Implementation Status & Results India Dam Rehabilitation and Improvement Project (P089985)

Size: px
Start display at page:

Download "Implementation Status & Results India Dam Rehabilitation and Improvement Project (P089985)"

Transcription

1 Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results India Dam Rehabilitation and Improvement Project (P089985) Operation Name: Dam Rehabilitation and Improvement Project (P089985) Project Stage: Implementation Seq.No: 7 Status: ARCHIVED Archive : 26-Dec-2013 Country: India Approval FY: 2010 Product Line: IBRD/IDA Region: SOUTH ASIA Lending Instrument: Specific Investment Loan Implementing Agency(ies): Central Water Commission under the Ministry of Water Resources and Five Participating States Key s Board Approval 29-Jun-2010 Original Closing 31-Dec-2016 Planned Mid Term Review 01-Sep-2014 Last Archived ISR 24-May-2013 Effectiveness 18-Apr-2012 Revised Closing Actual Mid Term Review Project Development Objectives Project Development Objective (from Project Appraisal Document) To improve the safety and operational performance of selected existing dams in the territory of the of the participating states. The PDO will be achieved through rehabilitation and improvement of dams and improvement in central and state-level institutional capacity to sustainably manage dam safety administration and operation and maintenance. Has the Project Development Objective been changed since Board Approval of the Project? Yes No Component(s) losure Authorized Public Disclosure Authorized Component Name Component Cost Rehabilitation and Improvement of Dams and Associated Appurtenances Dam Safety Institutional Strengthening Project Management Overall Ratings Previous Rating Current Rating Progress towards achievement of PDO Satisfactory Moderately Unsatisfactory Overall Implementation Progress (IP) Moderately Unsatisfactory Moderately Unsatisfactory Overall Risk Rating Implementation Status Overview Physical progress with the rehabilitation and improvement of dams remains very slow. The previous review mission in April 2013 had set as target that each state should have at least five dams under implementation by the end of December 2013 to show concrete evidence that the implementation is moving in the right direction. Several states have made good progress, but that is not yet reflected in contracts under implementation and overall implementation progress is still lagging significantly. As agreed with DEA, the target has been revised with an estimate to have 22 and 34 contracts awarded at the end of December 2013 and end of March 2014, respectively. Page 1 of 5

2 Locations Country First Administrative Division Location Planned Actual India State of Tamil Nadu State of Tamil Nadu India State of Orissa State of Orissa India State of Madhya Pradesh State of Madhya Pradesh India Kerala State of Kerala India Not Entered State of Chhattisgarh Results Project Development Objective Indicators Indicator Name Core Unit of Measure Baseline Current End Target Number of project dams with the ability Number Value (structural or non-structural) to safely cater for the design floods. indicates that already 60 dams are able to discharge adequate floods. Thesedams have other safety issues. No further investigations have taken place for the DRIP dams, which will be done as the dams enter the program. Number of project dams with acceptable Number Value stability and seepage. 31-Mar-2013 indicates that already 100 dams have no stability and seepage issues. Thesedams have other safety issues. No further investigations have taken place for the DRIP dams, which will be done as the dams enterthe program. Page 2 of 5

3 Number of project dams with basic dam safety Number Value facilities in place. indicates that already 100 dams have basic dam safety facilities in place. Number of project dams with need-based O&M Number Value plans operationalized. indicates that already 50 dams have need-based O&M plans operationalized. Required budget per state for adequate O&M. Percentage Value indicates that already 50 dams have budget for adequate O&M. Number of project dams where emergency Number Value response plans have been prepared and disseminated to the population. None so far. Intermediate Results Indicators Indicator Name Core Unit of Measure Baseline Current End Target Project dams with revised dam flood hydrology Number Value assessed and actions agreed to address 31-Dec-2015 changes in design parameters. A total of 85 hydrology reviews were approved so far (49 in April 2013). Project dams for which asset management Number Value plans have been prepared. None so far. Will start when the management and engineering consultants have mobilized. Page 3 of 5

4 Project dams with updated and approved dam operational manuals. DSO offices strengthened to carry out mandated functions adequately. Project dams with adequately trained staff that can implement the approved operation manuals. Number Value None so far. Number Value Various training activities have started, but full strengthening not yet completed. Number Value Based on information Those operators of dams that provided by CWC there are already have acceptable already 50 smaller project operation manuals. dams with acceptable operation manualsd that are being used by WRD staff at the dams. Data on Financial Performance (as of 02-Dec-2013) Financial Agreement(s) Key s Project Ln/Cr/Tf Status Approval Signing Effectiveness Original Closing Revised Closing P IBRD Effective 29-Jun Dec Apr Dec-2016 P IDA Effective 29-Jun Dec Apr Dec-2016 Disbursements (in Millions) Project Ln/Cr/Tf Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P IBRD Effective USD P IDA Effective USD Disbursement Graph Page 4 of 5

5 Key Decisions Regarding Implementation None. Restructuring History Level two Approved on 20-Dec-2011 Related Projects There are no related projects. Page 5 of 5

Implementation Status & Results Brazil BR Municipal APL: Teresina Enhancing Municipal Governance and Quality of Life Project (P088966)

Implementation Status & Results Brazil BR Municipal APL: Teresina Enhancing Municipal Governance and Quality of Life Project (P088966) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil BR Municipal APL: Teresina Enhancing Municipal Governance and Quality of Life Project (P088966)

More information

Implementation Status & Results Brazil Rio Grande do Norte Integrated Water Resources Management (P089929)

Implementation Status & Results Brazil Rio Grande do Norte Integrated Water Resources Management (P089929) Public Disclosure Authorized Public Disclosure Authorized The World Bank Implementation Status & Results Brazil Rio Grande do Norte Integrated Water Resources Management (P089929) Operation Name: Rio Grande

More information

The World Bank. Public Disclosure Copy. Public Disclosure Copy

The World Bank. Public Disclosure Copy. Public Disclosure Copy Implementation Status & Results Turkey Electricity Distribution Rehabilitation Project (P096801) Operation Name: Electricity Distribution Rehabilitation Project (P096801) Project Stage: Implementation

More information

The World Bank. Key Dates. Project Development Objectives. Component(s) Overall Ratings. Public Disclosure Copy

The World Bank. Key Dates. Project Development Objectives. Component(s) Overall Ratings. Public Disclosure Copy Implementation Status & Results Turkey Electricity Distribution Rehabilitation Project (P096801) Operation Name: Electricity Distribution Rehabilitation Project (P096801) Project Stage: Implementation

More information

Coral Reef Rehabilitation and Management Program- Coral Triangle Initiative (COREMAP-CTI) (P127813)

Coral Reef Rehabilitation and Management Program- Coral Triangle Initiative (COREMAP-CTI) (P127813) Public Disclosure Copy EAST ASIA AND PACIFIC Indonesia Environment Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 2 ARCHIVED on 03-Feb-2015 ISR17440 Implementing Agencies: Ministry

More information

The World Bank DRC - Agriculture Rehabilitation and Recovery Support (P092724)

The World Bank DRC - Agriculture Rehabilitation and Recovery Support (P092724) AFRICA Congo, Democratic Republic of Agriculture and Rural Development Global Practice IBRD/IDA Specific Investment Loan FY 2010 Seq No: 9 ARCHIVED on 23-Jun-2015 ISR19885 Implementing Agencies: UNOPS

More information

Implementation Status & Results Report Strengthening of Planning, Investment, Fiduciary and Procurement cap. (P148830)

Implementation Status & Results Report Strengthening of Planning, Investment, Fiduciary and Procurement cap. (P148830) LATIN AMERICA AND CARIBBEAN Bolivia Governance Global Practice Institutional Development Fund FY 2014 Seq No: 2 ARCHIVED on 28-Sep-2015 ISR20669 Implementing Agencies: Ministry of Development Planning

More information

Public Disclosure Copy

Public Disclosure Copy EUROPE AND CENTRAL ASIA Turkey Energy & Extractives Global Practice Recipient Executed Activities Investment Project Financing FY 2015 Seq No: 1 ARCHIVED on 25-Jan-2016 ISR22040 Implementing Agencies:

More information

The World Bank Ethiopia General Education Quality Improvement Project II (P129828)

The World Bank Ethiopia General Education Quality Improvement Project II (P129828) AFRICA Ethiopia Education Global Practice IBRD/IDA Investment Project Financing FY 2014 Seq No: 5 ARCHIVED on 14-Mar-2016 ISR22564 Implementing Agencies: Ministry of Education Key Dates Key Project Dates

More information

Public Disclosure Copy

Public Disclosure Copy SOUTH ASIA Afghanistan Agriculture Global Practice Recipient Executed Activities Specific Investment Loan FY 2014 Seq No: 6 ARCHIVED on 21-Dec-2015 ISR21980 Implementing Agencies: Key Dates Key Project

More information

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS* COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) 2 Fixed Rates Variable Rates FIXED RATES OF THE PAST 25 YEARS AVERAGE RESIDENTIAL MORTGAGE LENDING RATE - 5 YEAR* (Per cent) Year Jan Feb Mar Apr May Jun

More information

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS* COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) 2 Fixed Rates Variable Rates FIXED RATES OF THE PAST 25 YEARS AVERAGE RESIDENTIAL MORTGAGE LENDING RATE - 5 YEAR* (Per cent) Year Jan Feb Mar Apr May Jun

More information

Financial Management Manual. Dam Rehabilitation & Improvement Project

Financial Management Manual. Dam Rehabilitation & Improvement Project [For official use only] Central Water Commission Ministry of Water Resources Government of India Financial Management Manual Dam Rehabilitation & Improvement Project Funded by World Bank [Credit No. 47870-IN]

More information

AT&T Global Network Client for Windows Product Support Matrix January 29, 2015

AT&T Global Network Client for Windows Product Support Matrix January 29, 2015 AT&T Global Network Client for Windows Product Support Matrix January 29, 2015 Product Support Matrix Following is the Product Support Matrix for the AT&T Global Network Client. See the AT&T Global Network

More information

India: Equity Investment in and Loan to Infrastructure Development Finance Company

India: Equity Investment in and Loan to Infrastructure Development Finance Company Validation Report Reference Number: VR-22 Project Numbers: 31901 and 38926 Investment Numbers: 7138 and 7211 December 2013 India: Equity Investment in and Loan to Infrastructure Development Finance Company

More information

Analysis One Code Desc. Transaction Amount. Fiscal Period

Analysis One Code Desc. Transaction Amount. Fiscal Period Analysis One Code Desc Transaction Amount Fiscal Period 57.63 Oct-12 12.13 Oct-12-38.90 Oct-12-773.00 Oct-12-800.00 Oct-12-187.00 Oct-12-82.00 Oct-12-82.00 Oct-12-110.00 Oct-12-1115.25 Oct-12-71.00 Oct-12-41.00

More information

Technical Approach and Methodology

Technical Approach and Methodology 1 Dam Rehabilitation & Improvement Project (DRIP), India Technical Approach and Methodology relative to Section of Design Flood Review of TOR Making an integral part of Egis Eau Tender Technical Proposal

More information

The Current Portfolio and Implementation Lessons

The Current Portfolio and Implementation Lessons ONGOING PROGRAM AND KEY LESSONS The Bank has had an active program in Albania for nearly two decades and a number of lessons have been learned over that period. The lessons have been divided into three

More information

Live Report : Your Future Business Credit, Inc. Today: Friday, October 28, 2011. Company Summary. Currency: Shown in USD unless otherwise indicated

Live Report : Your Future Business Credit, Inc. Today: Friday, October 28, 2011. Company Summary. Currency: Shown in USD unless otherwise indicated ATTN: Report Printed:October 28, 2011 Live Report : Your Future Business Credit, Inc. D-U-N-S Number: 00-000-0000 Endorsement/Billing Reference: D&B Address Address Phone Location Type Single Location

More information

Easter Seals Central Texas Programs Outcome Profiles Monthly and Year to Date FY 2011 85% 87% 80% 80% 84% 84% 83%

Easter Seals Central Texas Programs Outcome Profiles Monthly and Year to Date FY 2011 85% 87% 80% 80% 84% 84% 83% I. Outcomes Indicators for individuals receiving services: (Service Delivery Effectiveness) 85% 87% 80% 80% 84% 84% 83% A. Access Sep 10 Oct 10 Nov 10 YTD Dec 10 Jan 11 Feb 11 YTD Mar 11 Apr 11 May 11

More information

RESTRUCTURING PAPER ON A PROPOSED RESTRUCTURING OF HEALTH SECTOR SUPPORT PROJECT JUNE 2, 2005 TO THE GOVERNMENT OF GUINEA APRIL 25, 2013

RESTRUCTURING PAPER ON A PROPOSED RESTRUCTURING OF HEALTH SECTOR SUPPORT PROJECT JUNE 2, 2005 TO THE GOVERNMENT OF GUINEA APRIL 25, 2013 Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized AFTHW AFR Document of The World Bank RESTRUCTURING PAPER ON A PROPOSED RESTRUCTURING

More information

Environmental Assessment

Environmental Assessment BP 4.01 January 1999 These procedures were prepared for use by World Bank staff and are not necessarily a complete treatment of the subject. Environmental Assessment (Archived August 2004) Note: OP and

More information

CAFIS REPORT 2015.10

CAFIS REPORT 2015.10 CAFIS REPORT 2015.10 INDEX Message CAFIS Inbound 03-06 07-08 CAFIS Arch 09-10 CAFIS Brain 11-12 CAFIS Global 13-14 What We Do 15-16 About CAFIS 17-18 Services for Member Stores 19-34 Services for Card

More information

BASEL DISCLOSURES DOCUMENT AS ON 31 st December 2014 TABLE DF-3 CAPITAL ADEQUACY

BASEL DISCLOSURES DOCUMENT AS ON 31 st December 2014 TABLE DF-3 CAPITAL ADEQUACY BASEL DISCLOSURES DOCUMENT AS ON 31 st December 2014 Qualitative Disclosures (a) A summary discussion of the Bank s approach to assessing the adequacy of its capital to support current and future activities.

More information

ASEM TRUST FUND: IMPLEMENTATION COMPLETION MEMORANDUM (ICM) Thailand: The Thailand Institute of Directors (IOD) ASEM Trust Fund No TFO24686

ASEM TRUST FUND: IMPLEMENTATION COMPLETION MEMORANDUM (ICM) Thailand: The Thailand Institute of Directors (IOD) ASEM Trust Fund No TFO24686 ASEM TRUST FUND: IMPLEMENTATION COMPLETION MEMORANDUM (ICM) Thailand: The Thailand Institute of Directors (IOD) ASEM Trust Fund No TFO24686 Summary Under the Government reform program supported by the

More information

Case 2:08-cv-02463-ABC-E Document 1-4 Filed 04/15/2008 Page 1 of 138. Exhibit 8

Case 2:08-cv-02463-ABC-E Document 1-4 Filed 04/15/2008 Page 1 of 138. Exhibit 8 Case 2:08-cv-02463-ABC-E Document 1-4 Filed 04/15/2008 Page 1 of 138 Exhibit 8 Case 2:08-cv-02463-ABC-E Document 1-4 Filed 04/15/2008 Page 2 of 138 Domain Name: CELLULARVERISON.COM Updated Date: 12-dec-2007

More information

GOVERNMENT OF INDIA PRESS INFORMATION BUREAU *****

GOVERNMENT OF INDIA PRESS INFORMATION BUREAU ***** GOVERNMENT OF INDIA PRESS INFORMATION BUREAU ***** POVERTY ESTIMATES FOR 2004-05 New Delhi, March, 2007 The Planning Commission as the Nodal agency in the Government of India for estimation of poverty

More information

Internal Migration and Regional Disparities in India

Internal Migration and Regional Disparities in India Internal Migration and Regional Disparities in India Introduction Internal migration is now recognized as an important factor in influencing social and economic development, especially in developing countries.

More information

Ashley Institute of Training Schedule of VET Tuition Fees 2015

Ashley Institute of Training Schedule of VET Tuition Fees 2015 Ashley Institute of Training Schedule of VET Fees Year of Study Group ID:DECE15G1 Total Course Fees $ 12,000 29-Aug- 17-Oct- 50 14-Sep- 0.167 blended various $2,000 CHC02 Best practice 24-Oct- 12-Dec-

More information

BAAC Savings Mobilization. by the Office of International Cooperation Management Department Bank for Agriculture and Agricultural Cooperatives

BAAC Savings Mobilization. by the Office of International Cooperation Management Department Bank for Agriculture and Agricultural Cooperatives BAAC Savings Mobilization by the Office of International Cooperation Management Department Bank for Agriculture and Agricultural Cooperatives January 2010 1 USD = 34 Baht, currency rate as of Oct.1, 2009

More information

ESTIMATES OF MORTALITY INDICATORS

ESTIMATES OF MORTALITY INDICATORS CHAPTER 4 ESTIMATES OF MORTALITY INDICATORS Mortality is one of the basic components of population change and related data is essential for demographic studies and public health administration. It is the

More information

qualifications a second discipline or for ex-servicemen upper age succeeding pages. CODE Age

qualifications a second discipline or for ex-servicemen upper age succeeding pages. CODE Age REEMPLOYMENT AMENDMENTS TO RECRUITMENT RULES TO HELP EXSERVICEMEN TO FIND A SECOND CAREERR 1. The States were to amend their recruitment rules in respect of age and educational qualifications for exservicemen

More information

Enhanced Vessel Traffic Management System Booking Slots Available and Vessels Booked per Day From 12-JAN-2016 To 30-JUN-2017

Enhanced Vessel Traffic Management System Booking Slots Available and Vessels Booked per Day From 12-JAN-2016 To 30-JUN-2017 From -JAN- To -JUN- -JAN- VIRP Page Period Period Period -JAN- 8 -JAN- 8 9 -JAN- 8 8 -JAN- -JAN- -JAN- 8-JAN- 9-JAN- -JAN- -JAN- -JAN- -JAN- -JAN- -JAN- -JAN- -JAN- 8-JAN- 9-JAN- -JAN- -JAN- -FEB- : days

More information

Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-39270) ON A CREDIT

Document of The World Bank IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-39270) ON A CREDIT Public Disclosure Authorized Document of The World Bank Report No: ICR00001193 Public Disclosure Authorized Public Disclosure Authorized IMPLEMENTATION COMPLETION AND RESULTS REPORT (IDA-39270) ON A CREDIT

More information

Grid Connected Solar Power in India. Tarun Kapoor Joint Secretary Ministry of New and Renewable Energy Government of India

Grid Connected Solar Power in India. Tarun Kapoor Joint Secretary Ministry of New and Renewable Energy Government of India Grid Connected Solar Power in India Tarun Kapoor Joint Secretary Ministry of New and Renewable Energy Government of India Indian Power Sector (31 March 2012) Thermal Hydro Nuclear Renewable 1,31,353 MW

More information

Monetary Policy and Mortgage Interest rates

Monetary Policy and Mortgage Interest rates Monetary Policy and Mortgage Interest rates July 2014 Key Points: Monetary policy, which operates through changes in the official cash rate (OCR), is the main lever of macroeconomic management in Australia

More information

STATUS OF PROJECTS IN EXECUTION FY09 SOPE EAST ASIA AND PACIFIC REGION COUNTRY: INDONESIA

STATUS OF PROJECTS IN EXECUTION FY09 SOPE EAST ASIA AND PACIFIC REGION COUNTRY: INDONESIA STATUS OF PROJECTS IN EXECUTION FY09 SOPE COUNTRY: INDONESIA Operations Policy and Country Services OCTOBER 02, 2009 Introduction The Status of Projects in Execution (SOPE) Report for FY09 provides information

More information

Quarterly Credit Conditions Survey Report

Quarterly Credit Conditions Survey Report Quarterly Credit Conditions Survey Report Contents March 2014 Quarter Prepared by the Monetary Analysis & Programming Department Research & Economic Programming Division List of Tables and Charts 2 Background

More information

PRICE DISSEMINATION PROJECT

PRICE DISSEMINATION PROJECT PRICE DISSEMINATION PROJECT A X I th F i v e Y e a r P l a n P r o j e c t An initiative by: FMC AGMARKNET NIC MCX NCDEX NMCE ICEX ACE Introduction: The dissemination of spot and futures prices of agricultural

More information

SOCIAL BACKGROUND OF OFFICERS IN THE INDIAN ADMINISTRATIVE SERVICE SANTOSH GOYAL

SOCIAL BACKGROUND OF OFFICERS IN THE INDIAN ADMINISTRATIVE SERVICE SANTOSH GOYAL SOCIAL BACKGROUND OF OFFICERS IN THE INDIAN ADMINISTRATIVE SERVICE SANTOSH GOYAL The Indian Administrative Service (IAS) is the highest cadre of the civil services in India and is the successor to the

More information

Sub: States Fiscal Consolidation (2010-2015)

Sub: States Fiscal Consolidation (2010-2015) O M No. F.1 (1)/2010-FRU Government of India Ministry of Finance Department of Expenditure *** North Block, New Delhi 110 001 Dated: 14 th January 2011 Sub: States Fiscal Consolidation (2010-2015) States

More information

Ghana's Economic Performance 2010

Ghana's Economic Performance 2010 GHANA STATISTICAL SERVICE (GSS) Statistics for Development and Progress Ghana's Economic Performance 21 i n f i g u r e s P.O. Box GP 198, Accra www. statsghana.gov.gh 211 Ghana's Economic Performance

More information

14-Dec-15. Number Amount Number Amount Number Amount Number Amount Number Amount

14-Dec-15. Number Amount Number Amount Number Amount Number Amount Number Amount 14-Dec-15 and Number of Qualifying Children, 2013 Returns with no Returns with one Returns with two Returns with three or Size of AGI qualifying children qualifying child qualifying children more qualifying

More information

Annual Borrowing Plan

Annual Borrowing Plan 20154 Bosnia and Herzegovina Federation of Bosnia and Herzegovina Federal Ministry of Finance Annual Borrowing Plan 2016 January 2016 www.fmf.gov.ba INTRODUCTION In order to increase transparency, fiscal

More information

ENGAGING A FIRM TO STAFF AND MANAGE A PROJECT PREPARATION CELL AT THE MINISTRY OF ENVIRONMENT & FORESTS. Terms of Reference

ENGAGING A FIRM TO STAFF AND MANAGE A PROJECT PREPARATION CELL AT THE MINISTRY OF ENVIRONMENT & FORESTS. Terms of Reference CAPACITY-BUILDING FOR INDUSTRIAL POLLUTION MANAGEMENT PROJECT ENGAGING A FIRM TO STAFF AND MANAGE A PROJECT PREPARATION CELL AT THE MINISTRY OF ENVIRONMENT & FORESTS Terms of Reference Background: The

More information

State Data Centre. Round Table Conference 30 th July 2009

State Data Centre. Round Table Conference 30 th July 2009 State Data Centre Round Table Conference 30 th July 2009 State Data Centre Key-supporting element of e-government initiatives & businesses for delivering services to the citizens with greater reliability,availability

More information

Press Note on Poverty Estimates, 2009-10

Press Note on Poverty Estimates, 2009-10 Press Note on Poverty Estimates, 2009-10 Government of India Planning Commission March 2012 GOVERNMENT OF INDIA PRESS INFORMATION BUREAU ***** POVERTY ESTIMATES FOR 2009-10 New Delhi, 19 th March, 2012

More information

US Army Corps of Engineers. Vision Statement. Be the premier stewards of entrusted hydropower resources

US Army Corps of Engineers. Vision Statement. Be the premier stewards of entrusted hydropower resources Vision Statement Be the premier stewards of entrusted hydropower resources Mission Statement Provide reliable hydroelectric power services at the lowest possible cost, consistent with sound business principles,

More information

Trends in Private and Public Investments in Agricultural Marketing Infrastructure in India

Trends in Private and Public Investments in Agricultural Marketing Infrastructure in India Agricultural Economics Research Review Vol. 21 (Conference Number) 2008 pp 371-376 Trends in Private and Public Investments in Agricultural Marketing Infrastructure in India M.S. Jairath* National Institute

More information

UFJ Holdings, Inc. The 5 th Japanese Financial Service Conference. October 8, 2003

UFJ Holdings, Inc. The 5 th Japanese Financial Service Conference. October 8, 2003 UFJ Holdings, Inc. The 5 th Japanese Financial Service Conference October 8, 2003 - Table of Contents - Management Reform Initiatives ---------------- 2 - Progress on Group Integration ----------------

More information

Africa Regional Office Sector Non-compulsory pensions; insurance and contractual savings (40%); Agro-industry (30%); Other industry (30%) Theme

Africa Regional Office Sector Non-compulsory pensions; insurance and contractual savings (40%); Agro-industry (30%); Other industry (30%) Theme Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Initial Project Information Document () Report No: AB609 Project Name SENEGAL - Private

More information

Chapter 3 LITERACY AND EDUCATION

Chapter 3 LITERACY AND EDUCATION Chapter 3 LITERACY AND EDUCATION Coverage Literacy Rates in Post-Independence India Literacy Rates of SC/ST by Sex and Urban-Rural Distribution State-wise Literacy Rates in last 3 decades State-wise Gap

More information

TERMS OF REFERENCE FOR THE HUMAN RESOURCES AND COMPENSATION COMMITTEE

TERMS OF REFERENCE FOR THE HUMAN RESOURCES AND COMPENSATION COMMITTEE I. PURPOSE The purpose of the Human Resources and Compensation Committee (the Committee ) is to assist the Board in fulfilling its obligations relating to human resource and compensation policy and related

More information

Planned Procurement Opportunities Report. June 2015

Planned Procurement Opportunities Report. June 2015 HILLSBOROUGH COUNTY AVIATION AUTHORITY Planned Procurement Opportunities Report June 2015 Prepared by the Procurement Department Overview The Planned Procurement Opportunities Report is updated and posted

More information

Engaging Business Units About their Public Websites through an Annual Web Review

Engaging Business Units About their Public Websites through an Annual Web Review Engaging Business Units About their Public Websites through an Annual Web Review Web4Dev Conference Vamsee Kanchi Europe and Central Asia Division The World Bank Summary Key Idea: While central business

More information

Planned Procurement Opportunities Report. April 2015

Planned Procurement Opportunities Report. April 2015 HILLSBOROUGH COUNTY AVIATION AUTHORITY Planned Procurement Opportunities Report April 2015 Prepared by the Procurement Department Planned Procurement Opportunities Report - April 2015 Overview The Planned

More information

Challenging quarter for Mobile Devices. Daily order rates improving. Free Cash Flow > Net Income. FCT acquisition. Page 3

Challenging quarter for Mobile Devices. Daily order rates improving. Free Cash Flow > Net Income. FCT acquisition. Page 3 August 7, 2013 Page 1 Statements in this release that are not historical are forward-looking and are subject to various risks and uncertainties that could cause actual results to vary materially from those

More information

Discussion Outline. A. KPIs Defined. B. Why KPIs Matter. C. KPI Menu. D. Implementation. E. Example KPIs. F. Pitfalls

Discussion Outline. A. KPIs Defined. B. Why KPIs Matter. C. KPI Menu. D. Implementation. E. Example KPIs. F. Pitfalls Discussion Outline A. KPIs Defined B. Why KPIs Matter C. KPI Menu D. Implementation E. Example KPIs F. Pitfalls 1 Key Performance Indicators (KPI s) Defined Periodic assessment of an organization, business

More information

Crop Reports Chilly & Turmeric & Sustainability Issues

Crop Reports Chilly & Turmeric & Sustainability Issues WORLD SPICE CONGRESS Cochin 16-19 th February 2014 Crop Reports Chilly & Turmeric & Sustainability Issues GIRIDHAR RAO Director Global Spice Network GRIFFITH LABORATORIES Chilli Crop Reports Crop Overview

More information

Involuntary Resettlement Portfolio Review

Involuntary Resettlement Portfolio Review Involuntary Resettlement Portfolio Review Phase II: Resettlement Implementation Social Development Department World Bank June 16, 2014 Acronyms AFR Africa Region AM Aide-Mémoire ARD Agriculture and Rural

More information

Press Note on Poverty Estimates, 2011-12

Press Note on Poverty Estimates, 2011-12 Press Note on Poverty Estimates, 2011-12 Government of India Planning Commission July 2013 GOVERNMENT OF INDIA PRESS INFORMATION BUREAU ***** POVERTY ESTIMATES FOR 2011-12 New Delhi: 22 July, 2013 The

More information

Farmers Cultural Practices. Availability of Planting Material

Farmers Cultural Practices. Availability of Planting Material Identification of Appropriate Postharvest Technologies for Improving Market Access and Incomes for Small Farmers in Sub Saharan Africa and South Asia Commodity Systems Assessment Sunil Saran Amity International

More information

Providing Trading Opportunities in a Sound Marketplace

Providing Trading Opportunities in a Sound Marketplace Providing Trading Opportunities in a Sound Marketplace Dec/2013 Classification of the Information Public USD Billion Million Active Market with Liquid Products Equities Market Market Cap of USD 1 trillion

More information

Standard of measurement by which efficiency, performance, progress, or quality of a plan, process, or product can be assessed 1.

Standard of measurement by which efficiency, performance, progress, or quality of a plan, process, or product can be assessed 1. Meaningful Metrics What is a Metric? Standard of measurement by which efficiency, performance, progress, or quality of a plan, process, or product can be assessed 1. A quality metric is a measurement of

More information

Web Edition: PROVISIONAL POPULATION TOTALS. Chapter 5. Census of India 2001 Series 1, India, Paper 1 of 2001. Chapter 5

Web Edition: PROVISIONAL POPULATION TOTALS. Chapter 5. Census of India 2001 Series 1, India, Paper 1 of 2001. Chapter 5 Web Edition: PROVISIONAL POPULATION TOTALS Chapter 5 Census of India 2001 Series 1, India, Paper 1 of 2001 Chapter 5 Density of Population 1 D e n s i t y o f P o p u l a t i o n One of the important indices

More information

FINANCIAL RESULTS Q1 2016

FINANCIAL RESULTS Q1 2016 FINANCIAL RESULTS Q1 2016 CFO Hallvard Granheim 28 th April 2016 Highlights Q1 Increase in underlying results (EBITDA) - Nordic prices are down 15% Q-on-Q - High production from Nordic hydropower assets

More information

The Kingdom of Thailand: Capacity Building for the Neighbouring Countries Economic Development Cooperation Agency

The Kingdom of Thailand: Capacity Building for the Neighbouring Countries Economic Development Cooperation Agency Technical Assistance Report Project Number: 40137 December 2006 The Kingdom of Thailand: Capacity Building for the Neighbouring Countries Economic Development Cooperation Agency The views expressed herein

More information

Republic of the Union of Myanmar: Support for Strengthening Public Debt Management

Republic of the Union of Myanmar: Support for Strengthening Public Debt Management Technical Assistance Report Project Number: 47225 Capacity Development Technical Assistance (CDTA) December 2013 Republic of the Union of Myanmar: Support for Strengthening Public Debt Management The views

More information

DENSITY OF POPULATION. Figures Map Table/Statements Notes

DENSITY OF POPULATION. Figures Map Table/Statements Notes 7 DENSITY OF POPULATION Figures Map Table/Statements Notes 7 Density of population Experience shows that a very populous city can rarely, if ever, be well governed. To the size of states there is a limit,

More information

Major Terms and Conditions of the IBRD Fixed Spread Loan (FSL) i

Major Terms and Conditions of the IBRD Fixed Spread Loan (FSL) i Major Terms and Conditions of the IBRD Fixed Spread Loan (FSL) i The interest rate on FSLs consists of (a) a variable base rate of six-month LIBOR 1 in respect of each interest period for each loan; and

More information

Republic of Tajikistan: Dushanbe-Kyrgyz Border Rehabilitation Project (Phase I)

Republic of Tajikistan: Dushanbe-Kyrgyz Border Rehabilitation Project (Phase I) Validation Report Reference Number: PCV: TAJ 2011-40 Project Number: 34569 Loan Number: 2062-TAJ December 2011 Republic of Tajikistan: Dushanbe-Kyrgyz Border Rehabilitation Project (Phase I) Independent

More information

Launching an Enterprise-Wide Solution My Government of Canada Human Resources (My GCHR)

Launching an Enterprise-Wide Solution My Government of Canada Human Resources (My GCHR) Tammy Labelle Public Works and Government Services Government of Canada Launching an Enterprise-Wide Solution My Government of Canada Human Resources (My GCHR) Copyright Notice The contents of this presentation

More information

Green Bonds. Our Experience with THE WORLD BANK. Presentation by: George Richardson, Head of Capital Markets

Green Bonds. Our Experience with THE WORLD BANK. Presentation by: George Richardson, Head of Capital Markets THE WORLD BANK Our Experience with Green Bonds Presentation by: George Richardson, Head of Capital Markets The Euromoney Sustainable and Responsible Capital Markets Forum New York - March 12, 2014 THE

More information

Government of India Ministry of Power ULTRA MEGA POWER PROJECTS

Government of India Ministry of Power ULTRA MEGA POWER PROJECTS Government of India Ministry of Power ULTRA MEGA POWER PROJECTS 1. Background Central Government in 2005-06 has taken the initiative for facilitating the development of a few Ultra Mega Power Projects

More information

a) Whether there is a need to revisit the existing approach for debt: equity ratio or to continue with the existing composition?

a) Whether there is a need to revisit the existing approach for debt: equity ratio or to continue with the existing composition? Summary of the comments and suggestions received on Approach Paper on Terms and Conditions of Tariff Regulations for the tariff period 1.4.2014 to 31.3.2019 ( Ref No. 20/2013/CERC/Fin(Vol-I)/Tariff Reg/CERC

More information

Financial Results Q3 & 9M FY 2015-16. February 11, 2016

Financial Results Q3 & 9M FY 2015-16. February 11, 2016 Financial Results Q3 & 9M FY 2015-16 February 11, 2016 Digital Initiatives DigiPurse is a mobile wallet that enables the users to preload a certain amount in the wallet and spend the amount for various

More information

PROJECTS SCHEDULING AND COST CONTROLS

PROJECTS SCHEDULING AND COST CONTROLS Professional Development Day September 27th, 2014 PROJECTS SCHEDULING AND COST CONTROLS Why do we need to Control Time and Cost? Plans are nothing; Planning is everything. Dwight D. Eisenhower Back to

More information

This document is developed by Swasti, Health Resource Centre as a product of the People for Health Project.

This document is developed by Swasti, Health Resource Centre as a product of the People for Health Project. Developed by Acknowlegement This document is developed by Swasti, Health Resource Centre as a product of the People for Health Project. This study has given us a better understanding of the human resource

More information

TELECOM REGULATORY AUTHORITY OF INDIA New Delhi, 12 th March, 2014 (www.trai.gov.in)

TELECOM REGULATORY AUTHORITY OF INDIA New Delhi, 12 th March, 2014 (www.trai.gov.in) For immediate release (Press Release No. 13/2014) Information Note to the Press TELECOM REGULATORY AUTHORITY OF INDIA New Delhi, 12 th March, 2014 (www.trai.gov.in) Highlights on Telecom Subscription Data

More information

XYZ Medica Inc. Change Management

XYZ Medica Inc. Change Management XYZ Medica Inc. Change Management December 2006 Suggested additions to this basic report template Classify Changes as per the recommendations of ITIL then report against the separate classifications. This

More information

Army National Guard: Common Installation Picture. Chris Argentieri Brooks Smith

Army National Guard: Common Installation Picture. Chris Argentieri Brooks Smith 1 Army National Guard: Common Installation Picture Chris Argentieri Brooks Smith 2 Agenda Introduction Goals/Purpose of Common Installation Picture program History of CIP processes Integration with the

More information

Fearnley Securities. 28 th Annual Marine Money Week. New Issuance through the Norwegian Bond Market. June 2015

Fearnley Securities. 28 th Annual Marine Money Week. New Issuance through the Norwegian Bond Market. June 2015 Fearnley Securities New Issuance through the Norwegian Bond Market 28 th Annual Marine Money Week June 215 IMPORTANT / DISCLAIMER: This presentation is prepared by Fearnley Securities, an Astrup Fearnley

More information

Department of Transitional Assistance Report on Paperless Documentation

Department of Transitional Assistance Report on Paperless Documentation Department of Transitional Assistance Report on Paperless Documentation January 4, 2016 REPORT ON PAPERLESS DOCUMENTATION DECEMBER 2015 Description of the Report Chapter 158 of the Acts of 2014 Section

More information

FY15 Interim Results Presentation. Darrin Grafton / Tim Bluett

FY15 Interim Results Presentation. Darrin Grafton / Tim Bluett FY15 Interim Results Presentation Darrin Grafton / Tim Bluett 1 Important notice This presentation is not an offer of securities. It is a summary and does not purport to be complete, accurate or independently

More information

Ocean Class AGOR Program Acquisition Status. Prepared by PEO Ships, PMS325Q For UNOLS Annual meeting 13 October 2009

Ocean Class AGOR Program Acquisition Status. Prepared by PEO Ships, PMS325Q For UNOLS Annual meeting 13 October 2009 Program Acquisition Status Prepared by PEO Ships, PMS325Q For UNOLS Annual meeting 13 October 2009 Agenda History/Status of Acquisition Efforts History of Specification Development Acquisition Schedule

More information

HMBS Update. An Evolving Market

HMBS Update. An Evolving Market HMBS Update An Evolving Market HMBS Current State Metrics Portfolio $52 Billion 327,728 Loans 8.3 Million Participations 14 HMBS Issuers with a Portfolio HMBS Issuance FY 2014: $7.1 Billion FY 2015 YTD:

More information

PROPOSED GUIDELINES FOR PERFORMANCE-RELATED INCENTIVE SCHEME (PRIS) DRAFT FOR DISCUSSION ONLY

PROPOSED GUIDELINES FOR PERFORMANCE-RELATED INCENTIVE SCHEME (PRIS) DRAFT FOR DISCUSSION ONLY Preliminary Draft for Discussion: Not to be used for any other purpose PROPOSED GUIDELINES FOR PERFORMANCE-RELATED INCENTIVE SCHEME (PRIS) DRAFT FOR DISCUSSION ONLY TABLE OF CONTENTS 1 Why Performance-Related

More information

Household Financial Services

Household Financial Services Household Financial Services Products, Supervision & Consumer Protection Financial Liabilities and Assets of the Household Sector Baht per household 200,000 180,000 Household Debt Household Deposit 160,000

More information

North American Steel Industry: Recent Market Developments and Key Challenges Going Forward

North American Steel Industry: Recent Market Developments and Key Challenges Going Forward North American Steel Industry: Recent Market Developments and Key Challenges Going Forward OECD Steel Committee May 6-7, 21 Paris, France * American Iron and Steel Institute (AISI) Steel Manufacturers

More information

MAITHAN ALLOYS LTD Result Update (PARENT BASIS): Q4 FY16

MAITHAN ALLOYS LTD Result Update (PARENT BASIS): Q4 FY16 Index Details MAITHAN ALLOYS LTD Result Update (PARENT BASIS): Q4 FY16 Stock Data Sector Iron & Steel/Interm. Products BSE Code 590078 Face Value 10.00 52wk. High / Low (Rs.) 313.80/72.25 Volume (2wk.

More information

AFRICAN DEVELOPMENT BANK AFRICAN DEVELOPMENT FUND UNITED REPUBLIC OF TANZANIA COUNTRY PORTFOLIO PERFORMANCE REVIEW REPORT

AFRICAN DEVELOPMENT BANK AFRICAN DEVELOPMENT FUND UNITED REPUBLIC OF TANZANIA COUNTRY PORTFOLIO PERFORMANCE REVIEW REPORT AFRICAN DEVELOPMENT BANK AFRICAN DEVELOPMENT FUND UNITED REPUBLIC OF TANZANIA COUNTRY PORTFOLIO PERFORMANCE REVIEW REPORT COUNTRY AND REGIONAL DEPARTMENT EAST A (OREA) SEPTEMBER 2009 Table of Contents

More information

MEDIA & ENTERTAINMENT. Indirect tax issues

MEDIA & ENTERTAINMENT. Indirect tax issues MEDIA & ENTERTAINMENT SECTOR Indirect tax issues Indirect Taxes on M&E Industry 2 List of Key Indirect Taxes applicable to Media & Entertainment Industry: Service tax Value Added Tax or VAT (state specific

More information

FINANCIAL RESULTS Q2 2015

FINANCIAL RESULTS Q2 2015 FINANCIAL RESULTS Q2 2015 CEO CHRISTIAN RYNNING-TØNNESEN CFO HALLVARD GRANHEIM 23 July 2015 Highlights Solid underlying results (EBITDA) - Lower Nordic prices offset by increased production and contribution

More information

The Importance of Care Coordination: The Partnerships

The Importance of Care Coordination: The Partnerships The Importance of Care Coordination: The Partnerships Partnerships for Health for Health Experience A Chronic Disease Prevention and Management Demonstration Project Mike Hindmarsh: Project Leadership

More information

Five Ways Student Loans Impact Credit. Federal Student Loans are Unique. Federal Student Loans are Unique

Five Ways Student Loans Impact Credit. Federal Student Loans are Unique. Federal Student Loans are Unique Five Ways Student Loans Impact Credit Federal Student Loans are Unique Established credit is not needed No payment due immediately Variety of repayment options Ability to postpone payments Can combine

More information

AFRICAN DEVELOPMENT BANK

AFRICAN DEVELOPMENT BANK AFRICAN DEVELOPMENT BANK EMERGENCY POWER INFRASTRUCTURE REHABILITATION PROJECT - PHASE I SUPPLEMENTARY GRANT PROPOSAL COUNTRY : ZIMBABWE APPRAISAL REPORT ONEC DEPARTMENT December 2013 Table of Contents

More information

Basel Committee on Banking Supervision

Basel Committee on Banking Supervision Basel Committee on Banking Supervision Implementation of Basel standards A report to G20 Leaders on implementation of the Basel III regulatory reforms November 2015 This publication is available on the

More information

The Banking Sector. Figure 3.1.1: Lending and Deposit Rates and IRS

The Banking Sector. Figure 3.1.1: Lending and Deposit Rates and IRS Chapter 3 The Banking Sector 3.1 Interest Rate Spread The interest rate spread (IRS) is widely used as a parameter of bank profitability, intermediation cost, and the degree of efficiency of the banking

More information

Consolidated Earnings Report for the Second Quarter of Fiscal 2011 [Japanese GAAP]

Consolidated Earnings Report for the Second Quarter of Fiscal 2011 [Japanese GAAP] Consolidated Earnings Report for the Second Quarter of Fiscal 2011 [Japanese GAAP] October 27, 2010 Company Name: KOITO MANUFACTURING CO., LTD. Stock Listing: First Section, Tokyo Stock Exchange Code Number:

More information

STATE WISE DATA As on 29.02.2016

STATE WISE DATA As on 29.02.2016 STATE WISE DATA As on 29.02.2016 Table No. Contents 1 Sector wise targets for 11th plan 2 Yearly achievements of Growth rates-11th five year plan for major/small States and UT's. 3 Sector wise targets

More information