2 Session Objectives Review basics management Discuss obstacles to effective management Share practices that work for you Empower you to try some new practices 2
3 Background: What is management? Who, what, when, why for s A defined sponsored scope A roadmap for deliverables Documented roles responsibilities A common language for communication relative to phases, tracking reporting Processes to enable communication, accomplish work, facilitate issue resolution risk mitigation Project Project management management processes processes tools tools help help manager manager team team to to organize, organize, document, document, track track report report on on tasks tasks progress. progress. 3
4 Background: Why management for IS&T? More s are spanning Institute More s are requiring client involvement Resources are constrained Combination se factors makes control management various initiatives more difficult than in past A consistent approach to manage scope, resources, time cost enables management effectiveness Project Project Management Management is is a a way way doing doing business business for for all all team team members members Provide Provide managers managers easy-to-use easy-to-use checklists checklists templates templates that that target target fundamental fundamental concepts concepts management management Utilization Utilization tools tools will will increase increase probability probability success success Provide Provide all all team team members members stakeholders stakeholders with with a a road road map map,, defined defined roles roles expectations expectations 4
5 Project Framework Initiate Prepare Execute & Control Close Track Track & & Control Control Scope Management Startup Startup Definition Definition / / Scope Scope / / Requirements Requirements Planning Planning Resource Resource Allocation Allocation Workplan Management Resource Management (Time, Cost, People) Deliverable Mgmt Quality Management Transition Plan Int/Ext Vendor Management Reporting Reporting Completion Completion & & Assessment Assessment Review Review Risk & Issue Management Sponsor Management Communication Management 5
6 Basic Project Management: Five Steps The following steps comprise management roadmap. The steps may overlap be iterative: 1. Startup 2. Define Confirm Scope/Requirements 3. Develop Plan Secure Resources 4. Track, Control, Report Review 5. Completion Assessment Communication, Risk Risk Issue Issue Management, Sponsor Management are are essential throughout both both planned spontaneous. 6
7 Step 1: Startup As you engage potential team members stakeholders, initiation activities establish scope, goals preliminary plan. Key Activities Document /or confirm scope assumptions Confirm sponsorship funding Draft high level plan Identify who needs to provide input into plan resources Checklists to consider Project Startup Sponsor Templates to consider Project Scope, Gantt Chart Resource Planning Project role descriptions Identify Identify engage engage IS&T IS&T groups groups that that you you will will need need to to provide provide services services for for your your.. 7
8 Step 2: Confirm Scope Define Requirements Engage your sponsor business stakeholders to confirm scope clarify business requirements. It is also time to identify technical requirements with appropriate IS&T providers (as necessary). Key Activities Confirm baseline scope with Sponsor Define, document confirm business technical requirements Identify impact on business processes Identify what s not in scope Checklists to consider Sponsor Templates to consider Project Scope The The baseline baseline scope scope is is needed needed to to kickf kickf refinements refinements can can be be made made later later as as necessary. necessary. 8
9 Step 3: Develop Plan Secure Resources The initial detailed plan will provide a roadmap baseline for all team members stakeholders. As evolves, plan may need to refined. Key Activities Identify who needs to provide input into plan Develop preliminary detailed plan based on scope, requirements, etc. Identify skills sets needed to accomplish tasks Develop communication plan Identify secure resources The The kick-f kick-f meeting meeting should should be be a Conduct pre-kickf meeting with Sponsor collaborative collaborative effort effort with with your your sponsor. Conduct kick-f meeting sponsor. Conduct risk assessment with team members Identify criteria for stopping Update detailed plan get buy-in from team Sponsor 9
10 Step 3: Develop Plan Secure Resources (cont d) Checklists to consider Project Planning Deliverable Quality Assurance Transition Templates to consider Activity list Detailed plan Project Resource Plan Communication matrix Project Risk Assessment 10
11 Step 4: Track, Control, Reporting Review Once you kick f, track, control, reporting review activities will be iterative comprise bulk management tasks. Key Activities Implement communication plan Hold regular team meetings to: share progress/status identify/resolve issues Hold formal sponsor updates Keep your manager informed Keep stakeholders informed Monitor progress report status Monitor risks take action as necessary Identify manage issues Tracking Tracking will will give give you you Manage scope track changes information information necessary necessary to to Update plan as needed assess assess health health,, as as well well as as give give you you information information for for reporting reporting status status to to sponsors sponsors stakeholders. stakeholders. 11
12 Step 4: Track Control, Report Review (cont d) Checklists to Consider Sponsor Transition Templates to Consider Project scope change Communication matrix Project status snapshot Detailed Project Plan Risk Assessment Issue Log A quick quick review review sponsor sponsor checklist checklist may may help help you you prepare prepare for for your your sponsor sponsor stakeholder stakeholder update update meetings. meetings. 12
13 Step 5: Completion Assessment The following activities will help to ensure a smooth transition leverage lessons learned for future s. Key Activities Develop a cutover plan or checklist, if applicable Complete documentation, training, knowledge transfer Conduct final review Conduct sponsor sign-f Transition to support/service organization or next team Close-out final tasks issues Conduct lessons learned Celebrate success Accomplishing Accomplishing what what set set out out to to do do is is a success. success. 13
14 Step 5: Completion Assessment (cont d) Checklists to consider Transition Project Closeout Templates to consider Issue log Detailed plan Communications Matrix 14
15 Basics Project Management: Common Obstacles Common obstacles you may face include: Unclear scope business need Uncommitted sponsor Uncommitted resources Or? 15
16 Basics Project Management: What works for you? What have you found helpful? 16
17 Basics Project Management: Going Forward Establish goals that will enable you to build your management skills Start to incorporate steps into daily work Continue to grow skills (e.g., courses, computer-based training Reference websites Seek guidance from experienced managers through coaching, mentoring, user groups Provide feedback on IS&T management methodology (PMM) Share ideas to help grow management expertise within IS&T 17
5.2. 5.2 Template for IT Project Plan. Template for IT Project Plan. [Project Acronym and Name]
231 5.2 Template for IT Project Plan Name of the Tool: Source: Usage: Description: Template for IT Project Plan GIZ This template has been designed as a tool to support the planning of IT projects for
More informationSCOPE MANAGEMENT PLAN <PROJECT NAME>
SCOPE MANAGEMENT PLAN TEMPLATE This Project Scope Management Plan Template is free for you to copy and use on your project and within your organization. We hope that you find this template useful and welcome
More informationPMAP. Project Management At Penn PMAP
Project Management At Penn 1 Fundamentals Course Objective To provide you with an overview of Topics Project Management at Penn () Project Governance Phases & Project Management Activities Project Management
More informationOrganization. Project Name. Project Overview Plan Version # Date
Project Overview Plan Template Organization Project Name Project Overview Plan Version # Date REVISION HISTORY VERSION # REVISION DATE COMMENT 1 APPROVALS: Authorized Signature DATE 2 Table of Contents
More informationEssential Elements for Any Successful Project
In this chapter Learn what comprises a successful project Understand the common characteristics of troubled projects Review the common characteristics of successful projects Learn which tools are indispensable
More informationOFFICE OF THE CIO. PROCEDURE Informational VERSION: 1.0
OFFICE OF THE CIO PROCEDURE Informational VERSION: 1.0 Purpose Project Management of Major or Large NDUS Information Technology Projects Project Managers Guide/Checklist This procedural process will ensure
More informationProgram Lifecycle Methodology Version 1.7
Version 1.7 March 30, 2011 REVISION HISTORY VERSION NO. DATE DESCRIPTION AUTHOR 1.0 Initial Draft Hkelley 1.2 10/22/08 Updated with feedback Hkelley 1.3 1/7/2009 Copy edited Kevans 1.4 4/22/2010 Updated
More informationMNLARS Project Audit Checklist
Audit Checklist The following provides a detailed checklist to assist the audit team in reviewing the health of a project. Relevance (at this time) How relevant is this attribute to this project or audit?
More informationPROJECT MANAGEMENT PLAN CHECKLIST
PROJECT MANAGEMENT PLAN CHECKLIST The project management plan is a comprehensive document that defines each area of your project. The final document will contain all the required plans you need to manage,
More informationProject Management Framework
Information Services Project Management Framework October 2003 Document ID No. Page 1 of 1 Contents 1. Introduction Page 3 2. Use of Framework Page 3 3. Project Register and Monitoring Page 4 4. Project
More informationDriving Project Success Through Effective Stakeholder Management. Neeraj Shah, MBA,PMP, SAPM
Driving Project Success Through Effective Stakeholder Management Neeraj Shah, MBA,PMP, SAPM Objective Why do projects or change initiatives fail? Who is a stakeholder? Why are they so crucial? Challenges
More informationProject Management Change Management Procedure
Change Management Procedure Procedure # Description: Overview Outlines the steps for a Project Manager to manage change in an organization Objective To ensure that organizational change is managed in a
More informationProject Management Office Charter
Old Dominion University Office of Computing and Communication Services Project Management Office Charter Version: 1.0 Last Update: February 18, 2010 Created By: Anthony Fox, PMP OCCS Project Management
More informationITS Project Management Methodology
ITS Project Management Methodology Information Technology Services Project Management Group 11/17/2014 Version 2.1 Author: ITS Project Management Group Document Control Change Record Date Author Version
More informationDPC - Strategy and Project Delivery Unit Project Management Methodology. Updated April 2010
DPC - Strategy and Project Delivery Unit Project Management Methodology Updated April 2010 This project management methodology is designed to help SPDU staff to plan, manage and measure a successful project
More informationIncident Standard Service Request Information Request. IT Request. Minor/Low Impact Change to Existing Service. Capture and refine the idea
Incident Standard Service Request Information Request IT Request Idea Capture and refine the idea Determine the type of work Minor/Low Impact to Existing Service Mgmt. Work with customer, management to
More informationPROJECT MANAGEMENT PLAN TEMPLATE < PROJECT NAME >
PROJECT MANAGEMENT PLAN TEMPLATE < PROJECT NAME > Date of Issue: < date > Document Revision #: < version # > Project Manager: < name > Project Management Plan < Insert Project Name > Revision History Name
More informationOvercoming Common Challenges of Change Management
Speaker: Beena Patel Company: Halcon & Crane Management Consulting Website: Overcoming Common Challenges of Change Management HalconAndCrane.com Welcome to the PMI Houston Conference & Expo and Annual
More informationMajor Project Governance Assessment Toolkit
Major Project Governance Assessment Toolkit Mark Ritchie, University of Edinburgh Pauline Woods-Wilson, Lancaster University Project and Change Management Group Project and Change Management Group Established
More informationPMO Starter Kit. White Paper
PMO Starter Kit White Paper January 2011 TABLE OF CONTENTS 1. ABOUT THE PMO STARTER KIT...3 2. INTRODUCTION TO THE PMO STARTER KIT WHITE PAPER...3 3. PMO DEVELOPMENT ROADMAP...4 4. PLAN PHASE...5 4.1 CREATE
More informationAt the end of this chapter. Project Charter. What is a Project Charter? What is a Project Charter? Why is a Project Charter used?
At the end of this chapter Project Charter Describe what a project charter is and why it is critical to project success. Explain what a project scope statement is and why it is important. List the various
More informationConcept of Operations for Line of Business Initiatives
Concept of Operations for Line of Business Initiatives Version 1.0 Office of E-Gov and IT, OMB March 2006 Table of Contents FOREWORD...2 1 OBJECTIVES OF THE LINES OF BUSINESS CONCEPT OF OPERATIONS...3
More informationITIL Implementation Planning
White Paper ITIL Implementation Planning Overview Introduction This paper describes the items that need to be considered in advance of starting an ITIL implementation effort. It is critical to make sure
More informationGartner, Inc. DIR-SDD-2042
Texas Department of Information Resources STATEMENT OF WORK (SOW) FOR DELIVERABLES-BASED INFORMATION TECHNOLOGY SERVICES Identity & Access Management Analysis IT Assessment & Planning Gartner, Inc. DIR-SDD-2042
More informationHuman Performance & the Role of Human Resources
DEFENSE LOGISTICS AGENCY AMERICA S COMBAT LOGISTICS SUPPORT AGENCY Human Performance & the Role of Human Resources Ms. Cheryl Steptoe-Simon July 20, 2016 Human Performance Functions Human Performance Components
More information44-76 mix 2. Exam Code:MB5-705. Exam Name: Managing Microsoft Dynamics Implementations Exam
44-76 mix 2 Number: MB5-705 Passing Score: 800 Time Limit: 120 min File Version: 22.5 http://www.gratisexam.com/ Exam Code:MB5-705 Exam Name: Managing Microsoft Dynamics Implementations Exam Exam A QUESTION
More informationPROJECT PLAN TEMPLATE
Treasury Board of Canada Secretariat Secrétariat du Conseil du Trésor du Canada Enhanced Management Framework for Information Management/Information Technology PROJECT PLAN TEMPLATE Document Revision Draft
More informationThe Secret Mix of Successful GIS Project Management
2014 WAURISA Conference The Secret Mix of Successful GIS Project Management Presented By: Geoff Almvig, Skagit County GIS Don Burdick, Salish Coast Sciences, LLC What Is A Project? Definition: A project
More informationPROJECT MANAGEMENT PLAN Outline VERSION 0.0 STATUS: OUTLINE DATE:
PROJECT MANAGEMENT PLAN Outline VERSION 0.0 STATUS: OUTLINE DATE: Project Name Project Management Plan Document Information Document Title Version Author Owner Project Management Plan Amendment History
More informationQuality Assurance for SAP Implementations
Quality Assurance for SAP Implementations Combining the power of SAP Quality Assurance Services with the depth and breadth of experience and knowledge of the SAP corporate ecosystem to drive your end-to-end
More informationAppendix 3: Project Management Substation Guidelines (General Process Flow Template)
365 Appendix 3: Project Management Substation Guidelines (General Process Flow Template) Checkpoint Methodology The schedule is issued prior to the go decision. It covers the duration of the project. It
More informationA Practitioner s Guide to Using Change Management Throughout the Project Life Cycle. PMI-SAC November 24, 2014
A Practitioner s Guide to Using Change Management Throughout the Project Life Cycle PMI-SAC November 24, 2014 Setting Intent Session Agenda The Story The Great Experiment Forward Together Call to Action
More informationCentral Agency for Information Technology
Central Agency for Information Technology Development of a National IT Governance Framework Project Management Agenda 1 What is project management? Why it is important? 2 Leading practices 3 Project management
More informationProject Management. On-Site Training and Facilitation Services. www.performanceweb.org. For more information, visit
Project Management On-Site Training and Facilitation Services For more information, visit www.performanceweb.org Benefits of On-Site Training The Performance Institute s proven consulting methodology is
More informationSubject Area 1 Project Initiation and Management
DRII/BCI Professional Practice Narrative: Establish the need for a Business Continuity Plan (BCP), including obtaining management support and organizing and managing the BCP project to completion. (This
More informationProject Management Life Cycle (PMLC)
Project Management Life Cycle (PMLC) Page 2 Project Management Life Cycle (PMLC) Introduction PMLC Working Group IT Business Process Management(BPM) IT Project Management Office (PMO) Finance System Support
More informationIntroduction to Project Management
L E S S O N 1 Introduction to Project Management Suggested lesson time 50-60 minutes Lesson objectives To be able to identify the steps involved in project planning, you will: a b c Plan a project. You
More informationMinnesota Health Insurance Exchange (MNHIX)
Minnesota Health Insurance Exchange (MNHIX) 1.2 Plan September 21st, 2012 Version: FINAL v.1.0 11/9/2012 2:58 PM Page 1 of 87 T A B L E O F C O N T E N T S 1 Introduction to the Plan... 12 2 Integration
More informationTemplate K Implementation Requirements Instructions for RFP Response RFP #
Template K Implementation Requirements Instructions for RFP Response Table of Contents 1.0 Project Management Approach... 3 1.1 Program and Project Management... 3 1.2 Change Management Plan... 3 1.3 Relationship
More information<name of project> Software Project Management Plan
The document in this file is adapted from the IEEE standards for Software Project Management Plans, 1058-1998, which conforms to the requirements of ISO standard 12207 Software Life Cycle Processes. Tailor
More informationITS Project Management Methodology
ITS Project Management Methodology Standards and Guidelines for managing projects at Information Technology Services, NYU July, 2008 Version 1.4 TABLE OF CONTENTS 1 INTRODUCTION.3 1.1 Overview..3 1.2 Purpose....3
More informationEMR Implementation Planning Guide
EMR Implementation Planning Guide A Ten-Step Guide to Planning for Successful Implementation of an Electronic Medical Record (EMR) System 1 Contents Purpose of this guide... 3 Step 1: Establishing the
More informationTRANSITION PLAN TEMPLATE
TRANSITION PLAN TEMPLATE In this template, instructions are included in italics. When you have completed the template and no longer need the instructions, delete them. Provide a brief overview of the transition
More informationAGILE - QUICK GUIDE AGILE - PRIMER
AGILE - QUICK GUIDE http://www.tutorialspoint.com/agile/agile_quick_guide.htm Copyright tutorialspoint.com AGILE - PRIMER Agile is a software development methodology to build a software incrementally using
More informationWriting a Development Plan A GUIDE FOR EMPLOYEES
Writing a Development Plan A GUIDE FOR EMPLOYEES Development Planning Career development and development planning are employee-directed activities. Employees are responsible for creating and implementing
More informationOE PROJECT CHARTER TEMPLATE
PROJECT : PREPARED BY: DATE (MM/DD/YYYY): Project Name Typically the Project Manager Project Charter Last Modified Date PROJECT CHARTER VERSION HISTORY VERSION DATE (MM/DD/YYYY) COMMENTS (DRAFT, SIGNED,
More informationSound Transit Internal Audit Report - No. 2014-3
Sound Transit Internal Audit Report - No. 2014-3 IT Project Management Report Date: Dec. 26, 2014 Table of Contents Page Background 2 Audit Approach and Methodology 2 Summary of Results 4 Findings & Management
More informationComputing Services Network Project Methodology
Computing Services Network Project Prepared By: Todd Brindley, CSN Project Version # 1.0 Updated on 09/15/2008 Version 1.0 Page 1 MANAGEMENT PLANNING Project : Version Control Version Date Author Change
More informationInformation Technology Services Project Management Office Operations Guide
Information Technology Services Project Management Office Operations Guide Revised 3/31/2015 Table of Contents ABOUT US... 4 WORKFLOW... 5 PROJECT LIFECYCLE... 6 PROJECT INITIATION... 6 PROJECT PLANNING...
More informationState of California. Contents. California Project Management Office Project Management Framework. Project Management. Framework.
Contents State of California Project Management Framework Page i Contents Overview 1 Introduction 3 8 15 Overview of the CA-PMF Document Structure and Convention Guide Discussion of Lifecycles Templates
More informationHow To Implement An Enterprise Resource Planning Program
ERP Implementation Program Key phases of ERP implementation: Analysis of the company existing or designing new business process descriptions Inventory of the company s existing formal workflows or designing
More informationEnhancing Law Enforcement Response to Victims:
Enhancing Law Enforcement Response to Victims: Strategy Implementation Checklist Enhancing Law Enforcement Response to Victims is a new professional standard developed by the International Association
More informationDepartment of Administration Portfolio Management System 1.3 June 30, 2010
E 06/ 30/ 2010 EX AM PL 1. 3 06/ 28/ 2010 06/ 24/ 2010 06/ 23/ 2010 06/ 15/ 2010 06/ 18/ 2010 Portfolio System 1.3 June 30, 2010 Contents Section 1. Project Overview... 1 1.1 Project Description... 1 1.2
More information1. Purpose and objectives
1. Purpose and objectives Identify and establish the driving force Long-term business goals Establish central deliveries of the implementation project Prioritize and plan with interim targets Delimitations
More informationBest Practices Statement Project Management. Best Practices for Managing State Information Technology Projects
State of Arkansas Office of Information Technology 124 W. Capitol Ave. Suite 990 Little Rock, AR 72201 501.682.4300 Voice 501.682.4020 Fax http://www.cio.arkansas.gov/techarch Best Practices Statement
More informationProject Management for the Professional Professional Part 4 - Stakeholder Analysis. Michael Bevis, JD CPPO, CPSM, PMP
Project Management for the Professional Professional Part 4 - Stakeholder Analysis Michael Bevis, JD CPPO, CPSM, PMP Topic 3 Common Project Stakeholders Who are Stakeholders and what is stakeholder management?
More informationProject organisation and establishing a programme management office
PROJECT ADVISORY Project organisation and establishing a programme office Leadership Series 1 kpmg.com/nz About the Leadership Series KPMG s Leadership Series is targeted towards owners of major capital
More informationProject Management for Everyone
Project Management for Everyone Contact Information Adam Donaldson, PMP Business Management & Analysis Group Phone: (202) 994-6867 Cell: (240) 472-2171 Email: adonald@gwu.edu Objectives Basic understanding
More informationUSFWC Project Management Workshop May 31 st, 2014
USFWC Project Management May 31 st, 2014 Project Management Basics Project Management Basics Project Definition Why do projects fail? Pain Curve Triple Constraint Principle Progressive Elaboration vs.
More informationFrequently Asked Questions in Project Management
Frequently Asked Questions in Project Management 1. Question: What is Project Management? Answer: Project Management is the collection and application of skills, knowledge, processes, and activities to
More information200Canada Bridges Page 1 07/11/2009. Project Management: Trainee Guide Module 1 INTRODUCTION
200Canada Bridges Page 1 07/11/2009 Project Management: Trainee Guide Module 1 INTRODUCTION Bridges Social Development Project Management Training Program www.canadabridges.com http://training.canadabridges.com/
More information2009 NASCIO Recognition Award Nomination State of Georgia
2009 NASCIO Recognition Award Nomination State of Georgia Nomination Category: IT Project and Portfolio Management Title of Nomination: IT Project Governance: Delivering on the Promise Nomination Submitted
More informationITRM Guideline CPM 110-01 Date: January 23, 2006 SECTION 4 - PROJECT EXECUTION AND CONTROL PHASE
PROJECT MANAGEMENT GUIDELINE SECTION 4 - PROJECT EXECUTION AND CONTROL PHASE Table of Contents Introduction... 3 Project Execution and Control Phase Overview... 3 Activities and Documents in the Execution
More informationFixed Scope Offering for Implementation of Sales Cloud & Sales Cloud Integration With GTS Property Extensions
Fixed Scope Offering for Implementation of Sales Cloud & Sales Cloud Integration With GTS Property Extensions Today s Business Challenges Adopt leading CRM practices and stream line processes Take advantage
More informationSystem Development Life Cycle Guide
TEXAS DEPARTMENT OF INFORMATION RESOURCES System Development Life Cycle Guide Version 1.1 30 MAY 2008 Version History This and other Framework Extension tools are available on Framework Web site. Release
More informationProject Aim 2020. Appendix C - Project Plan, Gap Analysis, and Approach
Appendix C - Project Plan, Gap Analysis, and Approach In the fall of 2013 and spring of 2014, the senior leadership meetings created awareness among the leaders about necessary improvements in planning,
More informationAppendix G: Organizational Change Management Plan. DRAFT (Pending approval) April 2007
Appendix G: Organizational Change Management Plan DRAFT (Pending approval) April 2007 Table of Contents TABLE OF CONTENTS... 1 INTRODUCTION:... 2 ABT ORGANIZATIONAL CHANGE MANAGEMENT SCOPE... 2 PEOPLESOFT
More informationTHE FUNDAMENTALS OF PROJECT MANAGEMENT
THE FUNDAMENTALS OF PROJECT MANAGEMENT Learning the Essential Elements for Effective Management at UW-Stout WHAT IS A PROJECT? 1. Improve the efficiency of a specific production line. 2. Organize the annual
More informationEnhancing Career Development Services
Enhancing Career Development Services Project Sponsor: Linda Deanna, AVCSA, Dean of Students Project Team Lead: Thy Nguyen Prepared by: Thy Nguyen Date: 5/26/2015 Content Purpose Scope Project Deliverables
More informationAIPM PROFESSIONAL COMPETENCY STANDARDS FOR PROJECT MANAGEMENT PART B CERTIFIED PRACTISING PROJECT PRACTITIONER (CPPP)
AIPM PROFESSIONAL COMPETENCY STANDARDS FOR PROJECT MANAGEMENT PART B CERTIFIED PRACTISING PROJECT PRACTITIONER (CPPP) Copyright: Australian Institute of Project Management Document Information Document
More informationProject Manager Job Descriptions
Promotion Criteria Position Overview Statement Principal Duties and Responsibilities PROJECT MANAGER Admin Level 4 Typically >8 years in increasing responsible IT leadership role; typically managed one
More informationInternal Audit Checklist
Internal Audit Checklist 4.2 Policy Verify required elements Verify management commitment Verify available to the public Verify implementation by tracing links back to policy statement Check review/revisions
More informationat various levels tacit knowledge areas groups, offering individual sponsorship, special interest groups, and career development support
To harness ongoing support for your mentoring program, measuring success is key. Conducting a top-down goal analysis should include organizational objectives, key performance indicators (KPIs), targets,
More informationFacility Services PROJECT MANAGEMENT METHODOLOGY FRAMEWORK
Facility Services PROJECT MANAGEMENT METHODOLOGY FRAMEWORK Facility Services Project Management Methodology Framework 1 - Executive Summary The purpose of this document is to introduce the University community
More informationTalent Dashboard: A Tool to Support Talent Conversations
Talent Dashboard: A Tool to Support Talent Conversations CCL has developed a talent tool designed to simplify talent conversations and to support a leader/manager s ability to coach, guide, and mentor
More informationIdentification. Preparation and formulation. Evaluation. Review and approval. Implementation. A. Phase 1: Project identification
II. Figure 5: 6 The project cycle can be explained in terms of five phases: identification, preparation and formulation, review and approval, implementation, and evaluation. Distinctions among these phases,
More informationCompany Overview. Financial Snapshot. Leading Global ERP Provider Global Midmarket Divisions / Subsidiaries of Global 1000
Today s Agenda!! $ " # # % & Epicor at a Glance Company Overview Global presence in over 50 countries Leading Global ERP Provider Global Midmarket Divisions / Subsidiaries of Global 1000 Founded in 1972.
More informationIT Service Provider and Consumer Support Engineer Position Description
Engineer Position Description February 9, 2015 Engineer Position Description February 9, 2015 Page i Table of Contents General Characteristics... 1 Career Path... 2 Explanation of Proficiency Level Definitions...
More informationEXECUTIVE SUMMARY...5
Table of Contents EXECUTIVE SUMMARY...5 CONTEXT...5 AUDIT OBJECTIVE...5 AUDIT SCOPE...5 AUDIT CONCLUSION...6 KEY OBSERVATIONS AND RECOMMENDATIONS...6 1. INTRODUCTION...9 1.1 BACKGROUND...9 1.2 OBJECTIVES...9
More informationRelease: 1. BSBPMG510A Manage projects
Release: 1 BSBPMG510A Manage projects BSBPMG510A Manage projects Modification History Not applicable. Unit Descriptor Unit descriptor This unit describes the performance outcomes, skills and knowledge
More informationNAVSEA Leadership Development Continuum
NAVSEA Leadership Development Continuum The Continuum allows employees to focus on leadership development through various stages of their careers, in preparation for future opportunities with the organization.
More informationEntity Information Management Strategic Review Service Definition. Overview of the service
Entity Information Management Strategic Review Service Definition Overview of the service The purpose of this service is to review all elements of an organisation s information management strategy and
More informationProcess Improvement Program Project Process
Process Improvement Program Project Process 1 P a g e 12/3/2014 The Process Improvement Program is part of the City of Fort Lauderdale s FL 2 STAT Approach to Exponential Improvement. Its objective is
More informationLocal Government Energy Efficiency Resources Guidebook 5: Project Management
Local Government Energy Efficiency Resources Guidebook 5: Project Management Prepared for: Los Angeles County ISD 1100 North Eastern Ave Los Angeles, CA 90063 Prepared by: The Energy Coalition 523 W. Sixth
More informationRisk, Risk Assessments and Risk Management. Christopher Bowler CPA, CISA August 10, 2015
+ Risk, Risk Assessments and Risk Management Christopher Bowler CPA, CISA August 10, 2015 + Agenda A Few Thoughts Fundamentals of Risk Assessments Fundamentals of Risk Management Assessments vs. Management
More information1.8 VoteCal Organizational Change Management Plan
1.8 VoteCal Organizational Change Management Plan VoteCal Statewide Voter Registration System Project State of California, Secretary of State (SOS) Page 1 Authors This document was prepared by: Don Westfall
More informationChapter 4: Planning Projects, Part I (Integration, Scope, Time, and Cost Management) Slide 1
Chapter 4: Planning Projects, Part I (Integration, Scope, Time, and Cost Management) Slide 1 Introduction to Project Management Learning Objectives Describe the importance of creating plans to guide project
More informationObjectives. Project Management Overview. Successful Project Fundamentals. Additional Training Resources
Project Management for Small Business Moderator: Maria Mancha Frontline Systems, Inc. Objectives Project Management Overview Successful Project Fundamentals Additional Training Resources Project Management
More informationWHY DO I NEED A PROGRAM MANAGEMENT OFFICE (AND HOW DO I GET ONE)?
WHY DO I NEED A PROGRAM MANAGEMENT OFFICE (AND HOW DO I GET ONE)? Due to the often complex and risky nature of projects, many organizations experience pressure for consistency in strategy, communication,
More informationA Practical Guide for Creating an Information Management Strategy and Strategic Information Management Roadmap
A Practical Guide for Creating an Information Management Strategy and Strategic Information Management Roadmap Principal Author Sam McCollum, CRM, MBA Director of End User Consulting Parity Research LLC
More informationProject Charter and Scope Statement
Prepared by: Mike Schmidt Version: 1.0 Last Revision Date: April 14, 2010 Create Date: May 6, 2010 EXECUTIVE SUMMARY... 3 1 INTRODUCTION... 4 2 PROJECT OBJECTIVES... 4 2.1 MISSION... 4 2.2 OBJECTIVES...
More informationCDC UNIFIED PROCESS PRACTICES GUIDE
Purpose The purpose of this document is to provide guidance on the practice called Project Close-Out and to describe the practice overview, requirements, best practices, activities, and key terms related
More informationProject Quality Review Form
(ee key Project Initiation and Planning 1. Project ponsor identified and named? 2. Project opened on Project Repository and communicated to project team? 3. Project Chartered (using Project Charter or
More informationPROJECT MANAGEMENT PLAN <PROJECT NAME>
PROJECT MANAGEMENT PLAN TEMPLATE This Project Management Plan Template is free for you to copy and use on your project and within your organization. We hope that you find this template useful and welcome
More informationPROJECT MANAGEMENT PLAN
PROJECT MANAGEMENT PLAN Template based on one from: www.projectmanagementdocs.com Contents 1 Introduction... 1 2 Logic Model... 2 2.1 Schedule Baseline and Work Breakdown
More informationFramework. 3/3/2011 By Karla Campbell Project Manager PMP Certificated UCOP
PROJECT MANAGEMENT Framework 3/3/2011 By Karla Campbell Project Manager PMP Certificated UCOP Topics 1. Benefits Of Project Management 2. Definitions 3. Roles 4. Project Process Groups 5. Best Practices
More information10 Critical Steps to Create a Project Plan
10 Critical Steps to Create a Project Plan Elizabeth Larson, PMP, CBAP and Richard Larson, PMP, CBAP Principals, Watermark Learning, Inc. Industry Article Watermark Learning 7300 Metro Blvd, Suite 207
More informationDo not open this paper until instructed by the invigilator. Please note: This question paper must not be removed from the examination room.
APM Introductory Certificate in Project Management Exam paper Candidate Reference Number Date of Exam Location of the Exam General Notes Time allowed 1 hour Answer all 60 multiple choice questions Use
More informationIT Standards & Contract Management
Appendix F IT Standards & Table of Contents Vision of Action... 2 Background... 3 Goals and Objectives... 4 Projects... 5 Metrics and Measures... 6 F IT Standards & Carol Steffanni Director, MDIT Bureau
More information