1 DTI Centre for Distributed Generation and Sustainable Electrical Energy Cost Benefit Methodology for Optimal Design of Offshore Transmission Systems Predrag Djapic and Goran Strbac Annex 25: Grid Integration of Offshore Wind Monday 18 th June 2007, DTI London
2 Content Scope Methodology Key results Application to Round II Impact on the regulatory regime design Reports: (1)Cost Benefit Methodology for Optimal Design of Offshore Transmission Systems (2) Grid Integration Options for Offshore Wind Farms
3 Scope Onshore system (Transmission or Distribution) Shoreline Offshore Transmission System Wind Generator Onshore TO / DNO Onshore Grid Entry Point or User System Entry Point Offshore TO Offshore Grid Entry Point Generator Ratings: 1500MW Distance: up to 100km Voltage level: 132kV and above
4 Examples of direct configurations Windfarm electrical system Windfarm electrical system 33 kv 33 kv 220 kv Shoreline Onshore network Onshore network 220kV
5 Example of shared AC connection 33 kv 33 kv 33 kv 400 kv 400 kv Onshore transmission network
6 Example of shared DC connection 33 kv 33 kv 33 kv 400 kv AC DC AC DC AC DC 275 or 400 kv 400 kv DC AC DC AC DC AC
7 Scope of cost-benefit analysis Offshore networks Switchgear reliability, installation cost, platform cost, ratings, maintenance requirements Cable reliability, installation cost, maintenance requirements, ratings Transmission mode (AC vs DC) Compensation requirements Losses Windfarms Wind resource characteristics Typical turbine ratings, availability, cost Windfarm size Windfarm distances from shore Future value of energy and ROCs Impact on onshore system operation Additional reserve costs
8 Concept of cost-benefit analysis Cost Total Cost Cost of curtailed wind energy and losses Optimal network Investment &Maintenance Costs Network Capacity and Redundancy
9 Wind characteristics 45 Frequency (%) Non-diverse wind source Diverse wind source Normalized Wind Output
10 Curtailment and loss factors Constrained Energy (p.u.) Load factor: 0.4 Non-diversified profile Diversified profile Power (p.u.) Profile Load factor (%) Loss factor (%) Non-diversified Diversified 40 23
11 Key results Offshore platform (AC or HVDC) Flexibility is of high value Offshore platform capacity should be about 95% of the maximum export capacity of the wind farm connected. For wind farms with a capacity of 120MW or greater, following an outage (planned or unplanned) of any offshore platform transformer, there should be, at a minimum, 50% of the installed platform transformer capacity remaining. Offshore cable network Optimal capacity installed can be lower than the maximum export capacity of the wind farm connected (X factor)
12 Design of cable networks Wind farm profile X factor (%) Condition - Increase in Cable length (km) Non-diversified wind profile Cable rating >95 Number of cables >91 >88 >86 >84 Diversified wind profile Cable rating >90 Number of cables >85 >82 >79 >77
13 Robustness of design (cable network) Length (km) Fixed value MTTR (months) Energy cost ( /MWh) MTTR case Energy cost case Energy cost ( /MWh) MTTR (months)
14
15 33k Robin RiggV Walney Ormonde 1x132kV West Duddon 3x220kV Shell Flats 2x132kV Barrow 1x220kV Hillhouse Rhyl Flats Gwynt Y Mor 2x220k V 1x132k V Burbo Bank North Hoyle 2x33kV Rh yl 1x132k V New substation
16 Teeside 33kV Redcar 33kv New 2 x275 line 2 x132kv Westermost Rough Garton 2 x132kv Inner Dowsing 33kV or 132kV Skegness Lynn 2 x220kv Humber Gateway 2 x220kv Lincs Triton Knoll Docking Shoal 4 x220kv Race Bank 2 x220kv Sall Dugeon East Sheringham Shoal Cromer 33kV Earlham 33kV Caister Scroby Sands
17 Bramford 3x132kV Clacton-on-Sea Greater Gabbard 1X132kV Gunfleet Sands Gunfleet Sands II London Array 3x220kV Kentish flats 1x33kv Herne Bay 2x132kV Thanet Richborough Power Station
18 Impact on the regulatory regime design (compensation scheme) On shore: Generators that obtain Firm Access Rights by purchasing TEC (at TNUoScharges) TEC provides compensation for constrained off generation Offshore: different regime proposed No fundamental difference in approach to design Network design based on long term average value of wind energy curtailed (large number of farms operated over long period of time) Impact of technology limitations: large wind farms supplied with multiple cables (600MW wind farm = 8% curtailment after a loss of a single cable) Risk to individual small projects potentially higher Different treatment will be inconsistent with the standards developed Cost of constraints All Round II projects: 10.8m and 13.1m per annum (post BETTA constraint costs 100m)
19 DTI Centre for Distributed Generation and Sustainable Electrical Energy Cost Benefit Methodology for Optimal Design of Offshore Transmission Systems Predrag Djapic and Goran Strbac Annex 25: Grid Integration of Offshore Wind Monday 18 th June 2007, DTI London
Cost Benefit Methodology for Optimal Design of Offshore Transmission Systems
Centre for Sustainable Electricity and Distributed Generation Cost Benefit Methodology for Optimal Design of Offshore Transmission Systems Predrag Djapic and Goran Strbac July 2008 FUNDED BY BERR URN 08/1144
More informationSupply Chain Opportunities and Management of Risk. Ian McCarlie
Supply Chain Opportunities and Management of Risk Ian McCarlie Supply Chain Opportunities and Management of Risk INTRODUCTION Supply Chain Opportunities and Management of Risk I see offshore wind as a
More informationOffshore Grids in the North Sea? Long-Term Hopes and Short-Term Reality Discussion
1. March 2012 Offshore Grids in the North Sea? Long-Term Hopes and Short-Term Reality Discussion Prof. Dr. Christian von Hirschhausen - 0 - Main Theses 1. There may be risk that Germany falls behind the
More informationThe installation and servicing
European Forum for Renewable Energy Sources The installation and servicing of offshore wind farms Kaj Lindvig, CSO, A2SEA A/S 16 th September 2010 A2SEA Started 1 st July 2000 100% dedicated offshore wind
More informationVISION MISSION ABOUT A2SEA. Stay ahead in taking wind power offshore and the future of energy in a sustainable direction.
COMPANY BROCHURE ABOUT A2SEA VISION Stay ahead in taking wind power offshore and the future of energy in a sustainable direction. MISSION To provide the offshore wind industry with safer, sustainable,
More informationUK content analysis of Robin Rigg Offshore Wind Farm operations and maintenance
UK content analysis of Robin Rigg Offshore Wind Farm operations and maintenance Subtitle A report commissioned by E.ON Climate & Renewables July 2012 Document history Revision Purpose and description Originated
More informationInstallation, future demands for recruitment and competencies. Speaker: Hans Schneider Date: 4 April 2013
Installation, future demands for recruitment and competencies 1 Speaker: Hans Schneider Date: 4 April 2013 Chief Operating Officer, A2SEA A/S Hans Schneider, COO PROFESSIONAL EXPERIENCE Chief Operating
More informationA Study into the Economics of Gas and Offshore Wind. A report for Greenpeace and WWF-UK
A Study into the Economics of Gas and Offshore Wind A report for Greenpeace and WWF-UK November 2012 Cambridge Econometrics Covent Garden Cambridge CB1 2HT Tel 01223 533100 (+44 1223 533100) Fax 01223
More informationProfile. Offshore Wind Projects. Sustainable EPC and Marine Contractors
Profile Offshore Wind Projects Sustainable EPC and Marine Contractors Offshore Pipeline Installation Svanen, heavy lift installation vessel Company profile Van Oord is a pre-eminent contractor for dredging,
More informationOffshore Wind China 2010 Bergen, 15th March 2010. Olivier Angoulevant Nexans Norway AS
Offshore Wind China 2010 Bergen, 15th March 2010 Olivier Angoulevant Nexans Norway AS At the core of performance At the core of performance : a worldwide leader Worldwide leader in cables, cabling systems
More informationCost Reduction Monitoring Framework
Cost Reduction Monitoring Framework Summary Report to the Offshore Wind Programme Board February 2015 Foreword The Offshore Wind Industry Council (OWIC) approved the Cost Reduction Monitoring Framework
More informationQUALITY CONTROL Prepared: V. van Gastel / team TenneT Reviewed: M. Müller 23.06.2015 Approved: F. Wester 23.06.2015 1. BACKGROUND MATERIAL...
POSITION PAPER STAKE HOLDER CONSULTATION PROCESS OFFSHORE GRID NL Type: Position paper Work stream Technical Topic: T.2 Number of J-Tubes Filename ONL 15-060-T2_ J tubes_ bays_pp_v2 Version 3 - Public
More informationEmployment in OWE in NL, 2010
Employment in OWE in NL, 2010 Exploitation and O&M R&D Project Development Construction Agentschap NL, 2011 Hollands Glorie in Offshore Wind NOG NIET VOLLEDIG Dutch companies and knowledge institutions
More informationSafeguarding Investments and Risk Exposure
Service & Installation Vessel / Wind Farm Project Certification Claus Winter Graugaard & Andreas G. Jensen Presentation overview Introduction Wind Turbine Installation (WTI) vessels Wind farm maintenance
More informationEXPERIENCE WITH DP-SYSTEMS ON BOARD
EXPERIENCE WITH DP-SYSTEMS ON BOARD SPEAKERS Head of Fleet, Ulla Bjørndal Møller & Development Manager Jesper Tang Kristensen Master Mariner, MSc in Maritime Technology Naval Architect Who is A2SEA? What
More informationPreliminary Information Memorandum. Thanet Offshore Transmission Assets. July 2009
Preliminary Information Memorandum Thanet Offshore Transmission Assets July 2009 SUMMARY In April 2009 Ofgem distributed a teaser document, UK Offshore Transmission Investment Opportunity, to investors
More informationProduct brochure Multi Functional Switchgear PASS M00 72.5 kv Flexible and compact switchgear solutions for windfarms
Product brochure Multi Functional Switchgear PASS M00 72.5 kv Flexible and compact switchgear solutions for windfarms The future of Wind Farms As offshore wind farms move towards deploying higher capacity
More informationKent Active System Management (KASM) Oct 2015 / Matthieu Michel
Kent Active System Management (KASM) Oct 2015 / Matthieu Michel Project Background (update): D Heat Map: SPN D Connection Offers Accepted (Cumulative) 1W D Heat map (June 2015) SPN D Connection Offers
More informationDesign of Offshore Wind Farms Prepared by Flemming Jakobsen & Andrass Ziska Davidsen LICENGINEERING A/S
Design of Offshore Wind Farms Prepared by Flemming Jakobsen & Andrass Ziska Davidsen Types of Foundations Overview of selected support structure and foundation types. From top left: 1. Monopile; 2. Tripod;
More information2012 San Francisco Colloquium
2012 San Francisco Colloquium http : //www.cigre.org HVDC and Power Electronic Systems for Overhead Line and Insulated Cable Applications B4-8 Trans Bay Cable A Breakthrough of VSC Multilevel Converters
More informationOffshore wind farm electrical engineering (when considering the operation of array cabling at voltages of 66kV)
Offshore wind farm electrical engineering (when considering the operation of array cabling at voltages of 66kV) 29 th January 2015 Lyndon Greedy / Hans Cleijne 1 SAFER, SMARTER, GREENER DNV GL Renewables
More informationVoltage Source HVDC Overview Mike Barnes Tony Beddard
Voltage Source HVDC Overview Mike Barnes Tony Beddard Note: This is a version with images removed which have copyrighted other than from the University of Manchester, for web publication. Should a conference
More informationHIGH LEVEL REVIEW HELIDECK AND ACCOMMODATION Helideck and accommodation facilities on offshore platforms for wind farms. TenneT.
HIGH LEVEL REVIEW HELIDECK AND ACCOMMODATION Helideck and accommodation facilities on offshore platforms for wind farms TenneT Public version Report No.: 130112-NLLD-R1, Rev. A-Public Date: 9 June 2015
More informationEssex... A great location for offshore wind
Essex... A great location for offshore wind The UK Government has very ambitious plans for the development of offshore wind farms in its coastal waters involving up to 40GW of installed capacity by 2020
More informationWIND ENERGY - THE FACTS PART III THE ECONOMICS OF WIND POWER
WIND ENERGY - THE FACTS PART III THE ECONOMICS OF WIND POWER Acknowledgements Part III was compiled by Poul Erik Morthorst of Risǿ DTU National Laboratory, Technical University of Denmark; Hans Auer of
More informationDONG Energy offshore wind experience
DONG Energy offshore wind experience Future Tendering Process for Offshore Wind Energy February 10th 2011 Per Hjelmsted Pedersen Head of Project Development DONG Energy Renewables DONG Energy Renewables
More information2015 CT Offshore A/S Diving Assistance Sub Station Debris Clearance WODS Wind Farm
REFERANCE LIST 2015 CT Offshore A/S Diving Assistance Sub Station Debris Clearance WODS Wind Farm 2015 DBB A/S Horns Rev 2 Wind Farm Diving Assistance Met Mast Decommissioning 2015 VBMS DE Butendiek Wind
More informationEuropean Subsea Cable Report & Forecast 2015-2025
European Subsea Cable Report & Forecast 2015-2025 J/15/1226 May 2015 4C Offshore - OrbisEnergy Centre, Lowestoft, NR32 1XH T: +44 (0)1502 307 037 E: info@4coffshore.com Table of Contents 1. Executive Summary
More informationHVDC PLUS and SVC PLUS: Reliable and Cost-effective Power Transmission Solutions with Modular Multilevel Converters
HVDC PLUS and SVC PLUS: Reliable and Cost-effective Power Transmission Solutions with Modular Multilevel Converters C. Bartzsch, Dr. H. Huang, T. Westerweller - Siemens, Germany Dr. M. Davies - High Electrical
More informationIntegrated cable solutions for offshore wind development
Integrated cable solutions for offshore wind development Offshore wind brings new opportunities Offshore wind is one of the most stable sources of renewable energy. Power fluctuations are minimal due
More informationNeart na Gaoithe Meet the buyer event. Chris Whitehead Facilitator
Neart na Gaoithe Meet the buyer event Chris Whitehead Facilitator Prysmian Martin Dale THE NEART NA GAOITHE OFFSHORE WIND FARM Meet the Buyer Event October, 2015 AGENDA 1. Introduction 2. The Prysmian
More informationOffshore Wind: some of the Engineering Challenges Ahead
Offshore Wind: some of the Engineering Challenges Ahead David Infield CDT in Wind Energy Systems Institute of Energy and Environment University of Strathclyde International context (from IPCC report) Greenhouse
More informationMagnus Callavik, ABB Power Systems, HVDC, 721 64 Västerås, Sweden Phone: +46(0)21323226. e-mail: magnus.callavik@se.abb.com
HVDC GRIDS FOR OFFSHORE AND ONSHORE TRANSMISSION Magnus Callavik, ABB Power Systems, HVDC, 721 64 Västerås, Sweden Phone: +46(0)21323226. e-mail: magnus.callavik@se.abb.com SUMMARY The objective with this
More informationSystem Protection Schemes in Eastern Denmark
System Protection Schemes in Eastern Denmark Joana Rasmussen COWI A/S, Energy Department System Protection Schemes in Eastern Denmark 1.Advanced system protection schemes are investigated and perspectives
More informationCOOLING SOLUTIONS WIND
NISSENS COOLING SOLUTIONS COOLING SOLUTIONS WIND www.nissens.com DELIVERING THE DIFFERENCE Our passion for cooling and climate solutions is fundamental to promote our customers growth and success. Nissens
More informationWorld Offshore Wind Market and challenges ahead
World Offshore Wind Market and challenges ahead 5-6 May 2010 Hamburg Offshore Wind Conference Andrew Henderson, GL Garrad Hassan 1 World Offshore Wind Market and Challenges Ahead Current Status & European
More information2012 San Francisco Colloquium
2012 San Francisco Colloquium http : //www.cigre.org Advances in voltage source converter (VSC) technologies B4-6 500 kv VSC Transmission System for lines and cables B. JACOBSON, B. WESTMAN, M. P. BAHRMAN*
More informationWho is National Grid?
Who is National Grid? National Grid is a leading international energy infrastructure business In the UK, our business includes electricity and gas transmission networks and gas distribution networks. We
More informationIntegrated Offshore Transmission Project (East) Final Report. Conclusions and Recommendations. August 2015
Integrated Offshore Transmission Project (East) Final Report Conclusions and Recommendations August 2015 Integrated Offshore Transmission Project (East) Final Report and Recommendations Executive Summary
More informationGrid connection of near shore wind farms
Grid connection of near shore wind farms methods, preconditions and results Rene Starup 5. Marts 2015 1 Topics Methods Preconditions Technical and socio-economic analysis 5. Marts 2015 2 60, 150 and 400
More informationPassion for Offshore. Wind Power & Renewables Division Market Unit Offshore
Wind Power & Renewables Division Market Unit Offshore Passion for Offshore - Frank Zimmermann, Head of Sales - 5 th British Chamber Conference on Renewable Energy, Hamburg, siemens.com/answers Siemens
More informationCaithness-Moray Needs Case Consultation
Caithness-Moray Needs Case Consultation Introduction RenewableUK and Scottish Renewables are the leading trade associations for renewable technologies in the UK and Scotland respectively, and welcome the
More informationViking Link Interconnector
Viking Link Interconnector Public information event for Bicker Parish Why we re here today We re here today to introduce the Viking Link project, to explain what we want to build and to answer any questions
More informationSiemens Wind Power Division
Erhvervs-, Vækst- og Eksportudvalget 2011-12 ERU alm. del Bilag 254 Offentligt Siemens Wind Power Division Michael Hannibal CEO Offshore, Business Unit EMEA EKF 2 May 2012 Siemens AG 2012 Siemens Global
More informationNetwork Interconnection of Offshore Wind
Network Interconnection of Offshore Wind Prepared for REOLTEC Carlos Aguirre Madrid, December 3rd Experience you can trust. Introducing KEMA A trusted independent partner providing advise throughout the
More informationOptimization of the coupled grid connection of offshore wind farms
Optimization of the coupled grid connection of offshore wind farms Dirk Schoenmakers Graduation project at Evelop Netherlands BV Technical University of Eindhoven September 2008 Supervisors: TU Eindhoven
More informationWe appreciate your feedback
Publishing date: 23/07/2015 Document title: We appreciate your feedback Please click on the icon to take a 5 online survey and provide your feedback about this document REPORT ON UNIT INVESTMENT COST INDICATORS
More informationOffshore Platform Powered With New Electrical Motor Drive System
Offshore Platform Powered With New Electrical Motor Drive System Authors: Jan O. Lamell, M.Sc E.E. ABB Automation Technologies Presenters: Thomas Johansson, M.Sc E.E. ABB Automation Technologies Timothy
More informationThe UK Offshore Wind Experience
The UK Offshore Wind Experience Tom Simchak Policy Advisor, Energy British Embassy, Washington EESI Briefing, 28 September 2015 UNCLASSIFIED The United Kingdom is The global market leader in offshore wind:
More informationValue breakdown for the offshore wind sector
[RAB (2010) 0365] Value breakdown for the offshore wind sector A report commissioned by the Renewables Advisory Board February 2010 1 Value breakdown for the offshore wind sector Contents 1. Introduction...
More informationSiemens presents new DC grid connection for offshore wind farms Siemens AG 2015 All rights reserved. siemens.com/grid-access-solutions
Higher cost efficiency in Wind Power Transmission Siemens presents new DC grid connection for offshore wind farms siemens.com/grid-access-solutions is leading in offshore grid access To date Siemens has
More information6 Oktober 2010... KIVI Niria congres Offshore Wind De uitdaging. Eneco wind. Ernst van Zuijlen
6 Oktober 2010... KIVI Niria congres Offshore Wind De uitdaging Eneco wind Ernst van Zuijlen Eneco Targets... Maximise the use of renewable energy 2012: 25% of electricity produced sustainable (50% wind)
More informationPOWER TRANSMISSION FROM OFFSHORE WIND FARMS
POWER TRNSMISSION FROM OFFSHORE WIND FRMS Thorsten Völker University of pplied Sciences Bremerhaven Germany BSTRCT The future for wind power generation in Germany is offshore wind energy. The preferred
More informationOFFSHORE WIND TECHNOLOGY OVERVIEW NYSERDA PON 995, Task Order No. 2, Agreement No. 9998
OFFSHORE WIND TECHNOLOGY OVERVIEW NYSERDA PON 995, Task Order No. 2, Agreement No. 9998 For the Long Island New York City Offshore Wind Collaborative Submitted By: AWS Truewind, LLC 463 New Karner Road
More informationMARKET EVENT REPORT. Scheduling Error Affecting Dispatch of Mintaro Gas Turbine Station. Electricity Market Operations Performance PREPARED BY:
Scheduling Error Affecting Dispatch of Mintaro Gas Turbine Station PREPARED BY: Electricity Market Operations Performance DATE: 26 August 2010 Contents 1 Introduction... 3 2 Background... 3 3 Scheduling
More informationSHE Transmission. 2015_10_30 Transmission Losses Strategy Rev 2.0 October 2015
SHE Transmission 2015_10_30 Transmission Losses Strategy Rev 2.0 October 2015 Summary This paper presents SHE Transmission s views and approach on the impact of transmission losses on the transmission
More informationOFFSHORE WIND ENERGY IS GETTING CHEAPER
OFFSHORE WIND ENERGY IS GETTING CHEAPER Market foresight and scale drive the cost down Dansk Energi, January 14, 2016 Sune Strøm, Manager, Regulatory Affairs Wind Power Offshore wind is closing in on the
More informationThe European offshore wind industry - key trends and statistics 2014. January 2015. A report by the European Wind Energy Association
The European offshore wind industry - key trends and statistics 2014 January 2015 A report by the European Wind Energy Association Contents Contents Executive summary 3 Annual market in 2014 4 Cumulative
More informationInfrastructure in a low-carbon energy system to 2030: Transmission and distribution. Final report. for. The Committee on Climate Change
Project Name Document Name Infrastructure in a low-carbon energy system to 2030: Transmission and distribution Final report for The Committee on Climate Change Imperial College and Element Energy 22 nd
More informationInfield Cable Topology Optimization of Offshore Wind Farms
Infield Cable Topology Optimization of Offshore Wind Farms Faculty of Applied Sciences Infield Cable Topology Optimization of Offshore Wind Farms For the degree of Master of Science in Sustainable Energy
More informationOFFSHORE WIND PROCUREMENT
OFFSHORE WIND PROCUREMENT Raymond Cravitz Procurement Manager 17 09 2015 Irish Sea DONG Energy is a leading energy group in Northern Europe Overview #1 in Danish energy markets Global leader in offshore
More informationUK Offshore Wind: Opportunities for trade and investment
UK Offshore Wind: Opportunities for trade and investment Executive Summary The United Kingdom is The global market leader in offshore wind: The UK has 5.7GW installed or under construction, and is on track
More informationOFFSHORE WIND POLICY AND MARKET ASSESSMENT A GLOBAL OUTLOOK
EUROPEAN UNION OFFSHORE WIND POLICY AND MARKET ASSESSMENT A GLOBAL OUTLOOK The European Union is a unique economic and political partnership between 28 European countries. In 1957, the signature of the
More informationPB POWER ISLAND OF IRELAND CAVAN-TYRONE AND MEATH-CAVAN 400KV PROJECTS PRELIMINARY BRIEFING NOTE OVERHEAD AND UNDERGROUND ENERGY TRANSMISSION OPTIONS
ISLAND OF IRELAND CAVAN-TYRONE AND MEATH-CAVAN 400KV PROJECTS PRELIMINARY BRIEFING NOTE OVERHEAD AND UNDERGROUND ENERGY TRANSMISSION OPTIONS FEBRUARY 2008 PB POWER PB Power Page i EXECUTIVE SUMMARY General
More informationEIA case for Hiiumaa offshore wind farm in Estonia
EIA case for Hiiumaa offshore wind farm in Estonia Georg Martin & Liis Rostin With contributions from Aune Aunapuu, Ramboll Eesti and materials from Nelja Energia Seminar on Environmental Impact Assessment
More informationNEW CABLE? - Understanding the cost to connect renewable generation in Orkney
New Holland, Holm 500kW Partner of Choice in Mid-Size Wind NEW CABLE? - Understanding the cost to connect renewable generation in Orkney Hammer, Westray 500kW Colin Risbridger Windflow UK Development Manager
More informationHVDC Technology for Large Scale Offshore Wind Connections
HVDC Technology for Large Scale Offshore Wind Connections Nandan Mahimkar, Gunnar Persson,Claes Westerlind, ABB AB, SE-771 80, Ludvika, Sweden, nandan.mahimkar@in.abb.com, gunnar.persson@se.abb.com,claes.westerlind@se.abb.com,
More informationHV Submarine Cable Systems Design, Testing and Installation
HV Submarine Cable Systems Design, Testing and Installation CIGRE Ireland Technical Seminar 6 th October 2010 Robert Donaghy Senior Consultant Engineer, ESB International Presentation Overview Applications
More informationEWEA CREYAP benchmark exercises: summary for offshore wind farm cases
Downloaded from orbit.dtu.dk on: Jan 07, 2016 EWEA CREYAP benchmark exercises: summary for offshore wind farm cases Mortensen, Niels Gylling; Nielsen, Morten; Ejsing Jørgensen, Hans Publication date: 2015
More informationJoint Con Edison LIPA Offshore Wind Power Integration Project Feasibility Assessment
Joint Con Edison LIPA Offshore Wind Power Integration Project Feasibility Assessment March 20, 2009 Joint Con Edison LIPA Offshore Wind Power Integration Project Feasibility Assessment Table of Contents:
More informationUK renewable energy an update
UK renewable energy an update 30 October 2014 Robert Hull, Managing Director Renewable energy key challenges 1 2 3 Costs to Climate change: Risks to security consumers: decarbonising of supply: short affordability
More informationRenewable Energy Grid Integration
Renewable Energy Grid Integration Jian Sun Professor and Director Grid Integration Issues Cost, Reliability & Efficiency of Grid Interface Grid Congestion, Weak Grids Variability of Renewable Production
More informationSubmarine Power Cables. State-of-the-art production facility, more than 100 years of experience and reference installations around the world.
Submarine Power Cables State-of-the-art production facility, more than 100 years of experience and reference installations around the world. Reliable submarine power cables ABB is one of the world s most
More informationSelected Projects siemens.com/energy
Power Capacitors and Capacitor Banks Selected Projects siemens.com/energy Capacitors for the World In 2009, Siemens extended its product portfolio to deliver high-voltage power capacitors and capacitor
More informationThe shaded blocks below indicate the areas of activity published within this Bulletin.
Area 1 Page 2 Area 2 Page 3-4 Area 3 Pages 5-7 Area 4 - Area 5 Pages 8-12 9 6 Area 6-27 March 2014 Issue 07 The shaded blocks below indicate the areas of activity published within this Bulletin. This Bulletin,
More informationThe European offshore wind industry key trends and statistics 2015. February 2016. A report by the European Wind Energy Association
The European offshore wind industry key trends and statistics 2015 February 2016 A report by the European Wind Energy Association Contents Contents Executive summary 3 Annual market in 2015 4 Cumulative
More informationOffshore Work Packages
Rampion Offshore Wind Farm Offshore Work Packages Meet The Buyer Naren Mistry, Engineering Manager 26 th Feb 2014 Rampion Offshore Project Scope Design, manufacture, transportation and Installation: Up
More informationTechnical Risks in Wind Project Development
Technical Risks in Wind Project Development Kevin J. Smith Global Segment Director Renewable Energy Services May 21, 2012 Discussion Objectives Introduction to project risks How to quantify risks Project
More informationHVDC-VSC: transmission technology of the future
A bi-pole ± 285 kv HVDC line sandwiched between 3-phase 400 kv HVAC lines. HVDC-VSC: transmission technology of the future A new hybrid HVDC circuit technology using voltage source converters is only half
More informationFirth of Forth Offshore Wind Farm Zone. Offshore and Onshore Project Information
Firth of Forth Offshore Wind Farm Zone Offshore and Onshore Project Information May 2012 Introduction Seagreen Wind Energy Limited (Seagreen) is a 50/50 joint venture between SSE and Fluor (UK) Limited.
More informationSSE Greater Gabbard Offshore Wind Farm Supply Chain Engagement
SSE Greater Gabbard Offshore Wind Farm Supply Chain Engagement www.sse.com Programme Introduction to SSE Overview of Tenders Overview of supplier requirements to work for SSE Overview of Procurement Process
More informationCIEMADeS 4th INTERNATIONAL CONFERENCE
CIEMADeS 4th INTERNATIONAL CONFERENCE Submarine Cable Connections - from concept to commissioning Puerto Rico, May 5th 2011 Vegar Syrtveit Larsen Nexans Norway AS Agenda Early phase What can typically
More informationTenneT. Stakeholder engagement and Consultation Process OWFs. Day 1 ONL 15-162. Michiel Müller / Rob van der Hage
TenneT ONL 15-162 Stakeholder engagement and Consultation Process OWFs Day 1 Expert Meeting, 15-16.04.2015, Arnhem Michiel Müller / Rob van der Hage Stay tuned. Safety first! Voor uw en onze veiligheid
More informationThe European offshore wind industry - key trends and statistics 2013. January 2014. A report by the European Wind Energy Association
The European offshore wind industry - key trends and statistics 2013 January 2014 A report by the European Wind Energy Association Contents Contents Executive summary 3 Annual market in 2013 4 Cumulative
More informationOFFSHORE WIND FARM ELECTRICAL CONNECTION OPTIONS. W.Grainger 1 and N.Jenkins 2 SYNOPSIS
OFFSHORE WIND FARM ELECTRICAL CONNECTION OPTIONS W.Grainger 1 and N.Jenkins 2 1 Border Wind Ltd, Hexham 2 Dept of Electrical Engineering and Electronics, UMIST SYNOPSIS The development of large scale offshore
More informationMonitoring the Operation of Wind Turbines Alex Robertson, Vestas Northern Europe
Monitoring the Operation of Wind Turbines Alex Robertson, Vestas Northern Europe Renewable Efficient Energy II Conference, 21.03.2012, Vaasa, Finland Modern wind power plant produce more data than ever
More informationLucien Antonissen Key Account Manager LIOS Technology Germany
Lucien Antonissen Key Account Manager LIOS Technology Germany Content Company Markets DTS Controller Software Configuration RTTR Demonstration Q&A NKT Holding 2013 NKT Holding Nilfisk-Advance NKT Cables
More informationTriton Knoll Offshore Wind Farm Limited Electrical System. Outline Traffic Management Plan
Triton Knoll Offshore Wind Farm Limited Electrical System Outline Traffic Management Plan October 2014 RWE Innogy UK Triton Knoll TMP Copyright 2014 RWE Innogy UK Ltd All pre-existing rights reserved.
More informationG8 - Contracts for Difference Metering
PUBLIC G8 - Contracts for Difference Metering EMRS Guidance EMR Settlement Limited Version 1.0 12 October 2015 CONTENTS Change Amendment Record...4 1. Introduction...5 2. Purpose...5 3. What is the Electrical
More informationSmart Grid and Renewable Energy Grid Integration. Jian Sun, Professor and Director Department of ECSE & Center for Future Energy Systems
Smart Grid and Renewable Energy Grid Integration Jian Sun, Professor and Director Department of ECSE & Center for Future Energy Systems 1 How Smart Can We Make This Grid? 2 Smart Grid Drivers Need to Use
More informationTidal Energy. Wind Energy. Transmission & Distribution Network. Offshore Substation. Onshore Substation. Tidal Stream Energy.
Offshore Renewables Tidal Energy Transmission & Distribution Network Offshore Substation Wind Energy Onshore Substation Tidal Stream Energy Consumer Atkins in Offshore Renewables The offshore wind journey
More informationThe shaded blocks below indicate the areas of activity published within this Bulletin.
The shaded blocks below indicate the areas of activity published within this Bulletin. Area 1 Page 2 Area 2 Page 3 Area 3 Pages 4-9 Area 4 - Area 5 Pages 10-13 This Bulletin, along with previous issues,
More informationBrochure Introducing HVDC
Brochure Introducing HVDC ABB and HVDC The world s first commercial high-voltage direct current (HVDC) link, situated between the Swedish mainland and the island Gotland, was delivered by ABB already in
More informationContext: significant penetration of DG = increased risks for system security
Distributed Generation: towards an effective contribution to power system security IEEE Tampa GM 2007: Panel on Impact of Dispersed Generation on Power System structure & security Bruno Meyer Outline Context:
More informationRequirements for Offshore Grid Connections. in the. Grid of TenneT TSO GmbH
Requirements for Offshore Grid Connections in the Grid of TenneT TSO GmbH Bernecker Straße 70, 95448 Bayreuth Updated: 21 December 2012 1/10 Requirements for Offshore Grid Connections in the Grid of TenneT
More informationOffshore Wind. IEEE Boston PES - November 16, 2010
Offshore Wind IEEE Boston PES - November 16, 2010 Offshore Wind A high-level overview of offshore wind project development identifying current technologies, challenges, risks and costs. Presented by: Brook
More informationStudy to Determine the Limit of Integrating Intermittent Renewable (wind and solar) Resources onto Pakistan's National Grid
Pakistan Study to Determine the Limit of Integrating Intermittent Renewable (wind and solar) Resources onto Pakistan's National Grid Final Report: Executive Summary - November 2015 for USAID Energy Policy
More informationDesign and Operation of Power Systems with Large Amounts of Wind Power, first results of IEA collaboration
Design and Operation of Power Systems with Large Amounts of Wind Power, first results of IEA collaboration H. Holttinen, P. Meibom, A. Orths, F. Van Hulle, C. Ensslin, L. Hofmann, J. McCann, J. Pierik,
More informationDansk Offshore Netværk, Lindø Industripark, 21. April 2015 The Road to Below 10 ct /kwh
Dansk Offshore Netværk, Lindø Industripark, 21. April 2015 The Road to Below 10 ct /kwh, Head of Cost of Energy Siemens AG, Wind Power and Renewables Answers for energy. Introduction Siemens Wind Power
More informationNETWORK OUTPUT MEASURES CONSULTATION
NETWORK OUTPUT MEASURES CONSULTATION Great Britain s electricity transmission network transmits high-voltage electricity from where it is produced to where it is needed throughout the country. It broadly