd Floor, 123 South Third Street, Easton, PA 18042 phone (610) 250-6724 - fax (610) 250-6607 email codes@easton-pa.gov PERMIT APPLICATION Owner: Phone #

More information

CITY OF BERKELEY BUILDING PERMIT DETAILED CHECKLIST

CITY OF BERKELEY BUILDING PERMIT DETAILED CHECKLIST CITY OF BERKELEY DETAILED CHECKLIST This checklist will assist you in preparing plans for submittal with a building permit application. Alterations, additions and remodeling projects may not require all

More information

Arizona Health Care Association DISASTER PLANNING AND EMERGENCY MANAGEMENT GUIDE POST INCIDENT DAMAGE ASSESSMENT CHECKLIST

Arizona Health Care Association DISASTER PLANNING AND EMERGENCY MANAGEMENT GUIDE POST INCIDENT DAMAGE ASSESSMENT CHECKLIST It is essential to perform a Basic Damage Assessment (BDA) following an adverse event to help ensure the safety of building occupants as well as prevent additional losses from occurring. This checklist

More information

Building Condition Assessment Report

Building Condition Assessment Report Building Condition Assessment Report Asset C3c - Oak Terrace Cottage 121 Address Riverview Lands, 2601 Lougheed Highway, Coquitlam, BC. V5C 4J2 Construction Year Size (Gross Floor Area) 1920. 2,553 Sq.Ft.

More information

Construction Services & Permitting List of Exempted Permits Created March 1, 2002 Effective April 1, 2011 Revised January 1, 2014

Construction Services & Permitting List of Exempted Permits Created March 1, 2002 Effective April 1, 2011 Revised January 1, 2014 City of St. Petersburg Planning & Economic Development Department Construction Services & Permitting List of Exempted Permits Created March 1, 2002 Effective April 1, 2011 Revised January 1, 2014 Reference

More information

DEPARTMENT OF PERMITS AND INSPECTIONS PERMIT REQUIREMENTS AND GUIDELINES

DEPARTMENT OF PERMITS AND INSPECTIONS PERMIT REQUIREMENTS AND GUIDELINES DEPARTMENT OF PERMITS AND INSPECTIONS PERMIT REQUIREMENTS AND GUIDELINES Building permits are required to erect, enlarge, alter, remove, demolish, or repair a structure. This includes everything from decks,

More information

ATTACHMENT A Town of Lakeside Fee Schedule. ANIMALS Annual pet registration fee per animal limit 4 animals $ 8.00 each

ATTACHMENT A Town of Lakeside Fee Schedule. ANIMALS Annual pet registration fee per animal limit 4 animals $ 8.00 each DESCRIPTION FEE ALARM SYSTEM PERMITS Permit new alarms $ 15.00 Renew or Change Permit $ 10.00 ANIMALS Annual pet registration fee per animal limit 4 animals $ 8.00 each Fees related to impoundment and

More information

KITCHEN AND BATH REMODELING BUILDING PERMIT REQUIREMENTS

KITCHEN AND BATH REMODELING BUILDING PERMIT REQUIREMENTS St. Louis County Department of Public Works Division of Code Enforcement KITCHEN AND BATH REMODELING BUILDING PERMIT REQUIREMENTS This guideline is intended to provide the homeowner/contractor with the

More information

COMMERCIAL PLAN SUBMISSION FOR NEW CONSTRUCTION AND/OR RENOVATIONS

COMMERCIAL PLAN SUBMISSION FOR NEW CONSTRUCTION AND/OR RENOVATIONS COMMERCIAL PLAN SUBMISSION FOR NEW CONSTRUCTION AND/OR RENOVATIONS Permit applicants shall submit three (3) COMPLETE SETS of plans and specifications with each application for a permit. Plans and specifications

More information

WARRANTIES AND PERFORMANCE STANDARDS T A B L E O F C O N T E N T S General Provisions Introduction Warranties Effective Date of Warranties Exclusive

WARRANTIES AND PERFORMANCE STANDARDS T A B L E O F C O N T E N T S General Provisions Introduction Warranties Effective Date of Warranties Exclusive WARRANTIES AND PERFORMANCE STANDARDS T A B L E O F C O N T E N T S General Provisions Introduction Warranties Effective Date of Warranties Exclusive Warranties Time Limits for Reporting Manufacturer s

More information

BUILDING DEPARTMENT 8748 W. 82 nd Place - Justice, IL 60458 Phone: (708) 458-2130 Fax: (708) 458-3207

BUILDING DEPARTMENT 8748 W. 82 nd Place - Justice, IL 60458 Phone: (708) 458-2130 Fax: (708) 458-3207 BUILDING DEPARTMENT 8748 W. 82 nd Place - Justice, IL 60458 Phone: (708) 458-2130 Fax: (708) 458-3207 SELF EVALUATION CHECKLIST FOR RESIDENTIAL AND MULTI-FAMILY DWELLING INSPECTIONS The attached checklist

More information

PLAN SUBMITTAL INFORMATION

PLAN SUBMITTAL INFORMATION PLAN SUBMITTAL INFORMATION APPLICATION FOR A BUILDING PERMIT Prior to drafting construction drawings, please check with the North Miami Beach Community Development Department concerning the following:

More information

Development Services Guidelines

Development Services Guidelines Dear Customer/Developer: Balcones Heights 3300 Hillcrest San Antonio, Texas 78201 210-735-9148 ext 246 Fax: 210-735-9409 Development Services Guidelines Welcome to the City of Balcones Heights, we look

More information

Certification: Building Plans Examiner. Exam ID: B3

Certification: Building Plans Examiner. Exam ID: B3 Certification: Building Plans Examiner Exam ID: B3 Scope: A Building Plans Examiner will be responsible for reviewing submitted plans to determine if they meet the requirements of the various Building

More information

TOWN OF BRIDGEWATER INSPECTIONAL SERVICES DEPARTMENT Phone: (508) 697-0904 Fax: (508) 697-0940 E-mail: inspection@bridgewaterma.

TOWN OF BRIDGEWATER INSPECTIONAL SERVICES DEPARTMENT Phone: (508) 697-0904 Fax: (508) 697-0940 E-mail: inspection@bridgewaterma. BUILDING PERMIT FEE SCHEDULE - RESIDENTIAL New Dwelling Structure... $0.50/Sq. Ft., Minimum $500.00 Expanded Living Space (In-Law Unit)... $0.50/Sq. Ft., Minimum $300.00 Mechanical HVAC duct work 2% value

More information

Building Permit Application

Building Permit Application Building Permit Application Administrative Use Only PARENT PERMIT NUMBER (Required if part of another project) PERMITTEE: PERMITTEE ADDRESS: E-MAIL ADDRESS: ARCHITECT/ENGINEER: PHONE: PHONE: ARCHITECT/ENGINEER

More information

Veterans Memorial Coliseum Options Study Appendix A - Deconstruction Scope of Work and Cost Estimate August 31, 2015

Veterans Memorial Coliseum Options Study Appendix A - Deconstruction Scope of Work and Cost Estimate August 31, 2015 Stage 1 DA.01 Fencing and cameras deployed Baseline - 3-5 years for Stage 1 for purposes of this study costs are described for a 3 year period $45,000 $0 Stage 1 DA.02 Secure all building doors and access

More information

CHARLOTTE COUNTY Community Development Department

CHARLOTTE COUNTY Community Development Department CHARLOTTE COUNTY Community Development Department Building Construction Services Division 18400 Murdock Circle, Port Charlotte FL 33948 Phone: 941.743.1201 Fax: 941.764.4907 www.charlottecountyfl.gov 50

More information

Physical Address/Intersection: Name of Project: Within a NFIP 100/500yr Floodzone:

Physical Address/Intersection: Name of Project: Within a NFIP 100/500yr Floodzone: Choctaw Date Recorded: Permit # RESIDENTIAL - BUILDING Permit APPLICATION Physical Address/Intersection: Name of Project: Within a NFIP 100/500yr Floodzone: YES NO Sec., Township, Range/Subdivision: Acres/Block:

More information

City of Milford, Connecticut Information Regarding Permits

City of Milford, Connecticut Information Regarding Permits City of Milford, Connecticut Information Regarding Permits This document serves as an introduction to the permitting requirements and policies of the City of Milford. It is not comprehensive and is not

More information

Does Wall Township require an inspection by the building department on resale of a home?

Does Wall Township require an inspection by the building department on resale of a home? Selling your home Does Wall Township require an inspection by the building department on resale of a home? No. We do not require a Certificate of Continued Occupancy on the resale of home. A Smoke Detector,

More information

City of Elk River BASEMENT Office Use Only

City of Elk River BASEMENT Office Use Only City of Elk River BASEMENT Office Use Only Fire and Building Safety Division (FABS) Building Permit Application Notes Scan Permit Total Date Permit # PID # $ Site Address Suite/Unit Structure Type Single

More information

City of Oviedo Commercial Shell Building Permit Application Guidelines

City of Oviedo Commercial Shell Building Permit Application Guidelines City of Oviedo Commercial Shell Building Permit Application Guidelines All permit application packages must be complete prior to acceptance. A complete application package shall include the following:

More information

Botetourt County, Virginia. Frequently Asked Questions

Botetourt County, Virginia. Frequently Asked Questions Botetourt County, Virginia Development Services Construction Compliance Frequently Asked Questions Permits... 2 When is a permit required?... 2 When is a permit NOT required?... 2 Who may apply for a permit?...

More information

LAS VEGAS PURCHASING WAREHOUSE 1054 South Commerce Street Las Vegas, Nevada

LAS VEGAS PURCHASING WAREHOUSE 1054 South Commerce Street Las Vegas, Nevada State of Nevada Department of Administration Purchasing Division Las Vegas Purchasing Warehouse Facility Condition Analysis LAS VEGAS PURCHASING WAREHOUSE 1054 South Commerce Street Las Vegas, Nevada Site

More information

DRAPER ELEMENTARY SCHOOL

DRAPER ELEMENTARY SCHOOL INITIAL YEAR BUILT 1953 BUILDING AREA 54,000 SF CURRENT PROGRAM CAPACITY 250 ENROLLMENT 2008 84 WARD 8 PROPOSED PROGRAM CAPACITY 325 Site Plan DRAPER - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5

More information

STATE OF SOUTH CAROLINA RESIDENTIAL PROPERTY CONDITION DISCLOSURE STATEMENT

STATE OF SOUTH CAROLINA RESIDENTIAL PROPERTY CONDITION DISCLOSURE STATEMENT STATE OF SOUTH CAROLINA RESIDENTIAL PROPERTY CONDITION DISCLOSURE STATEMENT The South Carolina Code of Laws (Title 27, Chapter 50, Article 1) requires that an owner of residential real property (single

More information

CITY OF PLANO BUILDING INSPECTION FEE SCHEDULE. Initial Deposit/Fees are due at the time of the submittals. Effective 03/01/10

CITY OF PLANO BUILDING INSPECTION FEE SCHEDULE. Initial Deposit/Fees are due at the time of the submittals. Effective 03/01/10 CITY OF PLANO BUILDING INSPECTION FEE SCHEDULE Initial Deposit/Fees are due at the time of the submittals. Effective 03/01/10 A. Access Control $5.25/$1000.00 valuation of project Electric (if applicable)

More information

NYC Department of Education Building Condition Assessment Survey 2014-2015 BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 10004

NYC Department of Education Building Condition Assessment Survey 2014-2015 BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 10004 School: InspectionId Asset Data Inspection Type Building Assessment Survey 204-205 BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 0004 Time In Last Edited 255 MECHANICAL 205-05-8 09:00AM

More information

Single Family Residential Building Permit Questions & Answers

Single Family Residential Building Permit Questions & Answers Single Family Residential Building Permit Questions & Answers Prepared by Dept. of Public Works Revised 07/01/13 200 East Park Street Edwardsville, IL 62025 (618) 692-7535 (618) 692-7505(Fax) Hours: Monday

More information

CHARTER TOWNSHIP OF NORTHVILLE DEPARTMENT OF PUBLIC SERVICES

CHARTER TOWNSHIP OF NORTHVILLE DEPARTMENT OF PUBLIC SERVICES CHARTER TOWNSHIP OF NORTHVILLE DEPARTMENT OF PUBLIC SERVICES BUILDING DIVISION FEE SCHEDULE Approved by the Board of Trustees May 19, 2011 CHARTER TOWNSHIP OF NORTHVILLE BUILDING DIVISION FEES TABLE OF

More information

Concord Building Department Frequently Asked Questions

Concord Building Department Frequently Asked Questions Does Concord have its own Building codes? No, we utilize the 8th Edition of the Massachusetts State Building code for one and two family dwellings, multi-family dwellings, and Commercial Buildings. When

More information

ALBEMARLE COUNTY CODE CHAPTER 5 BUILDING REGULATIONS ARTICLE I. ADMINISTRATION

ALBEMARLE COUNTY CODE CHAPTER 5 BUILDING REGULATIONS ARTICLE I. ADMINISTRATION CHAPTER 5 BUILDING REGULATIONS Sections: ARTICLE I. ADMINISTRATION 5-100 Purpose and intent. 5-101 Building inspection office established; powers and duties. 5-102 Board of appeals established; powers

More information

MARKET SCOUT CONTRACTORS QUESTIONNAIRE (complete in addition to an Acord application) 1. Applicant:

MARKET SCOUT CONTRACTORS QUESTIONNAIRE (complete in addition to an Acord application) 1. Applicant: 1. Applicant: 2. Type of all work performed by or for applicant (check You if performed by applicant and Subs if performed by subcontractors and both if done by both): Air Condition Systems Installation,

More information

ESTIMATE ORIG. ESTIMATE: TOTAL: $204,249 DATE: 01/15/08 DESCRIPTION OF WORK QUANTITY DIVISION TOTAL

ESTIMATE ORIG. ESTIMATE: TOTAL: $204,249 DATE: 01/15/08 DESCRIPTION OF WORK QUANTITY DIVISION TOTAL PARTITIONS REGULAR WALLS 9' HIGH 214 LF TENANT DEMISING WALL 150 LF INTERIOR FURRED WALLS 9' 86 LF OFFICE DEMISING WALL 98 LF DOUBLE FRAME RADIUS WALL 18 LF RADIUS SOFFITS 172 LF SOFFIT 76 LF FINISH NEW

More information

Bureau Veritas Contact Information

Bureau Veritas Contact Information Bureau Veritas Contact Information Permit Submittal The permit documents and fees will be submitted to the city. Submittal documents should be complete to expedite plan review and permit issuance. Please

More information

The Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE

The Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE The Lambton County Homeowner's BUILDING PERMIT INFORMATION GUIDE BUILDING SERVICES DEPARTMENT 789 Broadway Street, Box 3000 Wyoming, ON N0N 1T0 Telephone: 519 845-0801 Toll-free: 1-866-324-6912 Fax: 519

More information

Maryland. American Recovery and Reinvestment Act. 158 DoD Projects ($ 65.8M) Completed or Under Way by August 31, 2009

Maryland. American Recovery and Reinvestment Act. 158 DoD Projects ($ 65.8M) Completed or Under Way by August 31, 2009 Maryland American Recovery and Reinvestment Act 158 DoD Projects ($ 65.8M) Completed or Under Way by August 31, 2009 Project Title Component Installation Repair Building 316 Electrical, HVAC, Plumbing,

More information

Exterior Condition Report

Exterior Condition Report Scope of Work for Property Located at: 3918-20 West Cherry Street Date: 3/10/2014 Property is: Single Family Duplex Below is the minimum requirement to meet health and safety issues. The City of Milwaukee,

More information

REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N

REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N PLAN REVIEW FOR: PROJECT NAME: OWNER: ARCH/DESIGNER: ADDRESS: Ph/Fx: Plans Dated: E-mail: Sealed By: Estimated Project Cost - $ REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N

More information

Building Description Project Description Estimated Cost Notes Total Deferred

Building Description Project Description Estimated Cost Notes Total Deferred Building Description Project Description Estimated Cost Notes Total Deferred Athletic Fields & Grounds Baseball dugouts 125,000 Surface level/inground? Relamp Baseball field 16,000 Relamp Softball field

More information

RESIDENTIAL PLUMBING & MECHANICAL PERMIT SUBMITTAL REQUIREMENTS

RESIDENTIAL PLUMBING & MECHANICAL PERMIT SUBMITTAL REQUIREMENTS RESIDENTIAL PLUMBING & MECHANICAL PERMIT SUBMITTAL REQUIREMENTS 806 W. Main St Monroe, WA 98272 Phone: (360) 863-4532 or (360) 863-4609 Fax: (360) 794-4007 Plumbing: A plumbing permit is required before

More information

INSTALLATION OF WATER-CONSERVING PLUMBING FIXTURES SB 407 California Civil Code Section 1101.1 2013 Green Building Standards Code

INSTALLATION OF WATER-CONSERVING PLUMBING FIXTURES SB 407 California Civil Code Section 1101.1 2013 Green Building Standards Code INSTALLATION OF WATER-CONSERVING PLUMBING FIXTURES SB 407 California Civil Code Section 1101.1 2013 Green Building Standards Code In 2009, the California State Legislature passed Senate Bill SB 407 which

More information

How to Obtain a Building, Electrical, Plumbing Permit for the Remodeling of Single and Two-Family Dwellings in the City and County of San Francisco

How to Obtain a Building, Electrical, Plumbing Permit for the Remodeling of Single and Two-Family Dwellings in the City and County of San Francisco How to Obtain a Building, Electrical, Plumbing Permit for the Remodeling of Single and Two-Family Dwellings in the City and County of San Francisco 1660 Mission Street San Francisco, CA 94103 415. 558.

More information

ORDINANCE NO. 2006-533 AN ORDINANCE AMENDING AND ESTABLISHING THE FEE SCHEDULE FOR SERVICES PROVIDED BY THE ELKHART COUNTY BUILDING DEPARTMENT

ORDINANCE NO. 2006-533 AN ORDINANCE AMENDING AND ESTABLISHING THE FEE SCHEDULE FOR SERVICES PROVIDED BY THE ELKHART COUNTY BUILDING DEPARTMENT ORDINANCE NO. 2006-533 AN ORDINANCE AMENDING AND ESTABLISHING THE FEE SCHEDULE FOR SERVICES PROVIDED BY THE ELKHART COUNTY BUILDING DEPARTMENT WHEREAS Indiana Code Sections 36-1-3-1 et seq. permits any

More information

Self-Home Inspection Checklist

Self-Home Inspection Checklist To be used as a first home visit for note taking. Visit www.homeinspectiondirect.com for more tips and information about buying a home and hiring a home inspector. This form in no way replaces a professional

More information

EL LAGO BUILDING DEPARTMENT PERMIT ISSUANCE PROCEDURES As of February 20, 2013

EL LAGO BUILDING DEPARTMENT PERMIT ISSUANCE PROCEDURES As of February 20, 2013 PERMIT AUTHORIZATION EL LAGO BUILDING DEPARTMENT PERMIT ISSUANCE PROCEDURES As of February 20, 2013 El Lago ordinances require the issuance of building permits as a method of enforcing code minimums, ensuring

More information

2006 IBC BUILDING CODE CHECKLIST FOR COMMERCIAL PROJECTS

2006 IBC BUILDING CODE CHECKLIST FOR COMMERCIAL PROJECTS 2006 IBC BUILDING CODE CHECKLIST FOR COMMERCIAL PROJECTS IBC CODE DESIGN CHECKLIST (EXCEPT 1 AND 2-FAMILY DWELLINGS AND TOWNHOUSES) (Transfer the resulting data on the building plans Life Safety & Building

More information

Charter Township of Lansing Fee Schedule. (Civil Infraction Fines are listed on Page 8)

Charter Township of Lansing Fee Schedule. (Civil Infraction Fines are listed on Page 8) Charter Township of Lansing Fee Schedule (Civil Infraction Fines are listed on Page 8) TYPE AMOUNT ADOPTED RESIDENTIAL RENTAL REGISTRATION New Registration Fee $300 7/1/2014 Per Unit Fee $30 7/1/2014 License

More information

FARMERS MUTUAL INSURANCE COMPANY UNDERWRITING GUIDELINES CITY FIRE PROGRAM UNDERWRITING ITEMS OF IMPORTANCE

FARMERS MUTUAL INSURANCE COMPANY UNDERWRITING GUIDELINES CITY FIRE PROGRAM UNDERWRITING ITEMS OF IMPORTANCE FARMERS MUTUAL INSURANCE COMPANY UNDERWRITING GUIDELINES CITY FIRE PROGRAM UNDERWRITING ITEMS OF IMPORTANCE 11/2009 The following guidelines should be considered when offering insurance for certain types

More information

C-2 Construction, Inc. - NAICS Codes

C-2 Construction, Inc. - NAICS Codes C-2 Construction, Inc. - NAICS Codes 212313 - Crushed and Broken Granite Mining and Quarrying This U.S. industry comprises: (1) establishments primarily engaged in developing the mine site, and/or mining

More information

MISCELLANEOUS ELECTRICAL JOBS REQUIRING PERMITS

MISCELLANEOUS ELECTRICAL JOBS REQUIRING PERMITS MISCELLANEOUS ELECTRICAL JOBS REQUIRING PERMITS 01. SAFETY INSPECTION of service equipment at FPL Power Source 02. Construction GFI power outlets (Temp Pole for Construction) 03. 90 day temporary power

More information

UNIVERSITY OF CALIFORNIA, SAN DIEGO

UNIVERSITY OF CALIFORNIA, SAN DIEGO UNIVERSITY OF CALIFORNIA, SAN DIEGO UCSD BERKELEY DAVIS IRVINE LOS ANGELES MERCED RIVERSIDE SAN DIEGO SAN FRANCISCO SANTA BARBARA SANTA CRUZ UNIVERSITY CENTERS - 0076 PHONE: (858) 822-4987 9500 GILMAN

More information

Development Services Permit Application

Development Services Permit Application City of Long Beach 333 West Ocean Blvd., 4th Floor Long Beach, CA 90802 Phone: (562) 570-5237 Fax: (562) 570-6753 Development Services Permit Application General Information PROJECT NUMBER Plan Check Authorization

More information

BOROUGH OF NATIONAL PARK APPLICATION FOR A CERTIFICATE OF OCCUPANCY FOR CHANGE OF OCCUPANCY ADDRESS OF PROPERTY FOR INSPECTION CURRENT OWNER

BOROUGH OF NATIONAL PARK APPLICATION FOR A CERTIFICATE OF OCCUPANCY FOR CHANGE OF OCCUPANCY ADDRESS OF PROPERTY FOR INSPECTION CURRENT OWNER BOROUGH OF NATIONAL PARK APPLICATION FOR A CERTIFICATE OF OCCUPANCY FOR CHANGE OF OCCUPANCY ADDRESS OF PROPERTY FOR INSPECTION # BLOCK LOT VACANT YES NO CURRENT OWNER NAME ADDRESS TELEPHONE # PROSPECTIVE

More information