1 SUBSTATION SAMPLE PHOTOS HANDBOOK Version: May 2015

2 Table of Content 1.0 Switchgear Room Removable Stainless Steel Hand Railings..3 Switchgear Louvred Door 5 HT Openings & Floor Frame...12 Opening for Marshaling Box, Pilot Box & Battery Charger.15 Equipment Dimension...16 LT Openings...17 DB Box 19 Trap Door...20 Lightings.24 Isolator Cable Basement Cable Basement Door 26 Red Luminous Paint..27 Cable Ramp And Entry Pipes Transformer Room Transformer Room Door...31 Transformer Plinth Substation w/o cable basement Temporary Substation Earthing for s/s Lighting...40

3 7.0 Fencing Draw Pit Substation Main Gate 44 Butterfly Lock Others 10.1 Signage MCT Cable Lugs Hot Gland Arrangement of single core cable Backfill of sand at trench (for substation w/o cable basement) Things to include in Handover Letter..54

4 Removable Stainless Steel Hand Railings Reference: Appendix 11, Railings Switchgear Room 100mm

5 Reference: Appendix 11, Railings SP POWERGRID LTD

6 Switchgear Louvred Door Reference: Appendix 12, Switchgear Louvred Door 50mm

7 Hasp & Staple Reference: Appendix 12 55mm 150mm 65mm 40mm 20mm 18mm 55mm 15mm

8 Reference: Appendix 12, Switchgear & Cable Chamber Exit Door 30mm Shoot bolt housing

9 Reference: Appendix 12, Switchgear Louvred Door 1m

10 Reference: Appendix 12, Switchgear & Cable Chamber Exit Door All doors must latched at the internal floor level Use Spacer if required

11 Reference: Appendix 12, Switchgear & Transformer Louvred Door All doors to be fitted with good quality door hook and must be able to open fully.

12

13 HT Openings & Floor Frame Screed the floor 5mm below the floor frame, after the floor frame had been fixed

14 600mm x 150mm checker plate / metal grating Checker Plate (Back View)

15 30mm gap Grating width must not more than 300mm

16 Opening for Marshaling Box, Pilot Box & Battery Charger Reference: Appendix 11, Floor Plan IDS RTU Marshalling Tools & Key Cabinet Battery Charger Pilot Box Box

17 Equipment Dimension Item DIMENSION (L X B X H)mm BATTERY CHARGER 960 x 390 x 1300 RTU 600 x 300 x 600 MARSHALLING BOX 790 x 300 x 1300 PILOT BOX 800 x 250 x 1300 IDS 390 x 240 x 500 TOOLS & KEY CABINET 800 x 360 x 1110

18 LT Openings To provide (2x25mm2)+16mm2 cu cable with 1m of flexi hose and hot gland from DB box to right side of the LT opening. LT Board 2200mm x 600mm x 1850mm

19

20 Distribution Box Reference: Appendix 15, Electrical Installation Single Line Diagram Must be endorsed by LEW All MCB must be Label

21 Trap Door Reference: Appendix 11, Aluminum Trap Door & Cat Ladder 860mm x 860mm Alum Trap Door 760mm x 760mm opening 250mm

22 Reference: Appendix 11, Aluminum Trap Door & Cat Ladder 1500mm 375mm

23 Reference: Appendix 11, Aluminum Trap Door & Cat Ladder Non slip type 200mm

24 300mm 200mm

25 Lightings Reference: Appendix 15, Electrical Installation Wall Lighting 2.4m Ceiling Lighting 3m

26 Isolator Isolator 1.5m

27 Cable Basement Cable Basement Door Reference: Appendix 12, Switchgear & Cable Chamber Exit Door 5 x 12mm Steel Bolts Shoot Bolt Housing 30mm

28 Red Luminous Paint Reference: Appendix 15, Cable Chamber Basement To paint front and back of all beam with 50mm Red Luminous Paint

29

30 Cable Ramp & Entry Pipes Reference: Appendix 11, Cable Ramp & Entry Pipes All entry pipes must be smoothed and flush to the wall 200mm Less or equal to 30 degrees 150mm

31 For Earthing Cable 200mm

32 Transformer Room Door Reference: Appendix 12, Transformer Room Louvred Door with Hasp & Staple 2x50mm

33 Transformer Plinth Appendix 11, Layout Plan 75mm x 25mm Deep Grove

34 Angled-iron to be solidly welded across the trench All cable trenches to be covered by removable hot-dipped galvanized mild steel gratings Angled-iron to be solidly welded across the trench

35 Substation w/o cable basement SP POWERGRID LTD

36 Temporary Substation SP POWERGRID LTD

37 LT Opening (OGB) 200mm

38 5-WAY OGB 830 X 320 X 1300

39 Trap Door SP POWERGRID LTD

40

41 Earthing for s/s Lighting To DB Box From Earth Pit

42 Fencing Reference: Appendix 15, Fencing (where required) 600mm wide concrete apron to surround the fence externally

43 Draw Pit SP POWERGRID LTD

44 Substation Main Gate Reference: Appendix 13, Gate Details

45 Butterfly Lock Reference: Appendix 13, Gate Details

46

47 Signage SP POWERGRID LTD

48 MCT SP POWERGRID LTD

49 Cable Lugs 1000mm2 4 holes cable lugs

50 500mm2 2 holes cable lugs

51 500mm2 1 holes cable lugs

52 Hot Gland SP POWERGRID LTD

53 Arrangement of mm or 1000mm Cu single core cables 2 2 Arrangement of 500mm or 1000mm Cu single core cables is carried out as shown below so that the current in each phase is evenly distributed between the cables for that phase. Arrangement 1 L3 L2 L1 N L1 L2 L3 Width For S/C 2 500mm - 280mm Width For S/C mm - 380mm Arrangement 2 L3 L3 L2 L1 N L1 L2 Width For S/C 2 500mm - 200mm Width For S/C mm - 280mm

54

55 Things to include in Handing Over letter **All the 7 item below need to be done by the main contractor after the substation work had been completed 1) Seal all cable entry pipes. 2) Backfill all trench with wash dry sand 3) Apply thin layer of cement 4) Touch-up paint work 5) Cover all excess opening with checker plate or grating 6) Any other minor defect work 7) 24/7 security access For handover of substation, kindly liaise with the Project Officer of the respective section using Appendix 5 form extracted from the How to Apply for Electricity Connection handbook.

GENERAL SPECIFICATION FOR CIVIL ENGINEERING WORKS SECTION 13 WORK FOR ELECTRICAL AND MECHANICAL INSTALLATIONS

GENERAL SPECIFICATION FOR CIVIL ENGINEERING WORKS SECTION 13 WORK FOR ELECTRICAL AND MECHANICAL INSTALLATIONS GENERAL SPECIFICATION FOR CIVIL ENGINEERING WORKS SECTION 13 WORK FOR ELECTRICAL AND MECHANICAL INSTALLATIONS 13.1 13.2 2006 Edition SECTION 13 WORK FOR ELECTRICAL AND MECHANICAL INSTALLATIONS GENERAL

More information

Buildings Construction Procurement Strategy

Buildings Construction Procurement Strategy Buildings Construction Procurement Strategy Graham Strickleton Site, Buildings and Power supplies Procurement Manager JOURNEE DEDIEE AUX INDUSTRIELS ET AUX MEMBRES DU RESEAU A.P.I Disclaimer: these slides

More information

ITS specification Jointing chambers and pull pits (ITS-02-02)

ITS specification Jointing chambers and pull pits (ITS-02-02) ITS specification Jointing chambers and pull pits (ITS-02-02) NZ Transport Agency Effective from September 2011 Copyright information This publication is copyright NZ Transport Agency (NZTA). Material

More information

SECTION 15410 GROUND WATER STORAGE TANKS

SECTION 15410 GROUND WATER STORAGE TANKS SECTION 15410 GROUND WATER STORAGE TANKS PART 1 GENERAL.01 SCOPE A. Section Includes Requirements for designing, fabricating, and erecting a welded steel ground storage tank..02 SYSTEM DESCRIPTION A. Design

More information

Mechanical arms, belts and sheets

Mechanical arms, belts and sheets Car parks Mechanical arms, belts and sheets DETAIL ARM CAR PARK (mm) 5000 Platen 100x5mm Iron sheets 4mm 5000 485 2100 Belts type C 120x50x2 mm 4915 5400 Hot dipped galvanized UNE-EN ISO 1461 or black

More information

Table of Contents. IV. Interior Doors. 1. Product Training 2. Bilco Quote/Order Checklist

Table of Contents. IV. Interior Doors. 1. Product Training 2. Bilco Quote/Order Checklist Table of Contents IV. Interior Doors 1. Product Training 2. Bilco Quote/Order Checklist Interior Doors (non-drainage units) 1. Bilco T, TD, K, and KD Type doors A. T - single leaf aluminum construction

More information

Lift and Escalator Installations

Lift and Escalator Installations Buildings Department Practice Note for Authorized Persons, Registered Structural Engineers and Registered Geotechnical Engineers APP-29 Lift and Escalator Installations Building Works Requirements The

More information

CONSOLIDATED EDISON CO. OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003 DISTRIBUTION ENGINEERING DEPARTMENT SUBSTATION & EQUIPMENT SECTION

CONSOLIDATED EDISON CO. OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003 DISTRIBUTION ENGINEERING DEPARTMENT SUBSTATION & EQUIPMENT SECTION CONSOLIDATED EDISON CO. OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY 10003 DISTRIBUTION ENGINEERING DEPARTMENT SUBSTATION & EQUIPMENT SECTION SPECIFICATION EO-5023 REVISION 3 MARCH 2003 REQUIREMENTS FOR

More information

Product Catalogue (updated Feb. 2010)

Product Catalogue (updated Feb. 2010) Product Catalogue (updated Feb. 2010) 315 BROCK RD GREENSVILLE ON L9H 5H7 PHONE: 905-628-0766 FAX: 905-628-8277 www.efcomltd.com info@efcomltd.com 1 Table of Contents Tool Boxes... 3 Cylinder Enclosures

More information

Reduced depth High Density Cabinet HDC with 19 swing frame 36, 40 and 45 U

Reduced depth High Density Cabinet HDC with 19 swing frame 36, 40 and 45 U Reduced depth High Density Cabinet HDC with 19 swing frame 36, 40 and 45 U Applications The High Density Cabinets are suitable for Central Offices and can be used as fiber nodes and termination points

More information

Summary of Preliminary Assessment on Structural, Fire and Electrical Safety

Summary of Preliminary Assessment on Structural, Fire and Electrical Safety Name of the Factory Address of the Factory Present Status of the Factory Structural Assessment Conducted by : Galaxy Stitch Ltd. : BSCIC Industrial Estate, Plot no. A102, Tongi Gazipur Bangladesh : Under

More information

-1- SPECIFICATIONS 002085 CONE SETTER PLATFORM ATTACHMENT INDEX

-1- SPECIFICATIONS 002085 CONE SETTER PLATFORM ATTACHMENT INDEX -1-002085 CONE SETTER PLATFORM ATTACHMENT INDEX I. GENERAL EQUIPMENT : A. Intent Statement B. Cone Setter Platform II. III. 1. Understructure Frame 2. Mounting Components 3. Paint 4. Basket 5. Labels 6.

More information

Cable Trays Technical Instructions & Specifications

Cable Trays Technical Instructions & Specifications Cable Trays Technical Instructions & Specifications Products Catalogue Objective and Structure The company s main objective is the supply of quality products, with respect to: practical design increased

More information

SWIMMING POOL, SPA, & HOT TUB GUIDELINES

SWIMMING POOL, SPA, & HOT TUB GUIDELINES SWIMMING POOL, SPA, & HOT TUB GUIDELINES Pool permit cost is based on the total value of the project. See Permit Fee Schedule Table 1A. A. Adopted construction codes and installation requirements 1. 2015

More information

DIAMOND Retractable Rodding Robot Model SPRAYROD-R

DIAMOND Retractable Rodding Robot Model SPRAYROD-R 2004-12-21 2 1 (23) DIAMOND Retractable Rodding Robot Model SPRAYROD-R 2004-12-21 2 2 (23) Table of contents 1 TECHNICAL DESCRIPTION...4 1.1 MAIN DETAILS...5 1.2 COMPONENTS DESCRIPTION...5 1.2.1 Pneumatic

More information

How to secure your property after a disaster

How to secure your property after a disaster How to secure your property after a disaster The Red Guide to Recovery HOuse secured properly Board-Up of Windows, Doors and Roof Hole. Lot secured with Perimeter Fencing. Fires, floods, tornadoes, hurricanes,

More information

Welcome: What is U Drain? Drain Materials. Flow

Welcome: What is U Drain? Drain Materials. Flow Welcome: Thank you for looking into the U Drain floor drain system. This paper will explore the functional features of the U Drain and why it is superior to other grated systems in the marketplace. We

More information

Type 1, 3, & 3R Enclosures

Type 1, 3, & 3R Enclosures Junction oxes Type 1 Screw over....................................................................... 50-53 Junction oxes Type 1 Hinge over........................................................................

More information

CABLE TRENCH INSTALLATION GUIDE

CABLE TRENCH INSTALLATION GUIDE 1.0 INDEX 1.0 INDEX 2.0 PURPOSE 3.0 GENERAL INFORMATION 4.0 PLANNING INFORMATION 5.0 CREW INFORMATION 6.0 CONTRACTOR INFORMATION 7.0 PRECASTED/ POURED-IN-PLACE TRENCH DRAWINGS 2.0 PURPOSE This standard

More information

CODE OF PRACTICE 101 FOR DISTRIBUTION SUBSTATION DESIGN. Version 11.0

CODE OF PRACTICE 101 FOR DISTRIBUTION SUBSTATION DESIGN. Version 11.0 CODE OF PRACTICE 101 FOR DISTRIBUTION SUBSTATION DESIGN Issued By : Asset Management Department Asset Development Branch Date of Issue : January, 2010 Code of Practice No. 101 for Distribution Substation

More information

Guide to working on Public Sewers

Guide to working on Public Sewers Guide to working on Public Sewers affected by Building Works Introduction Severn Trent Water Ltd requires the work to be done in order to protect the public sewer and minimise the risk of us having to

More information

Installation Instructions

Installation Instructions Installation Instructions Pedestal Models FS 500 LE FS 800 LE Insert Models IS 500 LE IS 800 LE Pecan Engineering Pty Ltd 13 Acorn Road Dry Creek South Australia 5094 Email info@pecan-eng.com.au Phone:

More information

Specification Number: 13320. MV Substation Buildings

Specification Number: 13320. MV Substation Buildings Specification Number: 13320 Revision No. : 7 Issue Date : December 2003 Latest Review Date : November 2008 Approved by : MV/LV Network Performance Section Issued by : Specifications Manager Networks Procurement

More information

Emergency Voice Communication Systems EVCS Network 8 Data Sheet

Emergency Voice Communication Systems EVCS Network 8 Data Sheet Emergency Voice Communication Systems EVCS Network 8 Data Sheet The Emergency Voice Communications System (EVCS) Network 8 is for use as a Fire Telephone system, Disabled Refuge Call system or as a combined

More information

PivotLoc Ladder Systems

PivotLoc Ladder Systems N25 ACCESS AND SAFETY EQUIPMENT SPECIFICATION CLAUSES PivotLoc Ladder Systems To be read with The Main Contract Preliminaries, General Conditions, Sub-Contract Preliminaries. MINIMUM CONTRACTOR STANDARD

More information

If stepping is required, step at 180mm as seen in this picture.

If stepping is required, step at 180mm as seen in this picture. Cast Foundations to standard building regulations requirements. Foundations must be cast completely level, 600mm wide by 230mm deep for single storey, double storey is not allowed by NHBRC. If stepping

More information

SECTION 15140 - PIPE HANGERS AND SUPPORTS

SECTION 15140 - PIPE HANGERS AND SUPPORTS Part I - GENERAL 1.01 SECTION INCLUDES A. The work covered under this section consists of the furnishing of all necessary labor, supervision, materials, equipment, and services to completely execute the

More information

MUNICODE SERVICES LTD.

MUNICODE SERVICES LTD. The Preserved Wood Foundation Guide MUNICODE SERVICES LTD. Prepared by MuniCode Services Ltd. Outline and Restrictions of this Guide The following information required for the construction of Preserved

More information

Networking Cabinets > Part No Capacity Available Colors Height(mm) Width(mm) Depth(mm)

Networking Cabinets > Part No Capacity Available Colors Height(mm) Width(mm) Depth(mm) Wall Mount Cabinets Link IT Single Sided Wall Mount Cabinets Welded frame, reliable structure Standing or wall mounting installation Easy mounting installation 19 standard installation Removable side panels,

More information

AMERICAN GOTHIC PLAYHOUSE

AMERICAN GOTHIC PLAYHOUSE AMERICAN GOTHIC PLAYHOUSE Project Plan #856 Sheet 1 of 5 Pick a spot and get started with the beautiful that your kids will love. The design of the playhouse includes 35 square feet of interior space plus

More information

Machine Foundation Design

Machine Foundation Design Machine Foundation Design As the structural engineer who recently designed the machine foundation for one of the largest vertical turning and milling centers in the country, in addition to over 250 other

More information

Braselton Bros. Store Redevelopment 5134 HWY 53 BRASELTON, GA 30548 LEVEL 0 - DEMO & NEW PLAN. Room. Room. Room. Room. Room. Room. Room. Room.

Braselton Bros. Store Redevelopment 5134 HWY 53 BRASELTON, GA 30548 LEVEL 0 - DEMO & NEW PLAN. Room. Room. Room. Room. Room. Room. Room. Room. 1.d 2.d 3.d 4.d 1.d 2.d 3.d 4.d REMOVE, REPAIR, & REPLACE EXISTING STOREFRONT SYSTEMS D.1 D.2 REMOVE, REPAIR, & REPLACE EXISTING STOREFRONT SYSTEMS D.1 D.2 REMOVE STAIR & INFILL WALL C.1 REMOVE DOOR &

More information

STANDARD SPECIFICATIONS SECTION 05500 METAL FABRICATIONS

STANDARD SPECIFICATIONS SECTION 05500 METAL FABRICATIONS STANDARD SPECIFICATIONS SECTION 05500 METAL FABRICATIONS PART 1 GENERAL 1.1 DESCRIPTION A. Section includes requirements for providing metal fabricated items like castings, gratings, hatchways, ladders,

More information

Rack Cabinets. Rack Configuration. 19 inch

Rack Cabinets. Rack Configuration. 19 inch Rack Cabinets Rack Configuration 19 inch 19 RACK COMPONENTS FEATURES Hallam Manufacturing s range of 19 inch racks and cabinets for today s data/communications installations are designed and manufactured

More information

Installation Guide. Bath and Wall Surrounds SERIES 7104 1021861-2-B

Installation Guide. Bath and Wall Surrounds SERIES 7104 1021861-2-B Installation Guide and Wall Surrounds SERIES 7104 1021861-2-B Thank You For Choosing Sterling We appreciate your commitment to Sterling value. Please take a few minutes to review this manual before you

More information

BUILDINGA 1/10 SCALE FLATBED TRAILER

BUILDINGA 1/10 SCALE FLATBED TRAILER VOLUME 1, ISSUE 1 BUILDINGA 1/10 SCALE FLATBED TRAILER BUILT, DESIGNED & WRITTEN BY NATHAN MYERS MATERIALS: FEATURES: While the design was kept simple to allow anyone to be able to build their own trailer,

More information

LOADING DOCK EQUIPMENT. A. Section 03100 - Concrete Forms and Accessories: Placement of anchors into concrete.

LOADING DOCK EQUIPMENT. A. Section 03100 - Concrete Forms and Accessories: Placement of anchors into concrete. LOADING DOCK EQUIPMENT PART 1 GENERAL 1.1 SECTION INCLUDES A. Loading dock equipment of the following types: 1. Dock lifts. 2. Control stations. 1.2 RELATED SECTIONS A. Section 03100 - Concrete Forms and

More information

Slavic Village Building Condition Review

Slavic Village Building Condition Review Slavic Village Building Condition Review Slavic Village Development May 8, 2015 Page 1 EXECUTIVE SUMMARY City Architecture was commissioned by Slavic Village Development to review five existing facilities

More information

Proposed A&A work at E-Commerce Air-Hub at SATS Airfreight Terminal 1 (AFT1)

Proposed A&A work at E-Commerce Air-Hub at SATS Airfreight Terminal 1 (AFT1) 1. ADDITION & ALTERATION TO THE MAIN WAREHOUSE 1.1 ELECTRICAL WORKS 1.1.1 The Contractor shall provide into the AFT1 building with 2 x 1000Amp power supply to be terminated with a main isolator. The power

More information

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS

MTA UNIVERSAL STATION PEDESTRIAN BRIDGE Los Angeles, CA. Project Manual and Specification 100% PE SUBMITTAL TABLE OF CONTENTS Los Angeles, CA Project Manual and Specification DIVISION 1 GENERAL CONDITIONS 01 01 10 STATEMENT OF WORK 01 11 00 SUMMARY OF THE WORK 01 14 05 METRO (OWNER) - DIRECTED STOPPAGES 01 20 00 PRICE AND PAYMENT

More information

BOQ for Plumbing, Sanitary Works

BOQ for Plumbing, Sanitary Works BOQ for Plumbing, Sanitary Works Page 1 of 6 Sr.No Item Description Quantity Unit Rate Amount (Rs.) 1 SANITARY FIXTURES Providing & Fixing star white colour vitreous china wall mounted wc with 1a heavy

More information

EARTHING AND BONDING AT SECONDARY SUBSTATIONS

EARTHING AND BONDING AT SECONDARY SUBSTATIONS DISTRIBUTION CONSTRUCTION MANUAL SECTION 4 - SUBSTATIONS ISSUE B SEPT 1996 4.4.4 EARTHING AND BONDING AT SECONDARY SUBSTATIONS 1 SCOPE This section of the Distribution Construction Manual lays down the

More information

GATES, CATTLEGUARDS and PASSAGEWAYS. This factsheet looks at various options for allowing passage through fences for livestock, wildlife and people.

GATES, CATTLEGUARDS and PASSAGEWAYS. This factsheet looks at various options for allowing passage through fences for livestock, wildlife and people. Fencing Order No. 307.400-1 Agdex: 724 March 1996 GATES, CATTLEGUARDS and PASSAGEWAYS This factsheet looks at various options for allowing passage through fences for livestock, wildlife and people. GENERAL

More information

PROLINE Go l d Se r i e s. Desk Consoles and Accessories

PROLINE Go l d Se r i e s. Desk Consoles and Accessories Modular Enclosure Systems Application PROLINE Gold Series desk consoles are ergonomically designed for use in either a sitting or standing position. Single-access consoles have a front door and solid back.

More information

AT&T Specifications Trenching Conduit Boxes and M anholes Aerial Entrance Masts Service Cabinets Bonding and Grounding

AT&T Specifications Trenching Conduit Boxes and M anholes Aerial Entrance Masts Service Cabinets Bonding and Grounding AT&T Specifications Trenching Conduit Boxes and M anholes Aerial Entrance Masts Service Cabinets Bonding and Grounding A Guide for California Developers of Com m ercial Property This guide consists of

More information

(This report is endorsed) Industrivej 20, 9900 Frederikshavn, Danmark

(This report is endorsed) Industrivej 20, 9900 Frederikshavn, Danmark Spectrum Laboratories Ltd is accredited by International Accreditation New Zealand (formerly Telarc). The tests reported herein have been performed in accordance with the terms of our accreditation. This

More information

plumbing products guide

plumbing products guide plumbing products guide radiator pipe guide & seals A significant development in the drive to reduce air leakage and heat loss. Installations such as that shown are all too common. The detail is poorly

More information

COMPANY ESTIMATOR BID DAY PHONE NO.

COMPANY ESTIMATOR BID DAY PHONE NO. COMPANY ESTIMATOR BID DAY PHONE NO. Work Package: Structural Steel Fabrication & Erection The work in each bid package shall include but shall not be limited to all labor, burden, fringe benefits, materials,

More information

Go-kart for little race-drivers

Go-kart for little race-drivers Go-kart for little race-drivers Drill and drive. Go-kart What it lacks in speed, it more than makes up for in fun: the go-kart will excite little race-drivers. 1 Introduction It s only a go-kart, but it

More information

CDGRD-10. Grounding. Solutions For Comm/Data Applications

CDGRD-10. Grounding. Solutions For Comm/Data Applications CDGRD-10 Grounding Solutions For Comm/Data Applications Overview & Table of Contents Cooper B-Line s Grounding products for rack & runway provide a complete solution for grounding metal supports. The offering

More information

James M. Pleasants Company

James M. Pleasants Company James M. Pleasants Company SUBMITTAL DATA GAINESVILLE MECHANICAL DECEMBER 20, 2013 PROJECT: GSU: J-183 HUMANITIES LAW BLDG. QUOTE NO:12116 ENGINEER: STEVENS & WILKINSON GASKETED PLATE HEAT EXCHANGER Tag:

More information

NEGRP TEST SUMMARY. Joseph A. Lanzoni, November 2005

NEGRP TEST SUMMARY. Joseph A. Lanzoni, November 2005 NEGRP TEST SUMMARY Joseph A. Lanzoni, November 2005 The National Electrical Grounding Research Project (NEGRP) was a project managed and sponsored by the National Fire Protection Association (NFPA) Research

More information

Standard Door Specification

Standard Door Specification Element General Requirement To be defined in the project brief but should meet Building Regulations. All doors to be a minimum of 30 minute fire rated and must comply with all relevant UK legislation and

More information

Crime Prevention through Environmental Design (CPTED) - Checklist

Crime Prevention through Environmental Design (CPTED) - Checklist Crime Prevention through Environmental Design (CPTED) - Checklist * Where relevant, each item is to be shown on the architectural plans. A description of how the development complies, together with the

More information

DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL

DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL DIVISION 2 - SEWERAGE AND DRAINAGE SECTION 02720 - STORM DRAIN SYSTEMS PART 1 - GENERAL 1.01 DESCRIPTION A. Furnish and install all storm drains, including manholes, inlets, service lines and other appurtenant

More information

Storage Store the siding in a dry and ventilated area. Do not place it directly on the ground. Always cover the siding after a day s work.

Storage Store the siding in a dry and ventilated area. Do not place it directly on the ground. Always cover the siding after a day s work. Installation Guide Before you begin, take the time to read this entire guide to clearly understand the requirements and steps to follow for proper installation. Warning Do not install defective material.

More information

Installing Window and Door Mouldings

Installing Window and Door Mouldings Installing Window and Door Mouldings About Window and Door Mouldings The trim around windows and doors greatly influences the look and style of your interior. They also bridge the gaps and cover spaces

More information

Improving the flood resistance of your home. Advice sheet 6: Flood-resilient floors

Improving the flood resistance of your home. Advice sheet 6: Flood-resilient floors Improving the flood resistance of your home Advice sheet 6: Flood-resilient This sheet provides guidance on identifying different types of floor, assessing the routes floodwater may enter, and describes

More information

SPECIFICATIONS FOR THE INSTALLATION OF FIRE ALARM SYSTEMS, SPRINKLER SYSTEMS, AND MASTER BOXES IN THE POQUONNOCK BRIDGE FIRE DISTRICT

SPECIFICATIONS FOR THE INSTALLATION OF FIRE ALARM SYSTEMS, SPRINKLER SYSTEMS, AND MASTER BOXES IN THE POQUONNOCK BRIDGE FIRE DISTRICT SPECIFICATIONS FOR THE INSTALLATION OF FIRE ALARM SYSTEMS, SPRINKLER SYSTEMS, AND MASTER BOXES IN THE POQUONNOCK BRIDGE FIRE DISTRICT The purpose of these specifications is to insure that there are minimum

More information

TFL CUSTOM FIREPLACES WITH MASONRY BRICK LININGS. standard INSTALLATION SPECIFICATION INTO TIMBER FRAMING

TFL CUSTOM FIREPLACES WITH MASONRY BRICK LININGS. standard INSTALLATION SPECIFICATION INTO TIMBER FRAMING 6.CW.1A TFL CUSTOM FIREPLACES WITH MASONRY BRICK LININGS wood or gas standard INSTALLATION SPECIFICATION INTO TIMBER FRAMING The Fireplace Ltd is able to design and fabricate custom brick open masonry

More information

CONTENTS. Yale University Design Standards. Underground Electrical Duct Bank. A. Summary. B. System Design and Performance Requirements

CONTENTS. Yale University Design Standards. Underground Electrical Duct Bank. A. Summary. B. System Design and Performance Requirements 16600 Underground Electrical Duct Bank This document provides design standards only, and is not intended for use, in whole or in part, as a specification. Do not copy this information verbatim in specifications

More information

Rittal s Comprehensive Family Of... NETWORK RACK SOLUTIONS

Rittal s Comprehensive Family Of... NETWORK RACK SOLUTIONS Rittal s Comprehensive Family Of... NETWORK RACK SOLUTIONS STANDARD & ECONOMICAL BasicRack A complete low-cost, high-quality basic equipment management system. Design Six web channel holes per side allow

More information

PUBLIC VERTICAL PLATFORM LIFT PLANNING GUIDE

PUBLIC VERTICAL PLATFORM LIFT PLANNING GUIDE Multilift PUBLIC VERTICAL PLATFORM LIFT PLANNING GUIDE Applicable Codes: ASME A17.1 ASME A18.1 CSA B613 CSA B355-09 19-m01-2015 Part No. 000790 Copyright 2015 Savaria Corporation All rights reserved. Printed

More information

PC INTERFACE MODULES FOR TOLL-PLAZA CLASSIFICATION SENSORS

PC INTERFACE MODULES FOR TOLL-PLAZA CLASSIFICATION SENSORS PC INTERFACE MODULES FOR TOLL-PLAZA CLASSIFICATION SENSORS FRANCE Head office USA 4 Rue du Bois Chêne le loup Parc d Activité de Brabois 54 500 VANDOEUVRE LES NANCY (33) 0383442413, Fax (33) 0383443797

More information

WASHROOM UPGRADE SIR CHARLES TUPPER BUILDING 2250 RIVERSIDE DRIVE, OTTAWA, ON SIR CHARLES TUPPER BUILDING A0.0 COVER SHEET / DRAWING LIST

WASHROOM UPGRADE SIR CHARLES TUPPER BUILDING 2250 RIVERSIDE DRIVE, OTTAWA, ON SIR CHARLES TUPPER BUILDING A0.0 COVER SHEET / DRAWING LIST 0 RIVERSIDE DRIVE, OTTAWA, ON A0.0 COVER SHEET / DRAWING LIST A0. LEGEND AND GENERAL NOTES A0. GENERAL NOTES A0. GENERAL NOTES A0. TYPICAL WASHROOM WALL/SINK SECTION A0. DETAIL - CONTROL JOINT A0. DETAIL

More information

Uncovered Decks & Porches

Uncovered Decks & Porches Uncovered Decks & Porches Building Guides for Homeowners Why Do I need a Permit? D I D Y O U K N O W? As owner-builder you are the responsible party of record on such a permit. If your work is being performed

More information

Linear Luminaire for Fluorescent Lamps Series EXLUX 6001

Linear Luminaire for Fluorescent Lamps Series EXLUX 6001 > As wall, ceiling and pendant light fitting or side entry lamp > Version with 2 lamps: 18 W, 36 W and 58 W > Central locking > All-pole disconnection by means of an N/C switch when the lamp is opened

More information

Information Technology Solutions. Feeder Pillars

Information Technology Solutions. Feeder Pillars Feeder Pillars D ES IG NE R A ND M ANUFA C TU RE R Lighting Design Solutions are designers and manufacturers of a wide range of specialist street lighting furniture along with structural and architectural

More information

LONDON BOROUGH OF HACKNEY BUILDING SERVICES ENGINEER REPORT GAS HOUSE, SPRINGFIELD PARK, HACKNEY

LONDON BOROUGH OF HACKNEY BUILDING SERVICES ENGINEER REPORT GAS HOUSE, SPRINGFIELD PARK, HACKNEY LONDON BOROUGH OF HACKNEY BUILDING SERVICES ENGINEER REPORT GAS HOUSE, SPRINGFIELD PARK, HACKNEY 10 TH JUNE 2011 London Borough of Hackney Page 1 of 6 Brief Description of the Proposed Works The existing

More information

LIEBERT VNSA Installation Sheet

LIEBERT VNSA Installation Sheet LIEBERT VNSA Installation Sheet Description The Liebert vnsa network switch is designed for connecting multiple Ethernet-ready devices and comes in various models. The unit may have: A Liebert icom display

More information

PUBLIC RESTROOMS, DESIGN INTENT

PUBLIC RESTROOMS, DESIGN INTENT PUBLIC RESTROOMS, DESIGN INTENT 1.01 STRUCTURAL A. Where feasible, metal stud partitions will be constructed on a 6 high concrete curb. 1.02 MECHANICAL A. Restrooms will have a minimum of 15 air changes

More information

REQUIREMENTS AND SPECIFICATIONS FOR HIGH VOLTAGE CUSTOMER BUILT FACILITIES PEPCO ENGINEERING

REQUIREMENTS AND SPECIFICATIONS FOR HIGH VOLTAGE CUSTOMER BUILT FACILITIES PEPCO ENGINEERING REQUIREMENTS AND SPECIFICATIONS FOR HIGH VOLTAGE CUSTOMER BUILT FACILITIES PEPCO ENGINEERING Revised October, 2013 TABLE OF CONTENTS 1.0 INTRODUCTION... 3 2.0 REQUIRED DRAWINGS... 3 2.1 Site Plan... 3

More information

PART 1 GENERAL 1.1 SECTION INCLUDES

PART 1 GENERAL 1.1 SECTION INCLUDES J-1 Section 09110 Long Form Specification INTERIOR METAL STUD FRAMING This section includes lightweight, usually 0.036 inch (0.9 mm) thick or lighter, non-axial load bearing metal stud framing including

More information

AMS 120. EFT Guest Card Terminal & Refund unit

AMS 120. EFT Guest Card Terminal & Refund unit AMS 120 EFT Guest Card Terminal & Refund unit ACCOUNT MANAGEMENT STATIONS Wall mounted kiosk offering Visitor card purchase and refund Card deposit EFT purchase, refund and loading Full statement facilities

More information

CHAIN-LINK FENCES BID SPECIFICATIONS DESCRIPTION

CHAIN-LINK FENCES BID SPECIFICATIONS DESCRIPTION CHAIN-LINK FENCES BID SPECIFICATIONS DESCRIPTION 1 This item shall consist of furnishing and erecting Chain-Link fence in accordance with these specifications and the details shown on the plans and in

More information

GPD Rubber Press Seals

GPD Rubber Press Seals GPD Rubber Press Seals Leading in in ideas SYSTEM-TECHNIK GPD Rubber Press Seals Design Available with a rubber thickness of 30 mm for sealing against non-pressing water and a rubber thickness of 60 mm

More information

Reticulation sewers in basements Technical guidelines

Reticulation sewers in basements Technical guidelines Reticulation sewers in basements Technical guidelines Overview What These guidelines explain our technical requirements for laying sewers in building basements. The scope of the guide is restricted to

More information

SUPER SHED. Indoor shelter for your outdoor tools.

SUPER SHED. Indoor shelter for your outdoor tools. SUPER SHED Indoor shelter for your outdoor tools. Not everyone needs a garden shed. But, if you've no more space on your garage wall for that new leaf rake, if you can't find your potting trowel because

More information

ARTS AND CRAFTS 10.1.0. 5410 (open) 5412 (doors) H : 84" Tote Tray Storage. Damp Storage. Tote Tray Storage. Notebook Board Storage, Doors

ARTS AND CRAFTS 10.1.0. 5410 (open) 5412 (doors) H : 84 Tote Tray Storage. Damp Storage. Tote Tray Storage. Notebook Board Storage, Doors Drawing Board Storage, Open Drawing Board Storage, Doors Drawing Board Storage Notebook Storage, Open 1670 D : 23.25" holds 32 drawing boards 1 shelf, adjustable on 1¼" increments maximum board height

More information

Cold Room & Refrigeration System (Casserole Assembly) No of units: 1

Cold Room & Refrigeration System (Casserole Assembly) No of units: 1 Technical Specifications Cold Room & Refrigeration System (Casserole Assembly) No of units: 1 For chiller storage of all sorts of items Chiller storage temperature: 2-5 C Provides excellent thermal efficiency

More information

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT SAMPLE SCHEDULE OF S 1.00 General Conditions 1.01 Project Management 1.02 General Superintendent 1.03 Superintendents 1.04 Safety Engineer 1.05 Scheduling 1.06 Field Engineering 1.07 Bonds 1.08 Trailer

More information

SECTION 260536 - CABLE TRAYS. A. Continuous, rigid, welded steel or stainless steel wire mesh cable management system.

SECTION 260536 - CABLE TRAYS. A. Continuous, rigid, welded steel or stainless steel wire mesh cable management system. SECTION 260536 - CABLE TRAYS PART 1 - GENERAL SECTION INCLUDES: A. Continuous, rigid, welded steel or stainless steel wire mesh cable management system. B. Cable tray systems are defined to include, but

More information

Seismic Retrofitting for School Buildings in Japan Nonstructual Seismic Retrofitting

Seismic Retrofitting for School Buildings in Japan Nonstructual Seismic Retrofitting Seismic Retrofitting for School Buildings in Japan Nonstructual Seismic Retrofitting for School Buildings in Japan 8 January 2009 Koichi Shinpo Director, Educational Facilities Research Center National

More information

Integral Kit Instructions

Integral Kit Instructions Integral Kit Instructions For Fisher & Paykel Cabinet widths of 525, 635, 680, 790 mm wide For curved door Models Series B, C, D & G Manual 814980 Updated August 2008 IMPORTANT If your refrigerator has

More information

CORNER FRIDGE REFRIGERATION UNIT INSTALLATION AND OPERATION INSTRUCTIONS

CORNER FRIDGE REFRIGERATION UNIT INSTALLATION AND OPERATION INSTRUCTIONS CORNER FRIDGE REFRIGERATION UNIT INSTALLATION AND OPERATION INSTRUCTIONS D E F Y I N G C O N V E N T I O N Congratulations on your new Corner Fridge Your new corner fridge may have different functions

More information

HARDWARE LOCATIONS FOR HOLLOW METAL DOORS AND FRAMES

HARDWARE LOCATIONS FOR HOLLOW METAL DOORS AND FRAMES HOLLOW METAL MANUAL NAAMM STANDARD HMMA 831-11 8d NAAMM HMMA 831-11 METAL DOORS & FRAMES HARDWARE LOCATIONS FOR HOLLOW METAL DOORS AND FRAMES 8d NAAMM HMMA 831-11 METAL DOORS & FRAMES A Division of HOLLOW

More information

SECTION 14 20 10 - FREIGHT & PARKING GARAGE ELEVATORS PART I - GENERAL

SECTION 14 20 10 - FREIGHT & PARKING GARAGE ELEVATORS PART I - GENERAL SECTION 14 20 10 - FREIGHT & PARKING GARAGE PART I - GENERAL 1.1 SECTION INCLUDES [NOTE to AE: The following lists requirements that are specific to freight elevators. These requirements are in addition

More information

Does Wall Township require an inspection by the building department on resale of a home?

Does Wall Township require an inspection by the building department on resale of a home? Selling your home Does Wall Township require an inspection by the building department on resale of a home? No. We do not require a Certificate of Continued Occupancy on the resale of home. A Smoke Detector,

More information

Linkeo 19" freestanding cabinets

Linkeo 19 freestanding cabinets 87045 LIMOGES Cedex France Telephone: (+33) 05 55 06 87 87 - Fax: (+33) 05 55 06 88 88 Linkeo 19" freestanding cabinets Page 1. General characteristics....1 2. Range....2 3. Technical characteristics...3

More information

39HQ Airovision Air Handling Units

39HQ Airovision Air Handling Units 39HQ Airovision Air Handling Units Mounting instructions CONTENTS 1 - TRANSPORT AND LIFTING INSTRUCTIONS... 3 1.1 - General... 3 1.2 - Transport and storage... 3 1.3 - Roof edge protection during transport

More information

GUIDELINES FOR INSTALLATION OF AIR CONDITIONING UNITS 174-180 PHILLIP STREET, SYDNEY

GUIDELINES FOR INSTALLATION OF AIR CONDITIONING UNITS 174-180 PHILLIP STREET, SYDNEY GUIDELINES FOR INSTALLATION OF AIR CONDITIONING UNITS 174-180 PHILLIP STREET, SYDNEY July 2008 1.0 SCOPE These guidelines describe the way in which air conditioning units shall be installed or replaced

More information

TYPICAL FIRE SAFETY INSPECTION VIOLATIONS

TYPICAL FIRE SAFETY INSPECTION VIOLATIONS TYPICAL FIRE SAFETY INSPECTION VIOLATIONS The following is a list of typical violations often found by inspectors and a generic solution. You can use this list to improve the safety of your facility, to

More information

GUARDIAN REFUGE & EMERGENCY VOICE COMMUNICATION SYSTEMS

GUARDIAN REFUGE & EMERGENCY VOICE COMMUNICATION SYSTEMS GUARDIAN REFUGE & EMERGENCY VOICE COMMUNICATION SYSTEMS All Guardian Refuge and EVC Systems are BS9999 & BS5839 Pt9. 2010 compliant, and we offer our consultants assistance for BS5839, BS9999, (Fire safety

More information

OVERALL CONVEYOR WIDTH STEEL ALUMINUM MODEL # PER FT. 10 FT. 5 FT. PER FT. 10 FT. 5 FT. PER FT. 10 FT. 5 FT. PER FT. 10 FT. 5 FT.

OVERALL CONVEYOR WIDTH STEEL ALUMINUM MODEL # PER FT. 10 FT. 5 FT. PER FT. 10 FT. 5 FT. PER FT. 10 FT. 5 FT. PER FT. 10 FT. 5 FT. Pick Smarter. Pick Better. Pick UNEX. Skatewheel (SW) Skatewheel Gravity Conveyor is ideally suited to convey lightweight packages and where operations require portable or temporary conveyor lines such

More information

SECTION 32 31 13 CHAIN LINK FENCES AND GATES

SECTION 32 31 13 CHAIN LINK FENCES AND GATES PART 1 GENERAL 1.1 DESCRIPTION SECTION 32 31 13 CHAIN LINK FENCES AND GATES SPEC WRITER NOTES: 1. Delete or add information between //---// and any other items applicable to project. Cover any item added

More information

BERTHOLD ELECTRIC GENERATOR CONNECTION CABINET

BERTHOLD ELECTRIC GENERATOR CONNECTION CABINET BERTHOLD ELECTRIC GENERATOR CONNECTION CABINET Berthold Electric Company s Generator Connection Cabinet provides a quick and convenient station to connect a portable generator to a facility s main service

More information

SPECIFICATIONS FOR VASWANI BRENTWOOD PROJECT. RCC Framed Structure confirming with zone II seismic detailing. Reinforced Cement Concrete

SPECIFICATIONS FOR VASWANI BRENTWOOD PROJECT. RCC Framed Structure confirming with zone II seismic detailing. Reinforced Cement Concrete SPECIFICATIONS FOR VASWANI BRENTWOOD PROJECT 1. CONSTRUCTION: Foundation Super Structure Internal Walls External Walls Roof Retaining Walls RCC footing RCC Framed Structure confirming with zone II seismic

More information

All Weather Hall. Efficient, multipurpose & quick to build

All Weather Hall. Efficient, multipurpose & quick to build All Weather Hall Efficient, multipurpose & quick to build ALL WEATHER HALL www.deboer.com www.deboer.com ALL WEATHER HALL A flexible solution for a multitude of needs All Weather halls from De Boer provide

More information

Table of Contents. I. Roof Scuttles

Table of Contents. I. Roof Scuttles Table of Contents I. 1. Specification Guidelines 2. Bilco Quote/Order Checklist 3. Target Markets 4. Product Training 5. Benefits/Features 6. Scuttle Handrails Specification Guidelines Key Bilco features

More information