1 Tram Train Emerging Lessons for the UK Barry Graham Northern Rail Simon Coulthard Network Rail
2 Introduction The is a co-operative venture between: Northern Rail: procuring and operating tram trains Network Rail: design and construct infrastructure South Yorkshire PTE: owner of the Supertram network Department for Transport: strategic guidance and funding
3 Project Objectives 1. To understand the changes to industry costs of operating a lighter weight vehicle with track brakes on the national rail network 2. To determine changes to technical standards required both to allow inter-running of light weight tram vehicles with heavy rail passenger and freight traffic and to gain the maximum cost benefit from tram-train operation 3. To gauge passenger perception and acceptance of light rail tram-train services 4. To determine the practical and operational issues of extending tram-trains from the national rail network to onstreet running
4 How we see the Tram Train offer
5 Potential Application Regional / Suburban line into street tramway Rural Branch Line New Light Rail connection on old trackbed or street Regional / Suburban line to main line station forecourt
6 Key Technical Learning Vehicles Procurement Power Source and Fuel Consumption Ride Quality Passenger Environment Operating Model Infrastructure Wheel/Rail Interface Implications Train Protection & Crashworthiness Stations & Public Behaviour
7 Procurement European tram train products still evolving, e.g: diesel traction package greater compliance with heavy rail standards crashworthiness (increase in end loading) energy recovery toilets Passenger comfort (air conditioning)
8 Diesel Emissions No affordable offers for diesel electric tram trains due to: Small order size, No suitable NRMM Stage 3A or 3B compliant diesel engines available, Current products need to be reengineered to comply with European standards.
9 Traction Energy Supply 750 v dc the core traction package; 25kV ac equipment or diesel power pack can be accommodated at additional cost and weight; Regeneration into OHLE possible; On board energy recovery systems not yet available in production form for tram train; Specification needs to be optimised to maximise environmental benefits (i.e. no air con and appropriate performance).
10 Vehicle Procurement - Future Electric tram trains the norm in mainland Europe, which will be trialled in Phase 2. Needs joined up procurement to achieve value for money. Large orders elsewhere in Europe may stimulate manufactures to offer affordable diesel electric tram trains in future.
11 Phase 2 Procurement Specification varied to an electric tram train with an option for a diesel power pack Current target dates for vehicle procurement Revised ITT was issued in Nov 2009 Tenders due in Feb 2010 Contract Award in mid 2010 Vehicle delivery in mid 2012 Service introduction in late 2012
12 Impact on Passengers Total capacity slightly more than a comparable 2 car DMU; Tram type interior layout with less seats and more standing space; Toilets not usually fitted on tram trains, but some manufacturers are developing products with toilets; Tram train suspensions tend to be stiffer, giving a harder ride.
13 Operating Model Future schemes are a mixture of tramway extensions and heavy rail replacement; Operating solution will be different for each scheme; Industrial relations issues should not be underestimated; Options are being considered for the trial.
14 Railway / Tramway Interface Seamless transition. No change of crew or unit. Clear transfer of responsibilities at the interface. Reliable technology for switching between railway and tramway modes.
15 Timetabling and Performance How do you integrate a fixed departure railway timetable with a headway type tram operation? Who bears the performance risk?
16 Wheel/Rail Interface: Wheel Profiles Profile Optimisation P8 CT3 SST Kassel Manchester Metrolink
17 Why Raised Check Rails? European - raised check rails on curves and S&C Wheel profiles have a stepped Flangeback with 2 back-to-back dimensions 1380mm at running rail height 1360 at check rail height
18 Crashworthiness End loading on existing products is normally 600kN (compared with 2000kN for heavy rail vehicles); Standards change may lead to products with 800kN being developed (in accordance with EN15227 category 3). Side collision risk needs to be considered.
19 Train Protection Possible options to achieve acceptable level of safety include: Automatic Train Operation (100% effective) Additional TPWS fitment to every signal, Double blocking or other special operating arrangements, Increasing overlaps, Reducing line speed.
20 Stations Platform Height and Length Low height platforms to match with low door access height step free Single vehicle formation platform length 35-40m Double vehicle formation required for peak services
21 Station Design Other Considerations DDA compliance Station facilities Foot crossings Fenced Six Foot
22 Safety Verification
23 Key Considerations for Tram Train Proposals Technical Themes Passenger Carrying Capacity Stopping Pattern & Journey Time Route Capacity Is there on-street running? Infrastructure Depots: what is the maintenance strategy? Avoid duplication with the trial
24 Key Considerations for Tram Train Proposals Route Strategy Themes Establish the contribution to HLOS Confirm the change to the operating cost of running the existing railway Confirm the impact on route capacity Confirm stakeholder support Determine final funding requirement
25 Project Timescales Programme is subject to ongoing development Current estimate of system commissioning by end of 2012, subject to: Vehicle procurement, manufacture and testing Infrastructure construction Safety authorisation Final funding approval Interim learning report available to industry during 2010, with further updates
Tram-train in the UK?
Tram-train in the UK? INCOSE 25 th February 2009 By Giles Thomas What is a tram train? a light rail vehicle capable of operating on a street tramway and a conventional railway What is tram train? A combination
More informationEnglish. Trapeze Rail System. www.trapezegroup.com
English Trapeze Rail System www.trapezegroup.com Trapeze Rail System Enabling future railway, tram and metro transport The worldwide growth in demand for travel and increasing competition between all modes
More informationSUPPORTING THE RAIL INDUSTRY UNIQUE SOLUTIONS FOR UNIQUE SITUATIONS WWW.SGS.COM/RAIL
SUPPORTING THE RAIL INDUSTRY UNIQUE SOLUTIONS FOR UNIQUE SITUATIONS WWW.SGS.COM/RAIL OUR UNIQUE SOLUTION TO YOUR UNIQUE SITUATION SGS is recognised as the global benchmark for quality and integrity. We
More informationThameslink Desiro City & Signalling Press Trip April 20 to 21, 2015 Evolution in Motion. Siemens Mobility Division
Thameslink Desiro City & Signalling Press Trip April 20 to 21, 2015 Evolution in Motion Siemens Rolling Stock Portfolio in Great Britain We have some of the most reliable trains in UK.. Over 350 trains
More informationAround 33 million journeys are currently made on Metrolink every year. This is forecast to increase to 44 million journeys by 2019.
1. Introduction Transport for Greater Manchester oversees transport and travel across Greater Manchester, home of the UK s largest regional economy outside London and a diverse population of over 2.7 million
More informationAnalysis of fuel cell
Analysis of fuel cell commuter rail vehicles Stuart Hillmansen*1 1, D Meegahawatte1, C Roberts, P Jennings2, A McGordon2; 1University of Birmingham, United Kingdom, 2University of Warwick, United Kingdom
More informationEstimation of electrical losses in Network Rail Electrification Systems
Estimation of electrical losses in Network Rail Electrification Systems Page 1 of 16 Contents 1. BACKGROUND...3 2. PURPOSE...3 3. SCOPE...3 4. DEFINITIONS & ABBREVIATIONS...4 5. NETWORK RAIL INFRASTRUCTURE
More informationPreliminary Evaluation of Double Deck & Extra Long Train Operations. Project: DfT Capacity Development Options
Preliminary Evaluation of Double Deck & Extra Long Train Operations Project: DfT Capacity Development Options Project: DfT Capacity Development Options Double Deck and Extra Long Train Operations Task
More informationGTR (Govia Thameslink Railway)
GTR (Govia Thameslink Railway) The new franchise UK s biggest ever rail franchise; 22% of all passenger train services Thameslink identity restored for services running through central core; Great Northern
More informationRailway Business Strategy and R&D in Europe
Railway Business Strategy and R&D in Europe Hitachi Review Vol. 61 (2012), No. 5 190 Keith Jordan Yoichi Sugita, Dr. Eng. Takayoshi Nishino Toshiaki Kono Kiyoshi Morita OVERVIEW: Hitachi s European railway
More informationIntroducing Light Rail Page 1 of 9
Introducing Light Rail Page 1 of 9 Introducing Light Rail Page 2 of 9 Introduction History What is light rail? Light rail as an economic tool Application Why light rail? Vehicles Power supply Stations
More information11. Monitoring. 11.1 Performance monitoring in LTP2
178 11. Monitoring 11.1 Performance monitoring in LTP2 Performance against the suite of indicators adopted for LTP2 is shown in the following table. This shows progress between 2005/06 and 2009/10 (the
More informationYour Power. Traction energy
Your Power Traction energy Table of content 1. What is traction energy? 3 1.1 From producer to train 1.2 Advantages 1.3 Energy, voltage or current 1.4 Transport and distribution 1.5 Supply of traction
More informationAUTOMATIC TRAIN OPERATION: THE MANDATORY IMPROVEMENT FOR ETCS APPLICATIONS
AUTOMATIC TRAIN OPERATION: THE MANDATORY IMPROVEMENT FOR ETCS APPLICATIONS Benoit Bienfait and Patrick Zoetardt, Alstom Transport, Belgium Bob Barnard, Signalling Solutions Ltd, UK SUMMARY European Main
More informationTRUCKNOR AS Frode Myre Sales Manager
TRUCKNOR AS Frode Myre Sales Manager Volvo Truck & Bus distributor Western and south part of Norway 7 dealerships 14 workshops Van Hool bus importer for Norway Public Transport Strømberg Gruppen Trucks
More informationSubmission from Living Streets Aotearoa Wellington City Public Transport Spine Study
Submission from Living Streets Aotearoa Wellington City Public Transport Spine Study Contact person: Ellen Blake Email: wellington@livingstreets.org.nz Phone: 021 1067139 Date: 30 September 2013 About
More informationThameslink new Class 700 trains
Thameslink new Class 700 trains Your questions answered 1. When will the new trains enter service? The first trains are expected to enter passenger service in spring 2016 on the existing Bedford to Brighton,
More informationATTACHMENT TO NOTICE TO FIXED GUIDEWAY SYSTEM VEHICLE SUPPLIERS REQUEST FOR INFORMATION (RFI 001)
ATTACHMENT TO NOTICE TO FIXED GUIDEWAY SYSTEM VEHICLE SUPPLIERS REQUEST FOR INFORMATION (RFI 001) INTRODUCTION To supplement and expand its understanding of available fixed guideway transit system vehicle
More informationLower emissions, lower fuel consumption.
FULL HYBRID RANGE The new hybrid buses Lower emissions, lower fuel consumption. Our well-know battery series hybrid concept is ideal for urban operations. And numerous studies have recently confirmed this,
More informationProcurement & Contracting Division. Request for Information (RFI) Concerning Procurement of Electrified Rolling Stock ("Rolling Stock")
Request for Information (RFI) Concerning Procurement of Electrified Rolling Stock ("Rolling Stock") November 2013 1 Request for Information ( RFI ) Concerning the Procurement of Electrified Rolling Stock
More informationusage of these types of fuels with production price far higher then diesel and petrol, is also a measure. We can say that in Bulgaria there are
TRANSPORT The basic goals of the national transport policy are focused on sustainable development of the road and railway infrastructure of national and international importance, improvement of the transport
More informationSYSTEMWIDE REQUIREMENTS
SYSTEMWIDE REQUIREMENTS for the Peninsula Rail Program San Francisco to San Jose on the Caltrain Corridor Description of the Systemwide Context for the High Speed Train Project This document provides a
More informationECO Stars Fleet Recognition Scheme Improving Local Air Quality Through Operator Engagement
ECO Stars Fleet Recognition Scheme Improving Local Air Quality Through Operator Engagement Mark Cavers, Transport & Travel Research Ltd and Ann Beddoes, Barnsley Metropolitan Borough Council mark.cavers@ttr-ltd.com
More information3. Output framework. Key messages in this chapter
3. Output framework Key messages in this chapter The output framework consists of outputs which Network Rail must deliver for the money it receives, indicators which we use for monitoring purposes and
More informationClimate Change Adaptation for London s Transport System
Climate Change Adaptation for London s Transport System Helen Woolston London Climate Change Partnership, 1 Contents This presentation will cover: London Climate Change Partnership Climate Change Adaptation
More informationInnovative vehicles. The European experience - Martin Salet - Ministry of Transport, Public Works and Water management
Innovative vehicles The European experience - Martin Salet - Ministry of Transport, Public Works and Water management The European experience Content of this presentation The European situation Innovation
More informationCathkin Relief Road Planning Statement
Cathkin Relief Road Planning Statement The Proposal This statement sets out the background to the Cathkin Relief Road project currently being progressed by South Lanarkshire Council. The project will provide
More informationA new rail route to Oxford - Chiltern Railways plans
A new rail route to Oxford - Chiltern Railways plans Contents Chiltern Railways Evergreen 3 project A new line to Oxford Route and train services Benefits Main works and stations Programme Stakeholder
More informationLIGHT RAIL ON RING 3 NOVEMBER 19 TH 2014. Supplier Workshop. Islevbro station (Rødov
LIGHT RAIL ON RING 3 NOVEMBER 19 TH 2014 Supplier Workshop Islevbro station (Rødov 1 Agenda In the Auditorium: 1. Welcome and programme; purpose of the day 2. Ring 3 in Brief 3. Vision of Light Rail on
More informationAirport Rail Link is gathering speed. Wolfgang Rueprich, Project Manager Airport Rail Link, October 21, 2009
Airport Rail Link is gathering speed Wolfgang Rueprich, Project Manager Airport Rail Link, October 21, 2009 Integrated Public Transit System for Metropolitan Regions Regional / Long Distance Rail Service
More informationin Transport Technologies
North-West Development Region from Romania (associate partner in THE ISSUE Project) Regional Expertise Regional Expertise in Transport Technologies Marius Fărtan REMARUL 16 Februarie S.A. from Cluj-Napoca
More informationCarbon emissions. A practical guide for fleet operators and drivers. Photography by Bob McCaffrey on Flickr
Carbon emissions A practical guide for fleet operators and drivers Photography by Bob McCaffrey on Flickr Road haulage carbon emissions With the Government highly-focused on reducing the UK s carbon emission
More informationCROSSRAIL MOVING LONDON FORWARD. Simon Bennett
CROSSRAIL MOVING LONDON FORWARD Simon Bennett Introduction Europe s largest infrastructure project 14.8bn funding 38 stations 9 new stations 42 km new tunnels 8 million cubic metres of spoil 140 main works
More informationExperimental-demonstration route of a high-speed overhead STY
String Technologies Yunitskiy LLC +7-495-979-11-57, a.yunitskiy@gmail.com, www.yunitskiy.com Moscow 2011 2 String technologies Yunitskiy are fully Russian development. Russia has got a unique opportunity
More informationLondon Underground Environment Strategy
London Underground Environment Strategy 2008 2013 mayor of london Transport for London Contents Introduction 3 London Underground Environment strategy 4 Managing environmental impacts 5 Embedding environment
More informationNetwork Rail. Consultation on Traction Electricity Consumption Rates for Train Operating Companies. August 2008
Network Rail Consultation on Traction Electricity Consumption Rates for Train Operating Companies August 2008 2 1 Introduction... 3 Context & background... 3 2 Calculation of The New Electricity Consumption
More informationTrapeze Rail System Simulation and Planning
trapeze Rail System English Software for Rail Modelling and Planning Trapeze Rail System Simulation and Planning www.trapezegroup.com Enabling future railway plans Cost reductions through integrated planning
More informationPlanning and Design for Sustainable Urban Mobility
1 Planning and Design for Sustainable Urban Mobility 2 1 UrbanizationUrbanization Rapid pace, largely uncontrolled growth, taking place mainly in developing countries 3 Global Urbanization Trends World
More informationRandstadRail: Increase in Public Transport Quality by Controlling Operations
RandstadRail: Increase in Public Transport Quality by Controlling Operations Niels van Oort HTM, Urban public transport, Research and development P.O. Box 28503, 2502 KM The Hague, The Netherlands, e-mail:
More informationPEUGEOT e-hdi STOP/START TECHNOLOGY MEDIA KIT
PEUGEOT e-hdi STOP/START TECHNOLOGY MEDIA KIT PEUGEOT e-hdi TECHNOLOGY INTRODUCTION In designing the new generation of Euro 5 HDi engines - a project in which Peugeot has invested more than 1billion the
More informationBriefing Note. Use of standard gauges for non-passenger rail vehicles. March 2013
Briefing Note The Use of Standard Gauges for New Non-Passenger Rail Vehicles March 2013 1. Purpose This briefing note is written to guide the manufacturers and introducers of non-passenger rail vehicles
More informationTire User Guides. ALL ABOUT TIRE'S SIZE. Tire Size Designation For:
Tire User Guides Pirelli Tire Knowledge Over one hundred years' experience of tire technology has enabled Pirelli to combine in their products maximum levels of security, longevity, comfort and attention
More informationCity of Vantaa New Plans and Projects
City of Vantaa New Plans and Projects Smart Mobility for Better Cities Conference 12 May, 2011 Gilbert Koskela Project Engineer Marja-Vantaa project City of Vantaa has been a forerunner in Finland in studying
More informationWilmington to Newark Commuter Rail Improvement Project
Wilmington to Newark Commuter Rail Improvement Project The Delaware Transit Corporation (DTC), a subsidiary of the Delaware Department of Transportation (DelDOT), is undertaking a rail capacity expansion
More informationBUSINOVA A multi-hybrid bus for an energy efficient bus fleet and reduced air and noise pollution
Vincent LEMAIRE SAFRA François BARBIER Tisséo-SMTC BUSINOVA A multi-hybrid bus for an energy efficient bus fleet and reduced air and noise pollution 2012 Polis Conference Perugia November 30th, 2012 BUSINOVA
More informationTransit in the United States 3. Operating Costs and Performance Measures 13. Quality of Transit Service 19. ADA Compliance Bus 28
1999 National Transit Summaries and Trends Introduction 1 Introduces the transit modes discussed throughout the NTST. Transit in the United States 3 National statistics and trends in ridership, miles of
More informationEfficient recovery of braking energy through a reversible dc substation
Efficient recovery of braking energy through a reversible dc substation DANIEL CORNIC Senior R&D Engineer. Alstom Transport Daniel.Cornic@transport.alstom.com Abstract The full regeneration of the braking
More informationWEST YORKSHIRE BUS STRATEGY
WEST YORKSHIRE BUS STRATEGY Phase 1 Consultation on Vision and Principles Introduction and Purpose There is a statutory requirement for the West Yorkshire Combined Authority (WYCA) to produce a Local Transport
More informationMeasure 9: Updating the interoperability directives on high-speed and conventional railway networks First page:
Measure 9: Updating the interoperability directives on high-speed and conventional railway networks First page: Policy package: 2A: Rail liberalisation and harmonisation Measure 9: Updating the interoperability
More informationQatar Railway Company
Qatar Railway Company Agenda Qatar Rail 1. Objectives 2. Organisation 3. Railway Network 4. Master Schedule 5. Opportunities 2 1. Qatar Rail Objectives 3 Qatar National Vision 2030 The National Vision
More informationA RESPONSIBLE, COLLABORATIVE AND AGILE ORGANISATION
44 NZ Transport Agency Statement of intent 215 19 A RESPONSIBLE, COLLABORATIVE AND AGILE ORGANISATION In order to deliver our desired targets and results effectively and efficiently, we continue to invest
More informationSystem operation. A consultation on making better use of the railway network. August 2015
System operation A consultation on making better use of the railway network August 2015 Contents Executive summary 3 1. Introduction 4 Purpose of this document 5 Context 5 Structure of this document 6
More informationIndex of issues discussed
Strategy for regulation of health and safety risks - chapter 7: Rolling Stock Asset Management ORR strategy for Rolling Stock Asset Management How ORR will address this topic: The industry, regulator and
More informationOne of a series of papers on technical issues published by RTWP from time to time.
Railway Technical Web Pages Infopaper No. 2 2 nd August 2011 One of a series of papers on technical issues published by RTWP from time to time. Introduction An overview of the way railway vehicle capacity
More informationWho am I? PhD s and Industry a personal view. Outline of talk. The Railway Research Centre at the University of Birmingham
Who am I? PhD s and Industry a personal view Head of Civil Engineering at the University of Birmingham Director of Birmingham Railway Research Centre, Director of Rail Research UK Council member of EURNEX
More informationALWAYS ON GLOBALSWITCH.COM
ALWAYS ON GLOBALSWITCH.COM Data Centre Design Considerations Kelvin Fong Managing Director, Hong Kong ALWAYS ON GLOBALSWITCH.COM Agenda 1. Introduction to Global Switch 2. Customer Requirements 3. Development
More informationEnvironmental Product Declarations at Bombardier Transportation
Environmental Product Declarations at Bombardier Transportation Dr. Kathy Reimann EPD stakeholder conference - 15 May 2012 Bombardier Transportation EcoEfficient Optimised Environmental Performance Life
More informationTRANSPORT ASSESSMENT GUIDANCE
TRANSPORT ASSESSMENT GUIDANCE Contents 1 INTRODUCTION...1 Purpose of the Guidance...1 Policy Context...1 Who Should Read This Document?...2 Structure of Guidance...3 2 ASSESSMENT PRINCIPLES AND PROCESS...4
More informationThe complete provider for. Gauging Products and Measurement Systems
The complete provider for Gauging Products and Measurement Systems The Gauging Requirement Effective clearance assessment is something that concerns all railways and demands for significantly increased
More informationFreight Measures within Norwich s CIVITAS Project. Chris Mitchell, Norwich City Agency Manager, Norfolk County Council
Freight Measures within Norwich s CIVITAS Project Chris Mitchell, Norwich City Agency Manager, Norfolk County Council 1 Why CIVITAS Economic links Political support Previous innovative schemes POLIS Successful
More informationTable of Contents. Introducing AYGO. Accessing your vehicle 2 3. Lights 9. Wipers 10. Electric windows 4. Gear change 11
AYGO Brief Guide Table of Contents Accessing your vehicle 2 3 Electric windows 4 Steering wheel (Vehicles with an adjustable type) 4 Seat and seat belt adjustment 5 Instrument Panel overview 6 Instrument
More informationNOTTINGHAM. Workplace Parking Levy
Workplace Parking Levy NOTTINGHAM About Nottingham Nottingham is an ambitious and vibrant city. It is designated as a core city and is ranked as a top ten UK retail centre. The Greater Nottingham economy
More informationA name a commitment! These are the criteria which have characterized the development of dependable everyday cars up to the present time.
A name a commitment! Automobile development has been a ŠKODA commitment since 1905. Even in those days, the trade press wrote enthusiastically above the Laurin & Klement Model A: Solidly built, dependable
More informationChapter 3. Track and Wheel Load Testing
Chapter 3 Track and Wheel Load Testing This chapter describes the track, truck, and testing equipment that were used by the Transportation Technology Center, Inc. (TTCI) for collecting the data that was
More informationThe Mireo Intelligence on rails
The Mireo Intelligence on rails siemens.com/mireo The vehicles of the Desiro family have been systematically further developed Mittelrheinbahn AM08 SNCB ÖBB cityjet Raaberbahn Desiro ML Varied capacities
More informationTendering of passenger rail traffic in Norway
Tendering of passenger rail traffic in Norway Rail passenger service tender 1: «Sør» Overview of current services and traffic Sørlandsbanen line Jærbanen line Arendalsbanen line Rail passenger service
More informationhybrid fuel cell bus
hybrid fuel cell bus PURE EMOTION PURE capacity The full passenger capacity of a standard diesel bus seats 34 standees 70 (7 passengers per sqm) total 104 Thanks to the three axles of the Van Hool A330
More informationCustomer Charter. www.dublinbus.ie
Customer Charter www.dublinbus.ie Contents Our commitment to you 4 Providing a quality service 4 Keeping you informed 7 Providing an accessible service 8 Paying for your journey 9 Helping the environment
More informationHow To Make A Train Power Battery System For The Railways
Saft Li-ion hybrid traction battery systems Eco-driving railways to increased energy efficiency Next generation energy for a brighter, cleaner and more affordable future The rail industry has a well-earned
More informationSustainable Development Strategy
Sustainable Development Strategy Our vision and strategy: A railway fit for the future 2013 2024 Document Ref: SBPT204 Version 0.71 Executive summary Network Rail exists to generate outstanding value for
More informationStrategic Plan for Control Period 5, 2014 2019. Issue Two 2015-2016
Infrastructure Standards Committee Strategic Plan for Control Period 5, 2014 2019 Issue Two 2015-2016 Approved by the Infrastructure Standards Committee 05 March 2015 ISCC/020 Email: enquirydesk@rssb.co.uk
More informationone of your best resources
Think of us as one of your best resources Safe, efficient and flexible workforce transportation solutions Connecting people with people We re always going your way Greyhound. The original. Greyhound Resources
More informationHIGHWAYS ENGLAND STRATEGIC BUSINESS PLAN OVERVIEW 2015-2020
HIGHWAYS ENGLAND STRATEGIC BUSINESS PLAN OVERVIEW 05-00 STRATEGIC ROAD NETWORK 4,00 miles of motorways and major A roads A billion tonnes of freight transported each year 4 million people drive on the
More informationBuilt to carry an entire industry.
Refuse Built to carry an entire industry. Refuse is a tough business. That s why Mack trucks are built to overcome the punishing conditions that residential, commercial and municipal refuse applications
More informationTLIB3078A Inspect, prepare and start an electric tram
TLIB3078A Inspect, prepare and start an electric tram Release: 1 TLIB3078A Inspect, prepare and start an electric tram Modification History Not Applicable Unit Descriptor Unit Descriptor This unit involves
More informationINTRODUCTION Transform Travel
Climate Change Strategy 2007 The following Climate Change Strategy was prepared by FirstGroup in March 2007 at the financial year end 2006/07. It is a starting point to setting out our commitment to support
More informationFocus on Driving. Part of The 10-point plan. www.mcginley.co.uk
Focus on Driving Part of The 10-point plan www.mcginley.co.uk Now that the contingent labour award results are out, we are mobilising in your area. Since signing up to Mark Carne s Safety Vision for Network
More informationAUGUST 2013 INFORMATION BULLETIN. Livestock transport
AUGUST 2013 INFORMATION BULLETIN Livestock transport Introduction This information bulletin provides information that is relevant to operators and drivers involved in the transport of livestock. It details
More informationA future driven by innovation
Technical Strategy June 2013 A future driven by innovation Summary 2 Network Rail Limited Technical Strategy Summary We see a future that challenges the limits of our current technical approaches. A future
More informationTechnology and System Layout of the Transrapid Maglev Project
Technology and System Layout of the Transrapid Maglev Project Christian Rausch Transrapid International GmbH & Co. KG, Berlin ABSTRACT: At the start of the project planning, the basic requirements for
More informationIntegrated Services Workshop Services
Integrated Services Workshop Services Erlangen, 2009 Industry Sector, Mobility Division Page 1 We have the power of high-skilled personnel providing solutions worldwide Our worldwide expertise Project
More informationHybrid shunter locomotive
Hybrid shunter locomotive 1 Hervé GIRARD, Presenting Author, 2 Jolt Oostra, Coauthor, 3 Joerg Neubauer, Coauthor Alstom Transport, Paris, France 1 ; Alstom Transport, Ridderkerk, Netherlands 2 ; Alstom
More informationThis is us. Passionate about Apprenticeships.
Technical TRAINING This is us The Manchester College is the only assessment centre in the UK that can offer all levels and disciplines of irtec licensing. We can assess you for a licence at any of the
More informationHSR THE TRAIN OF THE FUTURE New technologies and research trends
HSR THE TRAIN OF THE FUTURE New technologies and research trends Manuel S. Pereira* * ERRAC Vice-Chairman JUL 2008 The third dimension: Competitiveness & innovation ENERGY/POWER BIOMECHANICS HUMAN/MACHINE
More informationTHE SCANIA OMNI BUS RANGE. A complete range of city and intercity buses
THE SCANIA OMNI BUS RANGE A complete range of city and intercity buses THE SCANIA OMNI BUS RANGE Moving people, changing minds Today s challenge is to create integrated people-movers for the urban landscape.
More informationMarket Efficient Public Transport? An analysis of developments in Oslo, Bergen, Trondheim, Kristiansand, and Tromsø
TØI report 428/1999 Authors: Bård Norheim and Erik Carlquist Oslo 1999, 63 pages Norwegian language Summary: Market Efficient Public Transport? An analysis of developments in Oslo, Bergen, Trondheim, Kristiansand,
More informationVRE SYSTEM PLAN SUMMARY
VRE System Plan Summary January 2014 VRE SYSTEM PLAN SUMMARY VRE A Cost-Effective Contributor to Regional Mobility During the last decade, VRE has demonstrated its ability to accommodate a rapid and substantial
More informationTram Concept for Skåne
Basic vehicle parameters REPORT 2012:13 VERSION 1.3 2012-11-09 Document information Title Report no. 2012:13 Authors Nils Jänig, Peter Forcher, Steffen Plogstert, TTK; PG Andersson & Joel Hansson, Trivector
More informationIntroduction to. Aalborg s Sustainability Strategy 2013-2016
Introduction to Aalborg s Sustainability Strategy 2013-2016 2 Foreword Aalborg should be a sustainable municipality, which will be to the benefit of local citizens, businesses and the environment. With
More informationBoPP Policies and Procedures PR12 BOPP Fleet management and use of vehicles
BoPP Policies and Procedures PR12 BOPP Fleet management and use of vehicles Key evaluation question QMS Standard Key Stakeholders involved in consultation Directorate, Management Forum, Facilities team
More informationRailway Simulation & Timetable Planning
Your Local Partner for Railway Projects Anywhere in South East Asia Railway Simulation & Timetable Planning Engineering & Maintenance CONSULTING SIMULATION PLANNING ENGINEERING PRODUCTS TECH SUPPORT Simulation
More informationThe Shanghai Maglev Route
The Shanghai Maglev Route 1 Contents 1. About the Shanghai Maglev... 3 2. Background information about EMS Technology... 4 3. Your train... 5 3.1 Getting to know the cab... 5 3.2 Central DMI screen additional
More informationSWANSEA METRO PROJECT (BUS RAPID TRANSIT) Gwyn Ephraim Arup David Whitehead City and County of Swansea
SWANSEA METRO PROJECT (BUS RAPID TRANSIT) Gwyn Ephraim Arup David Whitehead City and County of Swansea 1. INTRODUCTION 1.1 Background In the last decade a new 'intermediate' form of public transport has
More informationTranslink Carbon Report 2011/12
Translink Carbon Report 2011/12 Executive Foreword Translink is one of the largest companies in Northern Ireland, with around 4,000 employees, and is the main provider of public transport services across
More informationInternal & External Factors. Internal Factors. External Factors. Political. Economic
Internal & External Factors Internal Factors Availability of finance Availability of staff Availability of time Experience/Training of staff Equipment available Current technology Quality of products Leadership/Quality
More informationmoving Vienna region! ÖBB suburban & urban trains
moving Vienna region! suburban & urban trains moving Vienna region! train services moving Vienna region! 51 years of Suburban Railways in Wien und Niederösterreich Over 330.000 passengers daily ~ 150.000
More informationA Guide to Buying a Car or Van
A Guide to Buying a Car or Van In this guide, aimed at companies and fleets, we list the important factors to take into account when specifying the vehicle you need for the job. Checklists are included
More informationASSET & FACILITIES MANAGEMENT CORPORATE ENERGY EFFICIENCY POLICY
ASSET & FACILITIES MANAGEMENT CORPORATE ENERGY EFFICIENCY POLICY Paul Stokes Kevin Munford Asset & Facilities Manager Energy Officer 01/03/2006 THE COUNCIL S ENERGY POLICY FOR PUBLIC BUILDINGS AND TRANSPORT
More informationSeamless journeys from door to door. www.bettertransport.org.uk
Seamless journeys from door to door www.bettertransport.org.uk Seamless journeys from door to door If public transport is to offer a real and attractive alternative to cars, it needs to offer the same
More information.Policy framework. .Themes and Actions.Civitas and EU funding instrumens.future vision. Overview. Plan on Urban Mobility
Action Plan on Urban Mobility EUROPEAN COMMISSION 1 ADOPTED ON 30 SEPTEMBER 2009 Overview Policy framework Action Plan on Urban Mobility Themes and Actions Civitas and EU funding instrumens Future vision
More information