Powerhouse Kjørbo Norway
|
|
|
- Winfred Wheeler
- 9 years ago
- Views:
Transcription
1 Powerhouse Kjørbo Norway 1. INTRODUCTION PROJECT SUMMARY - Year of construction: None past energy renovations Representative picture of the project; e.g main facade MAIN RENOVATION TOPICS High insulated facades Airtightness 0,6 h-1 High efficiency technical systems, ground coupled heat pump, COP = 15 for cooling, COP = 3,5 for heating, efficient heat recovery, and low SFP PV electricity production on site Architect Snøhetta Architects AS, Oslo Consultants Skanska Norway, Hydro, Zero, ZEB and Asplan Viak Owner Entra Eiendom AS Brochure: Arne Førland-Larsen Contact: [email protected] IEA SHC Task 47 Renovation of Non-Residential Buildings towards Sustainable Standards Version:
2 2. CONTEXT AND BACKGROUND BACKGROUND The building situated in Sandvika, close to the Oslofjord from the northeast to the southeast side, with a highway with heavy traffic on the northwest. The renovation includes two blocks out of a total of 9 of the entire site. (Map next page) The refurbish buildings have an area of m 2 (internal area without outer walls) The buildings are programmed for approximately 240 person, which makes an average area of 22 m 2 per person OBJECTIVES OF THE RENOVATION Powerhouse is defined as a building that during its lifecycle produces more renewable energy than it consumes for the production of building materials, construction, operation and demolition of the building The building shall be built within commercial marketable conditions The energy production must be based on energy sources on site or nearby with access from the site Energy use for electrical appliances shall not be included in the energy balance account. BREEAM classification score: Outstanding Facade and typical floor plan before refurbishment Facade and typical floor plan after refurbishment
3 3. DECISION MAKING PROCESSES The Powerhouse Alliance The Powerhouse Alliance includes the companies: Snøhetta Architects, Skanska, Hydro, Entra Eiendom and the NGO Zero. The Powerhouse concept was first launched in The proposal for the first Powerhouse project, a new office building in Trondheim, was presented in The Powerhouse Kjørbo is the first renovation project of the Alliance. Powerhouse, criteria of the energy goal In order to fulfill the declared goal of the PowerHouse (given in a press release from the Alliance): The Powerhouse alliance will: challenge existing building conventions develop cutting-edge concepts promote new national and international standards for energy efficiency and energy positive buildings be technological path-breaking The main definition of PowerHouse: Powerhouse shall during its lifetime produce more energy than it uses for materials, production, operation, renovation and demolition Picture/figure - Interior of standard room - circulation area - representative area Timeline for the decision making process - Idea born: - First brief project description completed: - Detailed project description completed: - Tendering process started: - Signing of contract with main contractor: - Typical Start refurbishment: office space before - Refurbishment completed: Timeline for the decision making process Idea was born 2011 First brief project description completed Detailed project description completed Tendering process started Signing of contract with main contractor Start renovation (demolishing) Renovation completed Q Evaluation among occupants TBD Typical office space after
4 4. BUILDING ENVELOPE Roof construction : U-value: 0,08 W/m 2 K (average value) Wall construction : U-value: 0,15 W/m 2 K (average value above and below ground) Floor facing ground (basement) equivalent value in average : U-value: 0,16 W/m 2 K Windows : U-value: < 0,8 W/m 2 K (average value) Floor on ground U-value: 0,12 W/m 2 K Floor in basement U-value: 0,16 W/m2K Thermal bridge avoidance: Focus on thermal bridges in: Mounting of windows Insulation thickness where concrete slabs meets the façade Wood facade construction with few thermal bridges, and 200 mm insualtion in front of slabs Overall demand to thermal bridges are: < 0,03 W/m 2 k Window / to wall ratio: 40 / 60 Light transmitting factor for windows: 68% Daylight factor: average on working areas 2,1 Sun shading External sun shading integrated in facade Summary of U-values [W/m²K] Before After Roof/attic ~0,2 0,08 Floor/slab - 0,12 0,16 Walls ~0,3 0,15 Ceilings ~0,3 0,3 Windows ~1,8 0,8
5 5. BUILDING SERVICES SYSTEM OVERALL DESIGN STRATEGY The overall design strategy based on: Optimizing the building envelope Optimizing technical system Utilization renewable energy LIGHTING SYSTEM New lighting system have planned LENI number ~9 kwh/m 2 year HEATING SYSTEM Before Water based heating system After Air heating delivered from ventilation system combined with radiators in the wave wall in the center of the building COOLING SYSTEM Before: central cooling of inlet air for mechanical ventilation in combination with cooled beams. After: Central air cooling mechanical and displacement ventilation HOT WATER PRODUCTION Heat pump and district heating RENEWABLE ENERGY SYSTEMS Before: District heating After: preliminary ground based heat pump 310 kw PV system for electric generation to produce kwh/year Energy production Daylight strategy average DF > 2,1 Ventilation and cooling Reduced duct length Displacement ventilation Exhaust air through staircase
6 6. ENERGY PERFORMANCES ENERGY PERFORMANCE Annual delivered before ~ 240 kwh/m 2 (including data facilities.) Annual delivered after: ~20,4 kwh/m 2 (without data and technical equipment) ~50 kwh/m 2 year (including data facilities) RENEWABLE ENERGY USE Annual delivered before: Electricity ~ 125 kwh/m 2 District heating ~ 75 kwh/m 2 District cooling ~ 40 kwh/m 2 Annual delivered after: Electricity ~ 18,4 kwh/m 2 District heating ~ 2 kwh/m 2 PRIMAY ENERGY CONSUMPTION Primary energy consumption is defined as delivered energy multiplied with primary energy factors, as primary factor for conversion of electrical consumption calculated for a 60 year life time /Source ZEB and Powerhouse project report 2012/ Energy budget - net energy/ space deliverable Electicity District Total Space heating 15,4 4,6 0,9 5,5 kwh/m² year Ground couples heatpump Mechanical ventilation - heating 2,4 0,8 0,1 0,9 kwh/m² year Ground couples heatpump Hot Water 4,3 1,1 1 2,1 kwh/m² year Ground couples heatpump heating Energy fans for mechanical ventilation 2,1 2,1 2,1 kwh/m² year Energy pumps for heating, ventilation, cooling 0,8 0,8 0,8 kwh/m² year Lighting 7,7 7,7 7,7 kwh/m² year Technical equipmnet, PC, copymachines etc kwh/m² year Central data facilities - servers 16,9 16,9 16,9 kwh/m² year Coooling, cooled beams in office areas kwh/m² year Cooling, central servers 16,9 1,1 1,1 kwh/m² year Free cooling from ground Cooling, central mechanical ventilation 3,5 0,2 0,2 kwh/m² year Free cooling from ground Sum energy demand 82 47,3 2 49,3 kwh/m² year Sum exclusive central data facilities 65 30,4 2 32,4 kwh/m² year Sum exclusive central data facilities and technical equipment 53 18,4 2 20,4 kwh/m² year Energy demand / production Netto energy Delivered/ produced energy Primary energy factor Delivert energy Primary energy demand PV - production, first 30 years 40,7 1,98 80,6 kwh/m² PV - production, last 30 years 60,1 0,93 55,9 kwh/m² PV - production, average 60 years 68,7 kwh/m² Operational energy use -20,4 1,46-29,8 kwh/m² Embodied energy Sum -22,1 kwh/m² 16,8 kwh/m² Remarks CLARIFICATION: the energy calculations and given energy numbers will be according to the national standards which might vary between countries., i.e. numbers are not always comparable
7 7 ENVIRONMENTAL PERFORMANCE Waste management More than 90% of waste from construction phase is recycled and / or reused Ecological materials/ indoor AQ Building materials with lowest possible embodied energy Burned wood for façade cladding Labeling materials or materials with low polluting according to EN All product categories listed in BREEAM have been tested against and documented to meet the relevant standards Volatile Organic Compound (VOC) emissions. The climate gas emissions from new materials in the building comprise 50% of the emissions in a new reference building. (Ref definition se /Klimagassutslipp.no/ EPDs (Environmental Product Declarations according to ISO 14025/EN- NS15804) have been procured for at least 10 different building products used to a large extent Certification / Labels BREEAM-NOR, planned for certification label outstanding Picture/figure Sections / plans
8 8. MORE INFORMATIONS RENOVATION COSTS The building shall be renovated within commercial market conditions. The Powerhouse boundary is similar to the Boundary II (On site generation from on-site renewable) as illustrated below The specific cost of the project are not public for the time being. The tenant Asplan Viak has signed a 10 year renting contract. The rent is higher than for a similar office building with an average energy standard. However, when the reduced energy costs are included, the total cost for the tenant is at the same level as for a standard office building. OTHER INTERESTING ASPECTS Measured/delivered energy shall in net be counted to zero or be negative, and shall be calculated according to method/ principles given in the Norwegian Standard Real operation conditions shall be used in the calculations, and technical equipment shall not be included. The boundary of the plus energy building/powerhouse is the site on which the building is located. The energy goal must not be reached at the sacrifice of good architecture and indoor climate, or other central environmental qualities. Source: A.J. Marszala,, P. Heiselberga, J.S. Bourrelleb, E. Musallc, K. Vossc, I. Sartori d, A. Napolitanoe. Zero Energy Building A review of definitions and calculation methodologies, Energy and Buildings 43 (2011)
Norwegian Tax Authority - Oslo Norway
1. INTRODUCTION Norwegian Tax Authority - Oslo Norway PROJECT SUMMARY Year of construction - 1980 No previous energy renovations SPECIAL FEATURES Main topics in the renovation are: High insulated pre fabricated
The Powerhouse definition
The Powerhouse definition Updated: 19/05/2016 Powerhouse Kjørbo. Photo: Chris Aadland There exist numerous definitions on energy positive or plus-energy buildings. The Powerhouse collaboration s definition
School in Schwanenstadt, Austria
School in Schwanenstadt, Austria 1. INTRODUCTION PROJECT SUMMARY - building period 1960s - numerous expansions SPECIAL FEATURES - Renovation to meet Passive House Standard - decentralized ventilation system
Energy Efficient HVAC-system and Building Design
Energy Efficient HVAC-system and Building Design Maija Virta 1, Harri Itkonen 1, Panu Mustakallio 1, Risto Kosonen 1 1 Halton Oy, Finland Corresponding email: [email protected] SUMMARY This paper
IEA SHC Task 47 Renovation of Non-Residential Buildings towards Sustainable Standards
Date of revision: 15.6.2012 Osram Culture Centre Copenhagen, Denmark Valhalsgade 4, 2200 Copenhagen N 1. INTRODUCTION PROJECT SUMMARY Construction year: 1953 Energy renovation: 2009 No past energy renovations
The first apartment house renovation with Passive House components in Norway
14th International Passive House Conference Dresden, May 28, 2010 Michael Klinski Tor Helge Dokka The first apartment house renovation with Passive House components in Norway 168 flats, onebedrooms (55
Improving thermal insulation of concrete sandwich panel buildings
Improving thermal insulation of concrete sandwich panel buildings Jørgen Munch-Andersen Danish Building Research Institute, Aalborg University LCUBE conference, Vienna 17-18 April 2007 Outline A general
Passive house rehabilitation of post war residential building in Zug, Switzerland
Passive house rehabilitation of post war residential building in, Switzerland Owner: Erbengemeinschaft Ducret Architect: Miloni & Partner, Wettingen Energy concept designer: Zurfluh & Lottenbach, Luzern
Klosterenga, Oslo, Norway, 1998-2000 page - 1
Klosterenga, Oslo, Norway, 1998-2000 page - 1 Introduction Klosterenga is an urban revitalisation project close to the city centre of Oslo. The 3 apartments were built with a focus on energy saving. Next
Franciscan Monastery, Graz, Austria
Franciscan Monastery, Graz, Austria 1. INTRODUCTION PROJECT SUMMARY - first parts 1239 - main parts from 1250 to 1650 - protected monument SPECIAL FEATURES Mission of the Franciscans: conservation and
Energy Efficiency in Buildings
Energy Efficiency in Buildings Supplemental Guide to SANS 10400-XA & SANS 204 V. 3.0 Registered to: The Drawing Studio Image: digitalart / FreeDigitalPhotos.net Report Date: 26 August 2014 Practice Name:
Assessment Methods. 15 th November 2010 Huw Jenkins Simon Lannon
Assessment Methods 15 th November 2010 Huw Jenkins Simon Lannon Assessment Methods Program Country Year Program Country Year 1 R-2000 Canada 1982 12 LEED US 2000 2 P-mark Sweden 1989 13 ECO-Quantum Netherlands
Green House, Hungary
Further information Skanska AB www.skanska.com Contact Noel Morrin, SVP Sustainability & Green Support [email protected] Green House, Hungary Case Study 109 Aspects of Sustainability This project
Achieving Net Zero. Bradley Berneche, President Alouette Homes. National Marketing Committee Canadian Home Builders Association Ottawa, June 6, 2008
Achieving Net Zero Bradley Berneche, President Alouette Homes National Marketing Committee Canadian Home Builders Association Ottawa, June 6, 2008 Overview Who Is Alouette Homes? The EQuilibrium Initiative
Case study on residential building renovation and its impact on the energy use and thermal comfort
Case study on residential building renovation and its impact on the energy use and thermal comfort Hanne Kauko, Maria Justo Alonso, Ole Stavset and Ingrid Camilla Claussen SINTEF Energy Research Motivation
Innovative solution for heat recovery of ventilation air in older apartment buildings - with low intervention affecting the residents
Innovative solution for heat recovery of ventilation air in older apartment buildings - with low intervention affecting the residents Innovative solution for heat recovery of ventilation air in older apartment
Dienstleistung. Certification as "Quality Approved Passive House" Criteria for Residential-Use Passive Houses
Passiv Haus Institut Passivhaus Dienstleistung GmbH Dr. Wolfgang Feist Rheinstr. 44/46 Rheinstr. 44/46 D-64283 Darmstadt D-64283 Darmstadt www.passiv.de www.passivhaus-info.de Certification as "Quality
BREEAM Refurbishment and Fit-out 2014 Briefings. Part of the BRE Trust
BREEAM Refurbishment and Fit-out 2014 Briefings Part of the BRE Trust BREEAM for Refurbishment and Fit-out Follows 2 years of development Draft scheme published and consultation from 19 th July 2014 Launched
Challenging the possibilities
Passivhus Norden 2013 Challenging the possibilities Olav Langenkamp, Architect ETH-MAA, Langenkamp.dk Architects, Tigervej 26 8400 Ebeltoft Denmark, [email protected] Martin Wikkelsø Brandt, Cand. Polyt.
Energy audit in Finland
Energy audit in Finland NorTech Oulu Lauri Mikkonen Energy Audit in Finland An energy audit tells about the energy efficiency and total energy consumption in a building, including all consumed heating,
PAPERS PRESENTED AT THE CONFERENCE PASSIVHUSNORDEN 2012
PAPERS PRESENTED AT THE CONFERENCE PASSIVHUSNORDEN 2012 TABLE OF CONTENTS DAY 1 MAIN CONFERENCE HALL... 5 THE SKARPNES RESIDENTIAL DEVELOPMENT - A ZERO ENERGY PILOT PROJECT... 5 NET ZEB OFFICE IN SWEDEN
Building Energy Labels: The Swiss MINERGIE Label
Building Energy Labels: The Swiss MINERGIE Label Chennai, October 8 th, 2010 Heinrich Gugerli, Head Sustainable Building Group [email protected] www.stadt-zuerich.ch/nachhaltiges-bauen Energy
Data Collection Summary Report
Data Collection Summary Report Asilo Cologno Monzese Polo Territoriale per la Prima Infanzia con Asilo Nido 22/09/2011 The sole responsibility for the content of this report lies with the authors. It does
Passive House Projects in Norway an Overview
Passive Houses in Cold Climates SESSION 4 Passive House Projects in Norway an Overview Inger Andresen and Tor Helge Dokka, SINTEF Building and Infrastructure Architecture and Building Technology, N-7465
Energy savings in the residential area are essential in
Overheating and insufficient heating problems in low energy houses up to now call for improvements in future Requirements for improved energy performance have shifted major focus on energy calculations
Solar Homes Catch the Sun. Are you planning a new house? Discover how you can apply solar architecture principles to:
PASSIVE Solar Design Solar Homes Catch the Sun Are you planning a new house? Discover how you can apply solar architecture principles to: keep your heating bills to a minimum enjoy the comfort of a warm
Lead architect: Ron Arad Architects - Executive architect: Jaspers & Eyers
SOLUTIONS FOR SUSTAINABLE BUILDINGS THE GUIDE TO BREEAM Lead architect: Ron Arad Architects - Executive architect: Jaspers & Eyers Reynaers develops innovative and sustainable aluminium solutions, for
BYG DTU. Thermal properties of window frame Type 1 Sheet: 1. Type: Side, top and bottom profile. Source file: Format: dwg/dxf bmp
Thermal properties of window frame Type 1 Sheet: 1 Type: Side, top and bottom profile Profile: Frame profile made of wood and a GRP profile mounted with a sealed triple glazing unit. Materials: Wood GRP
Holistic Approach in Delivering Government Buildings The Low Carbon Concept
International Conference on Planning for Low Carbon Cities 22 May 2009 Holistic Approach in Delivering Government Buildings The Low Carbon Concept Ir. HO Sai-king, Assistant Director (Building Services),
Clean Energy Solutions Center IEA Technology Roadmap: Energy Efficient Building Envelopes Launch
Clean Energy Solutions Center IEA Technology Roadmap: Energy Efficient Building Envelopes Launch Didier Houssin and Marc LaFrance International Energy Agency 18 December 2013 Paris IEA/SPT Flagship Publication,
3.14 <NL> The Netherlands
The Netherlands 213 3.14 The Netherlands (by EPISCOPE partner DUT) 3.14.1 Current Legal s and Status of National NZEB Definition for Residential Buildings in the Netherlands In October 2012,
Hybrid heat pumps. saving energy and reducing carbon emissions
Hybrid heat pumps saving energy and reducing carbon emissions Bart Aspeslagh Product planning and new technology manager, Daikin Europe NV. [email protected] Stefanie Debaets Design engineer,
Improving comfort and energy efficiency in a nursery school design process S. Ferrari, G. Masera, D. Dell Oro
Improving comfort and energy efficiency in a nursery school design process S. Ferrari, G. Masera, D. Dell Oro Dept. Building Environment Science &Technologies Politecnico di Milano Italy Research funded
FACTORS AFFECTING ENERGY CONSUMPTION OF BUILDINGS
FACTORS AFFECTING ENERGY CONSUMPTION OF BUILDINGS 1 Ralf Lindberg, Professor Minna Korpi, M.Sc. Juha Vinha, Dr.Tech. June 11, 2008 Department of Civil Engineering, Tampere University of Technology 2 BACKGROUND
Sustainable Strategies for Rehabilitation Projects: 9th Street Office Building Adaptive Reuse Case Study
Sustainable Strategies for Rehabilitation Projects: 9th Street Office Building Adaptive Reuse Case Study Robert C. Burns, AIA, LEED AP Principal Director of Historic Architecture 804. 648. 5040, ext. 1107
Low energy class 1 typehouses according to the Danish building regulations
Low energy class 1 typehouses according to the Danish building regulations Jørgen Rose, Senior Researcher, Department of Energy and Environment, Danish Building Research Institute, Aalborg University;
Energy Management in Wuppertal
Energy Management in Wuppertal Organisation, Implementation and Financing Christian Gleim Gebäudemanagement der Stadt Wuppertal (GMW) 1 What do I want to tell you? Initial situation in Wuppertal Organisation
Kvernhuset Lower Secondary School
Kvernhuset Lower Secondary School Name of building: Kvernhuset Lower Secondary School Location: Fredrikstad, Norway (59.12 N, 10.56 E) Owner: Fredrikstad Municipality Start of operation: January 2003 Figure
Millennium Hall, Philadelphia, Pennsylvania is a Residence Hall/Dormitory building of approximately 102,680 ft². The client is Drexel University.
Page 1 of 6 INTRODUCTION Millennium Hall, Philadelphia, Pennsylvania is a Residence Hall/Dormitory building of approximately 102,680 ft². The client is Drexel University. Millennium Hall is described as
research highlight Highly Energy Efficient Building Envelope Retrofits for Houses
research highlight June 2012 Technical Series 12-103 Highly Energy Efficient Building Envelope Retrofits for Houses introduction In Canada approximately 30% of all energy is consumed in buildings, with
THE NATIONAL BUILDING REGULATIONS PART XA: ENERGY EFFICIENCY. Presentation by Peter Henshall-Howard: HEAD: BUILDING DEVELOPMENT MANAGEMENT.
THE NATIONAL BUILDING REGULATIONS PART XA: ENERGY EFFICIENCY. Presentation by Peter Henshall-Howard: HEAD: BUILDING DEVELOPMENT MANAGEMENT. A Diagrammatic representation of the relationship between the
Solar Energy Utilisation in Buildings
Solar Energy Utilisation in Buildings P. Karava, PhD Assistant professor Department of Civil and Environmental Engineering University of Western Ontario 2 Modern Buildings Change in architectural style
WORKSHOP: The roles of wood in green building and green building effects on the forest sector of in the UNECE region.
WORKSHOP: The roles of wood in green building and green building effects on the forest sector of in the UNECE region. Are ENGO s ready to promote the use of wood as the preferred building material? Alison
MARQUETTE UNIVERSITY: McCabe Hall
MARQUETTE UNIVERSITY: McCabe Hall THE SITE Newly acquired by Marquette, the vintage 1920 s building is located on the northeast corner of Wisconsin and 17th Streets. The urban setting offers immediate
9 Energy management. 9:1 General. BFS 2011:26 BBR Oct. 9:11 Scope of application
BFS 2011:26 9 Energy management This section contains the provisions and general recommendations for Chapter 3, Article 14 and Chapter 3 the first paragraph of Article 15 of PBF. Section 9:9 contains provisions
D5.3 Energy audit report
Project Acronym: EPLACE Project Title: Eco public PLAtform for smart green CityzEn s living labs Call identifier: CIP-ICT-PSP Call 6 Theme 1: ICT for SMART CITIES Objective1.1: Smart Urban digital services
HHHHH Outstanding 85%
Provinciehuis_Assessment_2040204_74,32%Final Score and Rating BREEAM Scheme: Europe 2009: Offices H Pass 30% Building Name: Provinciehuis Antwerpen HH Good 45% BREEAM Registration No.: BREEAM-0048-4626
Systems Selection Enclosure Systems Material Selection Assessment and Mitigation
Return to Curriculum Home CES Home Find an AIA/CES Registered Course Self Report a Learning Activity MATERIALS AND METHODS To develop professionally in Practice with a focus on sustainable design, you
Nearly Zero-Energy Buildings Examples of the sector trade, commerce, services
Nearly Zero-Energy Buildings Examples of the sector trade, commerce, services Hans Erhorn Fraunhofer-Institut für Bauphysik (IBP), Stuttgart Fraunhofer IBP Auf Wissen bauen Fraunhofer Institute for Building
The Integrated Design Process
The Integrated Design Process The Integrated Design Process (IDP) has been developed on the basis of experience gained from a small Canadian demonstration program for high-performance buildings, the C2000
POMONA COLLEGE Sustainability Integration Office Facilities and Campus Services
POMONA COLLEGE Sustainability Integration Office Facilities and Campus Services May 200 Table of Contents NEW CONSTRUCTION/MAJOR RENOVATION Process... Design... 3 MINOR RENOVATIONS/PROJECTS Process...
Delivering on innovation and market uptake. Best-in-cases of nzeb. Ramon Pascual Bucharest May 8th, 2015
www.zebra2020.eu Delivering on innovation and market uptake. Best-in-cases of nzeb Ramon Pascual Bucharest May 8th, 2015 Outline nzeb Database Best in cases of nzeb Climates in Europe Preliminary results
Does Green Building pay? Danish decisions and German experiences Green Building Council Denmark and AHK in Copenhagen the 26.09.
Sustainable integrated planning of GreenBuildings Best practice of Sustainable Green Corporate Architecture with Energy Efficiency & Renewables Does Green Building pay? Danish decisions and German experiences
CAN DEMAND CONTROLLED VENTILATION REPLACE SPACE HEATING IN OFFICE BUILDINGS WITH LOW HEATING DEMAND?
Topic B3: Control of indoor environment CAN DEMAND CONTROLLED VENTILATION REPLACE SPACE HEATING IN OFFICE BUILDINGS WITH LOW HEATING DEMAND? Axel CABLE 1,*, Mads MYSEN 1,2, Kari THUNSHELLE 1 1 SINTEF,
Energy-Plus Primary School, Hohen Neuendorf, Germany
Energy-Plus Primary School, Hohen Neuendorf, Germany Ingo LÜTKEMEYER, Prof. Dipl.-Ing. Architekt BDA 1 Jens KRAUSE, Dipl. Ing. 2 Günter LÖHNERT, Dr. Ing. 3 Holger KÖNIG, Dipl.-Ing. 4 Detlef HENNINGS, Dr.
Steel Solutions for Green Building
Steel Solutions for Green Building Createsima transforming tomorrow Steel Solutions for Green Building As society makes determined moves towards sustainability, construction has a very important role to
Integrated Solar Radiant Systems
Integrated Solar Radiant Systems William Shady PE President Topics Radiant heating Indoor air quality Radiant Cooling Project Photos Questions and answers The goal for our clients Healthy Comfort Why Radiant
DIAGNOSING, BENCHMARKING AND TRANSFORMING THE LEED CERTIFIED FIU SIPA BUILDING INTO A NET-ZERO-ENERGY BUILDING (NET-ZEB)
DIAGNOSING, BENCHMARKING AND TRANSFORMING THE LEED CERTIFIED FIU SIPA BUILDING INTO A NET-ZERO-ENERGY BUILDING (NET-ZEB) Thomas Spiegelhalter Florida International University College of Architecture Miami,
PROBIS SUPPORTING PUBLIC PROCUREMENT OF BUILDING INNOVATIVE SOLUTIONS
PROBIS SUPPORTING PUBLIC PROCUREMENT OF BUILDING INNOVATIVE SOLUTIONS Regione Lombardia ALER Bergamo Lecco Sondrio Treviglio via Dei Mulini n. 10/20 via Filzi n. 11/13 Prospectus Template provided by TEH-Ambrosetti.
A comparative study of energy certification systems for buildings
A comparative study of energy certification systems for buildings Jelena Milicevic Master's Thesis Submission date: April 2014 Supervisor: Vojislav Novakovic, EPT Norwegian University of Science and Technology
D5.1 National reports on energy certification of buildings PORTUGAL
- Energy Certification, Information And Communication Technologies For User Satisfaction D5.1 National reports on energy certification of buildings PORTUGAL 1 2 Statement of originality This deliverable
Exemplary Retrofitting of an Old School in Stuttgart - EROS -
Exemplary Retrofitting of an Old School in Stuttgart - EROS - City of Stuttgart, Summary The objective of the project was to demonstrate the potentials of a retrofitting process for a typical school in
Adjutantti, Finland. Case Study 95
Further information Skanska AB www.skanska.com Contact Noel Morrin, SVP Sustainability & Green Support [email protected] Adjutantti, Finland Case Study 95 Aspects of Sustainability This project highlights
main heating: pre1998 ducted warm air system main heating fuel: mains gas main heating SAP efficiency: 70.0% main heating controls: programmer
Archetype: 3250330 Archetype Description: 1965-1975, semi / end terraced dwelling, timber frame walls, oil / gas / electric warm air heating, E This archetype represents 823 dwellings, which accounts for
Renovation instructions
1(13) Renovation instructions The purpose of these instructions is to inform you of the things to consider when renovating an apartment. You can avoid many possible problems and additional costs following
Ecofys VII U-Values for Better Energy Performance of Buildings
Ecofys VII U-Values for Better Energy Performance of Buildings Quantifying the potential I II III IV & V VI Climate Protection Regulation Cost Effectiveness Enlarged EU Price Scenario Key figures from
Energy systems and services for zero emission buildings and neighborhoods
1 Japan-Norway Energy Science Week 2015 Smart Cities and Industries, Tokyo, May 28 Energy systems and services for zero emission buildings and neighborhoods Professor Vojislav Novakovic, PhD Norwegian
Combi Unit Genius. The energy efficient Building Service Centre
Fans Air Handling Units Air Distribution Products Fire Safety Air Curtains and Heating Products Tunnel Fans Combi Unit Genius The energy efficient Building Service Centre systemair Central Building Services
Distributed Energy Systems
VTT TECHNICAL RESEARCH CENTRE OF FINLAND LTD Distributed Energy Systems Kari Sipilä, Principal Scientist VTT, Smart Energy Systems What is DESY DESY is R&D program for local energy systems covering the
2014 British Columbia Building Code Changes
District of Houston 250-845-2238 2014 British Columbia Building Code Changes A District of Houston interpretation of the 2014 Building Code Changes for 9.36 & 9.32 The following changes reflect the most
DK2 IEA. Replacing mechanical ventilation with natural ventilation at Enghøjskolen school in Denmark
IEA Energy Conservation in Buildings and Community Systems, Annex 36 Case studies overview Replacing mechanical ventilation with natural ventilation at Enghøjskolen school in Denmark 1 Photos DK2 Figure
ENERGY STATEMENT for a proposed new residential care home at Great North Road, Doncaster, South Yorkshire, DN6 7EJ
ENERGY STATEMENT for a proposed new residential care home at Great North Road, Doncaster, South Yorkshire, DN6 7EJ Ref. No: 12/02870/FULM Contents 1. General... 2 2. Planning Condition... 2 3. Development...
Skanska s Green Approach
Green Building Skanska s Green Approach At Skanska, we are committed to being more than the leading green builder. We strive to be at the leading edge of sustainable building methods and technology and
The Importance of Building Criteria on Cooling Energy Demand of a Low Cost Residential House: Thailand Case Study
The Importance of Building Criteria on Cooling Energy Demand of a Low Cost Residential House: Thailand Case Study WARAPORN RATTANONGPHISAT 1,2,*, FEDERICO M. BUTERA 2, R.S. ADHIKARI 2 AND CHALERMPORN YOOPRATETH
The ZEB Research Centre and Pilot Buildings. Zero Emission Buildings forskningssenter og pilotbygg
The ZEB Research Centre and Pilot Buildings Zero Emission Buildings forskningssenter og pilotbygg Birgit Risholt Research Manager SINTEF Building and Infrastructure, Work package manager FME Zero Emission
Active Roofs and Facades in Sustainable Renovation
Ellebo Garden Room, Ballerup Overall winning project of the Nordic Built Challenge Architectural competition Active Roofs and Facades in Sustainable Renovation A Nordic Innovation Initiative for development
1..GENERAL DATA 2. CLIMATIC DATA. Location
1..GENERAL DATA Location Szentendre, Downtown, Hungary Property Community centre of Szentendre, Public, Municipality of Szentendre Year of Building: End of 19th Century Present use (1) Community centre
Report Date: 04/03/2014. Assessor: John Doyle Address: BLOCK K APT 108 SANDYFORD VIEW DUBLIN 18 BER: 106178106 MPRN: 10301589669
Report Date: 04/03/2014 Assessor: John Doyle Address: BLOCK K APT 108 SANDYFORD VIEW DUBLIN 18 BER: 106178106 MPRN: 10301589669 About this Advisory Report Energy use in our homes is responsible for almost
IALN11006400 /05 01 19.06.13. FAO: The Planning Department The Royal Borough of Windsor and Maidenhead Town Hall, St. Ives Road Maidenhead SL6 1RF
IALN11006400 /05 01 19.06.13 FAO: The Planning Department The Royal Borough of Windsor and Maidenhead Town Hall, St. Ives Road Maidenhead SL6 1RF Dear Sir / Madam Re: 12/02994 BCA Sports Hall Condition
Residential HVAC System Sizing
Residential HVAC System Sizing William P. Goss University of Massachusetts, Amherst, Massachusetts, USA Corresponding email: [email protected] SUMMARY Heating, ventilating and air-conditioning (HVAC)
Introduction to Energy Codes & Green Building Programs
Introduction to Energy Codes & Green Building Programs David Neiger B.S. Arch, LEED AP Homes, Certified HERS Rater Principal Populus Sustainable Design Consulting Why green homes? The Building Sector:
Advanced office buildings with efficient technologies in Frankfurt am Main
Advanced office buildings with efficient technologies in Frankfurt am Main Dr. Werner Neumann City of Frankfurt am Main Energiereferat Municipal energy agency Galvanistrasse 28 D 60486 Frankfurt am Main
Adaptive strategies for office spaces in the UK climate
International Conference Passive and Low Energy Cooling 631 Adaptive strategies for office spaces in the UK climate I. Gallou Environment & Energy Studies Programme, Architectural Association Graduate
Building Permit Application
Building Permit Application CBO: Don Reed / Inspector: Scott Richardson -All applications must be filled out in full -Residential applications will be issued or denied within 10 working days -Multi-residential
Green BIM/ Early BIM/
Green BIM/ Early BIM/ Agenda/ Introduction to Sustainability Process Environmental Analysis Tools Environmental Analysis Relation to LOD Conclusion Disclaimer/ This seminar is looking at Building Performance
Rainwater Harvesting
Rainwater Harvesting With climate change now a reality rather than a speculated possibility, the demand on water resources has gone up, whilst the amount of water available for supply has gone down. Forth
Low Carbon Domestic Refurbishment
www.breeam.com Briefing Paper Low Carbon Domestic Refurbishment Kiruthiga Balson, Gavin Summerson and Steven Stenlund 2 BRE Global Ltd 2014 Permission is granted for this report to be distributed only
A clean energy solution from cradle to grave
Environmental Product Declaration A clean energy solution from cradle to grave Offshore wind power plant employing SWT-6.0-154 siemens.com / wind 2 Assessing the performance of a wind power plant The environmental