Around 33 million journeys are currently made on Metrolink every year. This is forecast to increase to 44 million journeys by 2019.
|
|
- Dina Phelps
- 7 years ago
- Views:
Transcription
1 1. Introduction Transport for Greater Manchester oversees transport and travel across Greater Manchester, home of the UK s largest regional economy outside London and a diverse population of over 2.7 million residents and well-known as a centre of innovation, industry, education and culture. Our aim is to drive the growth of a healthy and sustainable Greater Manchester through the delivery of a reliable, integrated transport network, supporting and driving economic growth. We do this by working with Greater Manchester s 10 district authorities, public and private sector partners and national and regional government to keep Greater Manchester moving, connecting people with jobs, healthcare, education and leisure. We own and manage the Metrolink tram network, the ongoing expansion of which has seen it grow from 24 miles and 37 stops over three lines in April 2010 to seven lines today, totalling nearly 58 miles with 93 stops, plus a second, newly-built depot. A Second City Crossing across Manchester city centre is currently under construction. Proposals are in progress for a future extension to Port Salford, via the Trafford Centre. Around 33 million journeys are currently made on Metrolink every year. This is forecast to increase to 44 million journeys by We also build and manage bus stations and transport interchanges all over Greater Manchester, as well as installing and maintaining 12,000 bus shelters and stops and providing passengers with all the information they need to plan and make their journeys at stops, in Travelshops, at bus stations, online, via Traveline and in over 3,700 outlets across the region. We work with bus operators to ensure that buses are serving the right people in the right areas, and to a high standard. This includes subsidising free or concessionary fares for those who need them most, and subsidising and contracting bus routes which are not provided commercially but are socially valuable to the communities they serve. In total, over 225 million bus journeys are made in Greater Manchester every year. In Manchester city centre, Rochdale, Bolton and Stockport, we work with local authorities and other partners to provide Metroshuttle bus services. These services are free for anyone to use, and form convenient links for passengers between key rail stations, car parks, shopping areas and businesses. We are a key partner in Rail North, and we carry out strategic rail policies focused on meeting local and business needs. Greater Manchester s rail services account for 25 million journeys each year, with around 21,000 passengers travelling in the morning peak.
2 Our responsibilities also extend beyond public transport. For example, we manage the road network and co-ordinate maintenance, investment and strategic modelling to keep traffic flowing in one the UK s busiest conurbations. We also install and maintain traffic signals and oversee local road safety issues. We are committed to encouraging people to travel sustainably, improving health and the environment, through projects and initiatives to encourage cycling and walking. And through broadband provision, we aim to make Greater Manchester one of the world s top 20 digital cities by 2020, with all the obvious business and commercial benefits that brings: connecting people and businesses is not just about modes of transport. We have a proven track record of delivering high-profile, large-scale, value-for-money schemes and leading successful funding bids. For example, the 1.4bn expansion of the Metrolink network has been the lynchpin of regeneration in several locations, including Oldham, Rochdale and East Manchester, and the MediaCity spur has been key to the success of the BBC s flagship MediaCityUK development at Salford Quays. We re also delivering modern, safe, integrated transport interchanges with excellent customer facilities at Rochdale, Bolton, Altrincham and Wythenshawe, working with local authorities who recognise the essential role that transport plays in encouraging town centres to thrive, with all the economic and social benefits that brings. Currently, we re overseeing a bus priority package that includes improvements to the region s most important bus routes, as well as a completely new, fast, reliable busway from Leigh to Manchester city centre. This includes a guided section for specially adapted buses to avoid traffic congestion, opening up opportunities for regular, direct, high quality transport links between Leigh, Manchester and beyond for the first time. With funding sources including central government, district authorities and the European Union, we are currently running major sustainable transport schemes that will reduce carbon emissions, improve the health of the region s population and reduce congestion, as well as helping people get back to work. Our Travel Choices programme involves working with Job Centres, businesses and other partners to make people aware of their different options for travelling to work or education, whether by using public transport or commuting by bike: we ve even provided cycle training to teach beginners to ride bikes for the first time, and to help more experienced cyclists ride more safely and confidently on the roads,. And our Cycle Hubs, which provide cyclists with secure bike storage, showers, lockers and even bike maintenance shops, are being built in key locations across the region. We re also heavily involved in rail improvements across Greater Manchester, working with Network Rail and train operating companies to secure 580m from central
3 government for the Northern Hub rail improvement scheme. The next step will be to get Greater Manchester ready for HS2. And as well as services and infrastructure, we re investing in a smart ticketing system that will revolutionise the way customers pay for fares and ticket products. Called get me there, the system will use a touch-in, touch-out smart card system and contactless bank cards. The system will be rolled out progressively on Metrolink, then on buses, and subsequently on the rail network. The GM Agreement between Greater Manchester and central government gives Greater Manchester a broad set of devolved powers, including health and social care, business support, spatial planning and, most importantly for TfGM, transport. This gives TfGM the ability to transform transport connectivity across all modes, giving residents and businesses the infrastructure and services they need for the city region to thrive and flourish. It means Greater Manchester can develop its full potential as a modern, vibrant and prosperous city region that can compete on an international stage. Devolution has also made TfGM a key player in Transport for the North, unique partnership between the northern city regions, the government and the national transport agencies. In March 2015, Transport for the North published The Northern Powerhouse: One Agenda, One Economy, One North, a strategy for transforming transport for passengers and freight across the whole of the north of England. As Greater Manchester continues to prosper at the heart of the north of England, and its contribution to the wider UK economy expands, we will continue to form new partnerships and build on our past successes to make sure that transport whether by bus, rail or tram, on bikes, on foot or by road not only supports but accelerates and enables growth. 2. Procurement in TfGM 2.1 Procurement Responsibilities At Transport for Greater Manchester (TfGM) we understand our responsibility is to ensure that we spend public finances fairly, reasonably and deliver best value for money. To do this we aim to make it as easy and transparent for our present and future partners to work with us to deliver enhanced value and continuous improvement. To ensure this happens Procurement s role within TfGM is to support the organisation to: procure goods, services and works at the right quality; achieve the best value whole life cost; purchase the most economic quantities ensuring they are available when needed; Ensure compliance with all necessary regulations including EU public procurement of goods, services and works.
4 2.2 Procurement Policy and Process The table below illustrates the procurement approach taken for all values of expenditure < 1,000: Two verbal quotations are to be sought. The preferred payment method for this value of expenditure is via a Procurement credit card. 1,000 - < 50,000: Three written quotations to be obtained, however it isn t uncommon for tender exercises to be carried out between these values. Over 50,000: A formal tender exercise is to be carried out. Over OJEU threshold for contract or aggregation of goods/services in a 12 month period: By European law Transport for Greater Manchester are required to advertise in the Official Journal of the European Union (OJEU), any expenditure over 164,176 per contract or aggregation of goods/services in a 12 month period. TfGM advertise OJEU notices on Tenders Electronic Daily, potential suppliers are to express an interest via the method described within the notice; this expression of interest may be followed by a pre-qualification and tender exercise. Over OJEU threshold for contract works: Similar to the procurement of goods and services over a certain value, the procurement of works over 4,104,394 by EU law is required to be advertised by OJEU notice. Again OJEU notices can be found on Tenders Electronic Daily. All procurements are to be carried out electronically by our e-tendering system, Pro- Contract. Read section Welcome to E-Tendering for more info.
5 3. Working with TfGM 3.1 Welcome to E-Tendering As part of TfGM S initiative to drive continuous improvement and efficiency, an E- Tendering system provided by Due North, called Pro-Contract is used for all procurement activity. TfGM are working in partnership with Due North and AGMA to ensure that an environmentally friendly and more efficient tender process is undertaken. To ensure you can take advantage of the opportunities for business that TfGM have to offer, please register online via the 'Suppliers Area' by clicking the link below: By registering your company details you will receive information about TfGM s procurement activities which will enable you to express your interest against opportunities of interest online. You will automatically receive updates on procurement activities that match your selected capabilities, and send/receive tender documentation quickly and securely. Companies requiring any assistance in the registration process should contact Due north by and/or telephone: support@due-north.com Telephone: How we work with suppliers TfGM uses the purchase to pay system SAP to place orders with suppliers. Within SAP suppliers are grouped into three categories; Trading, Approved, and Preferred. An explanation of each category is quoted below: Trading Supplier: Supplier s who have not undergone a pre-qualification/tender exercise on behalf of TfGM Approved Supplier: Supplier s who have been successful at pre-qualification stage and unsuccessful at tender stage.
6 The benefit of being categorised as Approved is that you have already pre-qualified for a TfGM opportunity; therefore it could be that the next time you are approached to partake in a procurement opportunity you may not need to complete a Pre-Qualification Questionnaire. Preferred Supplier: Suppliers who are successful at the pre-qualification and tender stage The benefit of being a preferred supplier to TfGM is that in cases where no procurement process is required then preferred suppliers are approached to carry out the work directly or through a simple competitive process. Supplier Charter At TfGM it is recognised that the procurement process has a large part to play in contributing to the ethical, environmental and sustainability objectives of the organisation. The organisations stakeholders expect TfGM to be a socially responsible organisation, and to operate ethically. TfGM expects similar behaviours and performance standards of all suppliers. With this in mind TfGM will work with its suppliers and their supply chains to develop their procurement processes that encourage and drive continuous improvement in all areas of responsible procurement. Payment Terms TfGM payment terms are 30 days from the receipt of invoice. Where to submit invoices All invoices are processed centrally and therefore MUST be submitted to the following address: FAO Accounts Payable Transport for Greater Manchester 2 Piccadilly Place Manchester. M1 3BG DO NOT: Carry out any work on behalf of or for TfGM without a valid purchase order Send invoices to anybody within TfGM other than the address listed above. (We do however encourage our suppliers to send a draft invoice/delivery note to the person
7 named on the Purchase Order, this is to enable internal receipting processes to be carried out in preparation for our Accounts Payable team to process your invoice.) Invoice Processing Please be advised that in order for TfGM to issue payment of supplier invoices, we ask that you ensure the purchase order number (starting with 350 ) is referenced on the invoice. Failure to do so may delay payment. Payment Method The majority of all payments are made through BACS. Contact Us FAO: Transport for Greater Manchester Procurement 2 Piccadilly Place Manchester. M1 3BG procurement@tfgm.com
Our journey to a low carbon economy. Sustainable travel in Greater Manchester
Our journey to a low carbon economy Sustainable travel in Greater Manchester 2 Transport for Greater Manchester Greater Manchester has a vision of placing sustainable commuting and business travel at the
More informationThe Greater Manchester Combined Authority. Annual Statement of Accounts Year ended 31 st March 2015. Subject to Audit
The Greater Manchester Combined Authority Annual Statement of Accounts Year ended 31 st March 2015 Subject to Audit Annual Statement of Accounts 2014/15 Contents Explanatory Foreword by the Treasurer 3
More informationTransport for sustainable communities: a guide for developers
Transport for sustainable communities: a guide for developers March 2013 www.tfgm.com 2 TRANSPORT FOR GREATER MANCHESTER Contents Transport for sustainable communities: a guide for developers 1 Introduction
More informationTRANSPORT FOR GREATER MANCHESTER COMMITTEE REPORT FOR INFORMATION
9 TRANSPORT FOR GREATER MANCHESTER COMMITTEE REPORT FOR INFORMATION Date: 11 September 2015 Subject: Report of: Smart Ticketing Update Chief Executive, TfGM PURPOSE OF REPORT To provide an update on the
More informationWEST YORKSHIRE BUS STRATEGY
WEST YORKSHIRE BUS STRATEGY Phase 1 Consultation on Vision and Principles Introduction and Purpose There is a statutory requirement for the West Yorkshire Combined Authority (WYCA) to produce a Local Transport
More informationHow to do Business with the London. Borough of Sutton
How to do Business with the London Borough of Sutton February 2013 1 About this guide This guide has been developed to assist businesses wishing to sell their goods and services to the Borough. Contents
More informationApplication for a Scholar s Concessionary Permit
Application for a Scholar s Concessionary Permit Before completing this application form please check that this is the most suitable product for the type of journeys that you make. This permit entitles
More informationThe Region s Transport Authority
Agenda Item No. 12 The Region s Transport Authority Meeting: Integrated Transport Authority Date: Monday 28 April 2014 From: Subject: Lead Member: Head of Sustainability Cycle Charter Fair, Accessible
More informationmomentum Good for commuters, the economy and the environment Issue 4 Summer 2011 Transport briefing for senior decision makers
Issue 4 Summer 2011 In this issue How the Combined Authority means greater coherence momentum Transport briefing for senior decision makers Metrolink shows the tangible benefits of collaborative working
More informationUniversity of Glasgow Strategic Travel Plan 2010 2015
University of Glasgow Strategic Travel Plan 2010 2015 Jess Bailey Travel Plan Specialist Viola Retzlaff University of Glasgow Document Control Date Reviewed: March 2010 Version Number: 1 Author/Revised
More informationA guide on how to do business with Stockport NHS Foundation Trust. Procurement Buying In to Buying Locally
A guide on how to do business with Stockport NHS Foundation Trust Procurement Buying In to Buying Locally Contents Page Introduction 3 Aim of the guide 4 Corporate Citizenship more than a hospital 4 The
More informationTransport Mobility Management: Small Changes - Big Impacts
Transport Mobility Management: Small Changes - Big Impacts Understanding TMM in the Urban Context Damian PRICE and Amy LEATHER Abstract Although Transport Mobility Management (TMM) is still considered
More informationLondon 2012 Travel Demand Management Chris HANLEY
Chris HANLEY Abstract Travel Demand Management (sometimes referred to as Transport Demand Management or Transport Mobility Management) can be defined as the application of strategies to reduce demand on
More informationGetting there: Case studies November 2012
Getting there: Sustainable Transport in UK National Parks Case studies November 2012 Sustainable travel is key to promoting opportunities for the understanding and enjoyment of the special qualities of
More informatione-procurement A Guide For Suppliers
e-procurement A Guide For Suppliers 1. Introduction Background The Government has given councils targets for the implementation of e-procurement and for benefits to be achieved from e-procurement. These
More informationJoined up journeys - integrating park and ride services
customer newsletter May 2014 SMART TRANSACTIONS SOLUTIONS FOR GOVERNMENT AND BUSINESS Joined up journeys - integrating park and ride services Many towns and cities are encouraging car drivers to use park
More informationREPORT OF SCOTTISH GOVERNMENT/REGIONAL TRANSPORT PARTNERSHIPS/CoSLA WORKING GROUP
REPORT OF SCOTTISH GOVERNMENT/REGIONAL TRANSPORT PARTNERSHIPS/CoSLA WORKING GROUP Maximising the role of RTPs in furthering improvements to transport in Scotland August 2015 1 P a g e Executive Summary
More informationDemand for Long Distance Travel
Demand for Long Distance Travel April 2011 Demand for long distance travel 1 Structure of this paper 1.1 This paper is structured as follows: Section 2 sets out past trends in the demand for long distance
More informationGREATER MANCHESTER TRANSPORT STRATEGY 2040 OUR VISION
GREATER MANCHESTER TRANSPORT STRATEGY 2040 OUR VISION 2 CONTENTS Contents 1. Introduction 5 2. Greater Manchester in 2040 6 3. A vision for a connected Greater Manchester 16 4. Spatial themes 20 5. A globally
More informationCathkin Relief Road Planning Statement
Cathkin Relief Road Planning Statement The Proposal This statement sets out the background to the Cathkin Relief Road project currently being progressed by South Lanarkshire Council. The project will provide
More informationSeamless journeys from door to door. www.bettertransport.org.uk
Seamless journeys from door to door www.bettertransport.org.uk Seamless journeys from door to door If public transport is to offer a real and attractive alternative to cars, it needs to offer the same
More informationACT launches Cloud Services at the Transport Card Forum
CUSTOMER NEWSLETTER November 2013 customer newsletter November 2013 SMART TRANSACTIONS SOLUTIONS FOR GOVERNMENT AND BUSINESS ACT launches Cloud Services at the Transport Card Forum ACT exhibited its new
More informationNetwork Rail Consultation on Draft West Coast Main Line Route Utilisation Strategy Consultation Response by Birmingham International Airport Limited
Network Rail Consultation on Draft West Coast Main Line Route Utilisation Strategy Consultation Response by Birmingham International Airport Limited Introduction This is the consultation response by Birmingham
More informationFares Policy In London: Impact on Bus Patronage
Fares Policy In London: Impact on Bus Patronage Agenda Introduction to Transport for London Overview of Bus Patronage in London Changes in Policy and patronage since 2000 Fares Strategy Ticketing Strategy
More informationTransport for London. Projects and Planning Panel. Procurement of the Revenue Collection System and Services Date: 26 February 2014
Agenda Item 5 Subject: Transport for London Projects and Planning Panel Procurement of the Revenue Collection System and Services Date: 26 February 2014 1 Purpose 1.1 This paper is to inform the Panel
More informationREPORT BY THE COMPTROLLER AND AUDITOR GENERAL HC 535 SESSION 2013-14 5 JULY 2013. Department for Culture, Media & Sport. The rural broadband programme
REPORT BY THE COMPTROLLER AND AUDITOR GENERAL HC 535 SESSION 2013-14 5 JULY 2013 Department for Culture, Media & Sport The rural broadband programme 4 Key facts The rural broadband programme Key facts
More informationBedford s Network Management Strategy (2011 2021) November 2010
Bedford s Network Management Strategy (2011 2021) November 2010 Page 1 of 13 1. Introduction 1.1. The Bedford Borough Council Network Management Strategy has been developed to support local and national
More informationAir Quality Action Plan Progress Report 2010
Air Quality Action Plan Progress Report 2010 Author: Ben Rose Email: b.rose1@manchester.gov.uk Telephone: 0161 234 4868 Address: Neighbourhood Services Environmental Protection Group Hammerstone Road Gorton
More information11. Monitoring. 11.1 Performance monitoring in LTP2
178 11. Monitoring 11.1 Performance monitoring in LTP2 Performance against the suite of indicators adopted for LTP2 is shown in the following table. This shows progress between 2005/06 and 2009/10 (the
More informationThe Northern Transport Strategy: Autumn Report. One agenda. One economy. One North. November 2015. The Northern Transport Strategy: Autumn Report 1
The Northern Transport Strategy: Autumn Report One agenda. One economy. One North. November 2015 The Northern Transport Strategy: Autumn Report 1 Foreword The Northern Transport Strategy: Autumn Report
More informationBuilding on success. Virgin-Stagecoach and the InterCity East Coast franchise
Building on success Virgin-Stagecoach and the InterCity East Coast franchise A new approach for a new franchise We believe the InterCity East Coast franchise has the opportunity to become a truly world
More informationWelcome to Sheffield The UK s most business friendly city
E-learning Welcome to Sheffield The UK s most business friendly city E-learning Sheffield is increasingly being seen nationally and internationally as one of the most business friendly cities in the UK,
More informationGreater Manchester Local Transport Plan 3 Capital Programme 2015/16 2020/21
2 Greater Manchester Local Transport Plan 3 Capital Programme 2015/16 2020/21 Greater Manchester Local Transport Plan 3: Capital Programme 2015/16 2020/21 1. Summary Greater Manchester s Third Local Transport
More informationTravel Plan Action Plan update February 2013 V4
Travel Plan Action Plan update February 2013 V4 Update from plan approved by SMT June 09 Light grey shaded actions complete No. Action Status 1.0 Surveys, Analysis Monitoring and Targets 1.1 Undertake
More informationUniversity of Sheffield Draft Travel Plan Strategy. Property and Business Services
University of Sheffield Draft Travel Plan Strategy Property and Business Services June 2013 The Director of Estates and Facilities Management Statement The University of Sheffield is one of the UK s leading
More informationInnovations in London s transport: Big Data for a better customer experience
Innovations in London s transport: Big Data for a better customer experience Lauren Sager Weinstein Head of Analytics, Customer Experience Transport for London November 2015 Today s presentation agenda
More informationMPA/MPS PROCUREMENT STRATEGY 2009-12 TO BE THE UK LEADER IN PUBLIC SECTOR PROCUREMENT
MPA/MPS PROCUREMENT STRATEGY 2009-12 TO BE THE UK LEADER IN PUBLIC SECTOR PROCUREMENT CONTENTS Foreword ------------------------------------------------------------------------ 3 Executive Summary ---------------------------------------------------------
More informationGetting around London
Getting around London Improving health worldwide www.lshtm.ac.uk What we will cover: Different types of ticket Student discount Underground Bus London Overground Cycling and walking Taxis Transport for
More informationCycle Strategy 2006 2011
Cycle Strategy 2006 2011 TABLE OF CONTENTS 1 INTRODUCTION... 1 2 POLICY BACKGROUND... 2 3 BACKGROUND... 6 4 MAIN OBJECTIVES... 8 5 TARGETS... 9 6 THE CYCLE NETWORK... 10 7 CONCLUSION... 13 Appendix A:
More informationBuses in Essex County
Essex County Council contact@essex.gov.uk Date 18 March 2015 Please ask for Matthew Winslow Department Strategic Planning Tel. No 01268 294868 E-Mail matthew.winslow@basildon.gov.uk Ref BF1-MJW/18.03.15
More informationHow to do business with Wiltshire Council
How to do business with Wiltshire Council A guide for local small and medium size businesses including voluntary and community sector organisations June 2013 Page 1 Index 1. Introduction... 3 2. General
More informationTfL and Network Rail s consultation on Crossrail 2 Response from London First
TfL and Network Rail s consultation on Crossrail 2 Response from London First The online consultation (including background material) can be accessed via the following link. http://www.tfl.gov.uk/corporate/projectsandschemes/27405.aspx
More information2015/16. Council LOGO ATTRACTIVE SEAMLESS RELIABLE IMPROVED CONNECTIVITY ACCESS FOR ALL REDUCED EMISSIONS
2015/16 Council LOGO 0 ABOUT US Strathclyde Partnership for Transport (SPT) is the Regional Transport Partnership for the west of Scotland and is a partnership of twelve councils. SPT was established by
More informationInfrastructure Plan. Scoping Report
Infrastructure Plan Scoping Report November - I - 2009 Infrastructure Plan Scoping Report Contents: Page 1.0 Introduction 1 2.0 Approach 5 3.0 Timetable 7 - I - 1.0 Introduction 1.1 The Infrastructure
More informationDoing business with the Council
Doing business with the Council Contents INTRODUCTION 1 POLICIES AND PROCEDURES 2 BUSINESS OPPORTUNITIES 3 TENDERING 4 WHAT THE COUNCIL LOOKS FOR 5 CONTRACTS 7 SUPPORTING LOCAL AREA 7 FREEDOM OF INFORMATION
More information2 Integrated planning. Chapter 2. Integrated Planning. 2.4 State highway categorisation and integrated planning
2 Integrated planning Chapter 2 Integrated Planning This chapter contains the following sections: Section No. Topic 2.1 Introduction to integrated planning 2.2 Transit s Integrated Planning Policy 2.3
More informationHIGHWAYS ENGLAND STRATEGIC BUSINESS PLAN OVERVIEW 2015-2020
HIGHWAYS ENGLAND STRATEGIC BUSINESS PLAN OVERVIEW 05-00 STRATEGIC ROAD NETWORK 4,00 miles of motorways and major A roads A billion tonnes of freight transported each year 4 million people drive on the
More informationHIGH QUALITY OFFICE SPACE FROM 2 100 PEOPLE AT MANCHESTER AIRPORT
HIGH QUALITY OFFICE SPACE FROM 2 100 PEOPLE AT MANCHESTER AIRPORT Self-contained and compact, Manchester Airport is a business destination in its own right; one that s easy to access and get around. It
More informationAPPENDIX I EU PROCUREMENT AN INTRODUCTION
APPENDIX I EU PROCUREMENT AN INTRODUCTION EU Procurement An Introduction In accordance with EU Regulations, Procurements which exceed certain values must be advertised in Europe and must follow certain
More informationInternational transit, freight and logistics property to let at the UK s northern distribution gateway
International transit, freight and logistics property to let at the UK s northern distribution gateway KEY STATS 100,000 TONNES CARGO HANDLED ANNUALLY 3,000m 2 X 3,000M RUNWAYS World Freight Terminal at
More informationNon-Staff Travel, Subsistence and General Expenses Policy and Procedures
Non-Staff Travel, Subsistence and General Expenses Policy and Procedures Responsible Officer Author Business Planning & Resources Director Corporate Office Date effective from December 1999 Date last amended
More informationNeed for the scheme. The project will bring a number of benefits to road users including:
Introduction Welcome to our Project Bank Account (PBA) industry briefing event for the A96 Inveramsay Bridge Improvement Project, which is the first Scottish road infrastructure project to use a PBA. The
More informationSTARS Europe Accreditation Scheme
STARS Europe Accreditation Scheme Accreditation Guidance for STARS SCHOOLS Primary Schools This document brings together all the information needed for STARS schools implementing the STARS campaign Mobiel
More informationCycling and Public Transport: Designing for safety and convenience. Designing for safe cycling and the Manchester Metrolink network.
Cycling and Public Transport: Designing for safety and convenience. Pete Abel, Love Your Bike, Designing for safe cycling and the Manchester Metrolink network. 10 th June 2015 The Love Your Bike campaign
More informationHow to Do Business. With. Cheshire Constabulary
How to Do Business With Cheshire Constabulary A guide for suppliers January 2010 1 Contents INTRODUCTION 3 PROCUREMENT RULES AND REGULATIONS 3 European Regulations 3 National Rules 4 Local Rules 4 HOW
More informationCycle Network Modelling A new evidence-based approach to the creation of cycling strategy
Cycle Network Modelling A new evidence-based approach to the creation of cycling strategy A The Business Cycle, London, mapping of commuter cycle routes and hotspots, 2000. A It is refreshing to see an
More informationTown Centres GREATER MANCHESTER SPATIAL FRAMEWORK DRAFT TOPIC PAPER 5 TOWN CENTRES
GREATER MANCHESTER SPATIAL FRAMEWORK DRAFT TOPIC PAPER 5 TOWN CENTRES October 2010 1 INTRODUCTION This paper is concerned primarily with the 8 sub regional centres outside of the Regional Centre : Altrincham;
More informationregent house heaton lane stockport SK4 1BS
regent house heaton lane stockport SK4 1BS Don t just take our word for it On the Beach are an expanding business and we needed a landlord that could provide flexibility and who understood our requirements.
More informationResidential Development Travel Plan
Residential Development Travel Plan A Template for Developers Name of Development (Address) Name of Developer (Contact Details) Date of Travel Plan For office use: Planning reference.. /.. /.. Residential
More informationDelivering Customer Focused Outcomes and Value for Money through Commissioning and Procurement
Delivering Customer Focused Outcomes and Value for Money through Commissioning and Procurement Procurement Strategy 2012-2015 V1.0 Please consider the environment if you need to print this document and
More informationProcurement and contract management strategy
Procurement and contract management strategy Approved 2015 by Contents 1 Introduction...3 1.1 Purpose of procurement and contract management strategy 1.2 What is procurement? 1.3 What is contract management?
More informationNOTTINGHAM. Workplace Parking Levy
Workplace Parking Levy NOTTINGHAM About Nottingham Nottingham is an ambitious and vibrant city. It is designated as a core city and is ranked as a top ten UK retail centre. The Greater Nottingham economy
More informationLondon Borough of Bromley COMMISSIONING - PROPOSED TOTAL FACILITY MANAGEMENT CONTRACT
Report No. DRR14/089 London Borough of Bromley PART 1 - PUBLIC Decision Maker: Executive Date: 15 th October 2014 Decision Type: Non-Urgent Executive Key Title: COMMISSIONING - PROPOSED TOTAL FACILITY
More informationTransport and Logistics Management
Transport and Logistics Management MA/PGDip Greenwich Campus gre.ac.uk/business Why study this programme? Transport-related activities comprise the second largest global business sector (after construction)
More informationMajor and Minor Schemes
1 Major and Minor Schemes Peterborough City Council has identified a number of proposals for major transport schemes over the next five year period that will support the planned housing and employment
More informationOpening Doors. The Charter for SME Friendly Procurement
Opening Doors The Charter for SME Friendly Procurement Foreword 99% of all Welsh businesses are Small and Medium Enterprises (SMEs) and the Welsh Assembly Government recognises and appreciates the very
More informationInternal & External Factors. Internal Factors. External Factors. Political. Economic
Internal & External Factors Internal Factors Availability of finance Availability of staff Availability of time Experience/Training of staff Equipment available Current technology Quality of products Leadership/Quality
More informationHow To Develop A Balanced Transport System In Devon
Devon Structure Plan First Review - 1995 to 2011 7 Transportation (T Policies) Explanatory Memorandum (September 1999) (Policies and Proposals adopted February 1999) 7. TRANSPORTATION 7.1 Transportation
More informationConsultation on possible location of main site
THE HIGH SPEED RAIL COLLEGE Consultation on possible location of main site MARCH 2014 Contents Contents...2 The high speed rail college: consultation on possible location of main site...3 1. Introduction...4
More informationTo join Achilles UVDB, visit www.achilles.com/uvdb, call +44 (0)1235 861118 or email enquiries@achilles.com
UVDB Achilles UVDB FAQ s About Achilles UVDB What is the Achilles UVDB Supplier Information Management Service? Achilles UVDB is the community for the UK utilities industry. It enables the utilities sector
More informationHow to Tender for our Work
Pembrokeshire County Council Cyngor Sir Penfro How to Tender for our Work Parc Cenedlaethol Arfordir Penfro Pembrokeshire Coast National Park COLEG Sir Benfro Pembrokeshire COLLEGE March 2014 Contents
More informationINDEPENDENT REVIEW OF THE CAPITAL METRO FULL BUSINESS CASE
INDEPENDENT REVIEW OF THE CAPITAL METRO FULL BUSINESS CASE Derek Scrafton Transport Systems School of Natural and Built Environments University of South Australia Preface The Terms of Reference for this
More informationCONTRACTS STANDING ORDERS (CSOs) 2015 / 2016 CSO 2015-6 1
CONTRACTS STANDING ORDERS (CSOs) 2015 / 2016 CSO 2015-6 1 PART 3G Contracts Standing Orders 2015/16 Definitions Aggregation is the combining together of the total contract value from separate contracts
More informationSustainable Travel Plan. Date: December 2013. Estates Department
Sustainable Travel Plan Date: December 2013 Estates Department Next Revision: December 2014 Sustainable Travel Plan Key Deliverables 1. Improve bike parking facilities at Southwark and Havering campus.
More informationProcurement and Contract Management Strategy 2013-2017
Procurement and Contract Management Strategy 2013-2017 Title Owner Version 1 Distribution Procurement and Contract Management Strategy 2013 2017 Procurement and Performance Manager Corporate Issue date
More informationTiming Events are timed as conveniently as possible, avoiding school holidays and exam times.
HOME Schools & Colleges Teachers Guide 2015-2016 This Teachers Guide includes fire procedures and useful information for schools, colleges and similar groups attending events. It is accompanied by a Risk
More informationREGISTERS OF SCOTLAND SUPPLIER GUIDE TO PROCUREMENT
REGISTERS OF SCOTLAND SUPPLIER GUIDE TO PROCUREMENT 1. PURPOSE The purpose of this Guide is to provide suppliers with information and guidance on Purchasing and the Procurement function at Registers of
More informationForeword 4. 1 Introduction 6. 2 Our Approach 7. Strategic Framework 8. Delivering Together 9. The Liverpool City Region 10.
Contents Foreword 4 1 Introduction 6 2 Our Approach 7 Strategic Framework 8 Delivering Together 9 The Liverpool City Region 10 3 Governance 11 4 Our Vision, Mission and Values 12 5 Delivery Drivers 13
More information18 November 2015 At a meeting of the Select Committee held at 10.30 a.m. at County Hall, Chichester.
Environmental & Community Services Select Committee 18 November 2015 At a meeting of the Select Committee held at 10.30 a.m. at County Hall, Chichester. Present: Mr Tyler (Chairman) Mr Barrett-Miles Mr
More informationVision for Salisbury Quality Bus Partnership. 25 July 2012
Vision for Salisbury Quality Bus Partnership 25 July 2012 Vision for Salisbury Quality Bus Partnership Signed on 25 July 2012 Sir Christopher Benson J.P., D.L. Chairman... Salisbury Vision Partnership
More informationSurveys If you want to find out what a large group of people think, the easiest thing to do is carry out a survey.
Introduction NJ Font Bold 24 As a JTA one of the first things you can do is carry out some research. Research will help you know what topics the people in your school are interested in and will help you
More informationAccess Fund for Sustainable Travel Guidance on Bidding. Moving Britain Ahead
Access Fund for Sustainable Travel Guidance on Bidding Moving Britain Ahead July 2016 The Department for Transport has actively considered the needs of blind and partially sighted people in accessing this
More informationInnovative ticketing systems for public transport
10 Innovative ticketing systems for public transport The CIVITAS Initiative is a European action that supports cities in the implementation of an integrated sustainable, clean and energy efficient transport
More informationAPPENDIX B - PL1 Homes that meet people s needs and aspirations
APPENDIX B - PL1 Homes that meet people s needs and aspirations Decent and accessible homes are vital to all. Our focus on providing affordable homes is being progressed primarily through the Affordable
More informationfor the year ended 27 June 2015 STRONGER TOGETHER Annual Report and Accounts 2015
Annual Report and Accounts for the year ended 27 June STRONGER TOGETHER Annual Report and Accounts Strategic report Governance Financial statements Shareholder information OUR LEADERSHIP TEAM DISCUSSES
More informationTfL Corporate Archives Research Guides
TfL Corporate Archives Research Guides Research Guide No 15: Health Safety Records The Transport for London Corporate Archives has a substantial amount of material which relates to safety issues. The following
More informationClaughton Medical Centre Travel Plan
Claughton Medical Centre Travel Plan June 2011 1 Contents Page 1. Introduction 2 2. Objectives 3 3. Targets 5 4. Site Audit 6 5. Travel Survey 11 6. Marketing strategy 13 7. Monitoring and review 15 8.
More informationMidlands Connect. Economic Impacts Study
Midlands Connect Economic Impacts Study May 2015 In 2036, if journey times were cut by 20% across all of the intensive growth corridors Introduction The location of the Midlands, at the heart of the UK
More informationSubmission to the Assembly Regional Development Committee Inquiry into Sustainable Transport. September 2009
Submission to the Assembly Regional Development Committee Inquiry into Sustainable Transport September 2009 1. The Sustainable Development Commission (SDC) 1.1. The SDC is the Government s independent
More informationA new Garden Neighbourhood for West Guildford An opportunity for Smart Growth. university of surrey November 2013
A new Garden Neighbourhood for West Guildford An opportunity for Smart Growth university of surrey November 2013 A new Garden Neighbourhood for West Guildford Preface Since the County and Borough Councils
More informationThe New Mobility: Using Big Data to Get Around Simply and Sustainably
The New Mobility: Using Big Data to Get Around Simply and Sustainably The New Mobility: Using Big Data to Get Around Simply and Sustainably Without the movement of people and goods from point to point,
More informationSustainable Development Strategy
Sustainable Development Strategy Our vision and strategy: A railway fit for the future 2013 2024 Document Ref: SBPT204 Version 0.71 Executive summary Network Rail exists to generate outstanding value for
More informationMD-7-466 Rev.2 24/09/14 P1 of 13
MD-7-466 Rev.2 24/09/14 P1 of 13 TABLE OF CONTENTS Introduction Purpose of Booklet... 3 Introduction to the Bundaberg Region... 3 What does Council purchase?... 5 Legal rules that affect Council s purchasing...
More informationWelcome. to Sheffield The UK s most business friendly city. Software and IT
Software and IT Welcome David Richards WANdisco to Sheffield The UK s most business friendly city Software and IT Sheffield is increasingly being seen nationally and internationally as one of the most
More informationNFC in Public Transport
January 2011 This document is copyright 2005 2011 by the NFC Forum. All rights, including the right to copy and further distribute, are reserved. NFC Forum, Inc. 401 Edgewater Place, Suite 600 Contents
More informationDate: 26/01/2004. MEETING NAME Executive Delegation of award of energy supply contracts
Item No. Classification: Open Report title: Ward(s) or groups affected: From: Date: 26/01/2004 MEETING NAME Executive Delegation of award of energy supply contracts ALL Assistant Chief Executive Strategy
More informationReport on Maximising the role of RTPs in furthering improvements to transport in Scotland
Agenda 7 Report on Maximising the role of RTPs in furthering improvements to transport in Scotland Committee Strategy and Programmes Date of meeting 13 November 2015 Date of report 21 October 2015 Report
More informationSouthampton Local Sustainable Transport Fund
Centre for Sustainable Travel Choices Southampton Local Sustainable Transport Fund First Annual Report 1 April 2012 to 31 March 2013 TWE ET1 Funded by the Department for Transport This report This report
More informationNATIONAL TRANSPORT STRATEGY - CONSULTATION SUMMARY REPORT. Chapter 1 Background 1. Chapter 2 Pre-Consultation Stakeholder Events 2
NATIONAL TRANSPORT STRATEGY - CONSULTATION SUMMARY REPORT CONTENTS Chapter 1 Background 1 Chapter 2 Pre-Consultation Stakeholder Events 2 Chapter 3 Written Consultation 7 Chapter 4 User Consultation 9
More informationFASTER. EASIER. COOLER.
FASTER. EASIER. COOLER. BiTiBi FACT SHEETS The sole responsibility for the content of this publication etc lies with the authors. It does not necessarily reflect the opinion of the European Union. Neither
More information