SECTION WATER TREATMENT

Size: px
Start display at page:

Download "SECTION WATER TREATMENT"

Transcription

1 SECTION WATER TREATMENT PART 1 - GENERAL 1.01 GENERAL The Bidding and Contract Requirements, Division 1 - General Requirements, Section General Provisions, and Section Basic Materials and Methods shall apply to this section SCOPE The work covered under this section shall include the furnishing of all labor, piping, valves, gauges, control panels, water meter wiring, chemicals and all other equipment required for a complete water treatment service as indicated on the drawings or herein specified QUALITY ASSURANCE The water treatment chemical equipment and service supplier shall be a recognized specialist, active in the field of industrial water treatment for the last ten years, whose major business is in the field of water treatment and shall have regional water analysis laboratories, development facilities and service department, plus full time service personnel located within the trading area of the job site SUBMITTALS Provide shop drawings on this equipment as described in Section PART 2 - PRODUCTS 2.01 WATER TREATMENT SYSTEM Provide, install and service a water treatment system for the water systems. The water treatment system shall be as manufactured by MOGUL CORPORATION. Other manufacturers fully equal to the specified manufacturer as manufactured by HYDAC, MORR, ARC, or AQUATOMIC are acceptable. A. Piping, valves, and accessories shall be furnished and installed as required by the water treatment manufacturer. B. Provide all chemicals required at system start-up and throughout the service period. Chemical formulations shall not exceed the allowable EPA or local effluent limits. C. The water treatment chemical and service supplier shall furnish basic water test equipment including carrying case and reagents for use with suppliers' products. This shall include apparatus for determination of ph, P and M alkalinity, treatment /13

2 residual, and conductivity. Where specialized or supplementary equipment is required, it shall be furnished as part of the contract. D. Condenser System Feeding and Control Equipment - Contractor shall install the following apparatus including all external piping and wiring for each condenser water system. 1. One MOGUL AUTO CHEM Model as manufactured by the MOGUL CORPORATION, for controlling Total Dissolved Solids (TDS), biological growth, inhibitor feed and chemical treatment in the cooling water system. Controller shall be U.L. Listed. Control panel shall be a single, NEMA 1 steel enclosure, primed and fully painted, and shall have the following basic features, fully pre-wired: a. Internal wiring harnessed, color-coded, clearly identified, and brought to master terminal board. b. Grounded AC receptacles for chemical treatment pump and utility use. c. Main power switch and indicating lamps, with legend plate, for power, bleed control, biocide pump, inhibitor pump and system flow. d. Line voltage safety switch - Interlock with door to shut off line voltage to control when adjustment or maintenance is required. e. Manual-Off-Auto selector switches and indicating lamps for bleed off control, chemical feed and acid feed, with legend plates. f. Manual-Off-Auto selector switch for inhibitor feed and a push button to simulate a water meter pulse in the makeup water supply line for test purposes. g. A selector switch for control of chemical feed from metered makeup. h. Conductivity controller accurate to 5% full scale with an analogindicating meter. i. Front panel fuses. j. Dual biocide feed program modules to automatically alternate between two biocides with a seven-day timer. k. A temperature compensated conductivity electrode and flow switch mounted on the side of the controller enclosure. l. Bleed lock-out timer to prevent bleed function after a biocide feed /13

3 Power and bleedoff status shall be displayed by indicating lights on the front panel. The controller shall be insensitive to phase angle shifts and be capable of operating with input line voltage of 95 to 130 volts AC without affecting accuracy. Conductivity level shall be recorded on an indicating meter. The chemical feed shall be controlled by a reset timer actuated by a make-up water meter with electric contractor. The chemical feed control module shall have a pump status indicating lamp, a Manual-Off-Auto switch and a 20 amp pump relay. 2. The chemical feed pumps shall be mounted in a NEMA 1 steel enclosure, primed and fully painted. They shall be pre-plumbed, pre-wired and include the following: a. Sample stream piping assembly, including a conductivity flotee, sample cock, check valve and three chemical injection tees. b. One Inhibitor feed pump, two biocide feed pumps of the positive displacement type, with ball type check valves, 120/1/60 fractional hp motor drive, discharge pressure relief valve, foot valve, suction tubing and discharge tubing. The feed rate shall be adjustable while the pump is running and the chemicals shall be pumped directly from the shipping container. Pump shall be U.L. Listed and shall be manufactured by PULSA FEEDER, LMI or CHEM-TECH. 3. One sample stream injection assembly. 4. One water meter, complete with electric contacting registers sized to meter the peak make-up rates. 5. One bleedoff solenoid and throttling valve, sized for bleed off requirements of the system. 6. One 50-gallon inhibitor tank and two 30-gallon biocide tanks. Tanks shall be polyethylene and shall include lids. Pump suction will be through the lid. Fittings in tanks are not allowed. E. Hot and Chilled Water Systems - Contractor shall install a One Shot Feeder for each system, minimum four quart capacity, designed to meet pressure requirements of the specific system /13

4 PART 3 - EXECUTION 3.01 INSTALLATION The water treatment system shall be installed as recommended by the manufacturer. A. Pre-Cleaning and Cleaning 1. Provide the chemicals used for the pre-cleaning and cleaning sequences listed in Section Chemicals shall be capable of removing deposits from construction, such as pipe dope, oils, most loose mill scale, and other extraneous materials. The products used shall inhibit corrosion of the various metals in the piping systems and shall be safe to handle and use. Effectiveness of the product shall be such that the water need only be at ambient temperatures. Add recommended dosages of products for corresponding system capacities. B. ph Balance and Treatment 1. Piping systems shall be drained and flushed until the total alkalinity of the rinse water is equal to the makeup water, as described in Section Refill with clean water, which shall be properly treated to prevent scale and corrosion during operation of the water systems (See paragraph 3.01.C). This contractor shall assist in performing the ph balance of the systems. C. Maintain the following conditions in each system: 1. Chilled 2. Hot a. ph 7.0 to 9.0 b. Buffered Nitrite 500 PPM a. ph 7.0 to 9.0 b. Buffered Nitrite 1000 PPM to 180 Deg. F 2000 PPM above 180 Deg. F 3. Condenser a. ph 7.0 to 8.0 b. Organic Inhibitor 15 to 25 PPM c. Cycles 7 Maximum d. Organic Growths None /13

5 3.02 SYSTEM SERVICE A. The water treatment service shall start after the initial cleaning, flushing, start-up and check out of the water systems and shall continue for a period of one year after the substantial completion date of the entire project. B. Prior to the substantial completion date and during the one year service period after this date, the water treatment contractor shall visit the site and thoroughly inspect the systems for proper operation, make necessary adjustments, test water and chemical conditions, and complete a written report on conditions. Service frequency shall be as a minimum as follows: 1. Chiller/cooling tower condensers - every two weeks 2. Closed loop hot and chilled water - once per month C. Prior to the substantial completion date and during the one year service period after this date, the water treatment contractor shall test water samples from cooling tower water for legionella pneumophila. Tests shall be made monthly when the cooling tower operates. The report shall give the result in bacteria per millimeter and include the result from the previous month. D. The water treatment contractor shall maintain complete records of the treatment program for each system and submit to the Owner three copies of each report distributed to: 1. System Site 2. Project Manager, Office of Design and Construction Services, 8115 Gatehouse Road Falls Church VA Coordinator, Mechanical Maintenance Division, Maintenance Services, 5025 Sideburn Road, Fairfax Virginia E. The initial fill of water treatment chemicals and water treatment service shall be witnessed and verified by the Owners representative. A signed service card must be obtained by the technician after each visit for service. END OF SECTION /13

D. Open hydronic systems, including [condenser] [fluid-cooler spray] water, shall have the following water qualities:

D. Open hydronic systems, including [condenser] [fluid-cooler spray] water, shall have the following water qualities: SECTION 232500 - PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following HVAC water-treatment systems: 1. Open Loop Chemical Treatment Systems. 2. Closed Loop Chemical Treatment Systems. 3.

More information

26 3213.13 Diesel Engine Driven Generators Page 1 of 6

26 3213.13 Diesel Engine Driven Generators Page 1 of 6 Last Update: December 8, 2014 A. Description of System Consultant s Handbook Page 1 of 6 1. Provide a diesel engine driven electric generating unit, factory assembled, tested and certified to operate at

More information

A Guide to Trouble-Free Cooling Towers

A Guide to Trouble-Free Cooling Towers A Guide to Trouble-Free Cooling Towers A basic understanding of cooling tower operation and maintenance will help keep a cooling water system running in top condition, year after year By David M. Suptic

More information

FTA1100-J DIESEL ENGINE FIRE PUMP CONTROLLERS STANDARD SUBMITTAL PACKAGE

FTA1100-J DIESEL ENGINE FIRE PUMP CONTROLLERS STANDARD SUBMITTAL PACKAGE FTA1100-J DIESEL ENGINE FIRE PUMP CONTROLLERS STANDARD SUBMITTAL PACKAGE SBP1100J FTA1100J Diesel Engine Fire Pump Controllers Product Description Description Firetrol combined automatic and manual Mark

More information

C. Provide temporary water treatment for chilled, hot and condenser water until facility has final connections.

C. Provide temporary water treatment for chilled, hot and condenser water until facility has final connections. SECTION 23 25 00 - HVAC WATER TREATMENT PART 1 -GENERAL 1.1 SUMMARY A. This Section includes the following: 1. HVAC water-treatment systems. 2. Chemical treatment test equipment. 3. HVAC water-treatment

More information

Oil and Coolant Circulating Heating System. Model - OCSM

Oil and Coolant Circulating Heating System. Model - OCSM Oil and Coolant Circulating Heating System Model - OCSM Installation & Operation Manual 216280-000 REV 2 Identifying Your System The HOTSTART heating system is designed to heat fluids for use in marine

More information

SECTION 23 00 01 HEATING, VENTILATION AND AIR CONDITIONING EQUIPMENT

SECTION 23 00 01 HEATING, VENTILATION AND AIR CONDITIONING EQUIPMENT SECTION 23 00 01 HEATING, VENTILATION AND AIR CONDITIONING EQUIPMENT PART 1 - GENERAL 1.1 DESCRIPTION A. The Work specified in this Section consists of designing, furnishing and installing factory-assembled

More information

INSTRUCTION MANUAL. Boil-Out TABLE OF CONTENTS SAFETY WARNINGS 2-3 RESPONSIBILITY 3 INTRODUCTION 3 PRE-BOIL OUT PROCEDURES 3-5 BOIL OUT PROCESS 5-9

INSTRUCTION MANUAL. Boil-Out TABLE OF CONTENTS SAFETY WARNINGS 2-3 RESPONSIBILITY 3 INTRODUCTION 3 PRE-BOIL OUT PROCEDURES 3-5 BOIL OUT PROCESS 5-9 TABLE OF CONTENTS Description Page Number SAFETY WARNINGS 2-3 RESPONSIBILITY 3 INTRODUCTION 3 PRE-BOIL OUT PROCEDURES 3-5 BOIL OUT PROCESS 5-9 Indeck Keystone Energy, LLC. 5451 Merwin Lane, Suite 100 Erie,

More information

! WARNING. McDonnell & Miller Installation & Maintenance Instructions MM-217(I) Series 150S and 157S (Snap Switch, All Models except 157S-RB-P)

! WARNING. McDonnell & Miller Installation & Maintenance Instructions MM-217(I) Series 150S and 157S (Snap Switch, All Models except 157S-RB-P) Series 150S and 157S (Snap Switch, All Models except 157S-RB-P) Low Water Cut-Off/Pump Controllers For Steam Boilers and Other Level Control Applications McDonnell & Miller Installation & Maintenance Instructions

More information

The Control of ph and Oxidation Reduction Potential (ORP) in Cooling Tower Applications By Charles T. Johnson, Walchem Corporation

The Control of ph and Oxidation Reduction Potential (ORP) in Cooling Tower Applications By Charles T. Johnson, Walchem Corporation The Control of ph and Oxidation Reduction Potential (ORP) in Cooling Tower Applications By Charles T. Johnson, Walchem Corporation Introduction The importance of keeping cooling tower water in proper chemical

More information

TECHNICAL SPECIFICATION FOR PROJECTION WELDING MACHINE (Qty. 2 Nos.)

TECHNICAL SPECIFICATION FOR PROJECTION WELDING MACHINE (Qty. 2 Nos.) TECHNICAL SPECIFICATION FOR PROJECTION WELDING MACHINE (Qty. 2 Nos.) 1. Requirement: Two (02) Nos. DC Type, 3 phase, 3 wire Projection Welding Machine is required for welding of ventilation M.S. / Stainless

More information

ELECTRIC/DIESEL FIRE PUMP CHECK LIST

ELECTRIC/DIESEL FIRE PUMP CHECK LIST BUILDING NAME: DESIGNER: SCO REPRESENTATIVE: PUMP MANUF.: LOCATION: INSTALLER: DATE: OWNER NAME: INSTALLATION Certificate for flushing and hydrostatic test furnished Piping been hydrostatically tested

More information

Design & Construction Standards, Revised January 2013 5.21.30-1

Design & Construction Standards, Revised January 2013 5.21.30-1 PART 1 GENERAL 1.01 Scope of Standard A. This standard provides general requirements of The University of Texas at Austin for fire pumps. This document is not intended to serve as a guide specification.

More information

CDS TROUBLESHOOTING SECTION I. VACUUM. 1.0. Weak vacuum at wand. Gauge reads normal (10hg to 14hg)

CDS TROUBLESHOOTING SECTION I. VACUUM. 1.0. Weak vacuum at wand. Gauge reads normal (10hg to 14hg) CDS TROUBLESHOOTING SECTION I. VACUUM 1.0. Weak vacuum at wand. Gauge reads normal (10hg to 14hg) 1.1. Clogged hoses or wand tube. Disconnect hoses and carefully check for an obstruction. 1.2. Excessive

More information

E-Version SECTION 15318 - CHLORINATION SYSTEM PART 1 - GENERAL PART 2 - PRODUCT

E-Version SECTION 15318 - CHLORINATION SYSTEM PART 1 - GENERAL PART 2 - PRODUCT SECTION 15318 - CHLORINATION SYSTEM PART 1 - GENERAL 1.1. SCOPE OF WORK A. Under this item the Contractor shall furnish and install a sodium hypochlorite solution metering system complete with all accessories

More information

A. The Commissioning Authority (CxA) has been contracted or will be contracted directly with the Owner for this project.

A. The Commissioning Authority (CxA) has been contracted or will be contracted directly with the Owner for this project. DIVISION 23 HEATING, VENTILATING, AND AIR CONDITIONING (HVAC) SECTION 23 08 02 PART 1 GENERAL 1.01 AUTHORITY (CxA) A. The Commissioning Authority (CxA) has been contracted or will be contracted directly

More information

Fire Pump Plan Review March 2010

Fire Pump Plan Review March 2010 Fire Pump Plan Review March 2010 Date of Review: / / Permit Number: Business/Building Name: Address of Project: Designer Name: Designer s Phone: Contractor: Contractor s Phone: Occupancy Classification:

More information

Recommended Product Specifications Fuel Day Tank System Tramont UTRS Fuel Day Tank

Recommended Product Specifications Fuel Day Tank System Tramont UTRS Fuel Day Tank Recommended Product Specifications Fuel Day Tank System Tramont UTRS Fuel Day Tank This specification describes requirements for a Diesel Fuel Day Tank System consisting of one or more fuel tanks, an Electronic

More information

BERMAD Fire Protection

BERMAD Fire Protection 400E-2M/700E-2M IOM Bermad Electrically Controlled Deluge Valve with EasyLock Manual Reset Model: 400E-2M/700E-2M INSTALLATION OPERATION MAINTENANCE Application Engineering BERMAD 400E-2M/700E-2M Bermad

More information

WHOLESALE DIRECT INC. 5620 WEST 65TH STREET

WHOLESALE DIRECT INC. 5620 WEST 65TH STREET Auto Pump V 200 100 0 100 Max Rating Vehicle mount compressor ensures truck air brake system is properly pressurized for immediate dispatch from station Pressure switch regulated operation automatically

More information

MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION

MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION Fire Pump Plan Review 2009 International Fire Code and NFPA 20 Date of Review / / BLD201 - Project Address: Project Name: Contractor s Business

More information

D Youville College July 31, 2008 New Academic Building Cannon Design Project No. 002935.00

D Youville College July 31, 2008 New Academic Building Cannon Design Project No. 002935.00 SECTION 22 6119 - COMPRESSED-AIR EQUIPMENT FOR LABORATORY AND HEALTHCARE PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Packaged, oilless scroll air compressors. 1.2 DEFINITIONS A. Actual Air: Air

More information

Operational Overview and Controls Guide. Two or Three Pump IronHeart Lite with Variable Frequency Drives

Operational Overview and Controls Guide. Two or Three Pump IronHeart Lite with Variable Frequency Drives DOCUMENT: ECSEQ6-0 EFFECTIVE: 09/23/10 SUPERSEDES: Operational Overview and Controls Guide Two or Three Pump IronHeart Lite with Variable Frequency Drives 6700 Best Friend Road. Norcross, GA 30071. (770)

More information

Water Treatment Services Specifications Department of Intellectual and Developmental Disabilities 11437 Milton Wilson Road. Arlington, TN 38002

Water Treatment Services Specifications Department of Intellectual and Developmental Disabilities 11437 Milton Wilson Road. Arlington, TN 38002 Water Treatment Services Specifications Department of Intellectual and Developmental Disabilities 11437 Milton Wilson Road Arlington, TN. 38002 General Scope of Contract I. General Information II. Bidder/Contractor

More information

2014 Service Technician Training Program Closed Loop Systems

2014 Service Technician Training Program Closed Loop Systems 1/20/14 2014 Service Technician Training Program Closed Loop Systems Daniel S. Krack, CWT 2 Closed Loop Cooling and Heating The Closed Loop Cooling Advantages High Efficiency Chillers, Heat Exchangers,

More information

SECTION 13XXX DISPERSAL PUMP STATION (4x4 DiPS)

SECTION 13XXX DISPERSAL PUMP STATION (4x4 DiPS) SECTION 13XXX DISPERSAL PUMP STATION (4x4 DiPS) PART 1: GENERAL 1.01 SCOPE OF WORK A. Under this section of the specifications, the contractor shall furnish and install a shop-fabricated 4X4 Dispersal

More information

ETZGAR CONVEYOR COMPANY Controls Section v12.05

ETZGAR CONVEYOR COMPANY Controls Section v12.05 Section 7 Controls Page Description 7-1 Controls Index 7-2 Motor Data, Enclosure Rating and Abbreviations 7-3 Controls Safety Guidelines 7-4 Fixed Speed Controls Packages 7-5 Three Phase AC Variable Speed

More information

Model 1210C Battery Powered Pump Shown. Description

Model 1210C Battery Powered Pump Shown. Description 12 Volt DC Rotary Vane Pump Series 1200C Model 1210C Battery Powered Pump Shown Description of Included Models Model Number FR1205C FR1210C FR1211C FR2410C FR2411C Description Basic 12 volt DC pump with

More information

WARNING: IMPROPER SERVICING AND START-UP OF THIS EQUIPMENT MAY CREATE A POTENTIAL HAZARD TO EQUIPMENT AND TO OPERATORS OR PERSONS IN THE BUILDING.

WARNING: IMPROPER SERVICING AND START-UP OF THIS EQUIPMENT MAY CREATE A POTENTIAL HAZARD TO EQUIPMENT AND TO OPERATORS OR PERSONS IN THE BUILDING. START-UP AND OPERATION WATER BOILERS WARNING: IMPROPER SERVICING AND START-UP OF THIS EQUIPMENT MAY CREATE A POTENTIAL HAZARD TO EQUIPMENT AND TO OPERATORS OR PERSONS IN THE BUILDING. SERVICING AND START-UP

More information

2a. IEM Indoor Metal Clad Medium Voltage Switchgear 15KV 16346-1. 2a. Section 16346 INDOOR METAL CLAD MEDIUM VOLTAGE SWTICHGEAR (Std.

2a. IEM Indoor Metal Clad Medium Voltage Switchgear 15KV 16346-1. 2a. Section 16346 INDOOR METAL CLAD MEDIUM VOLTAGE SWTICHGEAR (Std. 2a. IEM Indoor Metal Clad Medium Voltage Switchgear 15KV 16346-1 2a. Section 16346 INDOOR METAL CLAD MEDIUM VOLTAGE SWTICHGEAR (Std. Relays) Part 1 General 1.1 CONDITIONS AND REQUIREMENTS: A. Refer to

More information

Medical Air Systems: Scroll

Medical Air Systems: Scroll GENERAL The Chemetron skid mount scroll medical air system is designed to provide medical breathing air for hospital and medical institutions. This system meets NFPA 99 requirements for Level 1 breathing

More information

with MERCURY FREE 1 HP Relays ! WARNING Before using this product read and understand instructions.

with MERCURY FREE 1 HP Relays ! WARNING Before using this product read and understand instructions. B Installation & Maintenance Instructions MM-414 Series 150E and 157E Low Water Cut-Off/Pump Controllers For Steam Boilers and Other Level Control Applications A Typical Applications: Primary or secondary

More information

Replacement parts. WM97+ gas-fired water boiler Boiler Manual. OBTAIN PARTS ONLY THROUGH WEIL-McLAIN THE BOILER CONTAINS CERAMIC FIBER MATERIALS

Replacement parts. WM97+ gas-fired water boiler Boiler Manual. OBTAIN PARTS ONLY THROUGH WEIL-McLAIN THE BOILER CONTAINS CERAMIC FIBER MATERIALS Replacement parts DO NOT SERVICE THE BOILER WITHOUT A WM97+ MAINTENANCE KIT AVAILABLE Failure to adhere to these guidelines can result in severe personal injury, death or substantial property damage. The

More information

Model: 400E-2M. Bermad Electrically Controlled Deluge Valve with Easy Lock Manual Reset. Installation Operation Maintenance. Application Engineering

Model: 400E-2M. Bermad Electrically Controlled Deluge Valve with Easy Lock Manual Reset. Installation Operation Maintenance. Application Engineering Model: 400E-2M Bermad Electrically Controlled Deluge Valve with Easy Lock Manual Reset Installation Operation Maintenance Application Engineering BERMAD 1. Safety First BERMAD believes that the safety

More information

SECTION 15750 PACKAGED ROOFTOP AIR CONDITIONING UNITS

SECTION 15750 PACKAGED ROOFTOP AIR CONDITIONING UNITS SECTION 15750 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes requirements for roof mounted, self-contained units, with electric cooling, and electric or reverse refrigeration cycle (heat pump) heating

More information

C. Burner management system to follow requirements of Industrial Risk Insurers (IRI).

C. Burner management system to follow requirements of Industrial Risk Insurers (IRI). SECTION 23 52 30 PART 1 - GENERAL 1.01 RELATED WORK A. Section 23 05 00: Common Work Results for HVAC B. Section 23 25 00: Chemical Water Treatment C. Section 23 51 23: Flue Piping 1.02 QUALITY ASSURANCE

More information

BOWL ASSEMBLY SELECTION Select impeller in exactly the same manner as for lineshaft type pump. Note comments under WELL SIZE.

BOWL ASSEMBLY SELECTION Select impeller in exactly the same manner as for lineshaft type pump. Note comments under WELL SIZE. SUBMERSIBLE PUMP selection A submersible pump consists of the following basic elements: < Bowl Assembly < Motor < Cable < Drop Pipe < Surface Plate (with)(without) discharge elbow DATA REQUIRED FOR SELECTION

More information

ADDENDUM #1(BID PACKAGE # 3)

ADDENDUM #1(BID PACKAGE # 3) H2Engineering, Inc. 114 East Fifth Avenue Tallahassee, FL 32303 Phone 850.224.7922 Fax 850.224.5876 ADDENDUM #1(BID PACKAGE # 3) To: Jeff Williams From: Peter Lindstrom Co: Leon County Date: October 04,

More information

LAKE COUNTY ANIMAL SERVICES EXPANSION SECTION 15459

LAKE COUNTY ANIMAL SERVICES EXPANSION SECTION 15459 SECTION 15459 PART 1 - GENERAL 1.1 RELATED DOCUMENTS: A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-1 Specification sections, apply to work

More information

MC4-50 Feeding System

MC4-50 Feeding System MC4-50 Feeding System Dry Calcium Hypochlorite For Municipal Applications The smarter way to water quality PATENTED SPRAY TECHNOLOGY DELIVERS UNPARALLELED CONSISTENT RESULTS The Constant Chlor Plus MC4-50

More information

SECTION 26 29 23 VARIABLE FREQUENCY DRIVES

SECTION 26 29 23 VARIABLE FREQUENCY DRIVES SECTION 26 29 23 VARIABLE FREQUENCY DRIVES PART 1 GENERAL 1.01 SCOPE A. Furnish and install individual freestanding variable frequency AC drives (VFD) as shown on the Drawings and specified herein. 1.02

More information

Building Commissioning 17900-1

Building Commissioning 17900-1 SECTION 17900 BUILDING COMMISSIONING PART 1 - GENERAL 1.01 WORK DESCRIPTION: A. General: 1. The Commissioning process is a joint team effort to ensure that all mechanical equipment, controls, and systems

More information

GROENEVELD AUTOMATIC GREASING SYSTEMS

GROENEVELD AUTOMATIC GREASING SYSTEMS GROENEVELD AUTOMATIC GREASING SYSTEMS TWIN Parts & Accessories Book Pumps, Fittings, Injectors, Lining, etc. www.groeneveld-group.com 1 TWIN ELECTRICAL Item Part # Description 1 F113966 Switch 24V 2 F122991

More information

Some Criteria for Choosing a Steam Boiler for a Microbrewery

Some Criteria for Choosing a Steam Boiler for a Microbrewery Some Criteria for Choosing a Steam Boiler for a Microbrewery Jack Coe Rite Engineering and Manufacturing Corporation Breweries rely on steam heating for a number of functions, primarily to heat the brew

More information

SECTION 23 05 12 GENERAL PROVISIONS FOR HVAC WORK

SECTION 23 05 12 GENERAL PROVISIONS FOR HVAC WORK SECTION 23 05 12 GENERAL PROVISIONS FOR HVAC WORK 1 GENERAL 1.1 GENERAL REQUIREMENTS A. This Section is coordinated with and complementary to the General Conditions and Supplementary General Conditions

More information

PUSH BUTTON START INSTALLATION MANUAL

PUSH BUTTON START INSTALLATION MANUAL PUSH BUTTON START INSTALLATION MANUAL ALTHOUGH THIS PRODUCT HAS BEEN THOROUGHLY TESTED KPIERSON TECHNOLOGIES ASSUMES NO RESPONSIBILITY FOR ANY DAMAGE THAT MAY RESULT BY THE INSTALLATION OF THIS PRODUCT.

More information

BERMAD Fire Protection

BERMAD Fire Protection Model: 400E-2M BERMAD Electrically Controlled Deluge Valve with Easy Lock Manual Reset Installation Operation Maintenance Safety First BERMAD believes that the safety of personnel working with and around

More information

Pump Specifications 250 Series Submersible Sump / Effluent Pump 2 Solids handling

Pump Specifications 250 Series Submersible Sump / Effluent Pump 2 Solids handling Pump Specifications 250 Series Submersible Sump / Effluent Pump 2 Solids handling 250_P1 R10/7/2015 Copyright 2015 Liberty Pumps Inc. All rights reserved. Specifications subject to change without notice.

More information

SECTION 15041 DISINFECTION OF PIPE AND WATER STORAGE FACILITIES

SECTION 15041 DISINFECTION OF PIPE AND WATER STORAGE FACILITIES SECTION 15041 DISINFECTION OF PIPE AND WATER STORAGE FACILITIES PART 1 GENERAL 1.01 DESCRIPTION This section describes requirements for disinfection by chlorination of potable water mains, services, pipe

More information

MAINTENANCE INSTRUCTIONS. Thermia Robust heat pump

MAINTENANCE INSTRUCTIONS. Thermia Robust heat pump MAINTENANCE INSTRUCTIONS Thermia Robust heat pump 9 6 8 0-5 4 7 4 5 0 0 1 R e v. 3 Table of contents 1 Important information.................. 2 1.1 Product description....................... 2 1.2 General................................

More information

Stenner Pump Chlorinator Installation & Start Up Guide

Stenner Pump Chlorinator Installation & Start Up Guide Clean Water Made Easy www.cleanwaterstore.com Stenner Pump Chlorinator Installation & Start Up Guide Thank you for purchasing a Clean Water System! With proper installation and a little routine maintenance

More information

Cat Electronic Technician 2015A v1.0 Product Status Report 6/3/2015 4:41 PM

Cat Electronic Technician 2015A v1.0 Product Status Report 6/3/2015 4:41 PM Cat Electronic Technician 2015A v1.0 Product Status Report 6/3/2015 4:41 PM Product Status Report Parameter Product ID Equipment ID Comments Value DHK00407 Machine Control 320D/323D (DHK00407) Parameter

More information

Munchkin Heat Exchanger Maintenance

Munchkin Heat Exchanger Maintenance Munchkin Heat Exchanger Maintenance By: Mike Granahan *Refer to the appropriate boiler manual for your specific model number. Adjustment procedures will vary. Boiler shown below is an HTP Munchkin 80M

More information

A. Section includes air conditioning units, controls and control panels.

A. Section includes air conditioning units, controls and control panels. SECTION 23 81 23 - COMPUTER-ROOM AIR-CONDITIONERS PART 1 - GENERAL 1.1 SUMMARY A. Section includes air conditioning units, controls and control panels. 1.2 REFERENCES A. Air-Conditioning, Heating, and

More information

Electronically Controlled Clutchless or Variable Drive Compressors

Electronically Controlled Clutchless or Variable Drive Compressors Electronically Controlled Clutchless or Variable Drive Compressors On many new air conditioning systems, such as Lexus, Cadillac, Chrysler, and others, a new type of compressor has been fitted. There are

More information

VOYAGER 570G. 744A Sprayer Control

VOYAGER 570G. 744A Sprayer Control VOYAGER 570G 744A Sprayer Control U S E R M A N U A L U S E R M A N U A L Table of Contents CHAPTER 1 - INTRODUCTION...1 SYSTEM CONFIGURATIONS...1 KIT CONTENTS...3 CONTROL HOUSING ASSEMBLY...5 CHAPTER

More information

SECTION 23 81 03 - PACKAGED ROOFTOP AIR CONDITIONING UNITS NON-CUSTOM

SECTION 23 81 03 - PACKAGED ROOFTOP AIR CONDITIONING UNITS NON-CUSTOM SECTION 23 81 03 - PACKAGED ROOFTOP AIR CONDITIONING UNITS NON-CUSTOM PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Packaged rooftop air conditioning unit (5 tons and smaller). 2. Roof curb. 1.2

More information

Annex-A TECHNICAL SPECIFICATION

Annex-A TECHNICAL SPECIFICATION Annex-A TECHNICAL SPECIFICATION FOR SUPPLY, INSTALLATION, TESTING AND COMMISSIONING OF 0.4kV (2,000kVA) DIESEL GENERATOR 1 1.0 SCOPE This specification covers the requirements of design, manufacture, delivery

More information

TANKLESS WATER HEATER INSTALLATION DIAGRAMS

TANKLESS WATER HEATER INSTALLATION DIAGRAMS TANKLESS WATER HEATER INSTALLATION DIAGRAMS Installation Diagrams Tankless Installation / Optional Return Small 10-15 Gallon Point-of-Use Water Single and Optional Return : One single, small capacity water

More information

Circuit Breakers. NRC Series. NRC Series. 900 www.idec.com

Circuit Breakers. NRC Series. NRC Series. 900 www.idec.com Switches & Pilot Lights Display Lights NRC series circuit breakers offer circuit protection which is far superior to using fuses in applications containing relay circuits, motor circuits, heater circuits,

More information

ADDENDUM NO. 1 TO THE BIDDING DOCUMENTS. HVAC SERVICE AND MAINTENANCE Saint Clair County MidAmerica Saint Louis Airport.

ADDENDUM NO. 1 TO THE BIDDING DOCUMENTS. HVAC SERVICE AND MAINTENANCE Saint Clair County MidAmerica Saint Louis Airport. ADDENDUM NO. 1 TO THE BIDDING DOCUMENTS DATE: May 6, 2016 HVAC SERVICE AND MAINTENANCE Saint Clair County MidAmerica Saint Louis Airport BIDS CLOSE: May 12, 2016, at 2:30 p.m., Local Time TO ALL BIDDERS

More information

How To Clean Up A Reactor Water Cleanup

How To Clean Up A Reactor Water Cleanup General Electric Systems Technology Manual Chapter 2.8 Reactor Water Cleanup System TABLE OF CONTENTS 2.8 REACTOR CLEANUP SYSTEM... 1 2.8.1 Introduction... 2 2.8.2 System Description... 2 2.8.3 Component

More information

Heating, Ventilation, Air Conditioning and Refrigeration (HVACR)

Heating, Ventilation, Air Conditioning and Refrigeration (HVACR) Heating, Ventilation, Air Conditioning and Refrigeration (HVACR) I. Demonstrate safety skills in typical HVACR work situations to NATE Core Installer Knowledge Areas for Technician Excellence for Safety

More information

32:(5#5$7,1* 4833#USP283#+] 4;33#USP293#+] 3ULPH 113 kva, 90 kw 124 kva, 99 kw 6WDQGE\ 114 kva, 91 kw 125 kva, 100 kw

32:(5#5$7,1* 4833#USP283#+] 4;33#USP293#+] 3ULPH 113 kva, 90 kw 124 kva, 99 kw 6WDQGE\ 114 kva, 91 kw 125 kva, 100 kw ,1'8675,$/#*(16(7 6HULHV#'9#448 32:(5#5$7,1* 4833#USP283#+] 4;33#USP293#+] 3ULPH 113 kva, 90 kw 124 kva, 99 kw 6WDQGE\ 114 kva, 91 kw 125 kva, 100 kw Generator set consisting of engine and alternator mounted

More information

Why and How we Use Capacity Control

Why and How we Use Capacity Control Why and How we Use Capacity Control On refrigeration and air conditioning applications where the load may vary over a wide range, due to lighting, occupancy, product loading, ambient weather variations,

More information

Pump Specifications 405 Series Commercial Drain Pump (High-Temp) 2 Solids handling

Pump Specifications 405 Series Commercial Drain Pump (High-Temp) 2 Solids handling Pump Specifications 405 Series Commercial Drain Pump (High-Temp) 2 Solids handling 405_P1 R1/27/2012 Copyright 2012 Liberty Pumps Inc. All rights reserved. Specifications subject to change without notice.

More information

Troubleshooting Salt Generators

Troubleshooting Salt Generators Troubleshooting Salt Generators NOTE Turn off power to unit prior to attempting service or repair. Problems and Corrective Action Problem Possible Cause Corrective Action Low or no chlorine. Low stabilizer

More information

Electric Motor Operator for: Gate Valves / Butterfly Valves / Plug Valves M&H VALVE

Electric Motor Operator for: Gate Valves / Butterfly Valves / Plug Valves M&H VALVE Electric Motor Operator for: Gate Valves / Butterfly Valves / Plug Valves M&H VALVE Almost every business day, M&H is assembling and testing valves with Electric Motor operators. Electric motor operator

More information

Electrical Systems - IQAN Digital Control System. IQAN Control System Components... 5.1.3

Electrical Systems - IQAN Digital Control System. IQAN Control System Components... 5.1.3 Section 5.1 Electrical Systems - IQAN Digital Control System IQAN Control System Components........................... 5.1.3 IQAN Operational Description: At Machine Startup.....................................

More information

300 Series PA Pump and Cooler Assemblies

300 Series PA Pump and Cooler Assemblies Type 300 Series PA Sizes 300 thru 370 (Page 1 of 9) 300 Series PA Pump and Cooler Assemblies Pump and Cooler Assemblies with Air/Oil Heat Exchanger When compact gear drives require assistance to dissipate

More information

TECHNICAL ADVISORY BULLETIN

TECHNICAL ADVISORY BULLETIN RISK CONTROL AND CLAIM ADVOCACY PRACTICE TECHNICAL ADVISORY BULLETIN November 2014 www.willis.com FIRE PUMP TESTING Fire pumps are a critical part of a fire protection system, especially when they are

More information

SECTION 26 09 26 LOW VOLTAGE LIGHTING CONTROLS

SECTION 26 09 26 LOW VOLTAGE LIGHTING CONTROLS SECTION 26 09 26 LOW VOLTAGE LIGHTING CONTROLS PART 1 - GENERAL 1.01 RELATED DOCUMENTS: A. The Conditions of the Contract and applicable requirements of Division 1, "General Requirements", and Section

More information

2A.1 Features of Chiller Control Components... 104. 2A.3 Chilled-Water Supply Temperature Control... 107. 2A.4 Cooling-Water Supply Control...

2A.1 Features of Chiller Control Components... 104. 2A.3 Chilled-Water Supply Temperature Control... 107. 2A.4 Cooling-Water Supply Control... Appendix 2A: Chiller Control Principles... 104 2A.1 Features of Chiller Control Components... 104 2A.2 Start-up and Shutdown... 105 2A.2.1 Start-up...105 2A.2.2 Shutdown...106 2A.3 Chilled-Water Supply

More information

REQUEST FOR QUOTE FOR WATER TREATMENT SERVICES OKALOOSA COUNTY BOARD OF COMMISSIONERS, FLORIDA

REQUEST FOR QUOTE FOR WATER TREATMENT SERVICES OKALOOSA COUNTY BOARD OF COMMISSIONERS, FLORIDA REQUEST FOR QUOTE FOR WATER TREATMENT SERVICES OKALOOSA COUNTY BOARD OF COMMISSIONERS, FLORIDA RFP # 61-14 PROPOSAL CLOSES: September 12, 2014 @ 4:00 P.M. Water Treatment Services For Okaloosa County Facilities

More information

Electric Panel Pump Control System. Operation, Maintenance and Installation Manual

Electric Panel Pump Control System. Operation, Maintenance and Installation Manual Manual No. 5EP-OM1-1 Electric Panel Pump Control System Operation, Maintenance and Installation Manual INTRODUCTION... 1 RECEIVING AND STORAGE... 1 DESCRIPTION OF OPERATION... 1 INSTALLATION... 2 SEQUENCE

More information

Max primary circuit temperature 90ºC Max primary circuit temp. 90ºC Max secondary circuit temperature 45ºC Max secondary circuit temp.

Max primary circuit temperature 90ºC Max primary circuit temp. 90ºC Max secondary circuit temperature 45ºC Max secondary circuit temp. EGLISH 1 Product description exchanger equipped with an electronic control unit and circulation pump for the primary circuit. All Aqua-Mex variants can be ordered with an interior coil of either titanium

More information

NEBB STANDARDS SECTION-8 AIR SYSTEM TAB PROCEDURES

NEBB STANDARDS SECTION-8 AIR SYSTEM TAB PROCEDURES NEBB STANDARDS SECTION-8 AIR SYSTEM TAB PROCEDURES 8.1 INTRODUCTION Testing, adjusting, and balancing of HVAC systems can best be accomplished by following a series of systematic procedures. The NEBB TAB

More information

Name of Equipment Silver King Model SKMCD1P/C1. This equipment chapter is to be inserted in the appropriate section of the Equipment Manual.

Name of Equipment Silver King Model SKMCD1P/C1. This equipment chapter is to be inserted in the appropriate section of the Equipment Manual. Name of Equipment Silver King Model SKMCD1P/C1 This equipment chapter is to be inserted in the appropriate section of the Equipment Manual. Manufactured exclusively for McDonald s By Silver King Refrigeration,

More information

PC1130 Electric Air Compressor

PC1130 Electric Air Compressor Senco Products Inc. 8485 Broadwell Road Cincinnati, Ohio 45244 PC1130 Electric Air Compressor Operating Instructions 2006 by Senco Products, Inc. Warnings for the safe use of this tool are included in

More information

Panel Mounted Air Conditioners by Dantherm, Inc.

Panel Mounted Air Conditioners by Dantherm, Inc. Panel Mounted Air Conditioners by Dantherm, Inc. CS020020A/B with USACG-6 Control PRODUCT INFORMATION MANUAL AC-2 CS020020 USACG-6 Manual Rev H Page 1 of 17 Dantherm, Inc. 110 Corporate Drive, Suite K

More information

Conventional Fire Detection and Extinguishant Control System Specification

Conventional Fire Detection and Extinguishant Control System Specification Conventional Fire Detection and Extinguishant Control System Specification Page 1 of 9 Scope Furnish a complete 24VDC Conventional, electrically supervised, combined fire detection and extinguishant release

More information

Operational Overview and Controls Guide

Operational Overview and Controls Guide DOCUMENT: ECSEQ2-1 EFFECTIVE: 02/14/07 SUPERSEDES: 02/26/03 Operational Overview and Controls Guide Standard Two or Three Pump Type VFD Booster Controls 6700 Best Friend Road. Norcross, GA 30071. (770)

More information

Compressor Service & Maintenance Manual

Compressor Service & Maintenance Manual Compressor Service & Maintenance Manual C Series COMPRESSOR (D)C1103 (D)C1203 (D)C2106 (D)C2206 (D)C3210 Copyright 2006 DCI. All Rights Reserved. 92311, Rev. C, 08/13 1 C1000 Series Service & Maintenance

More information

All work must conform to the National Electric Code, latest edition, and all other applicable codes and regulations.

All work must conform to the National Electric Code, latest edition, and all other applicable codes and regulations. DIVISION 16 ELECTRICAL SECTION 16100 - ELECTRICAL PART 1 - GENERAL SCOPE All electrical work as shown on the drawings and as necessary to provide a complete electrical system. Include primary service,

More information

CONTROL OF LEGIONELLA AUDIT PROFORMA

CONTROL OF LEGIONELLA AUDIT PROFORMA CONTROL OF LEGIONELLA AUDIT PROFORMA This document is an audit sheet designed to assist persons in control of cooling systems which incorporate cooling towers or evaporative condensers, to assess their

More information

GE Oil & Gas. Texsteam * Pumps: precise chemical injection pumping

GE Oil & Gas. Texsteam * Pumps: precise chemical injection pumping GE Oil & Gas Texsteam * Pumps: precise chemical injection pumping 2 With a wide range of capacities and operating pressures, GE s versatile Texsteam pumps can handle challenging chemical pumping requirements

More information

Frequently Asked Questions Generators

Frequently Asked Questions Generators Frequently Asked Questions Generators Fuel Related How much fuel do the generators use during normal operation? At exercise? The generator fuel consumption is given in each of the product knowledge books

More information

PERMITS REQUIRED & PERMIT EXEMPTIONS

PERMITS REQUIRED & PERMIT EXEMPTIONS PERMITS REQUIRED & PERMIT EXEMPTIONS This guideline is intended to assist the applicant in determining what types of construction work require a permit. The 1997 California Uniform Administrative Code,

More information

GLYCOL CHILLER SYSTEM TROUBLESHOOTING 101

GLYCOL CHILLER SYSTEM TROUBLESHOOTING 101 GLYCOL CHILLER SYSTEM TROUBLESHOOTING 101 By Jim VanderGiessen Jr, Pro Refrigeration Inc. There is a good chance your glycol chiller system is often completely forgotten about, until that dreaded day you

More information

Horizontal Split Case Fire Pumpset Electric Motor Driven 50 Hz

Horizontal Split Case Fire Pumpset Electric Motor Driven 50 Hz SERIES Horizontal Split Case Fire Pumpset Electric Motor Driven 50 Hz Selected Models INTRODUCTION Lubi offers LHCE series state-of-the-art fire pumpset with electric motor driven, horizontal split case

More information

FFI. Advances in Medium and Low Voltage Power Distribution ESS Metron Expo and Technical Seminars. Presented By: Greg Pelster & Robert Schmid

FFI. Advances in Medium and Low Voltage Power Distribution ESS Metron Expo and Technical Seminars. Presented By: Greg Pelster & Robert Schmid Advances in Medium and Low Voltage Power Distribution ESS Metron Expo and Technical Seminars Presented By: Greg Pelster & Robert Schmid FFI Ferrie, Franzmann Industries LOW VOLTAGE SWITCHGEAR & LOW VOLTAGE

More information

Horizontal Split Case Fire Pumpset Diesel Engine Driven

Horizontal Split Case Fire Pumpset Diesel Engine Driven SERIES Horizontal Split Case Fire Pumpset Diesel Engine Driven Selected Models INTRODUCTION Lubi offers LHCD series state-of-the-art fire pumpset with diesel engine driven, horizontal split case pump.

More information

Boiler Preparation, Start-Up and Shutdown

Boiler Preparation, Start-Up and Shutdown Boiler Preparation, Start-Up and Shutdown Learning Outcome When you complete this module you will be able to: Describe the basic preparation of a boiler for start-up, and the start-up and shutdown procedures.

More information

1. Conductivity < 15 micro ohms/cm 2. ph of 6.0 to 9.0 3. Nonvolatile TOC content < 1.0 ppm

1. Conductivity < 15 micro ohms/cm 2. ph of 6.0 to 9.0 3. Nonvolatile TOC content < 1.0 ppm PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is

More information

Facilities Maintenance Standards rev 9-1-2015

Facilities Maintenance Standards rev 9-1-2015 Facilities Maintenance Standards rev 9-1-2015 Purpose The purpose of these standards is to outline the minimum requirements for maintaining state owned facilities and infrastructures in a manner that will

More information

Nexus FS Point of Use Installation Guide

Nexus FS Point of Use Installation Guide Nexus FS Point of Use Installation Guide Nexus FS POU Install Guide:12152011:rev-12152011 Technical Specifications Dimensions: Height: 43.5 Width: 11.65 Depth: 15 Weight: 34.39 LBS Electrical Specs: Voltage:

More information

Hydraulic Troubleshooting PRESENTED BY

Hydraulic Troubleshooting PRESENTED BY Hydraulic Troubleshooting PRESENTED BY NORMAN KRONOWITZ Introduction Welcome to the CMA/Flodyne/Hydradyne s Hydraulic Troubleshooting presentation. We will introduce many aspects of troubleshooting hydraulic

More information

FOXAIR 60/50 ALL MODELS

FOXAIR 60/50 ALL MODELS FOXAIR 60/50 ALL MODELS OPERATION AND SERVICE MANUAL UNIT WEIGHT - ALL MODELS APPROX. 300 POUNDS FOXTRONICS, INC. 38 L x 28 W x 24 H Love Field-Dallas TX MADE IN THE USA 3448 West Mockingbird Lane Dallas,

More information

Water Leak Detection System

Water Leak Detection System Water Leak Detection System Installation and Operating Manual 505-334-5865 ph 505-334-5867 fax www.rodisystems.com email:info@rodisystems.com 936 Highway 516 Aztec, NM 87410-2828 Manual Revisions and Copyright

More information

CATHODIC PROTECTION TRANSFORMER RECTIFIER (CPTR)

CATHODIC PROTECTION TRANSFORMER RECTIFIER (CPTR) CATHODIC PROTECTION TRANSFORMER RECTIFIER (CPTR) Fig1. CPTR SMART CONTROL PRECISION CUSTOMIZED MANUAL OR AUTO SCR OR DIODE DRY TYPE SWITCH MODE DRY TYPE SCR OR DIODE OIL TYPE 1 INDEX PAGE 1. Cover 2. Index

More information