South to Midwest Transfer & Unused Generation Capacity

Size: px
Start display at page:

Download "South to Midwest Transfer & Unused Generation Capacity"

Transcription

1 South to Midwest Transfer & Unused Generation Capacity PAC Jan 29, 2014

2 Drivers and Objective EPA regulations, expected sustained competitive natural gas prices and high renewable energy penetration is driving retirements and a changing generation portfolio Resource adequacy surveys (LSEs and OMS) have indicated approximately 7.5 GW shortfalls in reserves against LOLE targets of 14.8% margin Analysis also indicates some existing capacity may be available: - Existing trapped capacity without Interconnection Service - Energy Resources that are not currently deliverable - MISO South area capacity Planning project is underway to identify location and quantity of existing unused capacity, and the transmission upgrades needed to release this capacity Implementing will require extensive outreach to impacted entities and regulators 2

3 Extensive Stakeholder Outreach Generator Owner TO & LSE Stakeholders State Regulators MISO 3

4 South to Midwest Transfer Project 4

5 2016 Resource Adequacy Summary Presented at SAWG and PAC December 2013 MISO Central & North Regions In GW MISO South Region In GW Resources 2016 Load (14.8% PRM) Expected Shortfall 2016 Resources 2016 Load (14.8% PRM) Expected Surplus 1 Net capacity additions over existing resources (planning resource not reported + new capacity + BTM + Imports + DSM exports retirements) 5

6 Milestones and Schedule Task Schedule/ Status Scoping Dec Jan Provide transparency on MISO Midwest shortfalls and establish Capacity needs from South Presented at December SAWG and PAC Evaluate 2016 transfer capability February March 2014 Provide transparency on transmission constraints based on transfer studies between MISO South and MISO Midwest and quantify resulting increases in simultaneous export limits Determine transmission solutions April June 2014 Coordinate with Transmission Owners on Network Upgrades and identify Near and Long Term feasible upgrade sets Provide transparency on Near term impact of transmission solutions on Resource Adequacy. Determine optimal set of Near Term upgrades through transfer studies. Final recommendations June November 2014 Perform final transmission study to determine impact of transmission solutions on Capacity Exports from MISO South Parallel efforts include ongoing projects to support Resource Adequacy as well as the base business annual LOLE study and ongoing Southern Region MEP study. 6

7 Key Deliverables MISO South to Midwest (North / Central) 2016 summer transfer limits Transmission constraints, mitigation plans, and high-level cost The Operations Reliability Coordination Agreement will be considered in the deliverables Set of Network Upgrades for recommendation to MTEP Estimation of Capacity Import and Export Limits for MISO Resource Assessment for 2016 planning year 7

8 Unused Generation Capacity Project 8

9 MISO Midwest Existing Capacity Summary 1 Based on the 2013 LTRA Interconnection Service Review data 2 GVTC Generator Verification Test Capacity, NRIS Network Resource Interconnection Service Note: These numbers will be refined in the Unused Generation Capacity project 9

10 Note: These numbers will be refined in the Unused Generation Capacity project 666 MW 1073 MW 663 MW 624 MW 292 MW 326 MW 90 MW 10

11 Milestones and Schedule Task Schedule/ Status Initiation Dec 2013 Jan 2014 Create scope document In Progress Create schedule and estimate In Progress Phase 1 -Preliminary Analysis (scoping) phase Dec 2013 Jan 2014 Calculate initial Unused Capacity Numbers Done Refine Unused Capacity Numbers In Progress Phase 2 System Impact Studies (SIS) Phase Jan 2014 May 2014 Model Building In Progress Input file creation System Impact Study Phase 3 Facilities Study and Recommendation Phase June 2014 Sept 2014 Coordinate with TO's to perform facility studies Make final recommendations on mitigation plans 11

12 Key Deliverables Unused generation capacity in the MISO Midwest region that are currently not qualified as planning capacity resources Transmission constraints, mitigation plans, and high-level cost by zones Estimate unlock MW by zones and years Set of Network Upgrades for recommendation to MTEP 14 Appendix A Estimation on new Planning Resource qualifications in MISO Resource Assessment for 2016 planning year 12

13 Project Team Executive Sponsor Patrick Brown Project Consultant Digaunto Chatterjee South to Midwest Transfer Capability Project Lead Jeanna Furnish Unused Generation Capacity Project Lead Ling Hua

Generator Interconnection and Deliverability Study Methodology Technical Paper

Generator Interconnection and Deliverability Study Methodology Technical Paper Generator Interconnection and Deliverability Study Methodology Technical Paper July 2, 2013 Generator Interconnection and Deliverability Study Methodology Table of Contents Introduction... 1 Section One:

More information

Memorandum. This memorandum requires Board action. Executive Summary

Memorandum. This memorandum requires Board action. Executive Summary California Independent System Operator Corporation Memorandum To: ISO Board of Governors From: Keith Casey, Vice President, Market & Infrastructure Development Date: July 8, 2014 Re: Decision on the Delaney-Colorado

More information

Addressing Affected System Impacts of Generator Interconnection: Processes and Principles. Stakeholder Call August 23, 2013 9:30 a.m. - 12:00 p.m.

Addressing Affected System Impacts of Generator Interconnection: Processes and Principles. Stakeholder Call August 23, 2013 9:30 a.m. - 12:00 p.m. Addressing Affected System Impacts of Generator Interconnection: Processes and Principles Stakeholder Call August 23, 2013 9:30 a.m. - 12:00 p.m. 1. Introduction Mercy Parker Helget Sr. Stakeholder Engagement

More information

Planning Reserve Margin (PRM)

Planning Reserve Margin (PRM) Planning Reserve Margin (PRM) Nguyen Pham Planning Specialist, Power Supply & Planning Overview A more detailed version of the PRM presentation given in July 2015 Q & A on the PRM report based on 2012

More information

Vectren Integrated Resource Plan (IRP) Stakeholder Meeting 3 of 3. Discussion of Analysis Results September 24, 2014

Vectren Integrated Resource Plan (IRP) Stakeholder Meeting 3 of 3. Discussion of Analysis Results September 24, 2014 Vectren Integrated Resource Plan (IRP) Stakeholder Meeting 3 of 3 Discussion of Analysis Results September 24, 2014 IRP Timeline 2 1. Identify key objectives and metrics Complete 2. Gather information

More information

Renewable Energy Transmission Planning Process (RETPP) Second Draft Final Proposal

Renewable Energy Transmission Planning Process (RETPP) Second Draft Final Proposal Renewable Energy Transmission Planning Process (RETPP) Second Draft Final Proposal April 2, 2010 Second Draft Final Proposal Introduction The central objective of the ISO s proposed renewable energy transmission

More information

2015/2016 Planning Resource Auction Results. April 14, 2015

2015/2016 Planning Resource Auction Results. April 14, 2015 2015/2016 Planning Resource Auction Results April 14, 2015 Executive Summary MISO successfully completed its third annual Planning Resource Auction The MISO region has adequate resources to meet its Planning

More information

Deliverability Testing

Deliverability Testing Deliverability Testing Henry Chao Vice President System & Resource Planning New York Independent System Operator New York State Reliability Council Executive Committee Meeting September 12, 2008 Definition

More information

EE and Reliability: SCE s LCR RFO and Preferred Resources Pilot. ACEEE Energy Efficiency as a Resource National Conference Mohammed Aliuddin

EE and Reliability: SCE s LCR RFO and Preferred Resources Pilot. ACEEE Energy Efficiency as a Resource National Conference Mohammed Aliuddin EE and Reliability: SCE s LCR RFO and Preferred Resources Pilot ACEEE Energy Efficiency as a Resource National Conference Mohammed Aliuddin 1 Several major drivers have led to initiatives that are changing

More information

2012-2016 Strategic Plan

2012-2016 Strategic Plan 2012-2016 Strategic Plan A Message from John R. Bear, President and CEO J. Michael Evans, Chairman of the Board of Directors MISO prides itself on continually fostering a transparent, effective stakeholder

More information

Generation and Transmission Interconnection Process

Generation and Transmission Interconnection Process PJM Manual 14A Generation and Transmission Interconnection Process Revision: 18 Effective Date: January 28, 2016 Prepared by Planning Division Generation Interconnection Department PJM 2016 Table of Contents

More information

Table of Contents. 4 PLAN DEVELOPMENT... 4-1 4.1 Plan Objectives... 4-1 4.2 Planning Tools... 4-1 4.3 Planning Process... 4-2

Table of Contents. 4 PLAN DEVELOPMENT... 4-1 4.1 Plan Objectives... 4-1 4.2 Planning Tools... 4-1 4.3 Planning Process... 4-2 Table of Contents 1 PREFACE... 1-1 2 RESOURCE PLAN NON-TECHNICAL SUMMARY... 2-1 2.1 Load Forecast... 2-1 2.2 Future Resource Needs... 2-2 2.3 Resource Plan Development... 2-3 2.4 Resource Alternatives...

More information

Clean Power Plan: MISO Analysis ADEQ/APSC Stakeholder Meeting

Clean Power Plan: MISO Analysis ADEQ/APSC Stakeholder Meeting Clean Power Plan: MISO Analysis ADEQ/APSC Stakeholder Meeting 8/28/2014 The generation fleet in MISO is being affected by timing, fuel prices and multiple phases of environmental regulations. MATS CSAPR

More information

Demand Response and Energy Efficiency in the Midwest ISO. A Primer

Demand Response and Energy Efficiency in the Midwest ISO. A Primer Demand Response and Energy Efficiency in the Midwest ISO A Primer John Moore Bruce Campbell Kevin Murray September 28, 2010 1 Agenda Types of Midwest ISO Demand Response (DR). Products DR is eligible to

More information

Appendix A. Glossary. For. 2016 Request For Proposals For Long-Term Renewable Generation Resources for Entergy Louisiana, LLC

Appendix A. Glossary. For. 2016 Request For Proposals For Long-Term Renewable Generation Resources for Entergy Louisiana, LLC Appendix A Glossary For 2016 Request For Proposals For Long-Term Renewable Generation Resources for Entergy Louisiana, LLC Entergy Services, Inc. June 8, 2016 Website means the internet website https://spofossil.entergy.com/entrfp/send/2016ellrenewablerfp/index.htm.

More information

Gas Electric System Interface Study. PPA Stakeholder Forum: MISO ENGCTF 6/03/2013 Eric Thoms (MISO)

Gas Electric System Interface Study. PPA Stakeholder Forum: MISO ENGCTF 6/03/2013 Eric Thoms (MISO) Gas Electric System Interface Study PPA Stakeholder Forum: MISO ENGCTF 6/03/2013 Eric Thoms (MISO) Table of Contents History Participating Planning Authorities (PPAs) / Study Region PPA Stakeholder Groups

More information

HVDC Transmission Line Project for Moving ERCOT Wind Into SERC

HVDC Transmission Line Project for Moving ERCOT Wind Into SERC HVDC Transmission Line Project for Moving ERCOT Wind Into SERC ERCOT RPG Meeting August 13, 2010 Agenda Pattern Energy Group SERC and ERCOT Market Drivers Southern Cross Project Overview Project Development

More information

Portfolio Carbon Initiative

Portfolio Carbon Initiative Portfolio Carbon Initiative Acting as market makers, capital providers, and advisers, financial institutions (FIs) are important actors in the shift to a low-carbon economy. As providers of debt and equity,

More information

2017 Budget and Grid Management Charge Initial Stakeholder Meeting

2017 Budget and Grid Management Charge Initial Stakeholder Meeting 2017 Budget and Grid Management Charge Initial Stakeholder Meeting June 16, 2016 Page 1 Agenda Topic 2017 Budget Process & GMC Rate Outlook Managing Employee Compensation Presenter(s) Ryan Seghesio & April

More information

Key Take Away : There are 4 types of MISO transmission transactions : 1) Drive- In, 2) Drive-Within, 3) Drive-through, and 4) Drive-Out

Key Take Away : There are 4 types of MISO transmission transactions : 1) Drive- In, 2) Drive-Within, 3) Drive-through, and 4) Drive-Out 1 2 3 Key Take Away : There are 4 types of MISO transmission transactions : 1) Drive- In, 2) Drive-Within, 3) Drive-through, and 4) Drive-Out Speaker Notes: Drive-In refers to transactions that originate

More information

Appendix C-2. Entergy Services, Inc. June 8, 2016

Appendix C-2. Entergy Services, Inc. June 8, 2016 Appendix C-2 Preliminary Due Diligence List (Existing Resources) For 2016 Request For Proposals For Long-Term Renewable Generation Resources For Entergy Louisiana, LLC Entergy Services, Inc. June 8, 2016

More information

Appendix D. Minimum Requirements For Developmental Resources. For

Appendix D. Minimum Requirements For Developmental Resources. For z Appendix D Minimum For Developmental Resources For 2016 Request For Proposals For Long-Term Renewable Generation Resources For Entergy Louisiana, LLC Entergy Services, Inc. June 8, 2016 MINIMUM REQUIREMENTS

More information

To verify the quality of completed Ministry of Health infrastructure projects and make recommendations for contract payments.

To verify the quality of completed Ministry of Health infrastructure projects and make recommendations for contract payments. Malawi Health Sector Strategic Plan (MHSP) Technical Assistance Component Draft Terms of Reference Supervision and Verification of MOH Infrastructure Programme Purpose To verify the quality of completed

More information

Managed Services Consulting. Europe, Asia, Africa, Middle East, Latin America, North America

Managed Services Consulting. Europe, Asia, Africa, Middle East, Latin America, North America Managed Services Consulting Europe, Asia, Africa, Middle East, Latin America, North America New Vibrations Consulting Services Contents New Vibrations Consulting Managed Services Consulting Feasibility

More information

PJM Overview of Markets. Georgian Delegation PUCO Office April 11, 2013

PJM Overview of Markets. Georgian Delegation PUCO Office April 11, 2013 PJM Overview of Markets Georgian Delegation PUCO Office April 11, 2013 1 Agenda Introduction Energy Markets Locational Marginal Pricing - LMP Two Settlement - Day Ahead / Real time Ancillary Services Capacity

More information

2012 Integrated Energy Policy Report Update Proceeding Evaluating and Capturing Benefits of Renewable Energy for California

2012 Integrated Energy Policy Report Update Proceeding Evaluating and Capturing Benefits of Renewable Energy for California 2012 Integrated Energy Policy Report Update Proceeding Evaluating and Capturing Benefits of Renewable Energy for California California Energy Commission April 12, 2012 Purpose Seek input on evaluating

More information

GIP. 3.2.3 Net Zero Interconnection Service.

GIP. 3.2.3 Net Zero Interconnection Service. GIP and GIA Energy Displacement Agreement shall mean an agreement between an Interconnection Customer with a commercially operating Generating Facility on the Transmission Provider s Transmission System

More information

New Brunswick Electricity Business Rules

New Brunswick Electricity Business Rules New Brunswick Electricity Business Rules Table of Contents Chapter 1 Chapter 2 Chapter 3 Chapter 4 Administration and Participation Transmission Planning and Connections Reliable Operations Billing and

More information

Process Improvement Plan

Process Improvement Plan Doc ID: Date: Revision: Status: Abstract This document describes the process improvement plan for Company XXX. Approvals Approvals. Signed. Date. Author Page 2 of 19 Sample Process Improvement Plan.doc

More information

PROJECT MANAGEMENT PLAN CHECKLIST

PROJECT MANAGEMENT PLAN CHECKLIST PROJECT MANAGEMENT PLAN CHECKLIST The project management plan is a comprehensive document that defines each area of your project. The final document will contain all the required plans you need to manage,

More information

LONG-TERM ASSESSMENT OF NATURAL GAS INFRASTRUCTURE TO SERVE ELECTRIC GENERATION NEEDS WITHIN ERCOT

LONG-TERM ASSESSMENT OF NATURAL GAS INFRASTRUCTURE TO SERVE ELECTRIC GENERATION NEEDS WITHIN ERCOT LONG-TERM ASSESSMENT OF NATURAL GAS INFRASTRUCTURE TO SERVE ELECTRIC GENERATION NEEDS WITHIN ERCOT Prepared for The Electric Reliability Council of Texas JUNE 2013 Black & Veatch Holding Company 2011.

More information

Update on Northeast Seams Issues. January 9, 2008 NYISO Management Committee Meeting

Update on Northeast Seams Issues. January 9, 2008 NYISO Management Committee Meeting Update on Northeast Seams Issues January 9, 2008 NYISO Management Committee Meeting Status of Seams Projects Current Deliverables Project 1. Intra-Hour Transaction Scheduling NYISO and ISO-NE have documented

More information

3 rd Review Meeting Convention on Nuclear Safety First Anniversary Report Status of Actions on Canada April 2006

3 rd Review Meeting Convention on Nuclear Safety First Anniversary Report Status of Actions on Canada April 2006 3 rd Review Meeting Convention on Nuclear Safety First Anniversary Report Status of Actions on Canada April 2006 1. Introduction At the 3 rd review meeting of the Convention on Nuclear Safety, held in

More information

Sound Transit Internal Audit Report - No. 2014-3

Sound Transit Internal Audit Report - No. 2014-3 Sound Transit Internal Audit Report - No. 2014-3 IT Project Management Report Date: Dec. 26, 2014 Table of Contents Page Background 2 Audit Approach and Methodology 2 Summary of Results 4 Findings & Management

More information

Consumer Cost Effectiveness of CO 2 Mitigation Policies in Restructured Electricity Markets. Jared Moore and Jay Apt.

Consumer Cost Effectiveness of CO 2 Mitigation Policies in Restructured Electricity Markets. Jared Moore and Jay Apt. Consumer Cost Effectiveness of CO 2 Mitigation Policies in Restructured Electricity Markets Jared Moore and Jay Apt Supporting Data Consumer Cost Effectiveness of CO 2 Mitigation Policies in Restructured

More information

Status Report. Status Report Guide. Strategic Capital, Infrastructure and Projects. A guide to completing the Status Report

Status Report. Status Report Guide. Strategic Capital, Infrastructure and Projects. A guide to completing the Status Report Status Report Guide A guide to completing the Status Report Strategic Capital, Infrastructure and Projects Prepared by: Andrew Segrott / Strategic Capital, Infrastructure and Projects Version 1.0 17 December

More information

Corporate Energy Conservation & Demand Management Plan (2014-2019) - Green Energy Act - Regulation 397/11

Corporate Energy Conservation & Demand Management Plan (2014-2019) - Green Energy Act - Regulation 397/11 STAFF REPORT ACTION REQUIRED Corporate Energy Conservation & Demand Management Plan (2014-2019) - Green Energy Act - Regulation 397/11 Date: June 9, 2014 To: From: Wards: Reference Number: Parks and Environment

More information

The Secret Mix of Successful GIS Project Management

The Secret Mix of Successful GIS Project Management 2014 WAURISA Conference The Secret Mix of Successful GIS Project Management Presented By: Geoff Almvig, Skagit County GIS Don Burdick, Salish Coast Sciences, LLC What Is A Project? Definition: A project

More information

Indian Experiences on Promoting Renewable Energy DR SUSHANTA K CHATTERJEE JOINT CHIEF (REGULATORY AFFAIRS) CENTRAL ELECTRICITY REGULATORY COMMISSION

Indian Experiences on Promoting Renewable Energy DR SUSHANTA K CHATTERJEE JOINT CHIEF (REGULATORY AFFAIRS) CENTRAL ELECTRICITY REGULATORY COMMISSION Indian Experiences on Promoting Renewable Energy DR SUSHANTA K CHATTERJEE JOINT CHIEF (REGULATORY AFFAIRS) CENTRAL ELECTRICITY REGULATORY COMMISSION Introduction Clean energy promotion in India Focus on

More information

Energy Productivity & Pricing

Energy Productivity & Pricing Energy Productivity & Pricing Markets for energy, renewable energy and carbon Dr Jenny Riesz February 2014 2 Average electricity retail prices Electricity price rises CSIRO Future Grid (2013) Change and

More information

Brazilian Electricity Market

Brazilian Electricity Market Brazilian Electricity Market Workshop: Wholesale Electricity Markets Hurdles to Overcome Kellogg School of Management Northwestern University Luiz Eduardo Barata Ferreira Chairman CCEE Electrical Energy

More information

Energy Efficiency Measurement & Verification

Energy Efficiency Measurement & Verification PJM Manual 18B: Energy Efficiency Measurement & Verification Revision: 02 Effective Date: 12/17/2015 Prepared by PJM Forward Market Operations PJM 2015 PJM 2008 Revision, Effective Date: i Table of Contents

More information

Wind Power and Electricity Markets

Wind Power and Electricity Markets PO Box 2787 Reston, VA 20195 Phone: 703-860-5160 Fax: 703-860-3089 E-mail: info@uwig.org Web: www.uwig.org Wind Power and Electricity Markets A living summary of markets and market rules for wind energy

More information

2016/2017 RPM Base Residual Auction Results

2016/2017 RPM Base Residual Auction Results Executive Summary The 2016/2017 Reliability Pricing Model (RPM) Base Residual Auction (BRA) cleared 169,159.7 MW of unforced capacity in the RTO. Accounting for load and resource commitments under the

More information

OE PROJECT CHARTER TEMPLATE

OE PROJECT CHARTER TEMPLATE PROJECT : PREPARED BY: DATE (MM/DD/YYYY): Project Name Typically the Project Manager Project Charter Last Modified Date PROJECT CHARTER VERSION HISTORY VERSION DATE (MM/DD/YYYY) COMMENTS (DRAFT, SIGNED,

More information

Addressing Barriers to Renewable Energy Procurement. In association with the EPA Green Power Partnership

Addressing Barriers to Renewable Energy Procurement. In association with the EPA Green Power Partnership Addressing Barriers to Renewable Energy Procurement In association with the EPA Green Power Partnership September 19, 2012 CORPORATE GOALS Corporations are increasingly interested renewable energy. The

More information

[ELECTRICITY PROCUREMENT PLAN] Prepared in accordance with the Illinois Power Agency and Illinois Public Utilities Acts September 29, 2014

[ELECTRICITY PROCUREMENT PLAN] Prepared in accordance with the Illinois Power Agency and Illinois Public Utilities Acts September 29, 2014 2015 Anthony Star Director [ELECTRICITY PROCUREMENT PLAN] Prepared in accordance with the Illinois Power Agency and Illinois Public Utilities Acts September 29, 2014 Illinois Power Agency 2015 Electricity

More information

Guidance for U.S. Positions on MDBs Engaging with Developing Countries on Coal-Fired Power Generation 1

Guidance for U.S. Positions on MDBs Engaging with Developing Countries on Coal-Fired Power Generation 1 October 29, 2013 Guidance for U.S. Positions on MDBs Engaging with Developing Countries on Coal-Fired Power Generation 1 The following guidance is intended to be adapted by individual MDBs and incorporated

More information

ITP Evaluation Process Plan Cross-Tie Transmission Line

ITP Evaluation Process Plan Cross-Tie Transmission Line ITP Evaluation Process Plan Cross-Tie Transmission Line The goal of the coordinated Interregional Transmission Project (ITP) evaluation process is to achieve consistent planning assumptions and technical

More information

A new electricity market for Northern Ireland and Ireland from 2016 - Integrated Single Electricity Market (I-SEM)

A new electricity market for Northern Ireland and Ireland from 2016 - Integrated Single Electricity Market (I-SEM) A new electricity market for Northern Ireland and Ireland from 2016 - Integrated Single Electricity Market (I-SEM) Non-technical summary High level design Draft Decision Paper SEM -14-047 June 2014 1 INTRODUCTION

More information

Business Requirements Specification

Business Requirements Specification Business s Specification Capacity Procurement Mechanism Replacement Doc ID: GNFDMDEHU6BB-46-53 Page 1 of 18 Disclaimer All information contained in this draft Business s Specification (BRS) as provided

More information

Comments of Louisiana Energy Users Group and Texas Industrial Energy Consumers. MISO South Market Congestion Planning Study. September 18, 2015

Comments of Louisiana Energy Users Group and Texas Industrial Energy Consumers. MISO South Market Congestion Planning Study. September 18, 2015 Comments of Louisiana Energy Users Group and Texas Industrial Energy Consumers On MISO South Market Congestion Planning Study September 18, 2015 In response to the MISO Staff s September 11, 2015 request

More information

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION ) Coordination Between Natural Gas ) Docket No. AD12-12-000 And Electricity Markets ) ) COMMENTS OF DOMINION RESOURCES SERVICES,

More information

Perspective on Trends in U.S. Electricity Markets and Nuclear Power Plant Shutdowns. September 2013

Perspective on Trends in U.S. Electricity Markets and Nuclear Power Plant Shutdowns. September 2013 Perspective on Trends in U.S. Electricity Markets and Nuclear Power Plant Shutdowns September 2013 Nuclear Plant Shutdowns: The Situation Five reactors shut down Four in 2013 One at the end of 2014 Crystal

More information

Terms of Reference: Consultancy Firm. Selection #1019083

Terms of Reference: Consultancy Firm. Selection #1019083 Terms of Reference: Consultancy Firm Selection #1019083 Support for Broadband Competitiveness Program in Eastern Europe, South Caucasus and Central Asia (ECA) Trust Fund: TF071399 Creating Sustainable

More information

GENERAL SERVICES ADMINISTRATION Federal Supply Service Authorized Federal Supply Schedule Price List

GENERAL SERVICES ADMINISTRATION Federal Supply Service Authorized Federal Supply Schedule Price List Zapotec Energy GENERAL SERVICES ADMINISTRATION Federal Supply Service Authorized Federal Supply Schedule Price List Schedule 03FAC Facilities Maintenance and Management Zapotec Energy, Inc. 675 Massachusetts

More information

How To Understand The Benefits Of The French Power Market Plan

How To Understand The Benefits Of The French Power Market Plan Why Did the US (Mostly) Go With LMP? Benefits of Flow Based Allocation Benjamin F. Hobbs EPRG, University of Cambridge, UK DoGEE, Johns Hopkins University, USA Market Surveillance Committee, California

More information

AAPG 2011 Annual Convention & Exhibition April 10, 2011

AAPG 2011 Annual Convention & Exhibition April 10, 2011 Generator Transmission Grid Interconnection Guidelines AAPG 2011 Annual Convention & Exhibition April 10, 2011 Hala Ballouz, B.Sc., M.Sc. TAMU, P.E. President, Electric Power Engineers, Inc. Partner &

More information

Request for Proposals For Renewable Energy Power Purchase Agreement

Request for Proposals For Renewable Energy Power Purchase Agreement Request for Proposals For Renewable Energy Power Purchase Agreement Issued by PowerOptions, Inc. October 2, 2015 Contents 1) Introduction... 1 a) PowerOptions Program... 2 b) Contracting Parties... 3 c)

More information

Capacity mechanism. General Directorate for Energy and Climate August 30, 2012

Capacity mechanism. General Directorate for Energy and Climate August 30, 2012 Capacity mechanism General Directorate for Energy and Climate August 30, 2012 Ministère de l économie, des Finances et de l Industrie Ministère de l'écologie, du Développement durable, des Transports et

More information

A Preliminary Investigation Into the Cost of Reducing Fuel Risk in the MISO Midwest Footprint

A Preliminary Investigation Into the Cost of Reducing Fuel Risk in the MISO Midwest Footprint A Preliminary Investigation Into the Cost of Reducing Fuel Risk in the MISO Midwest Footprint October 2013 MISO Policy & Economic Studies Department i Contents 1 Executive Summary... 4 2 Introduction...

More information

City Council Briefing. June 16, 2010

City Council Briefing. June 16, 2010 City Council Briefing June 16, 2010 1 Review the City s electricity procurement program and upcoming contract for the period beginning January 1, 2011. How we buy electricity How well we did on our last

More information

ERCOT Analysis of the Impacts of the Clean Power Plan Final Rule Update

ERCOT Analysis of the Impacts of the Clean Power Plan Final Rule Update ERCOT Analysis of the Impacts of the Clean Power Plan Final Rule Update ERCOT Public October 16, 2015 ERCOT Analysis of the Impacts of the Clean Power Plan Final Rule Update In August 2015, the U.S. Environmental

More information

MBOMBELA WC2010 STADIUM PRESENTATION TO PARLIAMENTARY PORTFOLIO COMMITTEE ALLEGED FUNDING CRISIS

MBOMBELA WC2010 STADIUM PRESENTATION TO PARLIAMENTARY PORTFOLIO COMMITTEE ALLEGED FUNDING CRISIS MBOMBELA WC2010 STADIUM PRESENTATION TO PARLIAMENTARY PORTFOLIO COMMITTEE ALLEGED FUNDING CRISIS PROGRESS TO DATE PROGRAMME FOR MBOMBELA STADIUM Site Clearance Started 01 Aug 2006 Fencing Contract

More information

Project Management Using Microsoft Project Plan - Basic

Project Management Using Microsoft Project Plan - Basic Project Management Using Microsoft Project Plan Basic V2.0 Project Management Using Microsoft Project Plan - Basic Version 2.0, February, 2011 Illume-Tech Solutions & Services COPYRIGHT 2011 ILLUME-TECH

More information

Scope 2 Accounting Guidance: What it means for corporate decisions to purchase environmental instruments

Scope 2 Accounting Guidance: What it means for corporate decisions to purchase environmental instruments Scope 2 Accounting Guidance: What it means for corporate decisions to purchase environmental instruments January 2015 Corporate Scope 2 accounting has traditionally been relatively straight forward. Common

More information

PJM Overview and Wholesale Power Markets. John Gdowik PJM Member Relations

PJM Overview and Wholesale Power Markets. John Gdowik PJM Member Relations PJM Overview and Wholesale Power Markets John Gdowik PJM Member Relations PJM s Role Ensures the reliability of the high-voltage electric power system Coordinates and directs the operation of the region

More information

ERCOT Long-Term System Assessment. Executive Summary

ERCOT Long-Term System Assessment. Executive Summary Long-Term System Assessment for the ERCOT Region December 2012 ERCOT Long-Term System Assessment Executive Summary Senate Bill 20 1 (79th Legislature, 1st Called Session [2005]) requires that the Public

More information

Joint Con Edison LIPA Offshore Wind Power Integration Project Feasibility Assessment

Joint Con Edison LIPA Offshore Wind Power Integration Project Feasibility Assessment Joint Con Edison LIPA Offshore Wind Power Integration Project Feasibility Assessment March 20, 2009 Joint Con Edison LIPA Offshore Wind Power Integration Project Feasibility Assessment Table of Contents:

More information

MANITOBA [IYDRO. Corporate Risk Management Middle Office Report Sept 2009

MANITOBA [IYDRO. Corporate Risk Management Middle Office Report Sept 2009 MANITOBA [IYDRO Corporate Risk Management Middle Office Report Sept 2009 A. Credit On-going review and advisory support continued to be provided to PS&O (Power Sales and Operations) credit function to

More information

Crosswalk Between Current and New PMP Task Classifications

Crosswalk Between Current and New PMP Task Classifications Crosswalk Between Current and New PMP Task Classifications Domain 01 Initiating the Project Conduct project selection methods (e.g., cost benefit analysis, selection criteria) through meetings with the

More information

Who are we? Jens Lohmueller, Credit Union Central of Ontario 3/9/2005

Who are we? Jens Lohmueller, Credit Union Central of Ontario 3/9/2005 Who are we? Credit Union (CUCO) is the trade organization of Ontario credit unions. We work within a collective network of service locations comparable in size to the major banks. There are over 700 branches

More information

Diverse Business Enterprises ( DBE ) Readiness Checklist to Sell Wholesale Power to SCE June 25, 2013

Diverse Business Enterprises ( DBE ) Readiness Checklist to Sell Wholesale Power to SCE June 25, 2013 Diverse Business Enterprises ( DBE ) Readiness Checklist to Sell Wholesale Power to SCE June 25, 2013 For questions regarding power procurement opportunities, please contact: Cristina Radu, Energy Contracts

More information

Project Management Professional (PMP)

Project Management Professional (PMP) Project Management Professional (PMP) Duration: 5 days Course Objectives: PMI s Project Management Professional (PMP) credential is the most important industry-recognized certification for project managers.

More information

JEA Net Metering Policy Tiers 1-3

JEA Net Metering Policy Tiers 1-3 Summary The JEA Net Metering Policy is intended to facilitate generation from customer-owned renewable energy sources to offset up to all of the customer s energy requirements. The policy provides system

More information

E N G I N E E R I N G

E N G I N E E R I N G Purpose If the customer s proposed project proceeds to Gate 1 of the Integrated Customer Solutions (ICS) process (see the ICS Process and Proposal Submission Guide), the customer must prepare a Load Displacement

More information

Quantifying the Amount and Economic Impacts of Missing Energy Efficiency in PJM s Load Forecast

Quantifying the Amount and Economic Impacts of Missing Energy Efficiency in PJM s Load Forecast Quantifying the Amount and Economic Impacts of Missing Energy Efficiency in PJM s Load Forecast PREPARED FOR The Sustainable FERC Project PREPARED BY Ahmad Faruqui, Ph.D. Sanem Sergici, Ph.D. Kathleen

More information

Project Aim 2020. Appendix C - Project Plan, Gap Analysis, and Approach

Project Aim 2020. Appendix C - Project Plan, Gap Analysis, and Approach Appendix C - Project Plan, Gap Analysis, and Approach In the fall of 2013 and spring of 2014, the senior leadership meetings created awareness among the leaders about necessary improvements in planning,

More information

The Gateway Review Process

The Gateway Review Process The Gateway Review Process The Gateway Review Process examines programs and projects at key decision points. It aims to provide timely advice to the Senior Responsible Owner (SRO) as the person responsible

More information

sink asset load power pool ISO pool participant bids operating constraints ancillary service declarations

sink asset load power pool ISO pool participant bids operating constraints ancillary service declarations G1 DEFINITIONS In the ISO rules: acceptable operational reason means with respect to a source asset, any one or more of the following: i) a circumstance related to the operation of the generating asset

More information

REQUEST FOR PROPOSAL INFORMATION SECURITY PROGRAM PROVIDER

REQUEST FOR PROPOSAL INFORMATION SECURITY PROGRAM PROVIDER REQUEST FOR PROPOSAL INFORMATION SECURITY PROGRAM PROVIDER OCTOBER 18, 2013 1 Table of Contents I. EXECUTIVE OVERVIEW... 3 II. BACKGROUND... 3 A. Goals & Objective of Request... 3 B. Project Scope... 4

More information

2019/2020 RPM Base Residual Auction Results

2019/2020 RPM Base Residual Auction Results Executive Summary The 2019/2020 Reliability Pricing Model (RPM) Base Residual Auction (BRA) cleared 167,305.9 MW of unforced capacity in the RTO. Accounting for load and resource commitments under the

More information

Project Management Guidebook

Project Management Guidebook METHOD 12 3 empowering managers to succeed Project Management Guidebook ISBN 0-473-10445-8 A bout this e-book This e-book was created by Method123 (see www.method123.com) to help provide you with a simple

More information

About Southern California Edison

About Southern California Edison About Southern California Edison One of the nations largest investorowned utilities with 125 years of service. Service Area 50,000 square miles Over 430 cities and communities Population Served Nearly

More information

Tehachapi Renewable Transmission Project (TRTP)

Tehachapi Renewable Transmission Project (TRTP) SM Tehachapi Renewable Transmission Project (TRTP) February 2009 Why We Are Here Today Provide background on SCE s commitment to renewable energy Discuss the operational and economic importance of the

More information

Viking Link Interconnector

Viking Link Interconnector Viking Link Interconnector Public information event for Bicker Parish Why we re here today We re here today to introduce the Viking Link project, to explain what we want to build and to answer any questions

More information

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION

UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Reliability Technical Conference Docket No. AD16-15-000 Prepared Statement of Mark Rothleder on behalf of the California Independent System

More information

NV Energy ISO Energy Imbalance Market Economic Assessment

NV Energy ISO Energy Imbalance Market Economic Assessment March 25, 2014 NV Energy ISO Energy Imbalance Market Economic Assessment NV Energy ISO Energy Imbalance Market Economic Assessment 2014 Copyright. All Rights Reserved. Energy and Environmental Economics,

More information

DOE Solar Energy Technologies Program Peer Review. Denver, Colorado April 17-19, 2007

DOE Solar Energy Technologies Program Peer Review. Denver, Colorado April 17-19, 2007 Development of the Focal Point Power Trough (FPPT) & PT-2 Advanced Concentrators for Power Generation Patrick Marcotte, IST SOLUCAR DOE Solar Energy Technologies Program Peer Review Denver, Colorado April

More information

Part 1: Residential Solar... 2. Part 2: Community Solar... 5. Part 3: Residential Energy Efficiency Services... 9

Part 1: Residential Solar... 2. Part 2: Community Solar... 5. Part 3: Residential Energy Efficiency Services... 9 Contents Part 1: Residential Solar... 2 Part 2: Community Solar... 5 Part 3: Residential Energy Efficiency Services... 9 Part 1: Residential Solar Request for Information: Solar installation services (residential)

More information

ERCOT EWTG Tracking Excess Generation from DG solar PV (and related data) Larry Howe Texas Solar Energy Society Board Member Jan 2015

ERCOT EWTG Tracking Excess Generation from DG solar PV (and related data) Larry Howe Texas Solar Energy Society Board Member Jan 2015 ERCOT EWTG Tracking Excess Generation from DG solar PV (and related data) Larry Howe Texas Solar Energy Society Board Member Jan 2015 File: 2015-01-22 ERCOT ETWG Slide 1 Texas Solar Energy Society (www.txses.org)

More information

RECOMMENDATION DISCUSSION:

RECOMMENDATION DISCUSSION: AGENDA ITEM J2 DATE: TO: Matt Jordan, General Manager FROM: Alison Adams, Chief Technical Officer SUBJECT: Comprehensive Asset Management Program - Presentation SUMMARY: Tampa Bay Water is implementing

More information

ALL ISLAND GRID STUDY WORK STREAM 4 ANALYSIS OF IMPACTS AND BENEFITS

ALL ISLAND GRID STUDY WORK STREAM 4 ANALYSIS OF IMPACTS AND BENEFITS ALL ISLAND GRID STUDY WORK STREAM 4 ANALYSIS OF IMPACTS AND BENEFITS January 2008 Executive Summary The All Island Grid Study is the first comprehensive assessment of the ability of the electrical power

More information

RE-POWERING MARKETS Market design and regulation during the transition to low-carbon power systems

RE-POWERING MARKETS Market design and regulation during the transition to low-carbon power systems RE-POWERING MARKETS Market design and regulation during the transition to low-carbon power systems EC-IEA Roundtatble on electricity market design and regulation Brussels, 18 February 2016 Power markets

More information

ITS Projects Systems Engineering Process Compliance Checklist

ITS Projects Systems Engineering Process Compliance Checklist ITS Projects Systems Engineering Process Compliance Checklist FHWA Final Rule (23 CFR 940) This checklist is to be completed by the MDOT or LPA Project Management Staff. Please refer to the accompanying

More information

7 th TYNDP WS. The role of storage in a liberalized market. Georg Dorfleutner RAG Energy Storage GmbH www.rag-energy-storage.

7 th TYNDP WS. The role of storage in a liberalized market. Georg Dorfleutner RAG Energy Storage GmbH www.rag-energy-storage. 7 th TYNDP WS The role of storage in a liberalized market Georg Dorfleutner RAG Energy Storage GmbH www.rag-energy-storage.at Unbundled SSO since 1.1.2013 Operating a storage-pool in Austria - CEGH TOV:

More information

Every Student I Every Day I Every Possibility

Every Student I Every Day I Every Possibility For the Facilities Master Plan March 4, 2015 1 Introduction This has been prepared to describe a proposed process to be implemented in order to develop comprehensive Facility Master Plans for all schools

More information

Tehachapi Wind Energy Storage Project (TSP)

Tehachapi Wind Energy Storage Project (TSP) Tehachapi Wind Energy Storage Project (TSP) Peer Review Presented by Mr. Loïc Gaillac October 20, 2011 San Diego, CA 1 Outline Policy Challenges SCE s Position SCE Smart Grid Vision Project Description

More information

B O A R D M E E T I N G N a s h v i l l e, T e n n e s s e e November 6, 2014

B O A R D M E E T I N G N a s h v i l l e, T e n n e s s e e November 6, 2014 B O A R D M E E T I N G Nashville, Tennessee November 6, 2014 PRESIDENT S REPORT B i l l J o h n s o n President & CEO Energy Environment Economic Development FY 2014 Overall Performance Safety Record

More information

The Standard for Portfolio Management. Paul E. Shaltry, PMP Deputy PM PPMS (2003-06) BNS02

The Standard for Portfolio Management. Paul E. Shaltry, PMP Deputy PM PPMS (2003-06) BNS02 The Standard for Portfolio Management Paul E. Shaltry, PMP Deputy PM PPMS (2003-06) BNS02 Purpose of this Presentation To provide information about The Standard for Portfolio Management Agenda Background

More information