1 1492 Integrated Decision-Support Framework for Municipal Infrastructure Asset Khaled Shahata 1 and Tarek Zayed 2 ABSTRACT Integration planning of Infrastructure systems reveals a changeling decisions facing Canadian municipalities for planning repair/renewal of road network, water distribution network, wastewater distribution network. Decision-making for these networks requires the incorporation of a massive amount of data collection, building business processes, identifying decision variables and optimization. The objective of this research is to establish a methodology to facilitate decision making process that ensures reliable and optimum decision regarding corridor rehabilitation for road, water and wastewater network. This proposed framework employs the following tasks: (1) analyze risk; (2) conduct performance evaluation; (3) assess the current physical condition of the pipe and road segment; (4) collecting data and performing data gap analysis; (5) document a conceptual business process diagrams; (6) develop decision analysis trees; and (7) implementing optimization of repair/renewal cost and defining the best replacement interval via genetic algorism (GA). In order to demonstrate the model features, a case study has been utilized from the City of Guelph, ON, Canada. The model is developed via genetic algorism (GA) using GIS platform. The results assist in setting priorities for integrated corridor rehabilitation and anticipated to generate a capital planning program for the city s infrastructure. In conclusion, this framework helps Canadian municipalities evaluate and select feasible optimal assets for integrated corridor rehabilitation. Keywords: * Decision-Support Framework, Decision-making, Asset management, GIS, standard municipal data, integrated infrastructure management, roads, water, wastewater network. 1 Asset Management Engineer, AECOM, Mississauga, Ontario, Canada, PH ext. 256; FAX ; Khaled.Shahata@aecom.com. 2 Associate Professor, Department of Building, Civil, and Environ. Eng., Concordia University, Montreal, Quebec, Canada, PH (514) ext. 8779; FAX (514) ; tzayed@alcor.concordia.ca. 1

2 1493 INTRODUCTION Efficient management of municipal infrastructure systems is currently more focused on the overall integrated multi-disciplinary aspects of Infrastructure Management process. The development and deployment of integrated infrastructure management systems is currently more of a necessity to maintain our infrastructure assets. Integrated infrastructure management would facilitate information flow across various disciplines and activities, which in return would improve the availability, reliability, and consistency of infrastructure information, resulting in timely and more efficient decisions. The need to adopt an integrated approach to infrastructure management is widely recognized in industry and academia (InfraGuide, 2003; Halfawy et al., 2002; Grigg, 1999 and Lemer,1998). Throughout the last two decades, municipalities have made significant investments in implementing software tools that focus on infrastructure management processes [Vanier, 2001& Halfawy et al., 2006]. The majority of the software tools were developed to function as stand-alone systems, and many have limited or no capability for sharing or exchanging information with other tools. Halfawy et al. (2006) reviewed commercial asset management systems in Canada. This paper aims to providing asset managers with an objective review of existing systems and technologies, and to identify a number of considerations that need to be addressed in the process of selecting an asset management system. It also highlights areas where further research and development are needed in order to extend the scope and capabilities of existing systems. The Infraguide report suggested a systematic integration approach for renewal of municipal road, sewer and water system in an integrated manner (InfraGuide, 2003). This approach consists of 5 tasks: The approach is based on collecting data inventories, condition assessment and performance evaluation. This evaluation can be completed independently for road, sewer and water systems. It should be noted that critical infrastructure assets should be dealt with separately from the non-critical assets thought out all phases of the process. Finally Task 5- developing a sound renewal plan which includes economic analysis, coordination with growth needs regulations, and risk management. The report set a high level framework for municipalities to adopt which will standardize procedures and integration their asset management initiatives. It is recommended for Municipalities and governmental official to join forces to enforce and standardizing these practices among all municipalities. There are several applications in development of municipal infrastructure management systems [ Lee & Deighton, 1995; Quintero et al., 2003; Ferreira & Duarte, 2005; and Halfawy, 2008)]. Municipalities have recognized the need to combine and to explore relationships among various data resources, and, when possible, to make them available to other department. Ferreira and Duarte (2005) proposed base liner referencing system (LRS) for an Integrated Infrastructure Management System is an attempt to provide a common referencing platform in which different data types can be represented spatially in a network structure in a standardized manner. The base LRS is intended to be the nucleus of the relational 2

3 1494 database and the GIS. Ferreria only examined the road network using his proposed technique; also he didn t introduce optimization to his proposed model. On the other hand, Halfawy (2008) has proposed a detailed framework to address a number of issues, including: asset life-cycle data modeling, sharing and management, systematization of municipal processes, and integration of disparate software tools in a flexible and modular architecture. Halfway emphasizes on data modeling and integration of software tools, rather than the details of individual integration processes (e.g. risk assessment, renewal planning, and optimization). Halfway did identify decision trees and/or business barrier between various municipal departments. Therefore, formalizing a more-detailed integrated business process model is considered necessary. RESEARCH OBJECTIVES The objective of this research is to establish a methodology to facilitate decision making process that ensure reliable and optimum decision regarding pursing corridor rehabilitation for road, water and wastewater network. In order to fulfill this objective the following sub objectives are identified: 1. Conduct a comparable study for current asset management practices. 2. Investigate/ develop condition assessment, performance analysis, and risk models for roads, water, and wastewater infrastructure. 3. Establish a conceptual business process diagrams to identify business drivers as well as barriers and obstacles for integrated corridor rehabilitation. 4. Develop an optimal decision support system for corridor rehabilitation which satisfies two main objectives: 1) minimizing the total replacement cost required to maintain the infrastructure at a specified level of service; and 2) minimizing the economic loss of replacing any asset earlier than its anticipated useful life. 5. Create decision trees to serve as best-practice guidelines for integrated corridor rehabilitation. 6. Develop a prototype tool that implements the developed methodology and recommends an optimal replacement strategy. METHODOLOGY The plan set to achieve the objectives of this research consists of three main phases: I. review of current asset management practices; II. development of integrated asset management framework and model; and III. prototype development and implementation. The decision-support framework for integrated asset management model is illustrated in Figure 1. This proposed framework employs the following steps: (1) perform overall Risk analysis at project and network level; (2) conduct performance evaluation for each asset class independently; (3) assess the current physical condition of the pipe and road segment; (4) collect data and perform data gap analysis; (5) document a conceptual business process diagrams to identify business drivers as well as barriers and obstacles for integrated corridor rehabilitation; (6) develop decision analysis trees to set priorities for integrated 3

4 1495 corridor rehabilitation; and (7) implement optimization of repair/renewal cost and defining the best replacement interval via genetic algorism (GA). Figure 1 Research Methodology Flow Diagram CASE STUDY AND DATA ANALYSIS In order to demonstrate the model features, a case study has been utilized from the City of Guelph, ON, Canada. The City of Guelph has a population of approximately 115,000. The total operating budget is approximately $255 million with a capital budget of roughly $81 million. Task 1: Risk Assessment Framework Risk assessment, based on the objective assessment of the probability and consequences of asset failure, represents a practical and effective means of identifying and prioritizing capital and maintenance requirements. Although failure modes will differ, the risk dimensions should remain constant (economic, environmental, health & safety, etc.). The parameters affecting cost of rehabilitation and replacement of Road/Sewer/Water (R/S/W) infrastructure assets were selected based upon four overall Criticality Indices as follows: a) economic: influence of the asset s failure on monetary resources; b) operational: influence of the asset s failure 4

5 1496 on operational ability; c) social: influence of the asset s failure on society; and d) environmental: influence of the asset s failure on the environment. Next, the parameters that influence each of the previous Criticality Indices were established and are outlined as shown in Figure 2. Some of these parameter where missing (e.g. contaminated soil, utility locations, soil types in some areas). These missing parameters were assigned an overall weight of zero until the required data are collected and populated. Road segment Sewer mains Water mains Economic parameters Operational parameters Pipe size - Business disruption critical customer (major water users, hospitals, health clinics) Pipe shape - Damage to surrounding infrastrture (e.g. Near gas, electricity, etc) Pipe bury depth - Pipe size - Contaminated soil - Road width - - Low accessibility - Pavement /pipe material Environmental parameters Land use Water body proximity Road right of the way - - Sensitive area (watershed, environmental land reserves, etc) Road type (expressway, arterial, collector, local, etc) - - Soil type Traffic count Social parameters No diversion road Land use Transit route Figure 2 Risk model parameters Road segment Sewer mains Water mains A methodology to transfer these subjective factors into a point system was adopted. Figure 3 shows the economic parameters matrices which outlines this importance ranking system. Each Criticality Index was sub-categorized and weighted by a percentage multiplier that represents its relative importance among the other subcategories. These index category weightings must add up to 100%. The bottom level of each matrix consists of a point system that assigns a relative consequences importance score of 1 to 5 to each parameter value or group of values. Parameter Values can be a characteristic value or a Boolean Yes/No value that indicates whether the asset has the characteristic or not. A Parameter Value with a score of 5 would represent a major impact on large portion of the infrastructure system while a score 1 represent no significant impact on current asset. The Consequence of failure model can be formulated as in Equation 1. Where (OCI) represents the Overall Criticality Index; Equation 1 5

6 1497 (W Index i ): weight for each Index i (e.g. Economic, Operational, Social, and Environmental factor); (W Var j ): weight for each Variable j (e.g. pipe size, depth, material, etc.); and (S Var j ): Score for each Variable j (scores ranges from 1 to 5). The risk model and the overall Criticality model can be formulated as in Equation 2. Risk = Probability of Failure (PoF) Overall criticality index (OCI) Equation 2 Index Weight Variable Weight Pipe Size Pipe Depth Economic 0.25 Material 0.15 Land Use Low Accessibility Road type 0.15 Processing None None None Spatial intersect with 20m buffer zone around land use polygons (ave R.o.W.width) spatially intersect water bodies, railroads, and escarpment None Notes sewers with 225 mm diameter pipes are a concern because fittings for these pipes are either very difficult to find or they must be fashioned by City staff The City of Guelph has experienced problems associated with tuberculation and reduced flow in copper and galvanized watermains. Updated to reflect "High Density" in the downtown area specified by design. ROW are estimated based on road class type Valid Entries water water water R/S/W R/S/W R/S/W Value Score Value Score Value Score Value Score Value Score Value Score OTHER 1 OTHER 1 No 1 Local CI, DI, 3 Park 2 Yes 5 Collector CONC 4 Residential 3 Arterial Cu or GALV 5 Comm/Indst 4 Expressway HighDensity 5 HWY 5 Sewer Sewer Sewer Value Score Value Score Value Score OTHER Brick Figure 3 Economic Parameters Risk Matrices The establishment of risk indices, parameters, parameter scoring and weightings outlined within the previous matrices were a result of expert opinion from City of Hamilton, City of Guelph, Region of Durham, AECOM and several consultations of literature review (e.g. Fares, 2008; UMA-AECOM, 2008) using a mixed Delphi- Analytical Hierarchy Process (Delphi-AHP) (Tavana et al., 1993). Task 2: Performance Management Framework Infrastructure exists to service its users; performance measures are used to link asset and system operation to these business objectives. Performance management aims in defining a baseline for service levels for various asset classes investigated in this dissertation. Performance management is divided into three stages, first identify key performance indicators for each asset class, then establish and measure performance, finally linking the key performance indicators to a desired level of service. 6

7 1498 Asset management experts were engaged to examine business drivers and identify how 'service' defined for each asset class, rationalize performance measures that link business goals with infrastructure operation, and establish 'scales' and threshold values representing the acceptable operating range for each metric. If sufficient information is available to estimate deterioration profile for each R/S/W system component then it would be used to develop advanced deterioration rates to recommend best replacement time. Otherwise generic deterioration models will be adapted from literature until required data are available. Example for performance management evaluation includes: Road network: Statistical analysis of defects, pavement management system (PMS) results, results of visual inspections Sewer network: Structural integrity of pipelines (Statistical analysis of defects), results of CCTV inspections, Health and economics considerations from flooding damage, Infiltration/inflow considerations, and River water quality objectives. Water network: Statistical analysis of repairs and leaks, breakage history, water quality issues, remote field testing, field sampling, and testing. Task 3: Condition Rating Framework At a basic level, Condition Assessment can be a simple and effective means of identifying and prioritizing infrastructure needs. Building upon Task 2 outcomes, best practice and extensive experience, Task 3 will establish a framework for condition assessment of R/S/W system infrastructure, relating ratings and performance definitions across asset classes, and establishing a mechanism for rolling-up component condition to an overall system level. The analysis of condition includes the evaluation of structural indicators (the physical condition of an asset) and performance indicators (the capacity or utilization of an asset). 3.1Road Network The pavement condition rating evaluation consists of a pavement distress survey, and the calculation and reduction of data into a surface condition scale through pavement management application software. Stantec s data collection vehicle was used to complete field data collection component on the paved roads. More specifically, this unit surveyed the paved network and collected pavement distress, road roughness, and digital video data. The Pavement Management System (PMS) database contains pavement rehabilitation historical data which saves information on all types of previous treatments, their application date, and associated costs. 3.2 Sewer network The Water Research Centre (WRc) rating system and operator/inspector certification provides a consistent assessment of sewer structural condition. The intent of the condition assessment process is to attach a condition grade to each reach of sewer based on the worst defect in that reach. This is a two step process involving the assignment of a preliminary internal condition grade (ICG) based on the raw defect scores obtained from CCTV inspections using WRc rating system. The condition grades are broken down into five categories, or discrete condition states, based on the 7

8 1499 potential for collapse and the likelihood of further deterioration. A final performance grade, or Structural Performance Grade (SPG), will be assigned based on the consideration of supplementary data such as soil conditions, frequency of surcharging and cursory data as shown in Figure 4. SPG is assigned by qualified individual based on the impact/significance of observed defects on performance. The grade reflects the probability of collapse where, on a scale of 1 to 5, 1 is pristine and 5 the sewer collapsed or collapse is imminent. Figure 4 Sewer Structural Performance Assessment Procedure 3.3 Water network Condition assessment of water mains is challenging compared to other infrastructure assets because they are typically underground, operated under pressure, and mostly they are inaccessible. A condition assessment model, using artificial neural network (ANN) and analytical hierarchy process (AHP), is developed in order to set up rehabilitation priority for water mains. Various factors are incorporated in the developed model, such as physical characteristics (i.e.: pipe type, size, age, breakage rate), in situ environmental (i.e.: Cathodic protection, ground water level, soil type, surface type, and road type), and operational (i.e.: Hazen-Williams factor, operational pressure) (Al Barqawi, 2006). This model was altered and updated based on the availability of data for the existing case study. Also a new factor was introduced to this model which is the Hydraulic Capacity of water mains assets. Head loss (HL/L) was selected as the main criterion to assess hydraulic capacity. Head loss is required on an individual asset basis, and is obtained from the City s water hydraulic model. Task 4: Data Collection and Analysis A questionnaire and workshop interviews were conducted with municipal experts and consultants in (City of Hamilton, City of Guelph, Region of Durham, City of North Bay, AECOM and several consultations of literature review (e.g. Al Barqawi, 2006; Chughtai, 2007; and Fares, 2008). These questionnaires were designed to collect the opinions of practitioners regarding the main factors affecting the risk, performance 8

9 1500 indicator, and condition rating. In addition to having access to GIS geodatabase, maintenance records, and various consultant reports for City of Guelph, Ontario, Canada. It is anticipated to conduct another workshop interview with York region and an additional workshop with City of Guelph to establish level of service parameters. Task 5: Business Process Diagrams This Task aims to document a conceptual business process diagrams to identify business drivers as well as barriers and obstacles for integrated corridor rehabilitation. Identify Issues and needs pertaining to integration of decision making for infrastructure assets. These processes involve the generation and manipulation of large data sets with complex interrelationships.this will require that all R/S/W Asset be tracked in some sort of data repository. Although WAM (Synergen) is the core corporate work order system that supports tracking assets, many external data repositories do exist. Examples of these data repositories include: GIS, Pavement Management System (PMS), and Other Miscellaneous Spreadsheets. Most of these processes still remain largely heuristic and subjective in nature, documented in the form of guidelines or manuals of best practices. Task 6: Decision Matrix & Decision Trees Analysis The purpose of this module is to equip the asset manager with a consistent methodology for decision-making during the integrated Corridor rehabilitation planning cycle. Within a planning cycle, the asset manger must make one of three decisions for the each asset in the road right of the way: a) Schedule Intervention; b) Schedule Inspection; and c) Revisit at next planning cycle. Task 7: Optimization Implementation Integrated infrastructure management has multiple objective functions, which imply optimizing a number of different objectives at the same time. In practice, problems with multiple objectives are reformulated as single-objective problems by either forming a weighted combination of the different objectives or else replacing some of the objectives by constraints. Optimizing integrated infrastructure rehabilitation requires the simultaneous optimization of more than one objective function. Such as minimize replacement cost, minimize the economic loss of early replacement of an asset, maximizing network condition rating, minimize consequence of failure and maximize performance. Optimization using genetic algorism (GA) allows searching for decision variable that minimizes the objective function while satisfying certain constrains. ANTICIPATED RESULTS The selection of the most suitable rehabilitation decision depends on the segmentation approach used for road, water, sewer assets. Figure 5 (a), (b), &(c) shows a sample condition rating results of road, sewer mains, water mains segments respectively for City of Guelph, ON. Each R/S/W segment is color coded based on their physical condition. Figure 5 (d) shows a systematic approach for defining the available corridor rehabilitation segmentation option. Each of this segmentation 9

10 Pipelines 2010: Climbing New Peaks to Infrastructure Reliability Renew, Rehab, and Reinvest options will be considered for further analysis and optimization of the cost effective options. For example, if a sewer main is the driving asset for implementing corridor rehabilitation then the following options will be considered for replacement: I) replace sewer segment from manhole to manhole and the equivalent portion of water and road segment (in some cases, this option might not be practical. Each case will have to be dealt with separately) ; II) (if sewer segment < water segment) replace sewer mains equivalent to the water segment length, and road segment equivalent to water segment ( utilizing this option might result in replacement of non critical asset. Each case will have to be dealt with separately) ; III) replace sewer segment from manhole to manhole, water segment from node to node, and road segment equivalent to the longer of sewer / water segment. Figure 5 Sample Integration management framework results & analysis CONCLUSION In this research work, a decision-support framework for integrated asset management of road network, water distribution network, wastewater distribution network is established. The Integrated framework amalgamates performance indicators, condition assessment, and risk into Phase I of the integration. On the other hand phase II implements optimization of repair/renewal cost and defining the best replacement interval. A series of Workshop setting interviews were conducted with various municipalities departmental staff to gather all necessary information for framework guideline development. A case study has been utilized from the City of Guelph, ON, Canada. The proposed framework requires City staff to work together to develop a shared database of asset inventories, condition, performance and financial information to support decision making throughout the organization and community,

11 1502 resulting in efficient and effective management of infrastructure services. The developed risk and condition rating modules architects an integrated solution to provide enabling tools to support achievement of the integration of decision-making. The optimization phase of the framework, currently in progress, is being developed via genetic algorism (GA) using GIS platform. The result anticipated to generate a capital corridor rehabilitation program for the city s infrastructure. This framework helps Canadian municipalities to evaluate and select feasible optimal assets for integrated corridor rehabilitation. REFERENCES Al Barqawi, H. (2006). Condition Rating Models for Underground Infrastructure:Sustainable Water-Mains. Master Thesis, Concordia University, Montreal, QC. Chughtai, F. (2007). An Integrated Approach to Sewer Pipeline Condition Assessment. Master Thesis, Concordia University, Montreal, QC, Canada. Fares, H. (2008). Evaluating the Risk of Water Main Failure Using a Hierarchical Fuzzy Expert System. Master Thesis, Concordia University, Montreal, QC. Ferreira, A., & Duarte, A. (2005). A GIS-Based Integrated Infrastructure Management System. From Pharaohs to Geoinformatics, FIG Working Week 2005 and GSDI-8, Cairo, Egypt April Grigg, N. S. (1999). Viewpoint. INFRASTRUCTURE: Integrated Issue or Tower of Babel? Journal of Infrastructure Systems, 5, No. 4, pp ,. Halfawy, M. (2008). Integration of Municipal Infrastructure Asset Management Processes: Challenges and Solutions. Journal of Computing in Civil Engineering, 22,No. 3, pp Halfawy, M. R., Newton, L. A., & Vanier, D. J. (2006). Review of commercial municipal infrastructure asset management systems. ITcon, 11 (pg ). Halfawy, M. R., Pyzoha, D., & El-Hosseiny, T. (2002). An Integrated Framework for GIS- Based Civil Infrastructure Management Systems. Annual Conference of the Canadian Society for Civil Engineering. Montréal, Québec, Canada: Canadian Society of Civil Engineers. InfraGuide. (2003). An Integrated Approach to Assessment and Evaluation of Municipal Road, Sewer and Water Networks. Canada: InfraGuide best practice,national Guide to Sustainable Municipal Infrastructure. Lee, H., & Deighton, R. (1995). Developing Infrastructure Management Systems for Small Public Agency. Journal of Infrastructure Systems, Vol. 1, No. 4, Lemer, A. C. (1998). PROGRESS TOWARD INTEGRATED INFRASTRUCTURE- ASSETSMANAGEMENT. NRCC/CPWA Seminar Series Innovations in Urban Infrastructure (pp. 7-24). APWA International Public Works Congress. Quintero, A., Konaré, D., & Pierre, S. (2003). Prototyping an Intelligent Decision Support System for Improving Urban Infrastructures Management. European Journal of Operational Research,, 162, Tavana, M., Kennedy, D., Rappaprt, J., & Ugras, Y. (1993). An AHP-Delphi Group Decision Support System Applied to Conflict Resolution in Hiring Decisions. Journal of Managemant Systems, 5, No.1, pp UMA-AECOM. (2008). City of Hamilton Water Main Management Framework: Technical Memorandum No. 3 Water Main Rehab Optimization. Hamilton: UMA-AECOM technical report # D , September Vanier, D. (2001). Why industry needs asset management tools. Journal of Computing in Civil Engineering, Vol. 15, No., pp

Using Risk-Based GIS Modeling Software to Optimize Sewer Renewal Planning

Using Risk-Based GIS Modeling Software to Optimize Sewer Renewal Planning Close Using Risk-Based GIS Modeling Software to Optimize Sewer Renewal Planning By Paul F. Boulos Rapid population growth and the deterioration of aging infrastructures are overtaxing sewer systems worldwide.

More information

The city of Odessa, Texas,

The city of Odessa, Texas, http://dx.doi.org/10.5991/opf.2012.38.0027 John D Antoni is a principal with Alan Plummer Associates (www.apaienv.com), Houston. Roy Staggs, assistant director of utilities, and Ajay Shakyaver, city engineer,

More information

Glossary. means the asset valuation module of Municipal DataWorks. means Geographic Information System

Glossary. means the asset valuation module of Municipal DataWorks. means Geographic Information System Getting Started The Prerequisites for Asset Management July 2009 Glossary Asset... means public infrastructure or a component thereof that has a tangible value, enables services to be provided and has

More information

Integrated Municipal Asset Management tool (IMAM)

Integrated Municipal Asset Management tool (IMAM) Integrated Municipal Asset Management tool (IMAM) Integrated Municipal Asset Management tool that makes it easy for decision makers to use and implement the developed Models. This tool is developed using

More information

The City of Owen Sound Asset Management Plan

The City of Owen Sound Asset Management Plan The City of Owen Sound Asset Management Plan December 013 Adopted by Council March 4, 014 TABLE OF CONTENTS 1 EXECUTIVE SUMMARY... 1 INTRODUCTION....1 Vision.... What is Asset Management?....3 Link to

More information

Info What? Using InfoMaster to Develop a Rehabilitation and Replacement Plan

Info What? Using InfoMaster to Develop a Rehabilitation and Replacement Plan Info What? Using InfoMaster to Develop a Rehabilitation and Replacement Plan Amanda Lei - City of San Jose Alex Palmatier - HDR 2014 HDR, Inc., all rights reserved. Background Forecasting and Budget Data

More information

Improved Decision-Making Through Effective Asset Management

Improved Decision-Making Through Effective Asset Management Improved Decision-Making Through Effective Asset Management Rob Corazzola, P.Eng., Hansen Canada Co-authored by Jon Poli, PE, Hansen Paper prepared for presentation At the Roadway Inventory and Condition

More information

Rehabilitation Scenarios for Sustainable Water Mains. University, Montreal, Quebec, Canada, PH (514) 848-2424 ext. 8779; FAX (514) 848-7965; email:

Rehabilitation Scenarios for Sustainable Water Mains. University, Montreal, Quebec, Canada, PH (514) 848-2424 ext. 8779; FAX (514) 848-7965; email: Rehabilitation Scenarios for Sustainable Water Mains Khaled Shahata 1 ; Tarek Zayed 2 ; and Saad Al-Jibouri 3 1 Graduate Student, Department of Building, Civil, and Environmental Engineering, Concordia

More information

Township of Enniskillen. Asset Management Plan

Township of Enniskillen. Asset Management Plan Township of Enniskillen Asset Management Plan 2014 1 TABLE OF CONTENTS Page A. Introduction 3 B. State of Local Infrastructure 4 C. Desired Levels of Service 7 D. Asset Management Strategy 8 E. Financing

More information

A GIS-Based Integrated Infrastructure Management System

A GIS-Based Integrated Infrastructure Management System A GIS-Based Integrated Infrastructure Management System Adelino FERREIRA and Anabela DUARTE, Portugal Key words: Geographic Information System, Infrastructure management, linear referencing system, engineering

More information

Structural Condition Models for Sewer Pipeline

Structural Condition Models for Sewer Pipeline Structural Condition Models for Sewer Pipeline Fazal Chughtai 1 and Tarek Zayed 2 1 Student Member ASCE, Graduate Student, Department of Building, Civil and Environmental Engineering, Concordia University,

More information

A NEW METHOD FOR DEVELOPING THE MOST COST- EFFECTIVE REHABILITATION PROGRAMS FOR OUR AGEING SEWER NETWORKS

A NEW METHOD FOR DEVELOPING THE MOST COST- EFFECTIVE REHABILITATION PROGRAMS FOR OUR AGEING SEWER NETWORKS A NEW METHOD FOR DEVELOPING THE MOST COST- EFFECTIVE REHABILITATION PROGRAMS FOR OUR AGEING SEWER NETWORKS Introduction Toby Bourke (MWHSoft), Graham McGonigal (MWH) There is currently widespread concern

More information

Oakland Macomb Interceptor Drain Rehabilitation State Revolving Fund Project Plan Overview. Public Meeting June 10, 2009

Oakland Macomb Interceptor Drain Rehabilitation State Revolving Fund Project Plan Overview. Public Meeting June 10, 2009 State Revolving Fund Project Plan Overview Public Meeting June 10, 2009 What is the OMI? The OMI is the Oakland Macomb Interceptor Sewer. The OMI transports much of the sanitary sewage from Oakland and

More information

Municipal infrastructure asset management systems: state-of-the-art review. Halfawy, M.; Newton, L. ; Vanier, D. NRCC-48339

Municipal infrastructure asset management systems: state-of-the-art review. Halfawy, M.; Newton, L. ; Vanier, D. NRCC-48339 Municipal infrastructure asset management systems: state-of-the-art review Halfawy, M.; Newton, L. ; Vanier, D. NRCC-48339 A version of this document is published in / Une version de ce document se trouve

More information

CHAPTER 2 PAVEMENT MANAGEMENT SYSTEM

CHAPTER 2 PAVEMENT MANAGEMENT SYSTEM CHAPTER 2 PAVEMENT MANAGEMENT SYSTEM 2.1. INTRODUCTION TO PAVEMENT MANAGEMENT The ability of a pavement system to serve a society is largely a function of planning. Planning is the intersection between

More information

ASSET MANAGEMENT PLAN

ASSET MANAGEMENT PLAN ASSET MANAGEMENT PLAN REPORT Prepared for: Township of South Frontenac December 2013 RVA 132914 This report is protected by copyright and was prepared by R.V. Anderson Associates Limited for the account

More information

REVIEW OF COMMERCIAL MUNICIPAL INFRASTRUCTURE ASSET MANAGEMENT SYSTEMS

REVIEW OF COMMERCIAL MUNICIPAL INFRASTRUCTURE ASSET MANAGEMENT SYSTEMS REVIEW OF COMMERCIAL MUNICIPAL INFRASTRUCTURE ASSET MANAGEMENT SYSTEMS SUBMITTED: May 2005 REVISED: January 2006 PUBLISHED: May 2006 at http://www.itcon.org/2006/16/ EDITOR: Dana J. Vanier Mahmoud M.R.

More information

Setting Priorities for Stormwater Infrastructure to Achieve Best Results Using a Risk Analysis

Setting Priorities for Stormwater Infrastructure to Achieve Best Results Using a Risk Analysis Setting Priorities for Stormwater Infrastructure to Achieve Best Results Using a Risk Analysis Wayne Miles, PE Michael Sloop, PE Presented at 2014 APWA Water Resources Conference September 16, 2014Wayne

More information

Phased Assessment Strategy for Sewers

Phased Assessment Strategy for Sewers Phased Assessment Strategy for Sewers A plan for understanding sewer system condition quicker, with fewer resources. Venay Sehgal Bhatia Digital Marketing Manager Envirosight Are deteriorating infrastructure

More information

ethekwini Metropolitan Municipality s

ethekwini Metropolitan Municipality s ethekwini Metropolitan Municipality s integrated approach to pavement asset management INTRODUCTION Recent asset management legislation has holistically incorporated a host of previously stand-alone principles

More information

Utilizing Trenchless Technology to Achieve Watermain Asset Management Objectives

Utilizing Trenchless Technology to Achieve Watermain Asset Management Objectives North American Society for Trenchless Technology (NASTT) NASTT s 2015 No-Dig Show Denver, Colorado March 15-19, 2015 MM-T6-05 Utilizing Trenchless Technology to Achieve Watermain Asset Management Objectives

More information

provided for improvements for each structure during these timeframes. Rehabilitation and Investment Strategies:

provided for improvements for each structure during these timeframes. Rehabilitation and Investment Strategies: ASSET MANAGEMENT STRATEGY BRIDGES AND LARGE CULVERTS (>3m Span) Inventory Anticipated Asset Life Cycle Fifteen (15) bridges and eleven (11) large culverts with a span greater than 3m (refer to PSAB 3150

More information

The Corporation of the Municipality of Callander. Asset Management Plan

The Corporation of the Municipality of Callander. Asset Management Plan The Corporation of the Municipality of Callander Asset Management Plan April 2014 1 Index A) Executive Summary P. 3 B) Introduction P. 4 C) State of Local Infrastructure P. 7 D) Expected Levels of Service

More information

A GIS Enabled Cost Estimation Tool for Road Upgrade and Maintenance to assist Road Asset Management System

A GIS Enabled Cost Estimation Tool for Road Upgrade and Maintenance to assist Road Asset Management System 1239 A GIS Enabled Cost Estimation Tool for Road Upgrade and Maintenance to assist Road Asset Management System Kabindra K. SHRESTHA 1, S.M.ASCE, M.S. CSIT, Pramen P. SHRESTHA 2, M.ASCE, Ph.D., P.E. 1

More information

Asset Management Plan Final Report

Asset Management Plan Final Report AssetManagementPlan FinalReport DillonConsultingLimited 10FifthStreetSouth Chatham,ONN7M4V4 T:519-352-7802 F:519-354-2050 May,2014 www.dillon.ca EXECUTIVE SUMMARY Public infrastructure is central to our

More information

www.nams.au.com AN INNOVATIVE APPROACH TO LOCAL GOVERNMENT ROAD NETWORK MANAGEMENT

www.nams.au.com AN INNOVATIVE APPROACH TO LOCAL GOVERNMENT ROAD NETWORK MANAGEMENT AN INNOVATIVE APPROACH TO LOCAL GOVERNMENT ROAD NETWORK MANAGEMENT Peter Clewer: Asset Management Officer (Roads), Mornington Peninsula Shire Amy Wade, Manager Axim - A Downer EDI Works Business Abstract

More information

INTRODUCTION. WASTEWATER MANAGEMENT PLAN MAY 2009 Metropolitan North Georgia Water Planning District 7-1

INTRODUCTION. WASTEWATER MANAGEMENT PLAN MAY 2009 Metropolitan North Georgia Water Planning District 7-1 INTRODUCTION There are approximately 16,000 miles of sewers and more than 450,000 manholes within the Metro Water District. Sewers and manholes within the Metro Water District range in age from new to

More information

ROAD NETWORK ASSET MANAGEMENT AS A BUSINESS PROCESS. Paper prepared for the REAAA Conference in Japan, 4 9 September 2000

ROAD NETWORK ASSET MANAGEMENT AS A BUSINESS PROCESS. Paper prepared for the REAAA Conference in Japan, 4 9 September 2000 ROAD NETWORK ASSET MANAGEMENT AS A BUSINESS PROCESS Paper prepared for the REAAA Conference in Japan, 4 9 September 2000 Florentina Mihai, BEng, GDipMgt, MIEAust Main Roads Western Australia Neville Binning,

More information

CCTV PIPE INSPECTION AND EVALUATION RUNWAY 17L-35R

CCTV PIPE INSPECTION AND EVALUATION RUNWAY 17L-35R CCTV PIPE INSPECTION AND EVALUATION For RUNWAY 17L-35R At ST. PETERSBURG CLEARWATER INTERNATIONAL AIRPORT February 2011 CCTV PIPE INSPECTION AND EVALUATION RUNWAY 17L-35R ST. PETERSBURG CLEARWATER INTERNATIONAL

More information

WSSC Ad-Hoc Committee on Large Diameter Water Mains. November 22, 2013

WSSC Ad-Hoc Committee on Large Diameter Water Mains. November 22, 2013 WSSC Ad-Hoc Committee on Large Diameter Water Mains November 22, 2013 Purpose: To Gain an Understanding of WSSC s Current Approach to Prioritizing PCCP Inspections and Repairs 2 PCCP Inspection Prioritization

More information

Saugeen Shores Asset Management Plan

Saugeen Shores Asset Management Plan 2012 Saugeen Shores Asset Management Plan Town of Saugeen Shores Asset Management Plan 1 Table of Contents SECTION PAGE NO. Table of Contents 1 List of Figures 2 Executive Summary 3 1.0 Preamble 4 2.0

More information

Utilizing Remaining Useful Life for Asset Management of Critical Wastewater Assets

Utilizing Remaining Useful Life for Asset Management of Critical Wastewater Assets *Jessica Brown, P.E., Freese and Nichols, Inc., (817) 312-6980; Jessica.Brown@freese.com Mazen Kawasmi, Freese and Nichols, Inc. ABSTRACT The City of Fort Worth s wastewater collection system includes

More information

{ { { Meeting Date 08/03/10. City of Largo Agenda Item 24. Leland Dicus, P.E., City Engineer

{ { { Meeting Date 08/03/10. City of Largo Agenda Item 24. Leland Dicus, P.E., City Engineer City of Largo Agenda Item 24 Form Revision Date: 10/19/09: Meeting Date 08/03/10 Presenter: Leland Dicus, P.E., City Engineer Department: CD Community Development TITLE: GIS PROGRAM UPDATE The implementation

More information

Business Unit Asset Management Plan Framework & Guidelines

Business Unit Asset Management Plan Framework & Guidelines Draft Report Business Unit Asset Management Plan Framework & Guidelines Prepared for March 2014 Contents Section Page Contents... i Background... 1 Asset Management Plans... 1 The AMP Framework... 1 About

More information

Town of Mattawa Asset Management Plan. December 2013

Town of Mattawa Asset Management Plan. December 2013 Town of Mattawa Asset Management Plan December 2013 2 P a g e Town of Mattawa Asset Management Plan Executive Summary This Asset Management Plan is intended to describe the infrastructure owned, operated,

More information

RE: 2014 Asset Management Plan. OBJECTIVE: To present Council with an Asset Management Plan and recommended implementation strategy moving forward.

RE: 2014 Asset Management Plan. OBJECTIVE: To present Council with an Asset Management Plan and recommended implementation strategy moving forward. HALDIMAND COUNTY Report PW-GM-01-2014 of the General Manager of Public Works For Consideration by RE: 2014 Asset Management Plan OBJECTIVE: To present Council with an Asset Management Plan and recommended

More information

Chapter 2 ASSET MANAGEMENT PLANNING AND PROGRAMMING FRAMEWORK CHAPTER 2 ASSET MANAGEMENT PLANNING AND PROGRAMMING FRAMEWORK PAGE 11

Chapter 2 ASSET MANAGEMENT PLANNING AND PROGRAMMING FRAMEWORK CHAPTER 2 ASSET MANAGEMENT PLANNING AND PROGRAMMING FRAMEWORK PAGE 11 Chapter 2 ASSET MANAGEMENT PLANNING AND PROGRAMMING FRAMEWORK CHAPTER 2 ASSET MANAGEMENT PLANNING AND PROGRAMMING FRAMEWORK PAGE 11 This page intentionally left blank. PAGE 12 MINNESOTA GO MNDOT TRANSPORTATION

More information

Interactive Decision Tree Automates Sewer Rehabilitation Planning

Interactive Decision Tree Automates Sewer Rehabilitation Planning Interactive Decision Tree Automates Sewer Rehabilitation Planning IWPCA Annual Conference June 5, 2008 Rodney Moeller, P.E., John Schroeder, P.E. BCEE, C. Timothy Fallara, P.E. & Mel Meng, P.E. Agenda

More information

Asset Management Plan Public Works and Social Housing Infrastructure City of Brantford, Ontario

Asset Management Plan Public Works and Social Housing Infrastructure City of Brantford, Ontario 2013 Asset Management Plan Asset Management Plan City of Brantford, Ontario November 29, 2013 Prepared by: Capital Planning Facilities and Asset Management, Public Works Corporation of the City of Brantford

More information

a GAO-04-461 GAO WATER INFRASTRUCTURE Comprehensive Asset Management Has Potential to Help Utilities Better Identify Needs and Plan Future Investments

a GAO-04-461 GAO WATER INFRASTRUCTURE Comprehensive Asset Management Has Potential to Help Utilities Better Identify Needs and Plan Future Investments GAO United States General Accounting Office Report to the Ranking Minority Member, Committee on Environment and Public Works, U.S. Senate March 2004 WATER INFRASTRUCTURE Comprehensive Asset Management

More information

BEFORE THE PHILADELPHIA WATER, SEWER AND STORMWATER RATE BOARD DIRECT TESTIMONY OF STEPHEN J. FURTEK

BEFORE THE PHILADELPHIA WATER, SEWER AND STORMWATER RATE BOARD DIRECT TESTIMONY OF STEPHEN J. FURTEK BEFORE THE PHILADELPHIA WATER, SEWER AND STORMWATER RATE BOARD Re Application of the Philadelphia Water Department for Increased Rates and Related Charges Fiscal Years 2017-2018 DIRECT TESTIMONY OF STEPHEN

More information

Bridges & Culverts Condition by Quantity

Bridges & Culverts Condition by Quantity 3.4.3 What condition is it in? Approximately 93% of the municipality s bridge structures are in good to excellent condition, with the remaining 7% in fair condition. As a result, the municipality received

More information

City of Olympia Water System Plan Update

City of Olympia Water System Plan Update Appendix 12- City of Olympia Water System Plan Update Technical Memorandum: October 8, 214 66 Columbia Street NW Suite 2 Olympia, WA 981 This page left intentionally blank. Table of Contents Introduction...

More information

OBJECT ORIENTED SOFTWARE SYSTEM BASED ON AHP

OBJECT ORIENTED SOFTWARE SYSTEM BASED ON AHP OBJECT ORIENTED SOFTWARE SYSTEM BASED ON AHP Soumi Ghosh Department of Computer Science & Engineering Amity School of Engineering and Technology Amity University, Sec-125, NOIDA, (U.P.), INDIA noni.soumi@gmail.com

More information

Condition Assessment of Underground Pipes April 2015 With excerpts from: Condition Assessment of Wastewater Collection Systems, EPA/600/R-09/049

Condition Assessment of Underground Pipes April 2015 With excerpts from: Condition Assessment of Wastewater Collection Systems, EPA/600/R-09/049 Condition Assessment of Underground Pipes April 2015 With excerpts from: Condition Assessment of Wastewater Collection Systems, EPA/600/R-09/049 EPA New England Water Infrastructure Outreach provides tools,

More information

Anna Boersma GIS for Water Resources December 3, 2012

Anna Boersma GIS for Water Resources December 3, 2012 Inflow and Infiltration A Qualitative Approach to Determining Areas of Highest Inflow and Infiltration in the Milwaukee Metropolitan Sewerage District s Jurisdiction Anna Boersma GIS for Water Resources

More information

Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013.

Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013. Interim Technical Guidelines for the Development of Environmental Management Plans for Underground Infrastructure Revised - July 2013 Rationale Underground infrastructure may be at risk from valley, streambank

More information

STANDARDIZED CLASSIFICATION SYSTEM TO ASSESS THE STATE AND CONDITION OF INFRASTRUCTURE IN EDMONTON

STANDARDIZED CLASSIFICATION SYSTEM TO ASSESS THE STATE AND CONDITION OF INFRASTRUCTURE IN EDMONTON STANDARDIZED CLASSIFICATION SYSTEM TO ASSESS THE STATE AND CONDITION OF INFRASTRUCTURE IN EDMONTON Theresa Cloake, P.Eng. Infrastructure Analyst and K.L. Siu, P.Eng. Senior Infrastructure Officer Office

More information

ABSTRACT. Development of a Sustainable Infrastructure Management System for a City Better Infrastructure for a Better Community

ABSTRACT. Development of a Sustainable Infrastructure Management System for a City Better Infrastructure for a Better Community ABSTRACT Development of a Sustainable Infrastructure Management System for a City Better Infrastructure for a Better Community City governments face great challenges to protect the public when critical

More information

CHAPTER 8 ASSET MANAGEMENT

CHAPTER 8 ASSET MANAGEMENT CHAPTER 8 ASSET MANAGEMENT 8.1 Introduction An additional task of the WRMP was to educate and engage GWA personnel in the concepts of asset management. Three specific areas of asset management have been

More information

Research Article Determination of Pavement Rehabilitation Activities through a Permutation Algorithm

Research Article Determination of Pavement Rehabilitation Activities through a Permutation Algorithm Applied Mathematics Volume 2013, Article ID 252808, 5 pages http://dxdoiorg/101155/2013/252808 Research Article Determination of Pavement Rehabilitation Activities through a Permutation Algorithm Sangyum

More information

ATTACHMENT 2: SPECIFICATION FOR SEWER CCTV VIDEO INSPECTION

ATTACHMENT 2: SPECIFICATION FOR SEWER CCTV VIDEO INSPECTION ATTACHMENT 2: SPECIFICATION FOR SEWER CCTV VIDEO INSPECTION 1.0 General 1.1 The work covered by this section consists of providing all labor, equipment, insurance, accessories, tools, transportation, supplies,

More information

CASE STUDY. City of Grand Rapids Stormwater Asset Management Program. City of Grand Rapids. By the Numbers

CASE STUDY. City of Grand Rapids Stormwater Asset Management Program. City of Grand Rapids. By the Numbers United States Environmental Protection Agency CASE STUDY City of Grand Rapids Stormwater Asset Management Program Overview With increasing pressure to meet water quality targets, address population growth,

More information

Asset Management Plan

Asset Management Plan Asset Management Plan Contents Executive Summary... 4 Asset Management Plan... 6 Introduction... 6 Financial Overview... 11 Conclusion... 11 Attached Appendices... 11 Asset Management Strategy... 13 Introduction...

More information

New Mexico DOT Transportation Asset Management Implementation Plan. final plan

New Mexico DOT Transportation Asset Management Implementation Plan. final plan New Mexico DOT Transportation Asset Management Implementation Plan final plan February 23, 2015 report New Mexico DOT Transportation Asset Management Implementation Plan date February 23, 2015 Table

More information

Dana J. Vanier, Ph.D. 1, Saidur Rahman, Ph.D.

Dana J. Vanier, Ph.D. 1, Saidur Rahman, Ph.D. Critical Issues and Opportunities for Managing Municipal Infrastructure: Preliminary Survey Results of Municipal Infrastructure Investment Planning Project Dana J. Vanier, Ph.D. 1, Saidur Rahman, Ph.D.

More information

Water Main Rehabilitation Prioritization - Getting the Data together for OWASA

Water Main Rehabilitation Prioritization - Getting the Data together for OWASA Water Main Rehabilitation Prioritization - Getting the Data together for OWASA Kilmeny J Stephens, Earth Tech, and Janet Jackson, OWASA Presented at the Twenty-Third Annual ESRI User Conference, San Diego,

More information

Asset Management Plan

Asset Management Plan Asset Management Plan Table of Contents Executive Summary... 5 Asset Management Plan... 6 Introduction... 6 Financial Overview... 10 Conclusion... 10 Attached Appendices... 10 Asset Management Strategy...

More information

Public Works Operations Manual Standard Operating Procedures for Water and Sewer WS-A412 Water Connection Repair

Public Works Operations Manual Standard Operating Procedures for Water and Sewer WS-A412 Water Connection Repair Public Works Operations Manual Standard Operating Procedures for Water and Sewer WS-A412 Water Connection Repair 1. Objective: 1.1. To repair the water connection in a timely and efficient manner, minimizing

More information

IS THAT LINER THICK ENOUGH?

IS THAT LINER THICK ENOUGH? IS THAT LINER THICK ENOUGH? Philip McFarlane, Opus International Consultants Ltd ABSTRACT The amount of pipeline rehabilitation being undertaken in New Zealand is increasing each year. Larger diameter

More information

Rehabilitation or Replacement? That Is The Question

Rehabilitation or Replacement? That Is The Question Rehabilitation or Replacement? That Is The Question Chris L. Windley PE Greg Anderson, PE 94th Annual Conference November 18, 2014 Overview Project Background Existing Sewer Condition Flow Projections

More information

National Road Network Service - Ambon, A.K.a. C.D. of the Trans Maluku

National Road Network Service - Ambon, A.K.a. C.D. of the Trans Maluku International Journal of Civil & Environmental Engineering IJCEEIJENS Vol:12 No:04 78 Performance of The National Road Transport Network Service Trans Island Maluku Ambon SIHALOHO, ANTONIUS and JINCA,

More information

THE MYTH OF DEEP PIPES: CRITICALITY AND PIPE REHABILITATION STRATEGIES

THE MYTH OF DEEP PIPES: CRITICALITY AND PIPE REHABILITATION STRATEGIES THE MYTH OF DEEP PIPES: CRITICALITY AND PIPE REHABILITATION STRATEGIES Ken Harlow, Director of Management Services, Brown and Caldwell kharlow@brwncald.com Introduction A fundamental principal of asset

More information

Source Water Assessment Report

Source Water Assessment Report Source Water Assessment Report Public Water Supply: TROY, CITY OF Assessment Areas Include: 516, 517 Kansas Department of Health and Environment Bureau of Water Watershed Management Section 1000 SW Jackson

More information

X Planning X Quality X Maintenance & Operations

X Planning X Quality X Maintenance & Operations Delaware Department of Transportation Division of Transportation Solutions Design Guidance Memorandum Memorandum Number 1-20 Revised 1. Road Design Manual 2. Bridge Design Manual 3. Utilities Design Manual

More information

Pavement Management Systems

Pavement Management Systems Pavement Management Systems Presented by Bill Weiss, P.E. Applied Pavement Technology, Inc. (APTech) At the 2015 Municipal Streets Seminar Ames, Iowa Why Pavement Management??? Pavements are expensive

More information

Our Challenging Future

Our Challenging Future Protecting Our Future by Making Advanced Asset Management Decisions < All stories in this section Gregory M. Baird Dec 23, 2011 America s economic dominance as a world power over the past several decades

More information

Frequently Asked Transmission Pipeline Questions

Frequently Asked Transmission Pipeline Questions Frequently Asked Transmission Pipeline Questions Who is PennEast, LLC? PennEast was formed by the partnership of AGL Resources, NJR Pipeline Company, South Jersey Industries and UGI Energy Services (UGIES).

More information

Bachelor's Degree in Business Administration and Master's Degree course description

Bachelor's Degree in Business Administration and Master's Degree course description Bachelor's Degree in Business Administration and Master's Degree course description Bachelor's Degree in Business Administration Department s Compulsory Requirements Course Description (402102) Principles

More information

PUTTING IT ALL TOGETHER: INTEGRATING MASTER PLANNING WITH ASSET MANAGEMENT

PUTTING IT ALL TOGETHER: INTEGRATING MASTER PLANNING WITH ASSET MANAGEMENT PUTTING IT ALL TOGETHER: INTEGRATING MASTER PLANNING WITH ASSET MANAGEMENT Jeffrey B. Stillman, P.E., Practice Leader (Main Author/Presenter) Kevin T. Laptos, P.E., Regional Planning Leader Kent A. Lackey,

More information

CURRICULUM VITAE. 2. ACADEMIC/PROFESSIONAL PARTICULARS (a) Field of Specialization: Building Engineering, Construction Engineering and Management

CURRICULUM VITAE. 2. ACADEMIC/PROFESSIONAL PARTICULARS (a) Field of Specialization: Building Engineering, Construction Engineering and Management CURRICULUM VITAE 1. PERSONAL DATA Name: Dr.Alaa Salman PhD, PMP, P.Eng (Ontario-Canada) Date of Birth: Dec.29/1969 Place of Birth: Baghdad - Iraq Nationality: Canadian Contact Address: Sultanate of Oman,

More information

City of Cambridge and IBM Build a Smarter City

City of Cambridge and IBM Build a Smarter City City of Cambridge and IBM Build a Smarter City September 8, 2010 Presented by Mike Hausser, P.Eng Director of Asset Management and Support Services City of Cambridge Infrastructure Asset Life Cycle Install

More information

White Paper. www.geodecisions.com

White Paper. www.geodecisions.com White Paper www.geodecisions.com A Geo Spatial Total Asset Management System (TAMS) To Improve Asset Management Decision Making Fall 2013 Abstract This paper describes a Geospatial Total Asset Management

More information

Repair or Replacement - Band-Aids vs. Surgery

Repair or Replacement - Band-Aids vs. Surgery Repair or Replacement - Band-Aids vs. Surgery Using RCP for the Replacement of Failed or Undersized Culverts www.concrete-pipe.org Introduction and Background Our Nation s infrastructure owners are facing

More information

Affordable Asset Management Workshop Making Use of the Data You Have An Owners Perspective

Affordable Asset Management Workshop Making Use of the Data You Have An Owners Perspective Affordable Asset Management Workshop Making Use of the Data You Have An Owners Perspective Building the Foundation for an Effective Asset Management Program Scott D. Kelly, P.E. Assistant City Administrator

More information

The Redwood City Public Works Services (PWS) Department is comprised of four operating divisions:

The Redwood City Public Works Services (PWS) Department is comprised of four operating divisions: City of Redwood City, Public Works Services (PWS) Work Process Needs Assessment By: Russell Narahara, Management Analyst II The purpose of this document is to provide an overview of how field work is currently

More information

M E M O R A N D U M. Among the standard conditions contained in the NPDES permit is also a Duty to

M E M O R A N D U M. Among the standard conditions contained in the NPDES permit is also a Duty to M E M O R A N D U M DATE: August 7, 2015 TO: FROM: SUBJECT: Metropolitan Wastewater Management Commission (MWMC) Matt Stouder, MWMC General Manager Capacity Management, Operations, and Maintenance (CMOM)

More information

Site Analysis. Floyd Zimmerman, FASLA. Summary CLIENT NEEDS. Supplemental Architectural Services 2000 AIA 1 SITE ANALYSIS SERVICES

Site Analysis. Floyd Zimmerman, FASLA. Summary CLIENT NEEDS. Supplemental Architectural Services 2000 AIA 1 SITE ANALYSIS SERVICES Site Analysis Floyd Zimmerman, FASLA Excerpt from The Architect s Handbook of Professional Practice, 13th edition 2000 Sensitive owners and designers understand that from the facility user s perspective,

More information

TOWN OF GRIMSBY ASSET MANAGEMENT PLAN

TOWN OF GRIMSBY ASSET MANAGEMENT PLAN TOWN OF GRIMSBY ASSET MANAGEMENT PLAN August 20, 2014 DFA Infrastructure International Inc. Executive Summary ES1 Background The Town of Grimsby (Town) with a population of approximately 25,325 is located

More information

Innovative Methods to Assess Sewer Pipe Risk and Improve Replacement Planning Decisions

Innovative Methods to Assess Sewer Pipe Risk and Improve Replacement Planning Decisions Innovative Methods to Assess Sewer Pipe Risk and Improve Replacement Planning Decisions Seth Anderson, GISP Management Consultant Celine Hyer, P.E. Associate Vice President Presentation Topics The Infrastructure

More information

Using Cloud-Computing to Promote Asset Management Best Practices A Ministry of Transportation Ontario Case Study

Using Cloud-Computing to Promote Asset Management Best Practices A Ministry of Transportation Ontario Case Study Using Cloud-Computing to Promote Asset Management Best Practices A Ministry of Transportation Ontario Case Study Benjamin Ong Fugro Roadware 2505 Meadowvale Blvd. Mississauga, ON L5N 5S2 Ph: (905) 567-2870

More information

Integrating GIS-Based Videolog and Asset Data With Commonly Used Systems Provides Major Benefits With Minimal Effort

Integrating GIS-Based Videolog and Asset Data With Commonly Used Systems Provides Major Benefits With Minimal Effort Integrating GIS-Based Videolog and Asset Data With Commonly Used Systems Provides Major Benefits With Minimal Effort Presented By: Debbie Burns, GIS Manager Michael Nieminen, Project Manager Introduction

More information

Estimation Of Residual Service Life For Existing Sewerage Systems

Estimation Of Residual Service Life For Existing Sewerage Systems Estimation Of Residual Service Life For Existing Sewerage Systems HW Kaempfer M Berndt G Voigtlaender Institute of Material Research and Testing at the Bauhaus University Weimar Germany Summary: The cost

More information

San Francisco s Urban Watershed Framework: A Decision Making Process to Support Multi-Benefit Wastewater and Stormwater Projects September 26, 2011

San Francisco s Urban Watershed Framework: A Decision Making Process to Support Multi-Benefit Wastewater and Stormwater Projects September 26, 2011 San Francisco s Urban Watershed Framework: A Decision Making Process to Support Multi-Benefit Wastewater and Stormwater Projects September 26, 2011 Karen Kubick, P.E., SSIP Program Director, SFPUC Randy

More information

Managing Linear Assets with Ventyx Ellipse

Managing Linear Assets with Ventyx Ellipse A Ventyx Whitepaper: Managing Linear Assets with Ventyx Ellipse Discover How Ventyx solutions Uniquely Meet the Requirements for Linear Asset Management Copyright 2012 Ventyx, An ABB Company. All rights

More information

At the end of today s seminar you should be better. Recognize the causes of Sewer Lateral backup. Identify techniques to protect your home from

At the end of today s seminar you should be better. Recognize the causes of Sewer Lateral backup. Identify techniques to protect your home from Preventing Sewer Backups Presented by IAPMO Today s Objectives At the end of today s seminar you should be better able to: Recognize the causes of Sewer Lateral backup Identify techniques to protect tyour

More information

GAS DISTRIBUTION FACILITIES DECISION MAKING, DISCUSSING AN ASSET MANAGEMENT APPROACH. Glyn Hazelden, Hazelden Group. Introduction

GAS DISTRIBUTION FACILITIES DECISION MAKING, DISCUSSING AN ASSET MANAGEMENT APPROACH. Glyn Hazelden, Hazelden Group. Introduction GAS DISTRIBUTION FACILITIES DECISION MAKING, DISCUSSING AN ASSET MANAGEMENT APPROACH Glyn Hazelden, Hazelden Group Introduction In today s environment, utility companies are faced with restructuring business

More information

City of Dallas Wastewater Collection System: TCEQ Sanitary Sewer Outreach Agreement City Council Briefing January 17, 2007

City of Dallas Wastewater Collection System: TCEQ Sanitary Sewer Outreach Agreement City Council Briefing January 17, 2007 City of Dallas Wastewater Collection System: TCEQ Sanitary Sewer Outreach Agreement City Council Briefing January 17, 2007 1/12/2007 1 Briefing Purpose Provide update on Wastewater Collection Activities

More information

QUICK GUIDE. Asset Management 101. A Step by Step Asset Management Plan. Asset Management 101: A Step by Step Asset Management Plan

QUICK GUIDE. Asset Management 101. A Step by Step Asset Management Plan. Asset Management 101: A Step by Step Asset Management Plan QUICK GUIDE Asset Management 101 A Step by Step Asset Management Plan 1 Asset Management 101 A Step by Step Asset Management Plan Bridges, roads, parks and even sewage and garbage management are things

More information

Asset Management 101: Where do you start?

Asset Management 101: Where do you start? What s the worst that could happen? Asset : Where do you start? David Dunn Department of Ecology IACC conference October 20, 2015 You know you need an asset management system. Everyone keeps telling you

More information

REPORT CITY OF WATERLOO ASSET MANAGEMENT PLAN OCTOBER 2014

REPORT CITY OF WATERLOO ASSET MANAGEMENT PLAN OCTOBER 2014 REPORT CITY OF WATERLOO ASSET MANAGEMENT PLAN OCTOBER 2014 City of Waterloo Asset Management Plan EXECUTIVE SUMMARY The City of Waterloo has prepared this asset management plan in accordance with the Ministry

More information

Types of Data. Features. Getting Started. Integrated Roadway Asset Management System

Types of Data. Features. Getting Started. Integrated Roadway Asset Management System 3-2014 GIS-based Asset Management System Optimize Maintenance Manage Signs Analyze Safety Roadsoft is a roadway management system for collecting, storing, and analyzing data associated with transportation

More information

2014 ASSET MANAGEMENT PLAN Building, Stormwater & Linear Transportation

2014 ASSET MANAGEMENT PLAN Building, Stormwater & Linear Transportation 2014 ASSET MANAGEMENT PLAN Building, Stormwater & Linear Transportation Version 1 Table of Contents Executive Summary... 5 1.1 Background... 5 1.2 State of Local Infrastructure... 5 1.3 Desired Levels

More information

Performance Management for Inter-organization Information Systems Performance: Using the Balanced Scorecard and the Fuzzy Analytic Hierarchy Process

Performance Management for Inter-organization Information Systems Performance: Using the Balanced Scorecard and the Fuzzy Analytic Hierarchy Process Performance Management for Inter-organization Information Systems Performance: Using the Balanced Scorecard and the Fuzzy Analytic Hierarchy Process Y. H. Liang Department of Information Management, I-SHOU

More information

How to Do a Water & Sewer System Inventory - Capital Improvements Plan

How to Do a Water & Sewer System Inventory - Capital Improvements Plan Table of Contents Background, Objective and Method... 2 Capital Outlay - Water System... 3 Capital Outlay - Sewer System... 4 Summary... 4 Water Exhibit... 5 Sewer Exhibit....6 w w w. c a v a n a u g h

More information

Durango Migrates its Infrastructure GIS to an Asset Management System

Durango Migrates its Infrastructure GIS to an Asset Management System Durango Migrates its Infrastructure GIS to an Asset Management System Rick Szmajter, GISP City of Durango Colorado ESRI International User Conference San Diego, CA July 22, 2015 rick.szmajter@durangogov.org

More information

Earth Retaining Structures

Earth Retaining Structures Earth Retaining Structures and Asset Management Earth Retaining Structures and Asset Management A Critical Component Tool in Maintaining Public Safety Earth Retaining Structures (ERS) are often an overlooked

More information

Comparative Study of Guidelines and Practices for Building Infrastructure Asset Management. Summary. 1. Introduction. 2. Australian Practices

Comparative Study of Guidelines and Practices for Building Infrastructure Asset Management. Summary. 1. Introduction. 2. Australian Practices Comparative Study of Guidelines and Practices for Building Infrastructure Asset Management Mr. Ashish SHAH B.E. (Civil), M.E. (I.T.) Researcher, RMIT University, Australia Research interests in Infrastructure

More information

A Comprehensive Approach to Storm Water Asset Management Planning. City of Virginia Beach Public Works Operations

A Comprehensive Approach to Storm Water Asset Management Planning. City of Virginia Beach Public Works Operations A Comprehensive Approach to Storm Water Asset Management Planning City of Virginia Beach Public Works Operations Steve McLaughlin, PE April 2016 Agenda City of Virginia Beach, VA Population: 450,000 250

More information

Industrial Pipeline Integrity Management & Remote Polyurea Pipe Lining Systems.

Industrial Pipeline Integrity Management & Remote Polyurea Pipe Lining Systems. Industrial Pipeline Integrity Management & Remote Polyurea Pipe Lining Systems. Aging pipeline infrastructure and industry s inability to evaluate and inspect has left many engineers and plant managers

More information