The BA/PM Partnership
|
|
|
- Eustacia Allison
- 10 years ago
- Views:
Transcription
1 The BA/PM Partnership By Elizabeth Larson, PMP, CBAP, CSM Principal, Watermark Learning Watermark Learning 7300 Metro Blvd, Suite 207 Minneapolis, MN Phone: 1(800) Website:
2 An IIBA/PMI Joint Collaboration At a conference several months ago I sat next to a project manager who observed, My organization has changed the way we do things. Now it s the business analysts who do a lot of the work that I used to do, such as meeting with the sponsor to uncover the business problems, and determining what we re going to do on the project I can t believe it. I feel like I m being treated like a second-class citizen! This complaint was indicative of many I ve heard in the recent past. Sometimes the frustration is expressed by a project manager (PM) and sometimes by a business analyst (BA). It seems that as organizations realize the importance of business analysis, they recognize that both BA and the PM roles are critical to project success. They also understand that the two roles need to build strong working relationships based on mutual respect and understanding and that a strong partnership between these two roles can significantly increase the likelihood of project success. The question seems to be, however, how can the two best work together? Joint Collaboration Background. Such confusion triggered a joint effort between the Project Institute (PMI) and the IIBA to facilitate a shared understanding of the roles. They formed a committee sponsored by both IIBA (Kevin Brennan) and PMI (Chuck Lage). With a project manager (Larry Goldsmith), three IIBA representatives (Barb Carkenord, Robin Grace, and myself, and three PMI representatives (Chris Cartwright, Jen Skrabak, and Cornelius Vonk), we were a global team from four countries and four continents. We spent about six months together in virtual teams comprised of one PM and one BA. Our goal was to review both organizations guides to their bodies of knowledge - IIBA s BABOK Guide Version 2.0 (BABOK ) and PMI s The PMBOK Guide Fourth Edition (PMBOK ). Using these bodies of knowledge as a base, the committee looked at knowledge areas, processes, techniques, and handoffs between the PM and BA. Our first task was to map the BABOK s knowledge areas and tasks to the PMBOK Process Groups of Initiating, Planning, Executing, Monitoring and Controlling, and Closing. As we mapped tasks to process groups, we uncovered a new process group, wholly in the business analysis domain, which we called pre-initiation. All the Enterprise Analysis tasks in the BABOK fell into this process group. Potential conflict. Part of our work was to describe how the PM and BA work together on each task. As a result of our analysis we noted four areas of potential overlap and conflict explained below: 1. Scope. There are two kinds of scope product (solution) and project. Product scope includes the features and functions of the end product, service, or result. Project scope is the work needed to deliver that product (solution). Potential conflict can arise when the BA identifies additional business requirements that affect the project scope. To avoid conflict BAs need to ensure that although they can recommend scope changes, they cannot make commitments to the business about those changes. Unmodified Copies Allowed. Page 2
3 2. Communication. The goal of business analysis is to recommend solutions that help organizations reach their objectives. To that end BAs works in two domains the business and the project, sometimes alternating between the two. Because of the relationship with the business and because of the trust established between them, a BA often become aware of project needs before the PM does. As noted above, they cannot make commitments to the business. Instead, the BA needs to communicate those needs to the PM for the effect on the overall project. 3. Risk management. As risks are identified and analyzed throughout the project, all the risks, including those related to the product are captured, and strategies to respond to these risks are developed. 4. Requirements. The PMBOK includes Collect Requirements as a section under the Scope knowledge area describing how requirements activities (business analysis) will be planned, tracked, and reported. This section in the PMBOK can be confusing to both BAs and PMs. To avoid conflict both parties need to involve the other in the business analysis planning activities. The table below summaries the roles and responsibilities that can help avoid conflict. Potential Areas BA PM Both of Conflict Scope Communications Defines high-level product (solution) scope during Enterprise Analysis (pre-initiation). Once the project has been authorized, the BA helps facilitate agreement and approval on scope from business stakeholders. The BA focuses on planning and defining the product scope and ensuring that the product deliverables are aligned with the project. Works primarily with stakeholders who are directly or indirectly affected by the product (solution) requirements. The BA might also maintain ongoing communications with that organization. Plans and manages the project scope, which includes integrating the business analysis approach and deliverables into the overall project. PM has the responsibility for managing the project scope. Is accountable for all project-related communication with all project stakeholders. Responsible for communicating to the sponsor about all aspects of the project.. Both the PM and BA have responsibilities relating to the scope. The BA is responsible for the product (solution) scope. The PM is responsible for the project scope and incorporating the product scope into the project scope. Stakeholder analysis is completed by both the BA and the PM. The PM needs to know the stakeholders for their project planning, the BA for their business analysis planning, which is incorporated into the project planning. Unmodified Copies Allowed. Page 3
4 Potential Areas of Conflict Risk Requirements BA PM Both Identifies and communicates business and business analysis risks to the PM. Assists PM in gaining stakeholder consensus on risk strategies. Reduces overall project risk by assessing implementation and organizational readiness risks. Responsible for defining, tracing, and creating a requirements management plan for how requirements will be analyzed, documented, and managed throughout the project. Responsible for creating the overall project risk management plan and for managing project risks. Responsible for incorporating business and business analysis risks into the project risk management plan. Participates in planning the business analysis work. Incorporates the requirements management plan and the business analysis plans into the overall project management plan. Both roles identify and analyze project and business risks and get agreement on risk response strategies. The BA works with the PM to determine which activities will be done and which deliverables will be produced. Strategies for collaboration. We identified three critical success factors for effective cooperation between the BA and PM: 1. Clear, documented, and mutually agreed on roles and responsibilities. To that end it is essential, as soon as a project is sanctioned and a PM assigned, for the two to discuss and agree on their roles and the nature of their relationship. It is also helpful to discuss the possible points of conflict before the planning processes begin and to decide proactively how to work together. 2. Constant and open communication. Even when initial discussions on roles and responsibilities occur, confusion and conflict can arise throughout the project. It is essential for both roles to make a commitment to discuss and resolve disagreements as they occur without waiting for them to disrupt the project. 3. Active business sponsor engagement. No matter how fine-tuned the relationship between the BA and PM, an engaged sponsor can make the difference between success and failure. One final key learning Both the PM and BA play leadership roles the PM for leading the team and delivering the solution and the BA for ensuring that the solution meets the business need and aligns with business and project objectives. And both roles, equally, are required for project success. Unmodified Copies Allowed. Page 4
5 About Watermark Learning Watermark Learning helps improve project success with focused business analysis and project management training and mentoring. We foster results through our unique blend of industry best practices, a practical approach, and an engaging delivery. We convey retainable real-world skills, to motivate and enhance staff performance, adding up to enduring results. Watermark Learning offers public, private, and online training. With our academic partner, Auburn University, we also provide Masters Certificate Programs to help organizations be more productive, and assist individuals in their professional growth. Watermark is a PMI Global Registered Education Provider, and an IIBA Endorsed Education Provider. Contact us at or at Unmodified Copies Allowed. Page 5
Partnering for Project Success: Project Manager and Business Analyst Collaboration
Partnering for Project Success: Project Manager and Business Analyst Collaboration By Barbara Carkenord, CBAP, Chris Cartwright, PMP, Robin Grace, CBAP, Larry Goldsmith, PMP, Elizabeth Larson, PMP, CBAP,
Project Manager and Business Analyst Collaboration
Project Manager and Business Analyst Collaboration Mike Sandberg Director, IT Business Analysis Center of Excellence Novell, Inc. Email: [email protected] LinkedIn: http://www.linkedin.com/in/mdsandberg
10 Critical Steps to Create a Project Plan
10 Critical Steps to Create a Project Plan Elizabeth Larson, PMP, CBAP and Richard Larson, PMP, CBAP Principals, Watermark Learning, Inc. Industry Article Watermark Learning 7300 Metro Blvd, Suite 207
How do I manage my Project Scope using Business Analysis
How do I manage my Project Scope using Business Analysis Venus Patel, PMP, PMI-PBA Raygene Patterson, PMP, CBAP, CSM Slide 1 Presenters Venus Patel Raygene Patterson PMP, PMI-PBA PMP, CBAP, CSM 10 years
Is Your Organization Agile-Ready?
Watermark Learning Article Is Your Organization Agile-Ready? Part 1: Four Formidable Questions Lately I ve been getting questions from Agile seminar participants about how to apply Scrum to real life,
It s not Like Selling Pots and Pans or is it? A new way of Selling Project Management to Senior Management
It s not Like Selling Pots and Pans or is it? A new way of Selling Project Management to Senior Management Elizabeth Larson, PMP, CBAP and Richard Larson, PMP, CBAP Principals, Watermark Learning, Inc.
Managing Small Projects: The Critical Steps
Managing Small Projects: The Critical Steps Elizabeth Larson, PMP, CBAP and Richard Larson, PMP, CBAP Principals, Watermark Learning, Inc. Industry Article Watermark Learning 7300 Metro Blvd, Suite 207
What s a BA Lead and Who Needs One? by: Alessandra Zardo Marie-Chantal Côté Sonia Ruffolo
What s a BA Lead and Who Needs One? by: Alessandra Zardo Marie-Chantal Côté Sonia Ruffolo 1 Agenda Who we are? Why talk about this? Points of discussion IMPORTANT NOTE: We are aiming to present our thoughts
Expert Reference Series of White Papers. Intersecting Project Management and Business Analysis
Expert Reference Series of White Papers Intersecting Project Management and Business Analysis 1-800-COURSES www.globalknowledge.com Intersecting Project Management and Business Analysis Daniel Stober,
Business Analysis Value Proposition Why Business Analysis is a key success factor in complex projects
Business Analysis Value Proposition Why Business Analysis is a key success factor in complex projects masventa Business GmbH, March 2014, v1.3 IIBA, the IIBA logo, BABOK and Business Analysis Body of Knowledge
Requirements Management in Multi Project Environments Managing Requirements across multiple projects according to best practises
Requirements Management in Multi Project Environments Managing Requirements across multiple projects according to best practises Rainer Wendt, CBAP, PMP, September 2012 IIBA, the IIBA logo, BABOK and Business
Foundations of Project Management. Presented by: Kelly Baumer, MBA, PMP Mindy Rings, MBA, PMP
Foundations of Project Management Presented by: Kelly Baumer, MBA, PMP Mindy Rings, MBA, PMP August 18, 2014 Project Management Basics In the next slides we will cover: Basic project management terminology
Process Improvement Training Portfolio
Process Improvement Training Portfolio evolve To stay competitive, all businesses focus on achieving increasingly better bottom-line results. That s why it s essential to develop and maintain business
Rising importance of Business Analysis when performing projects
Rising importance of Business Analysis when performing projects A state-of-the-art view on Business Analysis HJB Getting in Control Your Presenter More than 30 years experience in project/program/portfolio
Business Analyst to Business Architect
Business Analyst to Business Architect To Infinity... and Beyond! White Paper March 2010 Authors: Jack Hilty Cathy Brunsting Editor: Janice Koerber Copyright 2010 SentientPoint, Inc. All Rights Reserved
Transformation Management
Transformation Management Presentation to the HIMSS Change Management Task Force Scott Coplan, PMP, CPHIMS Courtesy of Scott Coplan ([email protected]) HIMSS Management Engineering & Process Improvement
u n I T E d K I n G d o u A
U N I T E D K I N G D O n w e d e M U n S i n p a i t e d A ESI International is a global project-focused training company, helping people around the world improve the way they manage projects, contracts,
A Business Analysis Perspective on Business Process Management
A Business Analysis Perspective on Business Process Management October 2013 Discussion Points! Why have Roles?! What is Business Analysis?! Who is the Business Analyst?! Business Analysis & Business Process
- 5 days (30 PDUs)... 15. ITIL V3 Intermediate Capability - Planning, Protection and Optimization... 14
Course List Business Analysis... 5 Advanced Business Analysis - 2 days (16 PD Hrs/CDUs)... 5 Basics of Business Analysis - 1 day... 5 Business Process Analysis - 2 days... 5 Business Analysis Certification
Business Analysis Standardization & Maturity
Business Analysis Standardization & Maturity Contact Us: 210.399.4240 [email protected] Copyright 2014 Enfocus Solutions Inc. Enfocus Requirements Suite is a trademark of Enfocus Solutions Inc.
Emotional Intelligence: The Secret to Highly Effective Stakeholder Engagements. Stephen Wagner PMI Breakfast Series
Emotional Intelligence: The Secret to Highly Effective Stakeholder Engagements Stephen Wagner PMI Breakfast Series Agenda Speaker background PMBOK changes stakeholder engagement Review of Emotional Intelligence
Certified Business Analysis. Professional (CBAP) version 3
Certified Business Analysis Professional (CBAP) version 3 Amman Jordan February 20 th 27 th, 2016 Table of Content 1 PROGRAM VALUE... 3 2 TARGET AUDIENCE... 4 3 PROGRAM OBJECTIVES... 5 4 ABOUT THE IIBA...
How To Get A Babok Certificate
The Certified Business Analysis Professional (CBAP ) Overview on the Exam and Application Process Presented 4/28/09 by Joy Toney, CBAP 1 Topics Vision and Mission of the IIBA IIBA Goals The BA Professional
IIBA Business Analysis Competency Model. Body Body of of Knowledge
IIBA Business Analysis Competency Model A Guide A Guide to the to the Business Business Version Analysis Analysis 3.0 Body Body of of Knowledge (BABOK (BABOK Guide) Guide) Version Version 2.0 2.0 Last
White Paper. Business Analysis meets Business Information Management
White Paper BABOK v2 & BiSL Business Analysis meets Business Information Management Business Analysis (BA) and Business Information Management (BIM) are two highly-interconnected fields that contribute
Project Management Professional Exam Prep Plus
In this course, you ll gain the essentials preparation needed to pass the PMP exam. Concentrating on exam content form the Guide to the Project Management Body of Knowledge-Fifth Edition (PMBOK Guide)
ROJECT ANAGEMENT PROGRAM AND COURSE GUIDE
ROJECT ANAGEMENT PROGRAM AND COURSE GUIDE PROJECT MANAGEMENT Project management has a direct impact on an organization s strategic success, so it s not surprising that the project management process has
The Masters Certificate in Business Analysis
The Masters Certificate in Business Analysis Over 1300 graduates in Canada The University of New Brunswick, in partnership with Schulich Executive Education Centre, Schulich School of Business, York University,
Project Management Certificate Program
CORPORATE EDUCATION GROUP Project Management Certificate Program Building knowledge, confidence and project management success Available in: Traditional Classroom Virtual Instructor-Led Classroom CORPORATE
ITIL Service Lifecycles and the Project Manager
1 ITIL Service Lifecycles and the Project Manager The intersection of IT Service and Project Delivery Presented to: Kansas City Mid-America PMI Chapter Mark Thomas January 17, 2011 1 Agenda 2 Introduction
Building a Business Analyst Competency & Training Program. Presented by Tom Ryder
Building a Business Analyst Competency & Training Program Presented by Tom Ryder October 30, 2012 Today s Presentation About me Background on UPS UPS at a glance History of innovation The reasons why UPS
Business Analyst Work Plan. Presented by: Billie Johnson, CBAP CSM
Business Analyst Work Plan Presented by: Billie Johnson, CBAP CSM Agenda Topic Introduction Overview of a Business Analysis Work Plan Initiating a Business Analysis Effort Components of the Business Analysis
Master s Certificate in Project Management and Advanced Course Offerings. SIGN UP TODAY! 412.963.1347 www.pmcentersusa.com.
Master s Certificate in Project and Advanced Course Offerings SIGN UP TODAY! 412.963.1347 www.pmcentersusa.com in alliance with PMI, PMP, PMBOK Guide and the PMI Registered Education Provider Logo are
PMP Examination Tasks Puzzle game
PMP Examination Tasks Puzzle game Here is a great game to play to test your knowledge of the tasks you will be tested on in the actual examination. What we have done is take each of the domain tasks in
Business Analysis Practice Manager - IT
Business Analysis Practice Manager - IT It s about you Do you understand how systems, processes and technologies can contribute to an organization s performance? Are you a people person who can see the
UNIVERSITY OF NEW BRUNSWICK. project management programs ADVANCE YOUR CAREER WITH INDUSTRY-LEADING TRAINING. www.unb.
UNIVERSITY OF NEW BRUNSWICK project management programs ADVANCE YOUR CAREER WITH INDUSTRY-LEADING TRAINING www.unb.ca/cel/project learn the skills to manage complex projects EFFICIENTLY AND EFFECTIVELY
Business Analysis. Business Analysis Certification Preparation, Training & Corporate Workshops. featuring
A Business Analysis Certification Preparation, Training & Corporate Workshops featuring Susan Levine Peter Johnson, CBAP www.linkedin.com/in/peterjohnsoncbap Business Analysis Certification Training from
BABOK by Speed-dating Workshop
BABOK by Speed-dating Workshop Facilitated by CBAP s BASSA 2012 3 September 2012 Agenda Workshop Objective BABOK Introduction The study methods used Mind map Tabulate Mnemonics/Rhymes Flash cards Pictures
PMP and CAPM Exam Preparation Workshop - A 5 Day Workshop (or five 1 Days) -
PMP and CAPM Exam Preparation Workshop - A 5 Day Workshop (or five 1 Days) - Delivered in Classroom or as an Internet Receive 35 PDU s PMI's Project Management Professional certification is one of the
Handling Requirements in Agile: BA vs. PO. April 14 th, 2011 - Agile NYC Pecha Kucha Presentation By Gene Gendel, PMP, CSM, CSP
Handling Requirements in Agile: BA vs. PO April 14 th, 2011 - Agile NYC Pecha Kucha Presentation By Gene Gendel, PMP, CSM, CSP 1 What Do We Need To Look At Today? Defining Business Analyst (BA) Defining
Vito Madaio, PMP, TSPM 2015, September, 24th
PMI-PBA Certification Vito Madaio, PMP, TSPM 2015, September, 24th Topics What is Business Analysis Business Analysis Certification PMI-PBA Prep Course Q&A Orientamento alla Business Analysis PBA-Prep
Project Management Framework
Project Management Framework Study Notes PMI, PMP, CAPM, PMBOK, PM Network and the PMI Registered Education Provider logo are registered marks of the Project Management Institute, Inc. Points to Note Please
Business Analysis in IT Projects
Business Analysis in IT Projects Successful IT Projects through better Requirements Rainer Wendt, February 2012 masventa Business GmbH Von-Blanckart-Str. 9 52477 Alsdorf Germany Tel. +49 2404 91391-0 Fax
Sept 10, 2013. The Agile Business Analyst
Sept 10, 2013 The Agile Business Analyst Maureen McVey, CBAP Head of Learning & Development, IIBA 16+ BA Experience I.T. industry for over 25 years. 20+ Experience in learning and development Founding
Project Charter Supporting Documents
2011 CVR/IT Consulting LLC All Rights Reserved 1 www.cvr-it.com [email protected] Overview Project Charter Supporting Documents CVR/IT Consulting LLC 2011 CVR/IT Consulting LLC All Rights Reserved 2 Introduction
This alignment chart was designed specifically for the use of Red River College. These alignments have not been verified or endorsed by the IIBA.
Red River College Course Learning Outcome Alignment with BABOK Version 2 This alignment chart was designed specifically for the use of Red River College. These alignments have not been verified or endorsed
Project Management and Business Analysis Maturity Assessments
Project Management and Business Analysis Maturity Assessments A White Paper from Kathleen Hass and Associates Table of Contents Introduction... 3 Section 1: Assessment Services... 4 PM/BA Practice Maturity
PMLead. Project Management Professional. edition. Based on PMBOK Guide 4 th. www.pmlead.net
PMLead Project Management Professional Based on PMBOK Guide 4 th edition www.pmlead.net SECTION II Chapter 3 Project Management Processes Chapter 3 Project Process Groups A process is a set of interrelated
Course Outline. Foundation of Business Analysis Course BA30: 4 days Instructor Led
Foundation of Business Analysis Course BA30: 4 days Instructor Led Prerequisites: No prerequisites - This course is suitable for both beginner and intermediate Business Analysts who would like to increase
Planning Requirements: Getting Started on a New Project
Planning Requirements: Getting Started on a New Project June 2015 Betsy Stockdale, PMI-PBA AGENDA TOPIC Importance of Planning Components of a Business Analysis Plan Example Plans YOU HAVE A NEW PROJECT
If You Think You Can Do Without a Business Analyst Think Again! By Maureen McVey, PMP and George Bridges, PMP
If You Think You Can Do Without a Business Analyst Think Again! By Maureen McVey, PMP and George Bridges, PMP In this article, we will introduce you to how the Business Analysis (BA) discipline can contribute
BPM 3.0 Skill Sets for the BPM Practitioner Sohail Thaker, MBA, PMP
BPM 3.0 Skill Sets for the BPM Practitioner Sohail Thaker, MBA, PMP 1 Ethier 30 years Boutique consulting firm Consult across multiple industries Business and technology Senior consultants Service lines
SIX KNOWLEDGE AREAS OF BUSINESS ANALYSIS
THE BABOK SIX KNOWLEDGE AREAS OF BUSINESS ANALYSIS PRESENTER Tomette J. Kirk, CBAP Business Consultant, Humana Health Care Reform [email protected] 2 BUSINESS ANALYSIS THE BASICS What do they have? What
PMI s PULSE OF THE PROFESSION IN-DEPTH REPORT THE HIGH COST OF LOW PERFORMANCE: THE ESSENTIAL ROLE OF COMMUNICATIONS ORGANIZATI ONAL AGILITY
PMI s PULSE OF THE PROFESSION IN-DEPTH REPORT THE HIGH COST OF LOW PERFORMANCE: THE ESSENTIAL ROLE OF COMMUNICATIONS ORGANIZATI ONAL AGILITY MAY 2013 EXECUTIVE SUMMARY In the context of organizational
Managing Multiple Vendors: Getting the Most from a Complex Team. November 16, 2012
Managing Multiple Vendors: Getting the Most from a Complex Team November 16, 2012 1 Contents About the presenters Context: working with multiple SIs is the norm Benefits and challenges of working with
Achieving Business Analysis Excellence
RG Perspective Achieving Business Analysis Excellence Turning Business Analysts into Key Contributors by Building a Center of Excellence Susan Martin March 5, 2013 11 Canal Center Plaza Alexandria, VA
5 Signs You Might Need a Service Management Framework (SMF) Assessment
5 Signs You Might Need a Service Management Framework (SMF) Assessment White Paper Terry Daffin Visionary Integration Professionals (1) To say running a large IT shop is challenging is an understatement.
Business Analysis Standardization A Strategic Mandate. John E. Parker CVO, Enfocus Solu7ons Inc.
Business Analysis Standardization A Strategic Mandate John E. Parker CVO, Enfocus Solu7ons Inc. Agenda What is Business Analysis? Why Business Analysis is Important? Why Standardization of Business Analysis
Assessing the Appropriate Level of Project, Program, and PMO Structure
PMI Virtual Library 2011 Daniel D. Magruder Assessing the Appropriate Level of Project, Program, and PMO Structure By Daniel D. Magruder, PMP Executive Summary Does your organization have in-flight projects
Useful Business Objectives and the Agile BA
Useful Business Objectives and the Agile BA Ø Cover this area with a picture related to your presentation. It can be humorous. Ø Make sure you look at the Notes Pages for more information about how to
PMI Risk Management Professional (PMI-RMP) Exam Content Outline
PMI Risk Management Professional (PMI-RMP) Exam Content Outline Project Management Institute PMI Risk Management Professional (PMI-RMP) Exam Content Outline Published by: Project Management Institute,
Business Analyst/Project Manager:
Business Analyst/Project Manager: A New Partnership for Managing Complexity and Uncertainty Vision and Mission The world's leading association for Business Analysis professionals Develop and maintain standards
How To Understand The Business Analysis Lifecycle
Business Analysis Lifecycle by Sergey Korban Aotea Studios Ltd November 2011 Contents Introduction... 3 Business Analysis Lifecycle... 4 Practical Application... 5 Start-Up Phase... 5 Initiation Phase...
Achieving Business Analysis Excellence
RG Perspective Achieving Business Analysis Excellence Turning Business Analysts into Key Contributors by Building a Center of Excellence 11 Canal Center Plaza Alexandria, VA 22314 HQ 703-548-7006 Fax 703-684-5189
Project Management Professional (PMP) Examination Content Outline
Project Management Professional (PMP) Examination Content Outline Project Management Institute Project Management Professional (PMP) Examination Content Outline June 2015 Published by: Project Management
Research Report. The Impact of Implementing a Project Management Office Report on the Results of the On-Line Survey
Business Improvement Architects 33 Riderwood Drive Toronto, Ontario, Canada M2L 2X4 Tel: (416) 444-8225 Fax: (416) 444-6743 Website: www.bia.ca E-mail: [email protected] Research Report The Impact of Implementing
Crosswalk Between Current and New PMP Task Classifications
Crosswalk Between Current and New PMP Task Classifications Domain 01 Initiating the Project Conduct project selection methods (e.g., cost benefit analysis, selection criteria) through meetings with the
Initiating Forms COPYRIGHTED MATERIAL 1.0 INITIATING PROCESS GROUP
1 Initiating Forms 1.0 INITIATING PROCESS GROUP The purpose of the initiating process group is to authorize a project, provide a high-level definition of the project, and identify stakeholders. There are
Project Management Professional (PMP) Examination Content Outline
Project Management Professional (PMP) Examination Content Outline Project Management Institute Project Management Professional (PMP ) Examination Content Outline Revised August 2011 Published by: Project
Project Management Change Management Procedure
Change Management Procedure Procedure # Description: Overview Outlines the steps for a Project Manager to manage change in an organization Objective To ensure that organizational change is managed in a
Gary A. Gack MBA, SSBB, CSQE
Sponsored by Business Analysis Certification: Why and How February, 2012 Gary A. Gack MBA, SSBB, CSQE President, Process-fusion.net (c) 2012 Process-Fusion.net 1 Agenda Why Certify Requirements Engineers
...more business training program
more profit more sales...more business training program Business Process Management Requirements Management Business Analysis Project Management Risk Management Individual & Inhouse Trainings 14 Professional
PMI Professional in Business Analysis (PMI-PBA) FAQs
PMI Professional in Business Analysis (PMI-PBA) FAQs General Information about Business Analysis What is Business Analysis? Business Analysis is the evaluation of an organization s needs followed by the
CBAP+Master. YOU WILL PASS the exam on the FIRST TRY! 150 Free Questions CBAP and CCBA Certification version 1.1. Written by CBAPs for CBAPs
Certified Business Analysis Professional Prep Questions 150 Free Questions CBAP and CCBA Certification version 1.1 YOU WILL PASS the exam on the FIRST TRY! Written by CBAPs for CBAPs Site: www.cbapmaster.com
The Standard for Portfolio Management. Paul E. Shaltry, PMP Deputy PM PPMS (2003-06) BNS02
The Standard for Portfolio Management Paul E. Shaltry, PMP Deputy PM PPMS (2003-06) BNS02 Purpose of this Presentation To provide information about The Standard for Portfolio Management Agenda Background
Introduction to Project Management. What is a Project? Project Management Institute (PMI) Chapter 1 Introduction
Introduction to Project Management Chapter 1 Introduction Information Systems Project Management: A Process and Team Approach, 1e Fuller/Valacich/George 2008 Prentice Hall 1-1 What is a Project? A planned
YIIP1100 PROJECT MANAGEMENT
YIIP1100 PROJECT MANAGEMENT PLANNING THE PROJECT - DEVELOPING PROJECT MANAGEMENT PLAN EXECUTING, CONTROLLING & MONITORING THE PROJECT JOUNI HUOTARI, JUHA HAUTANEN & JOHN MUSSER BASED ON PMBOK, SECTIONS
Questions & Answers. Project Management Institute (PMI) Registered Education Provider (R.E.P.)
This document supplements the detailed description in the course brochures and provides answers to the most frequently asked questions. New! Changes to Project Management Institute (PMI) PDU Programme
End User Computing & Business Analysis
End User Computing & Business Analysis Management of large Excel landscapes with Business-oriented Requirements Management Rainer Wendt, CBAP, PMP, June 2012 IIBA, the IIBA logo, BABOK and Business Analysis
Overview of A Guide to the Project Management Body of Knowledge (PMBOK Guide) Fourth Edition
Overview of A Guide to the Project Management Body of Knowledge (PMBOK Guide) Fourth Edition Topics for Discussion PMI Foundational Standards Harmonization of PMI s Foundational Standards Top 10 changes
The PMP Application Process
The PMP Application Process The purpose of this document is to explain the PMP application process and provide helpful links and tools for submitting your application. Reference: The reference for the
An Oracle White Paper March 2013. Project Management Office Starter Kit
An Oracle White Paper March 2013 Project Management Office Starter Kit Executive Overview... 1 Introduction... 1 Plan Phase... 2 Create Statement of Purpose and Goals... 2 Define Scope and Target Maturity...
Project Management & Business Analysis
SCHOOL OF CONTINUING EDUCATION Project Management & Business Analysis SCHOOL OF CONTINUING E D U C ATI O N SPRING 2014 C O N V E N I E N T LY L O C AT E D U P S TA I R S Face-to-Face & : Online Programs
Project Manager Skills Benchmark SPONSORED BY
Project Manager Skills Benchmark 2015 SPONSORED BY 2 Project Manager Skills Benchmark 2015 INTRODUCTION PM Solutions Research has been surveying organizations about their project management practices for
Technique 9.16 Metrics and Key Performance Indicators Gunter Wagner
Technique 9.16 Metrics and Key Performance Indicators Gunter Wagner Cover this area with a picture related to your presentation. It can be humorous. Make sure you look at the Notes Pages for more information
Minnesota Health Insurance Exchange Project (MNHIX) Deliverable Definition Document (DDD) For Project Management Plan Date: 07-31-2012
Minnesota Health Insurance Exchange Project (MNHI) Deliverable Definition Document (DDD) For Project Plan Date: 07-31-2012 11/9/2012 1:18 PM Page 1 of 8 1. High Level Deliverable Description The Project
Project Scope Management in PMBOK made easy
By Dr. TD Jainendrakumar The main objective of any project is to fulfill the scope of the project on time and within the budget. What is Project Scope? Scope refers to all the work involved in creating
Business Analyst Position Description
Analyst Position Description September 4, 2015 Analysis Position Description September 4, 2015 Page i Table of Contents General Characteristics... 1 Career Path... 2 Explanation of Proficiency Level Definitions...
Project Governance Or Is It Governance of Projects?
Project Governance Or Is It Governance of Projects? PMI SOC PDD 2013 v 2013.1 Presented by Darya Duma, PEng, PMP, PRINCE2 www.procept.com Procept Associates Ltd. 2013 Outline What is project governance?