1 Deliverability Testing Henry Chao Vice President System & Resource Planning New York Independent System Operator New York State Reliability Council Executive Committee Meeting September 12, 2008

2 Definition of Deliverability NYCA Deliverability: The NYCA transmission system shall be able to deliver the aggregate of NYCA capacity resources to the aggregate of the NYCA load under summer peak load conditions. This is accomplished through ensuring the deliverability of new Large Facilities, new Small Generators larger than 2MWs, and any existing facility increasing its capacity by more than the 2MWs allowed by NYISO OATT Attachment S, Section IX.B.3, in the three Capacity Regions in New York State. 2

3 Designation of Highways, Byways, and Other Interfaces Highways: All New York Control Area inter-zonal facilities 115 kv and higher that make up the key ROS interfaces among the LBMP Zones A I. Also included are NYS Power System facilities 115 kv and higher that are determined to be in series with the interface facilities. Byways: All Transmission facilities that are neither Highways nor Other Interfaces. This includes all transmission facilities within Zones J and K. NYCA Tie Facilities ( Other Interfaces ): Interfaces between NYCA Capacity Regions and between NYCA and external Areas. 3

4 Three Types of Tests Impact on Transfer Limits for Other Interfaces ( No Harm ) Determine any degradation of transfer capability between NYCA and external Areas Impact on Transfer Limits within ROS ( No Harm ) Identify any degradation of transfer capability to Highway interfaces Deliverability Test Determine if Highways or Byways constrain deliverability of capacity resources within Capacity Region 4

5 Deliverability Test Process Perform No Harm tests Class Year Projects are evaluated on an aggregated basis For Other Interfaces, if transfer limit is degraded by the lesser of 25MW or 2% of the limit determined for the ATBA case For Highway Interfaces: If transfer limit is degraded by the lesser of 25MW or 2%of the limit determined for the ATBA case and the NYCA LOLE increases by 0.01 event/yr or more Determine level of deliverable capacity, or bottled capacity, within applicable Capacity Region 5

6 Cost Allocation Process Determine cost of System Deliverability Upgrades ( SDU )--Cost of SDUs allocated to projects based on impact of requested CRIS level. Project cost responsibility: 100% of Byway upgrade Pro-rated portion of cost of Highway upgrade unless threshold met Based on MW amount of upgrade needed vs. total upgrade size 100% of Other Interface upgrade Alternatively, projects can accept reduced CRIS level determined to be deliverable. 6

7 Transfer Limit Assessments (ATBA/ATRA) Use linear assessment (PSS TM MUST) Within ROS Capacity Region Evaluate generation-to-generation transfer from west/north zone(s) to east/south zone(s) Identify transfer constraint(s) for each interface within the ROS Capacity Region: Measure interface total transfer capability (FCTTC) Incremental transfer limit (FCITC) indicates the additional generation above the base case dispatch that can be exported from the zone(s) to the importing zone(s) (Initial generation dispatch + incremental) is compared to total Pmax of all generation in exporting zone(s) Same process for ATBA and ATRA cases 7

8 Base Case Assumptions (ATBA/ATRA) Forced Outage Derates specific to Capacity Region ROS 5.08% NYC 5.66% LI 5.28% Specific intermittent capacity derates Land-based wind 90% Offshore wind 60% Small hydro 45% Large hydro 1.25% Load Forecast Uncertainty Based on 2008 IRM analysis = 7.3% Treatment of Controllable Devices PARs between external Area(s) and NYCA and between NYCA Capacity Regions are fixed in all cases at schedules determined in accordance with established procedures Controlled tie lines with assigned UDR rights are represented at the full value of the UDR PARs within a NYCA Capacity Region may be adjusted to mitigate overload(s) in the base case 8

9 Base Case Assumptions (ATBA) As Found System in 5 years (Base Case) Based on previous Class Year ATRA case Powerflow representation External Schedules reflect long-term firm capacity contracts Grandfathered capacity contracts per ICAP Manual, Att. E External controlled tie-lines at UDR NYC, LI capacity regions generation dispatch Import schedule consistent with IRM transfer levels ROS (Zones A I) generation dispatch Supply load within ROS and Additional generation to supply J&K import (IRM transfer) level All generators are assumed in service within NYCA 9

10 Base Case Assumptions (ATBA) Generator Pmax For grandfathered generation, Pmax is the highest DMNC of 5 years Wind generation Pmax is design nameplate Other generation (prior Class Years) w/o DMNC test, Pmax is design nameplate Levelized Dispatch within Capacity Region All generation modeled in service; generation within each Capacity Region uniformly dispatched proportional to the aggregate Pmax for the Capacity Region 10

11 Base Case Assumptions (ATRA) Class Year Projects added to the ATBA case e.g., all CY 2007 Projects are located in ROS All are wind generation; PMax is proposed nameplate Dispatch within ROS levelized including the Class Year generation projects capacity 11

12 Summary for ROS (CY 2007) Preliminary assessment of 2007 Class Year Projects Impact Inter-Area minimal changes in transfer limits External to NYCA limits slightly higher in ATRA case Inter-Capacity Region no changes Cross-State ( ROS ) Assessment Observed Changes in interface transfer limits Largest change is 48MW decrease (West-Central) Most transfer pairs are limited by the 92/91 binding constraint before any respective local constraint Interface constraints are above the installed capability of the exporting zone(s) generation After consideration of EFORd and LFU, both cases (ATBA/ATRA) appear fully deliverable within the ROS Capacity Region No capacity bottled within ROS Capacity Region 12

13 Preliminary Analysis Performed for J and K Capacity Zones Comparison of ATBA and ATRA cases: No prospective Class Year Projects in either Capacity Region Inter-Capacity Region and external BA interface No Harms Test No significant change in the transfer limits between the NYCA Capacity Regions No impact on J/K to external Area as all facilities are HVdc, VFT or PAR controlled facilities NYISO staff working with local TOs on the application of deliverability testing procedure to Intra-zonal transfer limit assessment within Zones J and K 13

14 Remaining Issues Two remaining issues to be worked out with Stakeholders for future tariff filings: LSE Upgrade Funding Mechanism This issue concerns deferred construction of Highway upgrades and collection of funds from LSEs above that paid by Developers Requested 6 months to resolve this issue Modeling Emergency Assistance ( EA ) This issue concerns how to consider EA in the power flowbased evaluations of deliverability of interconnection projects and external capacity Requested 4 months to resolve this issue Interim proposal to not model EA in Class

15 The New York Independent System Operator (NYISO) is a not-for for-profit corporation that began operations in The NYISO operates New w York s bulk electricity grid, administers the state s s wholesale electricity markets, and provides comprehensive reliability planning for state s s bulk electricity system. 15

ICAP/UCAP Overview. Aaron Westcott Awestcott@nyiso.com 518 356 7657. If possible, Please mute your phones Please do not use the hold button.

ICAP/UCAP Overview. Aaron Westcott Awestcott@nyiso.com 518 356 7657. If possible, Please mute your phones Please do not use the hold button. ICAP/UCAP Overview Aaron Westcott Awestcott@nyiso.com 518 356 7657 If possible, Please mute your phones Please do not use the hold button. Agenda What is ICAP/UCAP? How are ICAP and UCAP calculated? How

More information

TDI's NYC Merchant CHPE Transmission Project with POI at Astoria (NYISO Queue #305) Deliverability Analysis

TDI's NYC Merchant CHPE Transmission Project with POI at Astoria (NYISO Queue #305) Deliverability Analysis R103-11 TDI's NYC Merchant CHPE Transmission Project with POI at Astoria (NYISO Queue #305) Deliverability Analysis Prepared for Transmission Developers, Inc. Submitted by: Larry Eng, Staff Consultant

More information

Automation of ROS DAM

Automation of ROS DAM Automation of ROS DAM BPCG Mitigation Presenter MaryHelen Donnelly Operations and Reliability Products New York Independent System Operator Market Issues Working Group KCC May 15, 2012 Agenda Background

More information

NYISO Tariffs: MST Section 5 Control Area Services: Rights and Obligations. NYISO Tariffs. New York Independent System Operator, Inc.

NYISO Tariffs: MST Section 5 Control Area Services: Rights and Obligations. NYISO Tariffs. New York Independent System Operator, Inc. NYISO Tariffs New York Independent System Operator, Inc. NYISO Tariffs Document Generated On: 10/14/2011 Page 1 5.10 NYCA Minimum Installed Capacity Requirement The NYCA Minimum Installed Capacity Requirement

More information

Generator Interconnection and Deliverability Study Methodology Technical Paper

Generator Interconnection and Deliverability Study Methodology Technical Paper Generator Interconnection and Deliverability Study Methodology Technical Paper July 2, 2013 Generator Interconnection and Deliverability Study Methodology Table of Contents Introduction... 1 Section One:

More information

2012 Proposed Projects. Project Title Project Description. Business Intelligence Products

2012 Proposed Projects. Project Title Project Description. Business Intelligence Products Business Intelligence Products etariff Public Website Module This project will add the etariff Public Website module to www.nyiso.com. This is a small effort with new enhancements for the MPs. It allows

More information

Transmission Planning in the ERCOT Interconnection

Transmission Planning in the ERCOT Interconnection Transmission Planning in the ERCOT Interconnection Warren Lasher Manager, Long-Term Planning and Policy Department of Energy Electricity Advisory Committee The ERCOT Interconnection The ERCOT Region is

More information

PJM Overview of Markets. Georgian Delegation PUCO Office April 11, 2013

PJM Overview of Markets. Georgian Delegation PUCO Office April 11, 2013 PJM Overview of Markets Georgian Delegation PUCO Office April 11, 2013 1 Agenda Introduction Energy Markets Locational Marginal Pricing - LMP Two Settlement - Day Ahead / Real time Ancillary Services Capacity

More information

New York Independent System Operator, Inc. Proposed NYISO Installed Capacity Demand Curves. For. Capability Years 2011/2012, 2012/2013 and 2013/2014

New York Independent System Operator, Inc. Proposed NYISO Installed Capacity Demand Curves. For. Capability Years 2011/2012, 2012/2013 and 2013/2014 New York Independent System Operator, Inc. Proposed NYISO Installed Capacity Demand Curves For Capability Years 2011/2012, 2012/2013 and 2013/2014 Final Issued: 9/3/2010 Revised: 9/7/2010 10/30/2010 This

More information

Market Solutions to Loop Flow

Market Solutions to Loop Flow Market Solutions to Loop Flow Robert Pike Director, Market Design New York Independent System Operator Business Issues Committee September 9, 2009 1 Agenda Background Recommendation Next Steps Solution

More information

2015 Project Schedule Milestone Update

2015 Project Schedule Milestone Update 2015 Schedule Milestone Update Robb Pike Director, & Product Management New York Independent System Operator Ryan Smith Senior Manager, Enterprise Product & Management New York Independent System Operator

More information

Electric Energy Storage. Opportunities and Challenges in New York

Electric Energy Storage. Opportunities and Challenges in New York EESAT 2005 Electric Energy Storage Opportunities and Challenges in New York Presented by Rahul Walawalkar CEM, CDSM Authors Customized Energy Solutions Rahul Walawalkar Rick Mancini Stephen Fernands Raj

More information

Accounting and Billing Manual

Accounting and Billing Manual MANUAL 14 Accounting and Billing Manual December 2014 Version: 3.3 Effective Date: 12/29/2014 Committee Acceptance: BIC 12/10/2014 This document was prepared by: NYISO Customer Settlements New York Independent

More information

New York Independent System Operator (NYISO)

New York Independent System Operator (NYISO) New York Independent System Operator (NYISO) 2010 ISO/RTO Metrics Report 196 Section 5 NYISO Performance Metrics and Other Information The New York Independent System Operator ( NYISO ) is a not-for-profit

More information

A Locational Analysis of Generation Benefits on Long Island, New York

A Locational Analysis of Generation Benefits on Long Island, New York LBNL-57506 ERNEST ORLANDO LAWRENCE BERKELEY NATIONAL LABORATORY A Locational Analysis of Generation Benefits on Long Island, New York Juan Wang, Jesse Cohen, Jennifer Edwards, and Chris Marnay Environmental

More information

2009 Product Enhancements

2009 Product Enhancements Energy Marketplace Product Enhancements Comprehensive Bid Management System Phase 4 & 5 The Comprehensive Bid Management System project will address the pressing need to stabilize and modernize NYISO's

More information

Emergency Demand Response Program Manual

Emergency Demand Response Program Manual MANUAL 7 Emergency Demand Response Program Manual June 2016 Version: 7.2 Effective Date: 06/03/2016 Committee Acceptance: 05/18/2016 BIC This document was prepared by: NYISO Demand Response Operations

More information

Indian Point Energy Center Retirement Analysis

Indian Point Energy Center Retirement Analysis Prepared For: New York City Department of Environmental Protection 59-17 Junction Blvd. Flushing, NY 11373-5108 Indian Point Energy Center Retirement Analysis Prepared By: 200 Clarendon Street Boston Massachusetts

More information

PJM LMP Market Overview

PJM LMP Market Overview PJM LMP Market Overview Andrew Ott Senior Vice President, Markets June 10, 2010 PJM as Part of the Eastern Interconnection 6,038 substations KEY STATISTICS PJM member companies 600+ millions of people

More information

NYISO Demand Response Programs: Enrollment

NYISO Demand Response Programs: Enrollment NYISO Demand Response Programs: Enrollment Donna Pratt Demand Response Market Product Specialist New York Independent System Operator DR-Expo Chicago, Illinois October 16-17, 2007 New York Independent

More information

2016/2017 RPM Base Residual Auction Results

2016/2017 RPM Base Residual Auction Results Executive Summary The 2016/2017 Reliability Pricing Model (RPM) Base Residual Auction (BRA) cleared 169,159.7 MW of unforced capacity in the RTO. Accounting for load and resource commitments under the

More information

How To Manage The Ercot Grid

How To Manage The Ercot Grid US MEXICO Cross-border trade Joel Mickey Director, Market Design & Development NARUC Summer Meeting Dallas, Texas North American ISOs and RTOs Independent System Operators and Regional Transmission Organizations

More information

Section 4: Scheduling Philosophy & Tools

Section 4: Scheduling Philosophy & Tools Welcome to the Scheduling Philosophy & Tools section of the PJM Manual for Scheduling Operations. In this section you will find the following information: A description of the PJM OI s scheduling philosophy

More information

Staff carefully read each comment and is appreciative of the guidance offered, which informed our modifications to the Straw Proposals.

Staff carefully read each comment and is appreciative of the guidance offered, which informed our modifications to the Straw Proposals. CASE 07-E-1507 ERP DELIVERABLE 1: COST ALLOCATION & RECOVERY FOR REGULATED ELECTRIC BULK-SYSTEM RELIABILITY PROJECTS Staff Discussion of Comments February 15, 2008 Purpose & Goals Staff carefully read

More information

The Locational Based Marginal Prices ( LBMPs or prices ) for Suppliers and Loads in

The Locational Based Marginal Prices ( LBMPs or prices ) for Suppliers and Loads in 17.1 LBMP Calculation Method The Locational Based Marginal Prices ( LBMPs or prices ) for Suppliers and Loads in the Real-Time Market will be based on the system marginal costs produced by either the Real-

More information

Demand Response FAQs

Demand Response FAQs 1 Under the current CAISO tariff, assuming it would otherwise meet the requirements under the CAISO tariff and business practice manuals to do so, can the Load associated with a retail meter participate

More information

Outage Scheduling Manual

Outage Scheduling Manual MANUAL 29 Outage Scheduling Manual July 2015 Version: 4.3.1 Effective Date: 07/29/2015 Committee Acceptance: 6/11/2015 OC This document was prepared by: NYISO Energy Market Operations New York Independent

More information

Price Responsive Load Programs in the New York Wholesale Electricity Market. Wholesale Market and New York Independent System Operator

Price Responsive Load Programs in the New York Wholesale Electricity Market. Wholesale Market and New York Independent System Operator Price Responsive Load Programs in the New York Wholesale Electricity Market Peter W. Douglas, J. David Coup, and Daniel Osei-Antwi New York State Energy Research and Development Authority ABSTRACT This

More information

Re: New York Independent System Operator, Inc. s Notice of Delay to Effective Date; Docket No. ER13-1199-000

Re: New York Independent System Operator, Inc. s Notice of Delay to Effective Date; Docket No. ER13-1199-000 10 Krey Boulevard Rensselaer, NY 12144 June 12, 2013 Submitted Electronically Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street N.E. Washington, D.C. 20426 Re: New York Independent

More information

New York State of the Market System - NYISO Success Project

New York State of the Market System - NYISO Success Project Auxiliary Market Products Additional Capacity Zones The NYISO and stakeholders are developing the rationale in 2010 for creating additional capacity zones, identified as a recommendation in the 2009 State

More information

Update on Northeast Seams Issues. January 9, 2008 NYISO Management Committee Meeting

Update on Northeast Seams Issues. January 9, 2008 NYISO Management Committee Meeting Update on Northeast Seams Issues January 9, 2008 NYISO Management Committee Meeting Status of Seams Projects Current Deliverables Project 1. Intra-Hour Transaction Scheduling NYISO and ISO-NE have documented

More information

Item 3: ERCOT Strategic Goals

Item 3: ERCOT Strategic Goals : ERCOT Strategic Goals Betty Day Vice President, Governance Risk & Compliance Human Resources and Governance Committee ERCOT Public October 12, 2015 Update on 2015 Strategic Goals ERCOT Public 2 Operational

More information

PJM Merchant Transmission Request. Queue #R75. Mitchell Shepler Hill 138 Kv Feasibility / System Impact Study

PJM Merchant Transmission Request. Queue #R75. Mitchell Shepler Hill 138 Kv Feasibility / System Impact Study PJM Merchant Transmission Request Queue #R75 Mitchell Shepler Hill 138 Kv Feasibility / System Impact Study 413038v1a March 2007 PJM Interconnection 2007. All rights reserved. Preface The intent of the

More information

2019/2020 RPM Base Residual Auction Results

2019/2020 RPM Base Residual Auction Results Executive Summary The 2019/2020 Reliability Pricing Model (RPM) Base Residual Auction (BRA) cleared 167,305.9 MW of unforced capacity in the RTO. Accounting for load and resource commitments under the

More information

Presentation for The National Commission for Energy State Regulation of Ukraine

Presentation for The National Commission for Energy State Regulation of Ukraine Presentation for The National Commission for Energy State Regulation of Ukraine Todd Keech Laura Walter PJM Interconnection June 17, 2014 What is PJM? 1 What is PJM? ISO RTO Map Part of Eastern Interconnection

More information

Demand Response, Dynamic Pricing, and the Smart Grid in New York

Demand Response, Dynamic Pricing, and the Smart Grid in New York Demand Response, Dynamic Pricing, and the Smart Grid in New York James T. Gallagher Sr. Manager for Strategic Planning New York Independent System Operator jgallagher@nyiso.com Consumer Advisory Council

More information

NV Energy ISO Energy Imbalance Market Economic Assessment

NV Energy ISO Energy Imbalance Market Economic Assessment March 25, 2014 NV Energy ISO Energy Imbalance Market Economic Assessment NV Energy ISO Energy Imbalance Market Economic Assessment 2014 Copyright. All Rights Reserved. Energy and Environmental Economics,

More information

Generation and Transmission Interconnection Process

Generation and Transmission Interconnection Process PJM Manual 14A Generation and Transmission Interconnection Process Revision: 18 Effective Date: January 28, 2016 Prepared by Planning Division Generation Interconnection Department PJM 2016 Table of Contents

More information

Preliminary Project Description

Preliminary Project Description Auxiliary Market Products Additional Capacity Zones The NYISO and stakeholders are developing the rationale in 2010 for creating additional capacity zones, identified as a recommendation in the 2009 State

More information

Demand Response Programs: Lessons from the Northeast

Demand Response Programs: Lessons from the Northeast Demand Response Programs: Lessons from the Northeast Charles Goldman E. O. Lawrence Berkeley National Laboratory CAGoldman@lbl.gov Mid Atlantic Demand Response Initiative Meeting Baltimore MD December

More information

PJM Overview and Wholesale Power Markets. John Gdowik PJM Member Relations

PJM Overview and Wholesale Power Markets. John Gdowik PJM Member Relations PJM Overview and Wholesale Power Markets John Gdowik PJM Member Relations PJM s Role Ensures the reliability of the high-voltage electric power system Coordinates and directs the operation of the region

More information

Alternative Options for the Availability Standard and Replacement Rule components of the Standard Capacity Product II Initiative March 18, 2010

Alternative Options for the Availability Standard and Replacement Rule components of the Standard Capacity Product II Initiative March 18, 2010 Alternative Options for the Availability Standard and Replacement Rule components of the Standard Capacity Product II Initiative March 18, 2010 CAISO/M&ID/SCP II Team March 18, 2010 page 1 Standard Capacity

More information

Energy Storage for the Grid

Energy Storage for the Grid Energy Storage for the Grid New York Association for Energy Economics (NYAEE) July 25, 2013 1 Con Edison in the Forefront of Energy Storage Proposed in 1962 2000 MW Pumped Storage Abandoned 2 Load Shaping

More information

TRANSMISSION SERVICES MANUAL

TRANSMISSION SERVICES MANUAL TRANSMISSION SERVICES MANUAL Transmission Services Manual Version: 2.0 Revision Date: January 20, 2005 Committee Approved: January 19, 2005 Effectivity Date: February 1, 2005 Disclaimer The information

More information

Applicability and Eligibility

Applicability and Eligibility Application for Resource Adequacy Deliverability Status for a Distributed Generation Resource Interconnected or Seeking Interconnection to the Distribution Facilities of an Investor-Owned Utility Participating

More information

2014 STATE OF THE MARKET REPORT FOR THE NEW YORK ISO MARKETS

2014 STATE OF THE MARKET REPORT FOR THE NEW YORK ISO MARKETS 2014 STATE OF THE MARKET REPORT FOR THE NEW YORK ISO MARKETS By: David B. Patton, Ph.D. Pallas LeeVanSchaick, Ph.D. Jie Chen, Ph.D. Market Monitoring Unit for the New York ISO May 2015 2014 State of the

More information

Enabling 24/7 Automated Demand Response and the Smart Grid using Dynamic Forward Price Offers

Enabling 24/7 Automated Demand Response and the Smart Grid using Dynamic Forward Price Offers Enabling 24/7 Automated Demand Response and the Smart Grid using Dynamic Forward Price Offers Presented to ISO/RTO Council by Edward G. Cazalet, PhD The Cazalet Group ed@cazalet.com www.cazalet.com 650-949-0560

More information

IBERDROLA USA ELECTRIC TRANSMISSION PLANNING MANUAL CRITERIA & PROCESSES

IBERDROLA USA ELECTRIC TRANSMISSION PLANNING MANUAL CRITERIA & PROCESSES IBERDROLA USA TECHNICAL MANUAL TM 1.10.00 Revision 01 Date : 11-2014 Technical Manual Iberdrola USA IBERDROLA USA ELECTRIC TRANSMISSION PLANNING MANUAL CRITERIA & PROCESSES New York State Electric & Gas

More information

Monthly Report. March 2014. Rick Gonzales Rana Mukerji Robert Fernandez

Monthly Report. March 2014. Rick Gonzales Rana Mukerji Robert Fernandez Monthly Report March 2014 Rick Gonzales Rana Mukerji Robert Fernandez TABLE OF CONTENTS Operations Performance Metrics Report Market Operation s Report Daily Loads Project Status Report Regulatory Filings

More information

CALIFORNIA ISO. Pre-dispatch and Scheduling of RMR Energy in the Day Ahead Market

CALIFORNIA ISO. Pre-dispatch and Scheduling of RMR Energy in the Day Ahead Market CALIFORNIA ISO Pre-dispatch and Scheduling of RMR Energy in the Day Ahead Market Prepared by the Department of Market Analysis California Independent System Operator September 1999 Table of Contents Executive

More information

Planning Reserve Margin (PRM)

Planning Reserve Margin (PRM) Planning Reserve Margin (PRM) Nguyen Pham Planning Specialist, Power Supply & Planning Overview A more detailed version of the PRM presentation given in July 2015 Q & A on the PRM report based on 2012

More information

Last revised: September 1, 2014 TRANSMISSION FUNCTION TITLES AND JOB DESCRIPTIONS

Last revised: September 1, 2014 TRANSMISSION FUNCTION TITLES AND JOB DESCRIPTIONS Last revised: September 1, 2014 TRANSMISSION FUNCTION TITLES AND JOB DESCRIPTIONS EVP, Chief Operations Officer, has primary responsibility for the overall planning, operations and control of the transmission

More information

Priority Project Description Status and Milestone Deliverables

Priority Project Description Status and Milestone Deliverables 0 Billing System Corrections (Baseline) Status: Billing system problem resolution continues on a regular basis by a dedicated team of development staff. Once identified, billing issues are reviewed, solutions

More information

August 15, 2012 10:00 a.m. 1:30 p.m.

August 15, 2012 10:00 a.m. 1:30 p.m. NYISO Business Issues Committee Meeting Minutes NYISO Business Issues Committee Meeting Minutes August 15, 2012 10:00 a.m. 1:30 p.m. 1. Introductions, Meeting Objectives, and Chairman s Report The chair

More information

Recent Developments in US-Mexico Electricity Trade: A Tale of Two Borders

Recent Developments in US-Mexico Electricity Trade: A Tale of Two Borders Recent Developments in US-Mexico Electricity Trade: A Tale of Two Borders Nicolas Puga, Principal San Diego, California October 18-19, 2007 Historical trends of US-Mexico electricity trade may soon change

More information

New York s Transmission Challenges and Opportunities: An Overview

New York s Transmission Challenges and Opportunities: An Overview New York s Transmission Challenges and Opportunities: An Overview By: Dr. Matthew Cordaro 2012 is shaping up to be the year of the grid. Governor Cuomo has proposed an energy highway aimed at finding ways

More information

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Reliability Technical Conference Docket No. AD16-15-000 Prepared Statement of Mark Rothleder on behalf of the California Independent System

More information

Energy Imbalance Market

Energy Imbalance Market Energy Imbalance Market Tariff Framework September 10, 2013 CAIS[Type text] [Type text] [Type text] Table of Contents 1. Introduction... 1 2. Guiding Objectives for the Tariff Framework... 2 3. Tariff

More information

2016 2020 Strategic Plan New York Independent System Operator

2016 2020 Strategic Plan New York Independent System Operator 2016 2020 Strategic Plan New York Independent System Operator Since the inception of New York s competitive market... $6.4 billion in reduced fuel costs due to system efficiency improvements that exceeded

More information

POWER TRENDS 2014. Evolution of the Grid

POWER TRENDS 2014. Evolution of the Grid POWER TRENDS 2014 Evolution of the Grid sm Power Trends 2014 is printed on Mohawk Options 100% PC, which is made with 100% post-consumer recycled fiber, and manufactured entirely with Green-e certified

More information

Scope of Restoration Plan

Scope of Restoration Plan RWG Area Restoration Review Worksheet (10/28/09) EOP-006-02 Directory 8 EOP-005 NYSRG Rule G Text Restoration Plan Requirement R1.Each Reliability Coordinator shall have a Reliability Coordinator Area

More information

Performance Metrics. For Independent System Operators And Regional Transmission Organizations

Performance Metrics. For Independent System Operators And Regional Transmission Organizations Performance Metrics For Independent System Operators And Regional Transmission Organizations A Report to Congress In Response to Recommendations of the United States Government Accountability Office April

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. ) ) Reliability Technical Conference ) Docket No.

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION. ) ) Reliability Technical Conference ) Docket No. UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION Reliability Technical Conference Docket No. AD14-9-000 REMARKS OF BRAD ALBERT GENERAL MANAGER, RESOURCE MANAGEMENT ARIZONA PUBLIC

More information

New Brunswick Electricity Business Rules

New Brunswick Electricity Business Rules New Brunswick Electricity Business Rules Table of Contents Chapter 1 Chapter 2 Chapter 3 Chapter 4 Administration and Participation Transmission Planning and Connections Reliable Operations Billing and

More information

Kent Active System Management (KASM) Oct 2015 / Matthieu Michel

Kent Active System Management (KASM) Oct 2015 / Matthieu Michel Kent Active System Management (KASM) Oct 2015 / Matthieu Michel Project Background (update): D Heat Map: SPN D Connection Offers Accepted (Cumulative) 1W D Heat map (June 2015) SPN D Connection Offers

More information

ALL ISLAND GRID STUDY WORK STREAM 4 ANALYSIS OF IMPACTS AND BENEFITS

ALL ISLAND GRID STUDY WORK STREAM 4 ANALYSIS OF IMPACTS AND BENEFITS ALL ISLAND GRID STUDY WORK STREAM 4 ANALYSIS OF IMPACTS AND BENEFITS January 2008 Executive Summary The All Island Grid Study is the first comprehensive assessment of the ability of the electrical power

More information

SHE Transmission. 2015_10_30 Transmission Losses Strategy Rev 2.0 October 2015

SHE Transmission. 2015_10_30 Transmission Losses Strategy Rev 2.0 October 2015 SHE Transmission 2015_10_30 Transmission Losses Strategy Rev 2.0 October 2015 Summary This paper presents SHE Transmission s views and approach on the impact of transmission losses on the transmission

More information

Demand Response Frequently Asked Questions (Last Updated 02/23/16)

Demand Response Frequently Asked Questions (Last Updated 02/23/16) # Questions Answers 1 Under the current CAISO tariff, assuming it would otherwise meet the requirements under the CAISO tariff and business practice manuals to do so, can the Load associated with a retail

More information

DUKE ENERGY INDIANA. Preparation for Summer 2007. Presentation to Indiana Utility Regulatory Commission

DUKE ENERGY INDIANA. Preparation for Summer 2007. Presentation to Indiana Utility Regulatory Commission DUKE ENERGY INDIANA Preparation for Summer 2007 Presentation to Indiana Utility Regulatory Commission May 30, 2007 Overview of Presentation 2006 Duke Energy Indiana accomplishments/challenges Summer 2007

More information

Electricity Supply. Monthly Energy Output by Fuel Type (MWh)

Electricity Supply. Monthly Energy Output by Fuel Type (MWh) Ontario Energy Report Q4 Electricity October December Electricity Supply Electricity production was lower in Q4 than in previous years, with milder than normal weather in October and December resulting

More information

Proposal to Modify Bad Debt Loss Allocations and Working Capital Rebalancing Methodologies. Mary K. McGarvey Management Committee November 29, 2006

Proposal to Modify Bad Debt Loss Allocations and Working Capital Rebalancing Methodologies. Mary K. McGarvey Management Committee November 29, 2006 Proposal to Modify Bad Debt Loss Allocations and Working Capital Rebalancing Methodologies Mary K. McGarvey Management Committee November 29, 2006 1 Overview Calculation Methodologies: Allocation of bad

More information

The Materials Contained Are Property of GP Renewables & Trading, LLC and are considered proprietary. This is not for distribution.

The Materials Contained Are Property of GP Renewables & Trading, LLC and are considered proprietary. This is not for distribution. The Materials Contained Are Property of GP Renewables & Trading, LLC and are considered proprietary. This is not for distribution. 1 Wholesale Power 101 Maximizing Asset Value & Minimizing Risk 2 Facts

More information

New ISO-NE Return on Equity Rate Could Impact Future Transmission Decisions

New ISO-NE Return on Equity Rate Could Impact Future Transmission Decisions RESEARCH North America Power and Utilities Energy Efficiency New ISO-NE Return on Equity Rate Could Impact Future Transmission Decisions Continued Transmission Investments Key to Electric Grid Reliability

More information

FORM EIA-411 INSTRUCTIONS COORDINATED BULK POWER SUPPLY AND DEMAND PROGRAM REPORT

FORM EIA-411 INSTRUCTIONS COORDINATED BULK POWER SUPPLY AND DEMAND PROGRAM REPORT PURPOSE REQUIRED RESPONDENTS RESPONSE DUE DATE METHODS OF FILING RESPONSE Form EIA-411 collects information about regional electricity supply and demand projections for a ten-year advance period and information

More information

Day-Ahead Scheduling Manual

Day-Ahead Scheduling Manual MANUAL 11 Day-Ahead Scheduling Manual February 2016 Version: 4.1 Revision Date: 02/01/2016 Committee Acceptance: 01/13/16 BIC 01/14/16 OC This document was prepared by: New York Independent System Operator

More information

Energy Storage Activities at New York Power Authority

Energy Storage Activities at New York Power Authority Energy Storage Activities at New York Power Authority Li Kou, Ph.D. PE Sr. R&TD Engineer New York Power Authority APPA National Conference, Seattle, WA June 19, 2012 1 New York Power Authority Highlights

More information

Generation Interconnection Feasibility Study Report-Web Version. PJM Generation Interconnection Request Queue Position Z1-055

Generation Interconnection Feasibility Study Report-Web Version. PJM Generation Interconnection Request Queue Position Z1-055 Generation Interconnection Feasibility Study Report-Web Version For PJM Generation Interconnection Request Queue Position Z1-055 South Bend Generation Project March 2014 PJM Interconnection 2014. All rights

More information

Introduction to the Integrated Marketplace

Introduction to the Integrated Marketplace The information, practices, processes and procedures outlined and contained in this publication are the intellectual property of Southwest Power Pool, Inc. and are protected by law. This publication or

More information

Southwest Power Pool (SPP)

Southwest Power Pool (SPP) Southwest Power Pool (SPP) 2010 ISO/RTO Metrics Report 315 Section 7 SPP Performance Metrics and Other Information Southwest Power Pool, Inc. (SPP) is a regional transmission organization (RTO) that coordinates

More information

FRCC Standards Handbook. FRCC Automatic Underfrequency Load Shedding Program. Revision Date: July 2003

FRCC Standards Handbook. FRCC Automatic Underfrequency Load Shedding Program. Revision Date: July 2003 F R C C FRCC Standards Handbook FRCC Automatic Underfrequency Load Shedding Program Revision Date: July 2003 FRCC Underfrequency Load Shedding Program Modification and Approval Process Requests to modify

More information

Overview of Long Island Electric Service Territory

Overview of Long Island Electric Service Territory Overview of Long Island Electric Service Territory Long Island Electric Service Territory» Long Island s electric service customers are located in Nassau County and Suffolk County (except for the villages

More information

COMMENTS OF THE SOLAR ALLIANCE NEW JERSEY INTERCONNECTION RULES APRIL 29 TH, 2011

COMMENTS OF THE SOLAR ALLIANCE NEW JERSEY INTERCONNECTION RULES APRIL 29 TH, 2011 COMMENTS OF THE SOLAR ALLIANCE NEW JERSEY INTERCONNECTION RULES APRIL 29 TH, 2011 I. Background The Solar Alliance is a group of approximately 30 of the largest photovoltaic (PV) solar development and

More information

Product Management Update

Product Management Update Product Management Update Prepared By: NYISO Product Management August 2005 Draft for discussion purposes only NYISO Products Business solutions delivered as features, functions and services that enable

More information

Day- Ahead Congestion and Real-Time Commodity Markets in East York

Day- Ahead Congestion and Real-Time Commodity Markets in East York 2013 STATE OF THE MARKET REPORT FOR THE NEW YORK ISO MARKETS By: David B. Patton, Ph.D. Pallas LeeVanSchaick, Ph.D. Jie Chen, Ph.D. Market Monitoring Unit for the New York ISO May 2014 2013 State of the

More information

ERCOT Analysis of the Impacts of the Clean Power Plan Final Rule Update

ERCOT Analysis of the Impacts of the Clean Power Plan Final Rule Update ERCOT Analysis of the Impacts of the Clean Power Plan Final Rule Update ERCOT Public October 16, 2015 ERCOT Analysis of the Impacts of the Clean Power Plan Final Rule Update In August 2015, the U.S. Environmental

More information

May 20, 2013. Submitted Electronically. Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C.

May 20, 2013. Submitted Electronically. Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 10 Krey Boulevard Rensselaer, NY 12144 May 20, 2013 Submitted Electronically Kimberly D. Bose Secretary Federal Energy Regulatory Commission 888 First Street, N.E. Washington, D.C. 20426 Re: New York Independent

More information

Operations Performance Metrics Monthly Report

Operations Performance Metrics Monthly Report Operations Performance Metrics Monthly Report June 2013 Report Operations & Reliability Department New York Independent System Operator Prepared by NYISO Operations Analysis and Services, based on settlements

More information

From Forecast to Discovery: Applying Business Intelligence to Power Market Simulations

From Forecast to Discovery: Applying Business Intelligence to Power Market Simulations From Forecast to Discovery: Applying Business Intelligence to Power Market Simulations Presented at the Energy Central Webinar May 12, 2015 Copyright 2015 Newton Energy Group LLC Welcome and Introduction

More information

Joint Con Edison LIPA Offshore Wind Power Integration Project Feasibility Assessment

Joint Con Edison LIPA Offshore Wind Power Integration Project Feasibility Assessment Joint Con Edison LIPA Offshore Wind Power Integration Project Feasibility Assessment March 20, 2009 Joint Con Edison LIPA Offshore Wind Power Integration Project Feasibility Assessment Table of Contents:

More information

Monthly Report. August 2004. Rob Fernandez

Monthly Report. August 2004. Rob Fernandez Monthly Report August 2004 Rob Fernandez TABLE OF CONTENTS 1. Executive Summary... 1 2. System Operations and Planning... 4 3. Market Services... 6 4. Corporate and Market Risk Management...10 5. Strategic

More information

An Overview of the Midwest ISO Market Design. Michael Robinson 31 March 2009

An Overview of the Midwest ISO Market Design. Michael Robinson 31 March 2009 An Overview of the Midwest ISO Market Design Michael Robinson 31 March 2009 The Role of RTOs Monitor flow of power over the grid Schedule transmission service Perform transmission security analysis for

More information

Power Supplier Statement - Billing Date. Energy(MWh) 300 Forward Energy 303 Balancing Energy

Power Supplier Statement - Billing Date. Energy(MWh) 300 Forward Energy 303 Balancing Energy Power Supplier Statement - Billing Date Energy(MWh) 3 Forward Energy 33 Balancing Energy Energy Settlement ($) 31 Forward Energy 34 Balancing Energy 314 ELR DAM Contract Balancing Payment $ 32 DAM Bid

More information

LSE Registration ERCOT Region. By Derrick Davis Texas RE Corporate Counsel

LSE Registration ERCOT Region. By Derrick Davis Texas RE Corporate Counsel LSE Registration ERCOT Region By Derrick Davis Texas RE Corporate Counsel Presentation Objectives Provide the history of LSE registration and appeals Direct Energy DOE Portsmouth NERC s request for re-hearing

More information

Systems Operation Department

Systems Operation Department August 8, 2012 TRANSMISSION FUNCTION EMPLOYEES: Systems Operation Department General Manager Directs the activities of the of the System Operation Department including formulation of personnel issues,

More information

ECCO International, Inc. 268 Bush Street, Suite 3633 San Francisco, CA 94104

ECCO International, Inc. 268 Bush Street, Suite 3633 San Francisco, CA 94104 PROMAX SHORT-TERM ENERGY & TRANSMISSION MARKET SIMULATION SOFTWARE PACKAGE ECCO International, Inc. 268 Bush Street, Suite 3633 San Francisco, CA 94104 ECCO International, Inc. Copyright 2009 EXECUTIVE

More information

139 FERC 61,088 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER GRANTING MARKET-BASED RATE AUTHORIZATION AND REQUEST FOR WAIVERS

139 FERC 61,088 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION ORDER GRANTING MARKET-BASED RATE AUTHORIZATION AND REQUEST FOR WAIVERS 139 FERC 61,088 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Before Commissioners: Jon Wellinghoff, Chairman; Philip D. Moeller, John R. Norris, and Cheryl A. LaFleur. Silver State Solar

More information

Closing the Gap Between Wholesale and Retail

Closing the Gap Between Wholesale and Retail Closing the Gap Between Wholesale and Retail Transactive Energy Workshop March 28-29 Robert B. Burke GWAC MEMBER & PRINCIPAL ANALYST ISO NEW ENGLAND INC. Disclaimer This presentation represents the thoughts

More information

Transmission Planning Study (Year 2022) for Cherokee 4 Replacement Alternatives. Final Report

Transmission Planning Study (Year 2022) for Cherokee 4 Replacement Alternatives. Final Report Transmission Planning Study (Year 2022) for Cherokee 4 Replacement Alternatives (Required per CPUC Decision No. C10-1328) Final Report (Submitted with Public Service s 2011 ERP) Executive Summary The objective

More information

Two Settlement - Virtual Bidding and Transactions

Two Settlement - Virtual Bidding and Transactions Two Settlement - Virtual Bidding and Transactions (Fall 2009) PJM 2009 2009 PJM 1 Agenda Two-Settlement Overview Two-Settlement Features & System Two-Settlement Business Rules Two-Settlement Data Requirements

More information

Wind Plant Operator Data Guide

Wind Plant Operator Data Guide GUIDE 09 Wind Plant Operator Data Guide June 2016 Version: 2.1 Effective Date: 06/23/2016 This document was prepared by: NYISO Customer Support New York Independent System Operator 10 Krey Blvd Rensselaer,

More information