Fred s Desk. County Update. The Monthly Newsletter For The Belmont County Engineer s Department. Ohio/West Virginia Excavating

Size: px
Start display at page:

Download "Fred s Desk. County Update. The Monthly Newsletter For The Belmont County Engineer s Department. Ohio/West Virginia Excavating"

Transcription

1 Volume XIX, Issue 7 July 23, 2009 Fred s Desk County Update The Monthly Newsletter For The Belmont County Engineer s Department Inside This Issue Road Closure 2 Roads / Bridges 3 OUPS 4 e-cycle 5 Congratulations 6 BIDS WERE OPENED July 1 st for the removal and replacement of a new bridge on Washington Twp. Road 103 (Crabapple Road), with Sheldon Gantt, Inc. the low bidder at $198,900. The only other bidder was Ohio/West Virginia Excavating Co. at $281,300. This project is funded 74% by the Ohio Public Works Commission (OPWC) and 26% MVGT funds. This project was awarded to Sheldon Gantt and should be completed late this fall. Bids will be opened on August 12 th for construction of a new bridge and a new retaining wall on CH 4 (Colerain Pike). The new bridge, located 1.22 miles east of SR 250, will be a prestressed concrete box beam structure, 32 long and 24 wide. The retaining wall will be steel piling, placed in drilled shafts and encased in concrete, with reinforced concrete slabs placed between the piles. The total length of the wall is 450 and is located about 0.2 miles east of the bridge. The estimated cost of this project is $862,065, with OPWC funding $716,988. Ohio/West Virginia Excavating Co. is expected to begin work next week on replacing the existing bridge on Colerain Pike which is located 2.75 miles east of SR 250. The bridge will be replaced with a 16 span x 6 rise x 24 long four sided box culvert. This $91,385 contract is also funded by OPWC, with Belmont County providing 26% of the funding. Carr Concrete now has a contract to supply 6 each 33 8 long, 4 wide precast prestressed concrete box beams for a new bridge on CH 5 over Falls Run in Crescent, at a cost of $32,909. Once the beams are poured and delivered, our bridge crew will set them so that the bridge can be reopened. This bridge was closed after our annual bridge inspection this past spring. The bridge crew is now setting steel beams on the first of four small bridge replacement projects on Pultney T-300 (Pinch Run Road). They are also ready to set box beams on Richland T-276 (Brush Run Road). This bridge was also closed after the annual bridge inspection. Temporary bridges were placed at both locations. Our road crews spent most of this past month cleaning up after the heavy rainfall of June 17 th. Most of the damage was in Mead Township. Emergency Funding is being sought from OPWC to repair three embankment failures caused by these rains, two on Pipe Creek Road, and one on Willow Grove Road. Hopefully, we ll be successful in getting necessary funding. Belmont County Engineer s Department. 101 West Main Street. St. Clairsville, Ohio Phone Fax

2 County Road 4 - Colerain Pike to Close County Road 4, Colerain Pike, will be closed to all traffic at a location 0.75 miles west of State Route 647 on Monday July 27, 2009 at 8:00 A.M. for a bridge replace project. The existing bridge will be removed and replaced by a concrete box culvert by Ohio West Virginia Excavating Company Website Additions Over the next few weeks several permit application documents are going to be added to the Belmont County Engineer s website. The applications will include Driveway Culvert Application, Utility Installation Application, Special Hauling Permit Application, Easement for Storm Water Application and others. These will be available using a hyperlink called Permit Applications. Page 2

3 Roads & Bridges Pultney Twp. 300, Pinch Run bridge replacement pictured left and right. Pictured at left, concrete pour at Richland Twp At right Say hello to my little friend! Hot patching on County Road 4, Sand Hill. Ditching on County Road 64, Uniontown - New Athens. Page 3

4 Ohio Utility Protection Service The Ohio Utility Protection Service continues to set records with the amount of call request. On July 14 of this year, 5,749 calls were received state wide. The previous record was May 9, 2005 with 5,560 calls. The idig online ticket entry system is seeing significant growth as 25, 282 request were filed for the month of June. OUPS added a new feature to their web site recently called edig. This online request form is for homeowners only. Residents enter a single address location for utility locates and they receive an verification showing start date and a list of utilities notified. By law, everyone must contact OUPS at least 48 hours prior to any digging on their property. For the year 2007, our department received 1,145 notifications and for 2008, 1312 notices. So far for 2009, the Engineer s Department has received notices. Ohio Utility Protection Service Or Deed Transfer Stats DEEDS TRACTS EASEMENTS JANUARY FEBRUARY MARCH APRIL MAY JUNE Page 4

5 County Update Historical Facts in August Anne Frank s last diary entry in 1944, PT-109 sank off the Solomon Islands in 1943, Marilyn Monroe found dead in 1962, the Berlin Wall was created in 1961, Battle of Britain in 1940, cornerstone for the Statue of Liberty laid in 1884, Olympic Games opened in Berlin Germany in President Nixon resigned from office in Belmont County e-cycle Event Once again Keep Belmont County Beautiful and the Jefferson - Belmont Regional Solid Waste Authority are having an Electronics Recycling event at the Ohio Valley Mall main entrance. The event will be held on August 15 from the hours of 10:00 A.M. to 2:00 P.M. Electronics that can be dropped off include TVs, VCR s, DVD Players, computers, monitors, Mainframe and network equipment, handheld games, Game Systems, MP3 Players, cell phones, telephones, printers, scanners, fax machines, cords and chargers and small appliances Please NO microwaves, refrigerators or freezers. This event is limited to residents of Belmont and Jefferson Counties. Proof of residency is required. Many thank to Keep Belmont County Beautiful for supplying the above information Belmont County Fair September 8th through 13th, 2009 Page 5

ESI Consultants, Ltd. PROJECT EXPERIENCE

ESI Consultants, Ltd. PROJECT EXPERIENCE CRAWFORD COUNTY, ILLINOIS NBIS Program Manager and Bridge Inspection services provided for 123 structures throughout Crawford County. Routine Maintenance/Safety Inspection of existing bridges was performed

More information

CSXT Emergency Response for May 2010 Flood Repairs

CSXT Emergency Response for May 2010 Flood Repairs CSXT Emergency Response for May 2010 Flood Repairs 11 th Annual Geohazards Forum Chattanooga, Tennessee Christopher Ramsey, PE AMEC Project Overview Record rainfalls affecting greater Nashville. Some areas

More information

IH-635 MANAGED LANES PROJECT, SEG. 3.2

IH-635 MANAGED LANES PROJECT, SEG. 3.2 IH-635 MANAGED LANES PROJECT, SEG. 3.2 Location: Dallas, Texas Owner: Texas Department of Transportation Client: Ferrovial Agroman Construction Cost: $1 Billion Construction Completion Date: December,

More information

BRIDGES ARE relatively expensive but often are

BRIDGES ARE relatively expensive but often are Chapter 10 Bridges Chapter 10 Bridges Bridg Bridges -- usually the best, but most expensive drainage crossing structure. Protect bridges against scour. BRIDGES ARE relatively expensive but often are the

More information

WILDCAT CANYON ROAD SPECIFICATION NO. 16-11001 SLIDE REPAIR BIDDER'S PROPOSAL (continued)

WILDCAT CANYON ROAD SPECIFICATION NO. 16-11001 SLIDE REPAIR BIDDER'S PROPOSAL (continued) BIDDER'S PROPOSAL (continued) Item Estimated No. Description Quantity Unit Unit Cost Total Cost BASE BID 1 Traffic Control 1 LS $ $ 2 Construction Area Signs 1 LS $ $ 3 Excavation Safety 1 LS $ $ 4 Reset

More information

Structures Construction Pre-Work Checklist PRE-WORK SHEET FOR PROJECT MANAGERS

Structures Construction Pre-Work Checklist PRE-WORK SHEET FOR PROJECT MANAGERS Structures Construction Pre-Work Checklist PRE-WORK SHEET FOR PROJECT MANAGERS 1 Proposal & Plans Received? 2 Review Proposal, highlight important facts. Know proposal well to be able to find answers quickly.

More information

Engineering Policy 146. Severe Weather Management Plans

Engineering Policy 146. Severe Weather Management Plans Engineering Policy 146 Severe Weather Management Plans January 2014 Contents Engineering Policy... 1 1 Policy statement... 1 2 Applicability... 1 3 Context... 1 4 Objectives and benefits... 1 5 Consultation...

More information

Culvert Rehabilitation A presentation by ms consultants, inc. engineers, architects, planners

Culvert Rehabilitation A presentation by ms consultants, inc. engineers, architects, planners Culvert Rehabilitation A presentation by ms consultants, inc. engineers, architects, planners McConnell Road Culvert Greensboro, North Carolina Fisher Park Circle Culvert Greensboro, North Carolina Shady

More information

Safe & Sound Bridge Terminology

Safe & Sound Bridge Terminology Safe & Sound Bridge Terminology Abutment A retaining wall supporting the ends of a bridge, and, in general, retaining or supporting the approach embankment. Approach The part of the bridge that carries

More information

Chapter 22. Lump Sum Project Guidelines

Chapter 22. Lump Sum Project Guidelines Chapter 22 Lump Sum Project Guidelines 22.1 General...22-1 22.2 Project Selection...22-3 22.3 Plans Preparation...22-5 22.4 Preliminary Estimate...22-7 22.5 Specifications...22-9 22.6 Contracts Administration...22-11

More information

Baton Rouge Foundation Repair

Baton Rouge Foundation Repair Baton Rouge Foundation Repair 13822 Florida Blvd Bldg 3 Baton Rouge, LA 70819 Baton Rouge Foundation Repair offers services to correct the settlement of both Slab foundations and Pier & Beam foundations

More information

River Management 2013 Colorado Flood

River Management 2013 Colorado Flood River Management 2013 Colorado Flood Damages, Countermeasures, Socio-Economic Impacts Miles Blair, Allen Chestnut, Hwayoung Kim, & Caroline Ubing CIVE 717 Spring 2014 Flood Statistics Sept 9 th 16 th,

More information

Disputes and Claims. 3 Processes Dispute Resolution and Administrative Claims Process

Disputes and Claims. 3 Processes Dispute Resolution and Administrative Claims Process Disputes and Claims 3 Processes Dispute Resolution and Administrative Claims Process Default Process C&MS 108.02 Partnering OR PN 108 -Dispute Review Board (DRB) Considered for use on projects over $20

More information

HAMILTON COUNTY SOLID WASTE MANAGEMENT FACILITIES. Solid Waste Transfer Station Refuse Disposal & Recycling Site Rules and Regulations

HAMILTON COUNTY SOLID WASTE MANAGEMENT FACILITIES. Solid Waste Transfer Station Refuse Disposal & Recycling Site Rules and Regulations HAMILTON COUNTY SOLID WASTE MANAGEMENT FACILITIES Solid Waste Transfer Station Refuse Disposal & Recycling Site Rules and Regulations HAMILTON COUNTY MANAGEMENT FACILITIES Lake Pleasant Transfer Station

More information

BRIDGE RESTORATION AND LANDSLIDE CORRECTION USING STRUCTURAL PIER AND GRADE BEAM

BRIDGE RESTORATION AND LANDSLIDE CORRECTION USING STRUCTURAL PIER AND GRADE BEAM BRIDGE RESTORATION AND LANDSLIDE CORRECTION USING STRUCTURAL PIER AND GRADE BEAM Swaminathan Srinivasan, P.E., M.ASCE H.C. Nutting/Terracon David Tomley, P.E., M.ASCE KZF Design Delivering Success for

More information

The unit costs are based on the trend line of the 3 low bids for the average quantity.

The unit costs are based on the trend line of the 3 low bids for the average quantity. Page 1 of 8 COST ESTIMATE GENERAL INSTRUCTIONS The unit costs are based on the trend line of the 3 low bids for the average quantity. Apply the Unit Costs to ordinary structures. Unit Costs should generally

More information

Historic Flood Impact on the Nashville Drinking Water System. Scott Potter, Director Metro Water Services, Nashville, TN

Historic Flood Impact on the Nashville Drinking Water System. Scott Potter, Director Metro Water Services, Nashville, TN Historic Flood Impact on the Nashville Drinking Water System Scott Potter, Director Metro Water Services, Nashville, TN Historic Event = 13.53 /48 Hours May 1 6.32 of Rain = 3rd greatest one-day rainfall

More information

DESCRIPTION OF WORK:

DESCRIPTION OF WORK: DEPARTMENT OF PUBLIC WORKS COUNTY OF HENRICO P.O. BOX 27032 RICHMOND, VIRGINIA 23273 PERMIT NO. One (1) copy of application and four (4) copies of plans are hereby made to the Director of Public Works

More information

INDIANA DEPARTMENT OF TRANSPORTATION PAGE 1 NOTICE TO HIGHWAY CONTRACTORS

INDIANA DEPARTMENT OF TRANSPORTATION PAGE 1 NOTICE TO HIGHWAY CONTRACTORS INDIANA DEPARTMENT OF TRANSPORTATION PAGE 1 NOTICE TO HIGHWAY CONTRACTORS DATE OF LETTING: October 03, 2007 TIME OF LETTING: 10:00 AM EASTERN DST Sealed proposals for certain highway improvements as described

More information

Fire Alarm And System Description. Automatic Sprinkler System Description. Fire Suppression Equipment. Fire and Evacuation Drills

Fire Alarm And System Description. Automatic Sprinkler System Description. Fire Suppression Equipment. Fire and Evacuation Drills Building Name: Maddox Hall Year Built: 1985 Occupancy: Residence Hall Capacity: 152 Construction Type: Reinforced concrete slab, CMU walls, flat roof concrete slab. Building Name: Wright Hall Year Built:

More information

2014 ANNUAL REPORT. Department: Highway Department Head: David Hartman Departmental Employees: 27

2014 ANNUAL REPORT. Department: Highway Department Head: David Hartman Departmental Employees: 27 2014 ANNUAL REPORT Department: Highway Department Head: David Hartman Departmental Employees: 27 Department Mission: The Yates County Highway Department is responsible for the construction, maintenance

More information

Temporary Electric Service

Temporary Electric Service Temporary - Electric Construction Packet Temporary Electric Service This packet explains what is required to construct your Single new Phase electric Service temporary service and will guide you through

More information

One-Call Notification Screening

One-Call Notification Screening Purpose Reference The purpose of this document is to share learnings with pipeline operators related to the process of receiving, analyzing, and managing notifications from the State One-call Center to

More information

San Antonio Water System Standard Specifications for Construction ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS

San Antonio Water System Standard Specifications for Construction ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS ITEM NO. 1103 POINT REPAIRS AND OBSTRUCTION REMOVALS 1103.1 DESCRIPTION: 1. Repair of sanitary sewer lines by replacing short lengths of failed pipe with new pipe. 2. Repair of service laterals located

More information

Personal Property Inventory

Personal Property Inventory Personal Property Inventory www.libertymutualinsurance.com Why Do I Need an Inventory? Your homeowners insurance provides you with the security of knowing that your personal possessions are protected in

More information

BUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS

BUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS Construction/Maintenance Contracts and Design/Build Low Bid Contracts 1. Districts are responsible for reviewing their work program and identifying contracts that are good candidates for the Business Development

More information

Introduction to Minimal Excavation Foundations

Introduction to Minimal Excavation Foundations Introduction to Minimal Excavation Foundations What is a minimal excavation foundation? A construction technique that minimizes disturbance of the natural soil profile within the footprint of the structure

More information

SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS

SECTION 08000 STORM DRAINAGE TABLE OF CONTENTS SECTION 08000 STORM DRAINAGE 08010 DESIGN A. Location B. Sizing TABLE OF CONTENTS 08020 MATERIALS A. Pipe Materials B. Structure Materials C. Installation D. Inlets and Outlets 08030 INSPECTIONS AND TESTING

More information

Historic Bridges of Frederick County. Frederick County, Maryland Division of Public Works Department of Highways and Transportation (301) 600-1687

Historic Bridges of Frederick County. Frederick County, Maryland Division of Public Works Department of Highways and Transportation (301) 600-1687 Historic Bridges of Frederick County Frederick County, Maryland Division of Public Works Department of Highways and Transportation (301) 600-1687 Frederick County s Bridges We have 212 bridges over 20

More information

Abandoned Underground Utility Line Congestion A CONTRACTOR S PERSPECTIVE

Abandoned Underground Utility Line Congestion A CONTRACTOR S PERSPECTIVE Abandoned Underground Utility Line Congestion A CONTRACTOR S PERSPECTIVE PRESENTER: ROBERT BOB MEADS, PRESIDENT R&M Consultants & Project Management, LLC Virginia Beach, VA Purpose of Presentation To share

More information

Emergency repair of Bridge B421

Emergency repair of Bridge B421 Emergency repair of Bridge B421 over the Olifants River after fl ood damage INTRODUCTION AND BACKGROUND Bridge B421 is located on the R555 at km 5.03 on Section 01E between Witbank (now known as emalahleni)

More information

BUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS

BUSINESS DEVELOPMENT INITIATIVE SMALL BUSINESS PROGRAM GUIDANCE FOR RESERVING CONTRACTS Construction/Maintenance Contracts and Design/Build Low Bid Contracts 1. Districts are responsible for reviewing their work program and identifying contracts that are good candidates for the Business Development

More information

ENGINEERED FOUNDATIONS. Department of Public Works Jeff Hill, PE

ENGINEERED FOUNDATIONS. Department of Public Works Jeff Hill, PE ENGINEERED FOUNDATIONS Department of Public Works Jeff Hill, PE What is an engineered foundation. A Foundation Design Developed by a Trained Professional (Engineer) Types of Foundations (All of which can

More information

Value of Instrumentation Systems and Real-Time Monitoring: An Owner s Perspective

Value of Instrumentation Systems and Real-Time Monitoring: An Owner s Perspective Value of Instrumentation Systems and Real-Time Monitoring: An Owner s Perspective FHWA NATIONAL GEOTECHNICAL PROGRAM www.fhwa.dot.gov/engineering/geotech Why Geotechnical Instrumentation? Provide warning

More information

FOR IMMEDIATE RELEASE September 17, 2013 Contact:

FOR IMMEDIATE RELEASE September 17, 2013 Contact: NEWS RELEASE FOR IMMEDIATE RELEASE September 17, 2013 Contact: Diana L. Klink 757.514.4104 757.359.1845 Tim Kelley 757.514.4103 757.871.3039 UPDATE (Bridge Road/Mills Godwin Bridge) The work scheduled

More information

RECYCLING & WASTE DISPOSAL

RECYCLING & WASTE DISPOSAL Resident s Guide to RECYCLING & WASTE DISPOSAL in Lancaster County Save this brochure for future reference! TABLE OF CONTENTS MISSION STATEMENT Our mission is to manage solid waste and recyclable materials

More information

2015 ODOT Bridge Design Conference May 12, 2014. DeJong Rd Bridge High- Seismic Zone Case Study: Bridge Rehab vs. Replacement.

2015 ODOT Bridge Design Conference May 12, 2014. DeJong Rd Bridge High- Seismic Zone Case Study: Bridge Rehab vs. Replacement. 2015 ODOT Bridge Design Conference May 12, 2014 DeJong Rd Bridge High- Seismic Zone Case Study: Bridge Rehab vs. Replacement Mary Ann Triska 2015 HDR, all rights reserved. Presentation Outline Project

More information

PIPELINE ROUTING PERMIT. For A NATURAL GAS PIPELINE DAKOTA AND RAMSEY COUNTIES ISSUED TO NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY

PIPELINE ROUTING PERMIT. For A NATURAL GAS PIPELINE DAKOTA AND RAMSEY COUNTIES ISSUED TO NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY PIPELINE ROUTING PERMIT For A NATURAL GAS PIPELINE IN DAKOTA AND RAMSEY COUNTIES ISSUED TO NORTHERN STATES POWER COMPANY D/B/A XCEL ENERGY PUC DOCKET No. G002/GP-05-1706 In accordance with the requirements

More information

National Archives and Record Administration

National Archives and Record Administration National Archives and Record Administration Installation of Self-Closing Flood Barriers and Loading Dock Turntable Removal and Structural Slab Repairs ! 2010 Baltimore Washington Chapter Outstanding Repair

More information

SECTION 02100 SITE PREPARATION

SECTION 02100 SITE PREPARATION SECTION 02100 SITE PREPARATION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and General Provisions of Contract, including General Conditions and Supplementary Conditions and Division 1 through Division

More information

Request for Proposals Business Retention Database Software & Licensing

Request for Proposals Business Retention Database Software & Licensing Request for Proposals Business Retention Database Software & Licensing Sealed proposals will be received by the Buckeye Hills-Hocking Valley Regional Development District at the address below until Monday,

More information

The Guidance for the Management of Safety for Construction Works in Japanese ODA Projects

The Guidance for the Management of Safety for Construction Works in Japanese ODA Projects Contents The Guidance for the Management of Safety for Construction Works in Japanese ODA Projects September 2014 Japan International Cooperation Agency (JICA) i Contents ii Contents The Guidance for the

More information

K A N S A S DEPARTMENT OF HEALTH AND ENVIRONMENT PERMIT APPLICATION FOR A RECLAMATION FACILITY. 1. Applicant's Name

K A N S A S DEPARTMENT OF HEALTH AND ENVIRONMENT PERMIT APPLICATION FOR A RECLAMATION FACILITY. 1. Applicant's Name K A N S A S DEPARTMENT OF HEALTH AND ENVIRONMENT PERMIT APPLICATION FOR A RECLAMATION FACILITY 1. Applicant's Name Address (Street or Rural Route) (City & State) (Zip) Person to contact Title Phone Fax

More information

Design of Bridges. Introduction. 3 rd to 4 th July 2012. Lecture for SPIN Training at the University of Dar es Salaam

Design of Bridges. Introduction. 3 rd to 4 th July 2012. Lecture for SPIN Training at the University of Dar es Salaam Design of Bridges Introduction 3 rd to 4 th July 2012 1 FUNCTION OF A BRIDGE To connect two communities which are separated by streams, river, valley, or gorge, etc. 2 EVOLUTION OF BRIDGES 1. Log Bridge

More information

DRAINAGE :: DRAINAGE CONCERN FREQUENTLY ASKED QUESTIONS

DRAINAGE :: DRAINAGE CONCERN FREQUENTLY ASKED QUESTIONS DRAINAGE :: DRAINAGE CONCERN FREQUENTLY ASKED QUESTIONS The City of DeSoto s Department of Development Services is the point of contact for storm drainage related issues. The following are some frequently

More information

PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS

PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS C PROJECT ESTIMATE ASSUMPTIONS AND EXCLUSIONS In support of the alternatives development process, preliminary cost estimates were prepared for each of the three Candidate Build Alternatives. The cost estimates

More information

Elevating Your House. Introduction CHAPTER 5

Elevating Your House. Introduction CHAPTER 5 CHAPTER 5 Elevating Your House Introduction One of the most common retrofitting methods is elevating a house to a required or desired Flood Protection Elevation (FPE). When a house is properly elevated,

More information

West Thornhill Stormwater Flood Remediation Phase 1 Construction. Community Information Meeting

West Thornhill Stormwater Flood Remediation Phase 1 Construction. Community Information Meeting West Thornhill Stormwater Flood Remediation Phase 1 Construction Community Information Meeting Thornhill C.C. May 7, 2014 Purpose To advise residents and businesses of 2014 and 2015 construction activities

More information

Appendix J Survey Instruments and Results

Appendix J Survey Instruments and Results Appendix J Survey Instruments and Results This Appendix contains the following sections J-1 Survey of Use of High-Strength Steel Reinforcement in BRIDGE Structures J-2 Survey of Use of Stainless Steel

More information

New Commercial Service Application

New Commercial Service Application Please submit with this form an application fee of $500.00 and an Electronic CAD file of your preliminary plat. CAD file can be emailed to craign@inlandpower.com. Member Information Work Order Number:

More information

Core & Shell Construction. Rules and Regulations

Core & Shell Construction. Rules and Regulations Core & Shell Construction Rules and Regulations 1. Protection: During the construction Contractor shall endeavor to protect all areas of work from damage caused by workers, weather or equipment. 2. Permits

More information

2006-2008 MHD BRIDGE SECTION WEIGHTED AVERAGE UNIT PRICES GUIDELINES FOR THE USE OF THE WEIGHTED AVERAGE UNIT PRICE TABULATION SHEETS

2006-2008 MHD BRIDGE SECTION WEIGHTED AVERAGE UNIT PRICES GUIDELINES FOR THE USE OF THE WEIGHTED AVERAGE UNIT PRICE TABULATION SHEETS 2006-2008 MHD BRIDGE SECTION WEIGHTED AVERAGE UNIT PRICES GUIDELINES FOR THE USE OF THE WEIGHTED AVERAGE UNIT PRICE TABULATION SHEETS GENERAL 10/16/2008 The listed average unit prices are based on the

More information

11 p.m. to. Tuesday, June. will remain open. 14. closed

11 p.m. to. Tuesday, June. will remain open. 14. closed June 3, 2011 CONTACT: Marcia McAllister T: 703 572 0506 C: 571 730 9117 marcia.mcallister@dullesmetro.com Important Lane Closures June 5 11 Include Northbound Beltway Lanes, Eastbound Dulles Airport Access

More information

Milan M5 metro extension the construction of Lotto station

Milan M5 metro extension the construction of Lotto station Milan M5 metro extension the construction of Lotto station Giuseppe LUNARDI, Rocksoil S.p.A., Italy giuseppe.lunardi@rocksoil.com Luca MANCINELLI, Rocksoil S.p.A., Italy, luca.mancinelli@rocksoil.com Massimiliano

More information

Chagrin River Watershed Partners, Inc. Cost Analysis of Low Impact Development Best Management Practices

Chagrin River Watershed Partners, Inc. Cost Analysis of Low Impact Development Best Management Practices Chagrin River Watershed Partners, Inc. Cost Analysis of Low Impact Development Best Management Practices Amy H. Brennan (440) 975-3870 www.crwp.org abrennan@crwp.org Chagrin River Watershed Partners Formed

More information

Do you own or operate underground facilities?

Do you own or operate underground facilities? This document contains information on becoming a member of the MISS DIG System. Once completed and returned to MISS DIG along with the supporting documents, MISS DIG will be able to establish you as a

More information

VDOT Small Business Enterprise Program Approved Contractors

VDOT Small Business Enterprise Program Approved Contractors A & P Services, LLC Pisgah Forest (828) 862-4701 fence@citcom.net NC Highway, Street and Bridge Construction All Other Support Activities for Road ALH Construction Elizabethton TN (423) 543-4946 alhcc@chartertn.net

More information

The Real Service Life and Repair Costs for Bridge Edge Beams

The Real Service Life and Repair Costs for Bridge Edge Beams The Real Service Life and Repair Costs for Bridge Edge Beams Hans-Åke MATTSSON*, Håkan SUNDQUIST ** *) MSc, PhD Student, Department of Civil and Architectural Engineering, Division of Structural Design

More information

FLORIDA DEPARTMENT OF TRANSPORTATION GUIDELINE FOR

FLORIDA DEPARTMENT OF TRANSPORTATION GUIDELINE FOR FLORIDA DEPARTMENT OF TRANSPORTATION GUIDELINE FOR ESTABLISHING CONSTRUCTION CONTRACT DURATION July 2010 DISCLAIMER: The following documentation as a whole was derived from Federal Highway Administration

More information

Storm Ready. 3 Gulf Power Ready for the storm. 4 Be prepared, be safe. 5 Getting the lights back on. 6 Damage to your home s service connection

Storm Ready. 3 Gulf Power Ready for the storm. 4 Be prepared, be safe. 5 Getting the lights back on. 6 Damage to your home s service connection Storm Ready Prep and Safety Power Restoration Your Service Connection Generator Safety Power Outage Map Stay Connected with Gulf Power Storm Ready 3 Gulf Power Ready for the storm 4 Be prepared, be safe

More information

Novogradac Financing Renewable Energy Conference Park Hyatt, Washington, D.C. November 6-7, 2014. www.novoco.com 1

Novogradac Financing Renewable Energy Conference Park Hyatt, Washington, D.C. November 6-7, 2014. www.novoco.com 1 www.novoco.com 1 Renewable Energy Investment Case Study MODERATOR Tony Grappone Novogradac & Company LLP PANELISTS Andrew Bernstein Kearsarge Energy Jim Duffy Nixon Peabody LLP Brian Morrissey Citizens

More information

DUDERSTADT FOUNDATION & CONSTRUCTION, LLC.

DUDERSTADT FOUNDATION & CONSTRUCTION, LLC. DUDERSTADT FOUNDATION & CONSTRUCTION, LLC. Drilling since 1916 2215 Belknap Place Phone (210) 824-3800 San Antonio, TX 78212-1904 Fax (210) 824-9525 www.duderstadtfoundation.com ABOUT THE COVER: Drilled

More information

SECTION 3 SANITARY SEWER DESIGN

SECTION 3 SANITARY SEWER DESIGN SECTION 3 SANITARY SEWER DESIGN 3.1 GENERAL DESIGN CRITERIA 3.1.1 Requirement for Sanitary Sewer 3.1.2 Design Approval 3.1.3 IEPA Permit Required 3.1.4 Differentiation Between Public and Private Sanitary

More information

2012 Program Report. Agricultural Group Drainage Program

2012 Program Report. Agricultural Group Drainage Program 2012 Program Report Agricultural Group Drainage Program Accomplishments: It was a successful year for the drainage program. We were able to complete two new projects and seven maintenance projects throughout

More information

DATE OF LETTING: February 04, 2015 TIME OF LETTING: 10:00 AM EASTERN STD

DATE OF LETTING: February 04, 2015 TIME OF LETTING: 10:00 AM EASTERN STD INDIANA DEPARTMENT OF TRANSPORTATION PAGE 1 NOTICE TO HIGHWAY CONTRACTORS DATE OF LETTING: February 04, 2015 TIME OF LETTING: 10:00 AM EASTERN STD Sealed proposals for certain highway improvements as described

More information

REQUIREMENTS AND SPECIFICATIONS FOR HIGH VOLTAGE CUSTOMER BUILT FACILITIES PEPCO ENGINEERING

REQUIREMENTS AND SPECIFICATIONS FOR HIGH VOLTAGE CUSTOMER BUILT FACILITIES PEPCO ENGINEERING REQUIREMENTS AND SPECIFICATIONS FOR HIGH VOLTAGE CUSTOMER BUILT FACILITIES PEPCO ENGINEERING Revised October, 2013 TABLE OF CONTENTS 1.0 INTRODUCTION... 3 2.0 REQUIRED DRAWINGS... 3 2.1 Site Plan... 3

More information

Developing Critical Path Method Scheduling (CPM)

Developing Critical Path Method Scheduling (CPM) Developing Critical Path Method Scheduling (CPM) Pretest 1. An activity which is on critical path has a planned duration of 5 days. What is the total float for the activity? a. 0 b. 1 c. 2 d. 3 Pretest

More information

Definition of Tower from the Bradley County Zoning Resolution

Definition of Tower from the Bradley County Zoning Resolution Definition of Tower from the Bradley County Zoning Resolution 43. TOWER. Any outdoor structure designed and constructed to support one (1) or more transmitting or receiving devices for telephone, radio

More information

SECTION 33 31 00.11 GRAVITY SANITARY SEWERS

SECTION 33 31 00.11 GRAVITY SANITARY SEWERS SECTION 33 31 00.11 GRAVITY SANITARY SEWERS PART 1: GENERAL 1.01 SCOPE A. Gravity sanitary sewers and appurtenances. 1.02 SUBMITTALS A. Conform to requirements of Section 01 33 00 Submittals. B. Submit

More information

50AI01oe 02/15. Labko GRP cesspools. Instructions for installation, operation and maintenance

50AI01oe 02/15. Labko GRP cesspools. Instructions for installation, operation and maintenance 02/15 Labko GRP cesspools Instructions for installation, operation and maintenance Reliable solutions Wastewater treatment systems Contents 1 LABKO CESSPOOLS... 3 1.1 GENERAL... 3 1.2 IMPORTANT TO KNOW

More information

MOHAMMAD I CHAUDHRY, P.E. A CONSTRUCTION PROJECT MANAGER Specialized in Highways, Bridges and Infrastructures construction & Maintenance

MOHAMMAD I CHAUDHRY, P.E. A CONSTRUCTION PROJECT MANAGER Specialized in Highways, Bridges and Infrastructures construction & Maintenance MOHAMMAD I CHAUDHRY, P.E. A CONSTRUCTION PROJECT MANAGER Specialized in Highways, Bridges and Infrastructures construction & Maintenance SUMMARY: Mr. Chaudhry, a decisive, innovative leader with a demonstrated

More information

X Planning X Quality X Maintenance & Operations

X Planning X Quality X Maintenance & Operations Delaware Department of Transportation Division of Transportation Solutions Design Guidance Memorandum Memorandum Number 1-20 Revised 1. Road Design Manual 2. Bridge Design Manual 3. Utilities Design Manual

More information

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE JURISDICTION OF ALBERTA TRANSPORTATION 1.0 Application Procedures 2.0

More information

Structural Engineering Services

Structural Engineering Services DRH Engineers, PLC (DRH) is a small veteran owned civil/structural engineering firm located in Warrenton, VA. DRH has a distinguished record of providing quality structural engineering and project management

More information

TIPS FOR TENNESSEE DISASTER VICTIMS 1. REGISTER FOR ASSISTANCE WITH FEMA.

TIPS FOR TENNESSEE DISASTER VICTIMS 1. REGISTER FOR ASSISTANCE WITH FEMA. WHAT NOW? TIPS FOR TENNESSEE DISASTER VICTIMS 1. REGISTER FOR ASSISTANCE WITH FEMA. If you have sustained any damage, register for assistance at www.disasterassistance.gov/daip_en.portal (Pre screening

More information

III. Additional Meeting Dates a. October 3, November 7 for Fall b. Select Spring dates at November 7 meeting could change with class schedules

III. Additional Meeting Dates a. October 3, November 7 for Fall b. Select Spring dates at November 7 meeting could change with class schedules Stern Student Center Advisory Board Meeting Thursday, September 5 Stern Student Center, Room 201 9:30 a.m. IN ATTENDANCE Sarah Sheafer, CisternYard Media Kesha Rainey, Multicultural Student Programs and

More information

MDOT Construction Field Services Update. 2013 MDOT LAP/Consultant Construction Kickoff Meetings

MDOT Construction Field Services Update. 2013 MDOT LAP/Consultant Construction Kickoff Meetings MDOT Construction Field Services Update 2013 MDOT LAP/Consultant Construction Kickoff Meetings Topic Overview Contract Administration Issues & Trends e-construction Documentation Buy America Construction

More information

The Stabilizer TM. Benefits. www.griptite.com. Supplemental support system for sagging beams and floor joists within a crawl space

The Stabilizer TM. Benefits. www.griptite.com. Supplemental support system for sagging beams and floor joists within a crawl space The Stabilizer TM Supplemental support system for sagging beams and floor joists within a crawl space Pre-drilled holes in steel plate allow for connection to beam or floor joists. Benefits Levels and

More information

TD AMERITRADE Park Omaha

TD AMERITRADE Park Omaha TD AMERITRADE Park Omaha November 19, 2009 Report No. 6 MONTHLY CONSTRUCTION PROGRESS REPORT METROPOLITAN ENTERTAINMENT & CONVENTION AUTHORITY MONTHLY CONSTRUCTION PROGRESS REPORT Metropolitan Entertainment

More information

INMET Konstrukcje sp z o.o. Leading steel forms for prefabrication manufacturer in Poland

INMET Konstrukcje sp z o.o. Leading steel forms for prefabrication manufacturer in Poland The INMET Konstrukcje company is a leading manufacturer of the steel forms in Poland. On the basis of individualised projects the company manufactures modern and complex steel forms for the prefabrication

More information

Geotechnical Building Works (GBW) Submission Requirements

Geotechnical Building Works (GBW) Submission Requirements Building Control (Amendment) Act 2012 and Regulations 2012: Geotechnical Building Works (GBW) Submission Requirements Building Engineering Group Building and Construction Authority May 2015 Content : 1.

More information

BACKUPS! Solving the Problem in a Seattle Neighborhood

BACKUPS! Solving the Problem in a Seattle Neighborhood BACKUPS! Solving the Problem in a Seattle Neighborhood MARTHA BURKE SEATTLE PUBLIC UTILITIES A ND A NDY BEHNKE HERRERA ENVIRONMENTAL CONSULTANTS PNCWA 2 009 BOISE, IDAHO Broadview Area Project Study Area

More information

2010-2011 Contractor of the Year

2010-2011 Contractor of the Year U.S. Army Corps of Engineers: Little Calumet River Stage VII Steel Sheet Piling Installation Hammond, Indiana Thatcher worked two rigs concurrently one on the north side and one on the south. The United

More information

M E M O R A N D U M. DATE: March 26, 1997 Updated September 7, 2001. Alabama Department of Public Health Employees The RSA Tower

M E M O R A N D U M. DATE: March 26, 1997 Updated September 7, 2001. Alabama Department of Public Health Employees The RSA Tower M E M O R A N D U M DATE: Updated September 7, 2001 TO: FROM: SUBJECT: Alabama Department of Public Health Employees The RSA Tower Donald E. Williamson, M.D. State Health Officer Welcome to our new facilities

More information

Unit Price Averages Reports

Unit Price Averages Reports Unit Price Averages Reports 12/7/2015 UNIT PRICE AVERAGES REPORT Disclaimer The information provided in the following Unit Price Averages Report is only for the use of Alberta Infrastructure & Transportation

More information

Bridge Type Selection

Bridge Type Selection Bridge Type Selection The major consideration for bridge type selection for bridges on the State Aid system is initial cost. Future maintenance costs, construction time, and location are considered when

More information

FDOT DBE CERTIFICATION NAICS CODE GUIDE WITH CAP SIZES

FDOT DBE CERTIFICATION NAICS CODE GUIDE WITH CAP SIZES NAICS CODE Highway, Street, and Bridge Construction SIZE CAP ($ MIL) 237310 Asphalt Roadway (includes 300, 320, 327, 330, 334, 336, 337, 338) Application of prime and tack coats, leveling surfaces and

More information

Rehabilitation of the Red Bank Road Bridge over Hoover Reservoir. Presented By: Doug Stachler, P.E.

Rehabilitation of the Red Bank Road Bridge over Hoover Reservoir. Presented By: Doug Stachler, P.E. Rehabilitation of the Red Bank Road Bridge over Hoover Reservoir Presented By: Doug Stachler, P.E. Project Organization Owner Delaware County Engineers Office Design Consultant CH2M HILL Contractor Double

More information

June 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL

June 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL 7.0 7.1 GENERAL For the purpose of this manual, culverts are defined as structures that are completely surrounded by soil and located below the surface of the roadway parallel to the general direction

More information

Engineered Material Handling. Overhead Bridge Cranes and Gantry Cranes

Engineered Material Handling. Overhead Bridge Cranes and Gantry Cranes TM Engineered Material Handling Overhead Bridge Overhead and Gantry Bridge Cranes and Gantry Cranes Custom Engineered Crane Systems Gantry Cranes EMH builds a complete range of gantry cranes including

More information

EMERGENCY STORAGE PROJECT

EMERGENCY STORAGE PROJECT EMERGENCY STORAGE PROJECT San Vicente Pipeline San Vicente Pumping Facilities San Vicente Interconnect Pipeline San Vicente Dam Raise Carryover Storage Project Briefing Summary DATE: May 21, 2008 ORGANIZATION:

More information

10 Mile Drain Remediation

10 Mile Drain Remediation 10 Mile Drain Remediation Summary of the Clean-up efforts for the 10 Mile Drain and Lange Street canals Anthony V. Marrocco Macomb County Public Works Commissioner Completed Activities EPA s removal action

More information

2015 OPERATIONAL PROGRAMS SCHEDULE

2015 OPERATIONAL PROGRAMS SCHEDULE Project Manager Service Provider Timeline/Status DWQMS Internal Audit BluMetric Environmental DWQMS External Audit Off-site audit - November 6th 2015 SAI Global On-site audit - December 15th - 16th 2015

More information

2015 STATE OF THE URBAN TRAILS. Accomplishments, Active Projects, and Next Steps

2015 STATE OF THE URBAN TRAILS. Accomplishments, Active Projects, and Next Steps 2015 STATE OF THE URBAN TRAILS Accomplishments, Active Projects, and Next Steps Agenda What is an Urban Trail? Accomplishments Active Projects Next Steps What is an Urban Trail? Goals of Urban Trail Program:

More information

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary

More information

A Resident s Guide to Recycling

A Resident s Guide to Recycling A Resident s Guide to Recycling We understand. We re competing for attention with everything else in your life. Recycling may not be exciting but it s important and easy, and recycling right benefits the

More information

Installation PowerPoint for Grasscrete Formers

Installation PowerPoint for Grasscrete Formers Installation PowerPoint for Grasscrete Formers 1 This document describes the two single-use tools utilized to create the Grasscrete product. The original Former is a vacuum formed light gauge plastic mold

More information

Water Main Break During Normal Operating Hours

Water Main Break During Normal Operating Hours Emergency Guideline GU.FAC.018 - Version 1.0 For Project Supervisor, Team Leader, Caretakers, Trades Approved by FS Leadership Team, March 27, 2013 In addition to fixing water main breaks on its own property,

More information

Frequently Asked Questions

Frequently Asked Questions Warren County, Tennessee Building & Environmental Codes Department 201 Locust Street, Suite 6 McMinnville, TN, 37110 931.474.2633 Frequently Asked Questions What building codes are the Warren County Building

More information

States Where You Can t Throw E-Waste Into the Trash

States Where You Can t Throw E-Waste Into the Trash TAKE IT BACK. MAKE IT GREEN. RECYCLE RESPONSIBLY. States Where You Can t Throw E-Waste Into the Trash In some states in the US, it s perfectly legal for households and many small businesses to throw electronic

More information