1 Msschusetts Deprtin ent of Tritsporttion High wy Division Agreement Amount Rnge: $500,000 nd up Originting Office: Utilities 1Bond Agreement Agreement Type: Municipl Ermrk Project/Loction: ActonBruce Freemn Ril Tril Vendor/Prty Nme: Town of Acton Vendor/Prty Address: 472 Min Street Originl Mx. Obligtion: Acton, MA $ ompletion Dte/Durtion: 6/30/2015 (9 2i )O I Federl Aid Number: STP002S Description: Attched re two (2) copies of Agreement Number in the mount of $1,431, between the MssDOT, nd the Town of Acton (cting s the led community), reltive to the design nd upgrding of the rodwy network ssocited with sid project. The NonFederl Aid portion in the mount of $1,031, will be funded through 100% Stte Funds:NFA pitl Funds. The Federl Aid portion in the mount of $400, ws pproved by the FHWA on June 10, Following pprovl, one (1) copy should remin in the files of MssDOT nd one (I) copy should be forwrded to: Town of Acton 472 Min Street Acton, MA NTP Dte: Agreement #: Project ID: , Attention: Steven LedouxTown Mnger GRJker cc: Utilities, onstruction, District 3 Stte Aid Kti Murphy, Project Mngement Appr?ved By: ATIN HIEF ENGINEER Dte 9,QeccccL ot n Generl ounsel Dte 7 ATING HIGHWAY ADMINISTRATOR Dte DOT AWARD Secretry/EO Item Number: 13 Dte: Dte

2 Dovl L. Ptrick, Governor Timothy P Murry, Lt. Governor Jeffrey 8. Mulln, Secrerry & EO Frnk Depol, Acting Administrtor AGREEMENT NOTIE TO PROEED t)jmssdot 4tJ Msschusetts Deprtment of Trnsporttion Highwy Division June 29, 2011 Town of Acton 472 Min Street Acton, MA Agreement Number: Action Item #: Action Item Dte: June 29, 2011 Der Steven Ledoux: Enclosed is signed copy of your greement between the Msschusetts Deprtment of Trnsporttion, Highwy Division nd Town of Acton, reltive to n greement in the mount of $1,431, with regrds to the design nd upgrding of the rodwy project on the Bruce Freemn Ril Tril in Acton. In ccordnce with the terms of this greement, you re hereby notified to commence work on June 27, This work is scheduled to be completed on June 30, Thnk ou, Tny M. Brros Director of ontrcts & Records TMB!lnc cc: FHWA Fiscl ontrcts & Records EMil: Guy Rezendes, Utilities Andrew Nunes, onstruction Suzette unh, D3 onstruction Mohmed Zwhreh, D3 onstruction Dvid Mvlott. D3 onstruction Michel Hrtnett, 03 onstruction Thoms Emerick, D3 DUE Dvid Shedd, Project Mngement Kti Murphy, D3 Stte Aid Leding the Ntion in Trnsporttion Excellence Ten Prk Plz, Suite 4160, Boston, MA , TDD: Tel: 6 I w.mss. gov/mssdo

3 ,_ Dte PrintTitle: B/fling EMilAddress: Redisffibute Rte urrent OMMONWEALTH OF MASSAHUSETTS STANDARD ONTRAT FORM / This torn to be used for New ontrcts nd ont,ctarnendments/renewts. is jointly issued nd pubflshed by the Executve Office for Adnrinislrtion nd Finnce MED. the Office of the omofrouer(tr) nd the Opertionl Services DMsionj0Oi for use by ll ommonwelth Deprthients. Any chnges to the officil printed lnguge of this form shll be void. Additionl nonconflicting terms my be dded by Attchment. ontrctors should only complete sections mrked with 4. For Instructions nd hyperlinks (itlics), plese view this form t: ww.mssgoviosc under Guidnce For Vendors. Forms or t w.vw.mssgoiilosd under OSD Forms. 4ontrctorleolNme(nd dm): TOWN OFATON DeorfrnentMMARS Aloh çde nd Nme: MssDOT HIGHWAY DIVISON 4LeolAddress (from W9): 472 MAIN ST. ATON, MA Business Mllimo Address: 10 PARK PLAZA ROOM 6340, BOSTON, MA Pymenl Remittnce Address (trom W9): SAME AS ABOVE Address (it different): 4 ontrct Mnger STEVEN LEDOUXntrd Mnger GUY REZENDES 4 EMilAddress: Phone: 4 Fx: tiff: tstte of Incorport/on (if corportion) or NIA : N/A guy.rezendes stte.m.us Phone: Fx: J fly: MMARS Doc ID(s): TDOT.6433INTFOOXO201lA Vendor ode: AD/ol RFRProcurement or Other ID Number (if pplicble): MMARS Object ode: N21 Accounti sl Funding ontrct X NEW ONTRAT ONTRATAMENDMENT/RENEWAL OMPENSATION (heck only one): XTotl Mximum Ob!iotion of this ontrct $ 1431, ENTER URRENTQNTRAT START nd END DATES (priorto mendment) ontrct (Attch detiis of rte(s) units nd ny clcultions): urrent Strt Dte: End Dte: The following OMMONWEALTH TERMS AND ONDITIONS OMPENSATION: for this ontrct (heck Either, No ompenstion hng&; Mximum Obligtion or?te hs been executed nd filed with TR (heck only one): chnge. ATTAH Amended Scope nd Budgetto supportamendment.) cmrnonwelth Terms And onditions NO ompenstion hnge (Skip to OTHER section below nd select chnge) Terms And onditions ForHumn And Socil Servtes Budget Line Items (No Mnium Obligtion hnge) Mximum Obton hnge. PROUREMENT OR EXEPTION TYPE (heck one opt/on only): ) unenttotl ontrct Mximum Obligtion: $... Single Deprtment ProcurementiSingle Deprtment User ontrct ITotl onlrcl Mximum Obligtion, including ll prior mendments). Single Deprtment Procurement/Multiple Deprtment User ontrct b) Amendment Amount ( + or ): $ Multiple Deprtment Procurement/Limited Deprtment User ontrct c) NEW TOTAL ONTRAT MAXIMUM OBLIGATION: $ Sttewide ontrct (050 or n OSDdesignted Deprtment) Grnt(s defined by 615 MR 200) hnges to Rte ontrct Emergency ontrct (ttch justifiction) OTHER: (heck option, explin under Briel Description below, nd ttch documenttion,) ontrct Employee (omplete Employment Sttus Form) Amend Durtion Only (No ompenstion or Performnce hnge) ollective Purchse (ttch OSD pprovl) Scope of ServiceslPerformnce Only (no budget impct.) Legisltive/Legl Exemption (ttch uthorizing lnguge) ontrct (Temporry Extension to complete new Procurement) Other (Specify nd ttch documenttion): Other (Describe Detils nd Attch documenttion): ANTIIPATED START DATE: (0 &flt ( fenrerthedreontto ANTIIPATED STARTDATE: ler.wrtheotekner drnenl Ot4igtcns my begin. Review eitfict:on for Effective Dte Below prior to entiy ) Oblgtions my be in. Review efl,f:ctor, In Effectve O:e Bei,w For to entry ONTRAT END DATE: JUNE 30, 2015 NEW ONTRAT END DATE: 4PROMPTPAYMENTDISOUNTS. ontictor hs greed to the following Prompt Py Discounts for the listed Pyment Issue Dtes. See Promot Pyment Discount Policy: _% Within 10 Dys_ % Within 15 Dys_ % Within 20 Dys _% Within 30 Dys OR, he& off the following if: ontrctor either dims hrdship, or chooses not to provide PPD, or compenstion is not subject to prompt py discounts (grnts, noncommodity or nonserve compenstion) BRIEF DESRIPTION OF ONTRAT PERFORMANE OR REASON FOR AMENDMENT(Reference to ttchments is insufficient): THE TOWN OFATON (ATING AS THE LEAD OMMUNITY W/WESTFORD ARLISLE & ONORD) HAS PROURED THE SERVIES OF THE ONSULTING FIRM OF GREENMAN PETERSON, IN. (GPI) TO REDESIGN AND UPGRADE THE ROAD WAYNETWORK ASSOIA TED WITH THE BRUE FREEMAN TRAIL (PHASE 2A & 2) DESIGN PROJET. ( & ) ERTIFIATIONS Notwithstnding verbl orother representtions by the prties or n eriier Strt dte listed bove the Effective Dte of this ontrct oramendment shll be the ltest dte this ontrct or Amendment hs been executed by n uthorized signtory of the ontrctor the Deprtment, lter ontrct or Amendment Strt Dte specified bove, or the dte of ny required pprovls By executing this ontrct/amendment the ontrctor mkes under the pins nd penlties of pegury ll certifictions required under the ttched ontrctor ertifictions nd hs provided ll required documenttion noted with or shll provide ny required documenttion upon request nd the ontrctor grees tht ll terms goveming performnce of this ontrct nd doing business in Msschusetts re ttched or incorported by reference herein including the terms of the pplicble ommonwelth Terms nd onditions vilble t iww.mss.gov/osc under Guidnce For Vendors. Forms ort wwr.v.mss.gov/osd under 050 Forms, the terms of the ttched Instructions, the Request for Response (RFR), solicittion (if pplicble) or other uthoriztion, the ontrctots response to the RFR or solicittion (if pplicble), nd ny dditionl negotited performnce or budget provisions. The terms of this ontrct shll survive its termintion for the purpose of resolving ny clim, dispute or other ontrct cton, or for effectuting ny negotited representtions nd wrrnties THE PARTIES HEREBY ALSO ERTIFY ThAT (heck one option only): 1. Xthe ontrctor hs NOT incurred ny obiigtions triggering pyment obligtion for dtes pdpr to the Effective Dte of this ontrct or Amendment OR 2. ny obligtions incurred by the ontrctor gdto the Effective Dte of this ontrct oramendment (forwhich pyment obligtion hs been triggered) re intended to be prt of this ontrct/amendment nd shll be considered finl Settlement nd Relese of these obligtions which re incorported herein, nd upon pyment of these obligtions, the ontrctor forever releses the ommonwelth from ny further clims relted to these obligtions. AUTHORIZING SIGN R OR THE ONTRATOR: / AUTHORIZING SIGNATURE FOR THE DEPARTMENT: 4/ X:. + Print Nme: PrintTifle: 4 re n Must Be H ndjiritte At Time of ignture) Dte: (Signture nd Dte Must Be Hndwritten At Time of Signture) Print Nme: FRANIS A. DEPAOLA, PE. ATING HIGHWAY ADMINISTRATOR 7&,i (Issued 6/87/2007) Pge 1 of 1.

4 OMMONWEALTH OF MASSAHUSETTS ONTRATOR AUTHORIZED SIGNATORY LISTING Issued My _. ONTRATOR LEGAL NAME: ONTRATOR VENDORJUSTOMER ODE: Or INSTRUTIONS: Any ontrctor (other thn soleproprietor or n individul contrctor) must provide listing of individuls who re uthorized s legl representtives of the ontrctor who cn sign contrcts nd other leglly binding documents relted to the contrct on the ontrctor s behlf In ddition to this listing, ny stte deprtment my require dditionl proof of uthority to sign contrcts on behlf of the ontrctor, or proof of uthenticity of signture ( notrized signture tht the Deprtment cn use to veri1 tht the signture nd dte tht pper on the ontrct or other legl document ws ctully mde by the ontrctor s uthorized signtory, nd not by representtive, designee or other individul.) NOTIE: Acceptnce of ny pyment under contrct or Grnt shlt operte s wiver of ny defense by the ontrctor chllenging the existence of vlid ontrct due to n lleged lck of ctul uthority to execute the doe unient by the signtory. For privcy purposes DO NOT ATTAH ny documenttion contining personl informtion, such s bnk ccount numbers, socil security numbers, driver s licenses, home ddresses, socil security crds or ny other personlly identifible informtion tht you do not wnt relesed s prt of public record. The ommonwelth reserves the right to publish the nmes nd titles of uthorized signtories of contrctors AUTHORIZED SIGNATORY NAME TITLE S1cicw / 1tt.),lj /2c,rcf f_i I certif& tht I m the President, hief Executive Officer, hief Fiscl Officer, orporte lerk or Legl ounsel for the ontrctor nd s n uthorized officer of the ontrctor I tht the nmes of the individuls identified on this listing re current s of the dte of execution below nd tht these individuls re uthorized to sign contrcts nd other leglly binding documents relted to contrcts with the ommonwelth of Msschusetts on behlf of the ontrctor I understnd nd gree tht the ontrctor hs duty to ensure tht this listing is immeditely updted nd communicted to ny stte deprtment with which the ontrctor does business whenever the uthorized signtories bove retire, re otherwise terminted from the ontrctor s employ, hve their onsibilittes chnged resulting in their no longer being uthorized to sign contrcts with the ommonwe r whe er new signtories re designted. certi Signture Dte: Title: Fx: Jzw /ZZti.._ 9% Telephone: Emil: 73 S 9o22c& J) S kl& e/on [Listing cn not be ccepted without ll of this informtion completed.] A copy of this listing must be ttched to the record copy of contrct filed with the deprtment.

5 IW.. OMMONWEALTH OF MASSAHUSETTS ONTRATOR AUTHORIZED SIGNATORY LISTING Issued My 2004 ONTRATOR LEGAL NAME: ONTRATOR VENDORJUSTOMER ODE: PROOF OF AUTHENTIATION OF SIGNATURE This pge is optionl nd is vilble for deprtment to uthenticte contrct signtures. It is recommended tht Deprtments obtin uthentiction of signture for the signtory who submits the ontrctor Authorized Listing This Section MUST be completed by the ontrctor Authorized Signtory in presence of notry. Signtory s full legl nme (print or type): 54ne Title: J4k.iJ 1J Leo jlzk_t< Signture s it will pper contrct or other document (omplete only in presence of notry): AUTHENTIATED BY NOTARY OR ORPORATE LERK (PIK ONLY ONE) AS FOLLOWS: I, the sign re of the fcementioned signtory bove nd I/o My commission expires on: JcMx 12, 2&) 2 I W Notry verified (NOTARY) s notry public certi& tht the individuls identity on this dte: MAUSA ANN HABERM?LN Public ommonweflh ol Msschusoj[s My ommission Expires Jnury12, 2012 I, (ORPORATE LERK) certi tht I 1 witnessed AFFIX NOTARY SEAL withessed the signture of the forementionçd signtory bove, tht I verified the individul s identity nd confirm the individul s uthority s n uthorized signtory for the ontrctor on this dte: 20 AFFIX ORPORATE SEAL

6 Agreement Number Dte: FF1 WA Trnsporttion Enhncement funding & Msschusetts Stte pitol Funds MUNIIPALITY: ATON (LEAD OMMUNITY) PROJET: BRUE FREEMAN TRAIL (PHASE 2A nd 2) DESIGN AGREEMENT This Agreement mde nd entered into by nd between the MASSAHUSETTS DEPARTMENT OF TRANSPORTATION, hereinfter clled MssDOT, nd the MUNIIPALITY OF ATON (cting s the Led ommunity) (hereinfter clled the MUNIIPALITY ) nd WHEREAS, the MUNIIPALITY hs procured the services of the consulting firm of GREENMAN PETERSON, IN (GPI). (hereinfter clled the DESIGN ENGINEER ) to redesign nd upgrde the rodwy network ssocited with the BRUE FREEMAN RAIL TRAIL (PHASE 2) DESIGN PROJET. WHEREAS, MssDOT hs prequlified the DESIGN ENGINEER to perform the required work through its Architects & Engineers Review Bord, see Exhibit, nd WHEREAS, A PORTION OF the DESIGN PROJET is to be finnced in prt by the Federl Government through its Deprtment of Trnsportt&on (hereinfter clled the FHWA ), nd WHEREAS, the eligibility of Federl prticiption hs been estblished in ccordnce with FHWA Trnsporttion Enhncement funds AND Msschusetts Stte pitol funding. 1

7 NOW THEREFORE, in considertion of the premises nd mutully dependnt covennts herein contined, it is hereby greed between the prties hereto s follows: DIVISION OF WORK All necessry lbor, mterils, equipment nd other services shll be furnished by the MUNIIPALITY, through its DESIGN ENGINEER, who shll develop sid rodwy project to Finl Design Plns, Specifictions, nd Estimte (PS&E) The MUNIIPALITY shll provide by its own DESIGN ENGINEER, ll plns, specifictions, contrct nd environmentl documents in ccordnce with the ttched Scope of Work, lbeled EXHIBIT A. All work done under this contrct shll be in conformnce with the Msschusetts Highwy Deprtment Stndrd Specifictions for Highwys nd Bridges dted 1988 nd the English Supplementl Specifictions dted December 11, 2002; the Stndrd Specil Provisions contined in this book, the 1977 onstruction Stndrds nd the Supplementl Drwings dted April 2003; the ltest edition of the Mnul on Uniform Trffic ontrol Devices with revisions; the 1990 Stndrd Drwings for Signs nd Supports; the 1968 Stndrd Drwings for Trffic Signls nd Highwy Lighting; the ltest edition of Americn Stndrd for Nursery Stock; the Plns nd these Specil Provisions, 521 MR Rules nd Regultions of the Architecturl Access Bord (AAB) nd Americns with Disbilities Act (ADA), ny nd ll stte or federl regultions, nd/or to the stisfction of MssDOT s hief Engineer. Any nd ll pprovls mde by MssDOT during the Project s design review shll not relieve the MUNIIPALITY s responsibility for design errors nd omissions s specified under this greement. 2

8 In ddition, ll work shll be done in ccordnce with the policies of MssDOT nd FHWA. The DESIGN ENGINEER s contrct with the MUNIIPALITY shll dhere to MssDOT s six Articles of the Stndrd Provisions for onsultnt ontrct, 1993 edition, s pplicble nd noted within the body of this greement, nd/or EXHIBIT D. In ddition, the sid MUNIIPALITY contrct shll dhere to the FHWA s 23 MR 172 Administrtion of Engineering nd Design Relted Service ontrcts. MssDOT shll review the DESIGN ENGINEER S work performnce t the pproprite stges to ensure tht ll design tsks re being met. MssDOT shll forwrd to FHWA ll design documents for review t these pproprite stges. Therefore, the MUNIIPALITY shll provide summry of the Workhours expedited by its DESIGN ENGINEER t the 25%, 75%, nd 100% design submissions to MssDOT for review nd pprovl. The MUNIIPALITY shll not be llowed to proceed with the sid design contct beyond ech respective submissions, s described, until the MUNIIPALITY received written pprovl by MssDOT. The MUNIIPALITY shll obtin ny nd ll pplicble permits nd/or clernces required by locl, stte, nd federl gencies, unless otherwise directed by MssDOT. The MUNIIPALITY shll lso be responsible for obtining ll esements, property right interests nd/or right of wy pprisls needed for the construction, unless otherwise directed by MssDOT. The MUNIIPALITY shll lso provide, by its DESIGN ENGINEER, complete set of plns, specifictions, nd estimte for the Project which shll be dvertised by MssDOT. Any dditionl funds required for the sid rodwy project shll be the responsibility of the MUNIIPALITY. 3.

9 In the event tht the is necessry, the request for n MUNIIPALITY extension termintion dte specified in its bsolute discretion, MUNIIPALITY on no my believes n grees to submit to lter thn 60 extension of time MssDOT the ttched signture pge. written dys prior to the MssDOT, gree to grnt sid request for extension of time if it finds tht sufficient justifiction hs been provided by the MUNIIPALITY. n DIVISION OF EXPENSE The MUNIIPALITY OMMONWEALTH will reimburse the costs incurred to complete the $1,917, Given tht the is responsible to MUNIIPALITY PROJET. The MUNIIPALITY py for the 80% 20% shre. The of the ctul totl estimted cost is hs lredy spent $496,632 for survey nd Preliminry Engineering, therefore the will reimburse obligtion MUNIIPALITY. ws to reimbursement mount shll be up to, but not exceeding $1,431, This negotited between representtives of All costs incurred shll by borne the by the OMMONWEALTH. MUNIIPALITY. be Any pproved costs in OMMONWEALTH MssDOT nd by MssDOT nd mximum the prior bove this For MUNIIPALITY ll services to shll be net fee pyment method. Agreement re indicted in be performed under this Agreement, the compensted in ccordnce with the costs plus The mximum mounts EXHIBIT B. to be pid under this Extr result of shll be ny MUNIIPALITY. work, chnge orders, dditionl items tht errors, omissions, or t the request of the considered non prticipting cqsts nd shll my be rise s MUNIIPALITY borne by the

10 The Workhour Estimte is ttched hereto nd mde prt hereof s EXHIBIT B. The DESIGN ENGINEER shll insure tht the compenstion provisions nd cost principls in Federl Acquisition Regultion 31 (Technicl Reference 48 FR, hpter 1, Prt 31 re dhered to nd re referenced in contrcts with direct expense subconsultnts. The MssDOT Audit Opertions hs performed prequlifiction udit on the DESIGN ENGINEER in ccordnce with 23 FR, prt 172. See EXHIBIT E. The overhed rte, s indicted in EXHIBIT B on llowble indirect costs shll pply notwithstnding, ny udit which indictes tht higher indirect costs were ctully incurred. The following provisions shll supersede the reltive prgrphs of Article VI of the Stndrd Provisions ( EXHIBIT D ) In no event shll the mximum mount to be reimbursed to the MUNIIPALITY under thisr Agreement exceed the mximum pyment figures indicted in EXHIBIT B, finl udit results not withstnding, except by greement of ll prties. The mximum limit of $90,000 for slries llowed s chrge to indirect costs, the mximum overhed rte of 135%, nd the indirect costs dditive rte of 10% re not pplicble to this Agreement MssDOT s current policy to limit the hourly rte for engineering nd technicl employees is mximum of $51.00 per hour. The slries re cpped t the current rtes listed within this greement nd cnnot be exceeded without the pprovl of MssDOT. No ADD mchine time chrges for computerized drfting or design shll be llowed under direct expenses. No mrkup will be llowed on Direct Expenses.

11 Direct Expenses in excess of the stted limit or mended limit, s well s ny costs which re directly ttributble to this ontrct tht re not pre pproved in writing s direct expenses, shll be considered to be unllocted costs nd shll not be chrged to overhed. Reimbursble direct expenses for privte milege, mels, nd lodging shll conform with the following limits: 1. Privte Milege In ccordnce with present compny policy nd the Federl Trvel Regultions, but limited to mximum of $0.40 per mile. Necessry tolls nd prking fees will be considered included under sid milege limit. 2. Mels In ccordnce with present compny policy, nd the Federl Trvel Regultions, but limited to brekfst $5.00 mx, lunch $10.00 mx, nd dinner $20.00 mx, except tht the cost of mels relted to trips mde in the course of norml work dy shll not be reimbursed. 3. Lodging Actul costs in ccordnce with present compny policy, nd the Federl Trvel Regultions, but not to exceed $ per dy,, only when the work performed is greter thn 50 miles from the onsultnt s office or sub consultnt s office, nd only when overnight lodging is required. All reimbursble expenses re to be ccompnied by receipt. The Administrtion costs incurred by the MUNIIPALITY for the sid rodwy project re not eligible for reimbursement. 6

12 It is understood tht rtes nd cost components used in the estimte re not intended for use s reimbursble billing rtes or costs in lieu of ctul costs supported by the MUNIIPALITY s ccounting records. Federl prticiption ws received in ccordnce with the Federl Aid Highwy Progrm listed within the tlog of Federl Domestic Assistnce, identifying number (Highwy Plnning nd onstruction). The MUNIIPALITY is sub recipient of federl wrd nd is subject to the Single Audit Act Amendments of 1996, section 7502 (f) (2) The totl of pyments mde shll be djusted to conform to finl udit. The totl udited mount shll not exceed the mximum fee. Interim udits my be undertken t ny time. osts will be determined in ccordnce with Federl Acquisition Regultions (FAR). Towrd complince with the Single Audit Act Amendments of 1996, the MUNIIPALITY shll engge the services of n independent public ccountnt to conduct udits nd issue udit reports in ccordnce with 0MB circulr A133: Audits of Sttes, Locl Governments nd Non Profit Orgniztions. MssDOT reserves the right to reject IPA udit findings nd to perform its own udit nd issue its udit reports insofr s this greement is concerned. 7

13 THOD OF PAY NT TO TH MUNIIPALITY Section 1. During the course of the PROJET, the MUNIIPALITY my present monthly progress bills of the incurred costs for pprovl nd pyment by MssDOT. Section 2. Upon the completion of the PROJET to the stisfction of MssDOT nd the MUNIIPALITY, written notifiction shll be given to the District Highwy Director of MessDOT by the MUNIIPALITY tht sid work hs been completed nd, within 120 dys thereof, the MUNIIPALITY will submit to MssDOT finl detiled bill (in quintuplicte) s required by the FHWA, nd finl settlement will then be mde between the OMMONWE.LTH nd the MUNIIPALITY. In ddition to the finl detiled bill, the MUNIIPALITY my forwrd to MssDOT ll clcultions, plns, nd environmentl documents nd other dt necessry to complete the PROJET. This informtion my be submitted in n electronic formt comptible with MssDOT s needs. Section 3. All reimbursble chrges in connection with this Agreement will be subject to udit by representtives of MssDOT nd/or ERWA; nd the MUNIIPALITY will retin ll records nd documents pertining to the Agreement chrges until such udit is completed or until written pprovl to destroy the records is given by MssDOT. 8

14 The Finnce, Governor or his designee, the Secretry of Administrtion nd resonble times records nd the Stte Auditor or his designee shll hve the right t nd upon nd resonble notice to exmine the books, other complictions of dt of the pertin to the performnce of the provisions Agreement. nd MUNIIPALITY which requirements of this FUTURE MAINTE1ThNE The MUNIIPALITY mintennce nd the costs thereof. shll continue sole responsibility for the upkeep of ll property ssocited with the PROJET nd MISELLANEOUS shll not This greement shll not MUNIIPALITY commence until hs received n be MssDOT considered fully executed, signs this greement officil Notice to Proceed nd work nd from MssDOT. the EXPIRATION DATE This greement is set to expire of time is needed beyond this dte, with minimum 60 dy The on June 30, If n extension request is needed in writing dvnce notice before the expirtion dte. request will need to ddress the current expirtion dte, the proposed expirtion dte An nd ny other informtion deemed necessry. extension for this greement fter this dte will not grnted nd will be terminted. be 9

15 MASSA HUSETTS DEPAR TMENT OF TRANSPOR TA HON HIGHWA YDIVISION INTER OFFIE MEMORANDUM TO: Guy Rezendes, P.R. Utility nd Agreements Engineer FROM: Mrie J. Director of Project Mngement DATE: RE: June24,2010 ATON, WESTFORD, ARLISLE AND ONORD RAIL TRAILPHASE 2A AND PHASE 2 PROJET No & BRUE FREEMAN Submission of onsultnt Scope of Vork nd Work Hour Estimte using Enhncement Funds nd pitol Funds Project Mngement Section is in receipt of the consultnt scope of work nd work hours estimte lobe used with enhncement funds ($500,000) nd pitl Funds ($931,500). This contrct will provide for full P.S.& E. including construction phse services. Tins project ws pproved by the Project Review ommittee on November 16, 2007 (Proj. No ) nd November 24, 2008 (Proj.No ) nd involves n 8.5 mile multi use til through the Towns of Acton, Westford. rlisle nd oncord. The tril will be constructed primrily on n bndoned ril bed nd includes construction, replcement or rehbilittion of 10 bridges. The Town of Acton is cting s the representtive for the project on ll finncil mtters nd is designted s the led community. Attched is the Intermunicipl Agreement signed by Acton, Westford, Acton nd oncord. The totl cost to design the project is $1,917,432. This mount reflects $496,632 lredy expended by the municiplities for survey nd preliminry engineering. This mount exceeds 20% of the entire cost of the design nd stisfies the locl 20% locl mtch. The costs previously expended re shown in the ttched document. The Project Mngement Section hs reviewed the consultnt scope of work nd work hours estimte for design. It is our opinion tht the scope nd estimte re resonble for the proposed improvements identified nd reflect the intention of the flmding. The Project Mngement Section recommends tht design greement for totl of$1,431,500 (combined $500,000 nd ) be drfted. The finlized Scope of Work nd Workhour Estimte re ttched. If you hve ny questions, plese cll the Project Mnger, Dvid Shedd t extension XHJBJTA

16 Plnning Deprtment TOWN OF ATON 472 Min Street Acton, Msschusetts Telephone (978) Fx (978) plnningiwctonm.gov June 22, 2010 Dvid 0. Shedd, PiE. Project Mnger MssDOT/Highwy Division 10 Prk Plz, Suite 6340 Boston, MA Re: Bruce Freemn Ril Tril Phses 2A nd 2 Locl expense todte for survey nd design Dvid: The Towns of Acton, oncord, rlisle, nd Westford hve so fr spent the following mounts for survey nd design of the Bruce Freemn Ril Tril Phses 2A nd 2. Essentilly, these expenditures brought the design of these phses to the current 25% design stge. Acton $ 242,520 oncord $ 215,000 rlisle S 19,112 Westford $ 20,000 Totl $ 496,632 Plese let me know if need ny dditionl informtion. Regrds, Rolnd Brtl, AIP Plnning Director I\plnningprojecis\ril trils bfri.msshighwy\iocl design expenses s ofjune 2010 doe EXHIBIT A

17 OMMONWEALTH OF MASSAHUSETTS HIGHWAY DEPARTMENT 10 Prk Plz, Boston, MA STANDARDIZED SOPE OF SERVIES AND WORK HOUR ESTIMATE FORMS FOR ONSULTANT SERVIES FINAL DESIGN OF BRUE FREEMAN RAIL TRAIL PHASES 2A AND 2 ATONARLISLEWESTFORDONORD My 26, 2010 EXHIBIT A

18 No No OMMONWEALTH OF MASSAHUSETTS HIGHWAY DEPARTMENT GENERAL The Bruce Freemn Ril Tril (BFRT) corridor extends pproximtely Frminghm nd Lowell rilrod corridor nd Representtive Bruce Freemn. Phse 2A of the BFRT begins t the Phse 1 is 25 miles long the nmed in memory of former Stte pproximtely 4.8 miles in length nd is terminus t Route 225 in Westford nd continues southerly through rlisle nd Acton ending t Acton Indoor Sports long the former Penn entrl/old olon) Rilrod rightofwy. Phse 2 of the BFRT pproximtely 2.5 miles in length nd runs from the Sudbury Town line (north of Route 117) to point southest of ommonwelth Avenue in the Town of oncord. The section of the BFRT from ommonwelth Avenue to the Acton town ddressed s prt of the oncord Rotry project. line will be This Scope of Work hs been prepred bsed on the stisfctory review nd pprovl of the 25% plns for Phse 2 submitted by the Town of oncord to MssDOT nd the Design Public Hering held on 6/25/2009. It studies, trffic counts, ADD files etc. will be provided to GPI. is ssumed tht ll previously completed plns, documents, SETION 150 ENVIRONMENTAL 152 Historic/Archeology Federl Section 106 nd Stte hpter 254 Phse 2A effort is nticipted, Phse 2 Historic review will be completed by MssDOT ulturl Resources Unit. GPI will be vilble for consulttion with RU stff. 157 NEPA tegoricl Exclusion (E) Phse 2A effort is nticipted. Prepre tegoricl Exclusion (E) Determintion hecklist for FederlAid ccordnce with the Progrcunnztic Agreement For Approvl Of tegoricl Exclusions Between The Federl Higlni y Administrtion And The Msschusetts Highwy Phse 2 Actions in Deprtment. dted My (1987). 17, 2005, nd Federl Highwy Administrtion Regultion 23.F.R. 163 MEPA Environmentl Notifiction Form (ENF) Prepre n ENF for Phse 2A s necessry, in ccordnce Regultions 301 MR nd public notice; responses session. nd Phse 2 nd ssocited correspondence to vrious gencies, with the Msschusetts Environmentl Policy Act nd MEPA Prepre ssocited filing ttchments, such necessry; nd ttend one (1) public scoping to comments, s s distribution list Stndrdized Scope nd Workhour Estimte Rev 4/2008 EXHIBIT Pge2ofl9 A

19 OMMONWEALTH OF MASSAHUSETTS HIGHWAY DEPARTMENT 168 Msschusetts Endngered Species Act (MESA) nd Notice of Intent (NOT) Stremlined Review Phse 2A No effort is nticipted. Phse 2 No effort is nticipted. This project will require dditionl coordintion with NHESP for being in hbitt with number of species. This dditionl coordintion will be completed by MssDOT. Any informtion nd/or required in the ontrct will be provided by MssDOT to GPI. 170 USAE Section 404 Progrmmtic Generl Permit (PGP) Phse 2A nd 2 No effort is nticipted. letter prepred by the Wetlnds Unit. MssDOT will submit the NOT filing with cover 176 Wetlnd Resource Are Delinetion Phse 2A nd 2 No effort is nticipted. 177 VPA Abbrevited Notice of Resource Are Determintion (ANRAD) No effort is nticipted. 179 WPA Notice of Intent (NOT) Phse 2A Prepre nd submit n NOl to the Acton nd Westford onservtion ommissions in ccordnce with the Msschusetts Wetlnds Protection Act. Include the preprtion of ll ssocited forms nd bckup documenttion; permit plns, coordintion during review, site wlk, nd ttending four (4) conservtion commission herings, 2 per town. Phse 2 Prepre nd submit n NOl to the oncord onservtion ommission in ccordnce with the Msschusetts Wetlnds Protection Act. Include the preprtion of ll ssocited forms nd bckup documenttion; permit plns, coordintion during review, site wlk, nd ttending two (2) conservtion commission herings. 182 Wter Qulity ertifiction Phse 2A nd Phse 2 No effort is nticipted. It is ssumed tht the Order of onditions will serve s the Wter Qulity ertificte. Stndrdized Scope nd Workhour Estimte Pge 3 of 19 Rev 4/2008 EXHIBIT

20 OMMONWEALTH OF MASSAHUSETTS HIGHWAY DEPARTMENT 186 oordintion nd Liison Phse 2A Include scheduling nd prticipting in environmentl two (2) meetings with MssDOT, ssisting in expediting the permitting process, nd compiling nd mintining environmentl files nd records. Phse 2 Include scheduling nd prticipting in environmentl two (2) meetings with MssDOT. ssisting in expediting the permitting process, nd compiling nd mintining environmentl files nd records. SETION 220 DESIGN EXEPTION REPORT A Design Exception Report is required for Phse 2 of the BFRT in oncord. No effort is nticipted for Phse 2A. The tsks below pply to Phse 2 only. 221 Evlute the 13 ontrolling riteri ompre the recommended vlues of the 13 controlling criteri of hpter 2 of the Guidebook to the proposed vlues. Revisit those fetures requiring design exception nd work towrd developing design tht is consistent with current recommended design stndrds. 222 Perform Incrementl Evlution For ech of the controlling criteri tht do not meet the current recommended design criteri, prepre summry of impcts resulting from implementing the desirble, minimum nd the proposed designs. Also include summry of impcts of designs in the rnge between the minimum nd the proposed designs. Include right of wy impcts, impcts to trees, wlls, wetlnd resource res, constructions costs nd other impcts which influence the selected design. 223 Prepre Nrrtive/Report Prepre Design Exception Report including nrrtive, trffic nlysis, typicl sections, photogrphs, nd summry of impcts. SETION 350 DESIGN PUBLI HEARING It is ssumed tht two seprte public herings will be held. The Phse 2A Public Hering will be held in Acton nd the Phse 2 Public Hering will be held in oncord. Both herings will require the sme effort. The tsks below pply to both Phse 2A nd Phse 2. Stndrdized Scope nd Workhour Estimte Rev 4/2008 E I? A.

21 OMMONWEALTH OF MASSAHUSETTS HIGHWAY DEPARTMENT 352 Hering Preprtion Prepre the grphics nd other visul ids per the negotited scope of services to disply t the public hering. 353 Design Public Hering Attend Design Public Hering, present the project to the public nd respond to questions. Assist MssDOT in prepring written responses to letters received from concerned individuls s result of the hering. SETION % HIGHWAY DESIGN SUBMISSION It is ssumed tht the Phse 2A nd Phse 2 submissions will remin independent nd will not be combined. The tsks below pply to both Phses 2A nd Response to 25% omments Prepre forml written response to ll comments received regrding the 25% review nd ddress revisions stemming from the Design Public Hering tht MssDOT nd the onsultnt deem necessry. 402 Field Reconnissnce onduct field review of the proposed project interfce with djcent properties. streets, drives, dringe, utilities, wetlnds, etc. Define dditionl survey needs, if needed. 403 Meetings Liison nd oordintion Attend four (4) meetings for Phse 2A nd three (3) meetings for Phse 2 nd provide the liison necessry to dvnce the design of project. oordinte nd ttend meetings with MssDOT s Boston nd District Offices, community representtives, plnning gencies, s determined in the project scoping process. Provide MssDOT with minutes of the meetings. 404 Utility oordintion ontct utility compnies ffected by the proposed work. Discuss project impcts nd note the loctions of relocted utilities (poles, pipes, etc.) on the plns. Include estimte nd specil provisions for publicly owned utility work tht is to be performed by the construction contrctor. Stndrdized Scope nd Workhour Estimte Pge 5 of 19 Rev 4/2008 EXHIBIT A.

22 OMMONWEALTH OF MASSAHUSETTS HIGHWAY DEPARTMENT 405 Finl Horizontl Design Geometries Adjust the horizontl geometry bsed on the 25% review comments nd comments stemming from the Design Public Hering. Plns must clerly show ll spects of the horizontl geometry, including curve components such s Point of urvture (P), Rdius (R). DELTA, Length of urve (L), Tngent (T) nd Point of Tngency (PT) long with description of rodwy widths. sttion equtions nd horizontl offsets bet veen survey bseline nd design centerline. 406 Finl Verticl Design Geometrics Adjust verticl geometry bsed on 25% review comments nd comments stemming from the Design Public Hering. Plns must clerly show ll pertinent spects of the verticl geometry including Stopping Sight Distnce (SSD). Pssing Sight Distnce (PSD), Grde 1 (GI). Grde 2 (G2). Length of Verticl urve (L), K (fctor), sttion nd elevtion of Point of Verticl urvture (PV), Point of Verticl Tngency (PVT) nd Point of Verticl Intersection (PVI). Profiles re to be prepred in ccordnce with the Guidebook. 407 Pvement Design Respond to Pvement Design Engineer s review comments nd prepre detiled pvement design with updted dt sheets, per the Guidebook. 408 Typicl ross Sections Finlize the typicl cross sections ensuring tht mterils nd dimensions re clerly lbeled in ccordnce with the proposed pvement structure pproved by the Pvement Mngement Section. 409 Plot ross Sections Adjust cross sections to ensure tht the slope limits nd tretments of ech cross section re crfted to suit the specific site loctions. Individul cross sections should be evluted regrding gurdril loctions, grvel box detil, py limits, nd the need for subdrins nd retining wlls. 410 Plot Proposed Lyout nd Esements Adjust the plns bsed on the limits estblish by the finl cross sections to ensure tht dequte right of wy is vilble to perform the work. Existing lyout lines, proposed ltertions nd ny temporry or permnent esements must be clerly lbeled. 411 onstruction Plns Prepre the onstruction Plns in ccordnce with the Guidebook. Ech item of work within the project limits must be clerly lbeled. Drwings must be formtted s described in the Guidebook. Stndrdized Scope nd Workhour Estimte Pge 6 of 19 Rev 4/2008 EXHIBIT.A

23 Phse Phse Phse OMMONWEALTH OF MASSAHUSETTS HIGHWAY DEPARTMENT 412 Grding nd Tie Plns Prepre grding nd tie plns s pplicble showing detiled informtion regrding proposed cun e geometry nd grdes. 413 Dringe nd Wter Supply Detils lerly show ll existing nd proposed dringe nd wter supply instlltions. The dringe nd wter supply design must ddress ll work required to ccommodte the proposed rodwy improvements. During the Project s design development, the pln presenttion of proposed dringe fcilities will show rim nd invert elevtions. These will be included in seprte ADD lyer, so tht they cn be frozen off in the PS&E documents. These elevtions shll not be shown on the finl plns. 414 Trffic Signs Identify loctions for ll wrning. regultory nd route mrker signs. Indicte on the construction plns the sttus of existing sign structures. 415 Guide Sign Design nd Overhed Directionl (0Th Elevtions NOT REQUIRED 416 Trffic Signls nd Pln Preprtion Include designs for trffic signl instlltions, supports, nd foundtions. Develop trffic signl specifictions. Finlize phsing detils nd prepre the trffic signl plns t the following intersection: Acton Rod (Route 27) t rlisle Rod (Route 225) Phse 2A Include design of Pssive Signl control t the following tril crossing loctions: Min Street (Route 27) 2A Min Street (Route 27) Phse 2A Brook Street Phse 2A oncord Rod Phse 2A Wetherbee Street Phse 2A Old Mrlboro Rod 2 Willims Rod 2 Stndrdized Scope nd Workhour Estimte Pge 7 of 19 Rev 4/2008 EXHIBIT A

24 OMMONWEALTH OF MASSAHUSETTS HIGHWAY DEPARTYENT 417 Pvement Mrkings nd Pln Preprtion Design nd lyout the rodwy pvement mrkings, stop lines, cross wlks, gore mrkings, etc. Prepre pvement mrking plns. 418 Trffic Mngement Finlize the construction stging. Prepre the temporry trffic control construction plns in ccordnce with the MUTD such tht sufficient informtion is provided to demonstrte fesible mens of constructing the project. The level of detil shll recognize tht the ctul trffic mngement pln implemented by the contrctor my vry from tht shown on the plns. 419 Highwy Lighting Plns nd Detils NOT REQUIRED 420 Lndscping nd Pln Preprtion Finlize plnting loctions nd species bsed on review comments. nd tbulte relevnt dt. Develop plnting schedules 421 Erosion ontrol Detil the sequencing, mteril plcement nd mesures to control the potentil dmge to djcent properties. wetlnds, bodies of wter. etc. Include erosion control mesures in the plns. 422 Miscellneous ontrct Plns Prepre miscellneous full size drwings for presenttion of the proposed project. These shll include the following miscellneous contrct plns, s required: Title Sheet, Index, Key Pln, Boring Plns, Boring Logs, Typicl Sections, nd Specil Detils. 423 Ountitv & ost Estimte Prepre detiled estimte bsed on the ltest edition of the Stndrd Nomenclture. heck tht every item the Method of Mesurement nd Bsis of Pyment described in the Stndrd Specifictions for Highwys nd Bridges including the ltest supplements nd the Stndrd Specil Provisions. of work shown on the plns hs py item. Prepre the estimte in ccordnce with 424 Specil Provisions Prepre drft specil provisions bsed on the ltest edition of the Stndrd Specifictions for Highwys nd Bridges nd Supplementl Specifictions, nd verify tht every item in the estimte tht is listed in the Stndrd Nomenclture with n sterisk (*) hs specil provision. Ensure tht specil provisions re drfted only when bsolutely necessry to describe specific or unique ctivity to be performed by the contrctor. Stndrdized Scope nd Workhour Estimte Pge 8 of 19 Rev 4/2008 EXHIBIT A

25 OMMONWEALTH OF MASSAHUSETTS HIGHWAY DEPARTMENT 425 onstructbilitv nd Qulity ontrol (Q) Reviews Perform n independent review of the project using n experienced engineer, who is not directly involved in the preprtion of the contrct documents. The review shll focus on the prcticlity of constructing the project bsed on ccess to site, equipment needs, mteril properties, etc. Also provide n overll review of the plns, specifictions nd estimte for conformity to the Guidebook, the Stndrd Specifictions for liighwys nd Bridges, the ltest Supplementl Specifictions, the Bridge Mnul, the onstruction nd Trffic Stndrd Detils, nd the ltest Engineering nd Policy Directives. 426 Submission heck List Prepre nd submit the 75% Design heck List. SETION % HIGHWAY DESIGN SUBMISSION It is ssumed tht the Phse 2A nd Phse 2 submissions will remin independent nd will not be combined. The tsks below pply to both Phses 2A nd Respond to 75% omments Prepre forml written response to ll comments received regrding the 75% review. Resolve ny further review comments. 452 Finlize Plns Prepre set of plns ddressing ll comments received from the 75% review. Ensure tht the ccordnce with hpter plns re cler nd re prepred in 2 of the Guidebook. 453 Finlize Specil Provisions Review the specil provisions to ensure tht the specil provisions do not duplicte those with respect to Division Bsis of Pyment for every item in order nd not mbiguous. I of the Stndrd Specifictions. Review the Method of Mesurement nd to ensure tht the specil provisions re clerly defined 454 Finlize Estimte Prepre clcultion book in ccordnce with hpter clcultions for ll items of work tht hve 18 of the Guidebook. Prepre py item. Identify ny nonprticipting work. Stndrdized Scope nd Workhour Estimte Pge Rev 4/2008 EXHIBIT A 9 of 19

26 OMMONWEALTH OF MASSAHUSETTS HIGHWAY DEPARTMENT 455 Qulity ontrol (Q) Review Perform n independent review of the project using n experienced engineer, who is not directly involved in the preprtion of the contrct documents to perform n independent review of the project. Refer to the MssDOT web site for the ltest edition of ll reference documents, Engineering Directives nd Policy Directives. Verify tht the plns, specifictions nd estimte ccordnce with these documents. re prepred in 456 Submission heck List Prepre nd submit the 100% Design heck List. SETION 500 RIGHT OF WAY Rightofwy efforts will be required for both Phses 2A nd Preliminry Right of Wy Plns No effort is nticipted. It is were submitted nd pproved ssumed tht the Preliminry RightofWy Plns for Phse Lyout Plns nd Order of Tking Prepre Lyout Plns bsed on the pproved Preliminry Right of Wy Plns. Show lengths nd berings of ll lines nd clculte res. The Lyout Plns shll be prepred in ccordnce with hpter 18 of the Guidebook nd shll include the proposed lyout lines, property lines, corner mrkers, nmes of property owners, prcels loctions of ll bounds. The preprtion of to be tken, ccess nd nonccess points nd the Decree Pln shll be included, if required. 503 Written Instrument The Written Instrument for the Lyout nd Order of Tking shll be prepred in ccordnce with MssDOT Policy. The Written Instrument shll be crefully checked ginst the Lyout Pln. 504 Finl Right of Wy Plns After the FF1 WA hs grnted uthority to the Stte nd pproved Federl prticipting funds to cquire the right of wy tkings nd/or the Right of Wy Bureu ccepts the Preliminry Right of Wy Pln, the Preliminry Right of Wy Pln will become the Finl Right of Wy. 505 Title Serch GPI will ssist the Towns with the Title Serch process. GPI will provide project rightofwy plns, coordinte between MssDOT nd the Towns nd will ttend two (2) meetings. Stndrdized Scope nd Workhour Estimte Pge 10 of 19 Rev 4/2008 rrfltflt T

27 Existing Existing OMMONWEALTH OF MASSAHUSETTS HIGHWAY DEPARTMENT SETION 600 GEOTEFINIAL DESIGN Geotechnicl Design efforts will be required for both Phses 2A nd Geotechnicl Report oordinte with the Geotechnicl subconsultnt on the preprtion of the Geotechnicl Report. s it per Directive M151, Bridge Mnul, Footprint Progrm nd other guidelines. For this scope, is ssumed tht the Geotechnicl Report will be limited to the informtion regrding the grde seprted crossing lterntive of the bridge over Route 2A/l 19 (Phse 2A) Powder Mill Rod (Phse 2). The ctul soil borings will be obtined by MssDOT through their open ended contrcts with drillers. 607 Meetings, Reviews nd Liisons oordinte nd meet with MssDOT for reviews, revisions, nd dvncement of project submittls. SETION 700 PROJET DEVELOPMENT STRUTURAL Generl BFRT Phse 2A involves the modifiction of 6 existing simple spn steel girder bridges over Nshob Brook nd Butter Brook. The condition of these bridges nd reuse options were presented in the Jnury 2007 Preliminry Structures Report. No comments were received on this report, however the following structures scope of work conclusions of the report re vlid. The intent structurl repirs. is to reuse the is 6 bsed on the ssumption tht the existing superstructures with no A listing of the bridge is presented below: Acton Acton Acton Acton Acton Acton Existing #1 Existing Existing Existing #2 #3 nticipted Route 2A. No preliminry engineering hs been done on this structure other thn some visul concepts provided for the Public Hering nd 25% Highwy Design phse. The pproches re ncitipted to be embnkments constructed from mechniclly stbilized erth (MSE) wlls. The one new bridge structure 40 foot simple spn 35 foot simple spn 48 foot simple spn 30 foot simple spn #4 #5 21 foot simple spn #6 16 foot simple spn is Existing steel built up girders Existing steel built up girders Existing steel built up girders Existing steel built up girders Existing steel rolled section girders Existing steel built up girders to be prefbricted truss crrying the ril tril over Acton 2A Route 2A]1 New#1 19 New MSE embnkments on pproches Stndrdized Scope nd Workhour Estimte Rev 4/2008 structure t new loction Prefbricted truss over Route Pge 11 of 19 rntmtrtt A

28 Abndon Powder Mile OMMONWEALTH OF MASSAHUSETTS HIGHWAY DEPARTMENT BFRT Phse 2 involves 3 bridge loctions. A BRIDGE SUMMARY ws completed by GPI on Mrch 15, 2010 nd does include dditionl clrifictions to the Phse 2 scope. The three loctions re: 1) Bridge No Abndon Line over Nshob Brook Mrker This existing bridge is n pproximtely 70 foot long bllsted deck bridge. The bridge is comprised of 3 spns, with the 2 piers locted in the river. The proposed solution t this loction is to reuse the existing bridge nd construct the tril on the bridge itself. 2) Bridge No Line over Assbet River Mile Mrker The existing bridge superstructure hs been removed t this loction. The spn between the remining butments is pproximtely 90 feet. The proposed solution t this loction is to construct prefbricted structure on the existing butments. 3) Bridge No Mill Rod over Abndon Line This existing structure in this loction is corrugted steel pipe rch tht exists within the 20 foot embnknent of Power Mill Rod. The proposed solution t this loction is to construct tunnel long the sme lignment s the corrugte steel pipe rch. 701 Field Investigtion Phse 2A onduct field inspection to review the Route 2A bridge site nd djcent conditions, nd estblish project prmeters nd constrints. Evlute the ground nd river survey to determine the prmeters for bridge design. Phse 2 onduct field inspection to review the conditions t the three loctions referenced bove. Evlute the ground nd river survey to determine the prmeters for bridge design. 702 Determine Bridge onfigurtions ollborte with the highwy designer to determine the verticl nd horizontl lignments nd typicl crosssections for both the rodwy over nd the rodwy under. Determine preliminry spn length nd verticl bridge clernce. Provide ccommodtions on the bridge for both existing nd proposed utilities. Phse 2A This effort is for the Route 2A bridge pproches nd cross section s well s finl dimensions for the 6 existing bridges to be reused. Phse 2 This effort is for the existing bridge over Nshob Brook, the structure over the Assbet River nd the Powder Mill Rod tunnel. Stndrdized Scope nd Workhour Estimte Pge 12 of 19 Rev 4/2008 rtlttptm 14 A

29 OMMONWEALTH OF MASSAHUSETTS HIGHWAY DEPARTMENT 703 Preliminry Structurl Anlysis None nticipted. Phse 2A The 6 existing bridges were reviewed in the Jnury 2007 preliminry structures report nd determined dequte for reuse without strengthening. The bridge over Route 2A will be new structure. Phse 2 Bridge ws evluted in previous reports nd is ssumed dequte for support of ril tril bridge. The other two loctions will be new prefbricted superstructure nd new tunnel. 704 omprtive Design nd ost Anlyses Evlute those lternte bridge structure types tht re pproprite to the site bsed on considertions of highwy design prmeters, trffic sfety, impcts to surrounding properties nd environmentlly sensitive res, trffic mngement, construetbility, nd esthetics. ost shll only be used to select between lterntes tht hve been determined to be eqully pproprite to the site bsed on the Type Section Worksheet. Phse 2A This effort is primrily ssocited with the proposed prefbricted bridge over Route 2A nd ssocited pproch embnkment options. Some dditionl work will be involved in determining the finl existing bridge deck type considering concrete, timber, or some other mteril. Phse 2 This effort is primrily ssocited with the proposed prefbricted bridge t nd the tunnel under Powder Mill Rod. 705 Preliminry Structures Report Preprtion No effort is nticipted. Phse 2A This report ws previously completed in Jnury 2007 for the 6 existing bridges. No further work is nticipted. Phse 2 Reports hve been compiled previously by others during the 25% design. 706 Bridge Type Selection Worksheet Preprtion Prepre Type Selection Worksheet per the MssDOT Bridge Mnul detiling the vrious design lterntives for the bridge, complete with pproprite grphics, descriptive text nd cost brekdowns justifying the recommendtions presented. Phse 2A This effort is ssocited with the Route 2A bridge nd ssocited pproches. Stndrdized Scope nd Workhour Estimte Pge 13 of 19 Rev 4/2008 EXHIBIT A

30 OMMONWEALTH OF MASSAHUSETTS HIGHWAY DEPARTMENT Phse 2 This effort is ssocited with the new bridge t 1903 I nd the tunnel under Powder Mill Rod. 707 Meetings nd Liison Attend meetings nd coordinte with?vissdot during the preprtion of the type study report to dvnce the work. Respond to MssDOT review comments. 711 Estblish Boring Loctions SETION 710 SKETH PLANS Determine the loctions for the proposed bridge borings bsed on n pproved structure type. oordinte the boring progrm nd the geotechnicl design with MssDOT s Geotechnicl Section. Prepre the boring loction plns. Phse 2A This effort is ssocited with the Route 2A bridge nd pproches. Phse 2 This effort is ssocited with the new bridge t nd the tunnel under Powder Mill Rod. 712 Hydrulics Study nd Report (Bridges over Wter) No hydrulic reports re nticipted since the existing bridge openings will not be modified. 713 Sketch Pln Development Prepre sketch plns for ech structure in ccordnce with the MssDOT Bridge Mnul. Submit review copies together with the foundtion report to MssDOT. heck to ensure tht the proposed design nd construction stging pln ddresses the cost nd scheduling impcts ssocited with ccommodting both existing nd proposed utilities. Review the boring logs nd foundtion reports. Perform geometric design clcultions. Phse 2A Sketch plns re nticipted for ll 6 existing bridges nd the new bridge t Route 2A. The existing bridge sketch plns re nticipted to be two sheets ech with no boring log informtion. The new Route 2A bridge sketch plns re nticipted to be 5 sheets including 2 sheets of boring logs. Phse 2 Sketch plns re nticipted for ll 3 loctions. The existing bridge (19032) sketch plns re nticipted to be two sheets ech with no boring log informtion. The new prefbricted bridge (1903l) sketch plns re nticipted to be 5 sheets including 2 sheets of boring logs. The tunnel (19015) under Powder Mill Rod is nticipted to be 6 sheets including 3 sheets of boring logs. Stndrdized Scope nd Workhour Estimte Pge 14 of 19 Rev 4/2008 EXHIBIT A

31 OMMONWEALTH OF MASSAHUSETTS HIGHWAY DEPARTMENT 714 Meetings, oordintion nd Liison Prticipte in MssDOT Sketch Pln review meetings. Prepre responses to gency comments nd pln revisions, s necessry. Provide coordintion during the soils testing progrm nd prior to the preprtion of the soils nd foundtion reports being provided by the geotechnicl stff or subconsultnt. 715 onstruetbilitv Review Review the design of the proposed structure to ensure tht the structure does not present ny unusul mtters tht would unduly increse the cost the project or present potentil scheduling delys during construction resulting in clims for extr work. Prticulr ttention must be given to the proposed construction stging nd vilble right of wy. 716 Submission heck List Prepre nd submit Bridge Section heck list for ech bridge. SETION 750 FJNAL BRIDGE DESIGN 751 Structurl Design Superstructure Prepre the design clcultions, nd perform n independent design check of the clcultions for ll superstructure components in ccordnce with the MssDOT Bridge Mnul. Phse 2A This includes deck designs for the 6 existing structures with vrible girder spcing, riling design nd comptibility with the chosen deck system, nd preliminry prefbricted bridge nlysis to determine pproprite lods for substructure design t Route 2A. Phse 2 This includes riling design, deck modifictions, superstructure repir detils, preliminry prefbricted bridge nlysis, tunnel wll nd ceiling nlysis nd for design pplicbility nd determintion of foundtion lods. 752 Structurl Design Substructure Prepre the design clcultions nd perform n independent design chçck of the clcultions for ll substructure components, including ny cofferdms nd permnent excvtion support system requirements in ccordnce with the MssDOT Bridge Mnul. Phse 2A This effort includes potentil smll retining wlls t the existing bridges to support the ril tril embnkments nd lrger effort for the butments nd pproch embnkment wlls t the Route 2A bridge. Stndrdized Scope nd Workhour Estimte Pge 15 of 19 Rev 4/2008 PYMTRTT A

32 OMMONWEALTH OF MASSAHUSETTS HIGHWAY DEPARTMENT Phse 2 This effort includes potentil smll retining wlls t the existing bridges to support the ril tril embnkments nd lrger effort for the foundtions ssocited with the Powder Mill Tunnel loction. 753 Bridge Lyout Geometries Prepre the design clcultions nd perform n independent design check of the bridge geometric clcultions, including frming, lyout, criticl clernce nd elevtion of footings, lyout nd ties, etc. Phse 2A This is for the geometry t ll 7 bridges. Phse 2 wlls. This is for the geometry t ll 3 structure loctions including pproching retining 754 ontrct Drwings Prepre the structurl drwings in ccordnce with the MssDOT Bridge Mnul nd check the drwings for content nd ccurcy. Phse 2A It is nticipted tht the 6 existing bridges will ech hve 5 sheets consisting of bridge cover sheet, butment pln nd elevtion, butment detils, superstructure nd deck detils, miscellneous detils. The new bridge t Route 2A will be 9 sheets consisting of bridge cover sheet, boring log sheets, pln nd elevtion, butment plns nd elevtions, embnkment wll detils, miscellneous butment nd wll detils, Phse 2 It is nticiptedtht the existing bridge (I9032) will hve 7 sheets consisting of bridge cover sheet, butment pln nd elevtion, butment detils, superstructure nd deck detils, miscellneous detils. The new prefbricted bridge (19031) will be 9 sheets consisting of bridge cover sheet, boring log sheets, pln nd elevtion, butment plns nd elevtions, miscellneous butment nd wll detils. The tunnel t Powder Mill Rod will be pproximtely 12 sheets consisting of bridge cover sheet, boring log sheets, pln nd elevtion, foundtion detils, tunnel detils, pproch wingwlls, nd miscellneous detils. 755 First Review Submission Prepre nd submit the bridge design plns for MssDOT review nd subsequent resolution of the comments nd recommendtions received from MssDOT. 756 Quntity ost Estimtes Prepre the quntity clcultions, nd perfonri n independent check of the quntity clcultions of the bridge items nd relted cost estimtes. Stndrdized Scope nd Workhour Estimte Pge 16 of 19 Rev 4/2008 EXHIBIT A

33 OMMONWEALTH OF MASSAHUSETTS HIGHWAY DEPARTMENT 757 Specil Provisions Prepre the bridge specil provisions in ccordnce with the MssDOT Bridge Mnul. 758 Second Review Submission Prepre nd submit updted finl bridge designs plns for MssDOT review nd subsequent resolution of MssDOT comments nd recommendtions. 759 FHWA Review s No FHWA review is nticipted. 760 Meetings nd Liison Prticipte in meetings nd coordinte in scheduling nd dvncing the bridge design. 761 onstructbilitv nd Qulity ontrol (Q) Review Perform n independent review of the project by n experienced engineer who is not directly involved in the preprtion of the contrct documents. Review shll focus on the prcticlity of constructing the structure bsed on ccess to site, equipment needs, mteril properties, etc. Provide n overll review of the plns, specifictions nd estimte for conformity to the Guidebook, the Stndrd Specifictions for Highwys nd Bridges, the ltest Supplementl Specifictions, the Bridge Mnul, the onstruction nd Trffic Stndrd Detils, nd the ltest Engineering nd Policy Directives. 762 Submission heek List Prepre nd submit Bridge Section heck list for ech bridge. SETION 800 PS&E SUBMISSION It is ssumed tht the Phse 2A nd Phse 2 submissions will remin independent nd will not be combined. The tsks below pply to both Phses 2A nd Respond to 100% omments Prepre forml written response to ll comments received regrding the 100% review. 802 Finlize Plns, Specifictions nd Estimte Ensure tht ll comments from 100% review re ddressed nd reflected in the contrct documents. Stndrdized Scope nd Workhour Estimte Pge 17 of 19 Rev 4/2008 EXHIBIT A

34 OMMONWEALTH OF MASSAHUSETTS HIGHWAY DEPARTMENT 803 Prepre Detil Sheets Prepre Detil Sheets in ccordnce with hptet 13 of the Guidebook. dequtely reflected on the plns re to be described in the Detil Sheets. All items of work not 804 ombine Highwy nd Bridge Ensure tht the highwy plns ccurtely depict the pproved bridge design nd tht the index correctly identifies the pge numbering of the bridge plns. ombine Specil Provisions nd Estimte into one pckge tht elimintes redundncy nd mbiguity. 805 Qulity ontrol (Q Review Hve n experienced engineer who is not directly involved in the preprtion of the contrct documents perform n independent review of the project. Log on to the MssDOT website for the ltest reference documents such s Engineering Directives nd Policy Directives, nd verify tht the Plns, Specifictions nd Estimte re prepred in ccordnce with these documents. Review ll environmentl permits nd ensure tht the contrct documents provide mens of compensting the construction contrctor for performing work described in the permits. 806 onsultnt Peer Review GPI will respond to peer review comments. 901 PreBid Services SETION 900 ONSTRUTION ENGINEERING Review nd respond to inquiries from MssDOT relted to the bid documents. PreBid onference. Provide written responses to contrctor s questions. Prticipte in 902 Preonstruction onference Attend the Preonstruction onference. meeting. Answer questions nd prepre the minutes of the 903 Highwy Shop Drwings nd Signl Permit Review lighting, trffic signls, nd sign shop drwings, including foundtions nd supports; nd perform n opertionl site inspection. Prepre signl permit bsed on sbuilt conditions. 904 Bridge nd Wll Shop Drwings Review nd pprove or tke other pproprite ction upon structurl shop drwings for conformnce with the contrct documents. Stndrdized Scope nd Workhour Estimte Pge 1 8 of 19 Rev 4/2008

35 OMMONWEALTH OF MASSAHUSETTS HIGHWAY DEPARTMENT 905 Bridge onstruction Procedures Review nd pprove or tke other pproprite ction ccording to the Bridge Mnul regrding the conformnce of the bridge demolition nd erection procedures to the contrct documents 906 Furnishing Advice nd Field Visits Provide ssistnce to MssDOT in interpreting the contrct documents. onduct field visits to the project site during construction s requested by the Engineer to provide consulttion on design intent, ssistnce in ddressing unforeseen conditions nd br similr mtters, s requested by the Engineer. Attend periodic sttus nd coordintion meetings s determined by complexity of the project. 908 Bridge Rting nd Photogrphs Visit project site nd evlute structures for conformnce to the contrct documents. Tke photogrphs of completed structure, Prepre Bridge Rting Report. The VIRTIS softwre is not nticipted to be used, to prepre the rting report. Phse 2A It is nticipted tht the Route 2A bridge mnufcturer/designer will complete bridge rting clcultions nd provide professionl engineers stmp for those clcultions. GPI will only be responsible for compiling the report into MHD formt, Bridge rting reports will not be provided for the 6 existing bridges. Phse 2 It is nticipted tht the prefbricted bridge ( 19031) mnufcturer/designer will complete bridge rting clcultions nd provide professionl engineers stmp for those clcultions. GPI will only be responsible for compiling the report into MHD formt. Bridge rting reports will not be provided for the existing bridge (19032) or the tunnel under Powder Mill Rod. 909 Trffic Signl Inspection nd Fine Tuning Assist with Fine Tuning nd Adjustment of Trffic Signls nd ssist with Finl Inspection nd Approvl of Trffic Signls. Stndrdized Scope nd Workhour Estimte Pge 19 of 19 Rev 4/2008

36 $ $ OMMONWEALTH OF MASSAHUSETTS HIGHWAY DEPARTMENT SOPING WORKBOOK Form 14 Summry Tble ityitown Acton/Westfordirlisleloncord ontrct No.: 0 Loction: BERT Phse 2A nd Phse 2 FInl Design Assignment No.: 0 Dodge No 0 ProjinfoNo 604S32I6Oz ::.: ::fu*...t:.:*:.:.. :H.f. :.. TIOURI V RATE SUMMARY. N PM SE Lg AE El DIRETHOURLY RATEçIflDesip) $51.00 $51.00 $51.00 $40.89 $29.96 $26.53 DIRET HOURLY RATE ($3 (onstruction) $ ,00 $43.34 $31.75 $28.12 HOURLY RATE(s) (Design) $ $ $ $ $84.79 $75.08 HOURLY RATE ($3 (onstruction) $ $ $ $ $89.88 $79.58 I WORK HOUR AND FEE SUMMARY tf. I TASK DESRIPTION Pl PM SE Eng AL E T Tsk flours Tsk Pee 100 PROJErDEVEL0pMENTENGINEERING $ 141, ISO ENVIRONMENTAL $ 8, FUNTIONAL DESIGN REPORT $ 220 DESIGN EXEI rion REPORT 2 10 l % HIGHWAY SUBMISSION ], $ 10, , DESIGN PUBLI HEARING $ 30, %HIGHWAYSUBMI rral $ 274,293, % HIGHWAY SUBMITTAL $ 95, RiGHT OF WAY $ 53, GEOTEHNIAL REPORT , PROJET DEVEL0PMENT/STRUrURAL $ 64, SKETH PLANS S 119, FINAL BRIDGE DESIGN , PS&ESUBMFfl AL $ 74, ONSTRUTION ENGINEERING $ TOTALWORK HOURS TOTALFEE $ ATUALPERENTAGES (TYPIALPERENTAGES) 13% 1015% 1525% 2535% 1015% 1015%, I DESIGN ONSTRUTION TOTALS () Slry osts 566, $ ,79 $ 613, r I (N Indirect osts (%) % $ 877, $ 72, $ 950, (c) Net Fee (%) 11.00% $ 158, $ 13, $ ,67 rtotallimng FEE $ 1,603, $ 132, $ 1,735, I..*. H I..:. (d) Direct Expenses $ 181, $ 1, $ 182, , MAXIMUM PAYMENTAMOUNT $ 1,784, $ 133, $ 1,917,432,43 MAXIMUM OBLIGATION $ L917, SAY $ 1,917, SOPING WORKBOOK Rev BPRTrs,,1A,6tl Pr, thpi,rnt & loit 8 of 14

37 I I OMMONWEALTH OF MASSAHUSEflS FIIGHWAY DEPARTMENT SOPING WORKBOOK Fonn 1.3 Work Hour Estimte ity/town Actoril%Vestfordlrlisleioncord ontrct No.: Loction: BERT Phse ZA nd Phse 2 Finl Design Assignment No.: Bridge No.: Pmjlnfo No.: SETION 100 PROJET DEVELOPMENT ENGINEERING PROJET TYPF ODE PROJET DESRIPTION Project oncept Preprtion PreliminsyProjeci Are Anlysis ResonNeAltenstive(s)Identifiction J Pl PM SE Eng AE ET TOTAL Altemtives Anlysis & Report Preprtion j Et :. II SUBTOTAL 34 SETION 150 ENVIRONMENTAL I [ Erly oordintion ]HistiArch. Impcts (Section 106 nd hpter 254) Pl PM SE Eng AE ET TOTAL MESA Detenintion I. [54 Hzrdous Mterils Reserch/Review Project Development Meetings nd Herings NEPAIMEPA Determintion IS? NEPA NEPA [59 NEPADrftEnvironmentl Impct Sttement (EIS) NEPA NEPA NEPA tegoricl Exclusion (E) Environmentl Assessment (EA) Finl Environmentl Impct Sttement (ElS) Supplementl Environmentl Impct Sttement (EIS) Reevlution MEPA Environmentl Notifiction Form (ENF) MEPA Drft Envtroomentl Impct Report (DEIR) MEPA Finl Environmentl Impct Report (FEW) MEPA Notice of Project hnge (NOP) MEPA Supplementl Environmentl lmpoct Report (SEW) MESA/NOl Stremlined Review l69 MESA onservtion nd Mngement Pcmsit USAE Section 404 Progrmmtic Generl Permit (POP) USAE Individul Section 404 Permit U.S. ost Gurd Bridge Permit Progrmmtic Section 4(f) Evlution Drft Individul Section 4(/) Evlution Finl Individul Section 4(f) Evlution l76 Wetlnd Resource Are Delinetion [77 Wetlnds Protection Act (WPA) ANRAD ISO 181 WPA WPA V/PA Request for Determintion of Applicbility Notice of Intent Vrince (NOT) lspter9l Lreense/PermstApplictton Wter Qulity enifiction (401) [83 ostl Zone Mngement onsistency ertificte ISI Wildlife/Rre Species Assessment Essentil Fish Hbitt Assessment oordintion nd Liison I S of 14 EXHIBIT B

38 L OMMONWEAITll OF MASSAIIUSEflS high WAY DEPARTMENT SOPING VORKBOOK Form 13 Work hour Estimte ity/town Wnifnnti. rlisle nti Ad, Loction Bruce Freemn Ril Tril Plint A AnuignmetNo Sunity Only deno: t. Th No, SETION 100 rrr DEVELOPMENT ENGINEERING PROJETTVPEOIIEt PROFETDRSRIPTION, I Pl PSI SE Eng 1 AE ET TOTAL jjm!venanlin&rtponptepfltitm z I I SLTDTOTAL SETION 150 St Erly oordintion 52 EtlntjArclt. Impcin tsection 106 nd hpterl54) 53 MESA Detennintion 154 Fizrdoun Mnerilt ReerctnlReview 155 Project Development Meeting, nd Menings 156 NEPA/MEPA Determintion 57 NEPA tegoricl Exciunion (E) 155 NEI A Environmentl Aonestnrent tea) ISS NEPADrfttnvironn,ernl lsnpctsttenient (ElS) 60 NEPA Finl E,nvironnnon! Impct St:enenl (5) 6 NEPA Supplementl Environmentl Impct Sttement teis) 62 NEPA Reevlution 163 MEn Entncmen,tl Nctiliction Porn, (ENF) 64 IEPADrfnEnsirmimentibpuc±Reprn(DEIR) s MEPAFinl Ertiromeenil bepncrepontfetrl 56 MEPA Notice ntprojeet hnge (NOP) 167 MEPA Supplementl Environmentl Impct Report (SEIR) 65 MESA/NOl Sn,emtined Review 169 MESA onner, non nd Mngement Permit 170 USAE Section 404 Progrmmtic Generl Permit (POP) Ill IjSAE Individnl Section 404 Permit $. ost Gurd oeidge Permit 73 Progrmmtic Section 4(I) Evlution 174 Orl) Individul Sectinn1(l) Evlution (75 Finl Individul Section 40) Evlution 176 Wr4ResourneAmDelinetirm 177 Wetlnds Prctccton Act twpa) ANRAD 175 WPA RequentforDerennintion ofappticbiliny EN1flO%MENijh Pl PM SE IEJAE ET TOTAL 179 WPANoticeeflntentt(NOI) Ito VPA Vrince Itt lnrttrr9l LicenPennieAppiction III WtQutiev ertifiction (431)?uln,gcment enninnenry ertificte jjjwildliiu1rrespccienannrsnnrent 3Ieioe Its Enentinl Fit, Hbitt Anennmens Its oordintion nd Liiton Z I ieee 1ZE 201 Evlute Finting onditinn 202 Te/tic nt Anlt,,in ZOJiSdevvAnlvsin 204 IMUTD Signl (Vnnu 2nshntmsectionAr.ivnin DOsjPncponedceomnicn 207 Report Preprtion FIINTIONAI. DESIGN FPOM!T fl!j Pl I PM SE Er AE FT TOTAL 1 JI j SOPINGWORIvBOOFs Rev. 5/1608 2/9/loll of 14 T3J I B

39 I OMMONWEALTH OF MASSAHUSETTS HIGHWAY DEPARTMENT SOPING WORKBOOK Form 13 Work Hour Estimte ityitown Acton/Westfordlriisleloncnrd ontrct No.: Loction: BFRT Phse 2A nd Phse 2 Finl Design Assignment No.: Bridge No.: Projinfo No.: z SUBTOTAL I Evlute Existing onditions 202 Trffic ount Anlysis 203 Sfety Anlysis 204 MUTO Signl Wrrnts 205 Intersection Anlysis 206 Proposel Georneirics NRevortrreprtion H SETION 200 FUNTIONAL DESIGN REPOR OTAL I_ Pl PM SE Eng AE FT TOTAL El il_ SETION 220 DESIGN EXEPTiON REPORT 221 Evlute 13_ontrolling riteri (P000 h. 2) 2 4 Pl PM SE Eng AE r TOTAL 4 IS Perform Incremeistl Evlution 223 Prepre Nntive/Repon f SUBTOTAL ijf 14 EXHIBIT B

40 I 8 F 16 I I 4 8 OMMONWEALTH OF MASSAHUSEnS ifigliway DEPARTMENT SOPLNG WORKBOOK Form 1.3 Work Hour Estimte ity/town AelrrnThVesttordlcriisl&neortl ontrct No.: Loction: BERT Phse 2.4 nd Phse 2 Finl Design Assignment No,: Bndge No Projinfo ND [ I I SETION % mcrnvavdeslqwsunmlssion Pl PM SE ( Eng AE Er TOTAL 301 Pwject Initition nd Dt ompiltion Usililyoorilintion 16_ Survey oordintion nd ommit 8 40 ISO Bse Plns. Profiles nd Typicl Sections Field Reconnissnce Plot Existing LynLit Lines S Mecdngs nd Liison 2 t6 26 S II Determine Rodwy ross Section Preliminry Horizontl Geometry Preliminry Verticl Geometry ross Section Studies Prepre ross Sections Plot Proposed Lyout nd Esements Pvement Design Typicl Sections onstruction Detils gictiisrcpon L 158 [ 338 Preiiminrytlringe nd UtilityScudies Lne onfigurtion T I 32ojTrfficSignls Signs nd Pvement Mrkings Trffic Mngement Erly Environmentl oordintion onstn,ctbility Review Qulity ontrol (Q) Review Preliminry onstruction Estimte Submission heck List Modifictions nd Revisions Vlue Engineering (VE) j SUBTOTAL O12J 3221 SETION 350 DESIGN PUBLI hearing Pl PM SE Eng AE ET TOTAL 352 Hering Preprtion Design Public Hering E SUBTOTALi_f L [ 48 SOPING WORKBOOK Rev. 4/ of 14, EXHIBIT B

41 OMMONWEALTH OF MASSAHUSETTS HIGHWAY DEPARTMENT SOPING WORKBOOK Form 1.3 Work Hour Estimte ityitown ActonAvestIordlrllsltloncord ontrct No.: li ction: BERT Phse ZA nd Phsc 2 Finl Design Assignment No,: Bridge No Projinfo No :.i *.....:....:..:.. ti*.:::...:. :. SETION % rnglnvay DESIGN SUBMION 1 Pl PM SE Eng AE I ET TOTAL 401 Response to 25% omments Field Reconnissnce [ Meetings, liison nd oordintion (6 meetings) flt iit 404 Utility oordinlion Finl Horizontl Design Geometries Finl Verticl Design Geometries Pvement Design Typicl ross Sections PlotrossSrciion Plot Proposed Lyout nd Esements onstructionpins Grding &Tie Plns Dringe nd Wter Supply Detils ISO 414 Preliminry Trffic Signs Guide Sign Design & Overhed Directionl Elevtions 416 Trffic Signls nd Pln Preprtion ,!! Y!f? 136.!±_..?_J._L. I 418 Trffic Mngement nd Suggested Sequence of onstruction Highwy Lighting Plns nd Detils 420 Lndscping nd Pln Preprtion S onbol Plns Miscellneous ontrct Plns Quntity & ost Estimte Specil Provisions onsinsctbility nd Qulity ontrol (Q) Review Submission heck list ion l SUBTOTAL SEI1ON % HIGHWAY DESIGN SUBMISSION Pl PM I SE Eng AE El TOTAL 451 Rpond to 75% omments Finlize Plns Finlize Specil Provisions Finlize Estimte Qulity ontrol (Q) Review Submission heck List SUBTOTAL j SOPING WORKBOOK 4 of 14 EXHIBIT B

42 SUBTOTAL.... OMMONWEALTH OF MASSAHUSETTS HIGHWAY DEPARTMENT SOPING WORKBOOK Form 13 Work Hour Estimte ity/rown ActonAVestford/rhsle/oncord ontrct No.: Loction BFItT Phse 2A nd Phse 2 Elnl Desi&n Assignment No Bridge No Projlnfo No / *...J S....:. :*.*..*j :.*..:J...:j...:..*.].: SETION 500 rnnrr OF WAY Pl PM SE Eng At ur TOTAL 50! Preliminry Right of Wy Plns 502 Lyout nd Order of Tking Plns Written Instrument Finl Right of Wy Plns El 60! Reserch Avilble Subsurfce Dt 602 Field Reconnissnce 603 Subsurfce Investigtion Pln 604 Subsurfce Investigtion Inspection 605 Office Studies. Anlysis nd Testing SUBTOTAL SETION 600 GEOTEHNIAL REPORT.:3 Pl PM SE 1 En AE UT TOTAL 606 Geotechnicl Report Meetings. Reviews nd Liison Finl Plns Specifictions nd Estimte. H I E 1 STION700 PROJET DEVELOPMENr (RUTURAL) Pl PM SE Eng AE UT TOTAL 7Dt Field Investigtion Determine Bridge onfigurtion Preliminry Structurl Anlysis 704 omprtive Design nd osi Anlysis Preliminry Structures Report Preprtion 706 Bridge Type Selection Worksheet Preprtion Meetings nd Unison SUBTOTAL E I SETION 710 SIETII P ANS Pl PM SE Eng AU UT TOTAL 711 Estblish Boring Loctions Hydrulics Study nd Report (Bridges over Wter) 713 Sketch Pln Development Meetings, oordintion nd Uison onstructbility Review Submission heck List SGOROOK S of 14

43 OMMONWEALTH OF MASSAHUSETTS HIGHWAY DEPARTMENT SOPING WORKBOOK Form 13 Work Hour Estimte ity/town Acton/Westfordlrlisle/oncord ontrct No.: Loction BERT Phse 2A nd Phse 2 Finl Design Assignment No Bncle No Projiofo No / SUBTOTAL SORING WORKBOOK Rev. 4)2008 6o114

44 6 6 l 6 44 L OMMONWEALTH OF MASSAHUSETTS HIGHWAY DEPARThIENT SOPING WORKBOOK Form 13 Work Hour Estimte ity/town ActonlWesiford/rflslc/oneord ontrct No: 1,octioo: IIFRT Phse 2.4 nd Phse 2 Finl Design Assignment No.: Bridge No.: Projinfo No.: / li SETION 750 FINAL BRIDGE DESIGN j Pl PM SE Log AE FT TOTAL 751 Sinicturl Design Superstnicturc Structurl Dcsieu Substructure jj!jdgeyout$omeici ntrctDmving First Review Submission j_} Quntityost Estimtes Specil Provisions Second Review Submission FIIWA Reviews 760 Meetings nd Liison onstnsctbility nd Qulity ontrol (Q) Review Submission heck List ,yfjç z SUBTOTAL SErION 800 PS&E SUBMISSION Pl PM SE Eng AE FT TOTAL 801 Respond to 100% omments iniireplns,specifictionsnd&timie Prepre Detji Sheets S ombine Highwy nd Bridge ts Qulity ontrol (Q) Review onsultntPeerReview E SUBTOTAL! L SETION 900 ONSTRUTION ENGINEERING Pl PM SE Eng AE ET TOTAL 901 PreBid Services Preonstruction onference Highwy Shop Drwings nd Signl Pemut Bridge nd Wll Shop Drwings Bridge onstruction Procedures ISO 906 Fumishing Advice nd Field Visits Geotechnicl onstruction Evlution 908 Bridge Rting nd Photogrphs 4 I! Trffic Signl Inspection nd Fine Tuning SUBTOTAL; I [SI SOPING WORKBOOK Rev, 4/ of 14

45 OMMONWEALTH OF MASSAHUSETTS HIGHWAY DEPARTMENT SOPE OF VORK Acton/lVtstford/orlisle/oncord ontrct No.: Ii BFRT Phse 2A Finl Design DFRT Phse 2A lassgnncni No.: 0 0 Projlnfo No.: / Direct osts Expenses Design onstruction Totl Pdnting & opying $2, $ Milege &Trvei $ $ Misc. $ $ $1, NOB1S (GEOTEH) MBE $53, ,700,00 GREEN (SURVEY) MBE $61, , NOVER ARMSTRONG (ENViRONMENTAL) WBE $62, $62, SubTotl Direct osts $181, $1, , PD FORM It Rev. Il/IllS Pb 2A :ct,. nw g L Is 2/Lefl*I I 9 of is EXhIBIT B

46 Drft Noticenf SUBTOTAL]. 2 : F.... OMMONWEALTH OF MASSAIIUSEnS HIGHWAY DEPARTMENT SOPING WORKBOOK Form 1.3 Work Hour Estimte inyitowni Loiicn. AcIon.c&IeWentfordconcnni Tntl, fls Brorn rntmn Rn LA id Z onrd No.: Bridge No: J Projtnfo No.: [ I WTTON 100 PROjET OEVFIMP%IENT ENGINEERING proiefwpe onr..t nrle.lrcctuption ] SI 101 ]Project oncept Pmprtittn 102 Jpretiminny Project Are Anlyolo J9!L enonhic A)tenntivell Identifiction 104 lallemti Sen AnlySi% & Reponi Prepnlior flnigninot SI TOTAL SUBTOTAL :_ 5ETION IS ) ENvIRONMENrAL Pl PM fit TOTAL IS Erly oordintion 152 Impcts (Section 06 nd hpter 254) I53 MESA Deteoninlion 54 Htndirn Rcoench/Rcvtw Development Meetings nd Herings t56]nepathiepa_delenenintion Hi,tJA,th. ii1pnx 6lrcl Envonmenbl. 57 [NEPA tenonicl Exclusio (E) I I 158 NEPA Acncssment(EA) ISO NEPA Esnvionmenlt Impct Sttement lets) ISO NEPA Finl Environnientl Impct Sttement (EIS) 161 NEPA Sepplernentl Envimnentt Impct Sttement (ElS) 162 NEI A Reev)rtion iifi7tai 4 I 63 MEPA Environmentl Notifiction Forte (ENF) 30 6( MEPA Drft Evin,nmeirl Irpien Reton (DEIRI 165 MEI A Frd Environment) Impcn Report IFEIR) 66 MEPA Pmjeet hnce (NOP) 167 MEPA Sppicmcntl Impct Retxtzn (SEtR( 65 MESA/NOt Strcmtined Roniew 69 MESA onservtion nd Mngement Permit Enoironnt) 70 USAE Section 404 Progntnmtic Octeert Ponnit (POP) 171 USAE Indisidnl Sernion 4134 Permit ln]us.ostoonlb.rwpepe.. 23 :Fit tdividrs Sectinn 440 Eviuztion 176 We Resttnrce Att Delinetion 177 Wetlnds Act 06PA) ANRAD WPA Reqrsi for Determintion ofappliehilmty t?l lm ltlnot 2 IIflic Wildli&fflreSAsscsstfl : IfS Essentil Fish Hbitt 56 nrtniintion ndliison t2 I 20 Ansessrett i F los 2t SOPINGOVORK000K Rcv.5/2101 2/lt/2IltI tofl4 _j)f9_ 34

47 fr4 :1 z 0.T1, S 3 gj ft n c ztt, zfl 3=, 3 3 (r n

48 r tegoricl Envin,nrnentl Finl N/A F, _, F I. F F F OMMONWEALTH OF MASSAHUSEflS HIGHWAY DEPARTMENT SOPING WORKBOOK Form 1.3 Work Hour Estimte ity/tosws jacton, MA ontrct No,: Loction: Freemn Ril Tril. Phse 2A Assignment No.: Bolts eno: lnfono,: 101 Project oncept Preprtion 102 [Preliminry Project Are Anlysis 103 Resonble Alterntive(s) Identifiction 104 Alterntives Anlysis & Report Preprtion 05 Meetings (2) I SETION too PROJErDEVELOPMENTEr(GINEERING PROJETTVPFflflE Pl PM SE Erg AE ET TOTAL fl. t. j [ SUBTOTAL 151 Erly oordintion H 152 Hiss/Arch. Impcts (Section 106 nsi hpter 254) 53 MESA Determintion 54 Hzrdous Mterils ReserclilRr,.iew 155 [Project Development Nleecietgs nd Herings 156 NEPA/MEPA Determintion 157 TNEPr\ Exclusion (E) 158 NEPA Assessment lea) 59 NEPA Drft Environmentl Impct Sttement (615) 160 NEPA Finl Environmentl Impct Sttement (ElS) 16 I NEPA Supplementl Environmentl Impct Sttement (ElS) 162 NEPA Reevlution I SETION ISO ENVIRONMENTAL Pl PM SE Erg AL ET TOTAL 164 MEPA Drft Environmentl Impct Report (DEIR) 165 MEPA Entrironmenil Impct Report (PEIR) 166 MEPANoticeofPnsjecsttngr(NOP) 167 MEPA Supplementl Environmentt Impct Report (SEtR) 68 MESA/NOt Stremlined Review 69 MESA onservtion nd Mngement Permit 170 USAE Section 404 Progrnm ttic Generl Permit (POP) 171 USAE Individul Section 404 Perrrdt 172 US ost Gurd Bridge Permit 4 El jjdrft Individul Section 4(f) Evlution 75 Finl (ndivittut Section 4(f) Evlution 176 Wetlnd Resource Are Delinetion 77 Wetlnds Protection Act (WPA) ANRAD 178 WPA Request for Determintion of Applicbility 179 WPA Notice of Intent lnoi) ISO WPAVrince t EMrpti5_. 182 Wter Qulity ertifiction (401) (83 ostl Zone Mngemei,t onsistency ertificte 184 Wildlife/Rre Species Assessment N/A per MnsHighetty 185 Essentil Fish Hbitt Assessment per MssHighwy 186 [oordintion scsi N/A per MssHighwy liison SUBTOTAL f.j [J F SOPING WORKIIOOI( Rev. 5/ I of 13

49 [, F. F F OMMONWEALTH OF MASSAHUSETTS HIGHWAY DEPARTMENT SOPING WORKBOOK Form 1.3 Work Hour Estimte jon, MAontrct No,: ityflovrn Loction: Bruce Freemn Ril TrIl Phse 2A Assignment No.: Bridge No.: Projlnfo No.: SETION 200 FUNTIONAl. flesign REPORT 201 Evlute Existing onditions 202 Trffic ount Anlysts 203 SfetyAstlytit, 204 )IUTD Signl Wznms Msis (mc! rrum PM SE Ens 7... Mill TOTAI 207 Rcfl z} Preprtion SUBTOTAL SFTlON 221) DESIGN EXEPTION REPORT I Pl PM SE Eng At Er TOTAL 221 Evlute 13 ontxolling riteri (PDDO (Os. 2) 222 Irerfonn Incrementl Evlution 225 Prepre NnveMepon z 301 Protect Initition ged Dt ompiltion 502 Utility oordintion 303 Suneytrdirtton nl onmls 304 (Bse Plns, Profiles nd Typicl Sections 305 Field Rcctnoisnec 506 Plot Exicling Lyout Lines 307 Mceliegs nd Liison (I) 308 Detensine Rodwy ross Section 309 Preliminry Horizontl Geometry 310 Preliminry Verticl Geometry SI I ross Section Studies 3l _ SUBTOTAL SETION c IIIIIWAY DESIGN SUBMISSION 1 Pl PM SE Et AU ST I TOTAL 1PrcprerossSectior.s 313 Ptot Psoposed Lyve nd Esemenlt F 3i4 Pvement Design 315 Typicl Secttors I, 316 onstncriogt Detils I... 7FHydmlogiclSttdimIlydnoliuR 318 Preliminry Dringe nd Utility Studies 319 Lne onfigurtion 320 Trffic Signls 32! Signs nd Pvement Mekingt 322 Trffic Mngement 323 Erly Environmentl oordinuliot. 323 :Qtstmttctththty Review 525 Qulity ontrol (Q ) Review 326 Prclimir.ny onstnction Estinute 327 Submission heek tm 328 Modifictions nd Revtnions 4ifH:z.zrz...z zzz 1:. SOPING WORKBOOK Err. 5) t1/2011 2ofl4

50 OMMONWEALTH OF MASSAHUSETtS highway DEPARTMENT SORING WORKBOOK Form 1.3 Work Hour Estimte IEL jactonma Lovuüon; Brce Freemn Ril Tril Phse 2k No.: lildirno. ProjinfoNo: I H SUBmTAL SOPINGWORKBOOK Rev, 5/204sS 2,9 1/201 3o114

51 4 0 0 = 0 1 D : (1 9 = 3 1 : S, S.3 I, z 4. Al V 21 1 fl 0 : , o, 0. r21 = Zn = , Zn I 21. t1, l 21 nr l 21 21, SI , 21 t r:, t 21, I 21, :1 fl 2, U 21 3 fl,! ffl.. 21 U,.3 M 2 I, = I, I,.3 21 A, I I A, I, I, _ILE._L..i 1_ [ I LL tllz IL I ji..... I.. 4 t I 4 t l 4 I_ i I z M n t z ( =1 t,1 fl B, c tj trio t,, (I, ti> zfl i 4 4 S, 3 (Al l 4 S 21 2

52 ,,, z 0 I 7 1r 7 S I, c n 4 7 = =

53 OMMONWEALTH OF MASSAHUSETTS HIGHWAY DEPARTMENT SOPING WORKBOOK Form 1.3 Work Hour Estimte I ity/town Aclon, MA [onrrct No.: Loction: Bnct Frwrptin Ril Troll Plint 2.4 Assigmusent No: Bridge No.: Projinro No: SETION 750 TINAL BRIDGE DN Pl PM SE Ens AE ET TOTAL 75! Structurl Design Sspcnrnicturc 752 Struernrl Denim Subsiniciure BridgeLyouiGeomctrics 754 Drwings 755 First Review Submission 756QusttnyostEstunics 757 Specil Peovisins 758 Second Review Submission 750 FHWA Reviews 760 Meetings nd Liison 76! onstructbiliiynd Qulirycisnirol IQ) Rrsiew 1 J 762 SohmisionlsrclcLjst F z T SUBTOTAL. I 1 SETION 800 PS&E SUBMISSION 80! Respond to 100% omments 802 Finlize Plns, Specifictions nd Estimte n 803 Prepre Detil Sheets I SUBTOTAL Z Zli* I Pl PM SE Eng AR ET TOTAL [ SETION 900 ONSTRUTION_ENINEERINQ Pl PM SE Eng AR ET TOTAL 901 PmBid Senices 902 Pee onstruction onference [ 903 Highwy Shop Drwings nd Signl Penssit 904 Bridge nd Wll Shop Drwings 905 Bridge onstnxrton Procedures 906 Furnishing Adsire nd Field Visits 907 Geotechnicl onstruction Evlotion 901 Bridge Rting nd Photogrphs SUBTOTAL 1 SOI ING WORKBOOK Rev. 5/ /2011 6o114

54 . I JL. $ I,, I.. $. I OMMONWEALTH OF MASSAHUSETTS HIGHWAY DEPARTMENT SOPING WORKBOOK Form 1.4 Summry Tble ity/town Acton, MA ontrct No.: Lullon: BnjceFreemnRHTniIPh2A ignmcnino Bridce No.: Projlnfo No.: 0 HOURLY RATE SUMMARY tt_ Pl PM SE Eng AE (Design) $51.00 $50.38 $37.60 $31.31 $2470 DIRET HOURLY RATE DIRET HOURLY RATE(S) (onstruction) $ $) I $26.16 $33.19 $26.18 $27.73 HOURLY RATE IS) (Design) $ $ $ HOURLY RATE IS) (onstruction) 5)55.68 $ $ $79.91 $84.65 _ TASK DESRIPTION 100 PROJET DEVELOPMENT ENGINEERING.._ WORK HOUR AND FEE SUMMARY [ Pl PM SE Eng AE ET Tusk Flours Tsk Fee ISO ENVIRONMENTAL ) 0j 200 FtJNTJONALDES)GN REPORT 0 : OIDESIGNEXEPTIONREPORT i25%HIGIiWAYSUBMISSION ODE5IGNPUBLIHEARING $ % HIGHWAY SUBMITTAL $ % HIGHWAY SUBMITTAL $ 500 RIGIITOFWAY GEOTEHNIALREPORT PROJET DEVELOPMENT/STRUTURAL SKE THPLkNS OFLNALBRIDGEDESIGN SO0PS&ESUBMETAL S 1 $ $ S S ,98 $ $ $ 900 tonstruhon ENGINEERING fls. TOTALWORK[IOURS I TOTALFEE $ 53, : ATUALPERENTAGESI ) 1TYPIcALPERcEN7AG$r 13% 1015% I [ ()Slnryosts (hi Indirect osts (%) % % 2535% 1015% 1015% zzl_ zz zzi±zz :HzZE DESIGN ONSTRUTiON TOTALS $ 17,394,26 $. E $ ,96 $. : II (c)netfee( }) 11.00% $ 5, $ r TOTALUM)TINGFEE (d) Direct Expenses 53, $ $ $,. $ rz_z r MAXiMUM PAYMENT AMOUNT $ 53,79598 MAXIMUM OBLIGATION it r i_ $ 5 5 SAY 17,394,26 30, $ 5, S S 53, , , SOPING WORKBOOK Rev. 5/ /2011 7of14

55 OMMONWEALTH OF MASSAHUSETTS HIGHWAY DEPARTMENT SOPE OF WORK Direct osts Printing Milege & & Expenses Design onstruction Totl opying $ $0.00 $ Tolls $ $0.00 $ Driller $0.00 $0.00 $0.00 Police Detil $0.00 $0.00 $0.00 Soil Lbortory $0.00 $0.0U $0.00 Equipment/ Mterils $ $0.00 $ Mst Arm Boring $0.00 $0.00 $0.00 Pvement Test Pits/Anlysis $0.00 $0.00 $0.00 SubTotl Direct osts $ $0.00 $ PD FORM 1.1 Rev. 11/2005 UI RT N*is Wotkhotg Esiiw.,lc S of 16

56 .... OMMONWEALTH OF MASSAHUSEflS HIGHWAY DEPARTMENT SOPING WORKBOOK Form 1.3 Vork hour Estimte isyirown IVullord, rlile nd Aclon ontrct No. Loction: Bruce Freemn Ibil Tril Phse ZA Assignment No.: Sinney Only UndoeNo Prnnlnfo No E I SUBTOTAL t3joj2q 221 Evlute 13 ortrotliog riteri (P000 It. 2) 222 Preforni Incremetl Evlution 223 Prepre NnrrtivelRepon rn PESIGN EX)fljflN REPORT SUBTOTAL Pl PM SE Beg AL ET TOTAL SOl ING WORKBOOK Rev / of 4 XHJBIT B

57 7, S7, 7,. U 5..3,.3 En 5, 5, 5,, 1 7, En 2.3 7, 2 5, 7, 5, 7. n r.3, = 2 w 9,, 7, S., U 2 7 5, 5, S. 2 3, U 2..9 U U 3 E0, S I B L r, 5, U. En En. U 7,, U 4..4 d En 3 S.5. U 3, En t f 9 En En S. U 1 S 7,, En 7 U U3. r. 7, 3 7, S $ 5,.3.3. En, U S ).3, U, S En ạ , í ; En E 5, jj 0,,,.i 5 0 = d 1 0,, 2 0, z I 4 = t4 rn I 5, 1 3., 3 4 I. S.3 S. S 4 S., 2 p 2 En U, n 0 np o o 0 z 0< o >.r,, L o I U, P1

58 4 Sc, = n 7 ci 9. 1 U r = Zt i

59 I EfnToTAL fl I I EKKJBIT OMMONWEALTH OF MASSAHUSETTS 111GB WAY DEPAR I MENT SOPING WORKBOOK Form 1.3 Vork Hour Estimte itwlbwn Wnsfsnl, rlisle nd Anon onnci No Loction Brce Freemn Ril Tril Phse IA Assignment No Stsrvrv 0mb Bridge No Proilfo No ) Preliminry RighofWyPtn 502 [Lvmst nd Oedm cftnkin Plnt SETION 500 RIGHT OF WAY I Pl PM SE Sc AS FT TOTAL 503 Wflten lnutsrnmt 504 Fsnni Right of Wry Plns t : *j* :: z I SUBTOTAL H 60 I Resestls Avilble Subsurfce Dt 602 Field Reconnissnce 603 subsurfce Investigtion Pln 604 Subnusfce Inventiglion Inspection 605 Office Studies, Anlysis nd Testing 606 Geoteclnicl Report 607 Meetings, Reviews nd Liison 505 Finl Plns Specifictions nd Estimte I SETION 605 GEOTEhjt&LREPORT Pl PM SE Leg AS TOTAL SUBTOTAl.] SE flon 700 PROJET BEVEl 0PMENTJTRtflU3j. Pl PM SE Ens AS FT TOTAL 70) [Field Investigtion 1Z Delmnine Bridse oslignrtion 703 Preliminry Srnczens Anlysis 704 omprtive Detictr rd ot Anlysis 705 Preliminry SBttsrm Report Preprtion 706 BsidgeT 1cStienticetWesIsheeiPrepn:ion,,,,,J F 707 Meetisg nd Liison SUBTOTAL E SETION 711 Estblish_BoringLocsion 712 Hydrulics Sesdynd Report (Bridgesover Wter) 713 Sketch Pln Development 714 Meetings. oordintion nd Liison 715 onsliuclsbiliry Review 7)6 Submission iseck List 710 jf Qjft,ANj Pl PM SE Eng AL ET TOTAL SOPING WORkBOOK Rev. 5/ /2011 5sf 14 B

60 r 7: Us n 2, 0 L n o r rfl = In 9 /

61 , DESIGN I. OMMONWEALTH or MASS4HUSETTS 1HGIlVAY DEPARTMENT SOPING VORKEOOK Form 1 4 Summry Tble ityfrown Westlorsi, rlisle nd Arson onnncs No,: Locdos: Unite Freemn Ril Tril 9isse IA Assignment No. Suncy Only Bnidse No. ) ProjInfo No,: *..,.* *:. :, HOURLY RATItARY Pl PM SE Ens AE ET DIRET HOURLY RATE )(Denipn) $51.00 $5140 $46.26 $3149 $25.11 $2T27 DIRET HOURLY RATE(S) (onstcon) $ $40.37 $26.62 $2190 HOURLY RATE(S) (Design) $ $ $ $9705 $63.91 $69.41 HOURLY RATE(S) (onnls scnion) $ $ $ $ $6703 $73.64!ilRKI 11rzzzziz11z_ OURAM3,l%jIjX TASEDESRIPTION Pl PM SE Ens AE ET TsskHous TwISts, 100 PROJET DEVELOPMENT ENGINEERING $ ISOENVIRONMENTAL $ 200 FUNTIONAL DESIGN REPORT $ 220 DESIGN EXEPTION REPORT $ % HIGHWAY SUDMISSION 0 II $ 55,504, I I 350 DESIGNPUBLIHEARING $ % HIGHWAY SUBMITTAL $ % HIGHWAY SUBMITTAL $ SOOIIIGHTOFWAY $ 600 GEOTEHNIALREPORT $ 700 PROJET DEVELOPMENT/STRUTURAL I) 0 0 $ 7W SLANS $ 750 FINALDRIDGEDESIGN $ IOOPS&ESUHMJTI AL $ 900 ONSTRUTION ENGINEERING $ I TOTAL WORKHOURS 0 II TOTALFEE ,11 ATUAL PERENTAGES (TYPIAL PERENTAGES) 13% 1015% I5 25% 2535% 1015% 1015% ONSTRUTION TOTALS Ismn $ $ $ (I) Indited osts (%) % $ 21,220,34 $ $ ,. (d)neifec(s) 11,00% $ $ $ 5, TOTAL LIMITING FEE $ ,11 $ $ 55, ThEEEEEZZZZZZEZEEZE ZE N) Direct Expenses $ $ $ 1,435,00...I zz.. E I. H ZZ MAXIMUM PAYMENT AMOUNT $ 56,939 II $. $ ,11 MAXIMUM OBLIGATION $ ,11 SAY $ 56,900,00 SOrING WORKBOOK 2) I of I4 XUB1TB

62 Direct Expenses Milege 400 milesx 04 per mile $160 Utility Reserch $300 Deed/Pln Reserch $100 Police Det 8 hrs X $50 per hour $400 Print! opy $250 Overnight Mil $125 Abutter Notifiction vi ertified Mil $100 Totl $1,435 JEXBWr_13

63 tegoricl, N. SETION, N MASSAHUSEflS DEPARTMENT OF TRANSPORTATION HIGh WAY DIVISION SOPING WORKBOOK Form 1.3 Vork flour Estimte iwiiown oncord ontrcnno.:_ Loction: Bruce Freemn Ril Tril Plint 2 Assignment No, S.n ey Only Bridge No.: Proilnft, No.: 1 I SETION Inn PROJET DEVELOPMttNGtNEEjj PROJET TYPE ODE: _fwoje DESRIPTION. 101 Project oncept Preprtion 102 Pretiminsy Project Arcs Antynin 103 Resonble Altemtive(n) Identifiction 104 Alterntives Anlysis & Report Preprtion E SUBTOTAL PM SE Eng AE ET TOTAL ErRNTsL Pl PM SE Eng AE ET TOTAL 151 Ldy oordintion 152 HistiArch. Impct, (Section 06 nd hpter 254) 153 MESA Determintion 154 Hzrdous Mneril RenerchlRe.iew 155 Project Development Meetings nd Herings 156 NEPAfloIEPA Determintion 157 NEPA Exclunion (E) St NEPA tn roetentl Ausenment (EA) 159 NEPA BrD Enironnennl Inspcs Slsemenl (EIS) 160 NEPA Finl Environmentl Impct Sttement (EIS) lot NEPA Supptemsttt Environmentl impct Sttement (EIS) 162 NEPA Reevlution 63 MEPA Environmettt Notifiction Form (ENF) 164 MEPA Drft Environmentl Impct Report (DEIR) 65 MEPA Finl Ervironmentl Impct Report (FEIR) 66 MEPA Notice nfprojecr hnge (NOP) 67 MEPA. Supplementl Environmentl Impct Report (SEIR) 161 MESNNOI Stremlined Review 169 MESA onenistion nd Mngement Permit 170 USAE Section 404 Progrmmtic Generl Permit (PGP) 71 USAE lndividel Section 404 Permit 172 U S. ost Gurd Bridge Permit 173 Progrmmtic Section 4(t) Evlution 174 Drft Individul Section 4(f) Evltion 175 Finl Individul Section 4(1) Ertlution 176 Wetlnd Reoource Are Delinetion t 77 Wetlnds Protection Act (WPA) ANRAD 173 WPA Requet for Determintion ofapplicbility 179 WPA Notice_oflntent (NOt) ISO WPA. Vrince 1St hpter 9t LicenreiPentit Appliction 32 Wler Qutit, ertifiction (401) ls ostl Zone Mngemene onsistency ertificte 184 Wildlife/Rre Sprcien Anornment 185 Ensentil Fittt Hbitt Anenment 186 oordintion nd Liiton E 201 Evlute Etitting onditions 202 Trffic ounn Attynin 203 Sfety Anlysis 204 MUTD Signl Wrrnts 205 Intemeclion Anlysis 206 Proponed Geometricn 207 [Report Preprtion, SUBTOTAL 200 FISNUflONAL DflREjjjTFfl PM SE Eng At ET TOTAL SOPING WORKBOOK Rev. 219/2tttl t of 4 :J n:rr.

64 MASSAIIUSETrS DEPARTMENT or TRANSPORTATION HIGHWAY DIVISION SOPING WORKBOOK Form 1.3 Vork Hour Estimte iry/tow OBOYd onlecino Locticn Bddge No BrisccFrremnR.iITniI Ph,c2,tNo Proilro No: I 1 SUBTOTAL! Suncyonly I SETION 220 ffli NEXEPTION REPORT! Pl PM SE lep AL TOTAL 221 Evlute 13 ontrolling r/ln (P000 h 2) 222 Per/nn Incrementl Evlution 223 Prepre Nrntivdepon I SUBTOTAL SOrING WORKBOOK Rev 5/3m11 2/9/21) ; r

65 MASSAHUSETtS DEPARTMENT OF TRANSPORTATION HIGHWAY DIVISION SOI ING WORKBOOK Form 1.3 Vork Hour Estimte ity/town oncord otnctno.: Loction Bruce Frecutt, 11,11 Tril Plint 2 Assignment No. Sinney Only fudge No. ProlInfo No.: SETION % IIIGHWAvmIcN flflflsi. I SE 301 Project Initition nd Dt ompiltion Fg AE Er TOTAL 302 Utility oordintion Survey oordintion nd ontrolo Dne Plnt. Profiles nd Tyoicl Seoiono Field Reconnisonce I Plot Existing Lyout Linen 307 Meetings end Liinon 303 Deternoine Rodwy roon Section 309 Preliminry Horizontl Geometry 310 Preliminry Verticl entenry 3 I I roon Section Studies 312 Prepore row Sectioou 313 Plot Peopooed Lyout nd Eemrnto 314 Pvement Deoign 315 Twicnl Seoions 316 ontrction Detil 317 Hxirologicl Studies nd Hydrulics Repoot 318 Prclinoinoy Dringe nd Utility Stttdieo 319 Lne onfigurtion 320 Trffic Signls 321 Signs nd Pvement Mcbingo 322 Trffic Mngement 323 Erly Environmentl oordintion 324 onotxoctbility Roview 325 Qulity ontrol (Q) Review 326 Preliminry otostction Enrioorr 327 Sobmiooion heck Liot 328 Modifictions nd Revioionn 329 Vlue Engineering (VE) El SUBTOTAL rqmnjm. DESIGN_PUffll.IIEARING Pl PM SE Eng AE ET TOTAL 352 Sering Prepention 353 Doign Public Hering :j SUDTOThL SOPING WORKBOOK Rev /9/ of 14

66 ;$ Sn 1 B 1 1 t,1 S ci, In ci,.,, ci, n S 0

67 . : MASSAHUSETTS DE?ARTMENT OF TRANSPORTATION highway DIVISION SOPING WORKBOOK Form 1.3 Work Hour Estimte it lns oncord LoonctNo. Loction Bruce Freemn Ril Tril Plint 2 No Asnigement Survey Only Bridge No.. II SETION 500 RicirrorwAy Proilxsl o No,: : Pl PM SE Hers AL E TOTAL SOt Prelimirry Right ofwyplm 502)LyouiztdOrdofTkirgrln 503 Written lnsrnsmeet : ol Rcseml Anilbie Subsurfce Dt 602 Field Reconninnnce 603 Subsurfce Investigtion Pln 604 Subsurfce Investigtion Inspec cr Studies, Anlysi, nd TestIng 606 Oeoiethnict Report 507 Meetsflg Reviews nd Liison on ti 601 Finl Plns, Specifictions nd Ennimsre SUBTOTAL jfljoo EOTETINIAI. REPORT Pl PM SE Lg AL El TOTAL SUBTOTAL SETION 70Q PROTET DEVELQtMENT (Biiu&sI. I Pl PM SE 1 Eng AL ET TOTAL 731 Field Inventigdess 702 Delermirse Bridge onlirnrtion 703 Prlimin Strctirsi Anlysis 704 omprtive Osigs nd ml Aniyeis 705 Prelrminty Structures Report Preprtlion 706 Bridge Type Selection Worksheet Preprtion 707 Meetings nd Liinon SUBTOTAL I ill Estblish Boring Loctions 712 Hydrulics Study nd Report (Bridges over Wter) 713 Skercls Pln Developnnene 714 Meetings, oordintion sd Liison 715 onssnclbilily Review 716 Submission heck Line I SETION 710 5i5 EflciLtLA PL PM SE Erg AL ET TOTAL SUBTOTAL J, SONNO WURKBOMI, Rev. 5e of14

68 0 1:, o S. o 0 z r 2 0 i I, 2 rn O ri, o > 2 E : o1 0 0

69 0 0 $ $ $ MASSAHUSETTS DEPARTMENT OF TRANSPORTATION HIGHWAY DIVISION SOPING WORKBOOK Form 1.4 Summry Tble I F I I I I ih.town cocord ci No 0 Loction Brute Freeriun RlITnil PItocZ 9nrnentNc ;Sn eyoiy Bndoo No OF Proilofo No, hourly RATE SUMMARY. F Pl PM SE Ero AE ET DIRET HOURLY RATE ($5 (Drum) I $ DIRET HOURLY RATE IS) (onslmttonl $ HOURLY RATE ($3 (Drsoii) $ $ $97.05 $63.98 $6948 HOURLY RATE(S) (ornmxtonl $12995 $12005 $ $ , VORK IIOUR AND EFE SI MIARY TASK DESRIPTION Pl PM SE Duo AE ET khouj Took Fee I PROJETDEVELOPMENTENGINEERJNG I50ENVIRONMENTAL FUNTIONAL DESIGN REPORT DESIGNEXEPTOONREPORT % HIGHWAY SUBMISSION DESIGN PU0LI HEARING Th % HIGHWAY SUBMIflAL O % HIGHWAY SUBMITTAL 0 I) I) RIGHTOF WAY GEOTEHNIAL REPORT PROJET DEVELOPMENTISTEUTURAL TIO 5pS FINAL BRIDGE DESIGN P5&E SUBMITTAL $ 900 ONSTRUTION ENGINEERING $ TOTAL WORKHDURSF TOTALFEE $ lem44i655[ DESIGN ONSTRUTION TOTALS ()SSrvosls $ $ (b)indirrcrors(5.) 12955% $ 2.106,77 (c)nrovetri) 1100% $ I TOTAL LIMITING FEE $ $ $ I P ZZZE ZEr EZZ I ZZ (dl Direct Expenses $ $ I zz_ MAXIMUM PAYMENT AMOUNT $ EEEEEEEEZEZ MAXIMUM OBLIGATION J, S I SAY 3 4,300,00 SOrING WORKBOOK Rev. 5(200! 2/ I of 14

70 MASSAHUSETTS DEPARTMENT OF TRANSPORTATION HIGHWAY DIVISION SOPING WORKBOOK Direct Expense Direct Expenses Milege 50 miles X $ 040 per mile $20 Police Detil hours)( $5000 perhour $0 Totl $20 SOPING WORKBOOK Rev. 5/2008 2/9J2011 I of 14

71 MflZtemo P JmssDOT cifrey B Muilrt Secretsy & EO Luis Preworisky Administrtor Architects nd Engineers Review Bord Prequlifiction S S w.t Deprtment t wnsprtuon 5 Highwy Division Effective June 5, 2009 Expires June 5, 2011 GreenmnPedersen, Inc. 105 entrl Street, Suite 4100 Stonehm MA You re Prequlified in the following Disciplines: 0 Environmentl Studies MssDOT will D Lndscpe Architecture Ii?i Trnsporttion Plnning lntelligenct Trnsporttion Systems 0 Trnsit nd Ril Systems Design ulturl Resources 0 Hzrdous Wste Assessment Site Investigtion nd Hzrdous Wste Remedltion Wetlnds Delinetion nd Assessment Wetlnds Mitigtion Wter Qulity Assessment Wter Qulity. Mitigtion Air Qulity Noise Studies Ecology Engineering Field Survey Totl Sttion Au1oAD Bse Pln Services Lyout Document Preprtion Photogrmmetry retin this rting on its list of prequlifled firms until the Expirtion Dte shown bove. Your firm is required to submit new or updted ADM016 Form on or before the Expirtion Dte Bsic Rodwy Design Intermedite Rodwy Design omplex Rodwy Design Bsic Bridge DesignlRting Intermedite Bridge Design/Rting omplex Bridge Design/Rting c LI NBIS Bridge Inspection LI LI Moveble Bridge Design/Rting 0 LI Moveble Bndge Inspection LI Trffic Opertions Studies nd DeslgnLI LI Geotechnicl Engineering Including LI EZI Soils & Foundtion Studies onstruction Oversight LI onstruction ontrct Assistnce E21 Hydrulics nd Hydrology o Mterils Inspection nd Testing o Aschitecture if you wish to continue to be considered for new services by the Deprtment. Revised ADM016 Forms my lso be submitted t ny time prior to the Expirtion Dte. Filure to fumish n updted ADM016 Form prior to the Expirtion Dte being removed from MssDOTs list of prequlified firms This disqulify your firm from will will result being selected for new contrcts with MssDOT until n upedted form is submitted nd MssDOT hs issued new rting. in your firm Sincere, Peter VnBuskiric Se etry Architects & Engineers Review Bord Leding the Ntion Ten Prk Plz, Suite 4160, Boston, MA Tel: TOD: in Trnsporttion Excellencewww.mss.gov/mssot Evmzv ,

72 STAM3R PRmISIOIS AflAflIEIT I ARTItE I. WtAt pewisis 1. DEFIIlTIS The tot Lowing words s used herein, heretofore, nd hereinfter shll men: trs.taxt... The ontrctor urnl W The we lii of Msschusetts ThA1 the Prty of the Second Prt to this ontrct, cting directly or through n wthorized lwful gent or eq,toyee. oennr The Msschusetts Highwy Deprtwit of the nietth of Msschusetts. 1n... The id Engineer of the Deprtment cting directly or thr4i n flhoried reprnrt*tive, sixh representtive cting within the scope of the prticulr duties entrusted to him. ffl1 gt mrnsisiutt F The Federl Kiuy Adinistrtion t the United Sttes Drertment of trnsporttion. PtJfl Alt work described in the specil provisions ider the heding SE OF SERVIES. lfi&tls... The directions, provisions id reqjirents crising bth these Stndrd Pre wisin id the Specil Previsiors. WttM. PtJSlSS The specil direction, provision id re,irnwnts prepred to cover proposed work no: epressly provided for in these specifictions. The specil provision shell be incled within the generl term specificstin id shll be med. prt of the contrct with the eprnsd wnerstriding tht in the event of conflict, they shll previl over LL other specifictions of the contrct. 2. Ti s,j.e The onsultnt shll begin performnce of the services designted in the contrct prtly, id sht clet. the services without dely. Alt work shll be perfor by the nultont In ccordnce with the tie schedule s ho.ei in the Stndrd Service ontrct Section flb) nd in the SpeciL Provision hereinfter. Should cirottnes occtr, bdsich re beyond the control of the onultit such s n increese in the scope of work, revision to pproved work, or chnge in the conditions tder ithich the work is to be performed, the specified estited cletlon dte my be etended. If the estonion of time is more thn ow yer beyond the originlly specified tie period, the contrct fee my be r..,..tlted. Fir months prior to reching the cletion dte tr the itrec!, it shll b. the onsultnt s responsibility to notify the DeprW.t in writing it he feels tht he conect et the conviction dte. The onsultnt shll stte the reson thy tht te ctvnt be met èid reqiest revised dte for cnldertli. If the DeprtW.it cetermines tht on estersios of tin I. wrrnted, both prties eáill gre. to new ctetioi dte. Any djitwit to the contrct tee ttrib,ted to esclted slries ndlor other costs resulting I me the estended tm shll oily pply to costs incwred beyond the one yeç ddition to the originl cletion dte. 0.1w, the onsultnt is mde wre tht no will be pid for sirvices tht re rendered either prior to the dte of the Notice to Proceed or beyond the durtion specified in the ontrct, dns n extension of tie. is grnted. 3. TEI*ATI Upon receipt of written notifiction Iron the Deprtment tht this ontrct, or ny prt thereof, is to be terminted, the onsultnt shell lmàdltely cese opertion on the work stipulted, iii ssle t mteril tht hs been prepred, developed, furnished or obtined wider the tern of this ontrct tht my be in his possession or custody, nd shll trnsmit the se to the Drtnnt on or before the fifteenth dy following the receipt of the bove written notice t termintion, together 11th his evelition of the cst of the work performed. The onsultnt shll be entitled to just nd iittle pnt In ccordnce with ARTIlE Vt, Section 0 for ny ic...r..sted work stiifctorily performed prior to such notice. The Oepertwnt shll determine the ncisit of cceptble work performed by the onsultnt irder this ontrct. The Deprtment s evlution shll be used s ibsis to determine the it of censtion due hi icr this work, provided it shll be mde in good fith nd si.pported by sittntil evidence. In deterrining the vlue of the won performed by the onsultnt prior to termintion, no considertion wilt be given to profit which the onsultnt might hve resoncly expected to ske on the incoileteo portion zi the work. EXHIBIT D (pee I of 26)

73 5. OESl rncns 2 If no cntrct for corstnxtiui of the project is executed services outlined in ARTILE IV, th, services s outlined in ARTILE V this contrct shlt be deered to hve been ccqleted. within one yer fter cletion of the shll be cncelled id the services tter 4. srsrn wtiflaflml$ The oemttnt grees to perform the work reqsired Lter this contrct In strict conformity with the provisln of the V.p. 1..L s current Strterd Specifictin for Highwys rid Iridges nd b.fl.ts thereto insofr s sid provisions re pplicble to this contrct, sid Strcrd Specifictin rt....lc,ts being specificlly do pert of this contrct s fully id to the s effect s if the hd been set forth t length herein, except s herein otherwise provided. Au work shll be desired in ccordnce with the stwrde dpted by the Americn Assocition of St.;. IqlØwy rt Trnsppqtim Officils nd with th design stndrds of the Depernt using dt s ppers in the Dep.rtseit s rrest Stndrd Specifictions for Nighys rt Iridges, s.j 1, id shri in the Highwy Dnigi Snl, Krsl n tmifore Trff It ontrol Devices, Iridge MnL, onstruction Sisl, Serwey Sini, Right.1 11ev Snest id the Utility Acc.w.ritue Policy, long with lt other sterds, specifictin, ttend., directives id prctices presently dpted for is. by the Deprtwit rt s y be Ir time to tier...4ed. The design.1 projects on the FederL Aid Highwy Syst et ccly with strtirds 55 pproved by the Lthited Sttes Dep.rrt if Trnsporttion, Federl Highwy Ainistrtius. All rode on the Interstte Syst et cly with the Itsidr provided in Section 109 TItle 23 of the Federl Highwy Act of 1956, s 4i. 6. STAnhsQ N tj sic IPETIS OF The onsultnt shll mintin s office locted within the confines of the n.etth of Msschusetts. Suds office shll b. stffed with profession.l persomel deqte In r*er, trining rt experirite to perform the work required ester this contrct. Prior to the begirriing of won, the ultnt shll sldit the nt, titles id slry rtes of ll persnel t. be ssigned to the work rt ny sqnt Increse in slry rtes shll require the pprovl of the Engineer. In ddition, ertion rt eperirte records of siçiervisory perwviet dii will ctively pert icipte in the work shll be siitted. if, t ny tin dring the tre of this contrct, ny sqiervisory position is vcted, notice shll be iditely sent to the Engineer s to the person vcting the position id the r, title,.*xtien, esperiere record id rite of py of the person edn wilt fill the vcncy. Prior written pprovl of the Engineer foe the chnge In sçervisory personnel et be received by the otul twit. It is sterstood tht uthorized representtives of the Msschusetts Mighwey Deprtment id the Lkilted Sttn epsrrst of Trwwpontim, Federl Highwy Adinistrtlt fly inspect or review the onsultnt s design work in progress dring nol wking hógrs. Plns d docimente, lncti4ing those in the fontive stge, shll be redily vilble In the néwttnt s Mssctnetts Office t ll tiers dring norl working hen. It is greed tht wy or tiportin of the work performed by the nut;nt fly be reviewed by cultwet engineers retined by the Depertent for this purpose. T. LWGISG. ET Every person toyed in th. work covered by this ontrct shlt lodge, bord or trde ethere nd with edn he elects, rt neither the onsultnt nor his gents or toyees shll directly or Indirectly require s corditlon of loyeent therein tht n eeptoyee shll lodge, bord or trde t prticulr plce or with prticulr person. S. AWILAILE DATA A MATERIALS All dt pplicble to this project in possession of the Deprtment shll be mde vilble to the onsultnt by the Deprtment. The Deprtment shll furnish to the onsultnt br, cross section pper nd other tonl for the preprtion of pln, profiles, cross sections, etc. if such mterils re stndrd only with the Deportment rt crt be obtined elsewhere. EXHB1T if (pge 2 of 261

74 3 9. NEMIES I discs The Deprtment shll rke ll rrngements for rt hold ll necessry officil pi.tlic hesrings in cornection with the project Pitlic meetings to obtin citizen prticipetion in the plring id desiri of the project mey be rrnged by the Deprtment or by the onsultnt rider the direction of the Engineer. The onsultnt shll not, t ny tin, mke ny cnitnt or give ny informtion regrding projects being plited by the Deprwnt without prior pprovl of the Engineer The onsultnt shlt,,i requested by the Engineer, rider udi ssistnce s necessry, incl&dlnp preprtion rt explntion of sketches or pin, t or for ny hering, meeting or conference held by the Deprt it. 10. Asss The Dpsrtit shll negotite nd prepre ll necessry grents with rilrods, plic utilities, siicip.iities, gencies of the Lkilted Sttes Goverrent or ctl%en. The onsultnt shll prepere the pin, sketches rt other dt necessry in coi nectii with these grent id ssist the Engineer, if reqsted, t conferences relted to such grents. If t when reqird by the Deprtment, the onsultnt shll prepre for nd pper in ny Litigtion concerning this project in behlf of the telth, rt he shell be pid cti.el slry id overhed cost with ne profit llosnce for his services id he shll be reiflrsed for ny espersn incirred by him In reltion thereto. These services t tgperses shll not be considered s covered by the totl of the ten stipulted in this contrct 12. fl Wti The ultnt til keep record indicting the sibject id ststne of Lt forml notifies with the engineen.1 the Dep.reit s well s with representtives of other Stle t Federl gencies, niciplities, privte orgiizstin t the generl ptblc, t which he is in tt..4...e. ReportS shlt be prepred t sisitted to the Engineer describing the ject mtter discussed t ech eting, id s4ts.qjent reports stittd s te ctisew tken result of r 4tin presented. 13. flst P*LWntS After the onsultnt hs furnished to the Drpernt contrct drwings, proposed specil provisions of the specifictions, estimtes of qintitles rt tnit cost by iten, the Deprtment shll prepre the docusit for receipt of proposls from comtnttion contrctors rt for esecution of construction contrct or contrcts. 14. negju ci inct eon it is wderstood tht fter the isuttnt hs stitted to the Engineer cciiçlete contrct plns, specil provisin, estimtes id lyout plns s reqiri red wider ARTILE IV, Sectin, E id f, the Engineer shell, within resonble time, tither pprove sid docnts ci return tb with itch cits or rec...,4.d chnges s he dens desirble lie suds pprw( shll relieve the onsultnt of his libility for ny defect, error or omission in kit wrt. IS. ifltsis F Iflt p If fter receiving written ppiovl of his wrt s specified str ARTILE IV, Sections, E t F, the onsultnt shll be ordered in writing by the Engineer to ske revisin of the plies ndlor other dt, the onsultnt shlt be entitled to dditionl c tii s provided in ARTILE VI, Section. No c.nstion wilt be mde irder this section for work which the onsultnt hs co,leted id for which pprovl hs riot been given, or for revisions cwed by errors, omissions, oversi glit or neglect on the prt of the oiuttnt. EXHIBIT D (pge 3 of 26)

75 4 16. P*LlAfl OF P10% Id copies or sketches of plin, liwli4ing design plns in the formtive stöe re to be relesed by the onsultnt to ny other person or gency, except fter prior wrovt of the Deportment All press releses including plns d informtion to be puztlshed In newsppers, mgzines, rid other net medi re to be through Deprtment sources only. 17. tu,i1 OF PEPARflEIfl FEtt The elo)eent by the onsultnt of personwt on the pyroll of the Nsschisetes Highwy Deprtment shll not be permitted in the execution of this ontrct, even though such Loynt my be outside of the eploe regulr working bn or n Sturdys, hotideys or vction time. The onsultnt is pretwd to hve sufficient rid cetent orgniztion to de the work reqired IL tflaiflv The onsultnt wrrnt, tht be bee ct loyed or retined ny cny or person, other thn. bone lid. loyee working solely ft. the onsultnt, to solicit or scre this ontrct, d tht he hs not pid or greed to py ny cny or person, other thn bon tide eclyes working solely for the onsultnt, ny fee, cis.ion, percentge, brokerge fee, gift., or ny other cnidcrtin, contingent icon or resuttln I the wrd or ing of this ontrct. For bred, or violtion of this wrrnty, the Drtment shll hve the right to mviii this ontrct without libility, or, In its discretion, to deö.tt fm the ontrct price or considertion without Libility, or otherwise recover the full eo.,nt of such lee, cission, percentge, brokerge fee, gift or contingent fee iy. nifltj5 The onsultnt shll perfore with his oii orgniztion iriting to not less tht fifty (50) percent of the contrct fee, except tht ny it designted in the contrct sspec,lty lt sy be performed by subcontrct. If the clexity id nture of the project re sidi s to require highly specilized professionl or expert ssistnce, services or dvice in cormectin with specil phses of the work which normlly re not the type perfnd directly by the wultnt, such services my be obtined, provided tht prior written pprovl is received Irm the Depeflmnt, d, in the cse of FederlAid Projects, bth the Depertrit d the F H li.a. The onsultnt wrrnts tht hi. contrcts with stconsultnt shll bind ech ntconsultnt to ll provision of this contrct to the extent tht the regultion, rights rid interests of the Deprtnt rid the Federl Highwy Adeinistrtion my be effected, id the onsultnt ccepts legl rc finncil responsibility for ny filures to so protect nd enforce the regultion rights rid interests of the Deprtment rd the Federl Highwy Ainistrtii. The DeprTment reserves the right to pprove ny chnges in sitcontrctors or chnges In the suts or rtes of cst reissent to ny sitcontrctor The ecloyment of other firm or indivi*ls for si.mplntl specilized services, such s soil testing rid growid or eril survey work Included in the predetermined I cc, shll not require pprovl of the Federl Highwy Ainlstrstlut or the lod of issioners, bst prior written pprovl shll be obtined frm the hief Engineer of the Deprtireit Ieqsts for pprovl of work to be eblet nt include cler description of the work to be performed, cpbilities of the subcontrctor to perform nh work, brekic of cts id n t hours, method of pment rid mxims unt to be peld Any subcontrct exceeding S10,OQO 00 in cost shl I contin ll the contrscturl provision required by FederlAid Highwy Progr Nnl VoL. 1 ).. 7, Sec. 2, Pr fldisq!wlnatt im ertuwwt AWl AFFIInTIVE AtTI During the performnce of this contrct, the onsultnt, for itself, its ssignees nd successors in interest, shlt ciy with the reguttions of the Deprtment of Trnsporttion reltive to nondiscrimintion in Federlly ssisted progr of the Deprtment of Trnsporttion (Title 49, FI, Prt 21 hereinfter referred to s the tegultin), which re herein incorported by reference nd mde prt of this contrct The oisultrit shll cly with.11 provisions of the Ieqjired ontrct Provision icr Equl Opporttriity, the specil Provision for Specific Equl Opporttnity Pesponsibilitin id the Disdvntged Bi.siness Enterprise ProvisiuIk which re included herein nd mde prt of this ontrct. EXHIBIT D (pge 4 of 26)

76 21. NcTEU Unless otherwise specified, ny notice heretz der shll b. in writing nd shll be ded delivered when given in person to either prty or deposited In the U.S sil, postge prepid sid resseo s follows To the Deprtment hief Engineer Kssirits II Øiisy Deprtfl 10 Prk Pins, Iosti, NA T the ontrctor: (ontrctors ress s listed on pge 1 of the Stndrd ontrct3 U. The onsultnt shll trry insurnce in sufficient otrt to ssure the restortion of ny plns, drwings, cuttiors, field notes or other siilr dt relting to the work covered by this ontrct in the event of loss or destruction unit ll dt is turned over to the eprtrent. The onsultnt shll rnlt copies of the Insurnce policies s well s ny pplicble certifictes to the Deprtment for sttsqimnt filing with the Deprtment Secretry. The Deprtment shll not be oct Igted to mke ny pynt to the rniltnt for services performed.rfler the provisions of this contrct before receipt of evidence of i nsurwice coverge. The onsultnt shll lso crry Professionl Services Libility Insurnce f or errors nd omissions, in n tnt stted In the SPIIAI. PROvI3H*S. This Insurnce shll be obtined by the onsultnt nd shlt rln in force from the dte titn the onsultnt of If xes his Registered Professionl Engineer s st to the ontrct docients to the dte when ll construct Ion work desired jider this ontrct is cleted, inns this ontrct Is terminted s herein provided, or Lntil It is determined by the Engineer tht coestnxtion hs dvnced to the stge there errors In design cnct further ffect sid cuistnxtipm. This policy shll indilfy nd sve hrmless the...,.n.elth, Its officers, gent id loyees frne clim, suits, ctions, dges id csts of every ñ nd description resulting fr errors nd omissiors In the work performed by the onsultnt fter the strting dte of wid tter the ter of this ontrct. A certificte showing tht he Is crrying this insurnce thi L be siwi tted to the Deprtment for stmseqmnt filing with the Deprtment Secretry cc cncelltion t such Insurnce, dnther by the insurers or by the insured, shll be vlid tls. written notice theret is given by the prty proposing cncelltion to the other prty rid to the Deprtment t lest twenty (20) dys prior to the intended effective dte thereof, which dte shll be expressed in sid notice. Notice of cncelltion sent by the prty proposing cncelltion b, certified mil, postge repid, with return receipt of essee requested, shll be sufficient thotice. An ffidvit from ny officer, gent or eplovee, th.ily uthorized by the Insured, shll be prim fcie evioence tht the notice ws sent. this section shll Ly to the legl representtive, tristee in bnkntcy, receiver, ssignee, trtstee nd the successor In interest of such onsultnt. The foresid insurnce shll be tket out rid mintined by the onsultnt. Ii sc to provide med continue in force ny insurnce s described in this section shll be ded risteril brech of the ontrct nd shll operte s n immedite termintion theret. 23. IWOtIFJATTh OF IlEALTWI2LT*Xt LIAS1t.l1T The onsultnt shll be lible for ll dmge cied by errors or omissions in his work or in the work of his stcontrctors, gents, or eeplyees performed hter this greement. The orsuttnt epressly grees tht his sstcontrsctots, gents, or eeptoyees shlt possess the experience, knowledge rid chrcter necessry to qulify them individully for the prticulr duties they perform. Nothing in this Article or in this preeeient shll crete or give to third prties ny cli. or right of ction ginst the onsultnt or the Deprtment beirut such s my leglly exist irrespective of this ArticLe or Agrer.ent. The.,...elth my elect to indeenify the ontrctor for clim rising in tort if it determines tht the ontrctor performed Its obligtions titer this greement pirsunt to the direct stçervisicn rid control of the...,rselth or its designted gent(s). EXHIBIT D (p2e 5 of 261

77 6 If, thring the term of the ccntrc, the Depert,.et revise, the Umits of the Project or ke, ouier sfltntii chnge, In the sc or chrcter of the work so s to thereby increse the work to be performed by the unuttnt sth incresed work shll result in nitinl fee to be reid to The ormsj( In ccordr. with A*TIflE Vt SectIi. provided tht written gre cencerning such Incresed work 1114 ftfonl fee hs been mede by lt prties cnerned prior to the perforte of sixli Incresed work In the event tht no such written gie,e,g hs. be exec prior to the perforsence of such Iflcrese$ work, the orsuttit shlt tnt be entitled to ny dditlors fee. i projects being reljrsed with FederL Fwud,, wrovl of sid written grent by the FJ.u.A. shlt be req.ji red prior to the perfrpflc of such Iflcresed work.. *wti*y;p flr TO Tfly EflWTIw Ai,t of work in viprojecg specific cultrcts eopen,d. cwutrcts) shll be negotited in cuifcr. with lt ppliccie Stte ww Federl repjt.tf s. The 1p(icb(e slry rte, utilized to dewsine Irdiviol ssignment limiting fee sey be fixed by the Deprtt prior to contrct elecjtjo,i,!xninjt D (v2e 6 of 2

78 S Pek hir in percent 7 MhltU Ii. TRAFFI 51W! PHA A. DATA tetl Trffic crts shll be tken by the onsultnt within the corridor bring evluted sing n Auttjc Trff it kecorder cpble of prod xlng hourly volin The loctiwn end sopling ortions shll be çqtoved by theingineer. MnL turning vnent sti.ies shll be tken by the oniultnt. Studyfrst nd sllng durtion shlt be pproved by the Engineer *11 turning nvnt studies shll be djusted to reflect twenty four 24) hour tuning volimes med shll be dp.ted to reflect nrrrt yer Averge lni Dily Trffic (AID!) nl cl,;lfictjn stidies shlt be crflxted by the onsultnt t the loctions pproved by the Engineer Forest shll be consistent with eprit clssifiction methods nd sling durtion In order to estblish soãrce for specific trffic vol dt necessry in prepring estimtes of the zin did for the tot louirg tin frmes, 24, 8, 3 med I hir, trffic ytie cnting sttion shll be estblished by the tosuttiit. The loction id sling durtion t the estblished sttion shll be pproved by the Engineer. All mteril obtined by. the onsultnt shlt be furnished to the Engineer. this mteril shll incline nrrtive describing method of nlysis med in developing present dy trffic dt from the field cotrt. Origin id Oestirttion stdin shll be coidjcted by the onsultnt If the Engineer determines tht stiny is necessry for specific project. The opertionl methodology for such study shll be pproved by the Engineer. I. flaflt W! AilALflIS The nultnt shll furnish the Engineer with strighti tnt trffic flow digrm. Ibis digrm shll incli4e ll turning myents t intersctin; min Line vtims between Intersection; rid ill intersecting rod vlises. All dt on time digrm shll be presented on cirrent yer Averge Anwl Dily Trffic (AT) i 5.. r.nstit 1W A5Si. The nsuttit shll furnish the Engineer with trffic forecsts nd ssigreents to edi nd every lterntive being evluted the forecsts id ssigreents shll be for specific time frs s detenilned by the Engineer All phses of the trffic forecsts, devetoit models utilized id nlyticl thodology shll be dcterited In detil for sisicn to the Engirwer. Aoprmte design criteri shll be developed for the following tem: Directionl Distribution percent in Pek lir Trick Fctor in percent TAD Averge Dy Trick Fctor in percent A nrrtive shll be prepred for the bove it including grghicl displys, frequency distributions rid other btki ter,l..d.d to.iort the Individil lt A strightline trffic flow digrm shll be developed by the onsultnt Illmntrting the limits of the project, ll turning monts t intersection., min line trffic vlises between Intersection id intersecting rod vlises for streets i.thldi y be bridged or closed, the digrm shll include the pproprite design criteri pplicble to the project. The digrm or digr shll be developed for the design yer rid intermedite yers s determined by the Engineer. EXHJBJT D (p2e 7 of 26)

79 nne ill P*O*t DflflondT PMfl A. E$1WEW1 grey s The brod pspoee of the EMGIUEEIIWG sum is to provide s lysis d determintion of the s fesible loction for the tinsportrntion fcility between limits s identified in the 5E OF OflULTAMT : hx The onsultnt shll fully fmilirize hioselt wifl the topogrphic, geologicl nd other physicj chrcteristics of the stidy re All possible lterntes mt be considered. He shll prepr, the SlId ti describe the st fesible Loction with criswi of the dvntges id disdvntges of ltenwti possibilities, with sicrting dt for his concluelorn. Those lterntes idsich re not considered prcticli nd re eliminted I row further stidy nt be shm on mp rid be ccispenied by description of the lccti with sttmerit s to ediy further cnidertion is not wrrnted. The onsultnt shll dnstrte tht ll discrded lterntes hve been thoroughly investigted before being eliminted. The ornsltstt shll enlite ll prcticl lterne;c sotutin studs will sttstwtitly serve the Jct trffic desirt Ech evlution shll tke Into ccsit ll the fctors ffecting the cost of construction, si s f,dtii probi, mteriel stces, cistnictf on difficulties, mjor utilities ffected 1 inc d etht wter res The ormiltit shll lso scertin ll pr*eble ecwic nd soci t impct on the cosssitiei trversed tr ll lterntes. The wrt shll incline for ech prcticl Lternte considertion of existing nd potentil lnd m s relted to ietril nd residentil existing or pl..ed ss trnsporttion fcilities, terisel prking fcilities, schools, recretionl fcilities, church prishes d religious institutions, shopping centers, urbn rennet res, nturl resirces, wildlife hbitt, res of wter pollution cc hzrdous wste id ny other fctors Idiich my influence the proposed fcility. the esthetics of the design shll lso be cidered with pried to prdcing the most visully ttrctive ficility possible consistent with ptlic sfety id the interest of the crities trversed. The onsultnt shlt be responsible for cqinting himelf with the detils of existing fcilities.tt the pln of other gecies,sixh s Pegionl Plnting Agencies, locl plting bords, utility omtrs, housing uthorities, prk d conservtion cissin, etc.. rid he shll rrnge etsngs for this purpose nd collect ll necessry dt d informtion. The onsultnt shll give considertion to the pin d suggestions of sits egeecin in the development of the tinte indies rid show on the pin the generl loction.1 ll jr utilities stud my be ffected by the proposed design. The oecultrit shlt ndy sitsurfce soil conditions my be vilble f row ny snte, such s evidence f row stdy of field cm,ditin, previm explortin, seisic stidies d geologicl. if, in the devslont of ir lternte, the nultit t Ir dditinl sitsurfce Informtion Is ned with regrd to possible bridge sites, excvtion re, ledge, swy res or other conditions idiuch my influence the selection of on lternte loction, he shll so dvise the Engineer to stit for pprovl, plin rid rec...,ptioin for the mking of Din munry sitsurfce mnvestigtin If the Engineer concurs, borings, test pits or other sitsurfce tests shll be mde. These tests shll be mde by the Deprtment, triess otherwise determined by the Engineer. Pelrsnt f or such work, s my be pert ord by the onsultnt shlt be e in ccore with the provisions of MTIIE IV, Section 0. unless otherwise stted in the ontrct Specil Provisions, the Engineer shll furnish the onsultnt the bsic trffic dt id trffic ssiyent for existing d proposed fcilities within the contrct limits.. The onsultnt shll develop ll fetures of his designs to be cnistest with the trffic reqi,reernts med the sucrtirig trffic informtion shll be skio..i on the plin for ll loctions stistied. Trffic ssi. ci.t5 for lt vehicles shll be mde to the min roedey id to ech interchinge rop i well s tinning ovnts t intersectin t grde. Assigiits re to be expressed in ter of verge lly design trffic id directionel design hourly nlies for both the present id for the selected design yers s designted by the Engineer. The onsultnt shll show: rightlwy reqireemnts; iorizontl ligreents; profiles nd typicl crcsssections fr ll segnts of min highwys, interchnge rmps nd service or frontge ro; typicl sections for U existing wl proposed intersecting rods; sketches showing loctions of interchnges rid grde Intersections of sufficiert sce to insure fesibilityof design; co.tmectio.n id other highwys, including frontge rid service rods; rilroz seprtions or grde crossings; bridges; nd such other fetures s my be pertinent to the wrt. EXHIBIT D (pge 8 of 26

80 9 In ddition to the forntioned plns which shll show the loction of ll bridges, the Design Engineer shell develop id prepre siteeestry plns for ech bridge. These shlt consist of one or more drwings, t us ppropri te scle, showing in detil the type of bridge proposed, the spn rrngements, mini n clernces nd other pertinent dt s wy be req.s! red to estblish th, generl design I cuses of Its, stnxture. rtive studies shll be mde of the possible types of bridge for e loction nd n evlution of the ecic rid esthetic cnidertlons shll be.sde. it bridge Is over wter, the nultnt shll mke Ll cpsttions necessry to determine the proper steny cpenings for both hydrulic nd nvigtionl purposes. in inventory shll be mde by the onsultnt.1 the thmllirigs ndlor other iproved properties idsich will be ffected by ech lternte Loction, rid n estimte wde of the ir of mutes to be displced. A list of the bisiness estblishments displced nd the rier of penn eoployed in ech shll be coopi ted, The wieultont shll plot n pin the property lines.1 ll property f fected by the lterntes wider study. The inlcrsticn required to rstblish dine property lines shll be obtined fr ssessor s plus, tx rn, cnsty records, dee, nd field review. The obtining of ll suds informtion shll be the respoisibil ity of the onsultnt. The plus shll lso show the limits of the rightofsy required id such provision s my be necessry for ccess to those properties to which ill nets.1 ccess nsld otherwise be closed. the crnultnt shll lso include in the ENGINEERING REPORT the besic trffic Informtion nd sidseqnt ccjtti oil, fctors nd eetho sid by the nultnt in ss ignirig such trffic. If directed by the Engineer, the onsultnt shll develop n ecorsic nlysis for cds of the Lternte scfles in ccordnce with nrrent prctice of the Aericon Assocition of Stte Trnsporttion Officils, or instructi ow furnished by lie Engineer. Estimtes of the cost of cntruction nd of rightofwy shll be tbulted for ech of the lterntive sligrnts studied. The nultvst shll develop cst estimtes fr the ppos of progring f usd to corntrwt the prsed trnsporttion fcility. Limits of cs istnctien section, s well s other mthods of stge construction, shll be rec...4.d with costs oportioned to ech section. The costs shlt indi cost estimtes for rightofwy, rv.l or reloction of buildings, rilrod or utility chnges, in ddition to cost estimtes for the roeá.ys, structimes, dringe id other construction itn. AlL suds tiltin shll be presented for sch msicipel i ty trversed. The owulteit shll develop plus nd profiles t horizontl scle of itt Ins thn 1 ZOO, with verticl scle five tins greter thus the horizsnt. Wrticl controls id ll necessry gtrics shll be iii sufficient detil to permit the estblishment of the pproximte centerline on the groird. reful cosidertion shll be given to the is. of independent ligrsent nd profiles for directionl roöiys. In the devel...,...t of grde Lines, considertion shll be given to obtining blnce of erthwork q,tities where prcticl. On the bsis of the foregoing studies, the usultnt shll evlute the lterntes cormidered nd sit s4 7 te stçporting dt to substntite his conclusin. ALL Lterntes studied shll be vilble for review Dy the Engineer. The onsultnt shll sseele ll informticn id dt s required to chieve the objectives of the STILT. opies of preliminry drft of this study shlt be ss.ittd to the Engineer for review nd cceptnce. Sufficient primry nd sorting informtion, s determined by the Engineer, In the form of, detiled work sheets, tbjlticns. exhibits rid proceirl methods, shll be presented to unt the proposed nrrtive nd grphic contents of the REPORT. The preliminry drft of the ENGINEERING REPORT shll be presented in form sufficiently representtive of the FINAL ENGINEERING REPORT to fcilitte id per.it crreflnive review; nd shll include Si evlitlon id cost cerlson of the Lterntives studied. Following the Depertwent s review rid cents cii the preliminry drft of the ENGINEERING REPORT, the oiwultrt shll sitit three copies of the reviged pin rid profiles to the scles s forntioned for disply t flhic herings. Suds herings shlt be rrnged by the Engineer rid the onsultnt shll render such ssistnce s determined by the Engineer in ccordce with the tern of ARtILE I, Section H. The onsultnt shll review the trnscript of the public herings rt rte situ revisions to the ENGINEERING REPORT s determined necessry by the Engineer. The onsultust shll sibeit the FINAL ENGINEERING REPORT, with plns, in q.intity nd within the lime limittions s set forth in the SYE OF Wt. ALL revisions nd requsremnts, s designted by the Deprtment s review, shll be incorported in the FINAL ENGINEERING REPORT. EXHIBIT D (pge 9 of 26]

81 10 Incftded In etch copy of the FJnL ENGINEERING REPORT shll be copies of the pin nd profiles showing the rec...jd loction for the trnsporttion fcility id fesible lterntes reduced in size to not less thn I 600. Three copies of these plns to the scle of not less thi shlt lso be siarlitted to the Otpe..ut. EEYlnflUL tafl etatneits Wder this section, the consul tint shlt corflct the studies r proose the docimts necessry to rt the requirnts of the Ntionl Enviroreentl Polity Act nd the Msschusetts Envirorcentt Protection Act, s they hve bewi rded, The requirsts of the Ntionl Envirusentl Policy Act, for the p.rpose of this contrct re contined in the!n.u.a. PPfi eli id 907 nd Federl Aid Highwy Progrc Mnit, n.ers 771, 772, 773, id 77S n they hve been ded. The reqjirnt of Mschinett Envlruwntl Protection Act for the prposn of the contrct re contined in the Ruin nd Regultions filed by the Ezenitive Quid of Trnsporttion id ntnictlon on Now er 8, 1913 d rs.o.ti thereto.. The sid thcnts shll fless Ll lterntives, including icbuild lterntive, s developed In the ENGIIEERIIG IEPT. PROVISIIS: the corsultnt shlt proose ny or ll of the following dcints s specified in the SPEIAL I) Wqtinl Evwl...,pl Policy Act. [nvirssrtl Assestnt b. Negtive Declrtion c. Grft Envir...,tl Sttewtt d. Fled Envirotntl Sttnt 2) n 4setts Enj,..,.tl Protection Act. few I....t I Assesswit Fot b, Drft Eiwf..tl Jepct Report c. Finl Envi...tl lopct Report Prelleinry copin of ll sid donents shll be required for review prior to the printing of the finished doci.ent. An ssesseent of the prosed project shlt be cuzted to ssess the effects of this project on first; the physicl envirunt; i.e. the nturl nd nflnode environrts; id second, the envirnents involving pecple ewir...t: The following shll be studid in depth to deteroine the effect of cistrictionof the project on the t Air êlity The effect of the proposed trnsporttion itqicts on ir qjlity shll be ssessed. Roth long nd shortten projection of tulsc sir qtity shll be de Projections shell be node toted on initil nd dir trffic volss of the new fcility considering future nticipted levels of vehiculr pollution icing roved ir.llty predictive dels. The effect of chnges in ir qulity on the ecologicl systc of the region shll be ssessed t level.1 detil consistent with vilble dt s to bctgro.sid concentrtions of relevnt ir pollutnts. oordintion id consulttion shll be de with the coriznt ir pollution control getty for consistency with the Stte luçle..enttion Pln id trnporttion control strtegies. 2; lter QuLity The effect of the proposed construction on both the quntity nd qulity of surfce nd gro.sd wter shll be studied. The possibility of ice control cheiicls used on the rooy polluting either surfce or grted wter shll be investigted. EXHIBIT B (pge 10 of 26)

82 11 The effect of rec...uti en possible pot Litton on present or future wter supplies slut I be ssessed nd mde to minimize such effects both during construction nd fr the long term. 3, Sofi hnges in cisc Levels, both during construction estimted. The effect of such chnges on current following shll be considered s sensitive receptors: nd iduen the rod Is in service, shlt be id future lrd t shlt be stlliied. The 4. lesidentil Ares Schools hospitls Prts id Recretionl Ares A stidy tht I be mde of the economic effects of this project both on the indite re met mu the region s dil. The ecoeuic benefits of improved trnporttl on shll be evllted ginst the possible lss of txble property to the ssiciptities trvirsed. Possible incrise in ino.mtril denl..nt, id Its effect us the chrcter rid srowth of the nicipli ties ffected, shll be ttidied in botti severl d sitr specific context. 5 Ecologic The ecologicl chnges to be expected to cnr s the result of this project shll be ssessed Stxuies shll IncLude the effect on plnt nd wildlife in the re Long with rec,...,4tin to minimize uudnirblr chnges. 6. SocioPolItIcl DlspLcnt of fi lies bjsinessn, id c.sity fcilities through lrd tking poctdrn shll be evluted, d nth of reloction of displcd ctivi ties, or the ctul rmplcemenc of sd, cheellings id other stnxtires, shll be rec...4.d. The effect on suicipet services shll be studied, rid needs for Incresed police protection, chises In wter, sewer, id other xulcipl services shll be evluted. * divisive effect us the niclplltin cned by the proposed project shll be evluted. Prts, Uelife Srtirin, R...ptlwl Fcilitin d listoric Inr Prticulr ttention shll be pid to the effect of this project t prks, wildlife sncturies, recretionl fcilities nd historic ressrces All possible effort shll be mde to void using or tking such res. Mitre ffected, recentio to minimize itesirble effects shll be m nd provisions to increse the effectiveness of such fcilities shll, be investigted. Sufficient Informtion shll be presented in the invirnntl Stteeent to d..trte tht crehefive exmintion hs beer mde of slpuificsnt effects of the proposed project Including socil, econic d physicl envirorswntl fctors The Envirmentl Sttnt shll be presented In fint mid lnguge tht will be redi Lv uderstndble id of in in ft hn zing the pti Ic with the type id eten áf potentil rwirontqutl effects ttributble to the trnsportt ion fcility corstn*tiu. As prescilbed by the Federil Highwy Adeinistrtion req1rnts, this Sttnt shll contin nd discuss description of the proposed projects; the probble Impct of the proposedproject on the enwirnmt; rid probble dverse eeuvurornentl effects which crrot be voided, lterntives to the proposed project, the relt,orhip between locl shortterm nez on sn s envlrctnut nd or mintennce id erduncement of longicr. proo.ctivity; ny irreversible cnitnts of resowces; probtees id objections ri;ed by others; rt, s pproprite, steps to be tken to inirize hrm. EXHJBIT D (pge 11 of 261

83 12 Th, bsic prcch to be tsçloyed in the developent of this method shll be s lot Ion: 1. A cmiprehersive dt collection pogr including p.tlic meetings, nd coordintion with locl, Stte wd Federl gencies, s required. 2. Ezlntlut of dt to estblish bn lines to be id s reference for envirormentl iripcts. 3. EvLution of snltivity of warm fctors. 4. Preliminry evlution of the prepred project to identify envlrcrmentt iepcts nd possible probl res fr both the shortterm tt nd longterm pro&tt ivity. 5 A more detiled nlysis of significnt envirnntl Iqcts rid estblishment of the overll. iop.ct of the project on the envirunt. 6. PreprtIon of the Drft Sttnt, with copies, to be issued to vriotn pitlic gencies for ttieir c..,t. 7 Icon receipt id evlttlon of ctts fdtlowsng ptlic hering, Finl Sttnt shll be prepred with copies, required, for proper distribitimi., this frised pproch will ssure tht the Envirormentl 5ttnt fulfills the ptwposeprevlo.ly stted to provide co.tehensiv, evlution of sid. rnge of envirnimentl considerticr.. This spproch wilt Llow periodic revien rid modifiction to the study s more informtion becs vilble. flflt 4 (1) StAimi The oeultit tht L prcthte docient to deqtely si.wort the determintion required by Sect ion 1653 If) Title 49, United Sttes ode 1/, Section 138 TitLe 23 of the Federl Depsrtnt of Trrsporttion Act, herefter referred to s Section 4 l), wd FIRIA FederL Aid highwy Progr Ns*il 772 s nded. The pplicble portion of tht Act shll be siçplied to the onsultnt by the Depertt s prt of this contrct. The Section 4 If) Sttnt shll be prt of the Erwiroreentel lpct Sttnt but shll be written in uth form tht reference to other prts of the Envlr,...tl icect Sttit is nt necessry.. PtEtiMlMAfl fltatr IflT the oidelines For wsultwit Work lnfireo.rin Pr,liirsrv Rert on Reloction Weed rid Resorce ieferetic& in this contrct s s currently...nj4 or re vf sed by the Deprtment, re hereby incorported by 1 stlnt of the r.qisirent of tie onsultnt for this prt of the Project Dewlopeent Report Aw modifiction of these guidelines they pply to this contrct will be noted In the Specil Provisions. A copy of these guidel inn flt I be furnished to the onsultnt by the Engineer. ml nultwit shll prepre Project Develcr,t csite Report bsed ml studies concted in ccordnce with stdzsectins A, I,, nd D. Such Report shll meet the requirements of ll colicble Federl nd Msschusetts levi, rules, rid regultion concerning the docimenttion nd justifittlcn of proposed trnsporttion lprovements including, bit not being limited to: their engineering fessibi lily; lterntives; expected socil, ecorsic ord envirnntl itects; rid the process provided for obtining pitt it prticiption in their develw.c..t. A drft of the Envirormentl l.pct Sttement c...ent of such osite Report shll be vilble fr circultion by the Deprtment to goverrnt gencies rid the petlic for review nd c.,,.t. After such circultion, firl osite Report, including Finl EnvironmentL Itct Sttement tking into conidertion the vievi of such gencies rid the ptllc, diich explir rid justifies the finl design of the ieprovnt shlt be prepred by the onsul twit. Such Qsite Report shll cbntin the following prts: I) Intredscticn t Generl Project Bckgrotid 2) Engineering Study rid Report 3) Env,rorntl lopect Sttnt 4) 4(f) Sttnt 5) PreLiminry Reloction Report 6) GenerL Appendis, libliogrstfly, Ptttic Nesr;ng Trrtcript 7) Plin EXHIBIT D (yne 12 of 26]

84 13 The bove listed prts of such oslte Report shll be rrnged gs to be doble of being slx.it fn&pendently, long wfth prt lj lntroo.xtjg rd Gener.( Project 5ckgr,, to vriow gvrnwrn revi guldin. t not ft intent of this cwitrct tht the prts of the Project Develont cs. Report thn be prepred frdepee,,tj 1, of ech other or in the order s set forth bove These prts shll be developed concurrently to the e*tent possible so tht inforstion developed in ny te prt shlt be ref tected in the other prts s welt s In the concftsf wid rec_,.j_tfn of the lport. It Is the Depsrtntss Intern tht, idien the Project Deveio 1 Report hs been cnw(eted the selected corrfder toctir h5 been sved by the Federl Highwy ASlnistrtlon the dt contine shll be of sufficient detil tht engineering ci be dvnced to the Design Stge. S EXHIBJT if (pge 13 of 26)

85 I AJTTtLE IV D SJ PMA A. SWTS The clete or prtil sttvey my be mde by either the Deprtment or the onsul tint or prtilly by ech, s deslinted in the SE OF tipataht 5 SE AI SPEIAL *cvsiis, rt shlt include the following: 1. flew SWT Surveys shll be st s necessry for the preprtion rt cletlon of preliminry id finl design, contrct pin rt lyout plns for the project including Investigtion rt survey of: property boridries nd property otien rs s obtined f roe records ft l.d t the rey Registry of Deeds Horizontl control Including control for itogriwtry, shill be t second order precision id ccicy inlets otherwise specified, id in strict confornce to the current Msschietts Nl9wy Depr$ Survey Mimi or Specifictions for Aeril Sisycys nd Mcping by Photogrtric Methods for Highwys, hthichenr ili Design of primry trverses id proposed coeviectls to Kiss. Geodetic Survey control re to be sil;td by the nultsit to the Loction rt Surveys Engineer prior to ctul survey. The Loction d S.sveys Engineer shll review the proposed cowctioe. id trverse design rt my require chnges before his ovmt. SiSeørt chiges the onsultnt my wish to she ist be s*mitted to the Loction nd Surveys Engineer for wrovl. ontrol st be designed so tht it will be coviected In position nd zisith to Mss. Geodetic Stnqy.onnttlui of e.t or higher ccurcy. If the Loction d Surveys Engineer decides tht the ezisting logs control Is for sme reson indeqlte, he my direct Dcp.rt.ent forces to expnd, resisvty ct redjsnt the logs control, The intent is tht the onsultnt shll bse his project surveys ipon logs control tht the Dep.rtn hs t ttie time judged relible nd the onsultnt shlt expid control so tht there will be sufficient, d.,..4.ble id ccurte pe.. rt st perminu control on the Msschusetts Syst of Rectngulr oordintes. priry control rt ll sin hs, line surveys shll he djusted by the Deprtent. The onsultnt shll siit to the Loction id Swveys Engineer ll field nd office dt including field notebooks for review id cdepsttin. Wrt iddch does not conform to Dep.rnt stdrds will be rejected, nd the onsultnt will be directed te pert rm the wrt correctly t his eon Verticl control, including control f or photgrtry, shll be of second order ccurcy d on the logs dt irless otherwise specified, nd shll be sttject to s prior pprovl rt other conditions s horizontl control. sse line, detil, Levels rt cross sections my be tken id recorded in notebooks furnished by the Deprtment d perfoiwd In ccordnce with the current Survey Mrtil or lternte procedires my be pproved by the Depernt. The onsultnt shll include In the survey notebooks dequte ties to ll horizontl nd verticl control points so tht these points my be reprotced ccurtely. Ke shll Lso furnish tiesheets of these points. Points, including bseline stkes or pins,.thich were plced by the onsultnt rt ditch bec displced or rmeved rt cnnot be replced by existing ties, shll be reestlish.d by hi.. All field srwy work performed by the onsultnt shll be sttject to Inspection by the Deprtment during id fter ctul survey. The onsultnt shll keep the District Office contiricisly wre rt the loction of his survey prties District Survey Soçervisors nd their siçerlors, s well s representtives of Loction id Surveys, y nte field Inspections they my den necessry for proper performnce of the wort on the project, rt my require chnges or itiors ssject to pprovl of the Loction ct Surveys Engineer. Surveys mde by photogrntric methods my be ised upon pprovl of the Deprtment, but nt be silrented by necessry grout survey to obtin infort ion not vl tble or not sufficiently ccurte by ising this piotogrmetric method, such s bse lines, property Lines, iidergro..ed structures, siderwter dt rt other detil rt elevtions obscured by nturl growth id stnxtures. Field survey shll Include the Loction id stking of points where borings or other sitsurfce investigti re required. there soft instble.teril is evident, such s swss, orgnic deposits. etc.. sufficient pichings shll be tken to show the pproximte profi Ii of the hrd botton. this work will be considered s prt of the field survey work rt no extr c..enstiei will be pid. EXHIBIT D (pne 14 of 26)

86 15 ARTILE IV 2. ywirti ir PLTtJWG NOTES ALL sirvey tin shlt be cinted id trverse sheets prepred on fore to be provided by the Deprtment, except tht lt im bse line surveys shll be djisted into the Msschusetts Systee of Rectngulr oordintes by the Deprtment. bts fron survey notes shlt be trnscribed id plotted ui bse pln, profi in id cross sections in ccordnce with the current prctice of the Deprtment to the scles s directed by the Engineer. ALL field survey id plotting of such dt, including bse tine, detil id cross sections, shll be performed In ccordice with the Deprtment s nsrrst JVEY KA**L. i. pntmi.in m si sistt (nny clled the 252 nsission) The onultwit shll prepre plne, profiles rid typicl cross sections to the scle of the contrct pln shouing.11 design detils id eproxite highwy Lyout Lines, ircls4lng sketch pin for bridges, jor imge structures id for wll Setstrfce irwestigtin shll be reqjired to estbli sh the design t this stge. All dt s iy be shmi on plns prepred in coiwiection with the project devetnt report shll b. refined nd expended nd ny dditionl design. Design csttin will be necessry only to estblish the generl detils in ccordnce with the scle of the pin. S&etds plin of bridges rt jr structtrn shll thi, pt s id elntiei vien, pofiin, cross sectin id ny jr stnxturl detils, LL s described in the Irldge Miwl. Three copies of the pin d ny pertinent dt shll be st*itted to the Engineer for pprovl.. tnct PLANS N I. Upon...nl.1 the pin siditted for the prellfiery design mission, the nuitnt shll proced with the preprtion of contrct pin id Xctnts. 2. As the vrioin stges of the design re cletd the onsultnt shll prre set nit to the Engineer miss of two copln ech.1 crss sictin; profiles, right of wy pln; drinege pin; pln fr stre reloctlin id wetlnd herings; trffic control devices; highwy lighting id slpn; pln for bridges itt structures; lndscping, if required. id other miscettwn construction detils. All suds s,.issiors shll be to the scles of the bse plns nd profiles s described In nude IV Section A The nultnst shlt prepre necessry plns id specifictions to secire ny cfliticnl bering dt, if reired, t strictures or other Loction s çgzroved by the Engineer, in ccordnce with the provisin of A*TELE IV, Section 0. 4, The onsultit shll prepre stidsrd I Icerse pliti, ppers id other dt s y be reqired for sitnisslon by the Deprtment to the U.S. ost Otrd, U.S. Army orp of Engineers or ny other gency, in coenect I on with bridges over nvl gble wterwys. 5. The onsultnt shll contct the vrious utility c,ies nd uthori tin those fcilities iii IL be ffected by the proposed cntnrtion id obtin time such cnl s nd uthori ties the Loction of existing fcilities, together with proposed chnges. 6. The onsultnt shlt design itertloess of plicly oied utilities which y be rjired n ccit of construction of the project, except in csts such s ltertion of lire or pot ice signl syst or other cysts where, in the opinion of the Engineer, pitlic convenience r sfety req.ires such ltertions to be designed nd performed by the prticulr putlic gncy involved Insofr s prcticble, id s pproved by the Engineer, designs of such ltertions of publicly owned utilities by the onsultnt shll colors to the requirerents id design stndrds t the prticulr p.tlic gency Involved. EXHIBIT D (p2e 15 of Th1

87 7. In cornection with ll ltertius of utilities not designed by the onsultnt, idirthe pitlicly or privtely owned, nd in crection with ltertions of fcilities of pitlic trrwi syst or of rilrods, the onsul tng shll furnish to the gencies involved, Informtion nce&s.d to 9. Estimtes of work to be performed by the forces of the...,&eslth or tiicipl gencies or of pitt ic utility or rilrod c.nies shll be incorported in the prelilnry design estimtes. 11. The onsultnt shll prepre p1mw, specifictions id estimtes for the dolitis of 13. A ssission of ll teril prepred Incliding detiled plne, profiles id cross sections for Ll rodssys, service rods, interchnges, mjor id miner strscties; dringe fcilities; utilities; rest res; ltdscping; sin; trffic contrl devices id lighting, if reqired; detil. covering other specil probi nd sleitory specifictions unting the Ltest editing of Stnrd Provisions for MiØieys d Iridges will be e tc the EngIneer f or esintimi in the 14,. The wul tent sisl I prepre d si t to the Deprtment f in. I des Igi plns id lt necessry contrct plw to be sivlded in one or severl ccrstructf ss contrcts s stted in the Specil Provisions. All drwings id sots thereon shll confers to the required stndrds of the Deprtment, sle of øiich my be obtined 9 roe the Engineer. The orsuttst shlt sin to the Deprtment s finl contrct plus either Indi it trcings on trcing cloth or full scle repeoditiuw by photoof fcti ithcgri process n trcing cloth. Trcings ide on polyester drfting 15 The nultnt shlt prepre mid sidwit to the Engineer, f or pprovl estimtes of qi.ntities with mit cost by t covering work to be done irder cmstnxtion contrcts, with seprte estimtes for cds bridge, id shll prepre id silt detil sheets identifying d Locting the typicl 16 design by thw of the ltertions, incliding informtion regrding possible interferences with othe fcilities. The usultnt shll review dniyn mde by other flres id coordinte ll ltertios idsthr designed by him or not. I. In the cse of those utilities or rilrod ltertin to be designed id performed t dii ezpetse of the t...nlth by other gencies, such s elth or Misnc;pl Deprtments, ins Lit) iers or rilrod crnn the onsultnt shll ssist in obtining cost estimtes from such geities nd shill review such estimtes nd report to the Engineer concerning thom 10. The onsultnt shll perform these services in cwwction with other gencies s prt of the work covered by the Generl Fee muss otherwise specified in the Specil Provisions or in sqiplntl gr.t bit idings within The highwy lyout s specified by the Deprtent s Iit of hy Iuinu. These docinents my be inclided in the prime cntrwtion contrct or in seprte fllttion contrct s determined by the Engineer. 12. Ic work shll c..e en finl contrct trcings, estimtes, job specifictions id other dt necessry for the construction of the roth.y, stnxtures d ppurtennces intil sid preliminry siissins hve been pproved by the Engineer. period fter eightyfin (15) percent d before ninrty 00) percent of the work is cleted. Thi sstssion hs been clled the 75k si.slon of the first finl s*.ission film iing cette lit will lso be ccepted. Wshble plstic pencil s drfting film will be ccepted s finl contrct pt s for bridge work. The drfting film shll hve emm film thick.mss of four (4) mils with mtte surfce on sic side only for bridge pin Preprinted drfting ppliqiss representing north rroim, generl notes, s)tols etc, sisl I not be used on contrct plus. The first design dt shll be plotted on the bse p1mw id profiles s described in ASTItE IV section A 2 stin d contrct t d providing other necessry informtion The estimtes id detil sheets shll be prepred in ccorice with stndrd prctices id requirements of the Deprteent id shlt be typed on torn furnished by the Deprtment 4 The onsultnt shll prepre Specil Provisions for incorportion in construction contrcts The Specil Provisions shll consist of sit such specil directions, provisions id reqjirnents s re specilly pplicble to the prticulr construction contrcts conteepited, id tich re not sufficiently covered in the Stndrd Specifictions for Highwys rd Indies The onsultnt shll siit to the Engineer, for pprovl, two copies of cleted drft of the SpeciL Provisions before ninety (90) percent of the work is cleted. EXHIBIT D (pge 16 of 26)

88 1? 17. The onsultnt,,dienever requested, shll stit to the Engineer, letters, reports, or other dt to sitstntite the fetures of Ms design or recn..t1.tius id shlt mke vilble to the Engineer for the purpose of hving reproöxtions mde, ll plus, specifictions or other dt which hve been prepred by the onsultnt. 18. The onsultnt shll crefully verify Ll cttions, postings, rid design clcultions t shll furnish to the Deprtit, fter pprovl by the Engineer of the cletd design (irclscing plns, trcings, estimtes of quntities id wilt costs id specil provisln), two (2) per.nen legible copies, cd of his originl design clcultions id bridge quntity clcultin swt*ly bwd. All clcultions nt be stltted in owlfcte. One set shll be prepred id signed by the professionl design engineer, The second check shll be reviewed id signed by nother professionl engineer. tt. The ngegestejed PPQFESSZ&IAL EliSiwEti or IE15Tfl tal uwy st of the relth of fqsschimetts, whichever Is pplicble, shll pper on the riitofwy plns, construction plits, specifictions, reports nd ny other doctents prepred by the nulteit which will be retined In the perc t files of the Oepernt or filed In the Registry t Deeds In Qiltiui to the required st s stted bcve, the signture of the registrnt shlt pper directly belmi the ste. the se of fcsimile st wilt not be ccepted. D. SflflU INVEST! AT!$ the unultnt shll nte n investigtion of sttsurf ce conditions of sufficient scope to permit determintion of generl soil chrcteristics sd depth to bedrock s bsis for the pr design of roy id highwy stnctures. In order to properly mke the determintion of,sdergroisd conditions, the onsultnt shll st.it to ihe Engineer for pprovl proposed progr of borings, test pits, plte bering tests or other field or Lbortory tnt., long with n estimted cost for performing such work. The Engineer my title, reice or emend the ss*swfce Investigtion progr proposed by the onsultnt, or, t his option, the Engineer sy sped fy in detil the type, estrit id detils of stsurf ce iiwestigtin Tht re to be mde by the Deprteent forces or by such other srs s the Engineer my desire. Jn ny cse, the onsultnt shll ly out the work in detil nd prepre ny necessry plns nd contrct its for ny of the pproved sikcontrcts. If the Engineer shll require the onsultnt to sitcontrct sw field tests, the tisultuit shll receive csçetitive bids fr qulified contrctors which shll be siitted to the Engineer for his pprovl before ny tort is nhorized. ALL specil Lbortory tests for,d,id, tste pysnt Is to be mde shll be previonly roved by the Engineer The Deprtesit shll relrse the onsul trn for the di etc costs of the field tests id specil lbortory tests. Slry id Dverhesd costs, echidirig profit, rid trwl eperses for field inspectors furnished by the onsultnt shll be reiflsed s direct cit. Field irspectors shll be furnished by the onsultnt only If Drtnit. inspectors re not vilble id only fter written uthoriztion is given by the Engineer s to the nter to be provided, The consultnt shlt be responsible for properly identifying, describing sd ilssifying soil id rock crcoqsnersd in sitsurfce investigtions s prt of his generl fee. In this csiectirn, he shlt visully id lly eslrw ll soil sles nd rock corn id shll certify in writing to the Engineer imen, here id sito esitwd such soil sples. leports shll be prepred by the onsultnt covering ll sitsurfce investigtions nd soils nlysis.411th shll be sfliitted to the Enjineer, copies of which shll be mde for sflissioi to the federl Highwy Ainistrtion. It is irderstood tht the onsultnt shlt either hve in his erploy n engineer cpble of perforring the bsic soils id foodtion work or engge the services of soils engineer, the cost of 4iicfl is to be included in his generl fee the onsultnt shlt not receive estr pyment for the preprtion f piers, cvrtrcts, reports or other office tiork in connection with sitcontrcts for sit surfce investigtion work nor for his professionl engineering services in correction with the field or lbortory work or in conection with engineering nlyses of the results of such tests, such services being considered s cowered by the Generl Fee s defined hereinfter. EXhIBIT P (pte 17 of 26t)

89 18 le tort foi Witch dditionl pyment is climed shll be performed isiless prevloisly àçiproved in writing by the Ingineer rd no ci!. for pments for sitcontrctors, field inspectors or for ny other n in excess of Generl Fee shll be vlid using so pproved. E. 11WOFWY PLAn RightofWy pt shll be prepred by the orsultnt or Deprtment s specified herein rid s noted in pplicble Federl Highwy Ainistrtlui Policies nd Regultion lightefloy plns shll!ncli.de ll pertinent dt ffecting the costs of rightofwy sects s strictures, lrd setvices or ccess rode, iprovnts, lndscping, dringe, fences, cesspool:, septic tnks, wells etc ediere pplicble. The sin, for. rd rrwignt of lightofmy pin shll cstor. to the generl reqisrements f r highwy pin The lot Lowing pproprite syol.dlor idritif (ction informtion s showi s cnstructint Pin shll lso be irchded on the lightofwy plnt () Rightofwy FederL Aid Project NiXr (b) loction s to scles med c) A north rrow fr ech plws sheet id for ech Insert pln ircljd n ny sheet d) Access s)*ol. or sty other sois edsich my be Loyed for brevity of identifiction PUIINJRAfl tlltwlmt PLMS Preliminry lightofwy plns shll be prepred s trwnprent linen cloth or polyester drifting film. All ezisting dt rt detil shlt be In lit nd ll proposed wrt shll be prepred In pencil sos to provide legible prirts, These plns shll remin in the preliminry stge, imtit fter mm lyout hs been duly tiled in the Registry of Deeds tightof Wy cqisition informtion shll be posted on the Preliminry RightofWy Pln by the onsultnt lint s ses s the informtion is obtined. The nultnt shlt, frm time to time, be required to provide the Deportment with copies of the Preliminry lightofwy Pln for coordintion nd informtionl tpn. FIlM. lifloflt PLAn After the Deprtment hs recorded the lyout in the Registry of Deem the Preliminry Right of ly Pln wilt bec the Finl sight ofwy PLn. The Preliminry Rightof Wy Pln wilt be returned to the onsultnt with copy of lyout s recorded The onsist test will then idle ink ll pe ii work, mking LL necessry chrges to mire conformity with the recorded lyout plns. Ech sheet shll be lbeled Finl RightofWy Pln, Upon cletion, the Finl tightofmy Pln wilt be renned to the Deprtment s perneit record. Provision shlt be mde on ech sheet of the Finl lightofwy Pln for the nottion nd dte of itirs or revistn TW hutoftat Pt (P.WIlUTZ FINAL) The lightofly Pln shlt include the following: I Title Sheet 2 Typicl rosssections rt riticl Profiles 3 Prcel Sry Sheet 4. Loction Hp 5 Property Pl.i Sheets 1. TITLE set The content of the title sheet shll Include the informtion show, on the Deprtment s title sheet prepred for ghwsy constriction drwings Informtion noted us the coristrucion pln title sheet which is bvsosniy no crne to the light ofwy PIes, shll be ersed The following informtion shll be noted on the title sheet of the RightofWy Pln, in ny event. ) The Right ofwy Federl id project r*ber EXHIBIT D (pnels of 26

90 19 (b) An 1rx of the content of the Rightof Wy Pln (c) The title sheet shlt be lbeled s Preli.inry or Finl RightofWy Pisi 2. typial $EtTIS A ttic PSOFILES tricleded s pst of the RightofWy Pln there shll be provided typicl crolssectin with profiles for loctions there the profile is criticl reltive to the Lnd dtge Involved 3. Pfli. neon t, A prcel sry sheet shll show the following inforet ion: ) At prcel rtten (b) The v of the nt of record c) The before m of cds property Involved d) The re of ll tkings, noti, ithether the tking is sde in fee or s pereit or torry eert. e) Sheet rsen idsere stiect property Is shows on the loction Mps rt the Property Pln Shst l) The res of ll portion, of n ffected property iditch rin fter the tkings rt nottion s to the sggjs of icons i the ritr portion so notet 4. LAtI p.m s) Reference to the boot nd pge denoting evidence of title s recorded in the pproprite registry of deeds rtier probte court. A Loction Np shll be prepred to show, in bseline srnce, every property idsids suffers lid dge by reson of the cquisition or constnttion. A Loction Mp shll be p. red whether or net lsic eightofwy Pln is nt lbi. The Loction Mp shll be to scle mulch shll prodse legible prints such s cm It eq.ls two hmstred feet or one inch.ql. one his&ed feet, snidver scle ppers to be re.,...,.. fete. The Loction Mps shll be prepred throm the ddition by pencil of RightofWy lnfntion to trnéperent (mel cloth reproóstton of Issic RightofWy PLn (idsich hs been screened to tone dew, photogrtric detil) rt shll inclse the following: () tight of Wy loction lines both existing rt proposed. cm Fds property stids suffers trt dge by reson of the cquisition or construction. In the event procérty crrut be shi in its entirety on the Loction Mp in its proper bseline seqte, the property shll be showi in Its entirety t wi pproprite scle s us insert on Loction Np sheet. c) Every tking.de tic, ech property together with the prcel nter of ech tking d) AlL stncturn on the property. 5. flts s pt Property Pln Sheets shll be prepred t scle of 40 feet or 20 feet to the inch, idsichever is re suitble for the prticulr project. All properties bring ffected by the proposed tkings rdior cm sstrirtlon should be siioi..i in their entirety, lien possible in bseline sequrxe. If property Is too lrge to be shots, in its entirety on the Property Pln Sheets, it should be put on seprte sitert sheet t scle ducts is pproprite 1 ustlly 100 or 200 nte. It nt contin lt inforstlon tht lsould er on the 40 scle or 20 scle Property Pln Sheets the following Infortis shll be shms, fr ccti prrty on the Property Pln Sheets: ) RightofWy Units, both existing rt proposed, nd the bseline with sttions, the width of the proposed Right of Wy shell be shows here pplicble tnforntnxs reltive to ccess provisions, if pplicble, shell be indicted with pproved points of ccess clerly shows. (b) ALl tkings 9 together with the prcel rmer of ech tking, whether mde ir fee or s torry or pernnent esesent, the re rt dimensions thereof, nd the owner s n. EXHIBIT D (pge 19 of 26 )

91 20 c) All Iop.ovnts to the property, especil lv those locted within the limits of the tking res sixti s stncturn, drivewys, lndscping, fences, wlks, wells, septic tnks nd cesspcots, whew ticble. d) The top id bottos of slope of the proposed construction, whether within or beyond the limits the editing er proposed SigtitofWy e) New cuistructf on fetires such s drivewsys, structures, dringe, etc, tht sy ffect ptti cutr property l) All work to be performed in mitigtion of lnd dges such s proposed rights of ros. wy or ccesi It should be noted id r.øisized tht minim inn of ccxtniction dent I be shows wi the RightofWy P1mw. This co tstrtctlon detil should be ti.itedto t id bott of slopes, proposed retining wlls, drivewy cortrirtion, id dringe die,, it ffects prticulr property Edges of pvnt id sideslki should be shows lightly s not to detrct Ir clrity of the sigiitofhiy detil. It is wdentood tht cses my rise lien portions of these specifictions my not be suitble for prticulr project. In the even this occurs, the RightofWy Isrsu, Project Section, should be contcted fr clrifiction F. LA?Wt LW Tsxflg ptn$ 1W The onsultnt shll prepere wd slt to the Deprtment, for the rovl of the Engineer, Ll the Instrnts which re req.sred to be recorded in the Registry of Deeds in cvwction with the ccuis,tion of ny interest in rel estte d. necessry by the work to be dote tsder this contrct These instrsnts shll be crised of the plin (trcings), descriptions id orders of tking for dvnce tkings, ttertior, lyouts id/or esonts. The r,,.rtion of these instnnts sisl L conform to stndrd Dep.rtwit prctice Drwings shll be de n trcing cloth itng Indi Ink, sles of which my be obtined Ir the Engineer The title sheet of ll pin to be retrded sh.tl be sted with the sel of Lnd Sr. eyor registered in Msschusetts id. shll be In chrge of the work nd suds shll be signed by hi. below sid sel. The recording v filing of these snstrlnts in the Registry of Deed., in the office of the oiity issloners id in the office of the ity or Toei lerk shlt be by the Depsrnt s shll lso be the pprisl id settlnt of ll lnd ges, including negotitions with property oi.wrs reltive to me. EXHIBIT B (pge 20 of 26 )

92 MTID.E V 21 tiisttjtl P%A If fter c1etion following A. contrsct or contrcts for constnxtii by the onsultnt services to the Deprtnt. of the Sixh *TTAfl nru3tejtti FEfl. services project of the or outlined In AITItE IV, not be service, shll prt of it ire the o.nultnt retred if the project executed within one shlt is not yer lso rerder the cuistntted. As Drtent. pert of The person hl,..rl In, the ulun shll flned representing the orsultnt shill design esperieice to interpret the contnttiui pin be M nts. precoretntion coiferne sthe&ted fsilir with the project M hve by the sufficient I. t SO D*AUI$QS As cntnxtf we prt the cewtnxtien ef his gnrl fee, the orultnt shlt rniew, *.ings prep.rsd cuetrct by construction contrctors requirnts rt ll steel detils, prestress.d detils lt other its required to of. TATJ flmjpq bem xinttf good or engineering prctice. check rt Icnve their 5thcontrctors These detils, reinforcing bet lists, coflerdee detils, conform to the Depertnt s specifictions to LL shop detils e ssure conforice with shll include, idn pplicble, flswork, nd prctices. frcrk s (1) his *wings to the site iflhtted 1s of rid of by pert the wuultwit shll furnish consulttion rt Interprettion of Engineer. wrt in reltion to errors rt onisiun his Generl Fee, specifictions essy the isultnt. be required by the or Mo pywent wilt irufficiret det be In work de for visit. previly (2).1 work The onsultnt shll lso ke hi, service wl tble djrlrg constriction fr visits for consutttin in regrd to dditionl design services required VI by the Engineer. tensstlon for then services will Section 5. Sitinl Engineer, shll be pid s stted tones of the onsultnt eprte. persiveel of the wider UTIU VI rid pproved s re be or to the site wifcrnn probls ny be de s fwth.r described rsuttrit s stt I, if required sit Section ot, in the cse of stcinrsctor., relrssnt wilt in A1ttI.E pproved by ide n be mde s specilists the not direct EXHIBIT LV (pee 21 of 26)

93 22 **iittt yr tm$atin flfltfl A. FE The scn.r.lfl hereby grees to py nd the corsulteit grees to coqit s full censt ion for t I services rendered to the stisfction of the Depsrtsnt fee estblished In ccordnce with idiichever of the following two pyeits is set forth in the SPEIAL ptmii Slows flhltit flx I (LOW PiG for ll services to be performed uider the Generl Fee l sin nt pits llownce for direct ezper*n s further described fri P,wtit Method 2 d) of st llownce fr direct epe.zn is expressly provided for in the SPEIAL P10V131t*IS PAtT ITIW 2 gis PUS A *7 FEE) For ll services to be performed wider the Generl Fee, the onsultnt shlt be pid si uit equl to the sin of the tot low! it Ite, b, c, id : () Actul direct slry costs pid engineering mid technicl loyees by the nultnt for the time such loyers re directly utilized ui work necessry to fulfill the provisin l the ontrct. Actul direct slry costs shll cnist of pyroll costs t stright time for engineering rid technicl loyees, ezclting ll principls or flinistrtive officers sick s mers, prtners, stockholders sesing cre thn mw percent of the cm stock outstnding, or other mjor supervisory persnl, for the time such Loyees re directly utilizedmi the icek covered by this contrct if It is the usul prctice for slried principls or dlnistrtive officers of smll firs to perform engineering work, persision y be grnted by the Engineer to cbte the for the time jests they re ctully engged in this work, bit only t rte of py csur.te with the t of work performed. Permission y lso be ii vms by the Engineer for certin principls or dinistrtive off Irn of tge firs to be pid for engineering work performed by them t rte of py cesurte with the nere of work performd, bit only wider insul cmiditin for specific period of time. Written.. 1i1 shll be required from the Engineer prior to the use of sid principls or of I Icen by both lrge id smll firs. Pwit of ny sid prircipet or officers for dinistrtive djties t the inset rte of py for these positions.dll not be llowed, it being considered tht their slries re Included wider overhed. Slry rtes mid increses thereof pid to engineering or technicl loyees ssigned to this project shll be.urte with slries pid nd increses thereof mde to other eqiloyees of the onsultnt engged in similr work Any increses in slry shll be the resist t of csiy wide evlution of ll engineering mid technicl Loyees Sich evluti on shlt be in ccordnce with crony wide personiel regultions id estblished policies. The Engineer shll hve the right to exercise the power of review rid pprovl of slries rid Increses thereof for period of thirty dys following receipt of the onsultnt : written notice of sidi rtes rdlor increses. this notice st be stittrd prior to the dte sen slch rtes bec ffective. Unless the Engineer notifies the orsultsst in writing during the thirty dy period tht s slry rte or increse thereof is in his opinion, Lrressonble, sicts lck of notice shll constitute pprorl of the rte or increse f rem the proposed effective dte. All slry chnges from those stitted on the previm invoice shll be specificlly noted by the onsultnt on his rest invoice giving the dte of the Letter requesting sick increse. hnges in slry rtes mde prior to the dte of thi letter will not be pproved for pyment. Any such slry increse shll not be considered s justifiction f or vs increse in the mxin p.ment I or direct slry costs shows wider Mxine Pwnt Arts hereirtefore. No prnslis pyment shll be mde for overtime work tiless previo4ly pproved by the Engineer. It is the rrest policy of the Deprtment to limit the hourly rte for engineering nd technicl eeçloyees to t.5o per hour. Permission for higher rtes per hour my be grnted in specil situtions with the written pprovl of the Engineer. EXHIBIT 1? (pfe 22 of 261

94 t) Awlicble irdirect costs incurred djrsng the period of this contrct, to the extent tht such indirect costs re llowble usder the ontrct ost Principles nd PrOced.ires set forth in the Federl kcqisiflon Iegultius 31 (Technicl leference 48 F1 hpter 1 Prt 31) inch %ctnt is wscorpcrtd herein id de prt hereof by reference Tht prt of the slry id/or other pents, excepting snies pid s reitirsit for biness esperse, in excns of rte of,oqo. snlly pid to ny irdividit shll not be llowed by the Deprtment s chrge to overhed or otherwis to this contrct in ny mer, directly or indirectly For pwposn of prtil p,wnt provisiiel indirect cost dditive rte, expressed s percent of ctul direct slry csts, will be specified in the SPEIAL P*OVISIOUS Theest to be llowed fr indirect costs shll be the ctul dited nts of sris costs incirred by the rnultst, provided, however, tht the totl llownce for such costs shll in it event exceed n wst.diicls Is obtined by nttiplying the ctul dirct slry costs pid usder bove by the provisionl indirect costs dditive percentge rte s set forth in the IPEIAL PtoVlSTS, pits ID percent of the ust pid by the rtultnt for ctul direct slry cost in ccordnce with bove but hlted to s sin of 135 percent. Sid hl&t si lloweble indirect cost shll Ly notintlistrding ny udit which indictes tht h,wser indirect cost were ctully incurred c) A net fee s shres In the SPEIAL Peovisimis to cover consultnt s profit, sleet Lneot experses, id other fctors tht mey be cwidered flr the pplicble regultior nd tht re not pid for othenilse. d) Reirnt for direct ewpers to the extent tht they re t losble ider the provisions of the Federl Acqwsitiws megultion referred to bove nd net the re.nrnts ct forth below. Iestjrsble direct expenses shll include, hut not be Ileited to, costs covering work performed by other prties udi s borings, lbortory tests, field survey, specil electronic citer prtgring, services of ether professionl. or specilists, specil printing id reprod.rtiu nd certin teleçflcne id trvel export. s tither st forth below id norselly ict included In overhed expense. Prior written pprovl shll be obtined by the uieultwit fr the Engineer before these direct expenses re snetired. IeirsbLe direct ezpnn re inclfld irdee the lsso P)nit Inn All reqsts for reinenent of such direct expenses shell be ss*sltted In writing to the Engineer, together with estietes of the cost f or cds type of expense d the resons for sizh expenses. All bills,ig of direct expenses shll be Itemized by dte, n of person incurrirg such expenen, Loction of trvel or c.niction points, id shll include ll other dt relevst to verifiction of the expenses together with cy of the Engineer s letter uthorizing suds ezpesditte TeleØione chrges shll not be cosidered s direct expert. except I or toll chrges specif sct ly pproved by the Engineer Trvel Expenses when uthorized ider the SPEIAl. flovlslmis of this ontrct shll be mesured f row the Msscinsetts office of the onsultnt, or the residence of the orniàltlt svloyee trveling to projectrelted destintion point, idsictiever is the lesser distnce, sins otherwise expressly uthorized by the hief Engineer in writing lb trvel expense will be pid uslss provided for in the SPEIAL PIOVI5IOS or csey be previolly pproved in writing by the Engineer. Trvel shll be mede by the lent expive reesnble eew. First clss irfn, deluxe cc tir id neesnbl mel costs will not be pproved. Iii. is of rented utiles will be relirsd only t the ilesge rte s pproved f or personl or firsmind vehicles The cost of mels relted to trips d in the coisse of street workdy will itt be reiebund Trvel id certin other necessry experwes for ttendnce t pitlic settings nd herings, s designted by the Engineer, sey be resind bject to written pprovl of the Engineer. Since it is greed tht the work ider this contrct shll be performed in n deqitely stffed office of the onssltit locted within the ewlth of Ilssctsletts, costs Incurred by the nultit for telephone clls d trvel to or Ir his outofstte offices, shll not be reiwbjrsed. Trvel id ss.tsisteice shll not be pid for eseployees frs ny mitof stte office to work in Msschusetts except for certin specilists titers expressly pçwoved by the hief Engineer in writing. EXHIBIT I? (pge 23 ojj1

95 26 Printing of id copying.1 dt s reqired for reviews nd norl shll not be s direct experme. notwithstnding the fct tht the onsultnt does not printing or copying Pcent for specil printing p1 reports nd preprtion of to distribute p.bl Ic meetings, herings nd s imi tr occsions my, with the pprovl of the Engineer be r.is.d Expenses for pin equint. inistrtive stsissin tter 1 persumel performing deirtistrtive work will not be rei.tursed. or t rei,flssed All direct costs not wider this Article, id rot llowble udit of the onsul records s wi overhed item, shll be included in the net fee for profit nd trl locted costs. rel,rstie ii tint s All costs s described in the foregoing prgrphs re to be determined by ctul records kept by the onsultnt in ccordnce with the provision of this contrct id re stbject to finl udit by the Deprtment rid/or the FI. The totl prtil pyments mde shll be djusted to confor. to determintions mde in such udit in the Federl Gnn* my idertke interim udits t thy d,eirq the term of the ontrct. thi ccorce with the bove provisions of this Article. At their discnticn, thq Pepnren ti rt/cr In no event shll the ims ust to be pid wider this ontrct exceed then s shote on. Pge 1 of the SEAIA (trat notwithstnding finl udit results, ecept by gresent f ll prties, wtfl the c of tie U.S. Deprtment of Federl Hithwy In the cse Federl Aid projects. truce Importtion, Ainistrtion The sxiss sy be djusted idini the onsultnt estblishes, nd the Deprtment id the FIfUA re in gremnt, tht there hs been or Is to be significnt chnge in: tit rt ci (1) Scope, ciexity, or chrcter of the services to be performed (2) onditions mr idiich the work Is required to be performed; nd (3) Durtion of work, if the chnge the work errnts sixh fr djustrit. the time period specified in the grent for coqiletion of Upon djustment of the corl dered. sun nt, n pproprite djntwit in the predetermined net fee shll t. I. patt F ft MGi njtiw visits For Ll to the of the work for consulttion s described in ARTILE V, Section 52, the onsultnt shll be psid In ccordnce with PAtiENT THm 2 OSTS PLUS A NET FEE for ll services by his SttcorsuLtnt costs for ll visits to the site et the work for consulttion will be pid fr s direct expee. In ll trvel expenses shll be pid the onsultnt s Msschusetts office or the idiichrver is the shorter distnce. Other pproved direct exprses shll be to the extent tht they re Llowble the provisiors of Federl Acquisition Iegultiui 31 (technicl ref. 48r1 th. I Prt 31). All visits to the site of work shll require prior written pprovl by the Engineer. Ir relrsed loyees. itim,.loyee s he, site titer fr renred ndor No pment to the onsultnt shll be me for visits to the coestnxtion site In cviection with errors or insufficient dt in work pnwisly st.itted by the onsultnt. issln, All costs s described in the foregoing prgrphs re to be determined by ctul records kept by the dsing the term of the contrct id re to be sjrcted to finl udit by the Depsrrment the F.I.W.A. All prtil mde shll be djisted to conform to mde in sid finl udits Also, t its discretion, the Deprtment rt/or the F.H.Id.A. ny inceri udits t nytime during the term of the contrct; nd prtil pywents shll be djusted to conform to deterintions mde in such interim udits. ultnt pents. ucmmtt FEES im tnt$% QF WWRIL FEE srtke determlnti t/or If the onsultnt perfor services for revisions of pure s described in ARTILE I, Section 19 or other services for which n dditionl fee is provided, he shlt be pid n noint bsed on one of the following methods: EXHIBIT 0 (pee 24 of 26)

96 25 PA is I US Sit n Xiti ont tc, s minmt to be determined by WI estinte mde of the cnsuttens nticipted costs to perform so dditini senic, mid irctudir on llownce for profit. flssi ims 2 It PUIS A lqttil 2. An Xitimil nil bsed on costs pbs net fee s described In AITILE VI SEflIm A PATIENT PAsss ims 3 TS Pfl ISIT N In dditionl int to be determined by pplying greed costs to ech tiit of work or to cost per BiLe. kfcre ithoriztf t for ony work to be pid for in cs of the Gererit Fee, the nultnt id the Engineer shlt coenr s to the mims rt idtldi my be pid for edi work order. No work for sich ltltl pjit is ctid shll be performed intess previctsly ordered in writing by the Engineer end n dis shll hr vlid nin so ordered.. fltiefl,tr.inatt F In die eveit the Depertnt sen fit to notify the umultuit to tetu%, Lielt or defer the work this contrct, or w pen thereof, the tut toni shlt be pid for eny s...tmd work stisfctorily pert imed prior to dte of sid rotice In ow or wore of the following methode s shll be determined by the Engiveer: 1. By estimte of trit of work cteted sd by pyment of ls sin mrt. 2. By cost. pun net fee s stted In UTI VI, Section A, Pit Nethod 2. iiti net tee shlt be in..q.rt Ion with the rt of work pert ond. 3. By pn of work cteteds pplied to cost. of edi mit or go csts per mite. If the work to be Øerformd uter this ontrct Is terminted to be*n4ncy,.....jings, or tr uiy other cse En to ction or Irctiosby the uttn, the nuttsit shll be pid tor mnnted work stisfctorily pert ord prior to sid tersiretimi s so stted ve mirns the percentge of ll previos prtil p)ments udi were nteined s prt secwity for fulfill nit of this ontrct. This rt wilt be Ion cited by the oizltont to the beprtwut to c...,...te for dt suffered by the Dqruut s to tile sultit s flttse to clete the contrct. E. Psiri PrtiL pwnt ginst The GenerL Fee shll be S rc pidttkly ii.ovl by the ngiiwer of ins owulisit s Irivoittr for lt services peiforied to the etc t the preceding uth in iccordnci with m of the two p.jit ethos s shot in UTILE VI Section A of the SPEIAl. Psosints. PA.i im. I US 251 Prtil p,ets girst the Generl Fee shlt be for the ntlted vlue of ll services performed wider AITILES It, lit id IV by the owultut s shr in the tietes dhtted by the tnutttt med end by the Engineer. The ntimted vlue of sti services perfoewd ister AITILES II, III sd IV shll be bsed mu the estited proportion Wuicti sid services ber to the totl of lt such services to be pertornd flr ARTILES II, ill rid IV. The totl fee to be pid for servtces reitered wider AITILES II, III id IV shll be u nt s in the SPEIAL PROVES IONS. PrtiL picits of LL work performed by Vie oisuttnt wider ARTILE V. Sections A rid I, shll be mde in ccordrte with PATPEIr NETHW 2 OSTS PLUS A NET FEE. Prtil pyments shll be mde s rov by the Engineer. EXHIBIT D (pne 25 of 26]

97 26 PAflT Z 5t5 PUS A FE Prtil pe,wnts ginst the centrl Fee shll be for the vlue of services perfoiwd s lto.., irwolcn by the id pprwed by the Engineer. Invoices be ccwpnitd by ctt certified copies of records of his receipted frs other vr: u:n. performed wder the provislors of this ontrct. sflitted tic nultnt LDyen itt bills ll nt res r t r Prtil pyments shlt be bsed on ctul slries pid s specified iffdtr AStILE Vi A. Method Prgrpi ; pun costs s specified prgrpi b; ptis the proportionte shirt of the net Ire s specified Lter prgrph, ditch represents the percentg, of work to dte covered by the Invoices; plus for uthorized direct espensesbsed on receipted bit Is provided sfler prgrph d. iithty reirsnt titer ttty cleted Secti, The Deprtment reserves the right to defer ny prtil pienits diet the rtio of the totl slry csts billed (ezeltive t direct csts) t the totl slry csts s shn in the originl is greter the rtio of the work cocleted to the totl trt to be perf.r.4 ster the contrct prsl provisin. th P.,..ms m it.1 dditinl fees for or for other services s pecif ld in AtTI vi Section shll be pyble icon pprovl by the Engineer of the orsultont s invoices for such services performed to the eet of the preceding menth by or certified copies of pid invoices rdjcr fr the If required the method of pment isd. proils n t is, titer rrtflnied revisin octl in to the ornuttnt for direct costs nd incurred by hi. or ny of his sit cutulttt shll be pyble tcut pptonl by the Engineer of the msjltst s bill by ctul or certified cpit of pid invoices pyrolls the cctied Pits reirssnt on t sflhsion t idor ezpen icr i No presin pyments snl I be mde for overti.e work iless previously roved by the Engineer. Periodic invoices shlt, in ddition to current chrges, incorporte Lt previom chrges, either pid or t.rip d, for services performed mr the contrct through the dte of ech such invoice. ALL invoices time recor shll contin tht the oruttnt certifies nd penlties of perjwy, ll for ditch is requested hs pert ormod nd is in full coclice with the previslrs of the ontrct. perfore t flt trt sttit pit bee titer the pirs itch tht periw scnty TheDeç.ls..t shll ster Articles f or the hlf I timeit Ii, retin five p.rcnt 1St) of ll iv, escpt fr o! this ontrct by iii. iii it nts 6* nts ulttt. th fr prtil pyments me girst work for reibissblt direct costs, s pert nl After dedjotion of this retinge ll other to dte for wrt performed this ontrct, the iter t sin rminder Ir to be kept or retined the totl shll be pid to the o,nutt,t.. irs Ote Lte LL work ARTILES II, LII. IV re the suitnt shlt so notify the Engineer in writing of sid work id shll to she Oorit with sid notifiction cpy of lt s.pponing records kept by lil,n ccurtnce witn *i mt I, section etw te relevnt i the work perforwed in tith sid At!!Lfl id IV. Within ninety (90) fter written oprvt of sid work by the Engineer, Ll previously retined by the Deprtmit s prt for of sid work shlt be pid to the onsultnt In deition to or Less ny determined by the Deprtment s interim sdit to be se the orsul wit or the Drnt. if such mit hs bees nd sith hs been determined. cletion titer restting crnk iit ccornce t nts cleted, siit II, III, 5t interi.,ion mnt senrity cocleted Pements for checking of shop drwings shll bee s roved by the Engineer WM EXHIBIT B (pge 26 of 26)

98 mssdot PmgAtn..ñuu.xForn 1 INTEROFFIE MEMORANDUM Pre Awrd Review # I IAB54 To: From: Guy Rezendes. Utilities/Rilrod Engineer Elizbeth A. Pellegrini, Director of Audit Opertion,,. ee4)ó Dte: MylB.2011 RE: 6 PreAwrd Review of Town of Acton GreenmnPedersen, Inc. Project:: Bruce Freemn Ril Tril (Phse 2A & 2J Design Agreement Acton Highwy Division Agreement Mximum Obligtion: S Stte Shre Federl Trnsporttion Enhncement Funds As requested, Audit Opertions hs completed PreAwrd Review on the consultnt nd the subconsuitnts for the Town of Acton. To ssistyour office in determining the resonbleness of the proposed lbor nd indirect cost rtes we present the following comments We note tht the mnhour estimte/budget for Nover Armstrong Assocites in the proposed Agreement Is overstted s It Is clculted with n overhed rte of I 49.0 % The mnhour estimte/budget should be corrected to reflect the compny s ctul provisionl overhed rte of % Audit Opertions hs reviewed the proposed slries for GreenmnPedersen, Inc. nd their three subconsultnts under the proposed contrct The proposed slry rtes nd costs pper to be resonble, except for GreenmnPedersen, Inc s Engineering Position The proposed lbor rte is overstted by SI 05/hour for the design phse nd $ I 01/hour for the construction phse Audit Opertions hs lso reviewed the indirect cost rte submittls for GreenmnPedersen, Inc nd their three subconsultnts for their most recent fiscl yers nd hs pproved the following rtes Accordingly, we recommend the below indirect cost rtes be used for billing purposes on the proposed federlly funded contrct Municiplity Town of Acton N/A No proposed costs under this contrct onsultnt GreenmnPedersen, Inc 155% Subconsultnts. Nobis Engineering. Inc 175% Green Interntionl Affilites, Inc, % Nover Armstrong Assocites. Inc % Overhed rtes proposed. Actul overhed rte Is higher The mnhour estimtg/budget for Nover Armstrong Assocites in the proposed Agreement is overstted s it is clculted with n overhed rte of % We hve not reviewed the proposed direct expenses ontrct Administrtion procedures require direct expenses to be reviewed nd pproved by Highwy Division s Project Engineer prior to being incurred Audit Opertions hs not reviewed ny other re of the proposed contrct If you hve ny questions, plese contct Andrew rdinle t extension 7292 cc FHWA Michel Lwton & Willim Rork / Audit unitfue K c,. / o)7t5 Highwy RMV Rll& Trnsit 9 Aeronutics

99 mssdot Mnuiuitiu cplriiiicnt tt(iniporulion ertificte of Indirect osts Firm Nme rfl [ndirect sts nd Rte(s) for Fiscl Yer Ending I ttflt1 4j&4 g j, This is to cerq 15i tht I hve reviewed the indirect costs nd rte(s) proposl sithmuted sper the MssDOrprequljjlction udit requirement to estblish billing orfinl indirect cost rtesft the bove firm s fiscl period s specfled nd to the best ofmy knowledge nd belief.1) All costs included in this proposl to estblish billing orfinl indirect cost rtes re llowble in ccordnce with the cost principles ofthe FederlAcquisnion Regultions (FAR) oftitle 48, ode of Federl Regultions (FR) pd 31 2) This proposl does not include ny costs which re expressly unllowble under the cost principles qfthe FAR of48 FR 31 or its supplements All known mteril ti nsctions or events tht hve occurred ffecting theflrms ownership orgniztion nd indirect cost rtes hve been disclosed 3 ) All costs included in this proposl re properly llocble to Government conti cts on the bsis ofbeneficil or cusl reltionship between the expenses incurred nd the contrcts to which they re llocted in ccordnce with pplicble cquisition regultions Further, the sme csts tht hve been treted s indirect costs hve not been climed s direct costs nd tht similr types ofcosts hve been ccountedfor consistently I declre tht underpenlty ofperjury tht the foregoing is true nd correct Signture; NmeofertiiingOrncil Print): 114t t4iq ci J * Title: Pt Dte of ertifiction: I 2 D II Leding the Ntion in Trnsporttion Excellence 4

100 :1 ertificte of Indirect osts FzrmNxne Nos EPJcE,f JE61ZI3Gj Indirect osts nd Rte(s) for Fiscl Yer Ending ) 8 \ ) 1 0 This is to cert5i tht Ihve reviewed the indirect costs nd rte(s) proposl cubmitted s per the MssDOTprequ4flct,on udit requirement to estblish billing ci finl indirect cost rtes for the bove firm c fiscl period s specified nd to the best ofmy knowledge nd belief 1) All costs included in this proposl to estbli ch billing oi finl indirect cost rtes i e lloit ble in ccordnce with the cost principles ofthe Fede;? Acquisition Regultions (FAR) oftitle 48 ode of Federl Regultions (FJ) prt 31 2) This proposl does not include ny costs which re exprescly unlloii ble undei the cosrpi inciples ofthe FAR of48 FR 31 or us supplements All known mteril trnsctions oi events tht hve occui ied qffecting the flu iuis ownership, ougniztion nd mdi; ect cost rtes hi e been disclosed 3 ) All costs included in Ihispi oposl i e properly llocble to Government conti cts on the bsis ofbeneficil or cusl reltionship between the expenses incuu ted nd the contrcts to which they re llocted in ccordnce with pplicble cquisition regultions Further the sme costs tht hve been treted s indirect costs hve not been climed s direct costs nd tht similr types of costs hve been ccountedfor consistently I decli e tht under penlty ofpei,juiy tht thefoi ego ing is true nd cci rect Signture: Nme of edying OciI (Pt): AH x+ )ob3 Title: ( EQ Dte of ertifiction: (It! 3 f 5_ Leding the Ntion in Trnsporttion Excellence 4

101 1J/: tiil iflntn ul Tf.tipI,Un 7 O) 1 ertificte of Indirect osts Firm Nme: Green Interntionl Affilites, Inc. Indirect osts nd Rte(s) [or Fiscl Yer Ending: Tins is to certjfj tht I hve reviewed (lie hidhect csts nd rte(s) proposl sithinilted s per the MssDOTpi equlçjiction udit i equxi exnent to estblish billing ox finl mdix ect cost xtesfoi (lie bove firm fiscl period s specified nd to the best ofmy knowledge nd belief 1.) All costs included in tins proposl to estblish billing orfinl indix ect cst rtes re llowble in ccox dnce with (lie costpi xnczples of the Fec/c: lacquisition Regultions (FAR) of title 48, ode of Federl Regultions (FR,), prt ) TIns proposl does not include xxj costs ii hich re expressly unllrni ble under the cost pi xncxples ofthe FAR of 48 FR 31 ox its supplements All known liztex slt, nsctxons ox events tht hve occui med ffecting thefix iii s ownei ship, ox gniztion nd mdxi cci cost i tes hve been disclosed 3) All costs included in tluspi oposl ; epx opexly llocble to Gve; im;ent conti cts on the bsis ofbeneficil ox cusl i eltionship between the expenses mcvi red nd the conti cts to which they te llocted in ccoi dnce with pplicble cquisition xegultxons Fin the,, the sme costs tht hve been Ii eted s xndn ect costs hve not been climed s dim et costs nd tht similr types of costs hve been ccoinitedfor consistently. I declre tht under penlty ofpeijiny tht theforegoing is tine nd conect. Signture: )6: Nme of ertifying Officil (Print): IKo Ishikur Title President Dte of ertifiction: / ;;/: Leding the Ntion in Trnsporttion Excellence 4 r

102 p 4,4,...., h Li4f 4 i,. lisc Lt LJtft fltp:, rtr tfl 1 /7 Li Trc:up N ti. ertificte of Indirect osts Firm Nme: NThME cvrc2&k Aoofrvts Indirect osts nd Rte(s) for Fiscl Yer Ending This is to certlfr tht I hve reviewed the inthrect costs nd rte(s) proposl submitted s per the MssDOTprequ4ftcnon udit requirement to estblish billing orfinl indirect cost rtes for the bove firm s fiscl period s spec(fled nd to the best of my loiowledge nd belief 1.) All csts included in this proposl to estblish billing orfinl indirect cost rtes re llowble in ccordnce with the cost princi1es ofthe Federl Acquisition Regultions (FAR) oftitle 48, ode of Federl Regultions (FJ?), prr 31. 2) This proposl does not include ny costs which re expressly unllowble under the cost principles ofthe FAR of48 FR 31 or its supplements All known mteril trnsctions or events tht hve occurred ffecting the firnic ownership, orgniztion nd indirect cost rtes hve been disclosed 3.) All costs included in this proposl re properly llocble to Government contrcts on the bsis ofbeneficil or cusl reltionsht between the expenses incurred nd the contrcts to which they re llocted in ccordnce with pplicble cquisition regultions. Further, the sme costs tht hve been treted s indirect costs hove not been climed s direct costs nd tht similr types ofcosts hve been ccountedfor cpnsistently. I declre tht vndei penlty ofperjury tht the foregoing is true nd correct Signture (I NsneofertiI4ngOfficil(Print): /tc A Title: Dte of ertifiction: t5_ 9 o\ \ /s Leding the Ntion in Trnsporttion Excellence 4

103 mssdot Msschusetts Deprtment of Trnsporttion Request For Alloction of Funds Prior to Encumbrnce Project Number(s) Encumbrnce Document Trns Dept Unit Identifiction Number T DOT NTF00X02011A /20/2011 Funding Source pitl Operting LI Tolls pitl Tolls Operting LI LI Tolls Generl Expendble Trust LI LI Federl Grnt Approp No Obj Unit N N Activity 022 P 022N Progrm P P Phse P12 P11 N/P Amount Allocted $400, $1,031, $1,431, Obligtion By Fiscl Yer for MultiYer ontrcts Totl 2011 $ $ $ $300, $850, $1,150, $70, $150, $220; $29, $30, $59,000: $ $1, $1, MMARS Totl $400, $1,031, $1,431, Reson for Request: ontrct#: Reduction Vendor ID & Adress ode: V60001Y1 689 ADOO1 Vendor Nme: TOWN OF ATON urrent Yer Svings: L ontrct Loction: ATON ARLISLE ONORD WESTFORD ontrct Description: Bruce Freemn TrilPhse 2A nd 2 (FHWA Enhncrnent nd Stte pitol Funds) Report Notes: cost Recommended by: Approved (Signture! Dt), proved by; i (S 9nture I Dte) 4 Report Generted On: 6/20/2011 2:19:58 PM P I of 1 Trcking No : TN2G9NAc96O

104 niäxidot ommonwelth of Msschusetts Office of the omptroller ontrct ommodity Encumbrnce Form Document Nme ATON f706925j Document Description BRUE FREEMAN TRAIL Document LD. MA Informtion ode Dept Unit Document Identifier Action ode Deprtment Identifiction Number Vendor Line T DOT 6433 INTFOOXO2OI 1A Entry MA Heder? Vendor in formtion Budget FY: 2011 Document Totl: Si, Fiscl Yer: 2011 Vendor Nme: TOWN OF ATON Period: 11 VendorAddress: 472 MAIN ST Iily IAT0N Jstte: IMA Bord Awrd: Vendor/ustomer No.: V Requester ID: dotds3 Address ode: A000l Report Note: omment: Line #1 ommodity informtion ommodity ode List Price Description BRUE FREEMAN TRAIL Line Type Service Unit Pnce ontrct Amount $1,431, jommodity Ref Linel Quntity Serwce From Unit of Mesure Iseco To 06130/2015 I Line #1 Accounting in formtion Event Type PROS Budget FY 2011 Unit 8433 Mter Progrm Loction Line Amount $ Fiscl Yer 2011 Object N21 Progrm P Phse P12 Dept DOT Period 11 Approprition Progrm Period Activity 022P Line Descnption IBRUE FREEMAN TRAIL jdept Object TO THE OMPTROLER OF THE OMMONWEALTH OF MASSAHUSETTS FOR FISAL USE ONLY I hereby certify under the enlties of perjury ht ll lws of the ommonwelth goveming disbursements of public funds nd the regultions tber of hve bee omplied with nd observed. Entered By: Dte: Veritied By: Dte: (Initil) (Initil) Print N: (\ uv\4 (u\hf/a Signed:.v Title: repred b Print Nme: Guy Rezendes Signed: juthonzed Stgntory Qc :is Phone Ext.: 75 y Dte: Title: Phone Ext.: Dte: p 4o 4 Report Generted On: 6/20/2011 2:22:31 PM Pge 1 of 4 Trcking No: TN269NAOGD

105 rnssijot ommonwelth of Msschusetts Orfice of the omptroller ontrct ommodity Encumbrnce Form Document Nme ATON [ Document Description BRUE FREEMAN TRAIL I Line Description BRUE FREEMAN TRAIL Document LD. ode Dept j Unit j Document Identifier j Action T j DOT 6433 I 1NTF00X02011A I Entry I Line #2 AccoUnting informtion I Event Type PROS Budget FY 2012 Unit 6433 Mjor Progrm Loction Line Amount $300, Fiscl Yer 2011 Object N21 Progrm P Phse P12 Dept DOT Period 11 Approprition Progrm Period Activity 022P Line Description BRUE FREEMAN TRAIL Dept Object Line #3 Accounting Informtion 1 Event Type PROS Budget FY 2013 Unit 6433 Mjor Progrm Loction Line Amount $70, Fiscl Yer 2011 Object N21 Progrm P Phse P12 Dept DOT Period 11 Approprition Progrm Period Activity 022P Line Descnption BRUE FREEMAN TRAIL Dept Object Line #4 Accounting Informtion 1 Event Type PROS Budget FY 2014 Unit 6433 Mjor Progrm Loction Line Amount $29, Fiscl Yer 2011 Object N21 Progrm P Phse P12 Dept DOT Penod 11 Approprition Progrm Period Activity fo22p Dept Object TO THE OMPTROLLER OF THE OMMONWEALTH OF MASSAHUSETTS FOR FISAL USE ONLY I hereby certify under the penlties of perjury tht ll lws of the commonwelth governing disbursements of public funds nd the regultions thereof hve been complied with nd observed. Entered By: Dte: Vedtied By: Dte: (Initil) (Initil) Print Nme: Signed; Title: Phone Ext.: Dte: Prepred by Print Nme: Signed: Title: Authorized Signtory Phone Ext.: Dte: Report Generted On: 6120/2011 2:22:31 PM Pge 2 of 4 Trcking No TN2I39NABOD

106 im#rnor ommonwelth of Msschusetts OFfice of the omplroller ontrct ommodity Encumbrnce Form Document Nme ATON ] Document Description BRUE FREEMAN TRAIL Document LD. ode Dept Untt Document Identifier Action T I DOT I 6433 Line #5 Accounting Informtion 1NTF00X02011A I Entry I Event Type PROS Budget FY 2015 Unit 6433 Mjor Progrm Loction Line Amount $90000 Fiscl Yer 2011 Object N21 Progrm P Phse P12 Dept DOT Period 11 Approprition Progrm Period Activity 022P Line Descrrption BRUE FREEMAN TRAIL Dept Object Line #6 Accounting Informtion I Event Type PROS Budget FY 2011 Unit 6433 Mjor Progrm Loction Line Amount $ Fiscl Yer 2011 Object N21 Progrm P6D4532 Phse P11 Dept DOT Pertod 11 Approprition Progrm Period Activity 022N Line Descrtption BRUE FREEMAN TRAIL Dept Ob 1ect Line #7 Accounting Informtion I Event Type PROS Budget FY 2012 Unit 6433 Mjor Progrm Loction Line Amount S D0 Fiscl Yer BRUE FREEMAN TRAIL Dept Object N21 Progrm P Phso P11 Dept DOT Period 11 Approprition Progrm Period Activity 022N Line Description TO THE OMPTROLLER OF THE OMMONWEALTH OF MASSAHUSETTS FOR FISAL USE ONLY I hereby certify under the penlties of perjury tht ll lws of the ommonwelth governing disbursements of pubic hinds nd the regultions thereof hve been complied with nd observed. Entered By: Dte: Verified By: Dte: (Initil) (lni!il) Print Nme: Signed: Title: Phone Ext.: Dte: Prepred by Print Nme: Signed: Authorized Signtory Title: Phone Ext.: Dte: Report Generted On: 6120/2011 2:22:31 PM Pge 3 of 4 Trcking No : TN2S9NA9GD Object

107 ornn)onwelth of Msschusetts Office of the ompiroller ontrct ommodity Encumbrnce Form ñyizs3vot Document Nme ATON p Document Description BRUE FREEMAN TRAIL bocument 113. ode Dept Unit Document Identifier Action T DOT NTF00X02011A Entry Line #8 Accounting Informtion Event Type PROS Budget FY 2013 Unit 6433 Mjor Progrm Loction Line Amount $ Fiscl Yer 2011 Object N21 Progrm P Phse P11 Dept DOT Period 11 Approprition Progrm Period Activity 022N Line Description BRUE FREEMAN TRAIL Dept Object Line #9 Accounting In formtion 1 Event Type PRO8 Budget FY 2014 Unit 6433 Mjor Progrm Loction Line Amount $30, F51 Yer 2011 Object N21 Progrm P Phse P11 Dept DOT Jriod 11 Approprition Progrm Period Activity 022N Line Description BRUE FREEMAN TRAIL Dept Object Line #10 Accounting Informtion 1 Event Type PROS Bridget FY 2015 Unit 6433 Mjor Progrm Loction Line Amount $1, Fiscl Yer 2011 Object N21 Progrm P Phse P11 Dept DOT Period 11 Approprition Progrm Period Activity 022N Line Description BRUE FREEMAN TRAIL Dept Object TO THE OMPTROLLER OF THE OMMONWEALTH OF MASSAHUSETTS FOR FISAL USE ONLY I hereby certify under the penlties of perjury tht ll lws of the ommonwelth gnveming disbursements of public funds nd the regultions thereof hve been complied with nd observed. Entered By: Dte: Verified By: Dle: (Initil) (tniet) Print Nme: Signed: Title: Phone Ext.: Dte: Prepred by Print Nme: Signed: Authorized Signtory Title: Phone Ext.: Dte: Report Generted On: 6/20/2011 2:22:31 PM Pge 4 of 4 Trcking No TN2GBNA9GD

108 .,...t SYSTEM I I..... MASSAHUSETTS HIGHWAY DEPARTMENT 9fl2/2009 PARS NUMBER DATE PARS NO jfp4532p12 TOWN/ITY AnrflsleWesfford LOATION [Bruce Freemn Ril Tril FED AID PROJETNO STP ATIVITY ODES 009Ol L022 ] FHWA AUTH DATE 9/21/2009 ADV DATE REMARKS: Finl design of the Bruce Freemn Ril Tril Phses 2A J FIXED ASSET: SETIONA APPROPRIATION SUB REQUEST FOR ALLOATION OF BOND FUNDS PRIOR TO ENUMBRANE ENUMBRANEDOUMENTID TRANS DEPT RJORG NUMBER DATE OS). H ORG T AT N/P AMOUNT. J. L SETION B: OBLIGATION BY FISAL YEAR FOR MULTIYEAR ONTRATS 1 t hmtar L REASON FOR REQUEST: ONTRATOR / ONTR. NO: REMARKS: REOMMENDED 1TrLE ROVED: TO BE OMPLETED BY FISAL MANAGEMENT: TO BE OMPLETED BY EPO: APPROVED: MANAGER/DATE EXPENSEBUET: APPROVED BY: AOUNT MANAGER / DATE PARS/FIN68l REVISED 11/10/99 rr

109 .. MASSAHUSETTS HIGHWAY DEPARTMENT PARS NUMBER PARS NO:..H SYSTEM: HI FED AID PROJET NO: T TO\\/Ifl cton LOATION: Bruce Freemn Ril Tril ATIVITY ODES: ZZ FHWA AUTH. DATE: 6/6/2011 REMARKS: Agreement to reimburse the municiplity for costs ssocited with the NFA design greement Bruce Freemn (Phses 2A/2Q EZEEZEI ADV. DATE: DATE FiXED ASSET: REQUEST FOR ALLOATION OF BOND FUNDS PRIOR TO ENUMBRANE SETION 4 APPROPRIATION fl ENUMBRANE DOUMENT ID TRANS DEPT R/ORGNUMBERfl L t±* DATE AMOUNT 13. r APRIA: SETION n OBLIGATION BY FISAL YEAR FOR MULTIYEAR ONThATS REASON FOR REQUEST. ONTRATOR I ONTR, NO REMARKS REOMMENDED TITLE APPROVED TITLE TOBE OMPLETED BY FISAL MANAGEMENT: JTö EOThPLETED BY EPOE APPROVED MANAGER 1DATE EXPENSE BUDGET ENTERED BY/DATE L._ JAPPROVEDBYi PARS/FIN681 REVISED 11/10/99

110 DsvAL L. PATRiK, GOVERNOR TIMoThY P. MuRgcc, LT, GOVERNOR JEFFREY B. MUUAN, SEcRETARY & EO LUISA PAJEw0NSIY, ADMINIsntToR MowhgMsschusctt$FQFwtdQ 7I Highwy My 18, 2011 Re: Request for FHWA pprovl Acton Bruce Freemn Tril (Phse 2A nd 2) Design Agreement Ms. Pmel Stephenson, Division Administrtor Federl Highwy Administrtion 55 Brodwy IO Floor mbridge, MA Der Ms. Stephenson: Forwrded for your pprovl is one copy of n unexecuted greement between MssHighwy nd the municiplity of Acton with n estimte in the mount of$ (80% of $ ) for design nd engineering work to be done for the subject project. The procurement procedure hs been reviewed nd deemed n cceptble, vlid solicittion nd contrcting process. Subject to your pprovl, EPO will request ifinding for this work. ot Enc osures thtcurn}tfcth LA. / Guy F;Rezendes, P.E. It I JtS:b Utilities Engineer Qdg & Lt4n clo.n.cc wtè,. Mc. s OT tjkli&&j L1 c: Utilities flftfrflnjlt dje4 74..y ( 201(1,tviZtl 4 kmdd Z2?iJ/mcu Msschusetts Deprtment of Trnsporttion, Highwy Division TEN PARK PLAM BOSTON. MA PHONE: Fn: TDD:

111 Run Dte: 09/23/2G39 Run Tune: 09:03:50 U.S. DEPARTMENT OF FEDERAL TRANSPORTATION HIGHWAY ADMINISTRATION Pge 1 FEDERALAID PROJET AGREEMENT Report: FMISIX5A STATE: MASSAHUSETtS PROJET No: 0025(032r STATE PROJ. NO: THE STATE, THROUGH ITS HISkWAY AGENY, HAVING OMPLIED, OR HEREBYAGREEING TO OMPLY, WITH THE APPLIABLE TERMS AND ONDITIONS SET FORTH IN (t)title 23, U.S. ODE, HIGHWAYS, (2) THE REGULATIONS ISSUED PURSUANT THERETO AND (3) THE POLIIES AND PROEDURES PROMULGATED BY THE FEDERAL HIGHWAY ADMINISTRATION RELATIVE TO THE ABOVE DESIGNATED PROJET. AND THE FEDERAL HIGHWAY ADMINISTRATION HAVING AUTHORIZED ERTAIN WORK TO PROEED AS EVIDENED BY THE DATE ENTERED OPPOSITE THE SPEIFI ITEM OF WORK, FEDERAL RiNDS ARE OBLIGATED FOR THE PROJET NOT TO EXEED THE AMOUNT SHOWN HEREIN, ThE BALANE OF THE ESTIMATED TOTAL OST BEING AN OBLIGATION OF THE STATE, SUH OBLIGATION OF FEDERAL. FUNDS EXTENDS ONLY TO PROJET OSTS INURRED BY THE STATE AFTER THE FEDERAL HIGHWAY AOMINISTRATION AUTHORiZATION TO PROEED WITH ThE PROJET INVOLVING SUH OSTS. (U PROJET DESRIPTION: STP002S(032), FINAL DESIGN OF THE BRUE FREEMAN RAIL TRAIL PHASES 2A (WESTFORDARtJSLEATON) AND 2 (ONORD). DUNS #: LASSIFIATION OF PHASE OF WORK TO SE PUT UNDER AGREEMENT EFFETIVE DATE OF AUTHORIZATION HIGHWAY PLANNING & RESEARH PRELIMINARY ENGINEERING 09110/2009 RIGHTOFWAY ONSTRUTION MSAP OTHER PROGRAM URBAN! TOTAL OST FEDERAL FEDERAL FUNDS ADVANED ONST. ODE WITH SHARE UNDER AGREEMENT FUNDS 3380 $ % 5400, $0.00 TOTAL $500, $400, ESTIMATED TOTAL OST: $ TOTAL AUTHORIZED FOR PROJET: 5400, ON AVAILABLE FUNDS ERTIFIED BY: PAUL K. JAY DATE: 09/09/2009 APPROVED AND AUTHORIZED BY: PAUL K. JAY DATE: AGRMT/MODIFY REQUESTED BY: PAUL K. JAY DATE: 09/09/2009 FEDERAL HIGHWAY ADMINISTRATION PROJET INFORMATION REVIEWED BY: MARGERY A. BERNIS DATE: 09) APPROVAL REOMMENDED BY: JOHN M. MVANN DATE: 09/21/2009 APPROVED AND AUThORIZED BY: JOHN M. MVANN DATE: 09121/2009 STATE REMARKS: PROJET AUTHORIZATION. Obligtion ml $400,000 in Appr. ode = FFYO9 STWD TRANSPORTATION ENHANEMENT, 3380 Federl funds. STIP REFERENE DIVISIDN REMARKS:

UNITED STATES DEPARTMENT OF AGRICULTURE Washington, D.C. 20250. ACTION BY: All Divisions and Offices. FGIS Directive 2510.

UNITED STATES DEPARTMENT OF AGRICULTURE Washington, D.C. 20250. ACTION BY: All Divisions and Offices. FGIS Directive 2510. UNITED STATES DEPARTMENT OF AGRICULTURE Wshington, D.C. 20250 ACTION BY: All Divisions nd Offices FGIS Directive 2510.1 12-11-73 FEDERAL TORT CLAIMS I PURPOSE This Instruction: A Sets forth the bsic provisions

More information

JaERM Software-as-a-Solution Package

JaERM Software-as-a-Solution Package JERM Softwre-s--Solution Pckge Enterprise Risk Mngement ( ERM ) Public listed compnies nd orgnistions providing finncil services re required by Monetry Authority of Singpore ( MAS ) nd/or Singpore Stock

More information

In addition, the following elements form an integral part of the Agency strike prevention plan:

In addition, the following elements form an integral part of the Agency strike prevention plan: UNITED STTES DEPRTMENT OF GRICULTURE Wshington, DC 20250 Federl Grin Inspection Service FGIS Directive 4711.2 6/16/80 STRIKE PREVENTION ND STRIKE CONTINGENCY PLNS I PURPOSE This Instruction: Estlishes

More information

INJURY MANAGEMENT & REHABILITATION

INJURY MANAGEMENT & REHABILITATION OBJECTIVES To estblish systemtic pproch to injury mngement nd rehbilittion throughout the City immeditely following work relted illness, injury nd disbility. To estblish tht it is the responsibility of

More information

Pay over time with low monthly payments. Types of Promotional Options that may be available: *, ** See Page 10 for details

Pay over time with low monthly payments. Types of Promotional Options that may be available: *, ** See Page 10 for details With CreCredit... Strt cre immeditely Py over time with low monthly pyments For yourself nd your fmily Types of Promotionl Options tht my be vilble: Not ll enrolled helthcre prctices offer ll specil finncing

More information

2001 Attachment Sequence No. 118

2001 Attachment Sequence No. 118 Form Deprtment of the Tresury Internl Revenue Service Importnt: Return of U.S. Persons With Respect to Certin Foreign Prtnerships Attch to your tx return. See seprte instructions. Informtion furnished

More information

ClearPeaks Customer Care Guide. Business as Usual (BaU) Services Peace of mind for your BI Investment

ClearPeaks Customer Care Guide. Business as Usual (BaU) Services Peace of mind for your BI Investment ClerPeks Customer Cre Guide Business s Usul (BU) Services Pece of mind for your BI Investment ClerPeks Customer Cre Business s Usul Services Tble of Contents 1. Overview...3 Benefits of Choosing ClerPeks

More information

DlNBVRGH + Sickness Absence Monitoring Report. Executive of the Council. Purpose of report

DlNBVRGH + Sickness Absence Monitoring Report. Executive of the Council. Purpose of report DlNBVRGH + + THE CITY OF EDINBURGH COUNCIL Sickness Absence Monitoring Report Executive of the Council 8fh My 4 I.I...3 Purpose of report This report quntifies the mount of working time lost s result of

More information

Recognition Scheme Forensic Science Content Within Educational Programmes

Recognition Scheme Forensic Science Content Within Educational Programmes Recognition Scheme Forensic Science Content Within Eductionl Progrmmes one Introduction The Chrtered Society of Forensic Sciences (CSoFS) hs been ccrediting the forensic content of full degree courses

More information

S a l e s Ta x, U s e Ta x, I n c o m e Ta x W i t h h o l d i n g a n d M i c h i g a n B u s i n e s s Ta x E s t i m a t e s

S a l e s Ta x, U s e Ta x, I n c o m e Ta x W i t h h o l d i n g a n d M i c h i g a n B u s i n e s s Ta x E s t i m a t e s 78 (Rev. 8-08) S l e s T x, U s e T x, I n c o m e T x W i t h h o l d i n g n d M i c h i g n B u s i n e s s T x E s t i m t e s Forms nd Instructions Cll (517) 636-4730 or visit Tresury s Web site t

More information

Commercial Cooling Rebate Application

Commercial Cooling Rebate Application Commercil Cooling Rebte Appliction Generl Informtion April 1 st 2015 through Mrch 31 st 2016 AMU CUSTOMER INFORMATION (Plese print clerly) Business Nme: Phone #: Contct Nme: Miling Address: City: Stte:

More information

North American Logistics Services

North American Logistics Services North Americn Logistics Services Excellence in Logistics Services Business Profile Address : 7550 W 2 nd CT Hileh, FL 33014 Toll Free: 866.804.6287 Locl: 305.455.0640 Fcsimile: 786.472.6862 Website: Emil:

More information

Vendor Rating for Service Desk Selection

Vendor Rating for Service Desk Selection Vendor Presented By DATE Using the scores of 0, 1, 2, or 3, plese rte the vendor's presenttion on how well they demonstrted the functionl requirements in the res below. Also consider how efficient nd functionl

More information

Anthem Blue Cross Life and Health Insurance Company University of Southern California Custom Premier PPO 800/20%/20%

Anthem Blue Cross Life and Health Insurance Company University of Southern California Custom Premier PPO 800/20%/20% Anthem Blue Cross Life nd Helth Insurnce Compny University of Southern Cliforni Custom Premier 800/20%/20% Summry of Benefits nd Coverge: Wht this Pln Covers & Wht it Costs Coverge Period: 01/01/2015-12/31/2015

More information

Prescriptive Program Rebate Application

Prescriptive Program Rebate Application Prescriptive Progrm Rebte Appliction Check the pproprite progrm box for your rebte. OID Internl Use Only Cooling FSO (Fluid System Optimiztion) Foodservice Equipment Heting Lighting Motors & Drives Customer

More information

Health insurance exchanges What to expect in 2014

Health insurance exchanges What to expect in 2014 Helth insurnce exchnges Wht to expect in 2014 33096CAEENABC 02/13 The bsics of exchnges As prt of the Affordble Cre Act (ACA or helth cre reform lw), strting in 2014 ALL Americns must hve minimum mount

More information

Health insurance marketplace What to expect in 2014

Health insurance marketplace What to expect in 2014 Helth insurnce mrketplce Wht to expect in 2014 33096VAEENBVA 06/13 The bsics of the mrketplce As prt of the Affordble Cre Act (ACA or helth cre reform lw), strting in 2014 ALL Americns must hve minimum

More information

Test Management using Telelogic DOORS. Francisco López Telelogic DOORS Specialist

Test Management using Telelogic DOORS. Francisco López Telelogic DOORS Specialist Test Mngement using Telelogic DOORS Frncisco López Telelogic DOORS Specilist Introduction Telelogic solution for Requirements Mngement DOORS Requirements mngement nd trcebility pltform for complex systems

More information

Pre-Approval Application

Pre-Approval Application Pre-Approvl Appliction In tody s rel estte mrket, Pre-Approved mortgge provides you the buyer with powerful tool in the home purchse process! Once you hve received your Pre-Approvl, you cn shop for your

More information

An Undergraduate Curriculum Evaluation with the Analytic Hierarchy Process

An Undergraduate Curriculum Evaluation with the Analytic Hierarchy Process An Undergrdute Curriculum Evlution with the Anlytic Hierrchy Process Les Frir Jessic O. Mtson Jck E. Mtson Deprtment of Industril Engineering P.O. Box 870288 University of Albm Tuscloos, AL. 35487 Abstrct

More information

The Morgan Stanley FTSE Protected Growth Plan. Investor Pack

The Morgan Stanley FTSE Protected Growth Plan. Investor Pack The Morgn Stnley FTSE Protected Growth Pln Investor Pck The Morgn Stnley FTSE Protected Growth Pln Introduction The current investment environment with its extreme levels of uncertinty nd voltility, mkes

More information

abcdefghijklmnopqrstu

abcdefghijklmnopqrstu NHS Circulr: PCS(AFC)2008/2 The Scottish Government Helth Workforce Directorte Employment nd Retention Division bcdefghijklmnopqrstu Der Collegue MANAGING SICKNESS ABSENCE Summry 1. This py circulr informs

More information

BUSINESS OWNERS PACKAGE INSURANCE APPLICATION

BUSINESS OWNERS PACKAGE INSURANCE APPLICATION BUSINESS OWNERS PACKAGE INSURANCE APPLICATION Progrm ville through: CAMICO Insurnce Services Tel: 800.652.1772 Prt 1: Generl Informtion 1. Firm Nme: 2. Contct Person: (Person designted nd uthorized y the

More information

Humana Critical Illness/Cancer

Humana Critical Illness/Cancer Humn Criticl Illness/Cncer Criticl illness/cncer voluntry coverges py benefits however you wnt With our criticl illness nd cncer plns, you'll receive benefit fter serious illness or condition such s hert

More information

INSURANCE REQUIREMENTS FOR CONSULTANTS (WITHOUT ERRORS AND OMISSIONS REQUIREMENT)

INSURANCE REQUIREMENTS FOR CONSULTANTS (WITHOUT ERRORS AND OMISSIONS REQUIREMENT) INSURNCE REQUIREMENTS FOR CONSULTNTS (WITHOUT ERRORS ND OMISSIONS REQUIREMENT) 1. Consultant shall obtain and maintain during the performance of any services under this greement the following insurance

More information

Questionnaire for Public Trust Positions

Questionnaire for Public Trust Positions Stndrd Form 85P Revised September 1995 U.S. Office of Personnel Mngement 5 CFR Prts 731, 732, nd 736 Questionnire for Public Trust Positions Form pproved: OMB. 3206-0191 NSN 7540-01-317-7372 85-1602 Follow

More information

Office of Student Financial Aid Haven-Warren Room 210

Office of Student Financial Aid Haven-Warren Room 210 Office of Student Finncil Aid Hven-Wrren Room 210 Division of Enrollment Services & Student Affirs Phone: (404) 880-8992 FEDERAL WORK-STUDY PROGRAM HANDBOOK Revision Approved: Complince Committee Dte Februry

More information

STATE OF MONTANA Developomental Disabilities Program Comprehensive Evaluation Hi-Line Home Programs, Inc Adult Services

STATE OF MONTANA Developomental Disabilities Program Comprehensive Evaluation Hi-Line Home Programs, Inc Adult Services Dtes of Review: FY '09 Evluttor(s): S. Crpenter DESK REVIEW: Accredittion: Acredittion is no longer required by the stte contrct. Significnt Events from the Agency: Developomentl Disbilities Progrm Comprehensive

More information

Enterprise Risk Management Software Buyer s Guide

Enterprise Risk Management Software Buyer s Guide Enterprise Risk Mngement Softwre Buyer s Guide 1. Wht is Enterprise Risk Mngement? 2. Gols of n ERM Progrm 3. Why Implement ERM 4. Steps to Implementing Successful ERM Progrm 5. Key Performnce Indictors

More information

INSURANCE REQUIREMENTS FOR CONSULTANTS (WITH ERRORS AND OMISSIONS REQUIREMENT)

INSURANCE REQUIREMENTS FOR CONSULTANTS (WITH ERRORS AND OMISSIONS REQUIREMENT) Exhibit INS- INSURNCE REQUIREMENTS FOR CONSULTNTS (WITH ERRORS ND OMISSIONS REQUIREMENT) 1. Consultant shall obtain and maintain during the performance of any services under this greement the following

More information

Template convertible loan agreement. User notes

Template convertible loan agreement. User notes Templte convertile lon greement User notes This is simple convertile lon greement intended to e used when shreholder lends money to compny, generlly s form of ridging finnce until n expected event tkes

More information

Application Bundles & Data Plans

Application Bundles & Data Plans Appliction Appliction Bundles & Dt Plns We ve got plns for you. Trnsporttion compnies tody ren t one-size-fits-ll. Your fleet s budget, size nd opertions re unique. To meet the needs of your fleet nd help

More information

Quick Reference Guide: One-time Account Update

Quick Reference Guide: One-time Account Update Quick Reference Guide: One-time Account Updte How to complete The Quick Reference Guide shows wht existing SingPss users need to do when logging in to the enhnced SingPss service for the first time. 1)

More information

Thank you for requesting a Trade Account with Exertis (UK) Ltd.

Thank you for requesting a Trade Account with Exertis (UK) Ltd. Thnk you for requesting Trde Account with Exertis (UK) Ltd. Plese complete the following Trde Account Appliction Form fully nd return to: ACCOUNT APPLICATIONS Exertis (UK) Ltd Shorten Brook Wy Althm Business

More information

Morgan Stanley Ad Hoc Reporting Guide

Morgan Stanley Ad Hoc Reporting Guide spphire user guide Ferury 2015 Morgn Stnley Ad Hoc Reporting Guide An Overview For Spphire Users 1 Introduction The Ad Hoc Reporting tool is ville for your reporting needs outside of the Spphire stndrd

More information

PETER M. ROSS 22 Four Oaks Crescent London, Ontario N6J 4B7 Telephone: 51 9-661-4005/Facsimile: 5 19-471-0085 Email: pmross@,uwo.

PETER M. ROSS 22 Four Oaks Crescent London, Ontario N6J 4B7 Telephone: 51 9-661-4005/Facsimile: 5 19-471-0085 Email: pmross@,uwo. PETER M. ROSS 22 Four Oks Crescent London, Ontrio N6J 4B7 Telephone: 51 9-661-4005/Fcsimile: 5 19-471-0085 Emil: pmross@,uwo.c April 2lS', 2005 Corportion of the City of London City Clerk's Office Room

More information

Combined Liability Insurance. Information and Communication Technology Proposal form

Combined Liability Insurance. Information and Communication Technology Proposal form Comined Liility Insurnce Informtion nd Communiction Technology Proposl form Comined Liility Insurnce Informtion nd Communiction Technology - Proposl form This proposl form must e completed nd signed y

More information

Health insurance exchanges What to expect in 2014

Health insurance exchanges What to expect in 2014 Helth insurnce exchnges Wht to expect in 2014 33096CAEENABC 11/12 The bsics of exchnges As prt of the Affordble Cre Act (ACA or helth cre reform lw), strting in 2014 ALL Americns must hve minimum mount

More information

What is the closest Metro/Train or Bus station? The T - (www.the-t.com)

What is the closest Metro/Train or Bus station? The T - (www.the-t.com) Are GABLES 411: Sutter Creek Where is the closest post office? Locted 5.3 miles from the community, t the intersection of E Prk Row Dr. nd New York Ave. Below is the ddress nd phone number for your reference.

More information

Corporate Compliance vs. Enterprise-Wide Risk Management

Corporate Compliance vs. Enterprise-Wide Risk Management Corporte Complince vs. Enterprise-Wide Risk Mngement Brent Sunders, Prtner (973) 236-4682 November 2002 Agend Corporte Complince Progrms? Wht is Enterprise-Wide Risk Mngement? Key Differences Why Will

More information

aaaaaaa aaaaaaa aaaaaaa a Welcome To The ADP TotalPay Visa Card Program!

aaaaaaa aaaaaaa aaaaaaa a Welcome To The ADP TotalPay Visa Card Program! Welcome To The ADP TotlPy Vis Crd Progrm! The TotlPy Vis Crd Account Experience the ese & relibility of direct deposit through n ADP TotlPy VISA crd ccount ADP TotlPy VISA crd ccounts llow crdholders to

More information

Active & Retiree Plan: Trustees of the Milwaukee Roofers Health Fund Coverage Period: 06/01/2015-05/31/2016 Summary of Benefits and Coverage:

Active & Retiree Plan: Trustees of the Milwaukee Roofers Health Fund Coverage Period: 06/01/2015-05/31/2016 Summary of Benefits and Coverage: Summry of Benefits nd Coverge: Wht this Pln Covers & Wht it Costs Coverge for: Single & Fmily Pln Type: NPOS This is only summry. If you wnt more detil bout your coverge nd costs, you cn get the complete

More information

2. Transaction Cost Economics

2. Transaction Cost Economics 3 2. Trnsction Cost Economics Trnsctions Trnsctions Cn Cn Be Be Internl Internl or or Externl Externl n n Orgniztion Orgniztion Trnsctions Trnsctions occur occur whenever whenever good good or or service

More information

Small Business Cloud Services

Small Business Cloud Services Smll Business Cloud Services Summry. We re thick in the midst of historic se-chnge in computing. Like the emergence of personl computers, grphicl user interfces, nd mobile devices, the cloud is lredy profoundly

More information

Long Term Financial Planning

Long Term Financial Planning Long Term Finncil Plnning Overview of New Pltform City of Knss City, Missouri 2013 2018 Long term finncil plnning combines finncil forecsting with finncil strtegizing to identify future chllenges nd opportunities

More information

Network Configuration Independence Mechanism

Network Configuration Independence Mechanism 3GPP TSG SA WG3 Security S3#19 S3-010323 3-6 July, 2001 Newbury, UK Source: Title: Document for: AT&T Wireless Network Configurtion Independence Mechnism Approvl 1 Introduction During the lst S3 meeting

More information

Where is the nearest bus stop? Route 52 (www.miamidade.gov/transit/routes.com), Located at community entrance on Hammocks Bldv.

Where is the nearest bus stop? Route 52 (www.miamidade.gov/transit/routes.com), Located at community entrance on Hammocks Bldv. GABLES 411: Cscdes t the Hmmocks Are Where is the nerest post office? Locted 2.04 miles from the community, t the intersection of SW 88 St. nd SW 147 Ave, in the Kendll Plz. Below is the ddress nd phone

More information

Psychological health and safety in the workplace Prevention, CAN/CSA-Z1003-13/BNQ 9700-803/2013

Psychological health and safety in the workplace Prevention, CAN/CSA-Z1003-13/BNQ 9700-803/2013 Psychologicl helth nd sfety in the workplce Prevention, CAN/CSA-Z1003-13/BNQ 9700-803/2013 promotion, nd guidnce to stged implementtion This smple udit tool is n nnex of the Ntionl Stndrd of Cnd on Psychologicl

More information

Guide for completing the CMS-1500 (Professional Claims) Form

Guide for completing the CMS-1500 (Professional Claims) Form Guide for completing the CMS-100 (Professionl Clims) Form CCStp nd its ffilites offer this guide to help you complete the CMS-100 form for your ptients with CCStp coverge. In the event illing procedures

More information

Your car insurance policy

Your car insurance policy Your cr insurnce policy If you hve n ccident...cll us stright wy on 0844 891 5391. For our joint protection, clls my be recorded nd/or monitored. Welcome. We ve got you covered. Together with your policy

More information

San Mateo County ACCEL Adult-Education College and Career Educational Leadership AB 86 Adult Education Consortium Project Management Plan 24, 2014 -

San Mateo County ACCEL Adult-Education College and Career Educational Leadership AB 86 Adult Education Consortium Project Management Plan 24, 2014 - A Sn Mteo County ACCEL Adult-Eduction College nd Creer Eductionl Ledership AB 86 Adult Eduction Consortium Project Mngement Pln - Februry 24, 2014 - This project mngement pln presents ACCEL s process frmework

More information

AntiSpyware Enterprise Module 8.5

AntiSpyware Enterprise Module 8.5 AntiSpywre Enterprise Module 8.5 Product Guide Aout the AntiSpywre Enterprise Module The McAfee AntiSpywre Enterprise Module 8.5 is n dd-on to the VirusScn Enterprise 8.5i product tht extends its ility

More information

Below is the address and phone number for your reference.

Below is the address and phone number for your reference. Are GABLES 411: Gbles Ok Creek Where is the nerest post office? Locted 4 miles from the community, t the intersection of Clinton Keith nd Plomr Street. Below is the ddress nd phone number for your reference.

More information

File Storage Guidelines Intended Usage

File Storage Guidelines Intended Usage Storge 1 Google Cloud 2 Other cloud storge Exmple or Box, Dropbox, Crbonite, idrive File Storge Guidelines Usge Fculty nd student collbortion Specil use cses. When non-lcc employee nd students need ccess

More information

Welding procedure qualification tests of steels for hull construction and marine structures

Welding procedure qualification tests of steels for hull construction and marine structures (June 2005) (Rev.1 Nov 2006) (Rev.2 Mr 2012) Welding procedure qulifiction tests of steels for hull construction nd mrine structures 1. Scope 1.1 This document gives requirements for qulifiction tests

More information

Use Geometry Expressions to create a more complex locus of points. Find evidence for equivalence using Geometry Expressions.

Use Geometry Expressions to create a more complex locus of points. Find evidence for equivalence using Geometry Expressions. Lerning Objectives Loci nd Conics Lesson 3: The Ellipse Level: Preclculus Time required: 120 minutes In this lesson, students will generlize their knowledge of the circle to the ellipse. The prmetric nd

More information

Reasoning to Solve Equations and Inequalities

Reasoning to Solve Equations and Inequalities Lesson4 Resoning to Solve Equtions nd Inequlities In erlier work in this unit, you modeled situtions with severl vriles nd equtions. For exmple, suppose you were given usiness plns for concert showing

More information

Features. This document is part of the Terms and Conditions for Personal Bank Accounts. 16-20 Barolin St, PO Box 1063 Bundaberg Queensland 4670

Features. This document is part of the Terms and Conditions for Personal Bank Accounts. 16-20 Barolin St, PO Box 1063 Bundaberg Queensland 4670 S This document is prt of the Terms nd Conditions for Personl Bnk Accounts Issued y Auswide Bnk Ltd ABN 40 087 652 060/Austrlin Finncil Services & Austrlin Credit Licence 239686 Effective from Jnury 18

More information

ELECTRONIC DEVELOPMENT APPLICATION (EDA) SYSTEM

ELECTRONIC DEVELOPMENT APPLICATION (EDA) SYSTEM ELECTRONIC DEVELOPMENT APPLICATION (EDA) SYSTEM OPERATIONS MANUAL Version : 1.7 Lst Updte : 24 th Aug 2005 URBAN REDEVELOPMENT AUTHORITY EDA Opertions mnul Ver 1.6 (01042004) pg 1 Tle of Contents Section

More information

FortiClient (Mac OS X) Release Notes VERSION 5.0.10

FortiClient (Mac OS X) Release Notes VERSION 5.0.10 FortiClient (Mc OS X) Relese Notes VERSION 5.0.10 FORTINET DOCUMENT LIBRARY http://docs.fortinet.com FORTINET VIDEO LIBRARY http://video.fortinet.com FORTINET BLOG https://blog.fortinet.com CUSTOMER SERVICE

More information

LEGISLATIVE BUDGET SYSTEM BUDGET COMPARISON WORKSHEET EXPLANATION A W

LEGISLATIVE BUDGET SYSTEM BUDGET COMPARISON WORKSHEET EXPLANATION A W LEGISLTIVE UDGET SYSTEM UDGET COMPRISON ORKSHEET Page 1 of 24 Program ID: JUD101 Structure #: 010101000000 COURTS OF PPEL JUDICIRY SEQ # EXPLNTION FIRST FY SECOND FY EXPLNTION 79.00 6,429,114 79.00 6,429,114

More information

DATA SCIENTIST WHY IT S THE SEXIEST JOB OF THE 21 ST CENTURY

DATA SCIENTIST WHY IT S THE SEXIEST JOB OF THE 21 ST CENTURY Brought to you by HTTP://WWW.ANALYTICS-MAGAZINE.ORG DRIVING BETTER BUSINESS DECISIONS JULY/AUGUST 2013 ADVENT OF THE DATA SCIENTIST WHY IT S THE SEXIEST JOB OF THE 21 ST CENTURY ALSO INSIDE: Anlytics &

More information

European Convention on Certain International Aspects of Bankruptcy

European Convention on Certain International Aspects of Bankruptcy Europen Trety Series - No. 136 Europen Convention on Certin Interntionl Aspects of Bnkruptcy Istnul, 5.VI.1990 Premle The memer Sttes of the Council of Europe, signtories hereto, Considering tht the im

More information

Experiment 6: Friction

Experiment 6: Friction Experiment 6: Friction In previous lbs we studied Newton s lws in n idel setting, tht is, one where friction nd ir resistnce were ignored. However, from our everydy experience with motion, we know tht

More information

Techniques for Requirements Gathering and Definition. Kristian Persson Principal Product Specialist

Techniques for Requirements Gathering and Definition. Kristian Persson Principal Product Specialist Techniques for Requirements Gthering nd Definition Kristin Persson Principl Product Specilist Requirements Lifecycle Mngement Elicit nd define business/user requirements Vlidte requirements Anlyze requirements

More information

Project 6 Aircraft static stability and control

Project 6 Aircraft static stability and control Project 6 Aircrft sttic stbility nd control The min objective of the project No. 6 is to compute the chrcteristics of the ircrft sttic stbility nd control chrcteristics in the pitch nd roll chnnel. The

More information

GFI MilArchiver 6 vs C2C Archive One Policy Mnger GFI Softwre www.gfi.com GFI MilArchiver 6 vs C2C Archive One Policy Mnger GFI MilArchiver 6 C2C Archive One Policy Mnger Who we re Generl fetures Supports

More information

a a a a a a With CareCredit... Start care immediately Pay over time with low monthly payments For yourself and your family

a a a a a a With CareCredit... Start care immediately Pay over time with low monthly payments For yourself and your family With CreCredit... Strt cre immeditely Py over time with low monthly pyments For yourself nd your fmily Two Types of Promotionl Plns Avilble: No Interest if Pid in Full within 6, 12 or 18 Months On purchses

More information

Small Business Networking

Small Business Networking Why network is n essentil productivity tool for ny smll business Effective technology is essentil for smll businesses looking to increse the productivity of their people nd processes. Introducing technology

More information

GAO IRS AUDIT RATES. Rate for Individual Taxpayers Has Declined But Effect on Compliance Is Unknown

GAO IRS AUDIT RATES. Rate for Individual Taxpayers Has Declined But Effect on Compliance Is Unknown GAO United Sttes Generl Accounting Office Report to the Chirmn, Subcommittee on Oversight, Committee on Wys nd Mens, House of Representtives April 2001 IRS AUDIT RATES Rte for Individul Txpyers Hs Declined

More information

Voluntary Prekindergarten Parent Handbook

Voluntary Prekindergarten Parent Handbook Voluntry Prekindergrten Prent Hndbook Wht is Voluntry Prekindergrten (VPK)? Voluntry Prekindergrten (VPK) is legisltively mndted progrm designed to prepre every four-yer-old in Florid for kindergrten nd

More information

GAO HIGHER EDUCATION. Improved Tax Information Could Help Families Pay for College. Report to the Committee on Finance, U.S.

GAO HIGHER EDUCATION. Improved Tax Information Could Help Families Pay for College. Report to the Committee on Finance, U.S. GAO United Sttes Government Accountbility Office Report to the Committee on Finnce, U.S. Sente My 2012 HIGHER EDUCATION Improved Tx Informtion Could Help Fmilies Py for College GAO-12-560 My 2012 HIGHER

More information

THE INTELLIGENT VEHICLE RECOVERY AND FLEET MANAGEMENT SOLUTION

THE INTELLIGENT VEHICLE RECOVERY AND FLEET MANAGEMENT SOLUTION KENYA THE INTELLIGENT VEHICLE RECOVERY AND FLEET MANAGEMENT SOLUTION INTRODUCTION Hving estblished itself in no less thn eleven Sub-Shrn countries nd with more thn 230 000 vehicles lredy on its system

More information

End-to-end development solutions

End-to-end development solutions TECHNICAL SERVICES Endtoend development solutions Mnged y TFE HOTELS TFE Hotels re the only Austrlin Hotel group with inhouse end to end development solutions. We hve expertise in Arhiteturl nd Interior

More information

VoIP for the Small Business

VoIP for the Small Business Reducing your telecommunictions costs VoIP (Voice over Internet Protocol) offers low cost lterntive to expensive trditionl phone services nd is rpidly becoming the communictions system of choice for smll

More information

Small Business Networking

Small Business Networking Why network is n essentil productivity tool for ny smll business Effective technology is essentil for smll businesses looking to increse the productivity of their people nd processes. Introducing technology

More information

GFI MilArchiver 6 vs Quest Softwre Archive Mnger GFI Softwre www.gfi.com GFI MilArchiver 6 vs Quest Softwre Archive Mnger GFI MilArchiver 6 Quest Softwre Archive Mnger Who we re Generl fetures Supports

More information

Area. GABLES 411: Gables Wilton Park a

Area. GABLES 411: Gables Wilton Park a GABLES 411: Gbles Wilton Prk Are Where is the nerest post office? Locted 2 miles from the community, t the intersection of Oklnd Prk Blvd nd Dixie Highwy. Below is the ddress nd phone number for your reference.

More information

Tablet Charging Wall Mount 12

Tablet Charging Wall Mount 12 User's Guide Tlet Chrging Wll Mount 12 For the ltest User Instlltion Guide plese visit: www.ergotron.com User's Guide - English Guí del usurio - Espñol Mnuel de l utilisteur - Frnçis Geruikersgids - Deutsch

More information

Additional Protocol to the Convention on Human Rights and Biomedicine concerning Genetic Testing for Health Purposes

Additional Protocol to the Convention on Human Rights and Biomedicine concerning Genetic Testing for Health Purposes Council of Europe Trety Series - No. 203 Additionl Protocol to the Convention on Humn Rights nd Biomedicine concerning Genetic Testing for Helth Purposes Strsourg, 27.XI.2008 2 CETS 203 Humn Rights nd

More information

How To Network A Smll Business

How To Network A Smll Business Why network is n essentil productivity tool for ny smll business Effective technology is essentil for smll businesses looking to increse the productivity of their people nd processes. Introducing technology

More information

HP Application Lifecycle Management

HP Application Lifecycle Management HP Appliction Lifecycle Mngement Softwre Version: 11.00 Tutoril Document Relese Dte: Novemer 2010 Softwre Relese Dte: Novemer 2010 Legl Notices Wrrnty The only wrrnties for HP products nd services re set

More information

1.00/1.001 Introduction to Computers and Engineering Problem Solving Fall 2011 - Final Exam

1.00/1.001 Introduction to Computers and Engineering Problem Solving Fall 2011 - Final Exam 1./1.1 Introduction to Computers nd Engineering Problem Solving Fll 211 - Finl Exm Nme: MIT Emil: TA: Section: You hve 3 hours to complete this exm. In ll questions, you should ssume tht ll necessry pckges

More information

GENERAL APPLICATION FOR FARM CLASSIFICATION

GENERAL APPLICATION FOR FARM CLASSIFICATION SCHEDULE 1 (section 1) Plese return to: DEADLINE: Plese return this form to your locl BC Assessment office y Octoer 31. Assessment Roll Numer(s) GENERAL APPLICATION FOR FARM CLASSIFICATION Section 23 (1)

More information

Understanding Life Cycle Costs How a Northern Pump Saves You Money

Understanding Life Cycle Costs How a Northern Pump Saves You Money Understnding Life Cycle Costs How Nrn Pump Sves You Money Reference: Hydrulic Institute (www.s.g) Introduction Wht Life Cycle Cost (LCC) Clculting Totl LCC LCC Components Wht Life Cycle Cost Life Cycle

More information

COMMONWEALTH OF VIRGINIA STATE CORPORATION COMMISSION AT RICHMOND, JULY 20, 2015 ORDER ADOPTING AMENDED RULES

COMMONWEALTH OF VIRGINIA STATE CORPORATION COMMISSION AT RICHMOND, JULY 20, 2015 ORDER ADOPTING AMENDED RULES COMMONWEALTH OF VIRGINIA STATE CORPORATION COMMISSION AT RICHMOND, JULY 20, 2015 SI 111 COMMONWEALTH OF VIRGINIA, ex rel. " " P njul 20 P 3b «STATE CORPORATION COMMISSION jf Pr/e: In the mtter of Adopting