1 Appendix 2A: Chiller Control Principles A.1 Features of Chiller Control Components A.2 Start-up and Shutdown A.2.1 Start-up A.2.2 Shutdown A.3 Chilled-Water Supply Temperature Control A.3.1 Refrigerant Pump and Level Control A.3.2 Steam Valve Control A.3.3 Solution Pump and HTRG Level Control A.4 Cooling-Water Supply Control A.4.1 Cooling-Water Pump Control A.4.2 Cooling Water Fan Control A.5 Vacuum Maintenance A.6 Crystallization Detection and Decrystallization A.6.1 Crystal Detection A.6.2 Crystal Removal A.7 Safety Control and Diagnostics

2 Figure 2A - 1: Control logic of startup procedure Figure 2A - 2: Control logic of shutdown procedure Figure 2A - 3: Configuration of the refrigerant level meter Figure 2A - 4: Principle of the chilled-water supply temperature control Figure 2A - 5: Configuration of HTRG solution level probe Figure 2A - 6: Control principle of opening the steam valve Figure 2A - 7: Control principle of opening the steam valve Figure 2A - 8: Control principle of closing the steam valve Figure 2A - 9: General rule for the variation of solution pump frequency Figure 2A - 10: Control principle of the cooling fan (increasing cooling-water temperature) Figure 2A - 11: Control principle of the cooling fan (decreasing cooling-water temperature) Figure 2A - 12: Principle diagram of automatic gas purge device, AGPD

3 Appendix 2A: Chiller Control Principles The chiller operation program is a sequence of processes to start up, follow load, and shut down the chiller by adjusting the corresponding chiller control components listed in Table 2-4 on the basis of the measurements in Table 2-3. The chiller instrumentation and control system the manufacturer has provided was described in chapter 2. The chiller control principles will be discussed in detail in this appendix. The chiller control program can be divided into start-up, shutdown, and load-follow. Chiller operation involves chilled-water supply temperature control, cooling-water supply temperature control, noncondensable gas detection, crystallization detection and control, and chiller diagnostics. Chiller start-up starts with the start-up command and ends with the steam valve fully open. Chiller shutdown starts with the shutdown command to the chilled-water pump stop. While operating, the chiller continuously provides chilled water within a preset temperature range at the imposed chilled-water flow and return temperature. Load changes complicate the chiller control program. Higher cooling loads require higher heat input and sorbent solution flow. Additional factors need to be considered, such as the detection of noncondensable gas, crystallization formation, and abnormal conditions. 2A.1 Features of Chiller Control Components The chiller components to be adjusted during the chiller start-up, load-flow, and shutdown procedures are listed in Table 2-4; they have the following features: The chilled-water pump (CHWP) is a constant speed pump. It starts or stops immediately once it received an on or off command. The CHWP is usually the first component to start in the chiller and the last component to stop. Similar to the CHWP, the cooling-water pump (CWP) is a constant speed pump. It starts or stops immediately once it has received an on or off command. It operates only when the CHWP is running. The solution pump has a variable-frequency drive that adjusts the pump speed to maintain the sorbent solution level in the HTRG constant. It starts or stops immediately once an on or off command has been received. The refrigerant pump is a constant-speed pump. It starts or stops immediately once an on or off command is received. The cooling-tower fan (CTF) has low, medium, and high speeds to maintain the desired coolingwater supply temperature. 104

4 The steam valve has four staged openings. The steam valve opens or closes in steps between the first and fourth stages. The opening or closing of the steam valve is not measured directly but is estimated by the corresponding operating time of the drive motor. The city-water switch (CTS) is a magnetic valve. It opens or closes immediately once an on or off signal has been received. The CTS remains open to supply city water to the cooling tower because the cooling tower loses water to the atmosphere while the chiller operates. The cooling-water drain device (CWDD) is motor driven. The motor runs for a certain time to open or close the valve completely once an on or off command has been received. The cooling water begins to drain the cooling-water tank until it is empty, once the CWDD has opened for a certain length of time. When the cooling tower begins to fill with city water, the CWDD must be closed. The cooling-water by-pass valve (CWBPV) is motor driven. The motor runs until the valve is fully open or closed, as soon as it has received an on or off command. The cooling-water supply temperature is kept sufficiently high by the by-pass of circulating cooling water around the cooling tower. The electric refrigerant pump heater (RPH) prevents refrigerant from freezing in the evaporator. 2A.2 Start-up and Shutdown 2A.2.1 Start-up The chiller start-up command can be given through the push button on the chiller control panel or through the control software in the computer. The chiller starts the CHWP, the CWP, and the solution pump, and opens the steam valve in sequence. To operate these four major components, four conditions must be met: ambient temperature must be higher than a preset value cooling-water tank must be filled with water chilled-water flow must be sufficient chilled-water supply temperature must be higher than a preset value To meet these conditions, the chiller control system needs to open or close the corresponding valves (the CWDD and the CTS). The start-up procedure is illustrated in Figure 2A

5 Figure 2A - 1: Control logic of startup procedure When the chiller control system receives a start-up command, the chiller checks the ambient (surrounding) temperature. If this temperature is as high as the preset ambient temperature for cooling, the chiller will start; otherwise, the start-up will halt. If cooling is required, the chiller will sequentially close the CWDD and open the CTS to provide city water to the cooling tower. But if the cooling-water level probe fails to detect water for 3 minutes, the start-up program will terminate. When water is detected in the cooling-tower tank, the CHWP will start; and the status of the chilled-water flow will be checked by the chilled-water flow detector. If an adequate chilled-water flow is detected CWP will be started to circulate cooling water, and the solution pump will be started to circulate dilute solution from the absorber to the two regenerators. Once the solution pump is operating, and the chilled-water supply temperature is higher than its preset value, the steam valve will open in stages to supply thermal energy into the HTRG. After the start-up procedure has been completed, the control system modulates the refrigerant pump and the steam valve to meet the preset value of the chilled-water supply temperature. 2A.2.2 Shutdown The chiller starts to shut down when it receives the command through the push button or monitoring software, or when the chiller detects an operational malfunction or component failure. The shutdown process is simpler than the start-up process, but it requires roughly 45 minutes to cool the solution temperature with the circulating cooling water. 106

6 Figure 2A - 2: Control logic of shutdown procedure Shutdown Close SV Stop SP Stop CTF No Dilute process Yes Stop RP Stop CWP HTRG solution temperature<preset? Close CWV Stop CHW End The shutdown process is illustrated in Figure 2A-2. First the chiller closes the steam valve and then starts the sorbent cooling process by mixing the cold and dilute sorbent solution in the absorber with the hot and concentrated sorbent solutions in the two regenerators until the temperature of the sorbent solution in the HTRG drops from 155 o C to 85 o C. The chiller components stop one by one in sequence, as shown in Figure 2A-2. 2A.3 Chilled-Water Supply Temperature Control The chilled-water flow rate and the chilled-water supply and return temperature determine the cooling load. The absorption chiller responds to cooling-load changes by adjusting the amount of refrigerant supplied to and vaporized in the evaporator. The chiller operates the steam valve to supply steam to the HTRG that provides refrigerant. In response, the refrigerant generation rate and the corresponding vaporization pressure variations in the HTRG, the dilute sorbent solution flow rate must be adjusted to maintain a constant solution level in the HTRG. In general, the chiller control system responds to the cooling load changes and maintains the chilled-water supply temperature by modulating the refrigerant pump, the steam valve, and the solution pump. 2A.3.1 Refrigerant Pump and Level Control Figure 2A-3 illustrates the arrangement of the refrigerant pump and the refrigerant level probe. The level probe has three pins in a cylinder connected with the water tray and the top of the evaporator. The probe pins detect four levels of the refrigerant as illustrated in Figure 2A-3. The refrigerant pump control is detailed in Figure 2A

7 The refrigerant pump starts when two conditions are met: first, the refrigerant level submerges refrigerant Pin 1; second, the chilled-water supply temperature is the same as the above preset temperature. Once the refrigerant pump operates, it does not stop until the chilled-water supply temperature drops below the preset value or until the water leveling the refrigerant tray drops below Pin 1. Two additional conditions can also stop the refrigerant pump: first, the chiller executes a shutdown; second, the chiller executes the de-crystallization program. Figure 2A - 3: Configuration of the refrigerant level meter Pin 3 Pin 2 Pin 1 A B C D RBPSV L2 RP Chilled water Refrigerant tray The steam valve also plays a critical role in controlling the chilled-water supply temperature; its control principles will be discussed in the following section. Figure 2A - 4: Principle of the chilled-water supply temperature control 108

8 2A.3.2 Steam Valve Control For an absorption chiller, the cooling load is determined by the amount of refrigerant provided to the evaporator from the regenerators. The steam valve regulates the steam supply to the HTRG and the quantity of refrigerant produced in the HTRG. As a result, the steam valve must be controlled to respond to the cooling load variations. The control of the steam flow, the adjustment of the steam valve must In general respond to: the level of the sorbent in the HTRG. Maintaining this level assumes adequate surface for heat transfer from the steam to the sorbent. the temperature of the sorbent solution in the HTRG. Nominally 155 o C, maintaining this temperature assumes that the sorbent concentration and absorber pressure are appropriate the chilled-water supply temperature is, nominally, 7 o C. The structure of the HTRG solution level probe (L1) is illustrated in Figure 2A-5. Similar to the refrigerant level probe (L2), L1 has 4 pins and accordingly 5 areas along the height of the probe cylinder. Figure 2A - 5: Configuration of HTRG solution level probe Sorbent solution inlet L3 LTRG Condenser L1 Cooling-water outlet Cooling-water inlet Steam SV HTRG A B C D E Pin 4 Pin 3 Pin 2 Pin 1 Condensate Sorbent solution inlet and outlet Refrigerant To open the steam valve, the initial requirements must be met: the sorbent solution pump must be operating; the solution level must be above Pin 1 of the solution level probe in the HTRG 109

9 Figure 2A - 6: Control principle of opening the steam valve Figure 2A-6 presents the overall logic for initial opening of the steam valve. Under continuing operating conditions, the operation of the steam valve, opening and closing, is dependent on the chilled-water supply temperature from the evaporator in Figure 2A-7 and 2A-8. Figure 2A - 7: Control principle of opening the steam valve 4th stage Steam valve position 3rd stage 2nd stage 1st stage Close 5 o C 6 o C 7 o C 8 o C 9 o C CHW supply temperature 110

10 Figure 2A - 8: Control principle of closing the steam valve 4th stage Steam valve position 3rd stage 2nd stage 1st stage Close 5 o C 6 o C 7 o C 8 o C 9 o C CHW supply temperature When the steam valve receives a command from the control system, the valve will be adjusted in stage from closed to fully open by an electric motor. The first-stage opening ranges from 5% to 30%; the second, from 30% to 60%; the third, from 60% to 80%; and the fourth, from 80% to 100% open. There is one special case for the steam valve closing procedure. When the refrigerant level in the water tray rises into area D, (this happens when the cooling load drops dramatically), the steam valve closes one stage from its current opening. If the refrigerant level remains in D for more than 3 minutes, the steam valve will close one additional stage. If the level remains in area D for more than 10 minutes, the steam valve will close completely. When the level drops into area B, the steam valve will open again. 2A.3.3 Solution Pump and HTRG Level Control The solution pump control is set to minimize the solution level variations through a variable frequency pump. The configuration of the sorbent 4-pin-level probe is illustrated in Figure 2A-5. The target of HTRG level control is to hold the solution level constant in area C. The level control is implemented by modulating the solution pump frequency. The frequency band of the pump is between 15 and 42 Hz; the change rate is 2 Hz/s. The control formulation s variable frequency pump is illustrated in Figure 2A

11 Figure 2A - 9: General rule for the variation of solution pump frequency Frequency (Hz) Maximium Targeting frequency 35-2 Hz -1 Hz -1 Hz/5s -3 Hz/5s Hz/5s +1 Hz/5s 20 Minimium 15 A B C D E Solution level probe When the solution pump is activated during the start-up procedure, with the solution level within area A, the pump motor will operate at 25 Hz when the solution temperature is below 80 o C and at 30 Hz when the solution temperature is between 80 and 120 o C. The frequency will be 38 Hz when the solution temperature is higher than 120 o C. Once the solution hits area C, the solution pump will keep its current frequency unchanged until the level drops below or rises over area C. The pump frequency subsequently will decrease by 2 Hz when the solution level rises up one. Figure 2A-9 gives the general rules for the frequency variation corresponding to the solution level changes, increasing or decreasing. For both directions, the control system is aimed to hold the solution level in area C. 2A.4 Cooling-Water Supply Control The cooling tower has six control points, more than half the total control points for the chiller. Appropriate control for the cooling tower is required for effective and efficient chiller operation. Three control points deal with cooling-water quality: the CTS, the CWDD, and the CWDV. Three control points pertain to the control of cooling-water flow and supply temperature: the CWBPV, the CWP, and CTF. 2A.4.1 Cooling-Water Pump Control The CWP is a single-speed pump. The cooling-water pump can be started when the cooling-water level probe detects the required cooling-water level, and when the CHWP is operating. 112

12 2A.4.2 Cooling Water Fan Control The fan can be started only when the CWP in operating. The cooling-water fan has three speeds controlled by the measured cooling-water supply temperature. In the chiller, the cooling-water supply temperature is usually preset at 30 o C; at this temperature, the fan runs at medium speed. An acceptable temperature range is preset at 2 o C. When the water temperature hits at 32 o C, the fan speed will operate at high speed until the temperature drops back to 30 o C. If the cooling-water supply temperature drops to 28 o C, the fan will operate at low speed. The preset temperature and the temperature range for the fan speeds can be adjusted through the control system. The relation of the cooling-water supply temperature to the fan speed is illustrated in Figures 2A-10 and 2A-11. Figure 2A - 10: Control principle of the cooling fan (increasing cooling-water temperature) Fan status High Speed Midium Speed Low Speed Off 26 o C 28 o C 30 o C 32 o C Figure 2A - 11: Control principle of the cooling fan (decreasing cooling-water temperature) Cooling water supply temperature Fan status High Speed Midium Speed Low Speed Off 26 o C 28 o C 30 o C 32 o C Cooling water supply temperature 113

13 2A.5 Vacuum Maintenance Because of the high vacuum in the evaporator and the absorber vessel, air can leak into the water-libr absorption refrigeration system. Corrosion also occurs in the chiller, although corrosion inhibitors are added to the water-libr sorbent solution. Non-condensable gases, such as H 2, can be generated. An automatic gas purge device, AGPD, is installed to continuously remove these noncondensable gases to maintain the required low pressures in the evaporator and absorber. The vacuum can be maintained through the AGPD and periodic manual purge services. Figure 2A - 12: Principle diagram of automatic gas purge device, AGPD Figure 2A-12 illustrates the AGPD system of the chiller. The noncondensable gas in the absorber are separated and stored automatically by the AGPD until the storage chamber is full. The noncondensable gas generated in the upper tank (the HTRG and the LTRG), however, is difficult to remove through sorbent solution migrations. Even if the AGPD is installed, therefore, manual vacuum services are still required to purge noncondensable gas from the storage chamber and the upper vessel. In the chiller, the AGPD comprises purge chambers, solution supply and return pipes, pressure balancing pipes, gas pickup pipe, and a gas storage chamber. When noncondensable gases are generated in the system during operation, they tend to migrate to the absorber where the pressure is lowest. The solution 114

14 pump supplies a small portion of dilute solution to chamber A on the top of the automatic purge unit. Chamber A also connects the open space of the absorber. A second pressure-balancing pipe connects the absorber solution reservoir and Chamber A open space. The absorber and Chamber A have the same total pressure. The sorbent solution pumped to Chamber A flows back to the absorber reservoir through a drain pipe. A short pipe termed gas pickup pipe is inserted into the drain pipe at the upper end; the other end is opened to the open space of Chamber A. Gas from Chamber A flows into the sorbent solution and down the drain pipe because of the reduced pressure at the lower end of the gas pick up pipe. Water vapor in the gas will be reabsorbed into solution while the noncondensable gas will remain bubbles entering in Chamber B. Chamber B has one end connected to the absorber reservoir, the other end is connected to gas storage Chamber C. This configuration will cause level 3 to move down because of the increased quantity and pressure of the noncondensable gas in Chambers B and C. When the level 3 probe indicates that too much gas has accumulated in Chambers B and C and a manual vacuum process is required. To remove the noncondensable gas generated in the upper vessel (regenerators), a vacuum pump can be connected to Vacuum valve 2, at the same time; Vacuum valve 3 must be opened. Then gases in two regenerators are removed through the vacuum pump. This operation requires operating at ambient temperature. In this process, a small amount of water vapor is removed from Chamber B and C. As a result, the sorbent solution composition is increased. New machines tend to generate more noncondensable gases than older machines. 2A.6 Crystallization Detection and Decrystallization Crystals of LiBr solid can deposit from the sorbent solution at high concentrations and low temperatures 63% to 68% LiBr and 398 to 70 o F. Such deposits in the Broad chiller are most likely to form on the surfaces where concentrated sorbent solution leaves the HTHX and the LTHX interchangers and enters the absorber. Solid deposits of LiBr on such surfaces can reduce or block sorbent solution flows from the HTRG and/or the LTRG. Crystal formation is significantly affected by operating conditions in the chiller: The cooling-water supply temperature to the absorber. The resulting low temperature in the outlet sorbent stream from the absorber results in low temperatures where the concentrated sorbent leaves the HTHX and LTHX and increases the probability of deposition there. 115

15 Noncondensable gas accumulation in the evaporator and chiller. This gas inhibits water evaporation from the refrigerant and absorption in the sorbent. The temperature rises in the evaporator and falls in the absorber. Steam flow is increased by the chiller control. Consequently, the concentration of LiBr in the circulating sorbent solution increases and the temperature decreases, resulting in an increased probability of LiBr deposits. Abrupt shutdown. A shutdown results in decreasing sorbent solution temperature prior to reducing the sorbent solution concentrations by mixing the various sorbent and refrigerant reservoirs in the chiller. This can cause crystals to form. 2A.6.1 Crystal Detection The chiller detects the crystallization indirectly by monitoring the temperature and solution level in the HTRG and the LTRG. When the solution temperature is above 140 o C in the HTRG and the solution level remains at area E for more than 30 seconds, the chiller control concludes that crystals have formed in the HTHX, and the sorbent solution is blocked. Crystallization detection in the LTHX is simpler than in the HTHX. If the solution level in the LTRG is higher than its upper limit for more than 120 seconds, the chiller control concludes that crystal has formed in the LTHX and sorbent solution flow is blocked. 2A.6.2 Crystal Removal Once crystallization is detected, the decrystallization process is conducted immediately to maintain chiller operation. Usually when crystals start to form on the inner surface of tubes, they do not immediately block flows. The sorbent solution stream can still pass through in the pipes. If proper actions are taken, the crystals can be dissolved back into the flow of sorbent solution. If no action is taken, the crystals accumulate in the tubes and eventually completely block the solution flow. If this occurs, professional services are required to clear the blockage. Crystal removal involves stopping the CWP, the cooling-water fan, and the refrigerant pump sequentially. If crystals are detected in the HTHX, the solution pump will stop until the level drops to C. After the level has reached to C for 30 seconds, the chiller starts the solution pump at maximum frequency to circulate the dilute solution and dissolve the crystals back to solution. This process continues for 10 minutes. If crystals are detected in the LTHX, the chiller control stops the solution pump until the solution level in the LTRG drops to B. Once the level reaches B, the solution pump starts again at maximum frequency. 116

16 When the process has continued for 5 minutes, decrystallization will be concluded. If the power is interrupted, the decrystallization process is similar to the HTHX decrystallization process. 2A.7 Safety Control and Diagnostics Chiller control diagnostics and protection procedures are followed when malfunction or abnormality occurs during chiller operation. The chiller safety control and diagnostics can be categorized into the following three levels: malfunction shutdown, malfunction alarming, and abnormal warnings. In malfunction shutdown, the shutdown program is executed if the cooling-water supply, the city-water supply, the cooling water pump, the solution pump, and the steam valve fail, and if the chilled-water supply temperature and the HTRG solution temperature sensors fail. Any of these malfunctions trigger the shutdown program or ends the start-up program. In malfunction alarming, messages appear on the monitor. The alarm messages include: any one of the two chilled-water temperatures, and the cooling-water supply temperature sensor failures and the coolingwater pump, the refrigerant pump, and the HTRG solution level control failures. Some of the alarm messages, such as any one of the two chilled-water temperature sensor failure, will not shut down the chiller operation, but the cooling-water supply temperature sensor and the cooling-water pump problem do trigger the shutdown program if the problems persist. In abnormal warning, a message appears. A warning message is a notice such as the noncondensable is full. Warnings do not affect the chiller operation but are reminders that service or regular checks are required. 117

2B.1 Chilled-Water Return (and Supply) Temperature...119. 2B.3 Cooling-Water Supply Temperature / Flow... 124

2B.1 Chilled-Water Return (and Supply) Temperature...119. 2B.3 Cooling-Water Supply Temperature / Flow... 124 Appendix 2B: Chiller Test Results...119 2B.1 Chilled-Water Return (and Supply) Temperature...119 2B.2 Chilled-Water Flow... 122 2B.3 Cooling-Water Supply Temperature / Flow... 124 2B.4 Pressure/Temperature...

More information

Water Fired Chiller/Chiller-Heater. WFC-S Series: 10, 20 and 30 RT Cooling

Water Fired Chiller/Chiller-Heater. WFC-S Series: 10, 20 and 30 RT Cooling Water Fired Chiller/Chiller-Heater WFC-S Series: 1, 2 and 3 RT Cooling W E A R E F R I E N D L Y T O T H E E A R T H Water Fired SINGLE-EFFECT Chiller or Chiller-Heater Absorption Principle Cooling Cycle

More information

HVAC Processes. Lecture 7

HVAC Processes. Lecture 7 HVAC Processes Lecture 7 Targets of Lecture General understanding about HVAC systems: Typical HVAC processes Air handling units, fan coil units, exhaust fans Typical plumbing systems Transfer pumps, sump

More information

Any Service Technician Can Fix It A Good Service Technician Can Figure Out What s Wrong With It.

Any Service Technician Can Fix It A Good Service Technician Can Figure Out What s Wrong With It. I Dave s Statement If the thermostat calls for cooling, and the furnace fan is running properly, and the coil airflow is adequate, and the condenser fan is running properly, and the condenser airflow is

More information

COMMERCIAL HVAC CHILLER EQUIPMENT. Air-Cooled Chillers

COMMERCIAL HVAC CHILLER EQUIPMENT. Air-Cooled Chillers COMMERCIAL HVAC CHILLER EQUIPMENT Air-Cooled Chillers Technical Development Programs (TDP) are modules of technical training on HVAC theory, system design, equipment selection and application topics. They

More information

AIR CONDITIONING TECHNOLOGY

AIR CONDITIONING TECHNOLOGY AIR CONDITIONING TECHNOLOGY PART 9 Water Cooled Condensers & Cooling Towers IN LAST month s article we looked at how Air Cooled Condensers are used to transfer the total heat of rejection from the air

More information

A Practical Guide to Free Energy Devices

A Practical Guide to Free Energy Devices A Practical Guide to Free Energy Devices Part PatE17: Last updated: 24th November 2006 Author: Patrick J. Kelly This is a patent application from Stephen Meyer, brother of the late Stan Meyer. While this

More information

Fault codes DM1. Industrial engines DC09, DC13, DC16. Marine engines DI09, DI13, DI16 INSTALLATION MANUAL. 03:10 Issue 5.0 en-gb 1

Fault codes DM1. Industrial engines DC09, DC13, DC16. Marine engines DI09, DI13, DI16 INSTALLATION MANUAL. 03:10 Issue 5.0 en-gb 1 Fault codes DM1 Industrial engines DC09, DC13, DC16 Marine engines DI09, DI13, DI16 03:10 Issue 5.0 en-gb 1 DM1...3 Abbreviations...3 Fault type identifier...3...4 03:10 Issue 5.0 en-gb 2 DM1 DM1 Fault

More information

How To Clean Water From An Ammonia Refrigeration System

How To Clean Water From An Ammonia Refrigeration System Water Contamination and Water Removal in Industrial Ammonia Refrigeration Systems By Ray Ficker, PE Effects of Water Contamination Water contamination in an industrial ammonia refrigeration system can

More information

Federal Wage System Job Grading Standards for Air Conditioning Equipment Operating, 5415. Table of Contents

Federal Wage System Job Grading Standards for Air Conditioning Equipment Operating, 5415. Table of Contents Federal Wage System Job Grading Standards for Air Conditioning Equipment Operating, 5415 Table of Contents WORK COVERED... 2 WORK NOT COVERED...2 TITLES... 2 GRADE LEVELS... 2 HELPER AND INTERMEDIATE JOBS...

More information

Absorption. LG HVAC Solution. www.lgeaircon.com

Absorption. LG HVAC Solution. www.lgeaircon.com Ver. 1.0 LG HVAC Solution Absorption chiller www.lgeaircon.com LG Electronics, Air Conditioning & Energy Solution Company 20 Yoido-dong, Youngdungpo-gu, Yoido P.O.Box 355 Seoul 150-721, Korea For continual

More information

THERMO KING TRUCK & TRAILER UNIT ALARM CODES THIS DOCUMENT SHOWS ALL CURRENT ALARM CODES FOR THERMO KING TRUCK AND TRAILER UNITS.

THERMO KING TRUCK & TRAILER UNIT ALARM CODES THIS DOCUMENT SHOWS ALL CURRENT ALARM CODES FOR THERMO KING TRUCK AND TRAILER UNITS. THERMO KING TRUCK & TRAILER UNIT ALARM CODES THIS DOCUMENT SHOWS ALL CURRENT ALARM CODES FOR THERMO KING TRUCK AND TRAILER UNITS. NOT ALL CODES ARE POSSIBLE ON ANY INDIVIDUAL UNIT. IF THE ALARM APPLIES

More information

Thermo Top - Troubleshooting Tree

Thermo Top - Troubleshooting Tree Thermo Top - Troubleshooting Tree 07-15-2002 CAUTION Troubleshooting requires comprehensive knowledge about the structure and theory of operation of the Thermo Top heater. Troubleshooting and repairs may

More information

A discussion of condensate removal systems for clarifier and thickener drives for water and wastewater facilities.

A discussion of condensate removal systems for clarifier and thickener drives for water and wastewater facilities. A discussion of condensate removal systems for clarifier and thickener drives for water and wastewater facilities. Richard L. Dornfeld, BSME, P.E. Staff Engineer September 25, 2014 Moisture can be a problem

More information

Factory owners must ensure the boiler is:

Factory owners must ensure the boiler is: Factory owners must ensure the boiler is: * Registered with the Boilers and Pressure Vessels Division, Labour Department * Examined by an appointed examiner and has a valid certificate of fitness * Supervised

More information

Table V. Troubleshooting Checklist for Refrigeration Systems. Air or non-condensable gas in system. Inlet water warm.

Table V. Troubleshooting Checklist for Refrigeration Systems. Air or non-condensable gas in system. Inlet water warm. Table V Troubleshooting Checklist for Refrigeration Systems TROUBLE POSSIBLE CAUSE CORRECTIVE MEASURE High condensing pressure. Low condensing pressure. Air or non-condensable gas in system. Inlet water

More information

Refrigeration Basics 101. By: Eric Nelson

Refrigeration Basics 101. By: Eric Nelson Refrigeration Basics 101 By: Eric Nelson Basics Refrigeration is the removal of heat from a material or space, so that it s temperature is lower than that of it s surroundings. When refrigerant absorbs

More information

Indirect-Fired Storage Water Heater Models WH-30 through WH-80 INSTALLATION AND OPERATING INSTRUCTIONS

Indirect-Fired Storage Water Heater Models WH-30 through WH-80 INSTALLATION AND OPERATING INSTRUCTIONS Indirect-Fired Storage Water Heater Models WH-30 through WH-80 INSTALLATION AND OPERATING INSTRUCTIONS Contents Page Ratings and Specifications..................... 2 Installation Requirements......................

More information

Chapter 3.4: HVAC & Refrigeration System

Chapter 3.4: HVAC & Refrigeration System Chapter 3.4: HVAC & Refrigeration System Part I: Objective type questions and answers 1. One ton of refrigeration (TR) is equal to. a) Kcal/h b) 3.51 kw c) 120oo BTU/h d) all 2. The driving force for refrigeration

More information

CARING FOR YOUR WATER HEATER

CARING FOR YOUR WATER HEATER http://waterheatertimer.org/troubleshoot-rheem-tankless-water-heater.html Water Heater Inspections CARING FOR YOUR WATER HEATER Venting System (Direct Vent Only) The venting system should be inspected

More information

CONTAMINANT REMOVAL FROM CENTRIFUGAL SYSTEMS

CONTAMINANT REMOVAL FROM CENTRIFUGAL SYSTEMS CONTAMINANT REMOVAL FROM CENTRIFUGAL SYSTEMS BULLETIN 240-10-3 June 2004 Supersedes June 1983 Many centrifugal systems get little maintenance. As a result they operate with the refrigerant highly contaminated

More information

SERVICE GUIDELINES HCFC R22 TO HFC REFRIGERANT BLENDS

SERVICE GUIDELINES HCFC R22 TO HFC REFRIGERANT BLENDS SERVICE GUIDELINES HCFC R22 TO HFC REFRIGERANT BLENDS 2009 Tecumseh Products Company. All rights reserved. Page 1 of 8 Refrigerant R22 is widely used for residential and commercial air conditioning, as

More information

SECTION 5 COMMERCIAL REFRIGERATION UNIT 22 CONDENSERS

SECTION 5 COMMERCIAL REFRIGERATION UNIT 22 CONDENSERS SECTION 5 COMMERCIAL REFRIGERATION UNIT 22 CONDENSERS UNIT OBJECTIVES After studying this unit, the reader should be able to explain the purpose of the condenser in a refrigeration system. describe differences

More information

ON-VEHICLE INSPECTION

ON-VEHICLE INSPECTION Sight Glass I11244 ONVEHICLE INSPECTION 1. INSPECT REFRIGERANT VOLUME Observe the sight glass on the liquid tube. AC3 AC22F05 Test conditions: Running engine at 1,500 rpm Blower speed control switch: HI

More information

Condensing unit type EPSILON-ECHOS LE Technical information manual

Condensing unit type EPSILON-ECHOS LE Technical information manual Condensing unit type EPSILON-ECHOS LE Technical information manual 2 > EPSILON ECHOS Water chiller > EPSILON ECHOS /HP Reversible heat pump > EPSILON ECHOS /ST Water chiller with storage tank and pumps

More information

KU DESIGN GUIDELINES APPENDIX XVI RECOMMENDED BAS I/O CONTROL POINTS BY EQUIPMENT / SYSTEM

KU DESIGN GUIDELINES APPENDIX XVI RECOMMENDED BAS I/O CONTROL POINTS BY EQUIPMENT / SYSTEM KU DESIGN GUIDELINES APPENDIX XVI RECOMMENDED BAS I/O CONTROL POINTS BY EQUIPMENT / SYSTEM AIR HANDLING UNITS... 1 CHILLERS... 2 COOLING TOWERS... 2 CLOSED LOOP COOLERS... 2 MISCELLANEOUS SUPPLY FANS...

More information

ORC TURBOGENERATOR TYPE CHP - Organic Rankine Cycle Turbogenerator fed by thermal oil, for the combined production of electric energy and heat -

ORC TURBOGENERATOR TYPE CHP - Organic Rankine Cycle Turbogenerator fed by thermal oil, for the combined production of electric energy and heat - Doc. : 08C00031_e Date : 10.02.2009 Page : 1 / 9 ORC TURBOGENERATOR TYPE CHP - Organic Rankine Cycle Turbogenerator fed by thermal oil, for the combined production of electric - (Preliminary) Doc. : 08C00031_e

More information

VACUUM REFRIGERATION SYSTEMS

VACUUM REFRIGERATION SYSTEMS VACUUM REFRIGERATION SYSTEMS CHILL VACTOR The Croll-Reynolds CHILL-VACTOR is a chiller that uses a vapor flashing process. Water has a pressure-temperature relationship which is its boiling point. If its

More information

Signature and ISX CM870 Fuel System

Signature and ISX CM870 Fuel System Signature and ISX CM870 Fuel System Cummins Ontario Training Center HPI-TP Fuel System Heavy Duty High Pressure Injection - Time Pressure Fuel System The fuel system developed for the Signature and ISX

More information

Boiler Preparation, Start-Up and Shutdown

Boiler Preparation, Start-Up and Shutdown Boiler Preparation, Start-Up and Shutdown Learning Outcome When you complete this module you will be able to: Describe the basic preparation of a boiler for start-up, and the start-up and shutdown procedures.

More information

Cooking at the Speed of light!

Cooking at the Speed of light! Cooking at the Infrared Cooking & Colouring Infrabaker is a modular infrared continuous cooking system developed by Infrabaker International. The machine is designed to cook and/or put colour on a wide

More information

CW-5000/ 5200,1'8675,$/ &+,//(5 86(5 0$18$/

CW-5000/ 5200,1'8675,$/ &+,//(5 86(5 0$18$/ CW-5000/ 5200 Contents Cautions ---------------------------------------------------------------- 3 Parts introduction --------------------------------------------------- 4 Installation ------------------------------------------------------------

More information

PORTABLE AIR CONDITIONER

PORTABLE AIR CONDITIONER VERY IMPORTANT! MODEL: GDC-AC9RW / GDC-AC9RCS GDC-AC9RCW / GDC-AC12RW GDC-AC12RB / GDC-AC12RCB GDC-AC12RCW INSTRUCTIONS FOR USE PORTABLE AIR CONDITIONER Do not install and use your portable air conditioner

More information

CoolTop. A unique water cooled air-conditioning unit for server room cooling from the top AC-TOPx-CW-240/60

CoolTop. A unique water cooled air-conditioning unit for server room cooling from the top AC-TOPx-CW-240/60 CoolTop A unique water cooled air-conditioning unit for server room cooling from the top AC-TOPx-CW-240/60 Application CoolTop is a new, unique air conditioning unit especially designed for datacenters.

More information

ENERGY RETROFIT PROGRAM

ENERGY RETROFIT PROGRAM ENERGY RETROFIT PROGRAM An innovative but simple retrofit for existing hot water and chilled water piping systems that will help you save money. REDUCE FLOW BY 50% REDUCE PUMP HEAD BY 75% REDUCE PUMP POWER

More information

The main steam enters the building in the basement mechanical room; this is where the condensate line also leaves the building.

The main steam enters the building in the basement mechanical room; this is where the condensate line also leaves the building. MSV: Square Footage: 24,844 No. of Floors: 1 Year Built: 1963 Type of Use: Lounge and dining area open all night for snacks Steam Water-cooled condenser, 50-Ton York unit with a 6 cylinder-reciprocating

More information

Ambiente Quick Reference Manual

Ambiente Quick Reference Manual Ambiente Quick Reference Manual Schaerer USA Corporation 2900 Orange Avenue, Suite 102 Signal Hill, CA 90755 Phone (888) 989-3004 Fax (562) 989-3075 TABLE OF CONTENTS Machine Overview Page 1 Button Panel

More information

Fully Pumped Systems

Fully Pumped Systems Fully Pumped Systems (also see the picture gallery and System Basics) The term for any boiler that uses a pump to move all the heat from the boiler to every part of the system is fully pumped. As a rule

More information

HOT & COLD. Basic Thermodynamics and Large Building Heating and Cooling

HOT & COLD. Basic Thermodynamics and Large Building Heating and Cooling HOT & COLD Basic Thermodynamics and Large Building Heating and Cooling What is Thermodynamics? It s the study of energy conversion using heat and other forms of energy based on temperature, volume, and

More information

Why and How we Use Capacity Control

Why and How we Use Capacity Control Why and How we Use Capacity Control On refrigeration and air conditioning applications where the load may vary over a wide range, due to lighting, occupancy, product loading, ambient weather variations,

More information

Benefits of Cold Aisle Containment During Cooling Failure

Benefits of Cold Aisle Containment During Cooling Failure Benefits of Cold Aisle Containment During Cooling Failure Introduction Data centers are mission-critical facilities that require constant operation because they are at the core of the customer-business

More information

National Competency Based Skill Training Refrigeration and Air-conditioning Mechanic Logbook

National Competency Based Skill Training Refrigeration and Air-conditioning Mechanic Logbook National Competency Based Skill Training Refrigeration and Air-conditioning Mechanic Logbook Trainee:... Training Provider:... Year:... Trainee Contact no:... Competency Based Skill Training Logbook Introduction

More information

Volkswagen Golf 5 2004-> VW Rabbit GTI 2006->

Volkswagen Golf 5 2004-> VW Rabbit GTI 2006-> Стр. 1 из 24 Volkswagen Golf 5 2004-> VW Rabbit GTI 2006-> 19-1 Cooling system components Warning! Hot steam may escape when opening expansion tank. Wear protective goggles and protective clothing to prevent

More information

State of the Art Energy Efficient Data Centre Air Conditioning

State of the Art Energy Efficient Data Centre Air Conditioning - White Paper - State of the Art Energy Efficient Data Centre Air Conditioning - Dynamic Free Cooling - Release 2, April 2008 Contents ABSTRACT... 3 1. WHY DO I NEED AN ENERGY EFFICIENT COOLING SYSTEM...

More information

AdSORPTION CHILLER NAK

AdSORPTION CHILLER NAK AdSORPTION CHILLER NAK Chilling Capacity from 50 to 430 kw Usage of Surplus Heat from 50 C Ã*%8ÃPE+Ã TECHNICAL DESCRIPTION ADSORPTION CHILLER NAK 1 INTRODUCTION... 2 2 THE PRINCIPLE OF ADSORPTION... 2

More information

How does solar air conditioning work?

How does solar air conditioning work? How does solar air conditioning work? In a conventional air conditioning system; The working fluid arrives at the compressor as a cool, low-pressure gas. The compressor is powered by electricity to squeeze

More information

HYDRYER TYPE P Heat Regenerative Dryers ISO 9001 CERTIFIED

HYDRYER TYPE P Heat Regenerative Dryers ISO 9001 CERTIFIED HYDRYER TYPE P Heat Regenerative Dryers ISO 9001 CERTIFIED General Air Type P Hydryer Heat Regenerative Systems Introduction General Air Type P Hydryers are electric heat regenerative dryers, designed

More information

CPX/HT Series. REFRIGERATED AND HIGH TEMPERATURE DRYER 12 to 2400 CFM. High-performance products. Designed for you!

CPX/HT Series. REFRIGERATED AND HIGH TEMPERATURE DRYER 12 to 2400 CFM. High-performance products. Designed for you! CPX/HT Series REFRIGERATED AND HIGH TEMPERATURE DRYER 12 to 2400 CFM High-performance products. Designed for you! COMPRESSED AIR WATER CONTAMINATION Atmospheric air contains water in vapor form in different

More information

Module 5: Combustion Technology. Lecture 34: Calculation of calorific value of fuels

Module 5: Combustion Technology. Lecture 34: Calculation of calorific value of fuels 1 P age Module 5: Combustion Technology Lecture 34: Calculation of calorific value of fuels 2 P age Keywords : Gross calorific value, Net calorific value, enthalpy change, bomb calorimeter 5.3 Calculation

More information

USER MANUAL OPERATION AND USE OF CAR WITH. Diego G3 / NEVO SEQUENTIAL GAS INJECTION SYSTEM

USER MANUAL OPERATION AND USE OF CAR WITH. Diego G3 / NEVO SEQUENTIAL GAS INJECTION SYSTEM USER MANUAL OPERATION AND USE OF CAR WITH Diego G3 / NEVO SEQUENTIAL GAS INJECTION SYSTEM Page 2 z 7 Table of contents 1. STARTING THE ENGINE... 3 2. CONTROL PANEL... 3 2.1 Indication of the current level

More information

REMOTE MONITORING AND CONTROL OF THE KAKKONDA GEOTHERMAL POWER PLANTS

REMOTE MONITORING AND CONTROL OF THE KAKKONDA GEOTHERMAL POWER PLANTS REMOTE MONITORING AND CONTROL OF THE KAKKONDA GEOTHERMAL POWER PLANTS Shinji Nishikawa 1, Toshiyuki Takahashi 1, Takeshi Koi 1, and Katsuyoshi Yamada 2 1 Toshiba Corporation Power Systems & Services Company,

More information

MAINTENANCE INSTRUCTIONS. Thermia Robust heat pump

MAINTENANCE INSTRUCTIONS. Thermia Robust heat pump MAINTENANCE INSTRUCTIONS Thermia Robust heat pump 9 6 8 0-5 4 7 4 5 0 0 1 R e v. 3 Table of contents 1 Important information.................. 2 1.1 Product description....................... 2 1.2 General................................

More information

Section 7. Evaporator thermistor. Under-and-over pressure safety switches. Connections to the ECU

Section 7. Evaporator thermistor. Under-and-over pressure safety switches. Connections to the ECU Automatic Temperature Control Diagnosis and Repair Diagnosis of Automatic A/C Systems The most common automatic A/C system malfunctions tend to be the result of basic air conditioning problems. These problems

More information

- White Paper - Data Centre Cooling. Best Practice

- White Paper - Data Centre Cooling. Best Practice - White Paper - Data Centre Cooling Best Practice Release 2, April 2008 Contents INTRODUCTION... 3 1. AIR FLOW LEAKAGE... 3 2. PERFORATED TILES: NUMBER AND OPENING FACTOR... 4 3. PERFORATED TILES: WITH

More information

Fire suppression system for engine compartments USER MANUAL

Fire suppression system for engine compartments USER MANUAL Fire suppression system for engine compartments USER MANUAL Contractor s machinery/vehicles, tooling machines and special machines Edition 2011-3 Hydro pneumatic activation Mechanical activation Electrical

More information

Maxi Pressurisation Units (Maxi, Maxi Plus & HP)

Maxi Pressurisation Units (Maxi, Maxi Plus & HP) Maxi Pressurisation Units (Maxi, Maxi Plus & HP) Installation and Maintenance Instructions Contents 1 Dimensions 3 1.1 Installation 4 1.1 Mains/boosted cold water inlet 4 1.2 Connection to the system 5

More information

Thermal Mass Availability for Cooling Data Centers during Power Shutdown

Thermal Mass Availability for Cooling Data Centers during Power Shutdown 2010 American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. (www.ashrae.org). Published in ASHRAE Transactions (2010, vol 116, part 2). For personal use only. Additional reproduction,

More information

How To Understand Evaporator

How To Understand Evaporator SECTION 5 COMMERCIAL REFRIGERATION UNIT 21 EVAPORATORS AND THE REFRIGERATION SYSTEM UNIT OBJECTIVES After studying this unit, the reader should be able to Define high-, medium-, and low-temperature refrigeration.

More information

AIR COOLED CHILLER CHILLED WATER PUMP CONTROL: The chilled water pump with the lowest runtime will automatically start when the outside air temperature rises above the system enable setpoint. When the

More information

Safety Requirements Specification Guideline

Safety Requirements Specification Guideline Safety Requirements Specification Comments on this report are gratefully received by Johan Hedberg at SP Swedish National Testing and Research Institute mailto:johan.hedberg@sp.se -1- Summary Safety Requirement

More information

Attachment J-C18.1. HVAC Work Instructions

Attachment J-C18.1. HVAC Work Instructions . RFP: Attachment J-C18.1 HVAC Work Instructions NNC13ZFD017J SOW Item No. Title Page C18-02 Control Air Systems Annual PM 2 C18-03 Split System AC Indoor Section Annual PM 3 C18-04 Condensing Unit Semi-Annual

More information

NewAir AC-14100E / AC-14100H Portable Air Conditioner Owner s Manual PLEASE READ AND SAVE THESE INSTRUCTIONS

NewAir AC-14100E / AC-14100H Portable Air Conditioner Owner s Manual PLEASE READ AND SAVE THESE INSTRUCTIONS NewAir AC-14100E / AC-14100H Portable Air Conditioner Owner s Manual PLEASE READ AND SAVE THESE INSTRUCTIONS PARTS LIST Front Back FIG.5 FIG.6 1. Control panel 2. Carrying handle 3. Water tank 4. Casters

More information

Energy Saving Fact Sheet Boilers

Energy Saving Fact Sheet Boilers Energy Saving Fact Sheet Boilers Turn a burning issue into real energy savings You need a boiler to heat your premises and provide hot water or to generate steam for use in industrial processes. Unfortunately,

More information

MP-4000 Alarm List (Software version 2.4.3 or later)

MP-4000 Alarm List (Software version 2.4.3 or later) Service Bulletin SUBJECT: MP4000 Alarm s BULLETIN: C 100 DATE: June 19, 2013 ALARM LIST Where it is possible the alarm number is kept the same as for MP-3000. MP-3000 holds alarm number from 0 to 127.

More information

Daker DK 1, 2, 3 kva. Manuel d installation Installation manual. Part. LE05334AC-07/13-01 GF

Daker DK 1, 2, 3 kva. Manuel d installation Installation manual. Part. LE05334AC-07/13-01 GF Daker DK 1, 2, 3 kva Manuel d installation Installation manual Part. LE05334AC-07/13-01 GF Daker DK 1, 2, 3 kva Index 1 Introduction 24 2 Conditions of use 24 3 LCD Panel 25 4 Installation 28 5 UPS communicator

More information

Indoor coil is too warm in cooling mode or too cold in heating mode. Reversing valve or coil thermistor is faulty

Indoor coil is too warm in cooling mode or too cold in heating mode. Reversing valve or coil thermistor is faulty Codes Room Air Conditioner range: Indoor unit alarm s If timer lamp flashes for 1 second on, 1 second off, this indicates pre heating on the coil during heating mode and is not an error. If timer lamp

More information

Secondary Loop Chilled Water In Super High-Rise

Secondary Loop Chilled Water In Super High-Rise The following article was published in ASHRAE Journal, May 2008. Copyright 2008 American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. It is presented for educational purposes

More information

Nexus FS Point of Use Installation Guide

Nexus FS Point of Use Installation Guide Nexus FS Point of Use Installation Guide Nexus FS POU Install Guide:12152011:rev-12152011 Technical Specifications Dimensions: Height: 43.5 Width: 11.65 Depth: 15 Weight: 34.39 LBS Electrical Specs: Voltage:

More information

italtec PRINTED CIRCUITS EQUIPMENT PRINTED CIRCUITS EQUIPMENT Insulator machines Echting machines Special equipment and machines

italtec PRINTED CIRCUITS EQUIPMENT PRINTED CIRCUITS EQUIPMENT Insulator machines Echting machines Special equipment and machines PRINTED CIRCUITS EQUIPMENT PRINTED CIRCUITS EQUIPMENT Insulator machines Echting machines Special equipment and machines On customer request it is possible to supply: Benches for PCB Oven for PCB Chemicals

More information

FILLING AND PURGING THE SYSTEM

FILLING AND PURGING THE SYSTEM FILLING INSTRUCTIONS FOR WATER HEATER OR CONDENSING BOILER (City Water) Safety tip: Before beginning, turn off power to boiler and circulator. FILLING AND PURGING Step 1: Close Return Manifold Isolation

More information

Refrigerant Changeover Guidelines R-22 to R-407C. Leading the Industry with Environmentally Responsible Refrigerant Solutions

Refrigerant Changeover Guidelines R-22 to R-407C. Leading the Industry with Environmentally Responsible Refrigerant Solutions Refrigerant Changeover Guidelines R-22 to R-407C Leading the Industry with Environmentally Responsible Refrigerant Solutions Emerson Climate CFC Technologies, Inc. does not advocate the HCFC wholesale

More information

How To Clean Up A Reactor Water Cleanup

How To Clean Up A Reactor Water Cleanup General Electric Systems Technology Manual Chapter 2.8 Reactor Water Cleanup System TABLE OF CONTENTS 2.8 REACTOR CLEANUP SYSTEM... 1 2.8.1 Introduction... 2 2.8.2 System Description... 2 2.8.3 Component

More information

UNIT 2 REFRIGERATION CYCLE

UNIT 2 REFRIGERATION CYCLE UNIT 2 REFRIGERATION CYCLE Refrigeration Cycle Structure 2. Introduction Objectives 2.2 Vapour Compression Cycle 2.2. Simple Vapour Compression Refrigeration Cycle 2.2.2 Theoretical Vapour Compression

More information

Ammonia Detection System Codes and Design Specifications

Ammonia Detection System Codes and Design Specifications Ammonia Detection System Codes and Design Specifications December 28, 2015 Revision 5 920 N Trade Winds Pkwy Columbia, MO 65201 Ammonia detection system codes and design specifications Following is a discussion

More information

Engineering Recommendation on: Accumulators Revised 6-17-99 Issued January 10, 1979 Page 1 of 7

Engineering Recommendation on: Accumulators Revised 6-17-99 Issued January 10, 1979 Page 1 of 7 Issued January 10, 1979 Page 1 of 7 Accumulators have long been recognized by the industry as an effective means of maintaining good system balance by storing excess refrigerant as the condenser or evaporator

More information

Solar Hot Water Heaters

Solar Hot Water Heaters Solar Hot Water Heaters Three High Vacuum Water inlet Stainless Steel screw Gel seal and insulation Water outlet Dust proof seals Non Pressure Models Details ASWH-1b ( Color Painted 304 ) ASWH-1c ( stainless

More information

Dealer Sales & Service Guide

Dealer Sales & Service Guide Analog Models w/thermostat or Timerstat Heat Siphon Not Starting 1 BREAKER TRIPPED - Check Breaker Box for correct size breaker Breakers: EX; Domestic model 2.25hp (20amp) 3.25hp (40amp) 5hp (50amp) check

More information

It will be available soon as an 8.5 X 11 paperback. For easier navigation through the e book, use the table of contents.

It will be available soon as an 8.5 X 11 paperback. For easier navigation through the e book, use the table of contents. The System Evaluation Manual and Chiller Evaluation Manual have been revised and combined into this new book; the Air Conditioning and Refrigeration System Evaluation Guide. It will be available soon as

More information

Automobile Air Conditioning Primer

Automobile Air Conditioning Primer Automobile Air Conditioning Primer An air conditioner is basically a refrigerator without the insulated box. It uses the evaporation of a refrigerant, like Freon, to provide cooling. The mechanics of the

More information

How To Make A High Co 2 Gas Blend

How To Make A High Co 2 Gas Blend ECONOMICAL OPTION FOR CO 2 / METHANE SEPARATION IN PRODUCED GAS CONTAINING A HIGH CO 2 FRACTION F. Patrick Ross, P.E. TPR Consulting 9907 Sagecourt Drive Houston, Texas 77089 (713) 870-9208 pat.ross@att.net

More information

C. starting positive displacement pumps with the discharge valve closed.

C. starting positive displacement pumps with the discharge valve closed. KNOWLEDGE: K1.04 [3.4/3.6] P78 The possibility of water hammer in a liquid system is minimized by... A. maintaining temperature above the saturation temperature. B. starting centrifugal pumps with the

More information

Increasing Natural Gas Boiler Efficiency by Capturing Waste Energy from Flue Gas

Increasing Natural Gas Boiler Efficiency by Capturing Waste Energy from Flue Gas Increasing Natural Gas Boiler Efficiency by Capturing Waste Energy from Flue Gas Mark Schiffhauer, ATSI Engineering Services Cameron Veitch, Combustion and Energy Systems Scott Larsen, New York State Energy

More information

Cooling system components, removing and installing

Cooling system components, removing and installing Volkswagen Touareg 3.2 - Cooling system components, removing and installing Page 1 / 24 19-1 Cooling system components, removing and installing Warning! Hot steam may escape when opening expansion tank.

More information

Failure code manual. content

Failure code manual. content Failure code manual content 一 wall split AC series 2 二 floor standing AC series. 4 三 portable AC series.. 5 四 dehumidifer 6 五 DC inverter single split series...7 六 DC inverter multi-split series 10 1 一

More information

ECOCIAT. Domestic hot water heat recovery unit

ECOCIAT. Domestic hot water heat recovery unit Heat recovery unit Domestic hot water High energy efficiency with R410A Compact and quiet Scroll compressors Brazed-plate heat exchangers Heating Heat recovery ENVIRONMENTALLY HFC R410A PROTECTION DE FRIENDLY

More information

Operational Overview and Controls Guide. Two or Three Pump IronHeart Lite with Variable Frequency Drives

Operational Overview and Controls Guide. Two or Three Pump IronHeart Lite with Variable Frequency Drives DOCUMENT: ECSEQ6-0 EFFECTIVE: 09/23/10 SUPERSEDES: Operational Overview and Controls Guide Two or Three Pump IronHeart Lite with Variable Frequency Drives 6700 Best Friend Road. Norcross, GA 30071. (770)

More information

TSB #: 74 Date: 9/7/2013 HOLDEN VE/WM HVAC & A/C DIAGNOSTIC HINTS

TSB #: 74 Date: 9/7/2013 HOLDEN VE/WM HVAC & A/C DIAGNOSTIC HINTS HOLDEN VE/WM HVAC & A/C DIAGNOSTIC HINTS TSB #: 74 Date: 9/7/2013 Initial Once Read: In this technical bulletin we have listed diagnostic advice relating to the Holden VE/WM HVAC & A/C system. This information

More information

Heating Water by Direct Steam Injection

Heating Water by Direct Steam Injection Heating Water by Direct Steam Injection Producing hot water by direct steam injection provides a solution where large volumes of hot water at precise temperatures are required, and where energy and space

More information

ALONE. small scale solar cooling device Project No TREN FP7EN 218952. Project No TREN/FP7EN/218952 ALONE. small scale solar cooling device

ALONE. small scale solar cooling device Project No TREN FP7EN 218952. Project No TREN/FP7EN/218952 ALONE. small scale solar cooling device Project No TREN/FP7EN/218952 ALONE small scale solar cooling device Collaborative Project Small or Medium-scale Focused Research Project DELIVERABLE D5.2 Start date of the project: October 2008, Duration:

More information

USER S MANUAL HSC-24A

USER S MANUAL HSC-24A AIRREX AIR CONDITIONER USER S MANUAL HSC-24A Thank you for purchasing an AIRREX AIR CONDITIONER. BEFORE operation please read this user s manual carefully. Keep this manual readily available. It is ESSENTIAL

More information

E - THEORY/OPERATION

E - THEORY/OPERATION E - THEORY/OPERATION 1995 Volvo 850 1995 ENGINE PERFORMANCE Volvo - Theory & Operation 850 INTRODUCTION This article covers basic description and operation of engine performance-related systems and components.

More information

Using Portable Spot Air Conditioners in Industrial Applications

Using Portable Spot Air Conditioners in Industrial Applications Using Portable Spot Air Conditioners in Industrial Applications Cooling People, Processes and Equipment In today s highly competitive manufacturing sector, companies are constantly looking for new ways

More information

SALES SPECIFICATION. SC7640 Auto/Manual High Resolution Sputter Coater

SALES SPECIFICATION. SC7640 Auto/Manual High Resolution Sputter Coater SALES SPECIFICATION SC7640 Auto/Manual High Resolution Sputter Coater Document Number SS-SC7640 Issue 1 (01/02) Disclaimer The components and packages described in this document are mutually compatible

More information

Art.S001-S002 SOLAR MODULE WITH DELIVERY AND RETURN CONNECTIONS

Art.S001-S002 SOLAR MODULE WITH DELIVERY AND RETURN CONNECTIONS Art.S001-S002 SOLAR MODULE WITH DELIVERY AND RETURN CONNECTIONS Technical Information sheet 0001/07/Rev01 ENG FUNCTION Series S001 and S002 circulation units are applied to the primary circuit of solar

More information

National Grid Small Business Energy Efficiency Program Overview. Central New York Energy Expo March 30, 2010

National Grid Small Business Energy Efficiency Program Overview. Central New York Energy Expo March 30, 2010 National Grid Small Business Energy Efficiency Program Overview Central New York Energy Expo March 30, 2010 Agenda National Grid Cooler Retrofit Program Refrigeration 101 Smart Thermostat Controls, Anti-Sweat

More information

A Guide to Trouble-Free Cooling Towers

A Guide to Trouble-Free Cooling Towers A Guide to Trouble-Free Cooling Towers A basic understanding of cooling tower operation and maintenance will help keep a cooling water system running in top condition, year after year By David M. Suptic

More information

AIR - PNEUMATIC, AIR CONDITIONING, PRESSURIZATION

AIR - PNEUMATIC, AIR CONDITIONING, PRESSURIZATION AIR - PNEUMATIC, AIR CONDITIONING, PRESSURIZATION PNEUMATIC SYSTEM The Pneumatic System is normally supplied by the Engine's compressor sections. The Pneumatic System may also be supplied by APU bleed

More information

Oil and Coolant Circulating Heating System. Model - OCSM

Oil and Coolant Circulating Heating System. Model - OCSM Oil and Coolant Circulating Heating System Model - OCSM Installation & Operation Manual 216280-000 REV 2 Identifying Your System The HOTSTART heating system is designed to heat fluids for use in marine

More information

The Second Law of Thermodynamics

The Second Law of Thermodynamics The Second aw of Thermodynamics The second law of thermodynamics asserts that processes occur in a certain direction and that the energy has quality as well as quantity. The first law places no restriction

More information

AIR-COOLED CHILLERS APPLIED SYSTEMS. www.daikin.eu EUWA*5-24KAZW - EUWY*5-24KAZW -

AIR-COOLED CHILLERS APPLIED SYSTEMS. www.daikin.eu EUWA*5-24KAZW - EUWY*5-24KAZW - AIR-COOLED CHILLERS APPLIED SYSTEMS www.daikin.eu Cooling Only Heat pump EUWA*5-24KAZW - EUWY*5-24KAZW - Environmental Awareness Daikin and the Environment In recent years, motivated by a global awareness

More information