Rehabilitation Scenarios for Sustainable Water Mains. University, Montreal, Quebec, Canada, PH (514) ext. 8779; FAX (514) ;

Size: px
Start display at page:

Download "Rehabilitation Scenarios for Sustainable Water Mains. University, Montreal, Quebec, Canada, PH (514) 848-2424 ext. 8779; FAX (514) 848-7965; email:"

Transcription

1 Rehabilitation Scenarios for Sustainable Water Mains Khaled Shahata 1 ; Tarek Zayed 2 ; and Saad Al-Jibouri 3 1 Graduate Student, Department of Building, Civil, and Environmental Engineering, Concordia University, Montreal, Quebec, Canada, PH (514) ; FAX (514) ; kfsfarouk@yahoo.com. 2 Assistant Professor, Department of Building, Civil, and Environmental Engineering, Concordia University, Montreal, Quebec, Canada, PH (514) ext. 8779; FAX (514) ; tzayed@alcor.concordia.ca. 3 Associate Professor, Construction Management & Engineering Group, Department of Civil Engineering, University of Twente, The Netherlands, PH.+31-(0) , Fax:+31-(0) , s.h.s.al-jibouri@utwente.nl. Abstract The ability to regularly deliver safe drinking water is a constant challenge to municipalities. According to the Canadian National Research Council reports, the renewal and rehabilitation of infrastructure across Canada is estimated to be at least $15 billion. Therefore, selecting the best repair and/or rehabilitation scenarios is essential to optimize the quality of the existing water mains and to minimize rehabilitation cost losses. Current research identifies several rehabilitation methods for water mains, which are classified into three main categories: (1) repair (e.g. Open trench, sleeves); (2) renovation (e.g. slip lining, cement lining, epoxy lining, CIPP); and (3) replacement (e.g. pipe bursting, micro-tunneling, directional drilling, auger boring, open cut). Stochastic life cycle cost (SLCC), using Monte Carlo simulation approach, is utilized to compare the developed scenarios so that the optimal scenario can be accommodated for different types of water main pipes (e.g. Cast Iron, Ductile Iron, Concrete, and PVC). Data, related to the cash flow of each scenario, are collected from contractors and municipalities in Canada. Current research framework will assist municipality engineers to select the optimum rehabilitation scenario for each type of water main. In addition, it will assist them to properly manage their assets, which guarantee better quality of life for the society. Keywords: Stochastic - Life Cycle Cost - Water Mains Rehabilitation Monte Carlo Simulation. Introduction Water supply and sewer systems, in Canada, have reached a point where maintenance and renewal is essential. According to a survey conducted by the Canadian National Research Council (NRC), the present estimated cost across Canada for replacement and rehabilitation of water mains is at least $15 billion [NRC, 2004]. Some municipalities use deterministic life cycle cost (DLCC) approach which doesn t usually cover the uncertainty in service life, interest rate, or new construction/ rehabilitation cost and might lead to inaccurate decision. The American Association of Water Work (AWWA) manuals have published many documents on repair, renovation, and replacement techniques for rehabilitation of water mains [AWWA, 2001]. Most life cycle cost (LCC) models for civil infrastructure assume deterministic behavior of its service life [Hass et al., 1994, and Hudson et al., 1997]. Farngopol et al. (2001) reported that additional research is required to develop better LCC models and tools to quantify the risks, cost, and benefits associated with some civil infrastructures. 1

2 Salem et al. (2003) has presented a risk-based LCC of rehabilitation and construction alternatives for pavements. In addition, the NRC has developed a LCC model using fuzzy approach for cathodic protection of water mains [Rajani et al., 2004]. Kleiner et al. (2001) used dynamic programming approach to calculate LCC for relining and replacement, using open cut, alternatives of water mains. The selection of cost effective rehabilitation and/or new installation method is crucial to determine the repairing, renovating or replacing time for water mains. Moreover, it is required to develop a useful and easy tool to help decision maker in reaching the optimum rehabilitation or reconstruction decision. Research Objective The objective of this research is to develop a stochastic life cycle cost (SLCC) model that selects the appropriate new installation/ rehabilitation scenario of water mains. The SLCC model will be developed using Monte Carlo simulation approach. SLCC Model The SLCC model achieves the following steps as shown in Figure 1: 1) determine the breakage rate analysis; 2) identify the LCC procedure; 3) run Monte Carlo simulation; 4) perform sensitivity analysis; 5) select the best rehabilitation and replacement scenarios, and 6) generate a summary report. The following sub-sections describe the main elements of SLCC model. Figure 1 Life Cycle Cost Model (Shahata, 2006) SLCC Procedure The major components of SLCC procedure are summarized in Figure 2. It can be outlined as follows: (1) Define the main problem items (i.e. scope, evaluation criteria (e.g. acceptable risk level), rehabilitation alternatives, cost elements); (2) Decide the LCC approach (i.e. probabilistic vs. deterministic); (3) Assign economic parameters (e.g. discounted rate, analysis period); (4) Develop cash flow profile for each alternative (i.e. rehabilitation activities and their time interval based on deterioration and breakage rate analysis, estimate the rehabilitation technique cost); (5) Compute 2

3 Equivalent Annual Uniform Cost (EAUC) for each alternative; (6) Perform strategies (i.e. sensitivity analysis, uncertainty analysis); (7) Analyze results and generate final report. Figure 2 Life Cycle Cost Procedure (Shahata, 2006) Run Monte Carlo Simulation After developing the SLCC model, simulation approach is employed as follows: Identify parameters that carry uncertainty and determine their values. Construct probability distributions for the identified parameters using random sampling of variables from the defined fitted distributions. Design a simulation model Risk software package in order to generate the probability distribution of the EAUC for different alternatives. Figure 3 shows the calculation of EAUC using Monte Carlo simulation; this enables decision makers to make informed decisions regarding the rehabilitation alternatives that can be applied and the 3

4 level of risk that they plan to accept. Where: (EAUC) equivalent annual uniform cost; (n) service life, (PVcost t ) present value of all cost elements; (i) discounted rate. All these elements are expressed in a probability distribution functions. Figure 3 Calculating EAUC using Monte Carlo Simulation (Shahata, 2006) Perform sensitivity analysis A sensitivity analysis is carried out to provide a better understanding of the developed model. It is introduced to examine the effect of changing input parameters on the overall results. Input parameters will be changed individually while the other parameters are upheld constant. The sensitivity of the model to changes in the following parameters is tested: (1) discounted rate; (2) deterioration rate; and (3) unit cost of all major components. Suggested Scenarios The Alternatives used for rehabilitation project(s) are shown in Table 1, based on these alternatives some scenarios were suggested. However, scenarios are developed in 6 main categories as shown in Table 2. The total numbers of the suggested scenarios are sixty scenarios. Example of cash flow for repair only, renovation only, and replacement only scenarios are shown in Figure 4. The scenarios are built based on mains service life and breaks intervals. Such that when a break occurs, a rehabilitation method from the available alternatives is used in which this procedure can be applied up to a maximum of five breaks. Table 1 Alternatives for rehabilitation project(s) Operation Description Symbol 1 Repair Sleeves SVS Open trench OT 2 Renovation Cement or epoxy lining C/EL Slip lining SL Curried in Place Pipe CIPP 3 Replacement Pipe Bursting PB Open Cut OC Horizontal Directional Drilling HDD Microtunneling MT 4

5 Table 2 Suggested scenarios for rehabilitation project(s) Category Operation No. of Scenarios 1 Repair only 2 2 Renovation only 3 3 Replacement only 4 4 Repair & renovation 24 5 Repair & replacement 18 6 Renovation & replacement 9 Total 60 Figure 4 Example of suggested Scenarios (Shahata, 2006) The required data consist of operation & maintenance cost, replacement cost, deterioration rate (service life of pipe), and discounted rate. Costs are entered into the SLCC model as a triangular probability distribution with minimum, most likely, and maximum costs. To use this model, assumptions have to be made as follows: Parameters for Trenching and Excavation Cost: The soil condition used is sandy gravel soil with 1:1 side slope. Pipe depth is between m. Parameters for pipe materials: cast iron, ductile iron, PVC, asbestos cement, and concrete Parameters for Valve, Fitting, and Hydrant Cost: Frequency of installation is medium. 5

6 Time of breaks and type of repair data are collected from Canadian municipalities to predict the service life of mains. Data are analyzed and a probability distribution functions are used with mean (µ), and standard deviation (σ) to model the timing of each break. Discounted rate data are collected from bank of Canada and entered to the SLCC model as a normal probability distribution function. Application example This section compares the rehabilitation costs for a cast iron pipe with diameter range from 150 to 600mm (6-24 ). The Replacement only scenarios are utilized to clarify the developed model and framework in current research. They are summarized in the following analysis where the EUAC values are in ($/km/year). A histogram plot of the EAUC replacement only scenarios is shown in Figure 5. It shows the ranges of minimum, mean, and maximum cost of each scenario. Based on the relatively large size bars, variation can be easily observed. The minimum EAUC is for pipe bursting alternative with $/km/yr. Based on the chi-squared fit statistic, each of the following probability functions can best fit the output data for replacement only scenario: Log Logistic; Lognormal; Inv Gauss; and Pearson. Figure 6 shows the cumulative probability distribution of the EAUC for pipe bursting, open cut, HDD, and MT. It shows that pipe bursting scenario always yields a lower EAUC than all other scenarios. However, Figure 7 shows the sensitivity graph for pipe bursting scenario, which describes how changing inputs affect the outputs. For example, the input service life has a negative effect on the output alternative. A sensitivity coefficient value of 1 indicates a complete positive correlation between two variables. Though, a value of -1 indicates a complete inverse correlation between two variables and the value of 0 indicates that there is no correlation between variables. The sensitivity for mm diameter range of cast iron mains shows that deterioration rate for service life has the highest effect on the EUAC with a negative sensitivity coefficient of (-0.321). Which means that as service life increases EAUC decreases. The replacement technique costs and the discounted rate have significant positive sensitivity coefficient effect on the EUAC with a range of to These sensitivity coefficients indicated that service life is the most uncertain parameter that needs to be studied in order to reduce life cycle cost of water mains. Other sensitivity coefficient values indicate a partial correlation; the output is affected by changes in the selected input, but may be affected by other variables as well. Output results of the SLCC model, with 95% confidence level, showed that Open Trench is the best scenario for all diameter ranges ( repair only scenarios). They also show that Slip-Lining is the best scenario for all diameter ranges ( renovation only scenarios) and Pipe bursting is the best scenario for small diameter 150 to 600mm (6 to 24 ) ( replacement only scenarios). In addition, Open Cut is the best for large diameter 750 mm (> 30 ) in the replacement only scenarios. Conclusions A stochastic model has been developed to perform SLCC analysis for several water main rehabilitation alternatives. Data are collected from municipalities across Canada. The model has been tested for several scenarios and proved to be robust. A combination of repair, renovation, and replacement techniques are integrated in the model to develop different scenarios for rehabilitation of water mains. Several conclusions were found based on 60 selected scenarios: 1. Open Trench is the best for all diameters ranges ( repair only scenarios). 2. Slip-Lining is the best for all diameters ranges ( renovation only scenarios). 6

7 3. Pipe bursting is the best for small diameters 150 to 600mm (6 to24 ) ( replacement only scenario). 4. Open Cut is the best for large diameters 750 mm (> 30 ) in the replacement only scenarios. EAUC ( 1000 $/km/year) $180 $160 $140 $120 $100 $80 $60 $40 $20 $0 $25 $43 $67 pipe bursting (PB) 5% percentile Mean 95% percentile $29 $48 $72 $39 $68 $104 $53 $102 Open CUT (OC) HDD MT $170 scenario Name Figure 5 The EAUC for the replacement only scenarios (Shahata, 2006) Figure 6 Cumulative probability distribution for replacement only scenarios (Shahata, 2006) 7

8 Figure 7 Sensitivity graphs for pipe bursting scenario (Shahata, 2006) References American Water Works Association (AWWA) (2001). Manual of Water Supply Practices (M 28) Rehabilitation of Water Mains, 2 nd Edition, Denver, CO. Frangopol, D. M., Kong, J. S., and Gharaibeh, E. S. (2001). Reliability based life-cycle management of highway bridges. Journal of Computing in Civil Eng., 15(1): Hass, R., Hudson, W., and Zaniewski, A. (1994). Modern pavement management. Krieger Publishing, Malabar, Florida. Hudson, W., Hass, R., and Uddin, W. (1997). Infrastructure management. McGraw-Hill, New York. Kleiner, Y., Adams, B. J., and Rogers, J. S., 2001 "Water Distribution Network Renewal Planning" Journal of Computing in Civil Engineering, January, 15(1): National Research Council (NRC) (2004). Assessing Canada s Infrastructure Needs: A Review of Key Studies Infrastructure Canada research report, September. Rajani, B.; Kleiner, Y. (2004). Alternative strategies for pipeline maintenance/ renewal "AWWA Annual Conference, Orlando, Florida, June13-17, pp Salem, O., AbouRizk, S., and Ariaratnam, S. (2003). Risk-based life-cycle costing of infrastructure rehabilitation and construction alternatives. J. Infrastructure Systems, 9(1): Shahata, k. (2006). "Stochastic Life Cycle Cost Modeling Approach for Water Mains," Master Thesis submitted to Concordia University, Montreal, Canada, April. 8

Utilizing Trenchless Technology to Achieve Watermain Asset Management Objectives

Utilizing Trenchless Technology to Achieve Watermain Asset Management Objectives North American Society for Trenchless Technology (NASTT) NASTT s 2015 No-Dig Show Denver, Colorado March 15-19, 2015 MM-T6-05 Utilizing Trenchless Technology to Achieve Watermain Asset Management Objectives

More information

Executive Summary. Introduction

Executive Summary. Introduction Executive Summary Modern societies base their economic prosperity on a standard of living which includes a complex network of infrastructure, both above and below ground. Quality drinking water brought

More information

Relining of Water Mains with. Flexible High Pressure Pipelines. Raedlinger Primus Line, Inc. Ivan Zubiaga Executive Vice President 2014

Relining of Water Mains with. Flexible High Pressure Pipelines. Raedlinger Primus Line, Inc. Ivan Zubiaga Executive Vice President 2014 Relining of Water Mains with Flexible High Pressure Pipelines Raedlinger Primus Line, Inc. Ivan Zubiaga Executive Vice President 2014 Aging water main infrastructure The American Society of Civil Engineers

More information

This is the accepted version of this journal article:

This is the accepted version of this journal article: QUT Digital Repository: http://eprints.qut.edu.au/ This is the accepted version of this journal article: Piyatrapoomi, Noppadol and Kumar, Arun and Weligamage, Justin and Robertson, Neil (26) Probability

More information

Probabilistic Life cycle Cost Model for Sustainable Housing Retrofit Decision-Making

Probabilistic Life cycle Cost Model for Sustainable Housing Retrofit Decision-Making Probabilistic Life cycle Cost Model for Sustainable Housing Retrofit Decision-Making JAFARI 1 Amirhosein, VALENTIN 2 Vanessa, RUSSELL 3 Mark 1 Ph.D. Student, Department of Civil Engineering, University

More information

DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES 33 00 00 SITE UTILITIES

DESIGN AND CONSTRUCTION GUIDELINES AND STANDARDS DIVISION 33 UTILITIES 33 00 00 SITE UTILITIES SECTION INCLUDES Domestic Water Fire Water Service Water Well Sanitary Sewer Storm Drains Foundation Drainage RELATED SECTIONS 03 30 00 Concrete 21 00 00 Fire Suppression - Sprinklers 22 00 00 Plumbing

More information

Township of Terrace Bay Drinking Water System Financial Plan

Township of Terrace Bay Drinking Water System Financial Plan Township of Terrace Bay Drinking Water System Financial Plan August 2014 Introduction Municipalities in Ontario recently adopted a full accrual accounting approach to tangible municipal assets in accordance

More information

Structural Condition Models for Sewer Pipeline

Structural Condition Models for Sewer Pipeline Structural Condition Models for Sewer Pipeline Fazal Chughtai 1 and Tarek Zayed 2 1 Student Member ASCE, Graduate Student, Department of Building, Civil and Environmental Engineering, Concordia University,

More information

Bridges & Culverts Condition by Quantity

Bridges & Culverts Condition by Quantity 3.4.3 What condition is it in? Approximately 93% of the municipality s bridge structures are in good to excellent condition, with the remaining 7% in fair condition. As a result, the municipality received

More information

Quantitative Inventory Uncertainty

Quantitative Inventory Uncertainty Quantitative Inventory Uncertainty It is a requirement in the Product Standard and a recommendation in the Value Chain (Scope 3) Standard that companies perform and report qualitative uncertainty. This

More information

Risk Analysis and Quantification

Risk Analysis and Quantification Risk Analysis and Quantification 1 What is Risk Analysis? 2. Risk Analysis Methods 3. The Monte Carlo Method 4. Risk Model 5. What steps must be taken for the development of a Risk Model? 1.What is Risk

More information

Impacts of Increased Loading Due to Heavy Construction Traffic on Thin Pavements

Impacts of Increased Loading Due to Heavy Construction Traffic on Thin Pavements Impacts of Increased Loading Due to Heavy Construction Traffic on Thin Pavements Author: Harry Sturm, P. Eng. Stantec Consulting Ltd. 16-77 Mississauga Road Mississauga, ON L5N 7G2 Phone: (95) 817-296

More information

Township of Enniskillen. Asset Management Plan

Township of Enniskillen. Asset Management Plan Township of Enniskillen Asset Management Plan 2014 1 TABLE OF CONTENTS Page A. Introduction 3 B. State of Local Infrastructure 4 C. Desired Levels of Service 7 D. Asset Management Strategy 8 E. Financing

More information

APPLYING A STOCHASTIC LINEAR SCHEDULING METHOD TO PIPELINE CONSTRUCTION

APPLYING A STOCHASTIC LINEAR SCHEDULING METHOD TO PIPELINE CONSTRUCTION APPLYING A STOCHASTIC LINEAR SCHEDULING METHOD TO PIPELINE CONSTRUCTION Fitria H. Rachmat 1, Lingguang Song 2, and Sang-Hoon Lee 2 1 Project Control Engineer, Bechtel Corporation, Houston, Texas, USA 2

More information

Pipeline Asset Management: From Assessment to Prioritized Projects List

Pipeline Asset Management: From Assessment to Prioritized Projects List PROGRAM MANAGEMENT INEERING Pipeline Asset Management: From Assessment to Prioritized Projects List TAWWA / WEAT Summer Seminar July 28, 2011 PLANN NING ENG Andrew Hunt, PE Asset Management Project Manager

More information

12/8/2014. Brought To You By: This webcast is sponsored by NASSCO with the support of IPBA.

12/8/2014. Brought To You By: This webcast is sponsored by NASSCO with the support of IPBA. Brought To You By: This webcast is sponsored by NASSCO with the support of IPBA. 1 Pipe Bursting A Mature and Diverse Trenchless Technology December 10, 2014 1:00 3:00 pm Eastern How to Participate Today

More information

4 Steps for Quality Sewer Performance in Perpetuity

4 Steps for Quality Sewer Performance in Perpetuity 4 Steps for Quality Sewer Performance in Perpetuity By Gerhard Gerry P. Muenchmeyer, P. E. Principal Muenchmeyer Associates, LLC E-mail gerry@muenchmeyerassoc.com INTRODUCTION A well maintained and functional

More information

Hierarchical Fuzzy Expert System for Risk of Failure of Water Mains

Hierarchical Fuzzy Expert System for Risk of Failure of Water Mains Hierarchical Fuzzy Expert System for Risk of Failure of Water Mains Hussam Fares 1 and Tarek Zayed 2 Abstract: In Canada and the United States, there have been 7 water main breaks per day costing more

More information

Developing Rehab Strategies For Drinking Water Networks

Developing Rehab Strategies For Drinking Water Networks Developing Rehab Strategies For Drinking Water Networks RK Herz Dresden University of Technology, Dresden, Germany Summary: Urban drinking water networks come at age and need more and more rehabilitation.

More information

Letty Arvide-Gomar, PE

Letty Arvide-Gomar, PE Letty Arvide-Gomar, PE Outline DIP History and Applications Corrosion Issues Internal Cleaning Technologies Rehabilitation Options DIP History and Applications Corrosion Issues Internal Cleaning Technologies

More information

The surface roughness of the polyurethane lining is 10 times lower than cement-lined pipes.

The surface roughness of the polyurethane lining is 10 times lower than cement-lined pipes. QUALITY INSIDE When it comes to long life piping for drinking water, sewage, industrial water or gas, there is one name that continues to lead the way - ECOPUR by vonroll. Delivering precision-engineered

More information

Special Specification 7021 Water Main and Sewer Line Replacements

Special Specification 7021 Water Main and Sewer Line Replacements Special Specification 7021 Water Main and Sewer Line Replacements 1. DESCRIPTION Furnish, install, or replace water pipe, water valves, water meters and boxes, water service connections, fire hydrant assemblies,

More information

Analyzing The Bread & Butter Benefits of Sewer Main Pipebursting. Matt Werth General Manager PM Construction

Analyzing The Bread & Butter Benefits of Sewer Main Pipebursting. Matt Werth General Manager PM Construction Analyzing The Bread & Butter Benefits of Sewer Main Pipebursting Matt Werth General Manager PM Construction Pipebursting is the answer to many very difficult rehabilitation needs where there are almost

More information

Methodology. Discounting. MVM Methods

Methodology. Discounting. MVM Methods Methodology In this section, we describe the approaches taken to calculate the fair value of the insurance loss reserves for the companies, lines, and valuation dates in our study. We also describe a variety

More information

Sewer systems: Failures and rehabilitation

Sewer systems: Failures and rehabilitation Water Utility Journal 8: 17-24, 2014. 2014 E.W. Publications Sewer systems: Failures and rehabilitation C. N. Damvergis Hellenic Association of Hydraulic Works and Water Resources Management Consulting

More information

CRASHING-RISK-MODELING SOFTWARE (CRMS)

CRASHING-RISK-MODELING SOFTWARE (CRMS) International Journal of Science, Environment and Technology, Vol. 4, No 2, 2015, 501 508 ISSN 2278-3687 (O) 2277-663X (P) CRASHING-RISK-MODELING SOFTWARE (CRMS) Nabil Semaan 1, Najib Georges 2 and Joe

More information

Pipelines 2010: Climbing New Peaks to Infrastructure Reliability Renew, Rehab, and Reinvest 2010 ASCE

Pipelines 2010: Climbing New Peaks to Infrastructure Reliability Renew, Rehab, and Reinvest 2010 ASCE 1492 Integrated Decision-Support Framework for Municipal Infrastructure Asset Khaled Shahata 1 and Tarek Zayed 2 ABSTRACT Integration planning of Infrastructure systems reveals a changeling decisions facing

More information

SASTT contact details:

SASTT contact details: SASTT contact details: Web: www.sastt.org.za President: Andries Lötz Tel: (011) 688 1483 Fax: (011) 688 1524 E-mail: alotz@jwater.co.za Honorary director: Joop van Wamelen Tel: (012) 567 4026 Fax: 086

More information

Flowtite Jacking Pipe

Flowtite Jacking Pipe U.S. COMPOSITE PIPE SOUTH, LLC. MEMBER OF KTI PIPE GROUP OF COMPANIES Flowtite Jacking Pipe 18585 Samuels Rd. Zachary, La. 70791 PH. 225-658-6166 Fax 225-658-0947 www.flowtitepipe.com Flowtite GRP Pipe

More information

Appendix A: Acceptable pipe and fitting materials

Appendix A: Acceptable pipe and fitting materials Watercare Services Limited Water and Code of Practice Content from the NZS 4404:2010 Land development and subdivision infrastructure has been reproduced for use in the Infrastructure Design s Manual for

More information

Repair or Replacement - Band-Aids vs. Surgery

Repair or Replacement - Band-Aids vs. Surgery Repair or Replacement - Band-Aids vs. Surgery Using RCP for the Replacement of Failed or Undersized Culverts www.concrete-pipe.org Introduction and Background Our Nation s infrastructure owners are facing

More information

AirCost LCCA Software An overview of AAPTP 06 06 Paul M. Dalbey, P.E.

AirCost LCCA Software An overview of AAPTP 06 06 Paul M. Dalbey, P.E. AirCost LCCA Software An overview of AAPTP 06 06 Paul M. Dalbey, P.E. American Concrete Pavement Association, Southeast Chapter Concrete Airport Pavement Workshop Atlanta, GA Otb October 28, 2010 Overview

More information

Installation of Large Diameter Buried Pipes

Installation of Large Diameter Buried Pipes Installation of Large Diameter Buried Pipes Sullivan (Sully) Curran P. E., Executive Director I. Introduction and Scope There is an ongoing need to provide designers, specifiers, engineers, consultants

More information

Probabilistic Characterization of Uncertain Inputs in the Life-Cycle Cost Analysis of Pavements

Probabilistic Characterization of Uncertain Inputs in the Life-Cycle Cost Analysis of Pavements Probabilistic Characterization of Uncertain Inputs in the Life-Cycle Analysis of Pavements Omar Swei, Jeremy Gregory, and Randolph Kirchain Life-cycle cost analysis (LCCA) is an important tool for evaluating

More information

How To Balance Life Cycle Cost And Maintenance Cost

How To Balance Life Cycle Cost And Maintenance Cost Probabilistic Engineering Mechanics 19 (2004) 345 359 www.elsevier.com/locate/probengmech Two probabilistic life-cycle maintenance models for deteriorating civil infrastructures Jan M. van Noortwijk a,b,

More information

Project Cash Flow Forecasting Using Value at Risk

Project Cash Flow Forecasting Using Value at Risk Technical Journal of Engineering and Applied Sciences Available online at www.tjeas.com 213 TJEAS Journal21332/2681268 ISSN 2183 213 TJEAS Project Cash Flow Forecasting Using Value at Risk Mohammad Reza

More information

1.3.2 Method of construction and restoration of existing water service connections. This shall include:

1.3.2 Method of construction and restoration of existing water service connections. This shall include: 1.0 GENERAL 1.1 DESCRIPTION: This specification shall cover the rehabilitation of existing water lines using the GRUNDOCRACK PIPE BURSTING SYSTEM. Pipe bursting is a system by which the pneumatic bursting

More information

IS THAT LINER THICK ENOUGH?

IS THAT LINER THICK ENOUGH? IS THAT LINER THICK ENOUGH? Philip McFarlane, Opus International Consultants Ltd ABSTRACT The amount of pipeline rehabilitation being undertaken in New Zealand is increasing each year. Larger diameter

More information

Trenchless Construction Technology and Issues

Trenchless Construction Technology and Issues Trenchless Construction Technology and Issues Dr. Mohammad Najafi, P.E., F. ASCE Director, Center for Underground Infrastructure Research & Education (CUIRE) Professor and Director of Construction Engineering

More information

Whole of life cycle cost analysis in bridge rehabilitation

Whole of life cycle cost analysis in bridge rehabilitation Whole of life cycle cost analysis in bridge rehabilitation Report 2002-005-C-03 The research described in this report was carried out by Project Leader Team members Dr. Sujeeva Setunge Prof. Arun Kumar,

More information

2.1 Development of Risk-Based Asset Management Framework

2.1 Development of Risk-Based Asset Management Framework SECTION 2 Development of Asset Management Framework 2.1 Development of Risk-Based Asset Management Framework As part of the master planning effort, WES developed a risk-based asset management framework

More information

Quantitative Methods for Finance

Quantitative Methods for Finance Quantitative Methods for Finance Module 1: The Time Value of Money 1 Learning how to interpret interest rates as required rates of return, discount rates, or opportunity costs. 2 Learning how to explain

More information

Risk Workshop Overview. MOX Safety Fuels the Future

Risk Workshop Overview. MOX Safety Fuels the Future Risk Workshop Overview RISK MANAGEMENT PROGRAM SUMMARY CONTENTS: Control Account Element Definition ESUA Form Basis of Estimate Uncertainty Calculation Management Reserve 1. Overview 2. ESUA Qualification

More information

Greater Dublin Strategic Drainage Study Regional Drainage Policies - Volume 2 New Development

Greater Dublin Strategic Drainage Study Regional Drainage Policies - Volume 2 New Development 7 SPECIFICATIONS There is currently no Irish specification for construction of drainage works, or water supply works. There are several publications that give guidance on drainage works, such as the Building

More information

BROOKS BRIDGE WATERLINE REHABILITATION

BROOKS BRIDGE WATERLINE REHABILITATION The North American Society (NASTT) and the International Society for Trenchless Technology (ISTT) International No-Dig Show 2009 Toronto, Ontario Canada March 29 April 3, 2009 Paper C-3-02 BROOKS BRIDGE

More information

Pipe bursting provides viable alternative for rehab work By Greg Key, U.S. Pipe

Pipe bursting provides viable alternative for rehab work By Greg Key, U.S. Pipe Pipe bursting provides viable alternative for rehab work By Greg Key, U.S. Pipe As the Environmental Protection Agency tightens groundwater quality regulations, old leaking sewers lines made of pipe clay,

More information

PLANNING CAREFUL NORTH VANCOUVER PIPE BURST REQUIRES

PLANNING CAREFUL NORTH VANCOUVER PIPE BURST REQUIRES WATER & SEWER REHAB TECHNOLOGIES NORTH VANCOUVER PIPE BURST REQUIRES CAREFUL PLANNING Close proximity to storage silos, poor ground conditions and clogged storm sewer pipe puts trenchless contractor to

More information

Forecasting Demand for Automotive Aftermarket Inventories

Forecasting Demand for Automotive Aftermarket Inventories Informatica Economică vol. 17, no. 2/2013 119 Forecasting Demand for Automotive Aftermarket Inventories Ovidiu DOBRICAN West University of Timisoara ovidiu.dobrican@feaa.uvt.ro Management decisions regarding

More information

WATER MAIN CONSTRUCTION TECHNIQUES DEPARTMENT OF PUBLIC WORKS WATER & WASTEWATER DIVISION

WATER MAIN CONSTRUCTION TECHNIQUES DEPARTMENT OF PUBLIC WORKS WATER & WASTEWATER DIVISION WATER MAIN CONSTRUCTION TECHNIQUES Overview Water Main - Materials Specifications Installation Future? Water Main Materials Material Types There are various material types used for water mains, these include:

More information

Item No. Description Estimated Unit Total Unit Total Unit Total Unit Total Quantity Price Amount Price Amount Price Amount Price Amount

Item No. Description Estimated Unit Total Unit Total Unit Total Unit Total Quantity Price Amount Price Amount Price Amount Price Amount Engineer's Estimate DiPaolo Company 4350 DiPaolo Center Glenview, IL 60025 Stark Excavating, Inc. 1805 W. Washington Street Bloomington, IL 61701 Rowe Construction 1523 N. Cottage Avenue Bloomington, IL

More information

provided for improvements for each structure during these timeframes. Rehabilitation and Investment Strategies:

provided for improvements for each structure during these timeframes. Rehabilitation and Investment Strategies: ASSET MANAGEMENT STRATEGY BRIDGES AND LARGE CULVERTS (>3m Span) Inventory Anticipated Asset Life Cycle Fifteen (15) bridges and eleven (11) large culverts with a span greater than 3m (refer to PSAB 3150

More information

SECTION 02110 - ASBESTOS CEMENT PIPE REPAIRS, DEMOLITION, AND DISPOSAL

SECTION 02110 - ASBESTOS CEMENT PIPE REPAIRS, DEMOLITION, AND DISPOSAL SECTION 02110 - ASBESTOS CEMENT PIPE REPAIRS, DEMOLITION, AND DISPOSAL PART 1 - GENERAL 1.1 WORK INCLUDED IN THIS SECTION A. The WORK of this Section includes the repair, demolition, and disposal of asbestos

More information

Western Canada Water Conference and Exhibition September 17-20, 2013 Edmonton Alberta

Western Canada Water Conference and Exhibition September 17-20, 2013 Edmonton Alberta Western Canada Water Conference and Exhibition September 17-20, 2013 Edmonton Alberta CONDITION ASSESSMENT AND REHAB: A HOLISTIC APPROACH David E. Russell, President, PICA Corporation, 4909 75 Ave., Edmonton,

More information

Sewer Rehabilitation Design Requirements

Sewer Rehabilitation Design Requirements Sanitary Sewer Overflow (SSO) Control and Wastewater Facilities Program Sewer Rehabilitation Design Requirements City of Baton Rouge/Parish of East Baton Rouge Department of Public Works Submitted by Prepared

More information

ESTIMATION AND PLANNING TOOL FOR INDUSTRIAL CONSTRUCTION SCAFFOLDING. *C. Kumar, S. M. AbouRizk, and Y. Mohamed

ESTIMATION AND PLANNING TOOL FOR INDUSTRIAL CONSTRUCTION SCAFFOLDING. *C. Kumar, S. M. AbouRizk, and Y. Mohamed ESTIMATION AND PLANNING TOOL FOR INDUSTRIAL CONSTRUCTION SCAFFOLDING *C. Kumar, S. M. AbouRizk, and Y. Mohamed Department of Civil and Environmental Engineering University of Alberta Edmonton, AB, Canada,

More information

Pipeline Replacement using Relining

Pipeline Replacement using Relining Pipeline Replacement using Relining Mark Heathcote, March 2006 Relining of old pipeline systems is becoming an increasingly attractive option to asset owners and operators as an effective alternative to

More information

Recent outbreaks of pinhole leaks nationally are a significant issue. Figure 1.1 shows the

Recent outbreaks of pinhole leaks nationally are a significant issue. Figure 1.1 shows the CHAPTER 1 - INTRODUCTION 1. 1 Motivation Recent outbreaks of pinhole leaks nationally are a significant issue. Figure 1.1 shows the national distribution of pinhole leaks based on the data gathered by

More information

The Manitoba Water Services Board SECTION 022180 Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11

The Manitoba Water Services Board SECTION 022180 Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11 Page 1 of 11 Part 1 General 1.1 DESCRIPTION OF WORK.1 The work described herein shall consist of the excavation of trenches (or excavation of tunnels); the supply and placing of bedding and backfill materials;

More information

Assessment of the National Water Quality Monitoring Program of Egypt

Assessment of the National Water Quality Monitoring Program of Egypt Assessment of the National Water Quality Monitoring Program of Egypt Rasha M.S. El Kholy 1, Bahaa M. Khalil & Shaden T. Abdel Gawad 3 1 Researcher, Assistant researcher, 3 Vice-chairperson, National Water

More information

Rehabilitation Alternatives. MWEA Collection System Seminar October 1, 2009

Rehabilitation Alternatives. MWEA Collection System Seminar October 1, 2009 Rehabilitation Alternatives MWEA Collection System Seminar October 1, 2009 Overview Types of Rehabilitation Trenchless Categories On-Line Replacement In-Situ Options Selecting the Best Solution Types of

More information

CHAPTER 3 WATER DISTRIBUTION SYSTEM MAINTENANCE OPTIMIZATION PROBLEM

CHAPTER 3 WATER DISTRIBUTION SYSTEM MAINTENANCE OPTIMIZATION PROBLEM 41 CHAPTER 3 WATER DISTRIBUTION SYSTEM MAINTENANCE OPTIMIZATION PROBLEM 3.1 INTRODUCTION Water distribution systems are complex interconnected networks that require extensive planning and maintenance to

More information

HYDRAULIC ANALYSIS OF PIPE LINED WITH MADISON S 100% SOLIDS STRUCTURAL POLYURETHANE COATINGS

HYDRAULIC ANALYSIS OF PIPE LINED WITH MADISON S 100% SOLIDS STRUCTURAL POLYURETHANE COATINGS HYDRAULIC ANALYSIS OF PIPE LINED WITH MADISON S 100% SOLIDS STRUCTURAL POLYURETHANE COATINGS Shiwei William Guan, Ph.D. Vice President, R&D and International Business Madison Chemical Industries Inc. 490

More information

TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe

TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe TECHNICAL NOTE Culvert Sliplining and Lining of Casings with HPPipe TN 5.14 February 2010 Introduction It may be at times necessary, in an aging infrastructure, to rehabilitate drainage and sanitary lines

More information

A New Strategic Asset Management Tool for Simulating Water Utilities long-term Sustainability

A New Strategic Asset Management Tool for Simulating Water Utilities long-term Sustainability A New Strategic Asset Management Tool for Simulating Water Utilities long-term Sustainability Amin Ganjidoost/Dr. Rashid Rehan/Dr. Mark Knight/Dr. Andre Unger/Dr. Carl Haas University of Waterloo, Canada

More information

Force Main Condition Assessment: New Technologies & Case Studies

Force Main Condition Assessment: New Technologies & Case Studies Force Main Condition Assessment: New Technologies & Case Studies Andy Dettmer, Ph.D., P.E. CMOM Workshop August 19, 2014 2 1 Three takeaways 1. Most of your force mains are good 2. We can pinpoint the

More information

CHAPTER 2 HYDRAULICS OF SEWERS

CHAPTER 2 HYDRAULICS OF SEWERS CHAPTER 2 HYDRAULICS OF SEWERS SANITARY SEWERS The hydraulic design procedure for sewers requires: 1. Determination of Sewer System Type 2. Determination of Design Flow 3. Selection of Pipe Size 4. Determination

More information

Life-365 Service Life Prediction Model Version 2.0

Life-365 Service Life Prediction Model Version 2.0 Originally printed in Concrete International and posted with permission from the American Concrete Institute (www.concrete.org). Life-365 Service Life Prediction Model Version 2.0 Widely used software

More information

Pipe Bursting. Case Study at Zeeland, MI Collections Seminar September 6, 2012. Presentation Agenda. What is Pipe Bursting? What is Pipe Bursting?

Pipe Bursting. Case Study at Zeeland, MI Collections Seminar September 6, 2012. Presentation Agenda. What is Pipe Bursting? What is Pipe Bursting? Pipe Bursting Case Study at Zeeland, MI Collections Seminar September 6, 2012 By: Brian Hannon, PE and John Racek, PE Presentation Agenda What is Pipe Bursting? History of Pipe Bursting Types of Pipe Bursting

More information

2. SOCIAL COSTS Introduction...19 Worldwide Experience and Best Practices in Mitigating Disruption..20

2. SOCIAL COSTS Introduction...19 Worldwide Experience and Best Practices in Mitigating Disruption..20 TABLE OF CONTENTS 1. INTRODUCTION The NYC Water Distribution System.1 Assessing the Risks and Consequences of Pipeline Failures..3 Installation Alternatives....4 Structural Classification of Lining Techniques.16

More information

Water Main Lining A Sustainable Alternative to Open Cut Replacement

Water Main Lining A Sustainable Alternative to Open Cut Replacement Water Main Lining A Sustainable Alternative to Open Cut Replacement Sean O Dell, PE Baxter & Woodman, Inc. B&W Client Seminar, Crystal Lake May 1, 2014 Agenda Why, What, When, Where, Who, How Reduction

More information

Ductile Iron Pipe Couplings

Ductile Iron Pipe Couplings J-9 Pipe 1 2 Straight and Transition Ductile offer an easy and economical way of joining whether the is of the same nominal and/or type or different at each coupling. couplings will handle most of your

More information

Representing Uncertainty by Probability and Possibility What s the Difference?

Representing Uncertainty by Probability and Possibility What s the Difference? Representing Uncertainty by Probability and Possibility What s the Difference? Presentation at Amsterdam, March 29 30, 2011 Hans Schjær Jacobsen Professor, Director RD&I Ballerup, Denmark +45 4480 5030

More information

A Revolution for Telecom, Electric, Gas, & Water"

A Revolution for Telecom, Electric, Gas, & Water "Pipe Bursting A Revolution for Telecom, Electric, Gas, & Water" Presented by the Leadership of the IPBA International Pipe Bursting Association A Division of NASSCO National Association of Sewer Service

More information

SECTION 33 41 13 PUBLIC STORM UTILITY DRAINAGE PIPING

SECTION 33 41 13 PUBLIC STORM UTILITY DRAINAGE PIPING SECTION 33 41 13 PUBLIC STORM PART 1 - GENERAL 1.01 SECTION INCLUDES A. Storm drainage piping, fittings, and accessories at proposed station areas and locations other than under and immediately adjacent

More information

Quantitative Risk Analysis with Microsoft Project

Quantitative Risk Analysis with Microsoft Project Copyright Notice: Materials published by Intaver Institute Inc. may not be published elsewhere without prior written consent of Intaver Institute Inc. Requests for permission to reproduce published materials

More information

Building and Using Spreadsheet Decision Models

Building and Using Spreadsheet Decision Models Chapter 9 Building and Using Spreadsheet Decision Models Models A model is an abstraction or representation of a real system, idea, or object. Models could be pictures, spreadsheets, or mathematical relationships

More information

Section A. Index. Section A. Planning, Budgeting and Forecasting Section A.2 Forecasting techniques... 1. Page 1 of 11. EduPristine CMA - Part I

Section A. Index. Section A. Planning, Budgeting and Forecasting Section A.2 Forecasting techniques... 1. Page 1 of 11. EduPristine CMA - Part I Index Section A. Planning, Budgeting and Forecasting Section A.2 Forecasting techniques... 1 EduPristine CMA - Part I Page 1 of 11 Section A. Planning, Budgeting and Forecasting Section A.2 Forecasting

More information

CONSTRUCTION COST OF UNDERGROUND INFRASTRUCTURE RENEWAL: A COMPARISON OF TRADITIONAL OPEN-CUT AND PIPE BURSTING TECHNOLOGY SEYED BEHNAM HASHEMI

CONSTRUCTION COST OF UNDERGROUND INFRASTRUCTURE RENEWAL: A COMPARISON OF TRADITIONAL OPEN-CUT AND PIPE BURSTING TECHNOLOGY SEYED BEHNAM HASHEMI CONSTRUCTION COST OF UNDERGROUND INFRASTRUCTURE RENEWAL: A COMPARISON OF TRADITIONAL OPEN-CUT AND PIPE BURSTING TECHNOLOGY by SEYED BEHNAM HASHEMI Presented to the Faculty of the Graduate School of The

More information

AIR RELEASE, CLEANOUT, AND SEWER MANHOLES

AIR RELEASE, CLEANOUT, AND SEWER MANHOLES AIR RELEASE, CLEANOUT, AND SEWER MANHOLES **From Hartford IM BLDG(10) DESCRIPTION. This work shall consist of the construction of air release, cleanout, and sanitary sewer manholes; and the furnishing

More information

Profit Forecast Model Using Monte Carlo Simulation in Excel

Profit Forecast Model Using Monte Carlo Simulation in Excel Profit Forecast Model Using Monte Carlo Simulation in Excel Petru BALOGH Pompiliu GOLEA Valentin INCEU Dimitrie Cantemir Christian University Abstract Profit forecast is very important for any company.

More information

Schedule Risk Analysis Simulator using Beta Distribution

Schedule Risk Analysis Simulator using Beta Distribution Schedule Risk Analysis Simulator using Beta Distribution Isha Sharma Department of Computer Science and Applications, Kurukshetra University, Kurukshetra, Haryana (INDIA) ishasharma211@yahoo.com Dr. P.K.

More information

STOCHASTIC MODELLING OF WATER DEMAND USING A SHORT-TERM PATTERN-BASED FORECASTING APPROACH

STOCHASTIC MODELLING OF WATER DEMAND USING A SHORT-TERM PATTERN-BASED FORECASTING APPROACH STOCHASTIC MODELLING OF WATER DEMAND USING A SHORT-TERM PATTERN-BASED FORECASTING APPROACH Ir. LAM Shing Tim Development(2) Division, Development Branch, Water Supplies Department. Abstract: Water demand

More information

08003-1 WATER SERVICE 2

08003-1 WATER SERVICE 2 08003_Mar08_2011.pdf Page 1 of 7 INDEX Page 08003-1 WATER SERVICE 2 1.1 Pipe 2 1.1.1 Copper 2 1.1.2 Polyethylene 2 1.2 Valves and Fittings 2 1.2.1 Main Stops 3 1.2.2 Curb Stops 3 1.2.3 Curb Box 3 1.2.4

More information

REVIEW OF TRENCHLESS TECHNIQUES FOR THE REHABILITATION OF SEWERS. Gerhard (Gerry) P. Muenchmeyer, P.E. Muenchmeyer Associates, LLC

REVIEW OF TRENCHLESS TECHNIQUES FOR THE REHABILITATION OF SEWERS. Gerhard (Gerry) P. Muenchmeyer, P.E. Muenchmeyer Associates, LLC REVIEW OF TRENCHLESS TECHNIQUES FOR THE REHABILITATION OF SEWERS Gerhard (Gerry) P. Muenchmeyer, P.E. Muenchmeyer Associates, LLC What is really out there? DO YOU DIG IT? INDUSTRY CONCERNS UNEXPECTED DEVELOPMENTS

More information

LIFE CYCLE ANALYSIS OF WATER NETWORKS

LIFE CYCLE ANALYSIS OF WATER NETWORKS LIFE CYCLE ANALYSIS OF WATER NETWORKS Michael Ambrose - Environmental scientist, Commonwealth Scientific and Industrial Research Organisation (CSIRO), michael.ambrose@csiro.au* Prof. Stewart Burn Team

More information

Work Type Definition and Submittal Requirements

Work Type Definition and Submittal Requirements Work Type: Highway Materials Testing Geotechnical Laboratory Testing, Geotechnical Laboratory Testing, Standard Penetration (SPT) & Rock Coring, Cone Penetration Test, Solid Stem Auger Drilling, and Materials

More information

LEE S SUMMIT USES PIPE BURSTING TO BROADEN ITS ASSET MANAGEMENT TOOLBOX AND REHABILITATE POTABLE WATER DISTRIBUTION SYSTEM

LEE S SUMMIT USES PIPE BURSTING TO BROADEN ITS ASSET MANAGEMENT TOOLBOX AND REHABILITATE POTABLE WATER DISTRIBUTION SYSTEM North American Society for Trenchless Technology (NASTT) No-Dig Show 2010 Chicago, Illinois May 2-7, 2010 Paper D-4-02 LEE S SUMMIT USES PIPE BURSTING TO BROADEN ITS ASSET MANAGEMENT TOOLBOX AND REHABILITATE

More information

Outline Petroleum Engineering Seminars

Outline Petroleum Engineering Seminars Nuno Salsa Ferreira Outline Scope E&P Companies Assets Valuation Deepwater Growing Trend Deepwater Expenditures Drilling Operations Deepwater Drilling Main Challenges Rig Drilling Market Macondo Accident

More information

Trenchless Technology for Drainage Structures

Trenchless Technology for Drainage Structures Trenchless Technology for Drainage Structures Richard S. Williammee, Jr., MSCE, P.E. District Materials Engineer Fort Worth District TxDOT 2011 Transportation Short Course October 11, 2011 There are textbooks

More information

Superior Pipe Restoration Solutions. Proven, state-of-the-art technology that saves money, time and inconvenience. belcopipe.com

Superior Pipe Restoration Solutions. Proven, state-of-the-art technology that saves money, time and inconvenience. belcopipe.com Superior Pipe Restoration Solutions Proven, state-of-the-art technology that saves money, time and inconvenience. belcopipe.com About Us Belco Pipe Restoration was founded with the concept of using British

More information

ASSET MANAGEMENT STRATEGIES FOR METALLIC MUNICIPAL TRANSMISSION PIPELINES

ASSET MANAGEMENT STRATEGIES FOR METALLIC MUNICIPAL TRANSMISSION PIPELINES ASSET MANAGEMENT STRATEGIES FOR METALLIC MUNICIPAL TRANSMISSION PIPELINES Jose L. Villalobos, P.E. 1 and Carl Perry 2 Abstract: This paper presents strategies for the control of external corrosion on municipal

More information

PRODUCT CATALOGUE. for. SMARTPHONE / WEBSITE / DIGITAL EDITION / BOOK / ipad / GPS

PRODUCT CATALOGUE. for. SMARTPHONE / WEBSITE / DIGITAL EDITION / BOOK / ipad / GPS PRODUCT CATALOGUE for This product catalogue has been downloaded from COSSD.com. Listed products/services and their descriptions are shown as supplied by the title company COSSD does not guarantee the

More information

How to Do a Water & Sewer System Inventory - Capital Improvements Plan

How to Do a Water & Sewer System Inventory - Capital Improvements Plan Table of Contents Background, Objective and Method... 2 Capital Outlay - Water System... 3 Capital Outlay - Sewer System... 4 Summary... 4 Water Exhibit... 5 Sewer Exhibit....6 w w w. c a v a n a u g h

More information

Investigating the Role of Statistical Models in Water Distribution Asset Management: A Semi-structured Interview Approach

Investigating the Role of Statistical Models in Water Distribution Asset Management: A Semi-structured Interview Approach Investigating the Role of Statistical Models in Water Distribution Asset Management: A Semi-structured Interview Approach Vikram M. Rao *, and Royce A. Francis The George Washington University, Washington

More information

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE JURISDICTION OF ALBERTA TRANSPORTATION 1.0 Application Procedures 2.0

More information

University of Huddersfield Repository

University of Huddersfield Repository University of Huddersfield Repository Hajjaji, Mufeed, Denton, Paul and Jackson, Steve The effectiveness of using project management tools and techniques for delivering projects Original Citation Hajjaji,

More information

Risk-based Modelling for Wastewater Infrastructure Asset Management

Risk-based Modelling for Wastewater Infrastructure Asset Management Risk-based Modelling for Wastewater Infrastructure Asset Management Zoran Kapelan University of Exeter International workshop on the science of asset management (FRMRC2) London 9 Dec 2011 Outline The framework

More information

EXHIBIT "A. Technical Specifications for Water and Sewer Service Lines

EXHIBIT A. Technical Specifications for Water and Sewer Service Lines EXHIBIT "A Technical Specifications for Water and Sewer Service Lines Water and Sewer Line Bedding and Backfill: Drawings show cross-section of trench, pipe laid on top of 6" min. bedding material, bedding

More information

SECTION 02763 POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe.

SECTION 02763 POINT REPAIRS TO SANITARY SEWERS. A. Repairs to existing sewer lines by replacing short lengths of failed pipe. SECTION 02763 PART 1 G E N E R A L 1.01 SECTION INCLUDES A. Repairs to existing sewer lines by replacing short lengths of failed pipe. 1.02 UNIT PRICES A. Measurement for point repairs is on a unit price

More information

TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth

TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth TABLE OF CONTENTS NO. MP-1 MP-2 MP-3 MP-4 MP-4.01 MP-4.02 MP-4.03 MP-5 MP-5.01 MP-5.02 MP-5.03 MP-5.04 MP-5.05 MP-5.06 MP-5.07 MP-5.08 MP-5.11 MP-5.12 MP-5.13 MP-5.14 MP-5.15 MP-5.16 MP-5.18 MP-5.19 MP-5.20

More information