1 UCD IT Services IT11 - Cloud Services for Off-Site Resilience Project Initiation Document Version 1.0 December 2 nd 2014 Version History Version Date Summary of Changes Changed by /12/2014 Initial Draft /12/2014 Clatrification David Coughlan Cloud Services for Off-site Resilience Page 1 of 11
2 Contents 1 Objectives & Scope Background to the Project Project Objectives Expected Benefits Project Scope Change Control 3 2 Project Plan Project Approach Milestones & Deliverables Project Plan Roles & Responsibilities Project Team Meetings 7 3 Risks & Issues Initial Risk & Issue Log Ongoing Management of Risks and Issues 8 4 Communication Plan 9 5 Project Costs Initial Project Budget Ongoing Costs 10 Cloud Services for Off-site Resilience Page 2 of 11
3 1 Objectives & Scope This Project Initiation Document (PID) defines the Cloud Services for Off-Site Resilience project in detail including objectives, scope, approach, deliverables, timescale and structure of the project so that it can be understood and agreed by all stakeholders. 1.1 Background to the Project This project will set up the framework to support the IT Services Cloud First strategy. Identify key services and infrastructure that are necessary for disaster recovery and ensure continuity of service and resiliency with cloud based and/or hosted solutions. 1.2 Project Objectives Identify a list of key services and infrastructure to be moved to a Hosted solution to allow for the shutdown/isolation of on campus services. To ensure Key Services are available to offsite services in the event of the Belfield campus being unavailable. 1.3 Expected Benefits Increased flexibility with Hosting and Cloud based services. Maintain disaster recovery options with off-site hosting of key services and/or infrastructure. 1.4 Project Scope Identify and define our requirements for Cloud based services to help meet our ongoing requirement for both Application and Service resiliency. Where possible utilising suitable SaaS and IaaS solutions when/where appropriate. This will allow for a shutdown/isolation of on campus services whilst maintaining accessibility of Key Services and Infrastructure to customers off-site. 1.5 Change Control The Project Initiation Document will be approved on commencement of the project by the relevant project members. Following this, an ongoing Project Plan will be maintained and updated to accommodate any minor changes occur. Once the scope is agreed herein, any further changes to scope or major deviation from the proposed timeframes will be the subject of the change control procedures. Cloud Services for Off-site Resilience Page 3 of 11
4 2 Project Plan 2.1 Project Approach 1) Identify IaaS and SaaS partners a. Amazon b. Microsoft c. HEAnet d. Others 2) Identify key services and infrastructure which are required to ensure continuity of offsite services 3) Identify potential hosting partners and locations. a. Investigate possible stretched/virtual networks as well as stretched storage solutions. Cloud Services for Off-site Resilience Page 4 of 11
5 2.2 Milestones & Deliverables The following milestones, deliverables and target delivery dates have been defined for the project: Milestone Deliverable Responsibility Reviewers/ Approvers 0 Project Initiation completed Project Initiation Document completed Reviewers: Anthony Grenham Tom Cannon John Curran Due Date 2/12/ Identify Objectives Statement of Requirements Approvers: David Coughlan Shaun Kennedy 2 Agree Project Scope Agree Scope The individual(s) listed in the Responsibility column above are responsible for the relevant deliverables. Typically each deliverable will have one or many reviewer and a final approval by one or more individuals. Acceptance and sign-off of a deliverable is required by the Approval person. 2.3 Project Plan Insert the initial, albeit high-level, Project Plan. This can be completed using Excel or MS Project and imported into this document or can be merely a simple timeline to show proposed key milestones.project Structure The project comprises a Project Team and a Steering Group. The Steering Group will agree project schedules, approve major deliverables and resolve any critical issues that arise during the lifetime of the project. The Project Team will manage the project on a daily basis and will report regularly to the Steering Group. Cloud Services for Off-site Resilience Page 5 of 11
6 2.4 Roles & Responsibilities Define the responsibilities for each group and role within the project. The following are some sample responsibilities for common project groups and roles. Role Responsibilities Names Steering Group Ensure that the project direction is appropriate to the achievement of the ultimate objectives Review progress reports from the Project Manager and determine actions needed to address deviations Provide guidance to the Project Team on high level principles to be complied with Review and approve deliverables Monitor and proactively manage risks as they arise. David Coughlan Shaun Kennedy Anthony Grenham Tom Cannon John Curran Project Sponsor Ensure that resources are provided as required for the project Shaun Kennedy David Coughlan Take action on any issues escalated by the Project Team Project Manager Prepare the Project Plans Determine resource requirements and ensure that appropriate resources are allocated Manage the project to ensure that the desired results are achieved within agreed time-scales Monitor progress and report on a regular basis to the Steering Committee Prepare project deliverables and their presentation for approval Project Team Conduct the tasks and activities of the project in accordance with the Project Plan Prepare the project deliverables by the agreed due dates Report progress to the Project Manager Richard O Donovan Alan Ducey Anthony Grenham Tom Cannon John Curran Cloud Services for Off-site Resilience Page 6 of 11
7 2.5 Project Team Meetings The following are the scheduled project governance meetings: Team Attendees Frequency Steering Group Project Team As above As Above Monthly Fortnightly Cloud Services for Off-site Resilience Page 7 of 11
8 3 Risks & Issues 3.1 Initial Risk & Issue Log The following project risks or issues have been identified on commencement of the project. These initial tasks to address these risks or issues are outlined. Risk / Issue Probability H M L Impact H M L Actions to Mitigate Responsibility Loss of key personnel H H David Coughlan 3.2 Ongoing Management of Risks and Issues Any additional risks and issues identified will be maintained on an ongoing basis by the Project Manager in separate Risks and Issues logs. Cloud Services for Off-site Resilience Page 8 of 11
9 4 Communication Plan Identify the key stakeholders in the project and the plans for interaction and communication with each. Stakeholders are individuals and groups who will be capable of influencing the success of a project, directly impacted by the project as users or customers or involved in approving or implementing project deliverables. The following table highlights the communication and interaction activities planned for each stakeholder group: Stakeholder Actions Responsibility Customer Services IT Services Notification of any changes to services Notification of any changes to services IT Admin Any contractual changes IT Services Exec Mgmt Team Approval to implement any recommended solutions David Coughlan Cloud Services for Off-site Resilience Page 9 of 11
10 5 Project Costs 5.1 Initial Project Budget There are no project costs for the investigation phase and any proposed solutions will require procurement effort and approval 5.2 Ongoing Costs These will be dependant on the proposed solution. Cloud Services for Off-site Resilience Page 10 of 11
11 Related Documentation It is often useful to list any related documentation here, such as supporting documentation provided by the business/customer. Cloud Services for Off-site Resilience Page 11 of 11
UCD IT Services. Research Data. Project Initiation Document. Version 1.0 03 rd December 2014. Version History
UCD IT Services Research Data Project Initiation Document Version 1.0 03 rd December 2014 Version History Version Date Summary of Changes Changed by 1.0 03/12/2014 Initial Document 1.1 09/12/2014 Minor
More informationUCD IT Services. IT13 - Wireless Expansion. Project Initiation Document. Version 1.0 02 December 2014. Version History
UCD IT Services IT13 - Wireless Expansion Project Initiation Document Version 1.0 02 December 2014 Version History Version Date Summary of Changes Changed by 1.0 02/12/2014 Initial Draft Anthony Grenham
More informationIt0x Enhanced data storage services Sharepoint Teamsites
UCD IT Services It0x Enhanced data storage services Sharepoint Teamsites Project Initiation Document Version 1.0 2, December 2014 Version History Version Date Summary of Changes Changed by 1 2/12/2014
More informationIT1T Integrated Recruitment Systems 2015
UCD IT Services IT1T Integrated Recruitment Systems 2015 Project Initiation Document Version 1.0 2 December 2014 Version History Version Date Summary of Changes Changed by 1.0 02/12/2014 Initial Draft
More informationUCD International UCD IT Services. IT12 - Device Security & Encryption Strategy. Project Initiation Document. Version 1.0 2 nd December 2014
UCD International UCD IT Services IT12 - Device Security & Encryption Strategy Project Initiation Document Version 1.0 2 nd December 2014 Version History Version Date Summary of Changes Changed by 1.0
More informationIT Services Website Redevelopment
UCD IT Services IT01 IT Services Website Redevelopment Project Initiation Document Version 1.0 1, December 2014 Version History Version Date Summary of Changes Changed by 1 1/12/2014 Brian Morrissey IT
More informationOE PROJECT CHARTER TEMPLATE
PROJECT : PREPARED BY: DATE (MM/DD/YYYY): Project Name Typically the Project Manager Project Charter Last Modified Date PROJECT CHARTER VERSION HISTORY VERSION DATE (MM/DD/YYYY) COMMENTS (DRAFT, SIGNED,
More informationTRANSITION PLAN TEMPLATE
TRANSITION PLAN TEMPLATE In this template, instructions are included in italics. When you have completed the template and no longer need the instructions, delete them. Provide a brief overview of the transition
More informationSubject Area 1 Project Initiation and Management
DRII/BCI Professional Practice Narrative: Establish the need for a Business Continuity Plan (BCP), including obtaining management support and organizing and managing the BCP project to completion. (This
More informationIBAPro Project Management Methodology
IBAPro Project Management Methodology A description of the IBApps Project Management Methodology and Implementation Process Version 2.2, June 2013 Contents 1. Project Management... 3 2. Phases... 3 2.1.
More informationLONDON CYCLE HIRE SCHEME AGREEMENT. Schedule 10 Contract Management and Reporting. Schedule 10 Contract Management and Reporting REDACTED VERSION
LONDON CYCLE HIRE SCHEME AGREEMENT Schedule 10 Contract Management and Reporting Transport for London - Version Final CCS0000151079 SCHEDULE 10 Contract Management and Reporting Procedure 1. Introduction
More informationProject Roles and Responsibilities
Project s and This template can be used to define roles and responsibilities Below is a few typical examples of the different types of roles involved in delivering a project and their respective responsibilities.
More informationPROJECT SCOPE STATEMENT
PROJECT SCOPE STATEMENT Note: Any work not explicitly included in the Project Scope Statement is implicitly excluded from the project. Project Name: Prepared by: BI - IT Governance Amy Winkel Date: 12/20/2010
More informationCrosswalk Between Current and New PMP Task Classifications
Crosswalk Between Current and New PMP Task Classifications Domain 01 Initiating the Project Conduct project selection methods (e.g., cost benefit analysis, selection criteria) through meetings with the
More informationLGS Project Management Methodology
Page: 32 LGS Project Management Methodoy The LGS project management methodoy is integral to our overall delivery methodoy. Based on inpro, one of the LGS inspiration series documents, our methodoy is compliant
More informationTemplate K Implementation Requirements Instructions for RFP Response RFP #
Template K Implementation Requirements Instructions for RFP Response Table of Contents 1.0 Project Management Approach... 3 1.1 Program and Project Management... 3 1.2 Change Management Plan... 3 1.3 Relationship
More informationPROJECT PLAN FOR. Project Name Here
PROJECT PLAN FOR Project Name Here Version # DatE Reviewed and Approved for submittal to Executive Sponsor , Project Manager Project Plan Approved for submittal to Executive Sponsor: , Project
More informationContract and Vendor Management Guide
Contents 1. Guidelines for managing contracts and vendors... 2 1.1. Purpose and scope... 2 1.2. Introduction... 2 2. Contract and Vendor Management 2.1. Levels of management/segmentation... 3 2.2. Supplier
More informationSCHEDULE 8 Generalist Project Services Framework 2015
SCHEDULE 8 Generalist Project Services Framework 2015 Nominal Insurer And Schedule 8 (Project Services Framework) Page: 1 of 6 Schedule 8 Generalist Project Services Framework Contents Overview... 3 1.
More informationPROJECT MANAGEMENT PLAN Outline VERSION 0.0 STATUS: OUTLINE DATE:
PROJECT MANAGEMENT PLAN Outline VERSION 0.0 STATUS: OUTLINE DATE: Project Name Project Management Plan Document Information Document Title Version Author Owner Project Management Plan Amendment History
More informationDIRECTORATE OF AUDIT, RISK AND ASSURANCE Internal Audit Service to the GLA REVIEW OF THE IT STRATEGY AND IMPLEMENTATION CONTROL FRAMEWORK
Appendix 1b DIRECTORATE OF AUDIT, RISK AND ASSURANCE Internal Audit Service to the GLA REVIEW OF THE IT STRATEGY AND IMPLEMENTATION CONTROL FRAMEWORK DISTRIBUTION LIST Audit Team Steve Hutton, Head of
More informationHow To Write A Project Management Plan
Enter Project Name Project Management Plan (PMP) Kickoff Month, Day, Year 1 Purpose The Project Management Plan (PMP) is a formal, approved document used to manage project execution. The PMP documents
More informationPeer Review Panel Report. Information Technology Services
Peer Review Panel Report Information Technology Services 21 st October 2008 Introduction As part of s commitment to quality assurance it is the policy of the Institute to review key academic and other
More informationICT Service Desk Creation
ICT Service Desk Creation Project Initiation Document Document: ICT Service desk Creation: PID Issue Date: 26 th November 2010 Version: 0.1 Draft Version Number: 1.0 Change Control Quality Assurance Document:
More informationTitle: DISASTER RECOVERY/ MAJOR OUTAGE COMMUNICATION PLAN
POLICY: This policy is intended to address organizational wide communication executed during a or major IS service outage. When a disaster occurs or when any critical system/infrastructure component is
More informationEllucian Implementation Methodology. Summary of Project Management and Solution Delivery Phases
Ellucian Implementation Methodology Summary of Project Management and Solution Delivery Phases Rev. 5/10/2013 Table of Contents Overview 3 Project Management Initiation 4 Planning 5 Execution 6 Monitor
More informationSpecialist Cloud Services Lot 4 Cloud Printing and Imaging Consultancy Services
Specialist Cloud Services Lot 4 Cloud Printing and Imaging Consultancy Services Page 1 1 Contents 1 Contents... 2 2 Transcend360 Introduction... 3 3 Service overview... 4 3.1 Service introduction... 4
More informationProject Implementation Process (PIP)
Vanderbilt University Medical Center Project Implementation Process (PIP).......... Project Implementation Process OVERVIEW...4 PROJECT PLANNING PHASE...5 PHASE PURPOSE... 5 TASK: TRANSITION FROM PEP TO
More informationTasmanian Cloud & Government use of public cloud services
Tasmanian Cloud - Networking Tasmania Pre- Tender Consultation Tasmanian Cloud & Government use of public cloud services Scoping and implementation discussion paper Department of Premier and Cabinet Office
More informationMapping and Geographic Information Systems Professional Services
Mapping and Geographic Information Systems Professional Services G-Cloud Services RM 1557 Service Definition Esri UK GCloud 5 Lot 4 Specialist Services Government Procurement Service Acknowledgement Esri
More informationProject Management Toolkit Version: 1.0 Last Updated: 23rd November- Formally agreed by the Transformation Programme Sub- Committee
Management Toolkit Version: 1.0 Last Updated: 23rd November- Formally agreed by the Transformation Programme Sub- Committee Page 1 2 Contents 1. Introduction... 3 1.1 Definition of a... 3 1.2 Why have
More informationVoice Over IP Network Solution Design, Testing, Integration and Implementation Program Overview
Voice Over IP Network Solution Design, Testing, Integration and Implementation Program Overview 1/1 Table of Contents 1. Introduction...3 2. Executive Summary...4 3. Program Definition...5 3.1. Program
More informationNational IT Project Management Methodology
NATIONAL INFORMATION TECHNOLOGY AUTHORITY - UGANDA National IT Project Management Methodology Project Reporting Support Guide Version 0.5 Project Reporting Support Guide version 0.5 Page 1 Document Version
More informationCONFIGURATION COMMITTEE. Terms of Reference
SWBTB (8/13) 166 (g) CONFIGURATION COMMITTEE Terms of Reference 1. CONSTITUTION 1.1 The Board hereby resolves to establish a Committee of the Board to be known as the Configuration Committee (The Committee).
More informationProject Management/Controls and their impact on Auditing and Accounting Issues. October 31, 2012
Project Management/Controls and their impact on Auditing and Accounting Issues October 31, 2012 Today s presenters Patrick Hagan National Managing Partner State and Local Government patrick.hagan@mcgladrey.com
More informationGuideline - Business Continuity Plan
Guideline - Business Continuity Plan 1. Introduction: The Business Continuity Plan is a component of the Risk and Business Management suite. This suite includes: Risk Management including risk registers
More informationProject Management Guidelines
Project Management Guidelines 1. INTRODUCTION. This Appendix (Project Management Guidelines) sets forth the detailed Project Management Guidelines. 2. PROJECT MANAGEMENT PLAN POLICY AND GUIDELINES OVERVIEW.
More informationIT Re procurement 2013 project governance
ICO IT Re procurement 2013 project governance A summary of the recommended project governance that will be required to deliver the IT re procurement project Bill Ritchie Version 1.0 26 Apr 2012 Contents
More informationIT Services Performance Report
UCD IT Services IT Services Performance Report January December 2013 Prepared by: UCD IT Services Date: January 2013 Seamus Shaw Chief Technology Officer Contents Background 1 Service Availability Measures
More informationProject Governance. New Corporations Unit (NewCo) PWC Structural Separation Program
New Corporations Unit (NewCo) Department of the Chief Minister Level 14, NT House, 22 Mitchell Street, Darwin PWC Structural Separation Program Project Governance January 2014 Table of Contents 1. Introduction...
More informationPosition Description. Enterprise Agreement: Budget Responsibility: Nil
Position Description Position Details Position Scope Title: Division: Project Manager Finance & Corporate Services Enterprise Agreement: Budget Responsibility: Department: Payroll Authority Level: Ambulance
More informationMNLARS Project Audit Checklist
Audit Checklist The following provides a detailed checklist to assist the audit team in reviewing the health of a project. Relevance (at this time) How relevant is this attribute to this project or audit?
More informationWestern Australian Auditor General s Report. Information Systems Audit Report
Western Australian Auditor General s Report Information Systems Audit Report Report 14: June 2014 VISION of the Office of the Auditor General Excellence in auditing for the benefit of Western Australians
More informationTransition and Transformation. Transitioning services with minimal risk
IBM Global TECHNOLOGY Servicess and Transformation ing services with minimal risk Summary To transition services is a complex process involving many issues. When outsourcing to IBM, you gain the benefit
More informationA Managed Storage Service on a Hybrid Cloud
A Managed Storage on a Hybrid Cloud Business Context Sustainability Improve procurement & contract management Embrace and optimise advances in technology Environmental improvement & carbon reduction Global
More informationINFRASTRUCTURE DISASTER RECOVERY IN LOCAL GOVERNMENT
INFRASTRUCTURE DISASTER RECOVERY IN LOCAL GOVERNMENT PROJECT MANAGEMENT MANUAL Infrastructure Disaster Recovery in Local Government DOCUMENT CHANGE CONTROL As we develop this manual it is important that
More informationensurcloud Service Level Agreement (SLA)
ensurcloud Service Level Agreement (SLA) Table of Contents ensurcloud Service Level Agreement 1. Overview... 3 1.1. Definitions and abbreviations... 3 2. Duties and Responsibilities... 5 2.1. Scope and
More informationSAP ERP Upgrade Checklist Project Preparation
A SAP ERP Upgrade Checklist Project Preparation Upgrade Project Phase Project Preparation Definition From the project perspective the project preparation phase includes: Learning about the new functionality
More informationTo provide a procedure and associated guidelines to facilitate the management of project dependencies.
Management DEPENDENCY MANAGEMENT Purpose To provide a procedure and associated guidelines to facilitate the management of project dependencies. Overview Dependencies in this Phase are defined as actions,
More informationUoD IT Job Description
UoD IT Job Description Role: Projects Portfolio Manager HERA Grade: 8 Responsible to: Director of IT Accountable for: Day to day leadership of team members and assigned workload Key Relationships: Management
More informationIT Project Management Methodology. Project Execution Support Guide. Version 0.3
NATIONAL INFORMATION TECHNOLOGY AUTHORITY - UGANDA IT Project Management Methodology Project Execution Support Guide Version 0.3 Table of Contents 1 INTRODUCTION... 4 1.1 When should Project Execution
More informationInvolve Cloud Video Conferencing Service. VC:me (Video Conferencing: made easy) Service Definition
Involve Cloud Video Conferencing Service VC:me (Video Conferencing: made easy) Service Definition Contents 1. Service Overview... 3 Reservations Service... 4 Endpoint Management... 4 Reporting... 4 Testing...
More informationJoint Audit Report for South Lakeland District Council. & Eden District Council
Joint Audit Report for South Lakeland District Council & Eden District Council Audit of IT Data Backup and Recovery Arrangements Audit of Development Management 22nd May 2015 11 th June 2015 0 Page 0 Audit
More informationService description RFL Virtual Data Centre
Service description RFL Virtual Data Centre IaaS G-Cloud 6 1 Contents Overview... 3 Highlights... 3 Description... 3 Use cases... 3 Use cases... 5 Use cases... 5 Pricing... 5 Information assurance... 5
More informationData Center Consolidation: Lessons From The Field. John Tsiofas, Kraft Kennedy David Carlson, Kraft Kennedy
Data Center Consolidation: Lessons From The Field John Tsiofas, Kraft Kennedy David Carlson, Kraft Kennedy Agenda Factors to consider Technology strategy Building a project team How to use vendors wisely
More informationOperations. Group Standard. Business Operations process forms the core of all our business activities
Standard Operations Business Operations process forms the core of all our business activities SMS-GS-O1 Operations December 2014 v1.1 Serco Public Document Details Document Details erence SMS GS-O1: Operations
More informationITSM Tools Operation Continuity Plan Example
ITSM Tools Operation Continuity Plan Example 1 Table of Contents 2 Introduction... 2 3 Invocation... 2 4 Scope... 2 5 Data Dependencies and Considerations... 3 6 Security and Access Considerations... 3
More informationOur consultancy team will provide guidance throughout the process helping you to produce the necessary documentation and raise staff awareness.
Service Definition Business Continuity Plan Overview of Service Sapphire provides a bespoke service, working with your organisation to develop a comprehensive Business Continuity Plan (BCP) designed to
More informationExample Statement of Work
Example Statement of Work Scope of Work A project manager from will implement the fixed asset accounting product suite at. The implementation involves installing the system, configuring the database to
More informationOneSource Finance Project Board. Finance Project Proposal & Business Case
UNIVERSITY OF ABERDEEN OneSource Finance Project Board Finance Project Proposal & Business Case 1. SUMMARY This paper provides information on the proposed implementation of the Finance module of Unit 4
More informationCloud Brokerage. G-Cloud Service. Arcus Global 2014 1
Cloud Brokerage G-Cloud Service 1 An overview of the G-Cloud Service Information assurance Backup/restore and disaster recovery On-boarding and Off-boarding processes/scope etc. Pricing Service management
More informationProfessional Practice Six - Business Continuity Plan Development and Implementation
Professional Practice Six - Business Continuity Plan Development and Implementation The Business Continuity Plan is a set of documented processes and procedures which will enable the entity to continue
More informationProgramme Governance and Management Plan Version 2
PROCESS FOR CHANGE - Detailed Design Programme Governance and Management Plan Version 2 1 INTRODUCTION In October 2008, the Council approved the selection of seven opportunity themes to take forward from
More informationPolicy on Business Continuity
Status: Approved Custodian: Executive Office Date approved: 2013-12-04 Implementation date: 2013-12-05 Decision number: SAQA 07102/13 Due for review: 2016-12-03 File Number: Table of contents 1 Preamble...
More informationJOB DESCRIPTION CONTRACTUAL POSITION
Ref #: IT/P /01 JOB DESCRIPTION CONTRACTUAL POSITION JOB TITLE: INFORMATION AND COMMUNICATIONS TECHNOLOGY (ICT) SECURITY SPECIALIST JOB SUMMARY: The incumbent is required to provide specialized technical
More informationProject Start Up. Start-Up Check List. Why a Project Check List? What is a Project Check List? Initial Release 1.0 Date: January 1997
Why a Project Check List? A good way to ensure that all start-up tasks are completed prior to actually starting the project is to develop a start-up check list. The check list can be developed and then
More informationService Management and ICT Monitoring and Reporting Advisory and Implementation Services
Service Management and ICT Monitoring and Reporting Advisory and Implementation Services G-Cloud Service 1 1. An overview of the G-Cloud Service Arcus can assist you with a review and advice on the effectiveness
More informationProject Management Quick Reference Guide for MS Project 2010
Project Management Quick Reference Guide for MS Project 2010 Project 2010 offers flexibility and choice by providing tailored work management solutions for individuals, teams, and the enterprise. Besides
More informationPROJECT MANAGEMENT FRAMEWORK
PROJECT MANAGEMENT FRAMEWORK DOCUMENT INFORMATION DOCUMENT TYPE: DOCUMENT STATUS: POLICY OWNER POSITION: INTERNAL COMMITTEE ENDORSEMENT: APPROVED BY: Strategic document Approved Executive Assistant to
More informationBalancing and Settlement Code BSC PROCEDURE BSCP537. QUALIFICATION PROCESS FOR SVA PARTIES, SVA PARTY AGENTS AND CVA MOAs
Balancing and Settlement Code BSC PROCEDURE BSCP537 QUALIFICATION PROCESS FOR SVA PARTIES, SVA PARTY AGENTS AND CVA MOAs APPENDIX 3 GUIDANCE NOTES ON COMPLETING THE SAD Version 2.0 Date: 10 September 2007
More informationA director s guide How to prepare an RFI for an HR & payroll software system
A director s guide How to prepare an RFI for an HR & payroll software system consulting software solutions www.access-select.co.uk Selecting a new HR & payroll system is a big decision, one requiring significant
More informationSCHEDULE 10. Contract Management and Reporting. the Management Information and reporting requirements,
SCHEDULE 10 Contract Management and Reporting 1. Scope 1.1 This schedule sets out: contract management procedures; and the Management Information and reporting requirements, with which the Service Provider
More informationSCHEDULE 3. Milestones and Deliverables. Redacted Version
SCHEDULE 3 Milestones and Deliverables Redacted Version This Schedule 3 sets out the Service Provider s obligations in respect of the milestones and deliverables relating to the implementation and operation
More informationProject Management Frequently Asked Questions:
Project Management Frequently Asked Questions: Risk Management Version:1.4, November 2008 Inter Agency Policy and Projects Unit Department of Premier and Cabinet What are the benefits of risk management?
More informationCloud Based Email and Collaboration Project Charter
Cloud Based Email and Collaboration Project Charter Business Case Analysis Phase Version 0.9.5 May 23, 2012 Prepared by: Carol Gravatt Project Directors: Bob Micielli, DNR Dave Kirk, OCIO Document Revision
More informationDIRECTIVE NUMBER: 141.03.04.001 v2.0. SUBJECT: Correctional Integration Systems Change Management Plan
DEPARTMENT OF CORRECTION SUPPORT Management Services DIRECTIVE NUMBER: SUBJECT: Correctional Integration Systems Change PAGE NUMBER: 1 of 10 Adopted: 12-15-03 01.00.00. POLICY OF THE DEPARTMENT It is the
More informationICT SERVICE LEVEL AGREEMENT MANAGEMENT POLICY (EXTERNAL SERVICE PROVIDERS/VENDORS)
ICT SERVICE LEVEL AGREEMENT MANAGEMENT POLICY (EXTERNAL SERVICE PROVIDERS/VENDORS) TABLE OF CONTENTS 1. INTRODUCTION... 3 2. LEGISLATIVE FRAMEWORK... 3 3. OBJECTIVE OF THE POLICY... 4 4. AIMS OF THE POLICY...
More informationRFP: CTC-2013-BMB-01 Digital Asset Management (DAM) and/or Brand Web-to-Print Template Software-as-a-Service (SaaS) System
RFP: CTC-2013-BMB-01 Digital Asset Management (DAM) and/or Brand Web-to-Print Template Software-as-a-Service (SaaS) System Amendment No. 2 Questions and Answers Question 6 Having reviewed initial answers
More informationSpecialist Cloud Services Lot 4 Cloud EDRM Consultancy Services
Specialist Cloud Services Lot 4 Cloud EDRM Consultancy Services Page 1 1 Contents 1 Contents... 2 2 Transcend360 Introduction... 3 3 Service overview... 4 3.1 Service introduction... 4 3.2 Service description...
More informationCASE STUDY 6 SECTOR: NHS DELIVERABLE: NEW MULTIFUNCTION SERVICE DESK THE CLIENT:
CASE STUDY 6 SECTOR: NHS DELIVERABLE: NEW MULTIFUNCTION SERVICE DESK THE CLIENT: The Queen Elizabeth Hospital King s Lynn NHS Foundation Trust (QEH) is a 514 bed general hospital providing services to
More informationOrganization. Project Name. Project Overview Plan Version # Date
Project Overview Plan Template Organization Project Name Project Overview Plan Version # Date REVISION HISTORY VERSION # REVISION DATE COMMENT 1 APPROVALS: Authorized Signature DATE 2 Table of Contents
More informationCOMMUNICATIONS MANAGEMENT PLAN <PROJECT NAME>
COMMUNICATIONS MANAGEMENT PLAN TEMPLATE This Project Communications Management Template is free for you to copy and use on your project and within your organization. We hope that you find this template
More informationTechnical Project Manager JOB DESCRIPTION
JOB TITLE: BUSINESS UNIT: REPORTS TO: Technical Project Manager ICT Manager, ICT EA GRADE: Non-EA Position DATE APPROVED: 17/12/2015 JOB SPECIFICATION SUMMARY OF THE BROAD PURPOSE OF THE JOB The Technical
More informationMaturity Model. March 2006. Version 1.0. P2MM Version 1.0 The OGC logo is a Registered Trade Mark of the Office of Government Commerce
Maturity Model March 2006 Version 1.0 P2MM Version 1.0 The OGC logo is a Registered Trade Mark of the Office of Government Commerce This is a Value Added product which is outside the scope of the HMSO
More informationDPC - Strategy and Project Delivery Unit Project Management Methodology. Updated April 2010
DPC - Strategy and Project Delivery Unit Project Management Methodology Updated April 2010 This project management methodology is designed to help SPDU staff to plan, manage and measure a successful project
More informationClient Communication Portal Project
Client Communication Portal Project In 2014 Sunnyfield was awarded a grant by the Organisation Transition Fund to develop a Client Communication Portal. The aim of the project was to enhance person centred
More informationTelstra Service Management Framework. Your assurance of first-class network support
Telstra Service Framework Your assurance of first-class network support The Service Framework delivers comprehensive, integrated support Service Frame work SERVICE IMPROVEMENT & REPORTING Performance &
More informationContents. Project Management: August 2005 Page 2 Clinical Research Operational Standards for Professional Practice for Professional Practice
Project Management: August 2005 Contents Introduction........................................................... 4 About this standard: what is the importance of project management?................. 4
More informationDisaster Recovery Policy
Disaster Recovery Policy INTRODUCTION This policy provides a framework for the ongoing process of planning, developing and implementing disaster recovery management for IT Services at UCD. A disaster is
More informationAPPLYING PROJECT MANAGEMENT TECHNIQUES TO QEHS
APPLYING PROJECT MANAGEMENT TECHNIQUES TO QEHS Mary F. McDonald, CQA President/Principal Consultant Individual Solution Options/Quality Services (ISO/QS), Inc. Austin, TX 78739 Tel: (512) 282-0181 E-mail:
More informationAdvisory Council member responsibilities include:
GOVERNANCE AND OVERSIGHT OF THE KUALI PROJECT: The following provides a chart of the Governance and Oversight Structure for the Kuali Project. In addition to the below, is a Functional Council that includes
More informationGovernment of Trinidad and Tobago JOB DESCRIPTION CONTRACTUAL POSITION
Ref #: Government of Trinidad and Tobago JOB DESCRIPTION CONTRACTUAL POSITION JOB TITLE: PROGRAMME MANAGER JOB SUMMARY: The incumbent is required to manage and coordinate a programme comprising multiple
More informationXerox Print Monitoring Service (XPMS)
Xerox Print Monitoring Service (XPMS) Service Description G-Cloud : Lot 3 : Software as a Service (SaaS) April 2014 Version 1.0 2014 Xerox Corporation. All rights reserved. Xerox and Xerox and Design are
More informationGCloud 7 Hybrid Cloud Management Service- Service Description Issue 1
Overview of the Hybrid Cloud Management Ideal recognise that enterprises wishing to leverage hybrid (private and public) cloud infrastructure face a number of key technical and organisational challenges:
More informationInForm On Demand Single Trial Services Description
InForm On Demand Single Trial Services Description Version 7.0 Effective Date: 0 25-Sep-2014 This is the Services Description for Oracle InForm On Demand Single Trial ( Schedule ) to Your Study Order for
More informationTechnology Resilience and Failover policy
Technology Resilience and Failover policy Status: Approved Contents 1 Introduction... 4 2 Technology Resilience and Failover policy... 6 2.1 Policy scope... 6 2.2 Policy statements... 6 2.3 Exception management...
More informationLMI Aerospace PROJECT MANAGEMENT PLAN ACCESS REQUEST PROCESS IMPROVEMENT FEBRUARY 7, 2012
PROJECT MANAGEMENT PLAN ACCESS REQUEST PROCESS IMPROVEMENT FEBRUARY 7, 2012 TABLE OF CONTENTS INTRODUCTION... 2 PROJECT MANAGEMENT APPROACH... 2 PROJECT SCOPE... 2 MILESTONE LIST... 2 SCHEDULE BASELINE
More informationProgram Lifecycle Methodology Version 1.7
Version 1.7 March 30, 2011 REVISION HISTORY VERSION NO. DATE DESCRIPTION AUTHOR 1.0 Initial Draft Hkelley 1.2 10/22/08 Updated with feedback Hkelley 1.3 1/7/2009 Copy edited Kevans 1.4 4/22/2010 Updated