1 CONSULT DESIGN CONSTRUCT PETERSONS WATERFRONT CONDOMINIUMS 103 Park Street Chelan, Washington Findings Summary Report Prepared for: Petersons Waterfront Condominium Association March 21, 2014 J2 Project #06591

2 Page 2 of 42 Table of Contents 1.0 INTRODUCTION SCOPE OF WORK BUILDING DESCRIPTION DOCUMENTS REVIEWED VISUAL INSPECTION OBSERVATIONS EXTERIOR WALL ASSEMBLY, VENTS AND PENETRATIONS EXTERIOR DOORS AND WINDOWS DECKS AND FRONT BREEZEWAYS ROOF ASSEMBLY, PENETRATIONS AND GUTTERS FOUNDATION AND GRADING MISCELLANEOUS CONCLUSIONS AND RECOMMENDATIONS... 40

3 Page 3 of INTRODUCTION 1.1 SCOPE OF WORK J2 Building Consultants, Inc. (J2) was retained by the Petersons Waterfront Condominium Association to perform a visual and intrusive building envelope inspection of all buildings and areas of made accessible by site personnel. Based on the visual indicators, J2 performed exploratory (invasive) openings in the building envelope. The purpose of the inspection was to identify the construction component sequencing for building performance and to identify the extent of sheathing and framing damage reported by the Board as they consider a siding replacement project. 1.2 BUILDING DESCRIPTION The Petersons Waterfront Condominiums are comprised of four separate buildings. The property was originally developed in the mid 1980 s as phase 1 (building 1) and 2 (building 2). The phase 3(building 3) building was constructed in approximately In 2000, the fourth phase was constructed over a section of phase 1 to provide a four story structure at the east end of the building. In 2003, the fifth and final phase of development was completed at the southeast portion of the property. The phase 5 building was not part of this property assessment. Phases 1 thru 4 are clad with ship-lap cedar siding installed in a vertical manner. Horizontally installed wood lap siding was added to deck perimeters and exterior wall perimeters of the phase 4 project in early Phases 1 thru 3 buildings have aluminum framed windows and sliding glass doors throughout. The phase 4 units have vinyl windows and sliding glass doors installed. The upper level roof of phase four is a single ply membrane roof covering. The upper level flat roof of the phase 3 building is a torch down asphaltic membrane roof with UV protective coating. All other roofs are typical asphaltic shingle roof. All upper level residences are accessed via elevated walkways and breezeways at the south building elevation. Residential decks have a combination of vinyl sheet membrane surfaces, elastomeric membranes and concrete walking surfaces. 1.3 DOCUMENTS REVIEWED J2 was provided with two binders containing documentation of previous repairs performed at the phase 1 and phase 2 elevated walkways areas of the south elevations. The documents show extensive damage resulting from water intrusion at the concrete walking surfaces which affected the structural integrity of the elevated walking surfaces. The repairs were performed by two separate contractors between 2000 and VISUAL INSPECTION OBSERVATIONS 2.1 EXTERIOR WALL ASSEMBLY, VENTS AND PENETRATIONS The exterior cladding on the phase 1 thru phase 4 buildings is generally similar. The walls are clad with a combination of horizontal cedar lap siding and ship-lap cedar lap siding. The ship lap siding has been installed in a vertical fashion on the exterior walls. The siding, where inspected, is installed over an asphalt impregnated building paper or weather resistive barrier (WRB). The walls assembly has plywood sheathed exterior walls at all locations except those inspected on phase 4.

4 Page 4 of 42 The ship-lap siding, as previously identified, has been installed in the vertical orientation on the building walls. This installation is not the typical orientation for similar materials. Ship-lap siding is manufactured to interlock pieces of wood materials in an overlapping fashion to properly shed water. In order for the materials to provide the maximum weather protection, the siding should be installed in the horizontal orientation on the exterior walls. As a result of the vertical installation, the exposed siding joints are most susceptible to water intrusion and have required ongoing maintenance repairs to prevent water intrusion into the wall assembly and deterioration of the siding materials. Over time, the repairs have been performed by removing select components in the exterior walls and applying sealant between the siding joints to prevent water intrusion. Due to the age and improper installation of the ship-lap siding, several sections of the exterior cladding were observed to have stained areas and swelling consistent with prolonged water intrusion. These areas of water damaged siding have a diminished expected useful life and higher maintenance requirements. Additional stained wood siding was observed around unit decks, at the breezeway areas and building penetrations. At deck and breezeway locations, the siding has been installed in contact with the surrounding hardscape (concrete walkways) areas which do not follow Code requirements. Code requires a separation between siding materials and hard surfaces (or landscaping) to prevent damage due to splash or capillary action. The resulting stained siding is due to prolonged water saturation wicking into the siding and deteriorating the siding materials. These areas also have visible corrosion to siding fasteners. Some of these identified areas had high moisture content in the siding materials as documented by A BD 2100 moisture meter. Elevated moisture meter readings indicate saturation of the materials and eminent decay of the wood products. The cladding materials have been installed tight to building penetrations and transitions with perimeter sealant joints and no metal flashings. The window perimeters have a wood block frame perimeter made of 1x2 materials. Building transitions at deck areas, product interfaces and transitions are sealed to the adjoining materials prevent water from draining off the exterior cladding. This allows for water to be directed into the wall assembly in the event of wind driven rain. A horizontal wood lap siding has been installed at deck areas, breezeway areas and select areas of the phase 4 building. The horizontal lap siding was installed in the mid 2000 s following repairs to phase 1 and 2 breezeway areas and during the development of the phase 3 project. The siding has been installed with vertical MDO (medium density overlay) wood trim, according to Petersons Waterfront staff. MDO wood trim is an engineered wood product made of compressed wood products. While the lap siding does not show signs of visible damage, the MDO trim has started to swell from water intrusion. J2 removed the exterior cladding at several areas to inspect the underlying construction components at areas of critical waterproofing; change in plane of cladding materials and field locations where siding shows signs of water damage. Where siding was removed, the materials showed signs of previous water intrusion with stains on the back-side of the lap siding as well as on the WRB. No significant framing damage was observed at locations identified by the Association as having the greatest exposure. These areas were found to have some missing WRB in the field of installation but no significant damage to the plywood wall sheathing. The inspection areas revealed inconsistent application of the WRB at window perimeters, deck transitions, and field locations with additional voids at the roof levels. By Code, WRB is to be installed with a minimum two inch vertical overlap and a four inch horizontal overlap. Some areas of the WRB were found to have no overlap to integrate the

5 Page 5 of 42 WRB while other areas were found to have a four inch overlap. This observed condition shows an inconsistent installation of the weather resistive barrier. WRB was found at all areas exposed for the inspection, although much of the WRB installation was improperly installed. Areas with missing WRB show signs of previous water intrusion with limited staining on the plywood sheathing. Moisture meter readings of the wall sheathing showed limited saturation of the materials. These areas, however, do show signs of deterioration due to prolonged exposure. The deteriorated areas were generally found to be in proximity to the interface of roofing and cladding materials and at grade transitions. 2.1 Exterior Wall Assembly, Vents and Penetrations Photos P : Part of the Phase 1 building and Phase 4 building constructed over the existing structure P : Phase 1 building overview P : Phase 2 building overview P : Phase 3 building overview.

6 Page 6 of Exterior Wall Assembly, Vents and Penetrations Photos P : Typical ship-lap siding installation at exterior wall location. Note the stained surfaces and discoloration at siding butt joints P : Siding installed in contact with concrete surface showing corroded fasteners due to water saturation P : Typical horizontal lap siding installation at deck perimeter P : MDO trim installed at horizontal siding transition. Note swelling and separation of materials.

7 Page 7 of Exterior Wall Assembly, Vents and Penetrations Photos P : Decaying cladding interface between siding materials and door trim P : Improperly flashed building transition between siding materials and window head trim P : Building transition between siding materials. Note lack of space between materials allowing for water collection P : Detail of wood transition between cladding materials. Note deteriorating wood.

8 Page 8 of Exterior Wall Assembly, Vents and Penetrations Photos P : High moisture content of wood siding at unit P : High moisture content of wood transition trim at unit P : Cladding removal at unit 215. Note areas of missing WRB installation P : Detail of missing WRB under shed roof at window.

9 Page 9 of Exterior Wall Assembly, Vents and Penetrations Photos P : WRB mislap at window perimeter. This is not weathertight P : Deteriorated plywood sheathing at window perimeter at location of WRB mislap P : Inspection at unit P : Missing and deteriorated WRB exposing underlying plywood sheathing.

10 Page 10 of Exterior Wall Assembly, Vents and Penetrations Photos P : Lack of WRB integration into vent penetration P : Visible water drainage from deck wall to building wall interface. Note deteriorated WRB at top of wall P : High moisture content of plywood sheathing at inspection location P : Void in sheathing/wrb installation at location of water intrusion from deck top wall.

11 Page 11 of Exterior Wall Assembly, Vents and Penetrations Photos P : Cladding removal at fire escape landing of Phase 3 building P : Detail of cladding installation tight to landing causing deterioration P : Wall opening at location of stained cladding P : Exposed base plate framing at base of wall. This is not weathertight.

12 Page 12 of Exterior Wall Assembly, Vents and Penetrations Photos P : Mislapped WRB at wall interface with sloped roofing, improper installation that is not weathertight P : Open void at roof to wall transition, not weather tight P : Overview of inspection area. Note cladding sealed to concrete walkway preventing proper drainage and sealing moisture behind cladding P : Cladding opening at unit 225 breezeway wall area. Note corroded fastener and standing water.

13 Page 13 of Exterior Wall Assembly, Vents and Penetrations Photos P : Cladding removal at exterior wall of unit P : Mislap in rubber membrane installed under concrete on top of wall WRB, not weathertight. 2.2 EXTERIOR DOORS AND WINDOWS The operable and fixed pane windows of the phase 1 thru 3 buildings are typical flanged aluminum window units. The exterior deck doors are typical swing doors. The windows and doors reportedly from original construction. The product manufacturer for all window and door products on these building phases is unknown. The windows and doors installed in phase 4 are vinyl framed units with dual glazing panes. The windows are manufactured by Best Built with a performance class rating of 25. The sliding glass door units are manufactured by Milgard and do not have a designated performance grade. The aluminum framed window units in phases 1 thru 3 are original installation with single pane glazed units. Some of the small windows located in the living room area appear to be operable while all other windows are large fixed units. The window installation on phases 1 and 3 does not incorporate the building WRB into the window rough opening as would currently be required by all manufacturer and standard installation techniques. The windows have been installed with fasteners applied thru the nail fins and WRB installed up to the flanges (in most cases). An unknown clear plastic material has been sealed to the perimeter of the window flanges at the observed locations and WRB has been sealed to the flanges. According to the maintenance staff, window leaks have been reported during heavy rain events. The water intrusion is likely the result of poor waterproof detailing at the window head and rough opening to prevent water from entering the building envelope. The lack of weatherproof detailing was observed at the two window inspection locations. Active water intrusion was observed in unit 222 during our interior inspections. The water intrusion appears to be from water entering the wall assembly from the deck area above and draining to the interior of the window unit in 222. The phase 4 building has a combination of vinyl window products. The cladding was not removed at these window locations during the course of inspection, however, the nail fin was observed at one of the sliding glass door units. At

14 Page 14 of 42 the location of the exposed nail fin, the fiber cement siding was observed to have water saturation damage. This is likely the result of the typical cladding installation where head flashings and target flashings have been omitted from the installation sequencing. The windows are installed with a perimeter sealant joint at the interface with cladding materials. Several of these sealant joints have failed allowing for water to enter the wall assembly. At one observed location, the window perimeter has an exposed area at the cladding where no weather proofing has been provided. At this locations, deteriorated fiber cement siding was identified (unit 432). Several of the observed IGU s (Insulated Glass Units) in the newer vinyl windows have sealant failures within the glass pane, resulting in failed window panes. The butyl sealant applied between the glass units on the setting block are starting to bubble and separate from the IGU. This condition reduces their thermal function and makes the product less efficient due to the failed IGU. None of the observed window installations meet requirements for building performance or manufacturer standards. The aluminum framed windows appear to have exceeded their anticipated useful life as they are subject to water and air infiltration during storm events. 2.2 Exterior Doors and Windows Photos P : Typical fixed and operable aluminum framed window unit (Phase 1) P : Window installation with perimeter 1x2 wood trim (typical). Not weathertight, note damage.

15 Page 15 of Exterior Doors and Windows Photos P : Detail of window installation at sill. Note plastic wrap at sill and lack of WRB integration P : Detail of window installation missing sealant and WRB at nail fin rough opening location P : Typical window head detail with missing flashing at aluminum window location P : Detail of saturated wood trim at window head.

16 Page 16 of Exterior Doors and Windows Photos P : Active water intrusion at unit 222 from deck area located above P : High moisture content of gypsum interior window wrap at unit P : Typical exterior of vinyl window, unit P : Failed perimeter sealant of vinyl window unit.

17 Page 17 of Exterior Doors and Windows Photos P : Interior view of vinyl window, unit P : Sealant failure at interior of window IGU P : Overview of sliding glass door in unit P : Deteriorated fiber cement siding in rough opening of SGD, unit 432.

18 Page 18 of Exterior Doors and Windows Photos P : Exposed nailing fin on SGD, unit P : SGD frame set away from cladding with no weatherproof installation allowing water to enter wall assembly P : Typical vinyl window installation detail at window head. Note lack of flashing materials P : Vinyl window installation showing WRB lap into rough opening. Note the corroded fastener is a non-compliant installation.

19 Page 19 of DECKS AND FRONT BREEZEWAYS The residential deck areas of the phase 1, 2 and 4 buildings have a combination of finishes surfaces. The majority of the phase 1 and 2 decks have vinyl sheet membrane over wood substrate. Some decks have an outdoor carpet surface and others, with repairs performed, have a fluid applied waterproof membrane. The upper level phase 4 decks have a fluid applied membrane with patterned finish. The product applied to the surface is unknown. The phase 3 building has a combination of exposed aggregate concrete topping slab or tiled concrete deck surface. Several of the observed decks have active water intrusion staining the soffit areas located below those decks. According to the management team, there have been several repairs performed on the existing systems with additional repairs required. The vinyl sheet membrane decks are installed up to the exterior cladding areas but do not integrate with the cladding. This allows water draining from the building exterior to be directed below the membrane and into the wall assembly. The majority of these decks provide minimal slope to the single area drain. Of those that slope to drain, the majority of the deck drain assemblies have failed waterproofing at the drain body, allowing water to bypass the drain and enter the deck assembly. These failures are typical of all decks observed on at the phase 1 and 2 buildings, regardless of deck covering materials. The decks areas accessible for phase 3 have a combination of exposed aggregate concrete decking and tiled deck surfaces. The concrete has been placed over a rubber membrane on the wood deck framing. At the observed locations, the decks are not properly sloped to drain, allowing for water and ice build up at low areas of the deck. Build-up of water wicks into the wood cladding and damages the exterior materials. The phase 3 decks are provided with through wall drain bodies that have been set into the concrete decking. The phase 4 decks have a fluid applied deck membrane which is thicker than those observed elsewhere. The membrane materials appear to be performing as intended. However, the deck areas also do not provide sufficient slope to drain and allow for ponding water on the waterproof membrane. Standing water on a deck membrane generally voids any warrantable installation due to lack of compliance with code regulations to provide sufficient slope to drain. The phase 4 decks are constructed with a metal framed perimeter deck rail and glass inserts. The metal railing systems has been installed as a top mounted railing unit. Top mounted railing assemblies are generally more susceptible to water intrusion due to their installation through the membrane which punctures the waterproof coating. In order to prevent water intrusion, these assemblies should be installed over neoprene gaskets and in filled with sealant. Our inspection found several of the railings lifted from the deck surface allowing for a path of water intrusion into the deck assembly. At unit 432, the roof downspout drain travels through the upper level deck assembly. The penetration is sealed with expansive foam at the penetration. It is unknown if any waterproofing materials have been installed in the penetration void. In general, the decks do not provide sufficient slope to drain and lack proper waterproofing components to direct water off the deck surfaces. Standing water and failures in the deck membranes have resulted in water intrusion into the deck assembly that has resulted in three emergency deck repairs. Although some repairs have been made, the repairs have not corrected the issues and water damage has continued. The elevated walkways and breezeways from the parking are at the front elevations of phases 1 thru 3 have a concrete walking surface with perimeter wood clad wall systems and metal top rails. According to the information reviewed, significant rot repairs were performed on phases 1 and 2 in The rot repairs required existing

20 Page 20 of 42 walkways and breezeways be removed entirety and replace water damaged structural posts and beams. Those areas were structurally repaired with new framing members and plywood deck sheathing. A rubber waterproof membrane was placed on the plywood sheathing (mislapped with the WRB) and concrete was placed on the walking surfaces. Upon completion of the concrete areas, the cladding was installed at the wall areas. The deck top rails and caps are a combination of wood and metal materials. The top caps have been placed directly on the wood parapet wall framing. No flashings were installed at the time of cladding replacement of the parapet walls at the interface with the buildings. The lack of flashing (saddle flashing) at these locations allows water to enter the wall assembly damaging the underlying construction components. The cladding installed on phases 1 and 2 has been installed tight to the concrete walking surfaces violating code required separation between cladding materials and concrete areas. This condition allows water to wick into the cladding causing premature deterioration. Following identification of these issues, the site staff applied sealant to the vertical transition. The application of sealants has sealed in the water trapping it in the assembly. J2 performed an invasive inspection at a breezeway column where it intersects a section of the parapet wall in the phase 3 building. The area at the lowest level under the inspection location showed signs of water intrusion and structural compression (decay and damage) of the wood framing. Upon removing the column wrap, no flashings were found at the intersection between the top cap and the parapet wall. The lack of flashing materials has allowed water to enter the column area causing water damage to the structural framing. At the second floor inspection area, damaged 2x4 framing materials were found to have compressed (damaged) on to the beam areas. At the first floor level, the trim materials were removed exposing the post to beam connection. The area was found to be heavily saturated with corrosion observed on the post/beam metal connection plate. These conditions are systemic to areas observed at all phases of the buildings. The upper level units are accessed via concrete stair risers on wood stair stringers. According to site staff, several of the concrete treads are to be replaced in the near future. One stair tread was found to be detached from the wood stringer, creating a life safety issue. The concrete treads are delaminating thus exposing the steel reinforcing. All the concrete treads require evaluation for structural integrity, or should be replaced.

21 Page 21 of Decks and Front Breezeways Photos P : Phase 1 deck surface with exterior grade carpet P112065: Phase 1 deck showing lack of deck to wall flashing and deteriorated wood materials, not weathertight P : Phase 1 vinyl sheet membrane deck with ponding water on surface P : Vinyl sheet termination bar showing void at wall interface allowing for water intrusion.

22 Page 22 of Decks and Front Breezeways Photos P : Vinyl sheet membrane failure in unit P : Vinyl sheet membrane failure at transition to area drain P : Carpet surface in phase 2 deck P : Level showing reverse slope at location adjacent to deck drain.

23 Page 23 of Decks and Front Breezeways Photos P : Fluid applied membrane coating at repaired deck area, unit P : Failed membrane application at new deck coating, unit P : New deck through wall drain at unit P : Detail at through wall scupper detail of new deck repairs.

24 Page 24 of Decks and Front Breezeways Photos P : Overview of phase 3 deck area with concrete deck surface P : Ice build-up at deck area from reverse slope on deck surface P : Overview of phase 4 deck membrane P : Typical top mounted railing assembly in phase 4. Note the exposed fasteners under the railing mount, not weathertight.

25 Page 25 of Decks and Front Breezeways Photos P : Typical exterior wall to deck wall interface, not weathertight P : Ruler showing void at interface between components allowing for water intrusion P : Non-0weathertight parapet top cap interface with exterior wall showing void at critical location P : Typical railing mounts at deck parapet wall.

26 Page 26 of Decks and Front Breezeways Photos P : Typical walkway area from parking to second floor units P : Typical elevated walkway to access third floor units P : Typical drain assembly in elevated walkways. Note sealants applied at transitions, not weathertight P : Typical intersection between metal top rail assembly at column wrap at walkway areas.

27 Page 27 of Decks and Front Breezeways Photos P : Standing water on walking surface at elevated walkway P : Trim removed at post wrap showing lack of waterproofing at intersection, near unit P : Column wrap removed structural support adjacent to unit P : Deteriorated framing members exposed at post connection.

28 Page 28 of Decks and Front Breezeways Photos P : High moisture content in wood framing at structural post P : Low moisture content in wood framing at top of post location, near unit P : Cladding materials removed under post water intrusion location P : High moisture content in walkway beam.

29 Page 29 of Decks and Front Breezeways Photos P : High moisture content in wood sheathing at beam location P : High moisture content in post connection, near unit 325. Note corrosion on concrete from failed fasteners and steel connectors P : Typical concrete stair treads. Note exposed steel reinforcing P : Detail of exposed steel reinforcing at concrete stair tread.

30 Page 30 of ROOF ASSEMBLY, PENETRATIONS AND GUTTERS The roof area of the phase 1 and 2 buildings is a steep slope roof with asphalt shingles. The shingles are installed over roofing felt with a plywood roof sheathing underlayment. According to the information available, the roofs have received recent maintenance repairs to correct flashing issues and replace damaged shingles. These roofs were generally not accessed during our review. J2 did perform a limited inspection at roof terminations to confirm roof assembly sequencing. Shingled roofs have been installed at window locations throughout the property as shed eyebrow roofs. The shingled roof areas appear to be in good condition. Based on our review, the granular surface of the shingles is sound and providing protection as intended. The areas of concern are at transitions to cladding materials or chimney stacks. At these areas, voids were found at the step flashings installed under the cladding that are not wet and will allow for wind driven rain to enter the wall assembly. The phase 3 building has a combination of roofing materials at different locations. The front and rear elevations of the building have a steep slope asphalt shingle roof. The upper portion of the phase 3 building roof is a built up asphaltic membrane on a low slope installation. The roofing material has a UV coating over the surface of the low slope membrane areas. The roof area has a perimeter metal coping with top mounted fasteners. The fasteners driven through the metal coping were observed to have rubber gaskets. The roof drains at through wall scuppers are located at the low points of the roof assembly. A section of the phase 3 building at the north elevation has a single ply membrane over a semi-domed roof area. This roof membrane was not inspected. The roof membrane and coating materials are in good condition. Although areas of previous repair are evident, it does not appear to have identifiable or significant field failures. Minimal ponding water was identified at one area of the through wall scupper. By Code, water is not allowed on a low slope roof membrane for longer the 48 hours. The area with standing water is the result of a reverse slope at the through wall scupper allowing for the collection of water. At the time of roof replacement, the roof assembly will need to be brought up to current code requirements with the addition of new overflow drains and larger through wall scupper drains. The perimeter coping metal is fastened through the top of the coping into wood framing. Generally, this installation style is avoided as it can result in water intrusion through the open voids. Although the fasteners have rubber gaskets, the perimeter coping should be inspected annually to ensure there are not openings in the coping metals. One area of the perimeter coping was found to be partially detached due to a loose fastener. The phase 4 building has a single ply membrane roof. The roof appears to be either a TPO (thermoplastic polyolephin) or PVC (Polyvinyl Chloride) membrane material. The roof has a perimeter parapet coping with metal cap and through wall scupper drains. A visual review of the roof membrane and drainage system identified several deficiencies that require correction. Two areas of the membrane have been previously repaired by applying a mastic (asphaltic) material to the roof surface. The installation of this material on a single ply roof membrane is not a proper repair as the products are not compatible. The result of this repair is a separation between the roof membrane and the repair area. The roof through wall scupper at unit 432 deck was inspected following identifiable water intrusion at the exterior wall assembly. Upon removal of siding, it was discovered that the WRB installed under the phase 4 cladding did not properly lap into the roof assembly or the through wall scupper. The void in WRB and missing target flashings allow

March 19, 2014. Ms. Jean McDonald CAP Management 910 16th Street, Suite 1010 Denver, Colorado 80202

March 19, 2014. Ms. Jean McDonald CAP Management 910 16th Street, Suite 1010 Denver, Colorado 80202 Ms. Jean McDonald CAP Management 910 16th Street, Suite 1010 Denver, Colorado 80202 Re: Prospector s Point Walkway/Façade Repairs Martin/Martin, Inc Project No.: 13.0358.S.02 Ms. McDonald: Per your request

More information

Exterior Elevated Elements Inspection Guidelines

Exterior Elevated Elements Inspection Guidelines Exterior Elevated Elements Inspection Guidelines Planning and Development 1. Guideline Purpose These guidelines are intended to assist practicing professionals in complying with Berkeley Municipal Code

More information

Water Damage & Repair

Water Damage & Repair Water Damage & Repair Chinatown Preservation Talks 2015 James Engler, P.A Glenn Mason, AIA Mason Architects Program Outline Terminology & Waterproofing Basics Discussion of why this is important Below

More information

CLIENT. Inspection Report. 271 Front St. Alert Bay, B.C. Island Building Inspections V ANCOUVER I SLAND B. C.

CLIENT. Inspection Report. 271 Front St. Alert Bay, B.C. Island Building Inspections V ANCOUVER I SLAND B. C. CLIENT Inspection Report 271 Front St. Alert Bay, B.C. Island Building Inspections 2013 V ANCOUVER I SLAND B. C. Elevation Photos For the Property at 271 Front Street Alert Bay, BC ELEVATION PICTURES Front

More information

Asphalt Shingle Application Requirements

Asphalt Shingle Application Requirements Alberta Allied Roofing Association Asphalt Shingle Application Requirements Section 1 Roof Decks 1.1 General Asphalt Shingles are not permitted to be installed directly over rigid insulation. When Asphalt

More information

TITLE: MASONRY PARAPET WALLS AND FLAT ROOF REQUIREMENTS 11/1/09

TITLE: MASONRY PARAPET WALLS AND FLAT ROOF REQUIREMENTS 11/1/09 TITLE: MASONRY PARAPET WALLS AND FLAT ROOF REQUIREMENTS 11/1/09 PMT GUIDE # 10 Book of Order Section G-10.0102o: "The session is responsible for the mission and government of the particular church. It

More information

CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN 55110 Fax: 651-429-8503. Re-Roofing: Asphalt Shingles

CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN 55110 Fax: 651-429-8503. Re-Roofing: Asphalt Shingles CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN 55110 Fax: 651-429-8503 Re-Roofing: Asphalt Shingles This is a summary of the standard requirements based on the

More information

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000 RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000 SECTION R905 REQUIREMENTS FOR ROOF COVERINGS R905.1 Roof covering application. Roof coverings

More information

Residential Roofing Guide

Residential Roofing Guide Residential Roofing Guide TABLE OF CONTENTS Building Detail and Accessories...... 1 Panel Introduction and Handling...... 2 Cutting and Trimming.... 3 Roof Preparation..... 3 Roof Slope..... 3 Re-roofing...

More information

CHAPTER 7: Building Systems ROOFING SYSTEMS

CHAPTER 7: Building Systems ROOFING SYSTEMS ROOFING SYSTEMS Purpose Examples 1. Shingle roof system 2. Metal roof with blanket insulation 3. Metal roof with rigid insulation 4. Built-up asphalt roof system 5. Single-ply roof system 6. Modified Bitumen

More information

Block Lofts Condominiums

Block Lofts Condominiums Block Lofts Condominiums Building Envelope Condition Assessment 747 Ralph McGill Boulevard Atlanta, Georgia Presented to: Block Lofts Condominium Home Owners Association C/o Heritage Property Management

More information

RDH Building Sciences Inc.

RDH Building Sciences Inc. MAK LTR 2007 03 26 Proposal for Building Enclosure Consulting Services RDH Building Sciences Inc. 509 FAIRVIEW AVENUE N SEATTLE WA 98109-5507 TEL 206 324 2272 FAX 206 324 6339 SEA@RDHBE.COM WWW.RDHBE.COM

More information

Architectural Inspection Site Structures

Architectural Inspection Site Structures 0141 Freestanding Shelters Open air shelters not attached to the building. Bike rack shelter with bike racks: This 8'x30' structure is located on the north east side of the building on the wooded landscape

More information

September 3, 2009. Ric Boyd, Public Works Director Ketchikan Gateway Borough 344 Front St. Ketchikan, AK 99901

September 3, 2009. Ric Boyd, Public Works Director Ketchikan Gateway Borough 344 Front St. Ketchikan, AK 99901 September 3, 2009 Ric Boyd, Public Works Director Ketchikan Gateway Borough 344 Front St. Ketchikan, AK 99901 RE: Ketchikan Gateway Borough Gateway Recreation Center Roof Observations and Intrusive Inspections

More information

Building Condition Assessment: 215-219 West Lexington Street Baltimore, Maryland

Building Condition Assessment: 215-219 West Lexington Street Baltimore, Maryland KPA The Joint Venture of EBA Engineering, Inc. and Kennedy Porter & Associates, Inc. 4813 Seton Drive, Baltimore, MD 21215 Phone: (410-358-7171) Fax: (410)358-7213 Building Condition Assessment: Baltimore,

More information

Vision Home Inspection

Vision Home Inspection Vision Home Inspection 324 Rams Run Shepherdsville KY 40165-7877 Inspector: James McFadden Property Inspection Report Client(s): Property address: Inspection date: View report summary This report is the

More information

Building Condition Assessment Report

Building Condition Assessment Report Building Condition Assessment Report Asset C3c - Oak Terrace Cottage 121 Address Riverview Lands, 2601 Lougheed Highway, Coquitlam, BC. V5C 4J2 Construction Year Size (Gross Floor Area) 1920. 2,553 Sq.Ft.

More information

Final inspections are completed by site visit only. Access to fenced yards shall be planned.

Final inspections are completed by site visit only. Access to fenced yards shall be planned. ROOFING RESIDENTIAL BUILDING INSPECTIONS DEPARTMENT www.ci.blaine.mn.us This handout is intended only as a guide and is based in part on the 2015 Minnesota State Building Code, Blaine City ordinances,

More information

Page & Turnbull imagining change in historic environments through design, research, and technology

Page & Turnbull imagining change in historic environments through design, research, and technology DCI+SDE STRUCTURAL EVALUATIONS OFFICE BUILDING, TOOL SHED & WATER TANK, AND BLACKSMITH & MACHINE SHOP BUILDINGS SAN FRANCISCO, CALIFORNIA [14290] PRIMARY PROJECT CONTACT: H. Ruth Todd, FAIA, AICP, LEED

More information

Common Problems with Walls

Common Problems with Walls Common Problems with Walls Common Problems with Walls There are problems and concerns that are shared by all walls and siding installations. In this article, we will learn about the following commonly

More information

Finegan Inspection Services, Inc.

Finegan Inspection Services, Inc. Finegan Inspection Services, Inc. Report Prepared For: Phone 513-683-0733 Fa 513-697-0163 Owners Property Address City, State, ZIP Phone FAX Owners Realtor Realty Company Phone FAX OWNER INFORMATION PROPERTY

More information

CHAPTER VII. TITLE: STANDARDS FOR NEW ROOFING July 2015 CONSTRUCTION, RE-ROOFING CONSTRUCTION AND ROOFING SYSTEM GUARANTEE REQUIREMENTS

CHAPTER VII. TITLE: STANDARDS FOR NEW ROOFING July 2015 CONSTRUCTION, RE-ROOFING CONSTRUCTION AND ROOFING SYSTEM GUARANTEE REQUIREMENTS TITLE: STANDARDS FOR NEW ROOFING CONSTRUCTION, RE-ROOFING CONSTRUCTION AND ROOFING SYSTEM GUARANTEE REQUIREMENTS Responsible Organization: Office of Facilities Planning Instructions: This Manual supersedes

More information

Window Sill Details for Effective Drainage of Water

Window Sill Details for Effective Drainage of Water Construction Technology Update No. 76 Window Sill Details for Effective Drainage of Water By M.A. Lacasse and M.M. Armstrong Satisfactory window performance demands a good product and proper installation.

More information

www.citiesinspection.com October 5, 2015 Dear Client,

www.citiesinspection.com October 5, 2015 Dear Client, www.citiesinspection.com October 5, 2015 Dear Client, On 9/14/2015, Cities Inspection Service, Inc. completed a building inspection of the property located at 123 Oak Street, Someplace, Minnesota for you.

More information

University of California - Santa Barbara West Campus Point Faculty Housing

University of California - Santa Barbara West Campus Point Faculty Housing University of California - Santa Barbara West Campus Point Faculty Housing Reconstruction Guidelines and Considerations to Correct Exterior Building Envelope Weatherproofing Defects and Recommended Upgrades

More information

Roof Inspection. Summary Report

Roof Inspection. Summary Report Phone: (561) 866 9956 www.real-estate-inspections.com Roof Inspection Summary Report Subject Property File Number: 05-15-RF-002 Inspector: Craig Milliken, PE CPM Real Estate Inspections, Inc. Date of Inspection:

More information

Detached accessory structures that contain no conditioned floor area are exempt.

Detached accessory structures that contain no conditioned floor area are exempt. RESIDENTIAL ROOFING PERMITS: A roofing permit is required for roofing of residential dwellings and garages in accordance with Section R105 of the International Residential Code. Updated 11/2013 City of

More information

Mark Cramer Inspection Services, Inc.

Mark Cramer Inspection Services, Inc. Mark Cramer Inspection Services, Inc. 492 Twentieth Avenue, Indian Rocks Beach, FL 34635-2970 (727) 595-4211 Fax (727) 596-7583 Certified Member #12085 American Society of Home Inspectors Construction

More information

APPLICATION INFORMATION FOR RESIDENTIAL ROOFING AND RESIDENTIAL ROOFING PACKET

APPLICATION INFORMATION FOR RESIDENTIAL ROOFING AND RESIDENTIAL ROOFING PACKET Environmental Protection and Growth Management Department PERMITTING, LICENSING AND CONSUMER PROTECTION DIVISION 1 N. University Drive, Box #302 Plantation, Florida 33324 954-765-4400 www.broward.org/permittingandlicensing

More information

SINGLE FAMILY RESIDENCE HURRICANE MITIGATION APPLICATION

SINGLE FAMILY RESIDENCE HURRICANE MITIGATION APPLICATION SINGLE FAMILY RESIDENCE HURRICANE MITIGATION APPLICATION As of October 1, 2007, this mitigation form must be submitted as part of the roofing permit application package. Secondary water barrier (if applicable)

More information

How To Repair A Boat Landing Deck With A Boat Bed

How To Repair A Boat Landing Deck With A Boat Bed RESIDENTIAL INSULATED SHEATHING INSTALLATION GUIDE Residential Insulated Sheathing Installation Guide ROXUL COMFORTBOARD IS Table of Contents Slab-on-grade-to Above Grade Wall...1 Foundation Wall at Footing

More information

Inspecting to a higher standard.

Inspecting to a higher standard. Inspecting to a higher standard. Rob Hopkin Silver Spring, MD 20902 Monday, June 2, 2014 ProTec Inspection Services Inc. 19736 Selby Ave Poolesville, MD 20837 301-972-8531 www.protec-inspections.com rob@protec-inspections.com

More information

Sun Windows General Information Sun New Construction Window Installation Instructions

Sun Windows General Information Sun New Construction Window Installation Instructions Sun Windows General Information Section 1 G F H H H A. Apply Weather Resistive Barrier B. Apply Sill Flashing Tape C. Place Waterproof Sill Shims D. Caulk Back of Nail Fin Sides & Top, Set Window, Fasten

More information

!!! !!!! !!! !!! !!! !!! !!!!!!!!! Table of Contents! Section 1: Most Common Types of Flat Roofing! Section 2: Better Understand Your Flat Roof!

!!! !!!! !!! !!! !!! !!! !!!!!!!!! Table of Contents! Section 1: Most Common Types of Flat Roofing! Section 2: Better Understand Your Flat Roof! Table of Contents Section 1: Most Common Types of Flat Roofing Section 2: Better Understand Your Flat Roof Section 3: Flat Roofing Cost in 2015: Four Factors that Dictate Section 4: Planning A Flat Roofing

More information

Roof Inspection. Summary Report

Roof Inspection. Summary Report www.real-estate-inspections.com Roof Inspection Summary Report Subject Property Prepared for: File Number: Client in Detroit 05-15-RF-004 Inspector: Craig Milliken, PE # 32779 CPM Real Estate Inspections,

More information

Structure Survey Findings:

Structure Survey Findings: Structure Survey Findings: Visible portions of the following were observed: foundations; structure to walls, columns, floors, roofs, overhang posts, and columns; attached or firmly abutting decks, balconies,

More information

School Construction Authority Architecture & Engineering

School Construction Authority Architecture & Engineering SCOPING GUIDELINES 1.0 GENERAL GUIDELINES 2.0 BUILDING ENVELOPE SCOPING GUIDELINES 3.0 CATEGORIES AND COMPONENTS: The Flood Elimination/Below Grade Capital Category may include some or all of the following

More information

3.1 Water Intrusion Problems Related to Unsealed Stucco Penetrations

3.1 Water Intrusion Problems Related to Unsealed Stucco Penetrations 3.1 Water Intrusion Problems Related to Unsealed Stucco Penetrations Any penetration through the stucco that is left unsealed will allow entry of moisture. Even an average size home can have an extreme

More information

TABLE OF CONTENTS" SECTION 3: Comparing Standing Seam Metal to Other Metal Roofs PAGE 7"

TABLE OF CONTENTS SECTION 3: Comparing Standing Seam Metal to Other Metal Roofs PAGE 7 2 TABLE OF CONTENTS SECTION 1: What is a Standing Seam Metal Roof PAGE 3 SECTION 2: Common Types of Standing Seam Metal Roofs..PAGE 5 SECTION 3: Comparing Standing Seam Metal to Other Metal Roofs PAGE

More information

Water Management & Damage Prevention:

Water Management & Damage Prevention: Water Management & Damage Prevention: A Guide for Homeowners This article provides homeowners with basic information to make these decisions and take the appropriate actions to keep their homes dry and

More information

STRUCTURAL ASSESSMENT

STRUCTURAL ASSESSMENT STRUCTURAL ASSESSMENT Project: 1432-1434 East Commerce St. Job. No: 122200 Location: San Antonio, TX Date: Dec. 10, 2012 Weather: Sunny, Windy,60 deg Performed by: Jeff Haughton and Frank Lamas, Alpha

More information

Waterproofing Problems: A Simple Explanation, A Simple Solution

Waterproofing Problems: A Simple Explanation, A Simple Solution Waterproofing Problems: A Simple Explanation, A Simple Solution The purpose of this paper is to point out the underlying causes of waterproofing problems and simple means of preventing them. Such problems

More information

UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Architectural. Roofing. Basis of Design

UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Architectural. Roofing. Basis of Design Basis of Design This section applies to roofing membranes, flashing and accessories. Design Criteria Adhere to the standards and details of the latest editions of the National Contractors Association (NRCA)

More information

Foundations 65 5 FOUNDATIONS. by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. Seismic Retrofit Training

Foundations 65 5 FOUNDATIONS. by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. Seismic Retrofit Training Foundations 65 5 FOUNDATIONS by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. 66 Foundations Foundations 67 FOUNDATIONS Let's assume that the retrofit has been done correctly from the roofline

More information

SECTION 07 61 13 STANDING SEAM METAL ROOFING

SECTION 07 61 13 STANDING SEAM METAL ROOFING SECTION 07 61 13 STANDING SEAM METAL ROOFING PART 1 GENERAL 1.01 SCOPE OF WORK A. The Work shall include all labor, materials, equipment and supervision required to complete the work of the above referenced

More information

GreenGuard Housewrap Installation Guide

GreenGuard Housewrap Installation Guide 000768PACBPHW_Flashing Bro 5/23/03 2:52 PM Page 1 For the most current product information, go to www.green-guard.com. Pactiv Building Products believes the information and recommendations herein to be

More information

PREMIUM LAMINATED ASPHALT SHINGLES Dallas, TX Tuscaloosa, AL Phillipsburg, KS

PREMIUM LAMINATED ASPHALT SHINGLES Dallas, TX Tuscaloosa, AL Phillipsburg, KS Application Instructions for THESE ARE THE MANUFACTURER S APPLICATION INSTRUCTIONS FOR THE ROOFING CONDITIONS DESCRIBED. TAMKO BUILDING PRODUCTS, INC. ASSUMES NO RESPONSIBILITY FOR LEAKS OR OTHER ROOFING

More information

TARRANT COUNTY DETAIL STANDARDS

TARRANT COUNTY DETAIL STANDARDS TARRANT COUNTY DETAIL STANDARDS 1. Standard Coping 2. Coping at End Wall 3. Standard Sheet Metal Engagement Details 4. Gravel Guard 5. Gravel Guard Wall Termination 6. Gravel Guard, Gutter, and Downspout

More information

Common Callbacks. Designers love intersecting roof. ~ CoastalContractor

Common Callbacks. Designers love intersecting roof. ~ CoastalContractor Common Callbacks In the face of wind-blown rain and short drying cycles, coastal exteriors are shown no mercy by Steve Easley Callbacks typically result from three things: poor design, faulty construction,

More information

Assessing Curtain Walls

Assessing Curtain Walls Assessing Curtain Walls Considerations and Best Practices Paul E Beers GCI Consultants, LLC pbeers@gciconsultants.com What is a Curtain Wall System? A curtain wall system is an outer covering of a building

More information

NRDCA 400 GUIDELINE FOR FIELD APPLICATION of LIGHTWEIGHT INSULATING CONCRETE REROOFING/RECOVER SYSTEMS

NRDCA 400 GUIDELINE FOR FIELD APPLICATION of LIGHTWEIGHT INSULATING CONCRETE REROOFING/RECOVER SYSTEMS NRDCA 400 GUIDELINE FOR FIELD APPLICATION of LIGHTWEIGHT INSULATING CONCRETE REROOFING/RECOVER SYSTEMS The (NRDCA) has prepared this document to provide customers and installers information that the industry

More information

ELIGIBLE REPAIR PROJECT PARAMETERS

ELIGIBLE REPAIR PROJECT PARAMETERS THE DISTRICT MUNICIPALITY OF MUSKOKA ONTARIO RENOVATES PROGRAM FOR HOMEOWNERS ELIGIBLE REPAIR PROJECT PARAMETERS 1. To have your project considered and payment processed, all projects requiring a Building

More information

Superform Products Ltd.

Superform Products Ltd. TYPICAL CORNER REINFORCING NOTE : SEE ENGINEERED REBAR SCHEDULES SUPPLIED BY THE MANUFACTURER STEEL REINFORCEMENT WALL CORNER 90 Copyright 2012 Sept. 2012 5.1.1 Rebar Spacing 6" 12" Max. Load LB./FT. 2000

More information

Structural Assessment Report

Structural Assessment Report Report Dallas Township Elementary School Dallas, Pennsylvania (JBCI Project No. 144911) 1655 Suburban Station Building 1617 John F. Kennedy Boulevard Philadelphia PA 19103 215 665 0497 5 Sandwood Drive

More information

bout your HOUSE before you start Repairing And Replacing Materials Exterior Walls

bout your HOUSE before you start Repairing And Replacing Materials Exterior Walls A bout your HOUSE before you start Repairing And Replacing Materials Exterior Walls CE 28 h Exterior finish materials are expected to protect the house from the elements while providing an attractive appearance.

More information

Reference: BRM-00220488-A0 July 18 th, 2014. Cursory Visual Review of Various Below Grade Spaces and Exposed Foundation Walls

Reference: BRM-00220488-A0 July 18 th, 2014. Cursory Visual Review of Various Below Grade Spaces and Exposed Foundation Walls Reference: BRM-00220488-A0 July 18 th, 2014 Toronto Catholic District School Board 80 Sheppard Avenue East Toronto, Ontario M2N 6E8 Re: 1.0 Introduction Exp Services Inc. (exp) was retained by the Toronto

More information

ROOF INSPECTION & MAINTENANCE

ROOF INSPECTION & MAINTENANCE Physical Plant Administration Facilities Maintenance Department ROOF INSPECTION & MAINTENANCE All roofs require periodic inspection and maintenance in order to perform as designed and to provide a long

More information

ROOFS - Guidance for Repair, Maintenance and Replacement

ROOFS - Guidance for Repair, Maintenance and Replacement ROOFS - Guidance for Repair, Maintenance and Replacement Guilford Association Architectural Committee ROOFING Slate and tile roofs are a critical design feature of Guilford homes. The homes were designed

More information

Housewrap Errors. By Steve Easley

Housewrap Errors. By Steve Easley Housewrap Errors By Steve Easley There Are Seven Common Mistakes Contractors Make When Installing Housewraps Green building and remodeling programs, the U.S. Environmental Protection Agency s IAQ Plus

More information

INSPECTION FINDINGS. for. Paragon Condominiums 2102 W 31 st Avenue Denver, Colorado. Inspection Date: August 8, 2007. Perfonned By: Drew Schneider

INSPECTION FINDINGS. for. Paragon Condominiums 2102 W 31 st Avenue Denver, Colorado. Inspection Date: August 8, 2007. Perfonned By: Drew Schneider INSPECTION FINDINGS for Paragon Condominiums 2102 W 31 st Avenue Denver, Colorado Inspection Date: August 8, 2007 Perfonned By: Drew Schneider INSPECTRUM 27691 Moffat Road Evergreen, CO 80439 303.697.0990

More information

Table of Contents. Western States RustWall Wall and Soffit Panels Installation, Flashings & Shop Drawing Detail Guide

Table of Contents. Western States RustWall Wall and Soffit Panels Installation, Flashings & Shop Drawing Detail Guide Western States RustWall Wall and Soffit Panels Installation, Flashings & Shop Drawing Detail Guide Table of Contents Section Page Section Page Notes to Designer /Installers.. 1 Fastener Placement and Selection.2-3

More information

Installation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows

Installation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows Installation Instructions Double-Hung, Single-Hung, Casement, Awning, Sliding, Picture & Shapes Non-Impact & Impact Resistant Nailing Fin Windows americancraftsmanwindows.com Project Requirements: Read

More information

Comment Form on Proposed Gut Rehabilitation Alternatives

Comment Form on Proposed Gut Rehabilitation Alternatives Comment Form on Gut Rehabilitation Alternatives Name: Organization: Email: Instructions Submission: Please submit this form to energystarhomes@energystar.gov by October 10 th, 2012 with the subject line

More information

Storage Store the siding in a dry and ventilated area. Do not place it directly on the ground. Always cover the siding after a day s work.

Storage Store the siding in a dry and ventilated area. Do not place it directly on the ground. Always cover the siding after a day s work. Installation Guide Before you begin, take the time to read this entire guide to clearly understand the requirements and steps to follow for proper installation. Warning Do not install defective material.

More information

Facility Assessment for. 11801 East Main Street, Huntley, IL

Facility Assessment for. 11801 East Main Street, Huntley, IL Facility Assessment for 11801 East Main Street, Huntley, IL July 12, 2012 Prepared by: Dewberry Architects Inc. 25 S. Grove Avenue, Suite 500 Elgin, IL 60120 (847) 695-5840 The Village of Huntley requested

More information

(4020-NY) ARCHITECTURAL BUILDING INSPECTION ASSESSMENT AND REPORT

(4020-NY) ARCHITECTURAL BUILDING INSPECTION ASSESSMENT AND REPORT FEMA Task Order 12-J-0001 (4020-NY) ARCHITECTURAL BUILDING INSPECTION ASSESSMENT AND REPORT Orange County Government Center 255 Main Street, Goshen NY February 15, 2012 1 INDEX and TABLE OF CONTENTS I.

More information

Chapter 3 Pre-Installation, Foundations and Piers

Chapter 3 Pre-Installation, Foundations and Piers Chapter 3 Pre-Installation, Foundations and Piers 3-1 Pre-Installation Establishes the minimum requirements for the siting, design, materials, access, and installation of manufactured dwellings, accessory

More information

Table of Contents. Western States Standing Seam SS675 Panel Installation, Flashings & Shop Drawing Detail Guide. Notes to Designer /Installers..

Table of Contents. Western States Standing Seam SS675 Panel Installation, Flashings & Shop Drawing Detail Guide. Notes to Designer /Installers.. Western States Standing Seam SS675 Panel Installation, Flashings & Shop Drawing Detail Guide Table of Contents Section Page Section Page Notes to Designer /Installers.. 1 Fastener Placement and Selection.2-3

More information

Facility Assessment Report, Montgomery Independent School District

Facility Assessment Report, Montgomery Independent School District THE LEARNING CENTER CAMPUS DATA THE LEARNING CENTER 700 Dr. Martin Luther King Jr. Drive, Montgomery TX 77356 Year Built 1958 Approx. Total Square Footage Grades Served Current Enrollment 22,050 n/a n/a

More information

Stucco Moisture Inspection Report

Stucco Moisture Inspection Report Stucco Moisture Inspection Report For the Property Located At: Sample Inspection St. Report Prepared Ecusively For: Potential Buyer Pace FL. 32571 >< 850.393.6106 >< ofc- 850-941-8600 > Email: pat@moistureconsultantsinc.com

More information

Bituminous Sheet Flat Roofs: Their repair and maintenance

Bituminous Sheet Flat Roofs: Their repair and maintenance Bituminous Sheet Flat Roofs: Their repair and maintenance Flat roof covered in sheets of bituminous felt Introduction Whilst flat roofs are often regarded as inferior to their pitched counterparts and

More information

HISTORIC PRESERVATION COMMISSION ADMINISTRATIVE APPROVAL ISSUED JULY - SEPTEMBER 2014 DATE PROJECT ADDRESS PROJECT DESCRIPTION

HISTORIC PRESERVATION COMMISSION ADMINISTRATIVE APPROVAL ISSUED JULY - SEPTEMBER 2014 DATE PROJECT ADDRESS PROJECT DESCRIPTION HISTORIC PRESERVATION COMMISSION ADMINISTRATIVE APPROVAL ISSUED JULY - SEPTEMBER 2014 DATE PROJECT ADDRESS PROJECT DESCRIPTION 07/02/14 212A King George Street Remove existing picket fence from side yard

More information

201 WATER STREET FORWARDERS MUSEUM AND VISITORS INFORMATION CENTRE

201 WATER STREET FORWARDERS MUSEUM AND VISITORS INFORMATION CENTRE STRUCTURAL INSPECTION REPORT DRAFT 201 WATER STREET FORWARDERS MUSEUM AND VISITORS INFORMATION CENTRE TOWN OF PRESCOTT Date: November 2013 GENIVAR No.: 131-20617-00 2611 Queensview Drive, Suite 300, Ottawa,

More information

Building Condition Assessment: 109-111 North Howard Street Baltimore, Maryland

Building Condition Assessment: 109-111 North Howard Street Baltimore, Maryland KPA The Joint Venture of EBA Engineering, Inc. and Kennedy Porter & Associates, Inc. 4813 Seton Drive, Baltimore, MD 21215 Phone: (410-358-7171) Fax: (410)358-7213 Building Condition Assessment: Baltimore,

More information

Leaky Homes Financial Assistance Package (FAP) Repair plan example

Leaky Homes Financial Assistance Package (FAP) Repair plan example LEAKY HOMES FINANCIAL ASSISTANCE PACKAGE FACT SHEET Repair Plan Example - June 2014 Page 1 Leaky Homes Financial Assistance Package (FAP) Repair plan example Introduction This repair plan example is intended

More information

Building Condition Assessment Report

Building Condition Assessment Report C2 - Nurses Resident (aka Administration) Building Condition Assessment Report Asset Address Address Construction Year Size (Gross Floor Area) Asset Type Floors Above Ground Inspection Date C2 - Nurses

More information

WINDOW AND DOOR REPLACEMENT REQUIREMENTS

WINDOW AND DOOR REPLACEMENT REQUIREMENTS WINDOW AND DOOR REPLACEMENT REQUIREMENTS Should you have any questions after reading the following information, please call the Building Inspection Department at 651-439-4439 to discuss the topics of concern.

More information

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001)

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for Vinyl windows with an integral nailing fin. While the use of these installation instructions

More information

2.18 INTERIOR & EXTERIOR FINISHES 2.18.1 VAPOR & AIR BARRIERS

2.18 INTERIOR & EXTERIOR FINISHES 2.18.1 VAPOR & AIR BARRIERS 2.18 INTERIOR & EXTERIOR FINISHES 2.18.1 VAPOR & AIR BARRIERS The LOGIX wall assembly has no need for an additional vapor barrier, the solid concrete core covered with the low permeance EPS (Type II) foam

More information

Total Home Inspection Checklist

Total Home Inspection Checklist Total Home Inspection Checklist Use a checklist like this to make sure that you are looking at all parts of the house. Check off those items that are in good condition and make notes about those that are

More information

ROOF CONSTRUCTION Roof Styles Gable Roof Hip Roof Gambrel Roof

ROOF CONSTRUCTION Roof Styles Gable Roof Hip Roof Gambrel Roof ROOF CONSTRUCTION The overall appearance of a building is greatly affected by the roof lines and the roofing materials. The designer has many standard designs to choose from and should be able to find

More information

Window Installation Instructions

Window Installation Instructions Caution The correct installation methods of windows in full frame or insert applications is critical towards achieving the tested performance of the window and longterm enjoyment and energy savings for

More information

Building Envelope Maintenance Bulletin. Decks and Balconies. What are Decks and Balconies? What is a Deck or Balcony Membrane?

Building Envelope Maintenance Bulletin. Decks and Balconies. What are Decks and Balconies? What is a Deck or Balcony Membrane? Maintenance Matters Building Envelope Maintenance Bulletin No. 6 This bulletin provides practical information on steps to be taken for proper inspection, maintenance and longterm performance of decks and

More information

INSTALLATION OF A BAY WINDOW

INSTALLATION OF A BAY WINDOW INSTALLATION OF A BAY WINDOW Installation of a Bay Window These instructions relate to the replacement of an existing bay window or replacement of a straight window with a new bay window, in an opening

More information

CONSERVATION MAINTENANCE WORKSHEET Universal Checklist

CONSERVATION MAINTENANCE WORKSHEET Universal Checklist 3.1 SITE 1 Concrete curbs Check for cracks, spalling, growth from joints X 2 Stone curbs Check for cracks, spalling, growth from joints X 3 Concrete walkways Look for uneven surfaces, ponding, growth from

More information

Thank You! Owner Aaron Perry! Email info@exteriorproinc.com! 2936 Clifty Drive! Madison IN 47250! (855) 274-0444! (812) 274-0444!

Thank You! Owner Aaron Perry! Email info@exteriorproinc.com! 2936 Clifty Drive! Madison IN 47250! (855) 274-0444! (812) 274-0444! A properly installed and maintained flat roof can be one of a building s biggest assets while a leaking or failing roof can quickly become a building s biggest expense. We ve put this simple guide together

More information

Slavic Village Building Condition Review

Slavic Village Building Condition Review Slavic Village Building Condition Review Slavic Village Development May 8, 2015 Page 1 EXECUTIVE SUMMARY City Architecture was commissioned by Slavic Village Development to review five existing facilities

More information

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities Division 1 Requirements Design and Construction Quality Campus Master Plans Texas Tech University System Operating and Building Maintenance Project Administration Historically Underutilized Business (HUB)

More information

SECTION 3 ONM & J STRUCTURAL ANALYSIS

SECTION 3 ONM & J STRUCTURAL ANALYSIS Historic Boynton Beach High School Existing Building Assessment City of Boynton Beach February 10, 2011 SECTION 3 ONM & J STRUCTURAL ANALYSIS STRUCTURAL ENGINEERS SPECIAL INSPECTORS STRUCTURAL CONDITION

More information

FOUNDATION INSULATING SYSTEM, INCLUDING WATERPROOFING AND DAMP PROOFING

FOUNDATION INSULATING SYSTEM, INCLUDING WATERPROOFING AND DAMP PROOFING FOUNDATION INSULATING SYSTEM, INCLUDING WATERPROOFING AND DAMP PROOFING insulation installed on foundation walls must be separated from the building interior with a code approved thermal barrier. Foam

More information

SG Series 65mm Frame Windows (Fixed Lite Window Illustrated)

SG Series 65mm Frame Windows (Fixed Lite Window Illustrated) (Fixed Lite Window Illustrated) SINGLE LEAF CLADDING / CORRUGATED STEEL (Awning Window Illustrated) SINGLE LEAF CLADDING / FOAM BOARD (Casement Window Illustrated) BRICK VENEER CONSTRUCTION (Horizontal

More information

Lighthouse Engineering, L.L.C.

Lighthouse Engineering, L.L.C. Registered Engineering Firm (F: 9334) Phone: 214-577-1077 Fax: 214-224-0549 Website: www.lighthouseeng.com Email: Office@LighthouseEng.com Thursday, September 04, 2014 TO: Our Client RE: Initial Engineering

More information

Low-slope reroofing guidelines

Low-slope reroofing guidelines Low-slope reroofing guidelines by Thomas Bollnow and Joan P. Crowe, AIA The NRCA Roofing and Waterproofing Manual, Fifth Edition, contains reroofing guidelines for steep- and low-slope roofing. The August

More information

Envelope INSULATION BATT (2) Avoid Using Batt Insulation With Metal Framing. Pressure or Friction Fit

Envelope INSULATION BATT (2) Avoid Using Batt Insulation With Metal Framing. Pressure or Friction Fit R-H-DI1 INSULATION BATT NR-E-IB1 Avoid Using Batt Insulation With Metal Framing Batt insulation should not be used with metal framing systems. Although it is common to see fiberglass batt insulation installed

More information

Pre-Drywall Inspection Report

Pre-Drywall Inspection Report SM MEDALLION INSPECTIONS helping people make informed decisions Pre-Drywall Inspection Report 5657 Garden Valley Place Milton, Georgia 30024 Prepared for Betsy and Paul Dougherty January12, 2015 Medallion

More information

Ver. 2. Guide to. Inspecting Residential Brick Veneer

Ver. 2. Guide to. Inspecting Residential Brick Veneer Ver. 2 Guide to Inspecting Residential Brick Veneer 1. A guide created by industry professionals. The knowledgeable staff at MASONPRO together with technical support from the Masonry Institute of Michigan

More information

STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM

STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM Installed in Pre-engineered Steel Buildings Provides Lowest Cost Construction Method for CORROSIVE AND WET Environments PREFERRED SOLUTIONS, INC.

More information

Weather Resistive Barriers: Building Science Makes a Case for Two Layers by Dave Olson Technical Services Manager, Fortifiber Building Systems Group

Weather Resistive Barriers: Building Science Makes a Case for Two Layers by Dave Olson Technical Services Manager, Fortifiber Building Systems Group Weather Resistive Barriers: Building Science Makes a Case for Two Layers by Dave Olson Technical Services Manager, Fortifiber Building Systems Group Since water intrusion is among the most damaging problems

More information

ROOF ASSEMBLIES CHAPTER 9

ROOF ASSEMBLIES CHAPTER 9 CHAPTER 9 ROOF ASSEMBLIES SECTION R901 GENERAL R901.1 Scope. The provisions of this chapter shall govern the design, materials, construction and quality of roof assemblies. SECTION R902 ROOF CLASSIFICATION

More information

WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12

WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12 WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12 87 88 GOOD INDUSTRY PRACTICES 12 WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12.1 BACKGROUND Most roofs in Singapore are constructed using reinforced