1 Havsul MW Offshore wind power project, with excellent wind conditions Sandøy municipality, Møre and Romsdal, Mid- Norway HAVGUL Clean Energy AS, Prinsens gate 5, 0152 Oslo, Norway,
2 Key facts and figures: Location: Offshore, off the coast of Sandøy municipality, Møre- and Romsdal County, Mid Norway Installed MW: 350 MW Wind resource (hh 80 m): 8,4 m/s Estimated prod. (P50): 1,08 TWh (6.0 MW- 150 m rotor dia) Capacity factor (P50): 35 % Turbine costs: 4200 MNOK Balance of plant: 4800 MNOK (including interconnection) Municipally tax: 0,7 % of CAPEX, plus NOK 2,5/MWh Landowner compensation: NA Expected IRRequity: 12 % (lease arrangement oil company) Status of project: Project received final concession 10. Sept 2010 Owner of project: Vestavind Offshore. Havgul has taken over all development activities and has an option to buy the project. Short description. The project is located offshore off the coast of Sandøy Municipality in Møre- and Romsdal county in Mid- Norway. The water depth is between 10 and 50 meters, with sea bed conditions varying between rock bottom and sediments. The project has a total installed effect of 350 MW with a minimum distance to shore of app. 5 km. Power will be transported via a 25 km 132 kv sub sea cable, to the petroelum facility of Ormen Lange at Nyhamna, on the island of Gossen, connected to the 420 kv central grid. The project received final concession September Since then, work has been carried out with regard to seabed surveys, construction and production estimates. Wind measurements have been carried with the use of a combination of Lidar and measuring mast. Havsul I is eligible to offshore petroleum tax. This provides an excellent opportunity for tax depreciation for oil companies. There is no power or sertificate risk. Contact data: Havgul clean energy AS Att.: Harald Dirdal, Contact details: harald@havgul.no, HAVGUL Clean Energy AS, Prinsens gate 5, 0152 Oslo, Norway,
3 Kjølen Windfarm 105 MW Good wind condition Aremark municipality Østfold county South Norway HAVGUL Clean Energy AS, Prinsens gate 5, 0152 Oslo, Norway,
4 Key facts and figures. Location: Aremark municipality, Østfold county, south Norway Applied installed effect: 105 MW Wind resource (hh 120m): 6.9 ms Capacity factor: 36 % Estimated prod. (P50): 335 GWh (Nordex N117 2,4 MW) Turbine costs: 893 MNOK Balance of plant: 351 MNOK (including interconnection) Municipally tax: 0,7 % of CAPEX Land owner compensation: 4 % of gross income. Expected IRRequity: 13,68 % Status of project: Original project rejected by regulator NVE. Decision appealed to oil- and energy ministry and revised project submitted for approval Owner of project: Kjølen Vindpark AS (fully owned subsidiary of Havgul Clean energy AS) Short description. The project is located at a forested hill located in Aremark county, east of Halden, next to the Swedish border, in the south of Norway. The applied area covers around 13 km2, and involves around 20 land owners, all of which have signed a land owner agreement. The project was originally applied with an installed effect of 130 MW at an area of around 19 km2, which was rejected by the energy regulator NVE. This decision was appealed to the oil- and energy ministry, and as part of this process the project was reduced both in installed effect and area. The project is developed based on a Nordex N117, which yields an estimated production of 340 GWh. Interconnection will be at Halden transformer station, around 20 km south west of the wind park, from a local 132/33 kv transformer and via a 132 kv line. Contact data: Havgul clean energy AS Att.: Kalle Hesstvedt / kalle@havgul.no More information: HAVGUL Clean Energy AS, Prinsens gate 5, 0152 Oslo, Norway,
5 Siragrunnen Offshore Windfarm 200 MW Excellent wind condition Sokndal & Flekkefjord Municipalities, Vest- Agder and Rogaland counties Norway HAVGUL Clean Energy AS, Prinsens gate 5, 0152 Oslo, Norway,
6 Key facts and figures Location: Sokndal and Flekkefjord municipalites, Rogaland and Vest- Agder County, Norway Installed MW: 200 MW (application) Wind resource (hh 100m): 9,0 m/s Capacity factor (P50): 45 % Estimated prod. (P50): 780 GWh (Siemens SWT 154 6MW) Turbine costs: 2400 MNOK Balance of plant: 2600 MNOK (including interconnection) Municipally tax: 0,7 % of CAPEX Landowner compensation: None Expected IRRequity: 12,0% (lease arrangement oil company) Status of project: Expected concession Q Owner of project: Siragrunnen Vindpark AS (wholy owned subsidiary of Havgul clean energy AS) Short description The project is situated 1 km offshore on a shallow bank called Siragrunnen. The farm is located in Sokndal and Flekkefjord municipalites, south west of Norway. The farm area covers 40 km 2. The concession decision is expected Q The project is developed based on 34 Siemens SWT MW turbines, which yields an estimated production of 780 GWh at 3900 full load hours. The average mean wind speed is estimated to 9,0 m/s. Interconnection to the central grid (300 kv) will be at Åna- Sira transformer station, 7 km east of the windfarm, from a local 132/33 kv transformer and via a 132 kv power cable. Havsul I is eligible to offshore petroleum tax. This provides an excellent opportunity for tax depreciation for oil companies, through a lease arrangement. There is no power or sertificate risk. Contact data: Havgul clean energy AS Att.: Harald Dirdal / harald@havgul.no More information: HAVGUL Clean Energy AS, Prinsens gate 5, 0152 Oslo, Norway,
7 Tonstad Windfarm 200 MW Excellent wind condition Sirdal & Flekkefjord Vest- Agder Norway HAVGUL Clean Energy AS, Prinsens gate 5, 0152 Oslo, Norway,
8 Key facts and figures: Location: Sirdal and Flekkefjord municipality, Vest- Agder County, Southwest Norway Installed MW: 200 MW (concession/permit) Wind resource (hh 120m): 7,6 m/s Capacity factor (P50): 37 % Estimated prod (P50): 640 GWh (Vestas V112) Turbine costs: 1635 MNOK Balance of plant: 546 MNOK (including interconnection) Municipally tax: 0,7 % of CAPEX Landowner compensation: 3 % of gross income Expected IRRequity: 14.6 % (600 NOK/MWh, power + certificates) Status of project: Project received concession Owner of project: Tonstad Vindpark AS (fully owned subsidiary of Havgul clean energy AS) Short description. The project is located on a plateau above Sirdalsvatn, in Sirdal and Flekkefjord municipality in Vest- Agder County, south west of Norway. The park area covers 26.4 km 2, and involves around 40 landowners, all but a few of which have signed a landowner agreement. The project received concession/permit 19. December The project is been developed based on 64 Vestas V112, which yields an estimated production of 640 GWh at 3240 full load hours. The average mean wind speed is estimated to 7,7 m/s. Interconnection to the central grid (420 kv) will be at Ertsmyra transformer station, 15 km north of the windfarm, from a local 132/33 kv transformer and via a 132 kv powerline. Contact data: Havgul clean energy AS Att.: Helge Toft Mob helge@havgul.no / HAVGUL Clean Energy AS, Prinsens gate 5, 0152 Oslo, Norway,
Document number #12 DNS13006. Authors #20 Telephone: Date #40 AUGUST 2013
#0 INSPECTION REPORT Discipline or report series #0 Inspection VESTAS wind turbines Title #5 VESTAS WIND TURBINE #2 Report number #52 #3 Authors #20 Telephone: Date #40 AUGUST 203 Summary #60 6 UNIT VESTAS
More informationOffshore Windfarm Egmond aan Zee 4 years of Operation
Offshore Windfarm Egmond aan Zee 4 years of Operation CUEN Offshore Wind Energy Conference 28 June 2011, Cambridge Elke Delnooz Operations Support Manager www.noordzeewind.nl 1 Contents Project description
More informationOffshore Wind China 2010 Bergen, 15th March 2010. Olivier Angoulevant Nexans Norway AS
Offshore Wind China 2010 Bergen, 15th March 2010 Olivier Angoulevant Nexans Norway AS At the core of performance At the core of performance : a worldwide leader Worldwide leader in cables, cabling systems
More information1. Quarterly Accounts
1. Quarterly Accounts at. 31. March 2007 Statnett Quarterly Accounts as of 31 th March 2007 1 CONTENT 3 Quarterly Accounts 6 Profit & loss 7 Balance sheet 9 Change in equity 10 Cash flow statement 1. Quarterly
More informationDansk Offshore Netværk, Lindø Industripark, 21. April 2015 The Road to Below 10 ct /kwh
Dansk Offshore Netværk, Lindø Industripark, 21. April 2015 The Road to Below 10 ct /kwh, Head of Cost of Energy Siemens AG, Wind Power and Renewables Answers for energy. Introduction Siemens Wind Power
More informationOffshore Renewable Energy in Virginia
Offshore Renewable Energy in Virginia Presented to the Renewable Natural Resources Foundation December, 8 2009 Neil Rondorf Vice President, Maritime Operations Science Applications International Corporation
More informationTroms Kraft Produksjon AS (Troms Power Generation AS.)
Troms Kraft Produksjon AS (Troms Power Generation AS.) Fakken Wind Farm Invitation to register: Tender with negotiation regarding delivery of wind-turbines Table of contents 1 INVITATION TO PRE-QUALIFYING
More informationEIA case for Hiiumaa offshore wind farm in Estonia
EIA case for Hiiumaa offshore wind farm in Estonia Georg Martin & Liis Rostin With contributions from Aune Aunapuu, Ramboll Eesti and materials from Nelja Energia Seminar on Environmental Impact Assessment
More informationDeveloping Ocean Energy in Ireland. Belmullet Wave Energy Test Site
Developing Ocean Energy in Ireland Belmullet Wave Energy Test Site Where does our energy come from? Most of the energy we use in Ireland comes from fossil fuels such as oil, coal, peat and gas. We burn
More informationViking Link Interconnector
Viking Link Interconnector Public information event for Bicker Parish Why we re here today We re here today to introduce the Viking Link project, to explain what we want to build and to answer any questions
More informationNordex SE. Nordex goes Offshore
Nordex SE Nordex goes Offshore Hannover, April 2011 Content 1. Offshore Wind Market 2. Nordex Offshore History & Future 3. Competition & Technical Development 4. The N150/6000 2 Strong growth prospects
More informationHow To Build A 100Mw Wind Farm In Ques
ALTO VALLE WIND FARM - 100 MW Fotomontage of PARQUE EÓLICO DEL ALTO VALLE 100 MW VILLA EL CHOCÓN DEPARTMENT OF CONFLUENCIA PROVINCE OF NEUQUÉN Parque Eólico del Alto Valle S.A. is a company created by
More information6 Oktober 2010... KIVI Niria congres Offshore Wind De uitdaging. Eneco wind. Ernst van Zuijlen
6 Oktober 2010... KIVI Niria congres Offshore Wind De uitdaging Eneco wind Ernst van Zuijlen Eneco Targets... Maximise the use of renewable energy 2012: 25% of electricity produced sustainable (50% wind)
More informationDutch wind energy strength
Dutch wind energy strength Chris Westra (senior consultant ECN) (general manager We@Sea) www.we-at-sea.org www.ecn.nl www.haveneilandopzee.nl 2010 The start in 1972 here we are now: 2010 Drivers for offshore
More informationFigure 1: The existing 12 300 kw turbines with the Avedøre power plant, source [3].
HVIDOVRE OFFSHORE WIND FARM Hans Christian Sørensen SPOK ApS / Hvidovre Vindmøllelaug I/S, Blegdamsvej 4, DK 2200, Copenhagen N, Denmark, E-mail: consult@spok.dk, Phone: +45 35360219/+45 28110219, Fax:
More informationVIENTOS DEL SECANO WIND FARM 50 MW/12,6 MW
VIENTOS DEL SECANO WIND FARM 50 MW/12,6 MW MAYOR BURATOVICH DEPARTMENT OF VILLARINO PROVINCE OF BUENOS AIRES Parques Eólicos Pampeanos S.A. is a company created by ABO WIND 1 Project Description VIENTOS
More informationA E O L I S F O R E C A S T I N G S E R V I C E S WIND FARM ENERGY ASSESSMENT - FEASIBILITY STUDY. Kees van Vliet
A E O L I S F O R E C A S T I N G S E R V I C E S WIND FARM ENERGY ASSESSMENT - FEASIBILITY STUDY Kees van Vliet September 2007 K o n i n g s l a a n 11 2 3 5 8 3 G V U t r e c h t T h e N e t h e r l
More informationJen Banks Wind Energy Project Coordinator North Carolina Solar Center
Jen Banks Wind Energy Project Coordinator North Carolina Solar Center North Carolina Solar Center Mission Statement to advance the use of renewable energy resources to ensure a sustainable economy that
More informationOffshore Wind. IEEE Boston PES - November 16, 2010
Offshore Wind IEEE Boston PES - November 16, 2010 Offshore Wind A high-level overview of offshore wind project development identifying current technologies, challenges, risks and costs. Presented by: Brook
More informationJoint Con Edison LIPA Offshore Wind Power Integration Project Feasibility Assessment
Joint Con Edison LIPA Offshore Wind Power Integration Project Feasibility Assessment March 20, 2009 Joint Con Edison LIPA Offshore Wind Power Integration Project Feasibility Assessment Table of Contents:
More informationLatest Offshore Developments in Sweden
Latest Offshore Developments in Sweden Conference Copenhagen Offshore Wind, Offshore Wind Markets Myths and Realities Bella Center, 27 October 2005 Kenneth Averstad, Vattenfall AB Renewable Energy within
More informationHV Submarine Cable Systems Design, Testing and Installation
HV Submarine Cable Systems Design, Testing and Installation CIGRE Ireland Technical Seminar 6 th October 2010 Robert Donaghy Senior Consultant Engineer, ESB International Presentation Overview Applications
More informationGrid connection of near shore wind farms
Grid connection of near shore wind farms methods, preconditions and results Rene Starup 5. Marts 2015 1 Topics Methods Preconditions Technical and socio-economic analysis 5. Marts 2015 2 60, 150 and 400
More informationNORDEX USA, INC. GREAT LAKES SYMPOSIUM
NORDEX USA, INC. GREAT LAKES SYMPOSIUM CHICAGO 24 Sep 2013 AGENDA 1 About Nordex 2 Wind Industry Challenges & Our Responses Nordex USA, Inc. Great Lakes Symposium Presentation Chicago Sept 2013 Slide 2
More informationComparison of Resource and Energy Yield Assessment Procedures
Comparison of Resource and Energy Yield Assessment Procedures Niels G. Mortensen and Hans E. Jørgensen Wind Energy Division, Risø DTU EWEA Wind Resource Assessment Technology Workshop 2011 F Acknowledgements
More informationOur strategy in todays challenging market. Oslo 15 January 2015
Our strategy in todays challenging market Oslo 15 January 2015 The company Arise is one of the largest independent wind power operators in Sweden with the business model to: Sell electricity produced by
More informationGenesis Energy s customer focused strategy is delivering on business performance
Genesis Energy s customer focused strategy is delivering on business performance INTRODUCTION This disclosure includes market and operational information for Genesis Power Limited, trading as Genesis Energy,
More informationUser manual data files meteorological mast NoordzeeWind
User manual data files meteorological mast NoordzeeWind Document code: NZW-16-S-4-R03 Version: 2.0 Date: 1 October 2007 Author: ing. HJ Kouwenhoven User manual data files meteorological mast NoordzeeWind
More informationWind Farm Zone. Offshore wind energy. in the Netherlands. Project & Site Description. # Borssele
# Borssele Offshore wind energy Wind Farm Zone in the Netherlands Project & Site Description The roadmap from 1,000 to 4,500 MW offshore wind capacity >> Sustainable. Agricultural. Innovative. International.
More informationNorwegian Research Centre for Offshore Wind Technology
Norwegian Research Centre for Offshore Wind Technology John Olav Giæver Tande Manager NOWITECH Senior Research Scientist SINTEF Energy Research John.tande@sintef.no 1 Preface The Research Council of Norway
More informationSubmarine Power Cables. State-of-the-art production facility, more than 100 years of experience and reference installations around the world.
Submarine Power Cables State-of-the-art production facility, more than 100 years of experience and reference installations around the world. Reliable submarine power cables ABB is one of the world s most
More informationERFARINGER MED VINDKRAFT OG VEIEN VIDERE FOR OFFSHORE VIND
ERFARINGER MED VINDKRAFT OG VEIEN VIDERE FOR OFFSHORE VIND Eivind Torblaa, Head of Asset Management - Wind Det Norske Videnskaps-Akademi 3 oktober 2014 Agenda Litt om Statkraft Vind i Statkraft - Tilbakeblikk
More informationProduct brochure Multi Functional Switchgear PASS M00 72.5 kv Flexible and compact switchgear solutions for windfarms
Product brochure Multi Functional Switchgear PASS M00 72.5 kv Flexible and compact switchgear solutions for windfarms The future of Wind Farms As offshore wind farms move towards deploying higher capacity
More informationTufts Consulting Group: Macedonian Energy
March 2010 CENTER FOR EMERGING MARKETS ENTERPRISES STUDENT RESEARCH SERIES Tufts Consulting Group: Macedonian Energy An Executive Summary Opportunity In the more than 18 years since its independence from
More informationHow Dutch innovations support 40% cost price reduction. June 13th 2013 How Dutch innovations support 40% cost price reduction 1
How Dutch innovations support 40% cost price reduction June 13th 2013 June 13th 2013 How Dutch innovations support 40% cost price reduction 1 Dutch Top Sector Policy Government policy to further strengthen
More informationDepth-independent solution for Offshore Wind the WindFloat
THE COMPANY Principle Power Inc. 5 Years old 10 Employees + Engineering Locations in US and Europe Mission Depth-independent solution for Offshore Wind the WindFloat Technology Core IP patented and patent
More informationOffshore Wind Development
1 Danish Experiences from Offshore Wind Danish Experiences from Offshore Wind Development Danish Experiences from Offshore Wind 2 TABLE OF CONTENTS 1. INTRODUCTION 3 1.2 KEY LEARNINGS 4 2. HISTORY AND
More informationCost Benefit Methodology for Optimal Design of Offshore Transmission Systems
DTI Centre for Distributed Generation and Sustainable Electrical Energy Cost Benefit Methodology for Optimal Design of Offshore Transmission Systems Predrag Djapic and Goran Strbac Annex 25: Grid Integration
More informationDe Industrie. KIvI Niria Jaarcongres 2010. De uitdagingen voor windenergie op zee. Ballast Nedam Offshore. Dolf Elsevier van Griethuysen
KIvI Niria Jaarcongres 2010 De uitdagingen voor windenergie op zee De Industrie Ballast Nedam Offshore Dolf Elsevier van Griethuysen Arnhem, 6 oktober 2010 Offshore Windpark Egmond aan Zee (2006) HLV Svanen
More informationAn energy of the future coming from the sea
An energy of the future coming from the sea MAP showing the location of the Calvados offshore wind farm Why do we install off the coast of Calvados? Calvados offshore 75 PIONEER location of offshore wind
More informationLondon Array Off-Shore Wind Farm
London Array Off-Shore Wind Farm 1 Jamie R Mathlin Construction Manager Off-Shore Sub-Stations Project Commissioning Manager 27 Years Experience in the Power Industry Grid Trained Electrical Engineer 10
More informationOptimization of the coupled grid connection of offshore wind farms
Optimization of the coupled grid connection of offshore wind farms Dirk Schoenmakers Graduation project at Evelop Netherlands BV Technical University of Eindhoven September 2008 Supervisors: TU Eindhoven
More informationNetwork Interconnection of Offshore Wind
Network Interconnection of Offshore Wind Prepared for REOLTEC Carlos Aguirre Madrid, December 3rd Experience you can trust. Introducing KEMA A trusted independent partner providing advise throughout the
More informationOffshore Wind: some of the Engineering Challenges Ahead
Offshore Wind: some of the Engineering Challenges Ahead David Infield CDT in Wind Energy Systems Institute of Energy and Environment University of Strathclyde International context (from IPCC report) Greenhouse
More informationOverview of Long Island Electric Service Territory
Overview of Long Island Electric Service Territory Long Island Electric Service Territory» Long Island s electric service customers are located in Nassau County and Suffolk County (except for the villages
More informationWindpower Paving way for an industry adventure in the heart of Norway. Anne Strømmen Lycke Nordic Energy Summit 2015 Oslo, March 19th 2015
Windpower Paving way for an industry adventure in the heart of Norway Anne Strømmen Lycke Nordic Energy Summit 2015 Oslo, March 19th 2015 Agenda Why wind? Why is it taking so long? Sarepta Energi The Ytre
More informationValuation & Capital Structure
Valuation & Capital Structure Director Power & Renewable Energy Lars Ove Skorpen, Pareto Securities AS January 31, 2013 Tlf: +47 22 87 87 16 E-mail: lars.ove.skorpen@paretosec.com Pareto is consistently
More informationImpact of Renewable generation
Impact of Renewable generation Workshop Greenpeace - Terna "Power30" ROME, October15 th 2014 Index - Innovative Solutions Implemented - Main changes in the last years From liberalization to nowadays Investments
More informationWindREN AB IEA Task 19 national overview - Swedish activities in measurements and mapping of icing and de-icing of wind turbines Göran Ronsten,
WindREN AB IEA Task 19 national overview - Swedish activities in measurements and mapping of icing and de-icing of wind turbines Göran Ronsten, WindREN Why bother? Binding targets to be achieved by 2020
More informationSiemens Financial Services
Siemens Financial Services London, January 8, 2010 Joint press release of Siemens Project Ventures and Mainstream Renewable Power Siemens Project Ventures and Mainstream Renewable Power win contract to
More informationFact Sheet: Siemens Energy in the US
Fact Sheet: Siemens Energy in the US Energy infrastructure overview The U.S. electricity market is the world s largest and accounts for one-fifth both of global power demand and generation capacity. The
More informationSmart energy, clean energy, today s energy. The. Mariah. wind power project
Smart energy, clean energy, today s energy The Mariah wind power project The Mariah project at a glance The Mariah Project is developed by Scandia Wind Southwest LLC, a joint venture company owned by Havgul
More informationThe Role of a Pension Fund in Renewable Energy Investments. Transformational NAMA in the Renewable Energy Sector May 2013
The Role of a Pension Fund in Renewable Energy Investments Transformational NAMA in the Renewable Energy Sector May 2013 PensionDanmark at a Glance Industry-wide pension fund established in the early 1990
More informationClean Energy Trends in North Carolina. www.energync.org
Clean Energy Trends in North Carolina www.energync.org Agenda Background North Carolina Clean Energy Resources & Technologies North Carolina Clean Energy Policies North Carolina Clean Energy Trends Generation
More informationHøyanger Upper Secondary School
Høyanger Upper Secondary School The Upper Secondary School is situated in the western part of Norway, along the Sognefjord, a 3 hours drive from Bergen, the second largest town in Norway. Our school has
More informationR&D in Vattenfall Johan Söderbom
R&D in Vattenfall Johan Söderbom Agenda 1 2 3 Vattenfall in brief R&D portfolio Smart Grids Vattenfall in brief Net sales 2011: 181 billion SEK (20 billion ) Electricity Generation: 166,7 TWh 7.8 million
More informationElectricity market drivers
Daniel Assandri Head of Power Systems ABB (China) Ltd Electricity market drivers March 2008 Global T&D Market Drivers ABB Power Systems division - slide # 2 ABB s view on and market drivers The Americas
More informationMarin fornybar energi Prof Peter M Haugan, Geofysisk institutt, basert på materiale fra Prof II Finn Gunnar Nielsen, Geofysisk Institutt
Ny fornybar energi del 3: Marin fornybar energi Prof Peter M Haugan, Geofysisk institutt, basert på materiale fra Prof II Finn Gunnar Nielsen, Geofysisk Institutt Outline General. Marine renewables Wind
More informationMinistry of Power & Energy
Ministry of Power & Energy Institutional Frame work Power sector overview Renewable energy policy Major issues and barriers Institutional Framework Sustainable Energy Authority The Sri Lanka Sustainable
More informationMAXIMISING YOUR. Offshore wind assets ASSET OPERATION & MAINTENANCE SERVICES
MAXIMISING YOUR Offshore wind assets ASSET OPERATION & MAINTENANCE SERVICES RES is one of the world s leading renewable energy companies active in the wind, wave, tidal, solar and biomass sectors Asset
More informationUNDERGROUND THERMAL ENERGY STORAGE (UTES) WITH HEAT PUMPS IN NORWAY
UNDERGROUND THERMAL ENERGY STORAGE (UTES) WITH HEAT PUMPS IN NORWAY K. Midttømme, A. Hauge, R. S. Grini NGI, Norwegian Geotechnical Institute, Pb 1230, Havnegata 9, 7462 Trondheim, Norway. Tel +047 41607478
More informationCase Study 5 Use of Wind Turbine Technology
Case Study 5 Use of Wind Turbine Technology 1. Context Hong Kong relies on an adequate and reliable electricity supply for its economic development. Our electricity needs are met by the two electricity
More informationValue breakdown for the offshore wind sector
[RAB (2010) 0365] Value breakdown for the offshore wind sector A report commissioned by the Renewables Advisory Board February 2010 1 Value breakdown for the offshore wind sector Contents 1. Introduction...
More informationRenewable Energy Promotion Policies in Taiwan. Bureau of Energy Ministry of Economic Affairs
Renewable Energy Promotion Policies in Taiwan Bureau of Energy Ministry of Economic Affairs October 2015 1 Outline Current Development of Renewables in Taiwan Taiwan s New Renewable Energy Policy 2 Current
More informationWindfarm Installation Barge. a novel approach to installing foundations in offshore wind
Windfarm Installation Barge a novel approach to installing foundations in offshore wind North Sea Offshore Cranes and Lifting Conference in Aberdeen by Paal Strømstad (paal.stromstad@ingenium.no) April
More informationRenewable Energy Promotion Policies in Chinese Taipei
Renewable Energy Promotion Policies in Chinese Taipei Bureau of Energy, Ministry of Economic Affairs Chinese Taipei November 12, 2014 RE for CT - 1 Current Development of Renewables in Chinese Taipei RE
More informationCurriculum Vitae Fredrik Rüter 1 December 2014
Name RÜTER Fredrik Date of Birth 8 May 1960 Nationality Position Languages Coordinates Swedish Senior Consultant Swedish: mother tongue English: fluent (business, conversation, reading, writing) German,
More informationFIANNA FÁIL POLICY PAPER ON WIND ENERGY
FIANNA FÁIL POLICY PAPER ON WIND ENERGY MICHAEL MOYNIHAN TD SPOKESPERSON FOR COMMUNICATIONS, ENERGY AND NATURAL RESOURCES CONTENTS Executive Summary 2 Introduction 3 The Potential of Wind Energy 4 Current
More informationCIEMADeS 4th INTERNATIONAL CONFERENCE
CIEMADeS 4th INTERNATIONAL CONFERENCE Submarine Cable Connections - from concept to commissioning Puerto Rico, May 5th 2011 Vegar Syrtveit Larsen Nexans Norway AS Agenda Early phase What can typically
More informationWind Power opportunities in Västerbotten, northern Sweden
Wind Power opportunities in Västerbotten, northern Sweden - Explore the resources of a truly powerful province Why Sweden One of the world s most globalized and competitive nations Meeting-point for Scandinavia
More informationQUALITY CONTROL Prepared: V. van Gastel / team TenneT Reviewed: M. Müller 23.06.2015 Approved: F. Wester 23.06.2015 1. BACKGROUND MATERIAL...
POSITION PAPER STAKE HOLDER CONSULTATION PROCESS OFFSHORE GRID NL Type: Position paper Work stream Technical Topic: T.2 Number of J-Tubes Filename ONL 15-060-T2_ J tubes_ bays_pp_v2 Version 3 - Public
More informationSample Micro Hydro Initial Report
Sample Micro Hydro Initial Report Sample Micro Hydro Initial Report Introduction The Hydro Burn at Glen Water was visited by Richard Haworth of Glen Hydro to assess its suitability for a micro hydro installation.
More informationVoltage Source HVDC Overview Mike Barnes Tony Beddard
Voltage Source HVDC Overview Mike Barnes Tony Beddard Note: This is a version with images removed which have copyrighted other than from the University of Manchester, for web publication. Should a conference
More informationSwancor 上緯企業. Composite & Energy
Swancor 上緯企業 Composite & Energy Company Information Revenue (NTD) Main Product Composite materials Establish in 2011 3.6 Billion 2012 3,3 Billion 2013 3,5 Billion 2014 6.0Billion 2015Q1 2.0Billion 1992/2/25
More informationEco Server Park The Responsible Power Ready Location
Eco Server Park The Responsible Power Ready Location Power generation at site, multiple redundancy, transformers in place. Green power biomass, hydro, wind and solar. Site fully owned by the local grid
More informationINSTALLATION and LOGISTICS of OFFSHORE WIND FARMS
POWER Offshore Summer School 2006 INSTALLATION and LOGISTICS of OFFSHORE WIND FARMS Gerard van Bussel The Netherlands Offshore transport and installation vessels Semi Submersible Sheer leg crane Ship type
More informationWind Power in the Nordic Region Conditions for the expansion of wind power in the Nordic countries
Wind Power in the Nordic Region Conditions for the expansion of wind power in the Nordic countries NordVind October 2011 Conditions for the expansion of wind power in the Nordic countries The NordVind
More informationOffshore wind farm electrical engineering (when considering the operation of array cabling at voltages of 66kV)
Offshore wind farm electrical engineering (when considering the operation of array cabling at voltages of 66kV) 29 th January 2015 Lyndon Greedy / Hans Cleijne 1 SAFER, SMARTER, GREENER DNV GL Renewables
More informationTidal Energy. Wind Energy. Transmission & Distribution Network. Offshore Substation. Onshore Substation. Tidal Stream Energy.
Offshore Renewables Tidal Energy Transmission & Distribution Network Offshore Substation Wind Energy Onshore Substation Tidal Stream Energy Consumer Atkins in Offshore Renewables The offshore wind journey
More informationNorwegian offshore wind clusters
Norwegian offshore wind clusters Dr. scient. Kristin Guldbrandsen Frøysa, CMR kristin@cmr.no Slide 1 / 27-Sep-13 Arena Norwegian Offshore Wind September 2013 Arena Norwegian Offshore Wind Arena NOW is
More informationA clean energy solution from cradle to grave
Environmental Product Declaration A clean energy solution from cradle to grave Offshore wind power plant employing SWT-6.0-154 siemens.com / wind 2 Assessing the performance of a wind power plant The environmental
More informationOffshore Wind OPERATIONS & MAINTENANCE. A National Renewables Infrastructure Plan Stage 2 Information Paper
A National Renewables Infrastructure Plan Stage 2 Information Paper With investment of 100 billion planned over the next 10 years, the offshore wind sector offers a huge opportunity for Scottish businesses.
More informationReport on regulation and the electricity market
Report on regulation and the electricity market 2011 Norway Norwegian Water Resources and Energy Directorate (NVE) 31 st of July 2011 1 Table of contents 1 Foreword 3 2 Main developments in the electricity
More informationHVDC Light Cables. Submarine and land power cables
HV Light Cables Submarine and land s The HV Light s to offshore platform The light and robust HV Light s can be laid with very cost effecient methods HV Light System HV Light is a transmission system in
More informationNettpartner Group. Company Presentation
Nettpartner Group Company Presentation Vision and Mission Nettpartner the company all others in the industry want to emulate! Nettpartner shall be a leading supplier of innovative solutions linked to the
More informationPassion for Offshore. Wind Power & Renewables Division Market Unit Offshore
Wind Power & Renewables Division Market Unit Offshore Passion for Offshore - Frank Zimmermann, Head of Sales - 5 th British Chamber Conference on Renewable Energy, Hamburg, siemens.com/answers Siemens
More informationOffshore Windpark DanTysk. Cost-Effective Foundations Design to Installation
Offshore Windpark DanTysk Cost-Effective Foundations Design to Installation. Kieler Branchenfokus: Kieler Winindustrie Windindustrie 2015.02.03 3.2.15 Vattenfall s Offshore Pipeline Onshore capacity: 720
More informationDONG Energy AS Wind Energy Market Analysis
Brochure More information from http://www.researchandmarkets.com/reports/679994/ DONG Energy AS Wind Energy Market Analysis Description: DONG Energy AS Wind Energy Market Analysis Summary DONG Energy A/S
More informationPROJECT PROFILE DEVELOPMENT OF A 100MW OFFSHORE WIND FARM IN HONG KONG
Ref: PD/900/00/00 PROJECT PROFILE DEVELOPMENT OF A 100MW OFFSHORE WIND FARM IN HONG KONG July 2006 Revision 0 The Hongkong Electric Co., Ltd. TABLE OF CONTENT Page 1. BASIC INFORMATION...2 1.1 Project
More informationNordex SE Conference Call 9M 2010. Hamburg, November 11, 2010
Nordex SE Conference Call 9M 2010 Hamburg, November 11, 2010 Overview 9M 2010 Order intake disappointing in Q3 and well below our own expectations Revised guidance for 2010 Sales of ~ EUR 1 billion, stable
More informationFEED-IN OF EXCESS ENERGY AND SELF CONSUMPTION: NEW REGULATIONS IN GHANA S ENERGY SECTOR JULIUS NKANSAH-NYARKO ENERGY COMMISSION
FEED-IN OF EXCESS ENERGY AND SELF CONSUMPTION: NEW REGULATIONS IN GHANA S ENERGY SECTOR JULIUS NKANSAH-NYARKO ENERGY COMMISSION NOVEMBER 20, 2014 PRESENTATION OUTLINE Overview of Ghana s Energy Situation
More informationFloods and flood. Elin Langsholt
Floods and flood forecasting Hydrologisk modellering i flomvarslingenli Elin Langsholt Seksjon for hydrologisk modellering Potential flood risk Norway s total area: 324 000 km 2 410 000 km rivers and streams
More informationwww.e-co.no E-CO Energi's vision is to be to be a leading producer of hydropower COMPETENT AND CREATIVE
E-CO Energi's vision is to be to be a leading producer of hydropower COMPETENT AND CREATIVE 1 Owned by the City of Oslo Norway s second largest power producer with a mean annual production of 10 TWh. E-CO
More informationRENEWABLES INTEGRATION IN TURKISH POWER SYSTEM
RENEWABLES INTEGRATION IN TURKISH POWER SYSTEM Kazim SENOCAK Electrical Engineer Research, Planning & Coordination Department TURKISH ELECTRICITY TRANSMISSION CORPORATION () www.teias.gov.tr MAIN RESPONSIBILITIES
More informationOffshore Wind and regional development the case of Rostock. Offshore Wind Energy 2013 Słupsk, Poland
Offshore Wind and regional development the case of Rostock Offshore Wind Energy 2013 Słupsk, Poland Hanseatic City of Rostock Geographic location Hanseatic City of Rostock Hanseatic City of Rostock Port
More informationThe Energy Triangle Wind Power
Wind Power The Energy Triangle Wind Power In supplying society with its energy needs, a balance must be struck between three key dimensions: competitiveness, security of supply, and environment and climate.
More informationSiemens D3 platform 3.0-MW, 3.2-MW, 3.3-MW, and 3.4-MW direct drive turbines. Reduced complexity, increased profitability. siemens.
Siemens D3 platform 3.0-MW, 3.2-MW, 3.3-MW, and 3.4-MW direct drive turbines Reduced complexity, increased profitability siemens.com / wind As the major driver of innovation with more than 30 years of
More informationCASE: the Island of Nauvo, Finland
CASE: the Island of Nauvo, Finland 1. Demographic data The total area of Nauvo is 243,9 km 2 of which 3,59 km 2 is water. Current population of Nauvo is 1428, 34,1% of them live in the population centres.
More informationFuture Offshore Wind Power Sites -2025
Danish Energy Authorithy Amaliegade 44 DK-1256 Copenhagen K Tel 33 92 67 00 Fax 33 11 47 43 CVR-nr: 59 77 87 14 ens@ens.dk www.ens.dk Rubrik Verdana Bold 18 punkt Underrubrik Verdana 18 punkt Brødtekst
More informationOffshore Work Packages
Rampion Offshore Wind Farm Offshore Work Packages Meet The Buyer Naren Mistry, Engineering Manager 26 th Feb 2014 Rampion Offshore Project Scope Design, manufacture, transportation and Installation: Up
More information