LAKEVIEW CENTENNIAL HIGH SCHOOL

Size: px
Start display at page:

Download "LAKEVIEW CENTENNIAL HIGH SCHOOL"

Transcription

1 LAKEVIEW CENTENNIAL HIGH SCHOOL

2

3 CAMPUS DATA LAKEVIEW CENTENNIAL HIGH SCHOOL 3505 Hayman Dr., Garland, TX Facility # 005 Year Built 976 No. of Buildings No. of Portables 20 Approx. Total Square Footage Grades Served 303,033 9 th through 2 th Current Enrollment 2,063 Approx. Capacity 2,30 Building Levels 2 Facility Assessment Report, Garland Independent School District 3

4 SITE PLAN 4 Facility Assessment Report, Garland Independent School District

5 MASTER PLAN - FIRST FLOOR Facility Assessment Report, Garland Independent School District 5

6 MASTER PLAN - SECOND FLOOR 6 Facility Assessment Report, Garland Independent School District

7 MASTER PLAN - FIRST FLOOR COLOR LEGEND Administration Athletics CATE Cafeteria/Kitchen Circulation Fine Arts Library Toilets/Support Spaces Resource Facility Assessment Report, Garland Independent School District 7

8 MASTER PLAN - SECOND FLOOR COLOR LEGEND Athletics Circulation Science Lab CATE Fine Arts Resource Library Toilets/Support Spaces 8 Facility Assessment Report, Garland Independent School District

9 SITE - CIVIL GENERAL EXISTING SITE CONDITIONS AND DEFICIENCIES Overall vehicular paving condition: Overall sidewalk paving condition: Pavement striping condition: Fair Fair Poor Site Deficiencies: The concrete for the parking lot and drives are in fair condition across the site with large isolated areas of pavement cracked and failing. The access drive north of the student lot is in poor condition with significant cracking and pavement failure. There are 2 entrances around the main high school building that do not have ADA compliant access. Large portions of sidewalks around the site have heaved, subsided, and/or cracked preventing ADA access to doors and various facilities. The side-slopes of the drainage channel along the southeast property line are too steep to maintain. Erosion and vegetation control is an issue along the channel. A drainage sump and pump to north of the softball field is clogged and erosion has exposed piping. The bottom of the grade beam along a portion of the southeast building face is exposed due to erosion. The striping condition across the entire site is in fair condition with isolated areas that are flaking and fading. Facility Assessment Report, Garland Independent School District 9

10 SITE - CIVIL Location Map 0 Facility Assessment Report, Garland Independent School District

11 SITE - CIVIL No ADA route to softball field due to ramp configuration. Differential vertical movement at sidewalk joint. Unsecured gate access to tennis courts. Erosive conditions due to steep channel embankment. Sump clogged. Buried pipe exposed. Sidewalk cracked. Non-accessible route due to step. Facility Assessment Report, Garland Independent School District

12 SITE - CIVIL Concrete pavement cracked. Uneven panels. Concrete pavement cracked and spalling. Uneven panels. Door non-accessible due to steps. Concrete sidewalk cracked. Sidewalk heaving and uneven. Doors non-accessible due to steps. Erosion occurring along building edge. Grade beam exposed. 2 Facility Assessment Report, Garland Independent School District

13 SITE - CIVIL Doors non-accessible due to steps. Stairs are noncompliant due to uneven steps. Door non-accessible due to step. Door non-accessible. Northeast concrete pavement in poor condition. Concrete cracking occurring. Door not ADA accessible. Concrete spalling occurring. Sidewalk exceeds 2.0% at door. Facility Assessment Report, Garland Independent School District 3

14 SITE - CIVIL Swale clogged at curb cuts. Ponding occurring. Debris and siltation within channel. Erosion occurring along channel edges. Bleacher ramps are non-compliant. Door not ADA accessible. Door non-accessible due to curb/step. Dumpster area striping in poor condition. Concrete staining occurring. 4 Facility Assessment Report, Garland Independent School District

15 SITE - CIVIL Pavement in poor condition. Spalling, cracking and subsiding occurring. Curb and sidewalk broken. Pavement broken, cracked and subsiding. Sidewalk subsiding. Doors non-accessible due to steps. Sidewalk subsiding. Facility Assessment Report, Garland Independent School District 5

16 SITE - CIVIL Sidewalk heaving. Sidewalk cracked and subsiding. Southwest parking lot and drive aisle pavement in good condition. Joint need to be sealed. Door non-accessible due to step. Concrete pavement in fair condition. Cracking and spalling in isolated areas. Concrete pavement broken, cracked and subsiding. 6 Facility Assessment Report, Garland Independent School District

17 SITE - CIVIL West parking lot and drive aisle pavement in fair condition. Spalling and cracked concrete. Joints need to be sealed. Isolated areas of excessive cracking. West drive aisle pavement in poor condition. Concrete cracked and subsiding. West drive aisle pavement in poor condition. Concrete cracked and subsiding. West drive aisle pavement in poor condition. Concrete cracked, spalling and subsiding. Facility Assessment Report, Garland Independent School District 7

18

19 BUILDING CONDITION: EXTERIOR Lakeview Centennial consists of a brick structure with concrete accents. There are very few windows at this facility. The windows are single pane glass, and do not provide optimal energy efficiency as compared to a double pane window system. The brick walls are in need of repair, especially at the control joints. Sealant has deteriorated and is cracking or missing at most of the joints. These weak spots create possible areas of water infiltration to the wall systems. Several portions of brick walls around the structure indicate signs of moisture damage, as seen by discoloration of brick units and stains on the surface. Handrails at this facility do not currently meet code compliance. Rails are either missing, or do not have the correct dimensions or extensions, as required by code. Facility Assessment Report, Garland Independent School District 9

20 BUILDING CONDITION: EXTERIOR Facility Assessment Report, Garland Independent School District

21 BUILDING CONDITION: EXTERIOR Uneven brick color indicates possible water infiltration to the wall system. View of main entrance and drop off point. Brick wall indicates possible water infiltration, as evident by the brick colors. Cracked pavement at side exit. Steps leading to doors do not have handrails and concrete has pulled away from walkway surface, leaving a gap at the bottom stair. Moisture stains are visible, running down the wall from the soffit. Sealant at control joints should be replaced with new material. This joint has been patched, although cracks are visible. Facility Assessment Report, Garland Independent School District 2

22 BUILDING CONDITION: EXTERIOR Handrails from stair are not code compliant. Paint is peeling at control joints. Stair is missing handrails at both sides; walkway has shifted, as seen by uneven treads at bottom step. Joints have areas of missing sealant. Material should be removed and replaced with new sealant. Brick walls at service area have damage to masonry units. A sizable gap exists between brick wall and face of concrete. This opening could cause potential water infiltration. 22 Facility Assessment Report, Garland Independent School District

23 BUILDING CONDITION: INTERIOR (DOOR AND HARDWARE) Wood veneer doors are used at classrooms, with metal doors at stairwells and entrances. Classroom doors have door knobs, which do not met code compliance. Additionally, classroom doors are not equipped with lock down capability. Metal doors are mostly in poor condition, with damage to the leaf and/or hardware. Exterior metal doors have full glass panels, which have sealant that has deteriorated and has been painted over repeatedly. Sealant should be removed and replaced with new material. Facility Assessment Report, Garland Independent School District 23

24 BUILDING CONDITION: INTERIOR (DOOR AND HARDWARE) Facility Assessment Report, Garland Independent School District

25 BUILDING CONDITION: INTERIOR (DOOR AND HARDWARE) Floor Plan Level 2 Facility Assessment Report, Garland Independent School District 25

26 BUILDING CONDITION: INTERIOR (DOOR AND HARDWARE) Door handles with thumb latches are not code compliant. Door face shows heavy wear and damage to the wood. Door handle at main entry doors. Finishes have worn off. Glazing at doors is single pane, and sealant needs to be replaced with new material. Door closer is missing cover box and arms are sagging. Closer does not function properly. Door leads to a stairwell for egress. Door knobs are not code compliant. Typical door hardware at classrooms; knobs are not compliant and doors are not equipped with lock-down capability. 26 Facility Assessment Report, Garland Independent School District

27 BUILDING CONDITION: INTERIOR (INTERIOR FINISHES) Typical corridor finishes include terrazzo floors with brick walls and portions of ceramic tile at walls. Ceramic tile has broken and cracked pieces, particularly at the corners and edges. The majority of walls in this facility have vinyl wall covering that has been painted over. In most cases, the wall covering is peeling up at corners and at the base. Classrooms have VCT floors, which show heavy wear, especially at the science labs on the second level. Casework in the science labs is a mixture of older pieces and new sections of casework. Facility Assessment Report, Garland Independent School District 27

28 BUILDING CONDITION: INTERIOR (INTERIOR FINISHES) Facility Assessment Report, Garland Independent School District

29 BUILDING CONDITION: INTERIOR (INTERIOR FINISHES) 6 5 Floor Plan Level 2 Facility Assessment Report, Garland Independent School District 29

30 BUILDING CONDITION: INTERIOR (INTERIOR FINISHES) Terrazzo flooring at the entrance lobby is stained from a previous fixture that has been removed. Ceramic wall tile at main corridor has cracked and broken tiles, especially at the base and corners. This area has been patched with tiles that are a different color. Terrazzo treads at stairways have chips near the nosings. Typical classroom finishes; VCT flooring and vinyl wall covering at walls. Wall coverings do not comply with district standards. Typical ceilings have 2x2 ceiling tiles. VCT flooring, particularly at the science labs, is in poor condition. This room has a sizable hole at the edge. 30 Facility Assessment Report, Garland Independent School District

31 BUILDING CONDITION: INTERIOR (RESTROOMS) Restroom finishes for student restrooms consist of wall tile with porcelain tile floors and plastic partitions. Partitions have damage and/or vandalism, and some partitions have been painted over and patched together with other materials. Restroom entries have vinyl wall covering on the walls, which is peeling up at corners. Ceiling grids have rust and should be replaced. Facility Assessment Report, Garland Independent School District 3

32 BUILDING CONDITION: INTERIOR (RESTROOMS) Facility Assessment Report, Garland Independent School District

33 BUILDING CONDITION: INTERIOR (RESTROOMS) Floor Plan Level 2 Facility Assessment Report, Garland Independent School District 33

34 BUILDING CONDITION: INTERIOR (RESTROOMS) Faucet hardware is not code compliant; mirrors show rust and damage at the bottom. Typical floor finishes at restrooms. Vinyl wall covering I peeling off at the corner and bubbling up. Toilet seat is discolored and stained. Rust is visible on the ceiling grid. Partition has been pieced together and painted over. Crack visible at sealant, where fixture is mounted to wall. 34 Facility Assessment Report, Garland Independent School District

35 BUILDING CONDITION: FINE ARTS Lakeview Centennial has a Band Hall and Choir Hall both rooms have carpeted floors with gyp board walls and regular lay-in ceiling tiles. Per district standards, VCT flooring should be used at these spaces. The instrument storage at the Band Hall consists of built-in plastic laminate shelves. Laminate has peeled off at the faces, revealing the material underneath. Some practice rooms have wall carpet, which is separating at the seams and in poor condition. Facility Assessment Report, Garland Independent School District 35

36 BUILDING CONDITION: FINE ARTS Facility Assessment Report, Garland Independent School District

37 BUILDING CONDITION: FINE ARTS Built-in shelving for instruments is in poor condition. Plastic laminate has peeled off the edges. View of band hall. Room does not have a specialty acoustic ceiling and has carpet at the floor. District standards specify VCT flooring at band halls. Paint is peeling, revealing under layers of material. View of Choir Hall. Room has carpet and regular lay-in ceiling tiles. Typical practice room, which has gyp board walls and rolled carpet at floor. No specialty acoustic ceiling treatment is used. Wall carpet is peeling at the seams. Facility Assessment Report, Garland Independent School District 37

38 BUILDING CONDITION: ATHLETICS Both the competition gym and the P.E. gym have hardwood floors, which are covered with several layers of a polyeurethane coating. Despite this coating, the floor have uneven surfaces and knicks. The athletic equipment, such as basketball goals and wall pads, are in satisfactory condition. Ceilings have acoustic panels inset in between the structural members, and the panels have stains from water damage. Doors to the gym abut a sloped area of floor, which is greater than the allowable slope per code. Masonry walls inidcate possible water infiltration, due to the texture of paint on the masonry units. 38 Facility Assessment Report, Garland Independent School District

39 BUILDING CONDITION: ATHLETICS Floor Plan Level Facility Assessment Report, Garland Independent School District 39

40 BUILDING CONDITION: ATHLETICS Hardwood flooring at competition gym has an uneven surface across the boards. Floor has been painted and has many layers of polyurethane applied. View of basketball goals, which are in good condition. Ceiling has acoustic panels, which have water stains. Fixed metal bleachers at competition gym are in good condition. Gym floor ramps down to meet the doors. Slope seems quite steep. Texture of paint on the masonry walls indicates possible water damage to the masonry. 40 Facility Assessment Report, Garland Independent School District

41 BUILDING CODE AND TAS Typical door hardware at classrooms consists of door knobs, which do not meet code requirements. Additionally, several doors have thresholds which exceed the maimum height allowed between two surfaces. Handrails and guardrails are not compliant, and do not meet the required dimensions as outlined by code. Sinks do not provide knee clearance for occupants in a wheelchair. The Band Hall and Choir Hall currently do not have an accessible route. Both rooms have stairs at the entry by the doors. The elevator that serves these two rooms does not meet code compliance. Facility Assessment Report, Garland Independent School District 4

42 BUILDING CODE AND TAS Floor Plan Level 42 Facility Assessment Report, Garland Independent School District

43 BUILDING CODE AND TAS 5 Floor Plan Level 2 Facility Assessment Report, Garland Independent School District 43

44 BUILDING CODE AND TAS Water coolers do not meet the code requirement for knee space dimensions. Choir Hall and Band Hall both have stairs at entry of room. An elevator that services both spaces is not code compliant; thus these spaces are inaccessible. Door threshold from gym is too steep; thresholds should not be greater than ¼ height difference between two surfaces. Sink at faculty workroom/lounge is not code compliant and does not provide required knee clearances. Typical condition at second level stairwells; guardrails are not compliant. Egress door has a steep threshold. Occupants must step down as they exit. 44 Facility Assessment Report, Garland Independent School District

45 ENGINEERING REPORT - MECHANICAL / ELECTRICAL / PLUMBING Mechanical Systems Information The mechanical system at Lakeview Centennial High School (LCHS) is a two-pipe, chilled water hot water system that is comprised of numerous air handling units (AHUs), variable air volume boxes (VAV), and a central plant consisting of two water cooled chillers, two hot water boilers, and six associated pumps. The system also consists of several DX Gas rooftop units (RTUs) that serve various areas of the facility. Lakeview Centennial High School was constructed in 975. The classroom spaces located within this original section of the building are currently being served by a total of eight Trane VAV air handling units. These units are located in rooftop mechanical penthouses and were installed during the building s construction. They are in poor condition and have potentially reached the end of their useful life. The VAV AHUs serve the building s classroom spaces by providing conditioned air to numerous VAV boxes throughout the facility. These boxes are located above ceiling and regulate the flow of conditioned air into the spaces below. There are a total of 75 boxes on site at LCHS, all of which have been equipped with electric heat. They were manufactured by Tempmaster in 975 and are in poor condition. The gymnasiums, dressing rooms, cafeteria, admin office and resource center areas are currently being served by CHW/HW Trane constant volume air handling units. Rather than serve various spaces via VAV boxes, constant volume AHUs are dedicated to serving a single, particular space. The constant volume AHUs at LHCS are original to the building and are in poor condition. They have potentially reached the end of their useful life and may need to be replaced in the near future. Rooms 300 and 302 are served by two Trane CHW/HW fan coil units. These units were installed in 976 and are in poor condition. The facility s two water cooled chillers are 225 ton Trane units that are located in Mechanical Room 090. These units were installed in 2003 and are in good condition. Located just outside Mechanical Room 090 are two 999 cooling towers. These units are in good condition and should have several years of useful life left. Primary Chilled Water Pumps and 2 are Bell and Gossett pumps that are 3 Hp and 7.5 Hp units respectively. Secondary CHW/HW Pumps and 2 are 30 Hp Bell and Gossett units, and Condenser Water Pumps and 2 are 25 HP Bell and Gossett units. All pumps were installed in 2003 and are in good condition. The plant s two hot water boilers are Kewanee units that are original to the building. They are in poor condition and have reached the end of their useful life. The Technology Lab is currently being served by a 2.5 ton Carrier rooftop unit that was installed in 997. This RTU in poor condition and has reached the end of its useful life. The media studio and football dressing rooms are served by a total of seven Aaon DX GAS RTUs. These units were installed in 200 and are in moderate to poor condition. The Welding and Automotive Technology shops are served by three Lennox DX Gas RTUs that were installed in These units are in good condition and should have several years of useful life left. Mechanical systems are shown in the areas of the building they serve on the color-coded floor plan below. Facility Assessment Report, Garland Independent School District 45

46 ENGINEERING REPORT - MECHANICAL / ELECTRICAL / PLUMBING Electrical Systems Information The electrical system at Lakeview Centennial High School has undergone several renovations since the building first opened in 976. Electrical distribution equipment typically has a 20 to 30 year useful life after which, retrofitting, refurbishing or replacement is necessary to maintain a reliable electrical system. There is a single 480/277 service entry for the facility, with the main switchgear being located in Mech-0. It is a 3000 amp Federal Pacific MSB and is in poor condition. There are a total of fifty-five Federal Pacific panels and transformers located throughout the building. This equipment is outdated and obsolete. It is in poor condition and is at the end of its useful life. The remainder of the electrical system is comprised of Challenger, Eaton and General Electric distribution equipment. These panels and transformers are in good to moderate condition and are working satisfactorily at this time. Plumbing Systems Information A majority of the plumbing fixtures and piping are original to the building. This being the case, there are many ADA compliancy issues throughout. Maintenance has reported a lack of isolation valves on site and that there have been issues with the sewer line. It has also been noted that the Art and Homemaking Room areas are in need of upgrading. Flush valves on toilets and urinals are a combination of Sloan and Zurn manufacturers. Approximately 25% of the flush valves are low-consumption units. A majority of the lavatory faucets throughout the facility are metered. The building s electric water coolers are a combination of Oasis, Elkay and Halsey-Taylor units, approximately half of which are ADA compliant. There are three water heaters on site at LCHS. All three are 00 gallon Lochinvar EWN models that were installed in 202. They are all in good condition and should have several years of useful life left. 46 Facility Assessment Report, Garland Independent School District

47 Lakeview Centennial High School (Facility #005) ENGINEERING REPORT - MECHANICAL / ELECTRICAL / PLUMBING First Floor Facility Assessment Report, Garland Independent School District 47

48 ENGINEERING REPORT - MECHANICAL / ELECTRICAL / PLUMBING Second Floor Facility Assessment Report, Garland Independent School District

49 ENGINEERING REPORT - MECHANICAL / ELECTRICAL / PLUMBING MECHANICAL EQUIPMENT AREA PLAN NOTES:. Central Plant (Red) 2. Area(s) served by 975 CHW/HW Trane AHUs (Blue) 3. Area(s) served by 999 Carrier DX Gas RTU (Green) 4. Area(s) served by 200 Aaon DX Gas RTUs (Orange) 5. Area(s) served by 2008 Lennox DX Gas RTUs (Pink) Facility Assessment Report, Garland Independent School District 49

50 ENGINEERING REPORT - MECHANICAL / ELECTRICAL / PLUMBING Lighting Information Lighting was renovated in All ballasts are electronic and the standard fluorescent bulb size is T8 throughout the building. Gym lighting fixtures are T5HO high bay fluorescents. Exterior lighting is sufficient. Lighting is in good condition throughout the facility. Fire Alarm Information The fire alarm panel is manufactured by Harrington. The model of the panel is The panel is addressable and was installed in The panel was reporting trouble in zone. Fire Sprinkler System Information There is no fire sprinkler system currently in place at Lakeview Centennial High School. In order for this facility to be up to code, such a system should be installed. Energy Management System Information The controls on the CHW/HW system were renovated in Pneumatic valves and dampers on all AHUs, FCUs and VAV boxes remained in place and operational. These valves and dampers are controlled by DDC transducers. If this equipment is scheduled to be replaced in the near future, it may be beneficial to also replace controls at that time. All DX Gas RTUs were equipped with DDC control upon installation. 50 Facility Assessment Report, Garland Independent School District

51 ENGINEERING REPORT - ROOFING General Conditions The building features stucco wall panels and brick veneer exterior. All roof areas are covered with an asphalt gravel surfaced Built-Up roof system. Area A was replaced in 99. Areas C, D, E and F were re-roofed in 993, Areas B2, E2 and G in 998. The foyer and auditorium roof areas were replaced in Roof areas terminate into gravel guard edge conditions or walls. Drainage is provided by interior drains on most areas. Scuppers and downspouts were found on penthouse roofs in Areas D-F. The structural deck is lightweight concrete in most areas except in the gyms where tectum was found. Drainage/Slope Drainage on Areas A and G would be rated as satisfactory. Drainage on other sections would be graded as fair overall since there are locations around drains that retain some water as evidenced by discolored gravel. There is a large area on the North side of the auditorium roof that ponds water that could not be upgraded by adding drains or tapered insulation because it is directly above the stage and adjacent to fire hatches. Leaves and debris have accumulated around the drain next to the planetarium rise wall. Roof Membrane The roof membrane for the older sections is in satisfactory condition. The roof membrane covering the gym would be graded as good and the auditorium and foyer are in very good condition. Flashings Flashings at the base of walls and curbs in Areas A-C,D E and F are in fair condition. There appears to be water trapped behind base flashing along the rise wall in Area C4. Flashings at curbs and the base of walls in the more recent re-roof locations are in good condition. Surfacing Coverage of pea gravel surfacing is eroding along the edge to varying degrees depending on the age of the roof sections. Wind scour was observed at several areas of the older roof sections. Sheet Metal Gravel guards, counter flashings, copings, gutters and downspouts, for the older sections are in fair condition. Counter flashing and gravel guards on sections A2, A3, B and G are in good condition. A small corner piece of counter flashing is loose at a South side corner condition on Area F. Facility Assessment Report, Garland Independent School District 5

52 ENGINEERING REPORT - ROOFING Roof Performance There have been some leaks reported in the past generally at penetrations. There is a long term unresolved leak in the former planetarium. Numerous repair attempts have been made on the walls and base flashing. Campus Recommendations. Resurface areas of gravel erosion. 2. Remove debris from all roof areas. 3. Cut and replace section of base flashing that has entrapped water on Area C4. 4. Secure and seal loose section of counter flashing on Area F. 52 Facility Assessment Report, Garland Independent School District

53 ENGINEERING REPORT - ROOFING Facility Assessment Report, Garland Independent School District 53

54 ENGINEERING REPORT - ROOFING General appearance of kitchen. Loose counter flashing at wall. Leak repairs above planetarium. General appearance. Missing drain cover. Leaves around drain cover. 54 Facility Assessment Report, Garland Independent School District

55 ENGINEERING REPORT - ROOFING Debris on roof. Typical curb and counter flashing. Gravel erosion. Roof drain and gravel erosion at edge. General appearance. Wind scour. Facility Assessment Report, Garland Independent School District 55

56 ENGINEERING REPORT - ROOFING Expansion joint curb flashing. Curb and counter flashing. Drains and overflow scuppers on gym roof. Low spot in deck creates ponding area. Curb and counter flashing. Wind scour/gravel erosion. 56 Facility Assessment Report, Garland Independent School District

57 ENGINEERING REPORT - ROOFING Drainage on auditorium roof. Gutters and downspouts. Curb flashing and roof drain. Water trapped behind base flashing. Roof drain moisture relief vent. General appearance. Facility Assessment Report, Garland Independent School District 57

58

59 ENGINEERING REPORT - STRUCTURAL The recommendations below are based on our Structural Team s review of the scans of existing documents available in Garland ISD Archives, interviews with Garland ISD Staff from the School Facilities Department and the Maintenance Department, and onsite visual surveys of representative areas that were accessible. As with any structural condition assessment, more detailed assessments can always be performed at an additional cost with more time and may lead to additional recommendations; recommendations for specific types of more detailed assessments are provided below. Specific data regarding structural descriptions and observations of current conditions is provided in the Engineering Report - Structural Appendix separately for each construction phase of each facility. Therefore, refer to the Engineering Report Structural Appendix for more detailed information on where the following recommendations apply. Relevelling or replacement of all or some of the existing foundation and grade beams/piers is recommended to address sloping floors throughout the school due to significant foundation movement. Installing soil retainers at grade beams and re-grading isolated areas along the building perimeter is recommended as to keep additional soil, debris, and water from going into the crawlspace beneath the building. We recommend chipping out the remainder of the topping slab at a door entry in the back of school and replacing with a new topping slab. If any modification to the Structurally Suspended Slab areas is desired, Special Analysis will be required and significant Architectural and Structural limitations may be required. Further Study is recommended to determine if the unreinforced masonry will have any net axial tension or excessive flexural tension under code required design wind forces, which is not permitted by the code. Retrofitting new structural components may be recommended. Further Study is recommended to determine the design and condition of the connectors between wythes. Installing new connectors may be recommended after study. Further Study is recommended to determine if there is sufficient lateral anchorage at the top of all exterior unreinforced masonry that are parallel to roof joists. Installing lateral restraints may be recommended after further study. If any modification to the Unreinforced Masonry is desired, Special Analysis will be required and significant Architectural and Structural limitations may be required. Installing new bottom chord net uplift horizontal bridging angles along the ends of the steel joist is recommended when an opportunity presents itself such as a building remodel. Facility Assessment Report, Garland Independent School District 59

60 ENGINEERING REPORT - STRUCTURAL Facility Assessment Report, Garland Independent School District

61 ENGINEERING REPORT - STRUCTURAL Isolated area with gap between soil and grade beam. Close-up of previous photograph. Note, no soil retainer. Close-up of area depicted in Photograph. Note, no soil retainer. Chipped topping slab. Facility Assessment Report, Garland Independent School District 6

62

63 FOOD SERVICE (no picture available) Replace 20 QT mixer Hot cabinets gaskets are bad and have holes inside - replace Two door freezer gaskets are bad - heater out - replace Facility Assessment Report, Garland Independent School District 63

64

65 SECURITY Summary: This security assessment was performed on October 08, 203 at Lakeview Centennial High School in Garland, Texas. There was a brief interview with the campus assistant principal Dwight Lofton, however no campus personnel accompanied us with the walk through. General Statistics: The areas immediately surrounding the campus are densely packed single family residences, and open fields to the east. The roads bordering the campus are Hayman Drive, and Rowlett Road. Staff parking is provided on the southeast side of the campus and right in front of the main entrance. Parking spaces for administration are reserved and individually marked for each position. Entry into the campus is clearly marked with school zone signage, reduced speed signs, and clearly marked crosswalk striping at intersections surrounding the campus. There are two drives into and out of the campus, both of which are off of the first off Hayman Drive. There is a four foot perimeter fence around the athletic fields, which had gates that were secured. There were bike racks to the east of Door #3 which is not observable by staff. Preparedness and Life Safety: Campus Evacuations, Lockdown Procedures, and Drills o Students, faculty, and staff all practice the ISD s mandatory standard for fire drills, emergency lock down, and shelter in place for inclement weather. o It was indicated that the school practiced Reverse Evacuation drills for students outside of the building or interior area of the school. o Not all classrooms displayed the plans for emergency procedures of fire drill evacuation plans at the entry to the classroom. o In the event of a lock down, none of the exterior windows were marked to identify the classroom number for first responders. Severe Weather o The campus has a functioning weather radio system which includes exterior mounted devices used for monitoring the weather. However, there were not enough exterior PA speakers on the school building for the announcements to be heard. Automated External Defibrillator AED o A map depicting the location of AEDs should be placed at all exterior doors, gymnasium, cafeterias, and entrance into the school. o Not all faculty and staff are trained on the AED device. First Aid Kits and Safety Equipment o There was a first aid kit in the clinic, but not in the cafeteria or gymnasium. o The stage production area inside of Room # 00C had power equipment all round and no safety equipment was observed. o Inside of Room # 2233 was an enclosed prep area in the back of classroom that did not have any safety equipment noticed in the prep area or in the classroom. Facility Assessment Report, Garland Independent School District 65

66 SECURITY o o o In Room #00G is storage for multiple fire extinguishers. In Welding Room # 323 was a number of canisters collected along the wall, opposite the office side of the shop. The cat walk above the stage and hand rails that were bent, along with the metal plates below. Outer Perimeter: There is a four foot high chain link fence around all of the athletic fields on the north end of the campus. Building Exterior: There were signs of graffiti and damage to school property at: o In the northeast corner of the Automotive Technology Room #325 is spray paint on the wall. o At the bottom of Stairs #2 is graffiti written on the brick leading toward Rm. #9. o There is graffiti on the exterior wall of Room #34. o There was a swastika just outside of Door #8. The portable buildings had damage to the following items: o There were electrical boxes that had unlocked on/off switches. There aren t any lights under the canopies which make it difficult for teachers and other staff to use this as a viable exit. The exterior lighting appears to be insufficient on the property including the play areas and canopies leading to the portables. Future investment in additional lighting may be required to support any future surveillance camera improvements. Doors and Vestibules: The main entry does not have a managed vestibule. Doorway #6 is a pair of solid metal doors and do not offer natural surveillance from the inside of the building. The exterior door out of Welding Shop #323 was found unlocked. In Room #32 and #305 are local alarms that are independent to these rooms. Just inside of Stair #9A is a communications rack that s not inside of a cabinet. Door # was found to be open and unlocked. Not all exterior doors had the number identifiers above the door. There was a metal enclosure that was open with welding materials, on the south exterior wall of the welding shop. Door #23 was propped open to allow students free access in and out of the building. In front of Classroom #22 is an open ceiling tile and junction box with wires hanging out of it. 66 Facility Assessment Report, Garland Independent School District

67 SECURITY Visitor Management: The main entry does utilize an existing intercom and surveillance camera system which is located on the exterior side of the entry. Visitors are required to press the intercom button near the front door to request entry. As visitors are identified, they are permitted to enter the office only, which is to the right as you enter the main entry. The administrative staff indicated that the LED display on the Aiphone was too dark and difficult to see the face of the person seeking entry. The campus currently utilizes a Raptor based system for checking in visitors. Electronic Safety Security / Communications: Surveillance The campus has an existing surveillance system that monitors both the interior and exterior of the building. The majority of cameras on campus are in the interior and are located at major entrances, all exit doors, and high traffic areas. o There appears to be insufficient camera coverage around the general exterior of the building including all play areas, pick up and drop off points and delivery entrances. o Citing an issue with difficulty recognizing faces on camera, the administrative staff requested that either the distance between cameras be reduced so that there are more or that resolution of the camera be increased. o Interior camera dome looking down Corridor #3 outside of Stairwell #3 had a hole in the dome, but could not tell if it affected the camera view or not. o There is multiple areas where corridors split off the main hall and created blind spots for surveillance views. o Most stairwells had a blind spot at the bottom Intrusion There is an existing intrusion alarm system used on campus. Motion detection is used as the primary means of detection which is located at exits, computer labs, cafeteria, gymnasium, and main administrative area. o Not all IDF rooms had motion detection within the rooms. Access Control The existing access control system on campus consists of card readers at strategically located doors; main entry and choice keyed exterior doors. The access control system is not used to monitor the condition of the exterior doors during the day. Intercom The campus has an intercom system throughout the school as well as several speakers installed around the exterior of the campus. Two Way Radios There were a limited number of handheld radios located on campus. o Radios were present in the main office, gymnasium, cafeteria and several select classrooms. o Not all personnel carried handheld radio at all times. o When talking to administrative staff, it was indicated that there weren t enough radios for teachers and key personnel. Facility Assessment Report, Garland Independent School District 67

68 SECURITY Building Condition: Exterior The numbers used on the map above correspond to the photos on this page and the following pages. 68 Facility Assessment Report, Garland Independent School District

69 SECURITY GISD vehicle parked on the sidewalk. View of utility pole that has a loose base near the portable buildings. View of graffiti on the exterior wall outside of Room # 34. View of electrical switch that is unprotected by a padlock and covered graffiti on the exterior of the portable building. View of Door # 23 that was propped open to allow students in and out of the building without proper credentials. View of welding materials enclosure on the exterior of the welding shop that was shut and locked. Facility Assessment Report, Garland Independent School District 69

70 SECURITY View of covered up graffiti on the exterior wall between doors # 30 and 3. View of a swastika drawn on the exterior wall outside of Door #8. 70 Facility Assessment Report, Garland Independent School District

71 SECURITY Building Condition: Interior D B E F G C A The letters used on the map above correspond to the photos on the following pages. Facility Assessment Report, Garland Independent School District 7

72 SECURITY Building Condition: Interior H I J The letters used on the map above correspond to the photos on the following pages. 72 Facility Assessment Report, Garland Independent School District

73 SECURITY There are a group of fire extinguishers in Rm. #00G. If not protected, several of them could have fallen off the table. We re unsure of what gas was contained in the canisters on the floor, but there were more than (0) inside of the Welding Shop Room # 323. There are power tools in Room # 00C, but no safety gear for using the equipment. Spray painted graffiti inside the automotive shop # 325. View of the interior of Door #6 showing that there is no natural surveillance to the outside from these doors. View of graffiti on the bottom of Stairwell #3. Facility Assessment Report, Garland Independent School District 73

74 SECURITY View of camera dome on the ceiling outside of Stairs # 3. View of chemical prep area inside of Room #2233A that does not have safety gear nearby. View of catwalk above the auditorium stage, showing that the metal hand rails are bent down, seeming unsafe to walk across. View of catwalk above the auditorium stage, showing that the metal grates are buckling in the center, seeming unsafe to walk across. 74 Facility Assessment Report, Garland Independent School District

BUILDING DATA. Facility Assessment Report, Garland Independent School District 3. Williams Stadium (Facility #913)

BUILDING DATA. Facility Assessment Report, Garland Independent School District 3. Williams Stadium (Facility #913) WILLIAMS STADIUM BUILDING DATA WILLIAMS STADIUM 510 Stadium Dr., Garland, TX 75040 Facility # 913 Year Built No. of Buildings No. of Portables 0 Approx. Total Square Footage Approx. Capacity Building

More information

HOUSTON MIDDLE SCHOOL

HOUSTON MIDDLE SCHOOL HOUSTON MIDDLE SCHOOL CAMPUS DATA HOUSTON MIDDLE SCHOOL 2232 Sussex Dr., Garland, TX 7504 Facility # 043 Year Built 960 (w/additions) No. of Buildings 2 No. of Portables 6 Approx. Total Square Footage

More information

17,280 square feet Overview:

17,280 square feet Overview: CENTRAL OFFICE Located at 167 Boston Post Road, East Lyme, Connecticut, the Central Office was built in 1916 as the original Flanders Elementary School and remains connected to the current school. The

More information

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components Infrastructure Facility Condition Summary Weighted Avg Condition Score Facility Components Systems Surveyor/ Date Done Comments G Sitework.9 Site Improvements Parking Pedestrian Paving Site Development

More information

www.citiesinspection.com October 5, 2015 Dear Client,

www.citiesinspection.com October 5, 2015 Dear Client, www.citiesinspection.com October 5, 2015 Dear Client, On 9/14/2015, Cities Inspection Service, Inc. completed a building inspection of the property located at 123 Oak Street, Someplace, Minnesota for you.

More information

Facility Assessment Report, Montgomery Independent School District

Facility Assessment Report, Montgomery Independent School District THE LEARNING CENTER CAMPUS DATA THE LEARNING CENTER 700 Dr. Martin Luther King Jr. Drive, Montgomery TX 77356 Year Built 1958 Approx. Total Square Footage Grades Served Current Enrollment 22,050 n/a n/a

More information

SODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST

SODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST SODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST SODA SPRINGS HIGH SCHOOL REPAIRS AND UPGRADES SITE Construction Estimate = $100,000

More information

BUNKER HILL ELEMENTARY SCHOOL

BUNKER HILL ELEMENTARY SCHOOL INITIAL YEAR BUILT 1970 BUILDING AREA 98,200 SF CURRENT PROGRAM CAPACITY 332 ENROLLMENT 2008 387 WARD 5 PROPOSED PROGRAM CAPACITY 750 Site Plan BUNKER HILL - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

HICKMAN ELEMENTARY SCHOOL

HICKMAN ELEMENTARY SCHOOL HICKMAN ELEMENTARY SCHOOL 2 Facility Assessment Report, Garland Independent School District CAMPUS DATA HICKMAN ELEMENTARY SCHOOL 3114 Pinewood Dr., Garland, TX 75044 Facility # 133 Year Built 1975 No.

More information

November 3, 2015 Bond and District Additional Assistance Election Information

November 3, 2015 Bond and District Additional Assistance Election Information November 3, 2015 Bond and District Additional Assistance Election Information Proposition 432 - $22 million General Obligation Bond 150+ facility projects across all schools Building renovations and improvements

More information

Items in red were complete 2-22-10. Items in green were complete on 8-2-11. Lined out items are Life Safety Codes.

Items in red were complete 2-22-10. Items in green were complete on 8-2-11. Lined out items are Life Safety Codes. Office of Safe and Orderly Schools Facility Safety Assessment Dennis Meador, School Facilities Supervisor Mark Hobson, School Facilities Supervisor Division of School Building September 18 19, 2007 Items

More information

How To Check For A Deficiency

How To Check For A Deficiency UPCS in Pictures The following pictures are not all inclusive nor does it cover every deficiency. The pictures, however are some of the most commonly cited deficiencies on REAC inspections. Erosion The

More information

March 19, 2014. Ms. Jean McDonald CAP Management 910 16th Street, Suite 1010 Denver, Colorado 80202

March 19, 2014. Ms. Jean McDonald CAP Management 910 16th Street, Suite 1010 Denver, Colorado 80202 Ms. Jean McDonald CAP Management 910 16th Street, Suite 1010 Denver, Colorado 80202 Re: Prospector s Point Walkway/Façade Repairs Martin/Martin, Inc Project No.: 13.0358.S.02 Ms. McDonald: Per your request

More information

HAMILTON SCHOOL. 1401 Brentwood Parkway, N.E., Washington, DC INITIAL YEAR BUILT 1968 BUILDING AREA

HAMILTON SCHOOL. 1401 Brentwood Parkway, N.E., Washington, DC INITIAL YEAR BUILT 1968 BUILDING AREA INITIAL YEAR BUILT 1968 BUILDING AREA 187,700 SF CURRENT PROGRAM CAPACITY N/A ENROLLMENT 2008 129 WARD 5 PROPOSED PROGRAM CAPACITY N/A Site Plan HAMILTON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule

Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule Mequon - Thiensville School District Long Range Facilities Plan Monthly Project Schedule Homestead HS Sept.'15 Oct'15 Nov'15 Dec'15 Jan'16 Feb'16 Repair Asphalt @ Main Garage Replace Exterior Hollow Metal

More information

Architectural Condition Survey

Architectural Condition Survey Architectural Condition Survey Santa Fe Railroad / AMTRAK Depot, Lawrence. Kansas for the City of Lawrence, 2002 Survey: (student) PI: William Carswell, Associate Dean, School of Architecture, University

More information

Vision Home Inspection

Vision Home Inspection Vision Home Inspection 324 Rams Run Shepherdsville KY 40165-7877 Inspector: James McFadden Property Inspection Report Client(s): Property address: Inspection date: View report summary This report is the

More information

Building Condition Assessment Report

Building Condition Assessment Report C2 - Nurses Resident (aka Administration) Building Condition Assessment Report Asset Address Address Construction Year Size (Gross Floor Area) Asset Type Floors Above Ground Inspection Date C2 - Nurses

More information

CONSERVATION MAINTENANCE WORKSHEET Universal Checklist

CONSERVATION MAINTENANCE WORKSHEET Universal Checklist 3.1 SITE 1 Concrete curbs Check for cracks, spalling, growth from joints X 2 Stone curbs Check for cracks, spalling, growth from joints X 3 Concrete walkways Look for uneven surfaces, ponding, growth from

More information

48. AQUARIUM. Aquarium. Classification: Cluster: Location: Close to junction of Inselrhue and Loiter Way, Belle Isle. Total Area: No.

48. AQUARIUM. Aquarium. Classification: Cluster: Location: Close to junction of Inselrhue and Loiter Way, Belle Isle. Total Area: No. Classification: Cluster: Location: Total Area: No. of Stories Aquarium Acreage Owned: Acquired: 1904 Most Recent Improvements: THE AQUARIUM Close to junction of Inselrhue and Loiter Way, Belle Isle Two

More information

EAST LYME HIGH SCHOOL

EAST LYME HIGH SCHOOL Overview: 1971 N 1966 GYM 1966 CLASSROOM WING 1966 AUD. 1971 GYM 1998 1998 POOL EAST LYME HIGH SCHOOL Original 1966 Building: The original East Lyme High School was constructed in 1966 and was composed

More information

MURCH ELEMENTARY SCHOOL

MURCH ELEMENTARY SCHOOL INITIAL YEAR BUILT 1929 BUILDING AREA 47,700 SF CURRENT PROGRAM CAPACITY 479 ENROLLMENT 2008 491 WARD 3 PROPOSED PROGRAM CAPACITY 500 Site Plan MURCH - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION PK-5

More information

Inspection Item COMMENTS

Inspection Item COMMENTS APPENDIX 9 AFFORDABLE HOUSING PROGRAM INSPECTION CHECKLIST Participating Jurisdiction: Homeowner Name: Assisted Property Address: Date of Physical Inspection of Property: Total Square Footage of Property:

More information

Architectural Inspection Site Structures

Architectural Inspection Site Structures 0141 Freestanding Shelters Open air shelters not attached to the building. Bike rack shelter with bike racks: This 8'x30' structure is located on the north east side of the building on the wooded landscape

More information

Designing Schools To Reduce On-Going And Future Maintenance and Repair Costs

Designing Schools To Reduce On-Going And Future Maintenance and Repair Costs Designing Schools To Reduce On-Going And Future Maintenance and Repair Costs Charles H. Johnson, Consultant School Facilities Planning Division California Department of Education March 7, 2001 1 Designing

More information

ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT

ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT 1. SAFETY, HEALTH, CODE 1.1 Structural Requirements, Seismic Stability 1.1.1 Primary Structure 1.1.2 Ceilings 1.1.3 Cabinets, Equipment 1.1.4 Portables 1.2 Fire / Life Safety 1.2.1 Corridor, Separation

More information

Facility Assessment for. 11801 East Main Street, Huntley, IL

Facility Assessment for. 11801 East Main Street, Huntley, IL Facility Assessment for 11801 East Main Street, Huntley, IL July 12, 2012 Prepared by: Dewberry Architects Inc. 25 S. Grove Avenue, Suite 500 Elgin, IL 60120 (847) 695-5840 The Village of Huntley requested

More information

CLIENT. Inspection Report. 271 Front St. Alert Bay, B.C. Island Building Inspections V ANCOUVER I SLAND B. C.

CLIENT. Inspection Report. 271 Front St. Alert Bay, B.C. Island Building Inspections V ANCOUVER I SLAND B. C. CLIENT Inspection Report 271 Front St. Alert Bay, B.C. Island Building Inspections 2013 V ANCOUVER I SLAND B. C. Elevation Photos For the Property at 271 Front Street Alert Bay, BC ELEVATION PICTURES Front

More information

SPACE TYPE: LABORATORY (WET) FOR CHEMISTRY AND BIOLOGY

SPACE TYPE: LABORATORY (WET) FOR CHEMISTRY AND BIOLOGY SPACE TYPE: LABORATORY (WET) FOR CHEMISTRY AND BIOLOGY Construction Criteria The unit costs for (Wet) space types are based on the construction quality and design features in the following table. This

More information

Inspecting to a higher standard.

Inspecting to a higher standard. Inspecting to a higher standard. Rob Hopkin Silver Spring, MD 20902 Monday, June 2, 2014 ProTec Inspection Services Inc. 19736 Selby Ave Poolesville, MD 20837 301-972-8531 www.protec-inspections.com rob@protec-inspections.com

More information

Property Condition Assessment

Property Condition Assessment Property Condition Assessment Business, Wisconsin Inspection Date: 8/2009 Prepared For: Business Owner Report Number: TD999909 Prepared By: Shamrock Building Inspection Consultants LLC N29 W29951 Shel-Mar

More information

Building Description Project Description Estimated Cost Notes Total Deferred

Building Description Project Description Estimated Cost Notes Total Deferred Building Description Project Description Estimated Cost Notes Total Deferred Athletic Fields & Grounds Baseball dugouts 125,000 Surface level/inground? Relamp Baseball field 16,000 Relamp Softball field

More information

Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year

Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year Printed On: 2003/04/03 St Patrick CES, 7932 Study [03.3-050 Plumbing Piping Systems] Study condition, remaining service

More information

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal.

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal. 2.02 DESIGN DEVELOPMENT PHASE GENERAL The Architect shall prepare the Design Development Documents from the approved Schematic Design. The Design Development Documents shall consist of drawings and other

More information

CALLOWAY COUNTY SCHOOLS DISTRICT FACILITIES PLAN

CALLOWAY COUNTY SCHOOLS DISTRICT FACILITIES PLAN DISTRICT "SHELL" SUBMISSION DATE: 4/17/13 (delete following Hearing) KDE "SHELL" RESUBMISSION DATE: 4/19/13 (delete following Hearing) KBE APPROVAL DATE: JUNE 2013 CALLOWAY COUNTY SCHOOLS DISTRICT FACILITIES

More information

Board Seminar Facilities. School Year 2012-2013. Submitted by Joseph L. Lisa-Director of Facilities

Board Seminar Facilities. School Year 2012-2013. Submitted by Joseph L. Lisa-Director of Facilities Board Seminar Facilities School Year 2012-2013 Submitted by Joseph L. Lisa-Director of Facilities High School Installed new fence for Pre-K activities by weight room. Installed new rails and side walks

More information

Total Home Inspection Checklist

Total Home Inspection Checklist Total Home Inspection Checklist Use a checklist like this to make sure that you are looking at all parts of the house. Check off those items that are in good condition and make notes about those that are

More information

U.S. Department of Housing and Urban Development Office of Public and Indian Housing. A Good Place to Live!

U.S. Department of Housing and Urban Development Office of Public and Indian Housing. A Good Place to Live! U.S. Department of Housing and Urban Development Office of Public and Indian Housing A Good Place to Live! Introduction Having a good place to live is important. Through your Public Housing Agency (or

More information

SPACE TYPE: AUTOMATED DATA PROCESSING CENTER (ADP) (MAINFRAME)

SPACE TYPE: AUTOMATED DATA PROCESSING CENTER (ADP) (MAINFRAME) SPACE TYPE: AUTOMATED DATA PROCESSING CENTER (ADP) (MAINFRAME) Construction Criteria The unit costs for ADP Mainframe space types are based on the construction quality and design features in the following

More information

OPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY

OPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY Cost Code # Description Cost Code # Description 01 00 00.001 General Requirements 02 00 00.001 Existing Conditions 01 31 19.13.001 Preconstruction Meetings 02 21 00.001 Surveys 01 32 33.001 Photographic

More information

DAVIESS COUNTY SCHOOLS DISTRICT FACILITIES PLAN

DAVIESS COUNTY SCHOOLS DISTRICT FACILITIES PLAN DISTRICT "SHELL" SUBMISSION DATE: 11/13/12 questions 11/26/12 (delete following Hearing) KDE "SHELL" RESUBMISSION DATE: 11/19/12 revised 11/26/12 (delete following Hearing) KBE APPROVAL DATE: FEBRUARY

More information

Self-Home Inspection Checklist

Self-Home Inspection Checklist To be used as a first home visit for note taking. Visit www.homeinspectiondirect.com for more tips and information about buying a home and hiring a home inspector. This form in no way replaces a professional

More information

COMPREHENSIVE PROPERTY INSPECTIONS

COMPREHENSIVE PROPERTY INSPECTIONS COMPREHENSIVE PROPERTY INSPECTIONS Thank you for selecting CPI for your Deficiency Observation. A full home inspection was not performed on this property at the buyers request. This inspection is a limited

More information

SECTION 3 ONM & J STRUCTURAL ANALYSIS

SECTION 3 ONM & J STRUCTURAL ANALYSIS Historic Boynton Beach High School Existing Building Assessment City of Boynton Beach February 10, 2011 SECTION 3 ONM & J STRUCTURAL ANALYSIS STRUCTURAL ENGINEERS SPECIAL INSPECTORS STRUCTURAL CONDITION

More information

Executive Summary. June 2005 Auke Bay Elementary School Condition Survey Report Page 4 of 228

Executive Summary. June 2005 Auke Bay Elementary School Condition Survey Report Page 4 of 228 Building History 1. The original building was built in 1968. It is essentially a 2 story building built into a hillside. A portion of the second floor steps up the hill a half level above the second floor

More information

ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT

ORANGE UNIFIED SCHOOL DISTRICT SCHOOL FACILITIES MASTER PLAN NEEDS ASSESSMENT 1. SAFETY, HEALTH, CODE 1.1 Structural Requirements, Seismic Stability 1.1.1 Primary Structure 1.1.2 Ceilings 1.1.2 Water damage in many classrooms. Replace tiles. 1.1.3 Cabinets, Equipment 1.1.4 Portables

More information

COST OF WORK FORM. Abbreviations: ea = each, LF = linear feet, SF = square feet, HSF = square feet of living area (including garage conversion space)

COST OF WORK FORM. Abbreviations: ea = each, LF = linear feet, SF = square feet, HSF = square feet of living area (including garage conversion space) COST OF WORK FORM All costs shown are estimates using base grade materials, taxes, and labor. For houses where a higher quality is indicated, the costs should be increased for work requiring upgraded materials.

More information

CONDITION OF QUALITY ITEMS

CONDITION OF QUALITY ITEMS CONDITION OF QUALITY ITEMS FOUNDATION Always look for moisture problems and any bulges or irregularities in the walls. Lines on the walls or floors may indicate water problems. Have these been cured? If

More information

Facilities Operations Customer Service Standards WORK ORDER PRIORITIES

Facilities Operations Customer Service Standards WORK ORDER PRIORITIES Facilities Operations Customer Service Standards WORK ORDER PRIORITIES In order to provide fair and consistent maintenance service to all University faculty, staff and students, a work priority system

More information

LITITZ MUTUAL INSURANCE COMPANY 2 North Broad Street Lititz, Pennsylvania - MAIN OFFICE -

LITITZ MUTUAL INSURANCE COMPANY 2 North Broad Street Lititz, Pennsylvania - MAIN OFFICE - The original section of this building was constructed in 1941. The exterior walls are built of good quality stone. In the early 1980 s a similar addition was added to the north elevation. The exterior

More information

Evanston Main Street Station TOD Plan and Study. Appendix A.1: Station Area Existing Conditions

Evanston Main Street Station TOD Plan and Study. Appendix A.1: Station Area Existing Conditions Evanston Main Street Station TOD Plan and Study Appendix A.1: Station Area Existing Conditions EvanstonMainStreetStation TODPlanandStudy A 1 AppendixA.1: ExistingConditions Table of Contents Station Locations

More information

Building Condition Assessment Report

Building Condition Assessment Report Building Condition Assessment Report Asset C3c - Oak Terrace Cottage 121 Address Riverview Lands, 2601 Lougheed Highway, Coquitlam, BC. V5C 4J2 Construction Year Size (Gross Floor Area) 1920. 2,553 Sq.Ft.

More information

BUILDING ASSESSMENT QUESTIONNAIRE. B. TENANTS Is there more than one tenant in the building? YES

BUILDING ASSESSMENT QUESTIONNAIRE. B. TENANTS Is there more than one tenant in the building? YES Department of Health and Human Services, Division of Public Health Occupational and Environmental Epidemiology Branch 1912 Mail Service Center, Raleigh, North Carolina 27699-1912 BUILDING ASSESSMENT QUESTIONNAIRE

More information

Van Vleck ISD Bond Election

Van Vleck ISD Bond Election Van Vleck ISD Bond Election November 4, 2014 The Van Vleck ISD School Board called a bond election at their meeting on August 18 for $42.7 million. 2 School districts must ask voters for permission to

More information

3. Tile used in the toilets is generally in good shape, though somewhat dated looking. The floor tile is slippery when wet.

3. Tile used in the toilets is generally in good shape, though somewhat dated looking. The floor tile is slippery when wet. Architectural Elements Support Facilities A. System Description 1. Architectural support facilities include the lobby, classroom, fitness room, office area, staff toilet/showers, public toilet/lockers,

More information

RRIO Checklist. Use of checklist: Definitions: Limitations

RRIO Checklist. Use of checklist: Definitions: Limitations CITY OF SEATTLE RENTAL REGISTRATION AND INSPECTION ORDINANCE (RRIO) RRIO Checklist Use of checklist: Property owners will use the RRIO Checklist to confirm that their rental housing properties and units

More information

PLUMMER ELEMENTARY SCHOOL

PLUMMER ELEMENTARY SCHOOL INITIAL YEAR BUILT 1959 BUILDING AREA 69,400 SF CURRENT PROGRAM CAPACITY 481 ENROLLMENT 2008 228 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan PLUMMER - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Print Shop/Mail Room

Print Shop/Mail Room Chapter XVIII Print Shop/Mail Room Page 110 CHAPTER XVIII Print Shop/Mail Room ARCHITECTURAL/STRUCTURAL A. BUILDING EXTERIOR 1.0 EXTERIOR WALLS The exterior walls are comprised of stone veneer. There were

More information

Arizona Health Care Association DISASTER PLANNING AND EMERGENCY MANAGEMENT GUIDE POST INCIDENT DAMAGE ASSESSMENT CHECKLIST

Arizona Health Care Association DISASTER PLANNING AND EMERGENCY MANAGEMENT GUIDE POST INCIDENT DAMAGE ASSESSMENT CHECKLIST It is essential to perform a Basic Damage Assessment (BDA) following an adverse event to help ensure the safety of building occupants as well as prevent additional losses from occurring. This checklist

More information

Nominal Life Expectancy for Building Components

Nominal Life Expectancy for Building Components Nominal Life Expectancy for Building Components Building System Page A. HVAC 2 B. Elevator/Escalator 6 C. Plumbing 7 D. Roofing 8 E. Electrical 10 F. Fire/Life/Safety/Security System 11 G. Interior Finishes

More information

Open House and Home Tour Checklist

Open House and Home Tour Checklist 1 The House Address: Number of floors: Listing price: Basement? Property tax: Outdoor space? Eugh closet space? Style: Eugh storage space? Square footage: Room for expansion? Number of bedrooms: What appliances

More information

Commercial Roof Inspection Form

Commercial Roof Inspection Form Inspection Date: Inspector: Building Information Building ID: No.: Used For: Year Roof Applied: Building Description: Permanent Temporary Building Type: Retail Industrial Residential Building Name: Building

More information

PROFESSIONAL ENGINEERING INSPECTIONS, INC.

PROFESSIONAL ENGINEERING INSPECTIONS, INC. PROFESSIONAL ENGINEERING INSPECTIONS, INC. P. O. BOX 271492 HOUSTON, TEXAS 77277 Registered Engineering Firm #1503 http://www.profengineering.com (713) 664-1264 July 8, 2004 Mr. Simple Samson 2831 Octoberfest

More information

May 5, 2010. Client Client Address. Re: Inspection Address, Chicago, Illinois. Dear Mr. Client,

May 5, 2010. Client Client Address. Re: Inspection Address, Chicago, Illinois. Dear Mr. Client, PROPERTY INSPECTION PROFESSIONALS May 5, 2010 Client Client Address Re: Inspection Address, Chicago, Illinois Dear Mr. Client, On May 4, 2010, Tomacor completed a property inspection of the above referenced

More information

How To Plan A Building

How To Plan A Building State of Nevada Department of Administration Purchasing Division Las Vegas Purchasing Warehouse Facility Condition Analysis LAS VEGAS PURCHASING WAREHOUSE 1054 South Commerce Street Las Vegas, Nevada Site

More information

Report Index PROPERTY DESCRIPTION 1 ELECTRICAL SYSTEM 2 COMMON INTERIOR AREAS 3 INTERIOR ROOMS 6 KITCHEN 8 BATHROOMS 10

Report Index PROPERTY DESCRIPTION 1 ELECTRICAL SYSTEM 2 COMMON INTERIOR AREAS 3 INTERIOR ROOMS 6 KITCHEN 8 BATHROOMS 10 Report Index PROPERTY DESCRIPTION 1 ELECTRICAL SYSTEM 2 COMMON INTERIOR AREAS 3 INTERIOR ROOMS 6 KITCHEN 8 BATHROOMS 10 PROPERTY DESCRIPTION PROPERTY INSPECTED: INSPECTION ADDRESS: 4722 Baltimore Avenue

More information

REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N

REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N PLAN REVIEW FOR: PROJECT NAME: OWNER: ARCH/DESIGNER: ADDRESS: Ph/Fx: Plans Dated: E-mail: Sealed By: Estimated Project Cost - $ REVEWED BY: Ross Rogien B.O/P.R. ADDITIONAL REVIEW(S) REQ.-FIRE DEPT Y/N

More information

Estimating Database Checklist

Estimating Database Checklist Estimating Database Checklist If you are creating a new estimating database for projects, the following list offers a thorough listing of Main and Sub Categories. You can also use it as a checklist to

More information

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities Division 1 Requirements Design and Construction Quality Campus Master Plans Texas Tech University System Operating and Building Maintenance Project Administration Historically Underutilized Business (HUB)

More information

NORTH PENN HIGH SCHOOL RENOVATIONS

NORTH PENN HIGH SCHOOL RENOVATIONS NORTH PENN HIGH SCHOOL RENOVTIONS PRELIMINRY SCOPE, BUDGET & PHSING CONSIDERTIONS 401 EST HNCOCK STREET LNSDLE, P 19446 PREPRED BY BONNETT SSOCITES INCORPORTED 220 BLDWIN TOWER, 1510 CHESTER PIKE EDDYSTONE,

More information

Mechanical, Plumbing, and Fire Protection Conditions

Mechanical, Plumbing, and Fire Protection Conditions Mechanical, Plumbing, and Fire Protection Conditions Mechanical Conditions The mechanical systems within the building consist of a combination of the original 1926 systems and renovations that occurred

More information

HOUSTON ELEMENTARY SCHOOL

HOUSTON ELEMENTARY SCHOOL INITIAL YEAR BUILT 1962 BUILDING AREA 59,900 SF CURRENT PROGRAM CAPACITY 507 ENROLLMENT 2008 291 WARD 7 PROPOSED PROGRAM CAPACITY 325 Site Plan HOUSTON - 1 PROPOSED PROGRAM PROFILE GRADE CONFIGURATION

More information

Georgia Home Inspection Services

Georgia Home Inspection Services Cover Page Property Inspection Report My street, Anytown GA, 30000 Inspection prepared for: John Doe Inspection Date: 7/18/2011 Time: 5pm Age: 25+ Size: >1500 Weather: Clear This ranch style home is in

More information

Cherokee Trail High School 25901 East Arapahoe Road Aurora, Colorado 80016

Cherokee Trail High School 25901 East Arapahoe Road Aurora, Colorado 80016 Cherokee Trail High School 25901 East Arapahoe Road Aurora, Colorado 80016 Year Opened 2003 Current Square Footage 391,000 Site Acreage 86.22 cherokeetrail.cherrycreekschools.org $279,200 Asphalt and concrete

More information

Slavic Village Building Condition Review

Slavic Village Building Condition Review Slavic Village Building Condition Review Slavic Village Development May 8, 2015 Page 1 EXECUTIVE SUMMARY City Architecture was commissioned by Slavic Village Development to review five existing facilities

More information

BUILDING DEPARTMENT 8748 W. 82 nd Place - Justice, IL 60458 Phone: (708) 458-2130 Fax: (708) 458-3207

BUILDING DEPARTMENT 8748 W. 82 nd Place - Justice, IL 60458 Phone: (708) 458-2130 Fax: (708) 458-3207 BUILDING DEPARTMENT 8748 W. 82 nd Place - Justice, IL 60458 Phone: (708) 458-2130 Fax: (708) 458-3207 SELF EVALUATION CHECKLIST FOR RESIDENTIAL AND MULTI-FAMILY DWELLING INSPECTIONS The attached checklist

More information

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT SAMPLE SCHEDULE OF S 1.00 General Conditions 1.01 Project Management 1.02 General Superintendent 1.03 Superintendents 1.04 Safety Engineer 1.05 Scheduling 1.06 Field Engineering 1.07 Bonds 1.08 Trailer

More information

MASTER FACILITIES PLAN

MASTER FACILITIES PLAN OFFICE OF PUBLIC EDUCATION FACILITIES MODERNIZATION DC PUBLIC SCHOOLS 2010 MASTER FACILITIES PLAN DISTRICT OF COLUMBIA MAYOR ADRIAN M. FENTY SHARPE HEALTH SCHOOL Special Education HAMILTON CENTER SCHOOL

More information

HOME INSPECTION CHECKLIST

HOME INSPECTION CHECKLIST CLOSING.COM LEARNING CENTER HOME INSPECTION CHECKLIST CONTENTS Attic 1 Balconies 1 Basement 1 Bathroom 2 Ceiling, Floors and Walls 2 Crawlspace 3 Decks and Porches 3 Doors and Windows 4 Drainage 4 Driveways

More information

VJ ASSOCIATES 1825 K STREET NW, #1100 WASHINGTON, DC - 20006 TEL: (202) 609-7480 INITIAL PROJECT COST ANALYSIS

VJ ASSOCIATES 1825 K STREET NW, #1100 WASHINGTON, DC - 20006 TEL: (202) 609-7480 INITIAL PROJECT COST ANALYSIS VJ ASSOCIATES 1825 K STREET NW, #1100 WASHINGTON, DC - 20006 TEL: (202) 609-7480 INITIAL PROJECT COST ANALYSIS January 7, 2014 0 BASIS OF ESTIMATE The estimate is based on the drawings and documents received

More information

HOUSING QUALITY STANDARDS (HQS)

HOUSING QUALITY STANDARDS (HQS) HOUSING QUALITY STANDARDS (HQS) HQS INSPECTIONS Part II Site Inspections 24 CFR 982.401 & 405 1si Rev. 4-20-06 General Conditions All doors and windows accessible to the outside, must have a workable lock.

More information

How to report a repair

How to report a repair How to report a repair for repairs to your home? We are committed to making sure your home is in a good state of repair. To meet our legal responsibilities we will: Keep the exterior (eg roof, walls, doors,

More information

Current as of 11/10/08 1 of 1

Current as of 11/10/08 1 of 1 BEST PRACTICES STANDARDS FOR SCHOOLS UNDER CONSTRUCTION OR BEING PLANNED FOR CONSTRUCTION I. Site Layout A. School buildings shall be provided with a securable perimeter. A securable perimeter means that

More information

Walking and Working Surface Checklist:

Walking and Working Surface Checklist: Walking and Working Surfaces Purpose: This information is presented to improve the level of safety in our operations, and to inform you that we will comply with the OSHA Standard 29 CFR 1910.23. Responsibility:

More information

Roof Inspection. Summary Report

Roof Inspection. Summary Report www.real-estate-inspections.com Roof Inspection Summary Report Subject Property Prepared for: File Number: Client in Detroit 05-15-RF-004 Inspector: Craig Milliken, PE # 32779 CPM Real Estate Inspections,

More information

SECTION 00335 EXISTING HAZARDOUS MATERIALS CONDITIONS

SECTION 00335 EXISTING HAZARDOUS MATERIALS CONDITIONS PART 1 GENERAL 1.01 SUMMARY SECTION 00335 EXISTING HAZARDOUS MATERIALS CONDITIONS A. This section provides a list of known and assumed hazardous materials that may be impacted during renovation, demolition,

More information

Estimated Useful Life (EUL) Tables

Estimated Useful Life (EUL) Tables 3900 Wisconsin Avenue, NW Washington, DC 20016-2892 INSTRUCTIONS FOR PERFORMING A MULTIFAMILY PROPERTY CONDITION ASSESSMENT (Version 2.0) APPENDIX F ESTIMATED USEFUL LIFE TABLES These Estimated Useful

More information

A Self-Audit of Your Current Campus Security Systems

A Self-Audit of Your Current Campus Security Systems A Self-Audit of Your Current Campus Security Systems Security Solutions for Education, Business & Public Safety Free Consultations on ID Card Systems, Access Control, Call Recording, Video Surveillance,

More information

LIMITED ONE-YEAR WARRANTY SELLER S RESPONSIBILITY

LIMITED ONE-YEAR WARRANTY SELLER S RESPONSIBILITY LIMITED ONE-YEAR WARRANTY SELLER S RESPONSIBILITY Except as covered by a manufacturers limited warranty, the Seller hereby provides a Limited Warranty for the dwelling against defects in the original material

More information

NYC Department of Education Building Condition Assessment Survey 2014-2015 BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 10004

NYC Department of Education Building Condition Assessment Survey 2014-2015 BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 10004 School: InspectionId Asset Data Inspection Type Building Assessment Survey 204-205 BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 0004 Time In Last Edited 255 MECHANICAL 205-05-8 09:00AM

More information

Whitley Manufacturing Co., Inc. 201 W. First Street S. Whitley, IN 46787 Phone (260) 723-5131 Sales Fax (260) 723-6396 whitley@whitleyman.

Whitley Manufacturing Co., Inc. 201 W. First Street S. Whitley, IN 46787 Phone (260) 723-5131 Sales Fax (260) 723-6396 whitley@whitleyman. Building Type Building Code Whitley Classroom Buildings BOCA, UBC, SBCCI, NEC, ADA Structural Support Outrigger construction standard, Whitley model classrooms. Main support beams to be 12 11.8# per lineal

More information

Schedule of Maintenance Fees

Schedule of Maintenance Fees Schedule of Maintenance Fees Effective July 1, 2015 It is the policy of the Housing Authority of Murray not to charge for NORMAL wear and tear. However, the Housing Authority reserves the right in every

More information

Monthly Inspection Checklists

Monthly Inspection Checklists Monthly Inspection Checklists These safety checklists are part of a monthly inspection of church property. The items listed are not meant to imply that other concerns could not be present. The items listed

More information

Certification: Building Plans Examiner. Exam ID: B3

Certification: Building Plans Examiner. Exam ID: B3 Certification: Building Plans Examiner Exam ID: B3 Scope: A Building Plans Examiner will be responsible for reviewing submitted plans to determine if they meet the requirements of the various Building

More information

Rental Property Safety Inspection Checklist

Rental Property Safety Inspection Checklist PLANNING AND COMMUNITY DEVELOPMENT DEPARTMENT Rental Registration and Safety Inspection Program 210 Lottie Street, Bellingham, WA 98225 Telephone: (360) 778-8361 Fax: (360) 778-8302 TTY: (360) 778-8382

More information

Point Auditorium Design Narrative PROJECT NAME: Point Auditorium DATE: 06/25/15 TO: Lance Francis FROM: Leslie Ellsworth

Point Auditorium Design Narrative PROJECT NAME: Point Auditorium DATE: 06/25/15 TO: Lance Francis FROM: Leslie Ellsworth INTRODUCTION: Kronberg Wall Architects is pleased to present the Design Narrative for the Point University Auditorium conversion from the existing warehouse space. General Project Description: This project

More information

Historic Preservation Certification Application Part 2 343-345 Main Street West South Haven, Vermont NPS Project No. 12345

Historic Preservation Certification Application Part 2 343-345 Main Street West South Haven, Vermont NPS Project No. 12345 Exterior Features 1 site and drainage 2 foundation 3 wood siding and trim 4 exterior doors 5 windows / storm windows 6 porches front and rear 7 chimneys 8 roofing Interior Features 9 frame 10 basement

More information

costs and billing Facilities Services State-Funded and Billable Services Centrally Funded Services for State Supported Spaces Billable Services

costs and billing Facilities Services State-Funded and Billable Services Centrally Funded Services for State Supported Spaces Billable Services Facilities Services State-Funded and Facilities Services receives funding to provide maintenance in eligible state-supported areas. State-supported areas, equipment, and facilities are those that are utilized

More information

2. What building projects are exempted? (permit not required)

2. What building projects are exempted? (permit not required) BUILDING AND SAFETY DEPARTMENT 1. What building projects require a permit? Following is a list of projects that require building permits based on Appendix chapter 1 of the California Building Code and

More information

Building Foundation and Structure

Building Foundation and Structure Building Foundation and Structure Overview The construction of the Hall of Waters building began in 1936, and was constructed over the original site of the Siloam and Sulpho-Saline Springs. The original

More information