2 Agenda - Introduction - Migration Statistics - Drivers for Migration - Migration Strategies - Test Strategies - Impact on Test Environments - Conclusions 2
3 Migration Statistics Bloor research 2007 (Global 2000 companies): Market for data migration > $5 bn 80% ran out of time or budget 20% has no separate budget or timescale Hitachi 2010: Migration project expenditures are on average 200 percent of the acquisition cost of enterprise storage Enterprise storage migration costs can exceed US$15,000 per terabyte migrated Storage migration projects: 70% of time for planning, 30% for executing 3
4 Drivers for Migration Mergers, acquisitions, business process outsourcing, etc Deployment of a new operating or application system Server or storage technology replacement or upgrade Server or storage consolidation Virtualisation (client and/or server) Changes to database schemas and structure Relocation of the data centre Server or storage equipment maintenance Workload balancing or other performance-related tuning 4
5 Migration Challenges Minimize disruption to business processes Ensure all data is migrated and accounted for Handle the complexities of mapping data from various legacy systems to the new application(s) Existing data pollution Handle customer orders already in progress 5
6 Critical Success Factors Close cooperation business and IT Data and application migration requirements Full regression testing Full reconciliation of data Detailed planning Clear acceptance criteria Lessons learned 6
7 Migration strategies Rebuild & Data Migration: the application (including interfaces) is completely build from scratch Binary Copy: an exact copy (on binary level) is created and moved to the target environment Lift & Shift: physically move hardware from the old environment to the target environment Change of IP address: link to the new IP address in the target environment Virtualisation 7
8 Migration Implementation Big-bang Incremental migration Bi-directional synchronisation Or a combination 8
9 Test strategy: Rebuild & Data Migration The application (including interfaces) is completely build from scratch Full extensive testing is necessary 9
10 Test strategy: Binary copy An exact copy (on binary level) is created and moved to the target environment To check whether the move was successful an intake test at D or T is enough Necessary and depth of regression tests on Acceptance depends on business criticality 10
11 Test strategy: Lift & Shift Physically move hardware from the old environment to the target environment No interface testing needed for parts within the same Lift & Shift hardware Regression testing in Acceptance depend on business criticality and the size of Lift & Shift 11
12 Test strategy: Change of IP address Link to the new IP address in the target environment Interface testing is the most important part of testing Acceptance testing (regression) depends on the business risk 12
13 Test strategy: Virtualisation Server application: same testing as with Lift & Shift Client application: Extensive regression testing is necessary Acceptance testing (regression) depends on the business risk 13
14 Additional test types Performance test Security test Portability test Fallback & recovery (during migration and after) Business Continuity (resilience, fail over, disaster recovery site) 14
15 Impact on test environments Depending on migration strategy (Big bang, Incremental, Synchronisation) Connections between old and new environment must be controlled Network architecture should take test environments into account Hint: ask for updated technical architecture documents first! 15
16 Following DTAP (1) Development Can all elements be installed in the target environment and does basic functionality work 16
17 Following DTAP (2) A.2 A.3 A.4 Application A A.5 Test Make sure all elements (interfaces, etc.) work together. Probably with help of stubs & drivers A.1 Database 17
18 De afbeelding kan niet worden weergegeven. Het is mogelijk dat er onvoldoende geheugen beschikbaar is op de computer om de afbeelding te openen of dat de afbeelding beschadigd is. Start de computer opnieuw op en open het bestand opnieuw. Als de afbeelding Following DTAP (3) A A B B C C B D D Acceptance All business processes still work correctly 18
19 Following DTAP (4) Production Make sure all applications work together. Connectivity test & Dry-run 19
20 Conclusions Test strategy depends on migration strategy Focus not just on functional testing Clear technical architecture is necessary Although often looked at as a technical project, for a migration business influence is very important (acceptance, business as usual) Don t underestimate the complexity of a migration 20
EMERGENCIES IVAO BE 28 OCT. 2006. by Bob van der Flier IVAO-TA12 & PATCO
De afbeelding kan niet worden weergegeven. Het is mogelijk dat er onvoldoende geheugen beschikbaar is op de computer om de afbeelding te openen of dat de afbeelding beschadigd is. Start de computer opnieuw
Direct oral anticoagulants in daily care: what do we know today and what are the remaining issues?
De afbeelding kan niet worden weergegeven. Mogelijk is er onvoldoende geheugen beschikbaar om de afbeelding te openen of is de afbeelding beschadigd. Start de computer opnieuw op en open het bestand opnieuw.
CGS Technology Outsourcing
CGS Technology Outsourcing Project Management Best Practices; Modernizing Enterprise Infrastructure presented by Michael Brandi, Vice President 16 September 2015 2015 CGS Computer Generated Solutions.
Managing and Maintaining Windows Server 2008 Servers
Managing and Maintaining Windows Server 2008 Servers Course Number: 6430A Length: 5 Day(s) Certification Exam There are no exams associated with this course. Course Overview This five day instructor led
DISASTER RECOVERY BUSINESS CONTINUITY DISASTER AVOIDANCE STRATEGIES
DISASTER RECOVERY BUSINESS CONTINUITY DISASTER AVOIDANCE STRATEGIES Dejan Živanović EMC Technology Solutions Group SEE Presales Manager [email protected] 1 The Business Maturity Model V Enabled Web
19/10/12 1:50 PM DELIVERING WORLD CLASS IT SOLUTIONS
19/10/12 1:50 PM DELIVERING WORLD CLASS IT SOLUTIONS ABOUT LINCOM SOLUTIONS We are a privately owned Australian IT Solutions Company established in 2006, consisting of an immensely talented and cohesive
SMART Considerations for Active Directory Migration. A Strategic View and Best Practices for Migrating the Corporate Directory
SMART Considerations for Active Directory Migration A Strategic View and Best Practices for Migrating the Corporate Directory Table of Contents Introduction: The Strategic View of Active Directory Migrations...
NL VMUG UserCon March 19 2015
NL VMUG UserCon March 19 2015 VMware Microsoft Let's look beyond the war on checkbox compliancy. Introductie Insight24 Technologie is een middel, geen doel 3x M (Mensen, Methoden, Middelen) & Organisatie
Migrating Production HPC to AWS
Migrating Production HPC to AWS A Story of Early Adoption & Lessons Learned Lewis Foti Mentation Solutions Common Computing Service (CCS) The Common Computing Service (CCS) is the HPC (grid computing)
Documentation for data centre migrations
Documentation for data centre migrations Data centre migrations are part of the normal life cycle of a typical enterprise. As organisations expand, many reach a point where maintaining multiple, distributed
Information Technology White Paper
Information Technology White Paper Virtualization Building an Adaptive, Cost Effective Infrastructure at SSCT October 5, 2009 As the College grows the College needs to be poised to respond faster to market
Flash Use Cases Traditional Infrastructure vs Hyperscale
Flash Use Cases Traditional Infrastructure vs Hyperscale Steve Knipple, CTO / VP Engineering Atmosera : Global Hybrid Managed Services Provider Agenda Speaker Perspective The Infrastructure Market Traditional
UBISTOR WHITE PAPER: NAVIGATING THE ROAD TO THE CLOUD
UBISTOR WHITE PAPER: NAVIGATING THE ROAD TO THE CLOUD NAVIGATING THE ROAD TO THE CLOUD CONTENTS 03 Executive Summary 04 5 Reasons to Move to the Cloud 07 4 Step Roadmap to the Cloud 08 Conclusion 09 Sources
70-646 R3: Windows Server 2008 Administration. Course Overview. Course Outline. Course Length: 4 Day
70-646 R3: Windows Server 2008 Administration Course Length: 4 Day Course Overview This course will prepare the student for Exam 70-646: Pro: Windows Server 2008, Server Administrator. Topics covered include
Making Leaders Successful Every Day
Making Leaders Successful Every Day Why & How Enterprises Are Adopting the Cloud James Staten, VP, Principal Analyst The bottom line 1. Public cloud adoption is driven by the business, not IT Empowered
Applying CMMI SM In Information Technology Organizations SEPG 2003
Applying CMMI SM In Information Technology Organizations Mark Servello, Vice President Jim Gibson, Senior Consultant ChangeBridge, Incorporated Page 1 Portions Copyright 2002 Carnegie Mellon University
Service Availability Metrics
2014 Service Availability Benchmark Survey Published by Executive Summary This benchmark survey presents service availability metrics that allow IT infrastructure, business continuity, and disaster recovery
NOS for Network Support (903)
NOS for Network Support (903) November 2014 V1.1 NOS Reference ESKITP903301 ESKITP903401 ESKITP903501 ESKITP903601 NOS Title Assist with Installation, Implementation and Handover of Network Infrastructure
VIRTUALIZATION THE FOUNDATION OF CLOUD COMPUTING
VIRTUALIZATION THE FOUNDATION OF CLOUD COMPUTING TM 989 Old Eagle School Road Suite 815 Wayne, PA 19087 USA 610.964.8000 www.evolveip.net Did You Know Approximately 70 percent of a typical IT budget in
The Outsourced IT Hiring Guide
The Outsourced IT Hiring Guide 8 Steps to Help You Find Your Perfect Tech brought to you by 1) Maintenance vs. Issue Resolution Know the difference. With regularly scheduled maintenance, you ll experience
Module 4. Planning and Designing Load Balancing
Module 4 Planning and Designing Load Balancing Designing Lync Server 2010 Jump Start Day 1: Topology Design Mod 1: Lync Server 2010 Design Process Overview Module 2a: Designing a LS 2010 Topology ONE Module
Load Balancing Lync 2013. Jaap Wesselius
Load Balancing Lync 2013 Jaap Wesselius Agenda Introductie Interne Load Balancing Externe Load Balancing Reverse Proxy Samenvatting & Best Practices Introductie Load Balancing Lync 2013 Waarom Load Balancing?
CAPABILITY STATEMENT
WHO WE ARE UberGlobal Enterprise is the dedicated government and enterprise business division of Australian web service provider, UberGlobal. UberGlobal was founded through the merger of a number of medium
Migrating to the Cloud. Developing the right Cloud strategy and minimising migration risk with Logicalis Cloud Services
Migrating to the Cloud Developing the right Cloud strategy and minimising migration risk with Logicalis Cloud Services Organisations are looking for new ways to deliver IT services and demanding that ICT
Share the webinar Ask a question Votes (polling questions) Rate (before you leave) Attachments (you can download today s presentation)
Data Center Migration Primer Mark Smith Wednesday, June 27, 2012 General Information Share the webinar Ask a question Votes (polling questions) Rate (before you leave) Attachments (you can download today
Announcing the product launch of a Mitel Virtual Mitel Communication Director (Virtual MCD)
Announcing the product launch of a Mitel Virtual Mitel Communication Director (Virtual MCD) In today's global economy, businesses are - more than ever - looking to reduce capital and operating expenses.
AN APPLICATION-CENTRIC APPROACH TO DATA CENTER MIGRATION
AN APPLICATION-CENTRIC APPROACH TO DATA CENTER MIGRATION Five key success factors IT organizations today are under constant business pressure to transform their infrastructure to reduce costs, increase
Getting the Most Out of VMware Mirage with Hitachi Unified Storage and Hitachi NAS Platform WHITE PAPER
Getting the Most Out of VMware Mirage with Hitachi Unified Storage and Hitachi NAS Platform WHITE PAPER Getting the Most Out of VMware Mirage with Hitachi Unified Storage and Hitachi NAS Platform The benefits
Upgrading Your SQL Server 2000 Database Administration (DBA) Skills to SQL Server 2008 DBA Skills Course 6317A: Three days; Instructor-Led
Upgrading Your SQL Server 2000 Database Administration (DBA) Skills to SQL Server 2008 DBA Skills Course 6317A: Three days; Instructor-Led About this Course This three-day instructor-led course provides
Hybrid Cloud Customer Engagements
Hybrid Cloud Customer Engagements Juergen Schneider, IBM Distinguished Engineer, IBM Cloud Unit IBM Corporation 1 Agenda Why is Hybrid Cloud so important? Why are Enterprises approaching Hybrid Cloud solutions?
EMC VPLEX FAMILY. Continuous Availability and Data Mobility Within and Across Data Centers
EMC VPLEX FAMILY Continuous Availability and Data Mobility Within and Across Data Centers DELIVERING CONTINUOUS AVAILABILITY AND DATA MOBILITY FOR MISSION CRITICAL APPLICATIONS Storage infrastructure is
Designing Database Solutions for Microsoft SQL Server 2012 MOC 20465
Designing Database Solutions for Microsoft SQL Server 2012 MOC 20465 Course Outline Module 1: Designing a Database Server Infrastructure This module explains how to design an appropriate database server
Information Services Strategy 2011-2013
Information Services Strategy Issue 1 1 Introduction The States of Jersey public sector is facing significant pressure for efficiencies and savings. This has created the context to take a fresh look at
Migration and Building of Data Centers in IBM SoftLayer with the RackWare Management Module
Migration and Building of Data Centers in IBM SoftLayer with the RackWare Management Module June, 2015 WHITE PAPER Contents Advantages of IBM SoftLayer and RackWare Together... 4 Relationship between
Enterprise IT Assets: Realizing a Business Centric Strategy. A Techlogix White Paper
Enterprise IT Assets: Realizing a Business Centric Strategy A Techlogix White Paper 2 Enterprise IT Assets: Realizing a Business Centric Strategy EXECUTIVE SUMMARY This white paper presents a four step
Data Centre Strategy & Migration Services
PROPOSAL FOR DYLAN THOMAS Data Centre Strategy & Migration Services Version: 1.1 Status: Draft Date: April 14 CS Technology 21 Ironmonger Lane LONDON EC2V 8EY www.cstechnology.com Page 1 of 10 CONTENTS
THOUGHT LEADERSHIP. Journey to Cloud 9. Navigating a path to secure cloud computing. Alastair Broom Solutions Director, Integralis
Journey to Cloud 9 Navigating a path to secure cloud computing Alastair Broom Solutions Director, Integralis March 2012 Navigating a path to secure cloud computing 2 Living on Cloud 9 Cloud computing represents
OGH: : 11g in de praktijk
OGH: : 11g in de praktijk Real Application Testing SPREKER : E-MAIL : PATRICK MUNNE [email protected] DATUM : 14-09-2010 WWW.TRANSFER-SOLUTIONS.COM Real Application Testing Uitleg Real Application
Selecting the right Cloud. Three steps for determining the most appropriate Cloud strategy
Selecting the right Cloud Three steps for determining the most appropriate Cloud strategy Selecting the most appropriate cloud model can be a challenging process for organisations and IT executives tasked
Hosting JDE EnterpriseOne in the Cloud Hear how one company went to the cloud
Hosting JDE EnterpriseOne in the Cloud Hear how one company went to the cloud October 2015 2015 AT&T Intellectual Property. All rights reserved. AT&T, the AT&T logo and all other AT&T Agenda Organizational
How To Run A Hosted Physical Server On A Server At Redcentric
REDCENTRIC HOSTED PHYSICAL SERVER SERVICE DEFINITION SD027 V1.6 Issue Date 01 July 2014 1) OVERVIEW The Hosted Physical Server service (HPS) offers dedicated off-site server resource located within an
#BMIT. Welcome. Seminar Business Continuity
#BMIT Welcome Seminar Business Continuity Smart Business Strategies Business Meets IT - Agenda 9.30: Market Research: William Visterin, Smart Business Strategies 10.00: Chris De Blende, PwC Business
Bytes Cloud Services. 01372 418500 bytes.co.uk [email protected]
01372 418500 bytes.co.uk [email protected] Bytes Cloud Services Modern hosting & cloud services to support your business At Bytes Cloud Services, our modern hosting and cloud services are designed
Protecting Virtual Servers with Acronis True Image Echo
Protecting Virtual Servers with Acronis True Image Echo IT organizations have discovered that virtualization technology can simplify server management and reduce total operating costs. Despite the technical
Designing and Deploying Messaging Solutions with Microsoft Exchange Server 2010 Service Pack 2 20465B; 5 days, Instructor-led
Designing and Deploying Messaging Solutions with Microsoft Exchange Server 2010 Service Pack 2 20465B; 5 days, Instructor-led Course Description This five-day, instructor-led course provides you with the
Cross platform Migration of SAS BI Environment: Tips and Tricks
ABSTRACT Cross platform Migration of SAS BI Environment: Tips and Tricks Amol Deshmukh, California ISO Corporation, Folsom, CA As a part of organization wide initiative to replace Solaris based UNIX servers
SECURE CLOUD SOLUTIONS FOR YOUR BUSINESS.
SECURE CLOUD SOLUTIONS FOR YOUR BUSINESS. 2015 Learning Possibilities Ltd, 506 Centennial Park, Centennial Avenue, Elstree, Herts, WD6 3FG Email: [email protected] Telephone: +44 (0) 20 8236
Migration and Disaster Recovery Underground in the NEC / Iron Mountain National Data Center with the RackWare Management Module
Migration and Disaster Recovery Underground in the NEC / Iron Mountain National Data Center with the RackWare Management Module WHITE PAPER May 2015 Contents Advantages of NEC / Iron Mountain National
Enabling Multi-Tenancy with NetApp MultiStore
Enabling Multi-Tenancy with NetApp MultiStore Agenda What is Multi-Tenancy? Secure Multi-Tenancy as Cloud Infrastructure Introducing MultiStore MultiStore Use Cases Customer Examples 2009 NetApp. All rights
Course Outline: Course 6317: Upgrading Your SQL Server 2000 Database Administration (DBA) Skills to SQL Server 2008 DBA Skills
Course Outline: Course 6317: Upgrading Your SQL Server 2000 Database Administration (DBA) Skills to DBA Skills Learning Method: Instructor-led Classroom Learning Duration: 3.00 Day(s)/ 24 hrs Overview:
Migration and Building of Data Centers in IBM SoftLayer with the RackWare Management Module
Migration and Building of Data Centers in IBM SoftLayer with the RackWare Management Module June, 2015 WHITE PAPER Contents Advantages of IBM SoftLayer and RackWare Together... 4 Relationship between
Why Should Unified Communications Be Part Of Your Strategy?
oip Why Should Unified Communications Be Part Of Your Strategy? It s not just the large firms implementing Unified Communications (UC), small organisations are also starting to reap the benefits. Who Should
Company overview CUBE52. +44 (0) 118 328 2205 www.cube52.com [email protected] CLOUD SERVICES
Company overview +44 (0) 118 328 2205 www.cube52.com [email protected] CUBE52 CLOUD SERVICES Modern hosting & cloud services to support your business At Cube52, our modern hosting and cloud services are
Proprietary Kroll Ontrack. Data recovery Data management Electronic Evidence
Data recovery Data management Electronic Evidence Back-up migratie of consolidatie TAPE SERVICES Overview The Legacy Tape Environment Common Legacy Tape Scenarios Available Options Tape Service Components
Cloud Computing, Virtualization & Green IT
Cloud Computing, Virtualization & Green IT Cloud computing can change how IT supports business Consider the following: As much as 85% of computing capacity sits idle in distributed computing environments.
APPLICATION REPLATFORMING : MIGRATION AND MODERNIZATION
WWW.WIPRO.COM APPLICATION REPLATFORMING : MIGRATION AND MODERNIZATION DO BUSINESS BETTER Wipro's Application Replatforming Services help transform legacy applications, add value and decrease risks. These
IBM Smartcloud Managed Backup
IBM Smartcloud Managed Backup Service Definition 1 1. Summary 1.1 Service Description The IBM SmartCloud Managed Backup service provides public, private and hybrid cloudbased data protection solutions
Business Continuity and Disaster Survival Strategies for the Small and Mid Size Business. www.integrit-network.com
Business Continuity and Disaster Survival Strategies for the Small and Mid Size Business www.integrit-network.com Business Continuity & Disaster Survival Strategies for the Small & Mid Size Business AGENDA:
Estimating Cloud Computing Costs: Practical Questions for Programs
Estimating Cloud Computing Costs: Practical Questions for Programs Kathryn Connor RAND Corporation June 2014 In 2010, the OMB proposed Federal Agencies consolidate data centers to save money. In 2013,
How Telecom Italia Empowers Customer Service from the IMS Cloud
How Telecom Italia Empowers Customer Service from the IMS Cloud Giacomo De Filippis, IPCC Senior Program Manager, Telecom Italia Guillaume Calot, Strategic Business Director EMEA, Alcatel-Lucent Enterprise
Why is CICS Still Alive? Dr Geoff Sharman Visiting Professor in Computer Science Birkbeck College
Why is CICS Still Alive? Dr Geoff Sharman Visiting Professor in Computer Science Birkbeck College Agenda Middleware the hidden part of IT CICS (Customer Information Control System) track record as a middleware
This presentation provides an overview of the architecture of the IBM Workload Deployer product.
This presentation provides an overview of the architecture of the IBM Workload Deployer product. Page 1 of 17 This presentation starts with an overview of the appliance components and then provides more
Leveraging Virtualization for Disaster Recovery in Your Growing Business
Leveraging Virtualization for Disaster Recovery in Your Growing Business Contents What is Disaster Recovery?..................................... 2 Leveraging Virtualization to Significantly Improve Disaster
Disaster Recovery. Maximizing Business Continuity and Minimizing Recovery Time Objectives in Windows Server Environments.
Disaster Recovery Maximizing Business Continuity and Minimizing Recovery Time Objectives in Windows Server Environments Executive Summary TechAdvisory.org SME Reports sponsored by D-Net is your partner
Servervirualisierung mit Citrix XenServer
Servervirualisierung mit Citrix XenServer Paul Murray, Senior Systems Engineer, MSG EMEA Citrix Systems International GmbH [email protected] Virtualization Wave is Just Beginning Only 6% of x86
Server-Hosted Virtual Desktop Infrastructure (VDI)
White Paper Server-Hosted Virtual Desktop Infrastructure (VDI) The Future of Desktop Computing 2007 Virtual Iron Software, Inc. -1- April 14, 2007 Introduction With the widespread adoption of personal
Data Center Optimization. Disaster Recovery
Data Center Optimization Disaster Recovery Presentation Overview Introduction to PlateSpin PlateSpin Products and Solutions Overview The Current State of Disaster Recovery Planning Comparing DR Alternatives
Develop an intelligent disaster recovery solution with cloud technologies
Develop an intelligent disaster recovery solution with cloud technologies IBM experts share their insight on how cloud technologies can help restore IT operations more quickly, reliably and cost-effectively
Migrating from Unix to Oracle on Linux. Sponsored by Red Hat. An Oracle and Red Hat White Paper September 2003
Migrating from Unix to Oracle on Linux Sponsored by Red Hat An Oracle and Red Hat White Paper September 2003 Migrating from Unix to Oracle on Linux Executive Overview... 3 Unbreakable Linux and Low-Cost
An introduction to disaster recovery. And how DrAAS from I.R.I.S. Ondit can help!
An introduction to disaster recovery And how DrAAS from I.R.I.S. Ondit can help! Events That Impact Information Availability Events that require a data center move: Fewer than 1% of occurrences Natural
Using Converged Infrastructure to Enable Rapid, Cost-Effective Private Cloud Deployments
Sponsored by: VCE Authors: Richard L. Villars Matthew Marden June 2014 Business Value Highlights Customers using Vblock Systems as a platform for deploying private cloud workloads are realizing significant
MOVING TO THE CLOUD: Understanding the Total Cost of Ownership
MOVING TO THE CLOUD: Understanding the Total Cost of Ownership The most significant cost of owning and managing software applications is tied up in operating and maintaining the software, along with the
Designing Database Solutions for Microsoft SQL Server 2012
Course 20465A: Designing Database Solutions for Microsoft SQL Server 2012 Length: Audience(s): 5 Days Level: 300 IT Professionals Technology: Microsoft SQL Server 2012 Type: Delivery Method: Course Instructor-led