1 10 Steps to Successful Project Management Speaking A Workbook for T2 Systems Teaching Tools Training Consulting Lou Russell, Russell Martin & Associates 9084 Technology Drive* Suite 500 * Fishers, IN (317) info@russellmartin.com
2 Steps to Help Reluctant Dare to Properly Manage Resources! START Define Plan Manage Review END 1.Establish project scope 2.Set initial objectives 3.List risks/constraints 4. Document assumptions 5.Evaluate alternatives 6.Choose a course of action 7. Establish change management plan 8. Plan communications 1.Create schedule 2.Assign resources 3.Create budget 1.Control work in progress 2.Provide feedback 3.Negotiate for resources 4.Resolve differences 1.Turn over deliverables 2.Hold Project Review 3.Release resources 4.Document successes and failures 5. Celebrate accomplishments
3 Business Objective What is the #1 business reason according to the Project Sponsor? IRACIS Profit / Efficiency / Compliance Increase Revenue: Avoid Cost: Improve Service:
4 Establish Project Scope Brainstorm the stakeholders, inputs and outputs Stakeholder (role not person) What I need from them What I will provide to them (final deliverables or requirements exchanges) Comments Project Sponsor Subject Matter Experts Users of the Project Deliverables Approval / Standards / Compliance Technical Experts
5 Establish Project Scope: Scope Diagram EXAMPLE Student Environment Teaching Notes Facilitator Course / Learning Draft Materials Intro to Project Mgmt Learning Objectives SME Need to Know, standards
6 Project Objectives How will the success of your project be measured? What will you deliver and by when? What will be the quality criteria or completion criteria? What are the budget goals? Specific Measurable Reasonable
7 Document Risk Overall Project Risk Average: Size - How big is this project or how long will it take relative to others you have done? What is it s impact on the organization? Rated 1(small) - 10(large) Structure - How stable are the requirements? Has this been done before? Rated 1(fixed) - 10(undefined) Technology - How understood is the technology and processes? Rated 1(old) - 10(new) Size: Structure: Technology: AVERAGE:
8 Detailed Project Risk H = High M = Medium L = Low Risk Factor Likelihood H/M/L Impact H/M/L Proactive and/or Reactive Action Stakeholder changes L H PRO:rehearse, buffer REACT: board feedback PRO: REACT: PRO: REACT: PRO: REACT: PRO: REACT: List possible risks that might occur for your project. Evaluate the LIKELIHOOD and IMPACT of each risk. Then determine a PROACTIVE (to prevent) and/or REACTIVE (in case it happens) action as appropriate.
9 Document Constraints We ll go over these at 9:06 Rank these three (which one is #1, #2, #3 based on the description from your SPONSOR s point of view. Rank them again from your point of view if it is different. TIME COST QUALITY/ SCOPE # 1 (you can t get more of this no matter what) # 2 (you usually can t get more of this) # 3 (you can negotiate this)
10 PLAN: Work back from the date EXAMPLE Order Task Task Owner 1 Send Status Report Margie 2/1 Dates (milestones) 2 Send Status Report Margie 2/15 3 Complete requirements document Margie 3/1 4 Design Web Changes Margie 3/15 One person can only work on one task at a time 5 Publish Web Changes Tina 3/21 Checklist for the Project Schedule: Did I include project meetings? Did I include project communication tasks? Did I include risk mitigation tasks? Has my scope or risk changed as I ve identified tasks? Is my plan the BEST level of detail for the risk?
11 PLAN: Work back from the date EXAMPLE Project Task Task Owner Dates (milestones)
12 A 10 Steps Checklist PHASE DELIVERABLE TOOL ROLE APPROVAL Define Establish Scope Business Objectives, Scope Diagram Project Manager Project Sponsor, Define Set initial objectives Project Objectives Project Manager Project Sponsor, Define List risks/constraints Quick N Dirty Risk, Risk Mitigation Table Project Manager Project Sponsor, Define Document assumptions Document Project Manager Project Sponsor, Define Establish change management plan Document Project Manager Project Sponsor, Define Plan communications Communications Plan Project Manager Project Sponsor, Plan Create schedule/budget Excel spreadsheet Project Manager Project Sponsor, Manage Manage Review Manage work in progress Provide feedback Negotiate for resources Resolve differences Turn over deliverables Hold Project Review Release resources status report Project Manager Project Sponsor, All DEFINE deliverables Project Manager Project Sponsor, Post Project Review template Project Manager Project Sponsor,
IS&T Project Management: Project Management 101. June, 2006
IS&T Project Management: Project Management 101 June, 2006 Session Objectives Review basics management Discuss obstacles to effective management Share practices that work for you Empower you to try some
More informationOE PROJECT CHARTER TEMPLATE
PROJECT : PREPARED BY: DATE (MM/DD/YYYY): Project Name Typically the Project Manager Project Charter Last Modified Date PROJECT CHARTER VERSION HISTORY VERSION DATE (MM/DD/YYYY) COMMENTS (DRAFT, SIGNED,
More informationProject Planning Worksheet
Project Planning Worksheet Project Name: Prepared by: Department: Date: Background and Overview Give the business reason for requesting this project, and an overview of the work to be completed. Risks
More informationPROJECT MANAGEMENT PLAN Outline VERSION 0.0 STATUS: OUTLINE DATE:
PROJECT MANAGEMENT PLAN Outline VERSION 0.0 STATUS: OUTLINE DATE: Project Name Project Management Plan Document Information Document Title Version Author Owner Project Management Plan Amendment History
More informationSCHEDULE 8 Generalist Project Services Framework 2015
SCHEDULE 8 Generalist Project Services Framework 2015 Nominal Insurer And Schedule 8 (Project Services Framework) Page: 1 of 6 Schedule 8 Generalist Project Services Framework Contents Overview... 3 1.
More information5.2. 5.2 Template for IT Project Plan. Template for IT Project Plan. [Project Acronym and Name]
231 5.2 Template for IT Project Plan Name of the Tool: Source: Usage: Description: Template for IT Project Plan GIZ This template has been designed as a tool to support the planning of IT projects for
More informationProject Management 101. Laura Gettings November 2013
Project Management 101 Laura Gettings November 2013 For GBTA Introductions Overview What is a Project? What is Project Management? Why do we need Project Management? Plan the Process Create a Project Charter
More informationChange Management Procedure For Increase Bandwidth to University Buildings Project
Change Management Procedure For Increase Bandwidth to University Buildings Project Version number 1.0 Draft as of 4/11/2011 Printed on 7/1/2011 Author William M. Jones Owner William M. Jones Change Management
More informationOrganization. Project Name. Project Overview Plan Version # Date
Project Overview Plan Template Organization Project Name Project Overview Plan Version # Date REVISION HISTORY VERSION # REVISION DATE COMMENT 1 APPROVALS: Authorized Signature DATE 2 Table of Contents
More informationDraft Requirements Management Plan
BAO111: Core Competencies for the Business Analyst Draft Requirements Management Plan 1.0 INTRODUCTION 1.1 Purpose This document outlines requirements roles and responsibilities, presents a stakeholder
More informationDigital Advisory Services Professional Service Description Network Assessment
Digital Advisory Services Professional Service Description Network Assessment 1. Description of Services. 1.1. Network Assessment. Verizon will perform Network Assessment services for the Customer Network,
More informationProject Management Framework
Information Services Project Management Framework October 2003 Document ID No. Page 1 of 1 Contents 1. Introduction Page 3 2. Use of Framework Page 3 3. Project Register and Monitoring Page 4 4. Project
More informationStatus Report. Status Report Guide. Strategic Capital, Infrastructure and Projects. A guide to completing the Status Report
Status Report Guide A guide to completing the Status Report Strategic Capital, Infrastructure and Projects Prepared by: Andrew Segrott / Strategic Capital, Infrastructure and Projects Version 1.0 17 December
More informationAppendix 3: Project Management Substation Guidelines (General Process Flow Template)
365 Appendix 3: Project Management Substation Guidelines (General Process Flow Template) Checkpoint Methodology The schedule is issued prior to the go decision. It covers the duration of the project. It
More informationCapital Works Construction Project. [Insert Project Title] [Insert Sponsoring Agency]
Capital Works Construction Project [Insert Project Title] [Insert Sponsoring Agency] Detailed Business Case Commercial - in- Confidence [Insert Date] Table of Contents 1. Executive Summary --------------------------------------------------------------------------------------------------
More informationTHE FUNDAMENTALS OF PROJECT MANAGEMENT
THE FUNDAMENTALS OF PROJECT MANAGEMENT Learning the Essential Elements for Effective Management at UW-Stout WHAT IS A PROJECT? 1. Improve the efficiency of a specific production line. 2. Organize the annual
More informationCHANGE MANAGEMENT PLAN WORKBOOK AND TEMPLATE
CHANGE MANAGEMENT PLAN WORKBOOK AND TEMPLATE TABLE OF CONTENTS STEP 1 IDENTIFY THE CHANGE... 5 1.1 TYPE OF CHANGE... 5 1.2 REASON FOR THE CHANGE... 5 1.3 SCOPE THE CHANGE... 6 1.4 WHERE ARE YOU NOW?...
More informationPROJECT MANAGEMENT PLAN CHECKLIST
PROJECT MANAGEMENT PLAN CHECKLIST The project management plan is a comprehensive document that defines each area of your project. The final document will contain all the required plans you need to manage,
More informationKnowledge Area Inputs, Tools, and Outputs. Knowledge area Process group/process Inputs Tools Outputs
HUMAN RESOURCE MANAGEMENT Organizational planning Staff Acquisition Project interfaces such as organizational interfaces, technical interfaces and interpersonal interfaces. Staffing requirements Staffing
More informationAt the end of this chapter. Project Charter. What is a Project Charter? What is a Project Charter? Why is a Project Charter used?
At the end of this chapter Project Charter Describe what a project charter is and why it is critical to project success. Explain what a project scope statement is and why it is important. List the various
More informationThe Fast Track Project Glossary is organized into four sections for ease of use:
The Fast Track Management Glossary provides a handy reference guide to the fast track management model, encompassing the concepts, steps and strategies used to manage successful projects even in the face
More informationFramework. 3/3/2011 By Karla Campbell Project Manager PMP Certificated UCOP
PROJECT MANAGEMENT Framework 3/3/2011 By Karla Campbell Project Manager PMP Certificated UCOP Topics 1. Benefits Of Project Management 2. Definitions 3. Roles 4. Project Process Groups 5. Best Practices
More informationPROJECT SCOPE STATEMENT
PROJECT SCOPE STATEMENT Note: Any work not explicitly included in this Project Scope Statement is implicitly excluded from the project. Create links to referenced documents (e.g., Link_To_ ) by using Insert
More informationIndividual Development Planning. Staff Guidelines
Individual Development Planning Staff Guidelines Guidelines for Creating a Development Plan What is an individual development plan? It s a document created by you, the staff member, then discussed with
More informationITIL Implementation Planning
White Paper ITIL Implementation Planning Overview Introduction This paper describes the items that need to be considered in advance of starting an ITIL implementation effort. It is critical to make sure
More informationProject Scorecard Template
Project Scorecard Template 1. Identify criteria for success: Review the objectives and deliverables in the Project Definition, as well as any other existing information that is relevant to the project.
More informationThe Gateway Review Process
The Gateway Review Process The Gateway Review Process examines programs and projects at key decision points. It aims to provide timely advice to the Senior Responsible Owner (SRO) as the person responsible
More information21. Earned Value deals with: a. EV Scope b. PV Time c. AC Cost 22. Portfolios are organized around business goals. 23. Take stern action against
PMP Short Notes Based on PMBOK Guide fifth edition By Dilip Chaturvedi,PMP Email id: info@justpmp.com To know about our training schedule, please visit www.justpmp.com 1. Communication is more complex
More informationPROJECT MANAGEMENT METHODOLOGY SECTION 3 -- PLANNING PHASE
PROJECT MANAGEMENT METHODOLOGY SECTION 3 -- PLANNING PHASE Table of Contents Introduction...3-1 Overview...3-1 The Process and the Project Plan...3-1 Project Objectives and Scope...3-1 Work Breakdown Structure...3-1
More informationComputing Services Network Project Methodology
Computing Services Network Project Prepared By: Todd Brindley, CSN Project Version # 1.0 Updated on 09/15/2008 Version 1.0 Page 1 MANAGEMENT PLANNING Project : Version Control Version Date Author Change
More informationOE PROJECT CHARTER TEMPLATE
PROJECT : BearBuy Implementation PREPARED BY: Vanessa Wong and Jon Conhaim DATE (MM/DD/YYYY): 07/23/2011 PROJECT CHARTER VERSION HISTORY VERSION DATE COMMENTS (DRAFT, SIGNED, REVISED CURRENT STATUS) (MM/DD/YYYY)
More informationCommonwealth of Massachusetts CommonWay Schedule Management Guidelines. Common Values - Common Goals Common Way. Schedule Management.
Schedule Management Values - Goals Schedule Management Schedule Management v1.0 1 of 6 10/27/2010 Schedule Management Values - Goals Table of Contents 1 Schedule Management Guideline... 3 1.1 Determine
More informationTenStep Project Management Process Summary
TenStep Project Management Process Summary Project management refers to the definition and planning, and then the subsequent management, control, and conclusion of a project. It is important to recognize
More informationThis is the software system proposal document for the <name of the project> project sponsored by <name of sponsor>.
Guide to Preparing the SOFTWARE PROJECT MANAGEMENT PLAN R. Buckley CSc 190 Senior Project Department of Computer Science - College of Engineering and Computer Science California State University, Sacramento
More informationCompanion Notes for LTC Process Flowcharts. Notes for Initiation Stage
Companion Notes for LTC Process Flowcharts Contents Notes for Initiation, Planning, Execution/Production and Close Stages Glossary and Acronyms Page 1 4 5 6 Notes for Initiation Stage Purpose The purpose
More informationThis alignment chart was designed specifically for the use of Red River College. These alignments have not been verified or endorsed by the IIBA.
Red River College Course Learning Outcome Alignment with BABOK Version 2 This alignment chart was designed specifically for the use of Red River College. These alignments have not been verified or endorsed
More informationProject Managing Microsoft Dynamics CRM Implementations
Workshop 80054A: Project Managing Microsoft Dynamics CRM Implementations with Microsoft Dynamics Sure Step Length: 2 Day(s) Published: November 12, 2008 Language(s): Audience(s): English Developers Level:
More informationProject Risk Management
Project Risk Management Study Notes PMI, PMP, CAPM, PMBOK, PM Network and the PMI Registered Education Provider logo are registered marks of the Project Management Institute, Inc. Points to Note Risk Management
More informationDriving Project Success Through Effective Stakeholder Management. Neeraj Shah, MBA,PMP, SAPM
Driving Project Success Through Effective Stakeholder Management Neeraj Shah, MBA,PMP, SAPM Objective Why do projects or change initiatives fail? Who is a stakeholder? Why are they so crucial? Challenges
More informationStep by Step Project Planning
Step by Step Project Planning Contents Introduction The Planning Process 1 Create a Project Plan...1 Create a Resource Plan...1 Create a Financial Plan...1 Create a Quality Plan...2 Create a Risk Plan...2
More informationProject Management Body of Knowledge (PMBOK) (An Overview of the Knowledge Areas)
Project Management Body of Knowledge (PMBOK) (An Overview of the Knowledge Areas) Nutek, Inc. 3829 Quarton Road, Suite 102 Bloomfield Hills, Michigan 48302, USA. Phone: 248-540-4827, Email: Support@Nutek-us.com
More informationProject Management Guidebook
METHOD 12 3 empowering managers to succeed Project Management Guidebook ISBN 0-473-10445-8 A bout this e-book This e-book was created by Method123 (see www.method123.com) to help provide you with a simple
More informationEssential Elements for Any Successful Project
In this chapter Learn what comprises a successful project Understand the common characteristics of troubled projects Review the common characteristics of successful projects Learn which tools are indispensable
More informationCrosswalk Between Current and New PMP Task Classifications
Crosswalk Between Current and New PMP Task Classifications Domain 01 Initiating the Project Conduct project selection methods (e.g., cost benefit analysis, selection criteria) through meetings with the
More informationOFFICE OF THE CIO. PROCEDURE Informational VERSION: 1.0
OFFICE OF THE CIO PROCEDURE Informational VERSION: 1.0 Purpose Project Management of Major or Large NDUS Information Technology Projects Project Managers Guide/Checklist This procedural process will ensure
More informationMinnesota Health Insurance Exchange (MNHIX)
Minnesota Health Insurance Exchange (MNHIX) 1.2 Plan September 21st, 2012 Version: FINAL v.1.0 11/9/2012 2:58 PM Page 1 of 87 T A B L E O F C O N T E N T S 1 Introduction to the Plan... 12 2 Integration
More informationHoping that a project comes out the way you want is not a PLAN!! This is true in life, in school and on the job.
Project management is the discipline of planning, organizing, securing and managing resources to bring about the successful completion of specific project goals and objectives. (Wikipedia) Hoping that
More informationProject Management Guidelines
Project Management Guidelines Overview Section 86-1506 (5) directs the NITC to adopt guidelines regarding project planning and management. The goal of project management is to achieve the objectives of
More informationProject Roles and Responsibilities Template
Purpose The purpose of this document is to provide a summary of the primary roles in the X project and the responsibilities associated with each role. A roles and responsibilities spreadsheet also maps
More information1.20 Appendix A Generic Risk Management Process and Tasks
1.20 Appendix A Generic Risk Management Process and Tasks The Project Manager shall undertake the following generic tasks during each stage of Project Development: A. Define the project context B. Identify
More informationInput, Output and Tools of all Processes
1 CIS12-3 IT Project Management Input, Output and Tools of all Processes Marc Conrad D104 (Park Square Building) Marc.Conrad@luton.ac.uk 26/02/2013 18:22:06 Marc Conrad - University of Luton 1 2 Mgmt /
More informationINTERNAL SERVICES GROUP PMO
Ownership & Awareness Program 1 Program 3 Program 4 Program 5 Program 6 Program 7 Program 2 Cap ability Development Infra structure Program n INTERNAL SERVICES GROUP ESSENTIAL FUNCTIONS Act as an interface
More informationUtilizing Defect Management for Process Improvement. Kenneth Brown, CSQA, CSTE kdbqa@yahoo.com
Utilizing Defect Management for Process Improvement Kenneth Brown, CSQA, CSTE kdbqa@yahoo.com What This Presentation Will Cover How to Appropriately Classify and Measure Defects What to Measure in Defect
More informationProject Zeus. Risk Management Plan
Project Zeus Risk Management Plan 1 Baselined: 5/7/1998 Last Modified: N/A Owner: David Jones/Zeus Project Manager Page Section 1. Introduction 3 1.1 Assumptions, Constraints, and Policies 3 1.2 Related
More informationIT11 - Cloud Services for Off-Site Resilience
UCD IT Services IT11 - Cloud Services for Off-Site Resilience Project Initiation Document Version 1.0 December 2 nd 2014 Version History Version Date Summary of Changes Changed by 1.0 02/12/2014 Initial
More information15 Principles of Project Management Success
15 Principles of Project Management Success Project management knowledge, tools and processes are not enough to make your project succeed. You need to get away from your desk and get your hands dirty.
More informationSCOPE MANAGEMENT PLAN <PROJECT NAME>
SCOPE MANAGEMENT PLAN TEMPLATE This Project Scope Management Plan Template is free for you to copy and use on your project and within your organization. We hope that you find this template useful and welcome
More informationCOMMUNICATION MANAGEMENT PLAN Outline VERSION 0.0 STATUS: OUTLINE DATE:
COMMUNICATION MANAGEMENT PLAN Outline VERSION 0.0 STATUS: OUTLINE DATE: Document Information Document Title Amendment History Document Version Date Author/Reviewer Modifications 5/28/2014 Page i 2014 CSG
More information2.1 Initiation Phase Overview
2.1 Initiation Phase Overview The is the conceptualization of the project. This section describes the basic processes that must be performed to get a project started. Accordingly, the purpose of the is
More informationA Gantt Chart is not a Project Plan! It may be the output of MS Project but it is not the plan. It may be in integral part of a project plan.
A Gantt Chart is not a Project Plan! It may be the output of MS Project but it is not the plan. It may be in integral part of a project plan. 5 Processes of a Project 1. Initiating: outputs the charter
More informationTEC Capital Asset Management Standard January 2011
TEC Capital Asset Management Standard January 2011 TEC Capital Asset Management Standard Tertiary Education Commission January 2011 0 Table of contents Introduction 2 Capital Asset Management 3 Defining
More informationSFJ EFSM14 Manage the performance of teams and individuals to achieve objectives
Manage the performance of teams and individuals to achieve objectives Overview This standard is about making the best use of your team and its members so that they can achieve your organisation's objectives.
More informationCOMPLETED EXAMPLE PMM Interactive Flow
COMPLETED EXAMPLE PMM Interactive Flow Project Charge Document (M101) 1. Project Information Project Name: PMM Interactive Flow PlanView Number: Project Sponsor: Project Size: Project Director: Project
More informationIT Project Management Methodology. Project Risk Management Guide. Version 0.3
NATIONAL INFORMATION TECHNOLOGY AUTHORITY - UGANDA IT Project Management Methodology Project Risk Management Guide Version 0.3 Project Risk Management Support Guide version 0.3 Page 1 Version Date Author
More informationITS Project Management Methodology
ITS Project Management Methodology Information Technology Services Project Management Group 11/17/2014 Version 2.1 Author: ITS Project Management Group Document Control Change Record Date Author Version
More informationSubject Area 1 Project Initiation and Management
DRII/BCI Professional Practice Narrative: Establish the need for a Business Continuity Plan (BCP), including obtaining management support and organizing and managing the BCP project to completion. (This
More informationResources for Implementing the WWF Project & Programme Standards. Step 4.3 Analyze Operational and Financial Functions/ Performance
Resources for Implementing the WWF Project & Programme Standards Step 4.3 Analyze Operational and Financial Functions/ Performance March 2007 Step 4.3 Analyze Operational and Financial Performance Contents
More informationINTRODUCTION TO PROJECT MANAGEMENT
INTRODUCTION TO PROJECT MANAGEMENT OVERVIEW The purpose of presentation is to provide leaders and team members of projects, committees or task forces with advanced techniques and practical skills for initiating,
More informationCHANGE MANAGEMENT for Continuous Improvement. Guidance Document
CHANGE MANAGEMENT for Continuous Improvement Guidance Document Change Management for Continuous Improvement Table of Contents Purpose...page 2 An Overview...page 3 Process Chart...page 4 Process Flowchart...page
More informationProject Management Plan Template
Abstract: This is the project management plan document for . This is a controlled document and should be maintained in a configuration environment. Project Management Plan Template Contents REVISION
More informationMNLARS Project Audit Checklist
Audit Checklist The following provides a detailed checklist to assist the audit team in reviewing the health of a project. Relevance (at this time) How relevant is this attribute to this project or audit?
More informationTime Management. Part 2 Work Breakdown Structure (WBS) Review. Richard Boser
Time Management Part 2 Work Breakdown Structure (WBS) Review Richard Boser WBS Planning Process PMBOK WBS is deliverable-oriented grouping of components that organizes and defines the total scope of the
More informationLMI Aerospace PROJECT MANAGEMENT PLAN ACCESS REQUEST PROCESS IMPROVEMENT FEBRUARY 7, 2012
PROJECT MANAGEMENT PLAN ACCESS REQUEST PROCESS IMPROVEMENT FEBRUARY 7, 2012 TABLE OF CONTENTS INTRODUCTION... 2 PROJECT MANAGEMENT APPROACH... 2 PROJECT SCOPE... 2 MILESTONE LIST... 2 SCHEDULE BASELINE
More informationTHE PROJECT MANAGEMENT KNOWLEDGE AREAS
THE PROJECT MANAGEMENT KNOWLEDGE AREAS 4. Project Integration Management 5. Project Scope Management 6. Project Time Management 7. Project Cost Management 8. Project Quality Management 9. Project Human
More informationRisk Management Primer
Risk Management Primer Purpose: To obtain strong project outcomes by implementing an appropriate risk management process Audience: Project managers, project sponsors, team members and other key stakeholders
More informationSound Transit Internal Audit Report - No. 2014-3
Sound Transit Internal Audit Report - No. 2014-3 IT Project Management Report Date: Dec. 26, 2014 Table of Contents Page Background 2 Audit Approach and Methodology 2 Summary of Results 4 Findings & Management
More informationDevelop Project Charter. Develop Project Management Plan
Develop Charter Develop Charter is the process of developing documentation that formally authorizes a project or a phase. The documentation includes initial requirements that satisfy stakeholder needs
More information4. Critical success factors/objectives of the activity/proposal/project being risk assessed
ARTC Risk Management Work Instruction 2: 1. Conduct Risk Assessment Workshop This Work Instruction provides general guidelines for conducting a generic Risk Assessment workshop. The instructions supplement
More informationESKITP7145.01 Manage IT service delivery performance metrics
Overview This sub-discipline covers the competencies required to manage the monitoring, analysis and communication of IT service delivery performance metrics. Monitoring service level performance is a
More informationIncident Standard Service Request Information Request. IT Request. Minor/Low Impact Change to Existing Service. Capture and refine the idea
Incident Standard Service Request Information Request IT Request Idea Capture and refine the idea Determine the type of work Minor/Low Impact to Existing Service Mgmt. Work with customer, management to
More informationNegative Risk. Risk Can Be Positive. The Importance of Project Risk Management
The Importance of Project Risk Management Project risk management is the art and science of identifying, analyzing, and responding to risk throughout the life of a project and in the best interests t of
More informationProject Aim 2020. Appendix C - Project Plan, Gap Analysis, and Approach
Appendix C - Project Plan, Gap Analysis, and Approach In the fall of 2013 and spring of 2014, the senior leadership meetings created awareness among the leaders about necessary improvements in planning,
More informationThe Job of the Project Manager. Robert Youker World Bank (retired) 5825 Rockmere Drive Bethesda, Md. USA 20816 bobyouker@worldnet.att.
The Job of the Project Manager Robert Youker World Bank (retired) 5825 Rockmere Drive Bethesda, Md. USA 20816 bobyouker@worldnet.att.net For any organization and for any project manager it is vitally important
More informationIT1T Integrated Recruitment Systems 2015
UCD IT Services IT1T Integrated Recruitment Systems 2015 Project Initiation Document Version 1.0 2 December 2014 Version History Version Date Summary of Changes Changed by 1.0 02/12/2014 Initial Draft
More informationChange Management Tool kit Project Management Guidelines
Change Management Tool kit Project Management Guidelines Projects A project is a piece of work with fixed duration and clearly defined outcomes. Each project must have: 1 Aims: A clear overall purpose
More informationProject Roles and Responsibilities
Project s and This template can be used to define roles and responsibilities Below is a few typical examples of the different types of roles involved in delivering a project and their respective responsibilities.
More informationRisk Management Plan template <TEMPLATE> RISK MANAGEMENT PLAN FOR THE <PROJECT-NAME> PROJECT
RISK MANAGEMENT PLAN FOR THE PROJECT Prepared by: Approved by: Reference: Version: Date: INTRODUCTION This document is the Risk Management
More informationJIRA RAID User Manual
JIRA RAID User Manual CONTENTS 1 OBJECTIVE... 3 2 INTRODUCTION... 4 3 RISK ISSUE TYPE TEMPLATE... 4 3.1 CREATE ISSUE SCREEN... 4 3.2 VIEW ISSUE SCREEN AFTER REQUIREMENTS CAPTURED AND ISSUE CREATED... 13
More informationTRANSITION PLAN TEMPLATE
TRANSITION PLAN TEMPLATE In this template, instructions are included in italics. When you have completed the template and no longer need the instructions, delete them. Provide a brief overview of the transition
More informationSuccessfully Market your PMO
Successfully Market your PMO Tom Mochal President, TenStep, Inc 1 Agenda Background PMO Communication Plan Marketing the value 2 High-level Value Proposition Companies define goals/strategies toward a
More informationEllucian Implementation Methodology. Summary of Project Management and Solution Delivery Phases
Ellucian Implementation Methodology Summary of Project Management and Solution Delivery Phases Rev. 5/10/2013 Table of Contents Overview 3 Project Management Initiation 4 Planning 5 Execution 6 Monitor
More informationModule 11 Stakeholder Management PMP Exam Questions
Module 11 Stakeholder Management PMP Exam Questions PMP, PMBOK and the Registered Education Provider logo are registered marks of the Project Management Institute, Inc Question 1 You are the project manager
More informationProject Management for econnectivity
Project Management for econnectivity Marilyn Hunter - PMP November 10, 2015 2 Purpose of this session Provide information and understanding of how to lead connectivity projects within AgGateway or within
More information<name of project> Software Project Management Plan
The document in this file is adapted from the IEEE standards for Software Project Management Plans, 1058-1998, which conforms to the requirements of ISO standard 12207 Software Life Cycle Processes. Tailor
More informationG R E E N G L O B A L R E S O U R C E S : C O N F I D E N T I A L A N D P R O P R I E T A R Y 1
P R O P R I E T A R Y 1 INTRODUCTION TO CHANGE MANAGEMENT Definition The Change Process Change Management Approach Awareness to New Normal Change Management Approach Operating Principles List of Change
More informationValue Engineering VE with Risk Assessment RA
Preparation Conclude & Report Value Engineering VE with Risk Assessment RA yes START Plan for VE and RA Value Engineering Job Plan 1 2 Function Information Analysis 3 Creative 4 Evaluation 5 Develop recommendations
More informationProject Lifecycle Management (PLM)
Project Lifecycle Management (PLM) Process or Tool? Why PLM? Project Definition Project Management NEW REQUEST/ INITIATIVES SUPPORT (Quick fixes) PROJECT (Start Finish) ONGOING WORK (Continuous) ENHANCEMENTS
More informationPrior to printing, you should delete all [...] prompt text (in italics and blue text).
HOW TO USE THIS TEMPLATE: Introduction The template reflects the recommended content for a Project Charter document, as described in the PMI Project Management Body of Knowledge (PMBOK Guide, Third Edition).
More informationThe Essentials of Analysis and Design. Mehran Rezaei m.rezaei@eng.ui.ac.ir
The Essentials of Analysis and Design Mehran Rezaei m.rezaei@eng.ui.ac.ir Stakeholders: Players in the Systems Game A stakeholder: any person who has an interest in an existing or proposed information
More informationProject Audit & Review Checklist. The following provides a detailed checklist to assist the PPO with reviewing the health of a project:
Project Audit & Review Checklist The following provides a detailed checklist to assist the PPO with reviewing the health of a project: Relevance (at this time) Theory & Practice (How relevant is this attribute