1 FEMA Task Order 12-J-0001 (4020-NY) ARCHITECTURAL BUILDING INSPECTION ASSESSMENT AND REPORT Orange County Government Center 255 Main Street, Goshen NY February 15,

2 INDEX and TABLE OF CONTENTS I. BACKGROUND AND BUILDING HISTORY II. EXISTING CONDITIONS III. ARCHITECTURAL INSPECTION S AND WEATHER EVENTS DAMAGE I. BACKGROUND AND BUILDING HISTORY IV. CONCLUSIONS 2

3 I. BACKGROUND AND BUILDING HISTORY This report is a visual building condition architectural assessment with emphasis on the storm caused damage on behalf of FEMA in response to claims by the Orange County Government for the Orange County Government Building. The building was constructed in 1967 and designed by The Architect Paul Rudolph. The building size is approximately 160,000 square feet of space separated into three components called Divisions that are connected by corridors and are grouped around a center courtyard. The building s structure is reinforced concrete with two way reinforced floor and roof slabs and rectangular concrete columns and shear caps. The perimeter walls are predominantly split concrete block cavity walls. Large light monitors throughout the building extend above the roof to bring light into the interior. The building predates the energy crisis and mandates on energy consumption, as well as, ADA laws of the 1990 s. Hence these later enhancements are not apparent in the present building. The general opinion of the assessment team based on visual evidence and lack of building documentation is that the building has had few significant upgrades over the years. It is surmised that the roof was replaced at some time and the previous reports by the Owner s consultants indicate that structural work was done in the 1990 s, the records, documents, and construction records are not available. Modifications to the building observed are deviations from the original plans and are predominately interior re-arrangement of offices and service spaces from the original drawings and again no documentation was available. From the previous reports by the Owners Consultants representatives dated August 16, 2011, September 9, 2011, and November 2011, as well as, complaints from the Owners, employees, and published newspaper articles documents the building s long history of roof leaking and water penetration into the interior of the building that predates the storms. The extreme weather events of tropical storms Irene on August 28, 2011 and Lee on September 5,6,7, and 8 produced large amounts of water and wind in rapid secession on the building structure and site overwhelming the existing building envelope, especially the roof. II. EXISTING CONDITIONS A. Existing Building Structure and Envelope Prior to FEMA s site assessment, the assessment team received the previous assessment reports by the county s consultants. Further, in meetings with the County the assessment team requested the records of major site, building envelope, and equipment repairs or replacement drawings including records of the roof repair, replacement, and warranties. The county indicated that these records were not available from the files. 1. Structural Roof System Floor and roof slabs are two way reinforced concrete slab 6 inches thick. Keys between the slab and vertical walls were observed in some areas on the construction documents but in general no expansion joints or construction joints were shown. General industry standards at the time construction documents were prepared did not show concrete demarcation lines (cold joints) between the horizontal and vertical pours. These items were relegated to the shop drawings 3

4 to allow the contractor to control the extent and size of the concrete pours during construction. These drawings would of been reviewed by the project s architects and engineers and when approved formed the final basis for the installation. The approved shop drawings were not available for review. The reinforcing was extended vertically from the horizontal slabs and cast with the vertical wall to form the light well walls but the junction between the vertical and horizontal concrete was a cold joint. There was no evidence of a water bar installed between the horizontal slab and vertical wall. The lack of this element and the method of installing the roof figures prominently in the water infiltration problem and efflorescent described in the architectural narrative and photographs. 2. Building Foundation System From the Owner furnished documentation, The foundation is a combination of spread footing, grade beams and columns. There was no evidence of slab settlement at the lowest levels as a result of the flooding and the building structure is intact. The Owner s consultant reports indicate that in their opinion modifications and component replacement is required for the roof slabs and their components. However,the visual inspection revealed that the storms did not compromise the existing structural systems and the roof is in basically the same condition as it was prior to the storms. 3. Building Exterior Wall Construction and Flashing: In general and based on the building s construction documents, the exterior walls are cavity walls 10 inches to 14 inches thick with split faced concrete block on the exterior and either split faced, plain concrete block, or cast in place concrete on the interior. The walls show a two (2 ) cavity with 1 solid insulation terminating near the roof with plastic flashing at the bottom of the cavity wall and weep holes ( to drain the cavity ) extending to the outside. The first weak link in the integrity of the wall is the base flashing. It is called plastic in the documents and very well might be an early pvc product called Neverstal in general use in the late 1960 s and early 1970 s. The product is dimensionally unstable ( it shrinks) and becomes brittle over time. Because of this flashing there is reason to believe that the existing cavity wall flashing today is non- functional. C. Roof System and Drains The waterproofing layer of the existing roof system is a loose laid membrane roof over 2 inches of rigid insulation and utilizing 2 inches of light weight concrete fill below the insulation poured directly on the structural concrete deck. The ballast is 2 inches thick concrete block approximately 12 inches square with drainage grooves, set tightly together, and dyed black. The ballast has a high absorption rate, stays wet, and breaks up during the normal freeze thaw cycles. More to the point, the ballast fills the available roof area available to contain water. As a result during the storm or a large rain event the saturated roof flood over the cap flashing, down the fascia and the dye from the block is leached out and drips down the exterior wall indicating the black stain is a result of the roof overflow. The 4

5 absence of this condition at the rest of the walls below the third floor further point to the roof overflow as the cause. Drains are predominantly located at the roof to vertical wall intersections with some drains scattered in the open roof area. The roof drainage utilizes scuppers on the high roofs which drain to lower roofs and at the lower roof again scuppers drain to the main roof where roof drains pick up the water. III. ARCHITECTURAL INSPECTIONS AND WEATHER EVENTS DAMAGE A. Exterior Envelope Damage (1). Building Roofs and Roof Flashing The present condition of the roof was pre-existing prior to the storm events in August and September An inspection of the third floors of Divisions 1,2 and 3 found little interior water in the ceilings. Although the existing roof is marginally functional having a history of leaking, the most prevalent areas of damage occurred at the joint in the roof slab to vertical walls and in hair line cracks in the structural slabs themselves. The leaks here are manifest on the interior as efflorescent stains. This staining occurred on a regular basis before the storm but the amount of water in the storm intensified the water infusion through these cracks. To track the water paths from the roof the following illustrations taken from the construction drawings show the potential paths of water [Exhibit A]. The storms increased the pressure on these areas and all other weak points in the walls where water can migrate into the interior. There are many roof to wall flashings which on inspection lack the proper flashing techniques required for water seals.in addition the growth of moss at the wall roof junctions, drains, and pavers indicate accumulated standing water on the roof. ( PHOTOS: A-8,A-9,A-10,A-11,A-12,A-14,A-15) Given the condition of the roof, little actual damage of the interior due to the leaking roof was observed.. Most of the leaks are manifested as efflorescent stains. This staining has occurred on a regular basis before the storm but the amount of water in the storm intensified the water infusion through these cracks. (2). Roof Drains and Through Roof Piping Roof drains seem to be minimal and in poor condition. A few are located in the roof field but most are located at the junction of the vertical walls and the roof The roof is essentially flat. The condition of the existing roof drains, the overall lack of drains throughout the roof, lack of positive roof slopes, the inappropriate location of drains at walls, and the possible under sizing of the original drains all would reduce the ability of getting the water off the roof. (PHOTOS: A-20,A- 21,A-23,A-24,A-30,A-31,A-32,A-35) 5

6 There are numerous roof penetrations in the roof by drains, PVC vent piping, and electrical conduit that are not properly flashed by industry standards and will allow water to penetrate through the roof.(photos: A-32,A-33) (3). Walls Water intrusion into the interior from the roof occurs at the wall to roof slab intersection and at the hairline cracks in the structural slab.the walls themselves are in reasonable condition and only exhibit water and ballast dye stains at the third floor where the roof has overflowed.( PHOTOS: A-20,A-21,A-24,A-39) The attached illustrations taken from the actual construction documents and describe the potential paths of water into the building from the roof and walls Illustration 1. The lack of a cast in drip at the concrete fascia bottom or extension of the roof fascia over the wall below allows the water to travel down the fascia and migrate horizontally into the cavity wall. Wind and capillary action and horizontal winds serve as an enhanced water delivery system to the interior ( PHOTOS: A-10,A-11,A-18) Illustration 2. The poor installation and probable product failure of plastic flashing in the cavity wall allows the water to travel down the cavity and continue to the termination of the wall at the horizontal concrete slab. The water can then migrate horizontally and into the interior of the building( PHOTOS: A-19,A-20,A- 28,A29,A-30) Illustration 3. This detail is typical of the exposed rough formed concrete wall above the horizontal floor and roof slabs appearing throughout the facility. Although there is no cavity the wall has metal flashing. The flaw in this installation is that there is no horizontal water infusion protection from the roof in case of failure. Typically a continuous vertical water Bar is cast in the horizontal slab at the horizontal/vertical intersection (cold joint) blocking any water from entering the interior.(photos: A-12,A-25,A-26,A-27,A-28,A-29) The exterior walls are in good condition with little leaking through the wall to the interior, occurring at the wall to floor intersection. ( A-20) The wall staining is most apparent at the third floor walls below the roof. Here due to the incapacity of the roof to store water and the very low coping height at the roof edge the water overflows carrying the dye from the ballast paver down the face of the wall.(photo: A-39) Where the wall is protected by overhangs very little water and staining is observed ( PHOTOS: A-39,A-40) (4) Law Library and Adjacent Areas Evidence of leaking occurred in the Law Library and adjacent areas. The existing drawings indicate a mechanical equipment room on the roof above and one of 6

7 the exterior Mechanical Room walls crosses the area where the leaks occur. The deterioration of the wall /floor support beam traversing the space indicates either flooding in the mechanical room floor proper ( no water at the time of inspection) or in the vertical exterior wall above the beam at the roof. (PHOTO: A-13) (5). Electrical Switch Gear Vacant Transformer Room and Adjacent corridor Division 1 At the exterior stair landing between Unit 1 and 2 ( refer to the second floor plan Division 1) stairs between column lines 10,11, D, and E (PHOTO: A-2) a graded earth berm is sloped toward the paved landing. Water was standing on the pebble finished stair landing during the inspection. The construction joint between the landing slabs requires maintenance and there are water stains in this area from past water ponding. Under this area in the basement is the Electrical Switch Gear Room and adjacent former oil based transformer room now vacant. Water is entering the Electrical Switch Gear Room at the top of the wall (A-7). Although the landing is under cover at a higher level, the probable cause is the water getting below the landing slab and runoff from the adjacent berm which directs the water to the stair landing. In addition the leaks are present in the adjacent corridor ceiling, wall, and floor to the Switch Gear room (PHOTOS: A-4,A-5,A-6). It is not known how or to what extent the Switch Gear ceiling slab and walls were water proofed during construction or the method of doing it. (6). Internal Mechanical Piping Trenches, Valve Pits, and Sump Pump Pits Internally in the first floor of Division 3 (south side) there is a mechanical trench running along column line M between columns 2 to 7 that has water in it. The source could be external water from the grading or pipe leakage. Water bills were requested from the Country to see if possible pipe leaks could be inferred from the bills.(photo: A-1) On the north side of Division 3 further mechanical piping trenches are located started at column 7P and running east internally at the building perimeter to Column line 2 and turning south to column line O. These pits contained water and either there is leakage from the piping or ground water is seeping into the trenches. No details are available to determine if any of the trenches were water proofed during initial construction or if any foundation drainage was installed at the perimeter walls. In addition there are additional sump pits and access doors in the First Floor of Division 3 at the raised floor area in the Jury Selection Room at column lines 2 and 3 at Column line N, as well as, in the vicinity of the raised floor area at column P5. There was some water in these pits and it was not clear if these pits connect or what system they are a part of. IV CONCLUSIONS 7

8 The rain events of August and September 2011 overwhelmed an existing deteriorated roofing and insufficient pump systems. Below grade support spaces and pipe trenches were flooded and required pumping from an overwhelmed sump pump system. The deteriorated condition of the roof, drainage, and penetrations prior to the flood is the root cause of the subsequent problems in the interior space primarily on the third floor of all divisions.. The existing building ground floor elevations at grade and volume of water during the flood from the adjacent creek caused the flooding of the below grade service spaces. The stair landing above the of the Electrical Switch Gear Room, vacant transformer room, and adjacent corridors allowed water to seep into these spaces. Within the courtyard area the grading which is partially sloped to the building may be a contributing factor to the pipe trench flooding in the First Floor of Unit 3. Sloped grades to the north side of Unit 1 may contribute to the Electrical Switch Gear Room Flooding. The present roof depends on a single layer of roofing to protect the interior spaces and the system has failed to do that. Protection from water penetration should be provided at the last point of entry to the interior namely at the structural roof slab and vertical walls regardless of the type and composition of the final roof. The existing roof should be replaced and the amount and location of roof drains should be reconsidered. Suspected deteriorated cavity wall flashing, as well as, the apparent lack of weep holes potentially allow water in the wall to gather at the wall s base and infiltrate the building. Only one area of direct wall leaking on the floor at the interior was found.(photo: A-19). The walls are in good condition. If additional leaks on the floor develop, the walls should repaired at that actual leak location only. The vertical walls where not exposed to the third floor roof flooding showed little water absorption or staining and do not need to be replaced. (PHOTOS: A-16,A-17,A-38) Prevention of water Infusion to the lower service spaces should start with the removal of the existing stair landing slab, the area examined, and reconstructed as a watertight envelope forming the electrical Switch Gear room and adjacent spaces ceiling. The pipe trenches must have a reliable pumping system and a methods to deal with large water infiltrations as a result of protracted rain if the existing trenches and piping are to remain viable. The window systems weathered the storms in reasonable fashion with only a few water intrusion locations generally at the window heads. All the calking in the windows should be replaced. 8

9 Appendix A Photographs 9

10 (A-1) GROUND SLOPES TOWARD BUILDING AND AREA DRAIN. MECHANICAL PIPING TRENCH BEHIND WALL CONTAINS WATER. THE AREA DRAIN IS QUITE SMALL FOR THE AREA DRAINED AND SOME PONDING WAS DETECTED. (A-2) GROUND TO THE RIGHT OF THE STAIRS SLOPES TOWARD THE STAIR LANDING. STAIRS EXPOSED TO WEATHER AND CHANNELS WATER TO LANDING. UNDER LANDING IS THE ELECTRICAL SWITCH GEAR ROOM, THE FORMER TRANSFORMER VAULT, AND ADJACENT CORIDOR. WATER WAS STANDING ON THE LANDING AT THE LAST SITE VISIT. 10

11 (A-3) IN THE ELECTRCIAL SWITCH GEAR ROOM THE RESULTS OF THE WATER INTRUSION FROM THE SURFACE ABOVE ARE OBVIOUS. NOTE THE ORANGE HOSE IS DRAINING A SUMP PUMP THROUGHT THE TRANSFORMER VAULT (A-4) WATER HAS LEACHED DOWN THE WALL CORRODING METAL PANEL COVERS AND CONDUIT. MOST OF THE FLOOR IS COVERED WITH WATER DURING THE LAST SITE VISIT. THIS PHOTO WAS AFTER THE SECOND VISIT IT DURING A RAIN EVENT. 11

12 (A-5) THE CORRIDOR OUTSIDE THE SWITCH GEAR ROOM HAS WATER FROM THE SLAB UNDER THE STAIR LANDING ABOVE. SEE PHOTOGRAPH (A-4) (A-6) CORRIDOR CEILING AT THE LEAKING ROOF SLAB. 12

13 (A-7) THE ASSESMENT TEAM SUSPECTS THAT THE WATERPROOFING ON THE SWITCH GEAR ROOM ROOF SLAB ABOVE IS EITHER NON EXISTANT OR COMPROMISED. ALSO THE CALK JOINT IN THE SLAB ABOVE MAY BE THE JOINT BETWEEN MULTIPLE ROOF SLABS AND REQUIRES MAINGTENANCE.. THE LACK OF DOCUMENTS PREVENTS A FIRM CONCLUSION ON THE INITIAL WATERPROOFING DETAILS OF THE ROOF SLAB. HOWEVER, THE LEAKS INTO THIS ROOM ARE LONG STANDING. B. EXISTING WALL FLASHING AT ROOF 13

14 (A-8) TYPICAL CONDITION OF LACK OF FLASHING CONTUNITY AND POOR MAINTANENCE (A-9) POOR TRANSITION TO WALL/COPING JUNCTION AND OPEN AREA TO INSIDE WALL BELOW 14

15 (A-10) POORLY MAINTENANED JOINT AT ROOF SLAB TO WALL. LACK OF THROUGH WALL FLASHING. (A-11) ATTEMPTS TO CALK THE OVERSIZED JOINT (PHOTO: A-10) JOINT WITH A PUTTY LIKE CALKING. NOTE WEATHER WEAR ON TOP OF FINS 15

16 (A-12) INADEQUATE WALL FLASHING AT THE LIGHT MONITORS AND ROOF FAILURE AS WELL AS ALLOWING WATER TO MIGRATE INTO THE INTERIOR AT THE ROOF SLAB. (A-13) SUPPORT BEAM FOR MECHANICAL ROOM WALL ON ROOF. WATER INFUSION FROM EITHER THE EXTERIOR WALL ABOVE OR FLOOR FLOODING HAS DETERIORATED THE CONCRETE BEAM AND LEAKED WATER INTO THE LAW LIBRARY CEILING BELOW. 16

17 (A-14) CONCRETE FASCIA AND CALKING DETERIORATION AND COMPROMISED REINFORCING REQUIRES EXTENSIVE REPAIR AND PROBABLLE WINDOW AND FRAME REPLACEMENT. (A-15) POOR FLASHING JUNCTION NSTALLATION 17

18 (A-16) THE EXISTING DOCUMENTS INDICATE CAVITY WALL FLASHING. AND WEEP HOLES TO ALLOW THE WATER TO DRAIN FROM THE WALL. FEW WEEP HOLES ARE APPARENT IN THE EXTERIOR WALLS. (A-17) WALLS PROTECTED BY OVERHANGS AND NOT EXPOSED TO VERTICAL RAINS AND THE EFFECT OF ROOF WATER OVERFLOW DO NOT EXHIBIT THE WATER AND DYE SATURATED PATTERNS. WIND DRIVEN RAINS HAVE LESS OF A WALL SATURATED PATTERN OR THE PATTERN IS NON EXISTANT. 18

19 (A-18) SOME WALLS HAVE PROPER FLASHING AT THE COPING AND BETWEEN THE COPING AND WALL; HOWEVER WATER OVERFLOW PATTERNS INDICATE COMPROMISED FLASHING AND WATER INFILTRATION AT THE STRUCTURAL ROOF SLAB. (A-19) THERE IS SOME EVIDENCE THAT THE LACK OF CAVITY WALL FLASHING AT THE SUPPORT SLABS CONTRIBUTES TO LEAKING WALLS AND INFILTRATION AT THE INTERIOR FLOOR LEVELS. 19

20 (A-20) ROOF COPING TOO LOW, JOINTS NOT FLASHED OR MAINTAINED AND ROOF CANNOT DRAIN (A-21) ROOF OVERFLOW AS A RESULT THE ROOF S INABILITY TO HOLD WATER AND ABSENSE OF PROPERLY LOCATED ROOF DRAINS. NOTE THE BALLASTS WHICH HAVE BEEN REMOVED TO ATTERMPT TO DRAIN THE ROOF AND BALLAST DEBRIE AND DYE WHICH HAS LEACHED FROM THE PAVERS. 20

21 (A-22) THIS FASCIA AND THE BALLAST STAINS ARE THE RESULT OF WATER STAINING AS PER PHOTOGRAPH (A-21) ABOVE (A-23) BALLAST DETERIORATION IS DUE TO THE POUROUS NATURE OF THE BALLAST, WATER SATUARATION AND FREEZE THAW CYCLES. THIS CONDITION IS THOROUGHOUT THE MAJORITY OF ROOF AREAS.. 21

22 (A-24) BALLAST REMOVED TO PROVIDE A WATER PATH TO THE DRAIN. NOTICE THE COPING TOP IN REFERENCE TO THE BALLAST. (A-25) ROOFING WATERPROOFING HAS FAILED AND WATER HAS PENETRATED INTO THE STRUCTURAL SLAB AND ENTERED THE BUILDING THROGH THE CONSTRCUTION JOINT BETWEEN THE HORIZONTAL SLAB AND VERTICAL WALL 22

23 ` (A-26) FAILED ROOF SYSTEM AND HAIRLINE CRACKS IN STRUCTURAL SLAB ALLOWED WATER TO PENETRATE THE CRACK IN THE SLAB. (A-27) FAILURE OF THE CAVITY WALL FLASHING AIDED BY THE SLAB TO WALL JOINT AT THE ROOF DECK AND BELOW THE BEAM ENABLED WATER TO ENTER THE INTERIOR 23

24 (A-28) SCOPE OF THIS WATER PENETRATION TO THE INTERIOR MASONRY AT THE CAVITY WALL AND WALL JOINT BELOW THE ROOF IS THROUGHOUT THE ENTIRE STAIR AT THIS LEVEL (A-29) ENLARGED DETAIL OF (D-11) ABOVE 24

25 (A-30) MOST ROOF DRAINS ARE LOCATED AT THE BASE OF THE VERTICAL WALLS (A-31) THE HIGHER ROOFS ARE DRAINED BY SCUPPERS ON THE TO THE NEXT LOWEST ROOF AND FINALLY TO THE MAIN ROOF WHERE THE WATER IS PICKED UP BY THE WALL DRAINS AT THE LOWEST ROOF. THE SCUPPERS EJECT THEIR WATER CLOSE TO THE WALLS AND NO SPLASH BLOCKS ON THE MAIN ROOF TO MIGATE THE FORCE OF THE WATER HITTING THE ROOF DECK ARE INSTALLED. NOTE THE SCUPPER ON THE LEFT SIDE OF THE PHOTO. AND ONE OF THE FEW ROOF DRAINS LOCATED IN THE MAIN ROOF AREA. 25

26 (A-32) (A-33 (A-32) (A-33) PENERTRATIONS THROUGH THE ROOF, DRAINS, EQUIPMENT, CONDUIT AND VENTS IMPROPERLY FLASHED SERVE AS WATER CONDUITS INTO THE INTERIOR OF THE BUILDING 26

27 (A-34) (A-35) (A-34 (A-35) AGAIN, PENERTRATIONS AND MODIFICATIONS TO THE EXISTING ROOF WHICH HAVE NOT BEEN PROPERLY FLASHED AND SEALED CONTRIBUTE TO THE WATER INTRUSION TO THE INTERIOR. THIS PARTICULAR CONDITION IS IN THE MECHANICAL EQUIPMENT ON THE ROOF OF UNIT 2 ABOVE ROOM 3210 RESULTING IN INTERIOR DAMAGE. (A-36,A-37) IN THIS CASE THROUGH AN INTERIOR CHASE CARRYING A LARGE PIPE TO THE MECHANICAL ROOM ON THE ROOF. 27

28 (A-35) (A-36) (A-37) (A-36) (A-37)EVIDENCE OF WATER PENETRATION AT A CHASE WALL WHICH CONTAINS MAJOR PIPING DIRECTLY TO THE HVAC UNITS ON THE ROOF AT 28

29 (A-38) (A-39) (A-38 (A-39) VERTICAL WALLS BELOW THE THIRD FLOOR ROOF FLOODING EXHIBIT LESS WATER ABSORPTION AND STAINING. 29

30 (A-40) WATER OVERFLOWING ON THE WALLS IS MOST PREVLANT AT THE THIRD FLOOR 30

School Construction Authority Architecture & Engineering

School Construction Authority Architecture & Engineering SCOPING GUIDELINES 1.0 GENERAL GUIDELINES 2.0 BUILDING ENVELOPE SCOPING GUIDELINES 3.0 CATEGORIES AND COMPONENTS: The Flood Elimination/Below Grade Capital Category may include some or all of the following

More information

Vision Home Inspection

Vision Home Inspection Vision Home Inspection 324 Rams Run Shepherdsville KY 40165-7877 Inspector: James McFadden Property Inspection Report Client(s): Property address: Inspection date: View report summary This report is the

More information

EAST LYME HIGH SCHOOL

EAST LYME HIGH SCHOOL Overview: 1971 N 1966 GYM 1966 CLASSROOM WING 1966 AUD. 1971 GYM 1998 1998 POOL EAST LYME HIGH SCHOOL Original 1966 Building: The original East Lyme High School was constructed in 1966 and was composed

More information

Roof Inspection. Summary Report

Roof Inspection. Summary Report www.real-estate-inspections.com Roof Inspection Summary Report Subject Property Prepared for: File Number: Client in Detroit 05-15-RF-004 Inspector: Craig Milliken, PE # 32779 CPM Real Estate Inspections,

More information

Water Management & Damage Prevention:

Water Management & Damage Prevention: Water Management & Damage Prevention: A Guide for Homeowners This article provides homeowners with basic information to make these decisions and take the appropriate actions to keep their homes dry and

More information

TITLE: MASONRY PARAPET WALLS AND FLAT ROOF REQUIREMENTS 11/1/09

TITLE: MASONRY PARAPET WALLS AND FLAT ROOF REQUIREMENTS 11/1/09 TITLE: MASONRY PARAPET WALLS AND FLAT ROOF REQUIREMENTS 11/1/09 PMT GUIDE # 10 Book of Order Section G-10.0102o: "The session is responsible for the mission and government of the particular church. It

More information

Exterior Elevated Elements Inspection Guidelines

Exterior Elevated Elements Inspection Guidelines Exterior Elevated Elements Inspection Guidelines Planning and Development 1. Guideline Purpose These guidelines are intended to assist practicing professionals in complying with Berkeley Municipal Code

More information

Structure Survey Findings:

Structure Survey Findings: Structure Survey Findings: Visible portions of the following were observed: foundations; structure to walls, columns, floors, roofs, overhang posts, and columns; attached or firmly abutting decks, balconies,

More information

NRDCA 400 GUIDELINE FOR FIELD APPLICATION of LIGHTWEIGHT INSULATING CONCRETE REROOFING/RECOVER SYSTEMS

NRDCA 400 GUIDELINE FOR FIELD APPLICATION of LIGHTWEIGHT INSULATING CONCRETE REROOFING/RECOVER SYSTEMS NRDCA 400 GUIDELINE FOR FIELD APPLICATION of LIGHTWEIGHT INSULATING CONCRETE REROOFING/RECOVER SYSTEMS The (NRDCA) has prepared this document to provide customers and installers information that the industry

More information

INSPECTION FINDINGS. for. Paragon Condominiums 2102 W 31 st Avenue Denver, Colorado. Inspection Date: August 8, 2007. Perfonned By: Drew Schneider

INSPECTION FINDINGS. for. Paragon Condominiums 2102 W 31 st Avenue Denver, Colorado. Inspection Date: August 8, 2007. Perfonned By: Drew Schneider INSPECTION FINDINGS for Paragon Condominiums 2102 W 31 st Avenue Denver, Colorado Inspection Date: August 8, 2007 Perfonned By: Drew Schneider INSPECTRUM 27691 Moffat Road Evergreen, CO 80439 303.697.0990

More information

Envelope INSULATION BATT (2) Avoid Using Batt Insulation With Metal Framing. Pressure or Friction Fit

Envelope INSULATION BATT (2) Avoid Using Batt Insulation With Metal Framing. Pressure or Friction Fit R-H-DI1 INSULATION BATT NR-E-IB1 Avoid Using Batt Insulation With Metal Framing Batt insulation should not be used with metal framing systems. Although it is common to see fiberglass batt insulation installed

More information

201 WATER STREET FORWARDERS MUSEUM AND VISITORS INFORMATION CENTRE

201 WATER STREET FORWARDERS MUSEUM AND VISITORS INFORMATION CENTRE STRUCTURAL INSPECTION REPORT DRAFT 201 WATER STREET FORWARDERS MUSEUM AND VISITORS INFORMATION CENTRE TOWN OF PRESCOTT Date: November 2013 GENIVAR No.: 131-20617-00 2611 Queensview Drive, Suite 300, Ottawa,

More information

Waterproofing Problems: A Simple Explanation, A Simple Solution

Waterproofing Problems: A Simple Explanation, A Simple Solution Waterproofing Problems: A Simple Explanation, A Simple Solution The purpose of this paper is to point out the underlying causes of waterproofing problems and simple means of preventing them. Such problems

More information

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003)

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003) NCMA TEK National Concrete Masonry Association an information series from the national authority on concrete masonry technology CONCRETE MASONRY FOUNDATION WALL DETAILS TEK 5-3A Details (2003) Keywords:

More information

PETERSONS WATERFRONT CONDOMINIUMS

PETERSONS WATERFRONT CONDOMINIUMS CONSULT DESIGN CONSTRUCT PETERSONS WATERFRONT CONDOMINIUMS 103 Park Street Chelan, Washington Findings Summary Report Prepared for: Petersons Waterfront Condominium Association March 21, 2014 J2 Project

More information

Basement & Foundation Damage

Basement & Foundation Damage Basement & Foundation Damage Please note-this presentation is only intended to be used as a basic educational tool and is by no means all encompassing. Each property should be treated on a case by case

More information

Foundation Experts, LLC Specializes in Foundation Repair and Waterproofing

Foundation Experts, LLC Specializes in Foundation Repair and Waterproofing 1 Most basements show some signs of leaking and cracking. Through the years, problems with water, poor soils, grading, drainage and possible settling affect the integrity of a basement. Being able to recognize

More information

Preventing Ice Dams on Roofs

Preventing Ice Dams on Roofs Preventing Ice Dams on Roofs Facility Manager November/December 2005 When a roof leaks, facility managers inevitably receive complaints from building occupants. If it is winter, ice dams are often the

More information

Building Condition Assessment: 109-111 North Howard Street Baltimore, Maryland

Building Condition Assessment: 109-111 North Howard Street Baltimore, Maryland KPA The Joint Venture of EBA Engineering, Inc. and Kennedy Porter & Associates, Inc. 4813 Seton Drive, Baltimore, MD 21215 Phone: (410-358-7171) Fax: (410)358-7213 Building Condition Assessment: Baltimore,

More information

WET/DAMP BASEMENTS ANSWER: BASEMENT WALLS AND FLOORS CAN BECOME WET BY A LEAK, CAPILLARY SUCTION OR CONDENSATION.

WET/DAMP BASEMENTS ANSWER: BASEMENT WALLS AND FLOORS CAN BECOME WET BY A LEAK, CAPILLARY SUCTION OR CONDENSATION. WET/DAMP BASEMENTS PROBLEM. IS THIS BASEMENT LEAKING OR COULD WE HAVE ANOTHER PROBLEM? Water line arching up on wall in corners of basement. Water collecting on concrete floor starting in corners. ANSWER:

More information

Homeowner s Guide Foundation Water PenetrationTips TIPS TO IDENTIFY WATER PENETRATION PROBLEMS / CRACKING BASEMENTS

Homeowner s Guide Foundation Water PenetrationTips TIPS TO IDENTIFY WATER PENETRATION PROBLEMS / CRACKING BASEMENTS Homeowner s Guide Foundation Water PenetrationTips TIPS TO IDENTIFY WATER PENETRATION PROBLEMS / CRACKING BASEMENTS MAINTAINING YOUR HOME BASEMENT FOUNDATION BY HOMEOWNER PREVENTATIVE MAINTENANCE LUX WATERPROOF

More information

Commercial Roof Inspection Form

Commercial Roof Inspection Form Inspection Date: Inspector: Building Information Building ID: No.: Used For: Year Roof Applied: Building Description: Permanent Temporary Building Type: Retail Industrial Residential Building Name: Building

More information

Commercial Roof Management

Commercial Roof Management Disclaimer: This material is designed and intended for general informational purposes only, and is not intended, nor shall it be construed or relied upon, as specific legal advice. Roof damage is a leading

More information

Inspecting to a higher standard.

Inspecting to a higher standard. Inspecting to a higher standard. Rob Hopkin Silver Spring, MD 20902 Monday, June 2, 2014 ProTec Inspection Services Inc. 19736 Selby Ave Poolesville, MD 20837 301-972-8531 www.protec-inspections.com rob@protec-inspections.com

More information

Water Damage A Rising Concern

Water Damage A Rising Concern Water Damage A Rising Concern Consumer Information Guide Changing weather patterns and the increased severity of rainstorms has led to increased water losses, making water damage the number one property

More information

bout your HOUSE before you start Repairing And Replacing Materials Exterior Walls

bout your HOUSE before you start Repairing And Replacing Materials Exterior Walls A bout your HOUSE before you start Repairing And Replacing Materials Exterior Walls CE 28 h Exterior finish materials are expected to protect the house from the elements while providing an attractive appearance.

More information

Solving Persistent Moisture Problems and Moisture Damage

Solving Persistent Moisture Problems and Moisture Damage B etter buildings Solving Persistent Moisture Problems and Moisture Damage Summary This three-storey, 15-unit, 1,300 square metre (13,993 sq. ft) walk-up was built in 1958. In the 1980s, the building started

More information

Foundations 65 5 FOUNDATIONS. by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. Seismic Retrofit Training

Foundations 65 5 FOUNDATIONS. by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. Seismic Retrofit Training Foundations 65 5 FOUNDATIONS by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. 66 Foundations Foundations 67 FOUNDATIONS Let's assume that the retrofit has been done correctly from the roofline

More information

Elevating Your House. Introduction CHAPTER 5

Elevating Your House. Introduction CHAPTER 5 CHAPTER 5 Elevating Your House Introduction One of the most common retrofitting methods is elevating a house to a required or desired Flood Protection Elevation (FPE). When a house is properly elevated,

More information

www.citiesinspection.com October 5, 2015 Dear Client,

www.citiesinspection.com October 5, 2015 Dear Client, www.citiesinspection.com October 5, 2015 Dear Client, On 9/14/2015, Cities Inspection Service, Inc. completed a building inspection of the property located at 123 Oak Street, Someplace, Minnesota for you.

More information

Building Condition Assessment: 215-219 West Lexington Street Baltimore, Maryland

Building Condition Assessment: 215-219 West Lexington Street Baltimore, Maryland KPA The Joint Venture of EBA Engineering, Inc. and Kennedy Porter & Associates, Inc. 4813 Seton Drive, Baltimore, MD 21215 Phone: (410-358-7171) Fax: (410)358-7213 Building Condition Assessment: Baltimore,

More information

Water Intrusion 101. Presented by: Michael D. Spensieri, P.E. Regional Engineering Manager Office: 800-482-5611 Ext: 2018 www.donan.

Water Intrusion 101. Presented by: Michael D. Spensieri, P.E. Regional Engineering Manager Office: 800-482-5611 Ext: 2018 www.donan. Water Intrusion 101 Presented by: Michael D. Spensieri, P.E. Regional Engineering Manager Office: 800-482-5611 Ext: 2018 www.donan.com Goals Open environment Interactive discussion PLEASE ask questions

More information

SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS

SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS SECTION 08000 STORM DRAINAGE 08010 DESIGN A. Location B. Sizing TABLE OF CONTENTS 08020 MATERIALS A. Pipe Materials B. Structure Materials C. Installation D. Inlets and Outlets 08030 INSPECTIONS AND TESTING

More information

Common Problems with Walls

Common Problems with Walls Common Problems with Walls Common Problems with Walls There are problems and concerns that are shared by all walls and siding installations. In this article, we will learn about the following commonly

More information

bout your HOUSE before you start Renovating Your Basement Moisture Problems

bout your HOUSE before you start Renovating Your Basement Moisture Problems A bout your HOUSE before you start Renovating Your Basement Moisture Problems CE 28 c Condensation of cold surfaces, efflorescence Water leak in corner on floor Mold and decay on floor joists and sill

More information

Architectural Inspection Site Structures

Architectural Inspection Site Structures 0141 Freestanding Shelters Open air shelters not attached to the building. Bike rack shelter with bike racks: This 8'x30' structure is located on the north east side of the building on the wooded landscape

More information

Requirements for Building Application Submission

Requirements for Building Application Submission THE DEVELOPMENT CONTROL AND PLANNING BOARD P O Box 597 Phone: 869 465-2277 Bladen Commercial Development Fax: 869 465-5842 Basseterre, St. Kitts Email: phyplskb@caribsurf.com To: Architects, Designers

More information

Best Basement Water Management Practices

Best Basement Water Management Practices Best Basement Water Management Practices Guide written by Patrick Sluss Sluss Construction (330) 224 5394 When a home owner is faced with a leaking basement there is a way to correct the problem and a

More information

Chapter 3 Pre-Installation, Foundations and Piers

Chapter 3 Pre-Installation, Foundations and Piers Chapter 3 Pre-Installation, Foundations and Piers 3-1 Pre-Installation Establishes the minimum requirements for the siting, design, materials, access, and installation of manufactured dwellings, accessory

More information

bout your house before you start Renovating Your Basement Moisture Problems

bout your house before you start Renovating Your Basement Moisture Problems A bout your house CE 28c before you start Renovating Your Basement Moisture Problems Mold and decay on floor joists and sill plates Stuffy air, high humidity, poor air circulation Water draining in from

More information

Water Damage & Repair

Water Damage & Repair Water Damage & Repair Chinatown Preservation Talks 2015 James Engler, P.A Glenn Mason, AIA Mason Architects Program Outline Terminology & Waterproofing Basics Discussion of why this is important Below

More information

Page & Turnbull imagining change in historic environments through design, research, and technology

Page & Turnbull imagining change in historic environments through design, research, and technology DCI+SDE STRUCTURAL EVALUATIONS OFFICE BUILDING, TOOL SHED & WATER TANK, AND BLACKSMITH & MACHINE SHOP BUILDINGS SAN FRANCISCO, CALIFORNIA [14290] PRIMARY PROJECT CONTACT: H. Ruth Todd, FAIA, AICP, LEED

More information

Asphalt Shingle Application Requirements

Asphalt Shingle Application Requirements Alberta Allied Roofing Association Asphalt Shingle Application Requirements Section 1 Roof Decks 1.1 General Asphalt Shingles are not permitted to be installed directly over rigid insulation. When Asphalt

More information

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250. 02150-1 of 6 SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING 02150.01 GENERAL A. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily

More information

Property Condition Assessment

Property Condition Assessment Property Condition Assessment Business, Wisconsin Inspection Date: 8/2009 Prepared For: Business Owner Report Number: TD999909 Prepared By: Shamrock Building Inspection Consultants LLC N29 W29951 Shel-Mar

More information

PROFESSIONAL ENGINEERING INSPECTIONS, INC.

PROFESSIONAL ENGINEERING INSPECTIONS, INC. PROFESSIONAL ENGINEERING INSPECTIONS, INC. P. O. BOX 271492 HOUSTON, TEXAS 77277 Registered Engineering Firm #1503 http://www.profengineering.com (713) 664-1264 July 8, 2004 Mr. Simple Samson 2831 Octoberfest

More information

How to Identify, Evaluate & Repair Shrinkage Cracks in Poured Concrete

How to Identify, Evaluate & Repair Shrinkage Cracks in Poured Concrete How to Identify, Evaluate & Repair Shrinkage Cracks in Poured Concrete What is concrete shrinkage cracking, how and where does it occur? Are concrete floor cracks a structural problem? How to recognize

More information

The existing roof angle change terminations and flashings when sound and intact can be reused.

The existing roof angle change terminations and flashings when sound and intact can be reused. January 2, 2015 Summary Specification Re-Skinning an Existing Roof Maintenance and Repair Warranty Upgrade for Up to 30 Years Re-Skinning Over an Existing Roof with a New C-EPDM Membrane Using The Existing

More information

Metropolitan Builders Association Masonry & Concrete Standard

Metropolitan Builders Association Masonry & Concrete Standard Metropolitan Builders Association Masonry & Concrete Standard Background Masonry and concrete work in residential construction often provides the base structure upon which the house is built or as a veneer.

More information

BEST MANAGEMENT STANDARDS FOR FOUNDATION REPAIR MARCH 2003 REVISED JUNE 13, 2012

BEST MANAGEMENT STANDARDS FOR FOUNDATION REPAIR MARCH 2003 REVISED JUNE 13, 2012 BEST MANAGEMENT STANDARDS FOR FOUNDATION REPAIR MARCH 2003 REVISED JUNE 13, 2012 Prepared in cooperation with the Building Inspectors Association of Southeastern Wisconsin www.biasew.net 1 BEST MANAGEMENT

More information

Pre-Drywall Inspection Report

Pre-Drywall Inspection Report SM MEDALLION INSPECTIONS helping people make informed decisions Pre-Drywall Inspection Report 5657 Garden Valley Place Milton, Georgia 30024 Prepared for Betsy and Paul Dougherty January12, 2015 Medallion

More information

STRUCTURAL ASSESSMENT

STRUCTURAL ASSESSMENT STRUCTURAL ASSESSMENT Project: 1432-1434 East Commerce St. Job. No: 122200 Location: San Antonio, TX Date: Dec. 10, 2012 Weather: Sunny, Windy,60 deg Performed by: Jeff Haughton and Frank Lamas, Alpha

More information

Slavic Village Building Condition Review

Slavic Village Building Condition Review Slavic Village Building Condition Review Slavic Village Development May 8, 2015 Page 1 EXECUTIVE SUMMARY City Architecture was commissioned by Slavic Village Development to review five existing facilities

More information

Protect Your Home From Flooding. A guide for Lethbridge Residents

Protect Your Home From Flooding. A guide for Lethbridge Residents Protect Your Home From Flooding A guide for Lethbridge Residents Every year, millions of litres of water flow into the City of Lethbridge s stormwater and wastewater collection systems from residential

More information

March 19, 2014. Ms. Jean McDonald CAP Management 910 16th Street, Suite 1010 Denver, Colorado 80202

March 19, 2014. Ms. Jean McDonald CAP Management 910 16th Street, Suite 1010 Denver, Colorado 80202 Ms. Jean McDonald CAP Management 910 16th Street, Suite 1010 Denver, Colorado 80202 Re: Prospector s Point Walkway/Façade Repairs Martin/Martin, Inc Project No.: 13.0358.S.02 Ms. McDonald: Per your request

More information

Basement Moisture Problems

Basement Moisture Problems Foundations Foundation Purpose The purpose of a foundation is to distribute the weight of a structure securely into the ground. Engineering data regarding soil, rock and water conditions are used to design

More information

Roof Condition Report. Academy International School 8550 Charity Drive. Colorado Springs, Colorado

Roof Condition Report. Academy International School 8550 Charity Drive. Colorado Springs, Colorado Roof Condition Report Academy International School 8550 Charity Drive Colorado Springs, Colorado FOR Mr. Robert Thompson Academy School District 20 10221 Lexington Drive Colorado Springs, Colorado July

More information

Roof Inspection Report 3840 Greenway Circle, Lawrence Kansas, 66046 Sauer-Danfoss Building

Roof Inspection Report 3840 Greenway Circle, Lawrence Kansas, 66046 Sauer-Danfoss Building Roof Inspection Report 3840 Greenway Circle, Lawrence Kansas, 66046 Sauer-Danfoss Building Prepared For: Ms Marilyn Bittenbender Colliers International 805 New Hampshire St Lawrence Kansas, 66046 Prepared

More information

FIELD TESTING SERVICES

FIELD TESTING SERVICES FIELD TESTING SERVICES Chris Leach Director of Testing Baton Rouge, Louisiana Destin, Florida Scott Leach David Nichols Field Testing Representative Field Testing Representative 17485 Opportunity Avenue

More information

Proposed Minimum Subterranean Termite Treatment Standards

Proposed Minimum Subterranean Termite Treatment Standards Proposed Minimum Subterranean Termite Treatment Standards Introduction This document is intended to serve as a model for states considering the adoption of standards for soil application of termiticides.

More information

The minimum reinforcement for the stem wall is the placement of:

The minimum reinforcement for the stem wall is the placement of: PolySteel creates an ideal insulated stem wall for concrete slabs that can make this part of your project easier and faster, in addition to making your finished project more energy-efficient. Figures 3.20

More information

APPLICANT: ORANGE COUNTY, NEW YORK

APPLICANT: ORANGE COUNTY, NEW YORK Figure 1 Div 1 3 rd Flr Leakage in County Executives Office Figure 2 Div 1 3 rd Flr Location 067 approximately 2 SF of visible mold growth above entrance to Room 341 Figure 3 Div 1 3 rd Flr Location 067

More information

Investigation Of Water Damage Claims For Subrogation Potential

Investigation Of Water Damage Claims For Subrogation Potential Investigation Of Water Damage Claims For Subrogation Potential by Chris Shiver, PE and Phil Chapski, PE, Cerny and Ivey Engineers, Inc., Norcross, Georgia Water entry into homes and businesses is the cause

More information

Site Grading and Drainage to Achieve High-Performance Basements

Site Grading and Drainage to Achieve High-Performance Basements Construction Technology Update No. 69 Site Grading and Drainage to Achieve High-Performance Basements By M.C. Swinton and T.J. Kesik Proper site grading and foundation drainage strategies are required

More information

Building Foundation and Structure

Building Foundation and Structure Building Foundation and Structure Overview The construction of the Hall of Waters building began in 1936, and was constructed over the original site of the Siloam and Sulpho-Saline Springs. The original

More information

Lighthouse Engineering, L.L.C.

Lighthouse Engineering, L.L.C. Registered Engineering Firm (F: 9334) Phone: 214-577-1077 Fax: 214-224-0549 Website: www.lighthouseeng.com Email: Office@LighthouseEng.com Thursday, September 04, 2014 TO: Our Client RE: Initial Engineering

More information

UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Architectural. Roofing. Basis of Design

UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Architectural. Roofing. Basis of Design Basis of Design This section applies to roofing membranes, flashing and accessories. Design Criteria Adhere to the standards and details of the latest editions of the National Contractors Association (NRCA)

More information

SEWER BACKUPS & BASEMENT FLOODING PREVENTATIVE SOLUTIONS FOR THE BUILDING OWNER

SEWER BACKUPS & BASEMENT FLOODING PREVENTATIVE SOLUTIONS FOR THE BUILDING OWNER Village of Shorewood, Wisconsin SEWER BACKUPS & BASEMENT FLOODING PREVENTATIVE SOLUTIONS FOR THE BUILDING OWNER Prepared By: Thomas A. Zoulek, P.E., LEED A.P. Vice President Mid City Plumbing & Heating

More information

R E S I D E N T I A L H O U S I N G

R E S I D E N T I A L H O U S I N G HL 252 Rev. April 1997 R E S I D E N T I A L H O U S I N G CONTROLLING EXTERNALWATER PROBLEMS FOR RESIDENCES I II III IV V Lot Drainage Gutter Water Management Foundation Waterproofing Floor Slab Waterproofing

More information

STRUCTURAL ASSESSMENT. Full Metal Jacket Building 0 Prince Street, Alexandria, VA

STRUCTURAL ASSESSMENT. Full Metal Jacket Building 0 Prince Street, Alexandria, VA STRUCTURAL ASSESSMENT FOR Full Metal Jacket Building 0 Prince Street, Prepared by: ALPHA CORPORATION (Alpha) 1850 S. Loudoun Street, Suite 200 Winchester, VA 22601 540-723-0704 September 22, 2010 J. Michael

More information

Reference: BRM-00220488-A0 July 18 th, 2014. Cursory Visual Review of Various Below Grade Spaces and Exposed Foundation Walls

Reference: BRM-00220488-A0 July 18 th, 2014. Cursory Visual Review of Various Below Grade Spaces and Exposed Foundation Walls Reference: BRM-00220488-A0 July 18 th, 2014 Toronto Catholic District School Board 80 Sheppard Avenue East Toronto, Ontario M2N 6E8 Re: 1.0 Introduction Exp Services Inc. (exp) was retained by the Toronto

More information

HEDDERMAN ENGINEERING, INC. www.heddermanengineering.com Office 281-355-9911, Fax 281-355-9903 office@heddermanengineering.com

HEDDERMAN ENGINEERING, INC. www.heddermanengineering.com Office 281-355-9911, Fax 281-355-9903 office@heddermanengineering.com HEDDERMAN ENGINEERING, INC. www.heddermanengineering.com Office 281-355-9911, Fax 281-355-9903 office@heddermanengineering.com, 2011 TO: Mr. REF: CONDITION OF PROPERTY SURVEY Dear Mr. : At your request,

More information

Williamson and Associates, Inc. Report of Building Exterior Condition Evaluation, dated January 2 nd, 2013. (68 pages)

Williamson and Associates, Inc. Report of Building Exterior Condition Evaluation, dated January 2 nd, 2013. (68 pages) INNOVATIVE BUILDING AND ARCHITECTURE CONSULTANTS Mr. Bud Hall Senior Vice President of construction Turnberry Associates 19501 Biscayne Boulevard, Suite 400 Aventura, FL 33180 Subject: The Nashville Hilton

More information

HomeSpec REPORT SUMMARY

HomeSpec REPORT SUMMARY HomeSpec 04/25/2007 Ms. Rachel Trujeque Re: 13038 West Plum Road Lot #1225 - Peoria, AZ. 85383 - Pre Drywall Inspection Dear Ms. Trujeque, At your request, a visual pre drywall inspection of the above

More information

Roof Inspection. Summary Report

Roof Inspection. Summary Report Phone: (561) 866 9956 www.real-estate-inspections.com Roof Inspection Summary Report Subject Property File Number: 05-15-RF-002 Inspector: Craig Milliken, PE CPM Real Estate Inspections, Inc. Date of Inspection:

More information

What you need to know about concrete block basement construction.

What you need to know about concrete block basement construction. Designing and planning your new residence is a vitally important process, which will have a great influence on the future enjoyment of your home. A successful process will ensure all areas of the home

More information

ARCHITECTURAL TECHNOLGY 4 ADVANCED CONSTRUCTION TECHNOLOGY BASEMENT CONSTRUCTION YEAR 3 SEMESTER 1 AIDAN WALSH R00060057. Lecturer: Jim Cahill

ARCHITECTURAL TECHNOLGY 4 ADVANCED CONSTRUCTION TECHNOLOGY BASEMENT CONSTRUCTION YEAR 3 SEMESTER 1 AIDAN WALSH R00060057. Lecturer: Jim Cahill ARCHITECTURAL TECHNOLGY 4 ADVANCED CONSTRUCTION TECHNOLOGY BASEMENT CONSTRUCTION YEAR 3 SEMESTER 1 AIDAN WALSH R00060057 Lecturer: Jim Cahill 29 th November 2011 TABLE OF CONTENTS SUMMARY 1 MAIN BODY SECTION

More information

EXTERNAL WATERPROOFING MEMBRANES BEST PRACTICE GUIDELINES

EXTERNAL WATERPROOFING MEMBRANES BEST PRACTICE GUIDELINES Building and Construction Industry A joint industry initiative produced by BSA Supershow logo.indd 1 30/01/2008 9:43:29 AM EXTERNAL WATERPROOFING MEMBRANES BEST PRACTICE GUIDELINES FAILING WATERPROOFING

More information

Document type: Practice Note Title: External and internal membranes Document number: AC2234 Version: 5. 1. Purpose

Document type: Practice Note Title: External and internal membranes Document number: AC2234 Version: 5. 1. Purpose Document type: Practice Note Title: External and internal membranes Document number: AC2234 Version: 5 1. Purpose The purpose of this practice note is to address the incidence of deck and roof membrane

More information

CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN 55110 Fax: 651-429-8503. Re-Roofing: Asphalt Shingles

CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN 55110 Fax: 651-429-8503. Re-Roofing: Asphalt Shingles CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN 55110 Fax: 651-429-8503 Re-Roofing: Asphalt Shingles This is a summary of the standard requirements based on the

More information

The Ultimate Guide To Protecting Your House From Water In The Basement

The Ultimate Guide To Protecting Your House From Water In The Basement The Ultimate Guide To Protecting Your House From Water In The Basement Table of Contents 3 Causes of Water in the Basement!... 3 Reason Number 1: Poor Grading!... 3 Reason Number 2: Improper Drainage!...

More information

SECTION 3 ONM & J STRUCTURAL ANALYSIS

SECTION 3 ONM & J STRUCTURAL ANALYSIS Historic Boynton Beach High School Existing Building Assessment City of Boynton Beach February 10, 2011 SECTION 3 ONM & J STRUCTURAL ANALYSIS STRUCTURAL ENGINEERS SPECIAL INSPECTORS STRUCTURAL CONDITION

More information

CHAPTER 11 STORM DRAINAGE

CHAPTER 11 STORM DRAINAGE CHAPTER 11 STORM DRAINAGE SECTION 11 GENERAL 11.1 Scope. The provisions of this chapter shall govern the materials, design, construction and installation of storm drainage. 11.2 Where required. All roofs,

More information

about your house Before You Start Renovating Your Basement Moisture Problems Figure 1 Moisture problems to solve

about your house Before You Start Renovating Your Basement Moisture Problems Figure 1 Moisture problems to solve about your house CE 28 c Before You Start Renovating Your Basement Moisture Problems Mold and decay on floor joists and sill plates Stuffy air, high humidity, poor air circulation Water draining in from

More information

The Uniform Building Inspection Report Condensed

The Uniform Building Inspection Report Condensed The Uniform Building Inspection Report Condensed Single Family Residence:, Scottsdale, AZ Condensed Report Version Prepared for: John Doe Inspection Date: 9/19/2005, 1:00:00 AM Report Number: 091805s Inspection

More information

First in Service First in Safety

First in Service First in Safety 7840 Nagle Avenue Morton Grove, Illinois 60053 847-470-5235 Fax - 847-965-9511 Wind Damage; Frequently Asked Questions: What can I do with branches that fall in my yard? Bring them out to the parkway;

More information

Assessing Curtain Walls

Assessing Curtain Walls Assessing Curtain Walls Considerations and Best Practices Paul E Beers GCI Consultants, LLC pbeers@gciconsultants.com What is a Curtain Wall System? A curtain wall system is an outer covering of a building

More information

Mark Cramer Inspection Services, Inc.

Mark Cramer Inspection Services, Inc. Mark Cramer Inspection Services, Inc. 492 Twentieth Avenue, Indian Rocks Beach, FL 34635-2970 (727) 595-4211 Fax (727) 596-7583 Certified Member #12085 American Society of Home Inspectors Construction

More information

Self-Home Inspection Checklist

Self-Home Inspection Checklist To be used as a first home visit for note taking. Visit www.homeinspectiondirect.com for more tips and information about buying a home and hiring a home inspector. This form in no way replaces a professional

More information

Why is my air conditioner dripping on my customers?

Why is my air conditioner dripping on my customers? De-Mystifying HVAC Why is my air conditioner dripping on my customers? By Ron Prager One of the most frequent emergency service requests is a call for an air conditioner leaking water into the store. These

More information

BASEMENT FLOODING. Prevention Guide for. Homeowners

BASEMENT FLOODING. Prevention Guide for. Homeowners BASEMENT FLOODING Prevention Guide for Homeowners 1 Did You Know? Floods are the most common hazards in Canada. Water damage is a common cause of loss for homeowner insurance. A heavy rainfall can result

More information

WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12

WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12 WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12 87 88 GOOD INDUSTRY PRACTICES 12 WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12.1 BACKGROUND Most roofs in Singapore are constructed using reinforced

More information

Winterizing Your Building

Winterizing Your Building Winterizing Your Building DEC Author: Steven J. Susca This article was originally published in the Hoffmann Architects Journal in Issue 3, 2009. As spring thaws uncover the ravages winter weather has wreaked

More information

CONSOLIDATED EDISON CO. OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003 DISTRIBUTION ENGINEERING DEPARTMENT SUBSTATION & EQUIPMENT SECTION

CONSOLIDATED EDISON CO. OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003 DISTRIBUTION ENGINEERING DEPARTMENT SUBSTATION & EQUIPMENT SECTION CONSOLIDATED EDISON CO. OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003 DISTRIBUTION ENGINEERING DEPARTMENT SUBSTATION & EQUIPMENT SECTION SPECIFICATION EO-5023 REVISION 3 MARCH 2003 REQUIREMENTS FOR

More information

Sun Windows General Information Sun New Construction Window Installation Instructions

Sun Windows General Information Sun New Construction Window Installation Instructions Sun Windows General Information Section 1 G F H H H A. Apply Weather Resistive Barrier B. Apply Sill Flashing Tape C. Place Waterproof Sill Shims D. Caulk Back of Nail Fin Sides & Top, Set Window, Fasten

More information

ELIGIBLE REPAIR PROJECT PARAMETERS

ELIGIBLE REPAIR PROJECT PARAMETERS THE DISTRICT MUNICIPALITY OF MUSKOKA ONTARIO RENOVATES PROGRAM FOR HOMEOWNERS ELIGIBLE REPAIR PROJECT PARAMETERS 1. To have your project considered and payment processed, all projects requiring a Building

More information

MEMORANDUM. General: Foundation:

MEMORANDUM. General: Foundation: MEMORANDUM State of Alaska Department of Transportation and Public Facilities Central Region - Division of Construction and Operations Public Facilities Branch TO: Jennifer Murrel DATE: August 19, 2010

More information

Foundation Water Problems. An Overview and Discussion of some Causes and Cures for Water Infiltration into Basements and Foundation Structures

Foundation Water Problems. An Overview and Discussion of some Causes and Cures for Water Infiltration into Basements and Foundation Structures Foundation Water Problems An Overview and Discussion of some Causes and Cures for Water Infiltration into Basements and Foundation Structures This presentation was prepared and presented by Dwight Walker

More information

Comment Form on Proposed Gut Rehabilitation Alternatives

Comment Form on Proposed Gut Rehabilitation Alternatives Comment Form on Gut Rehabilitation Alternatives Name: Organization: Email: Instructions Submission: Please submit this form to energystarhomes@energystar.gov by October 10 th, 2012 with the subject line

More information

CITY OF NORTH RIDGEVILLE 7307 AVON BELDEN ROAD NORTH RIDGEVILLE, OH 44039 (440) 353-0819 WWW.NRIDGEVILLE.ORG

CITY OF NORTH RIDGEVILLE 7307 AVON BELDEN ROAD NORTH RIDGEVILLE, OH 44039 (440) 353-0819 WWW.NRIDGEVILLE.ORG CITY OF NORTH RIDGEVILLE 7307 AVON BELDEN ROAD NORTH RIDGEVILLE, OH 44039 (440) 353-0819 WWW.NRIDGEVILLE.ORG WHY IS THERE WATER IN MY BASEMENT? There are two major sources of water in a basement as the

More information