1 GUIDELINES FOR INSTALLATION OF AIR CONDITIONING UNITS PHILLIP STREET, SYDNEY July SCOPE These guidelines describe the way in which air conditioning units shall be installed or replaced in the building situated at Phillip Street, Sydney. 2.0 APPROVALS No air conditioning replacements or new installations shall be carried out without the approval of Counsel s Chambers Limited and any such approval, if given, shall be on the basis that all work shall comply with the requirements of these guidelines. Approval shall also be obtained, where necessary, from any statutory authority, which may have jurisdiction over the installation. This document is to be used in conjunction with the Contractor on-site procedures & conditions and Rules for Tradesmen issued by Counsel s Chambers Limited. Consultation must take place with Counsel s Chambers Limited and a preliminary design must be agreed upon by Counsel s Chambers Limited before the installation takes place. This would ideally occur prior to providing a quotation in the event that the installer s preliminary design is not acceptable to Counsel's Chambers Ltd. Inspection of the installation must take place and final approval granted from Counsel s Chambers Limited. Installers are reminded that any old air conditioning units and any excess building materials must be removed off-site on the day of installation of the new unit. 3.0 INSTALLATIONS - PHILLIP STREET, FAÇADE 3.1 Split System Type Air Conditioners The colour of the units shall be approved by Counsel s Chambers. Outdoor units shall be mounted on the left hand end of the window ledges and supported by two (2) stainless steel brackets so that the base of the unit is 330mm above the outer edge. The brackets shall be fastened to the ledges using minimum M8 stainless steel threaded rod placed into pre-drilled holes minimum depth 70mm. The annular C:\Documents and Settings\amanda\Local Settings\Temporary Internet Files\OLK27\AC GUIDELINES JULY 08.doc

2 space between the rods and the holes shall be filled with Hilti Hit HY 150 bonding compound. The ledge surface surrounding the holes shall be generously coated with the same compound so that the feet of the brackets sits in the compound and is sealed around the edges. The sealing of the brackets to the ledges is important to prevent any moisture penetration into the ledges. The brackets shall be secured to the threaded rods using stainless steel nuts, washers and spring washers. The outdoor units shall be secured to the brackets using stainless steel bolts, nuts, washers and spring washers with the units separated from the brackets by rubber washers. Indoor units may be placed where required subject to the approval of Counsel s Chambers. Pipes and conduits may only pass through neat holes cut in the window glazing on the panels beneath the windows. Any openings in glazing or panels shall be sealed watertight. Infill panels of wood or other material are not to be used. Sufficient insulation is required around refrigerant piping and fixtures to prevent condensate formation. Penetrations shall not be made in frames of windows or panels in exterior walls. Condensate from the outdoor units shall be run in 20mm white plastic pipe to discharge into the existing main drain system at each level. Condensate from the indoor units may also utilise the existing main drain system. Exposed piping and conduit shall be covered with 70mm x 70mm aluminum channel ducting over its entire length. The channel ducting shall be painted to match the surfaces to which it is fixed. The external air conditioning units and fixtures are required to be installed using the Building Maintenance Unit (BMU). The BMU must be booked in advance and Phillip St façade installations can only occur on weekends. Any person using the BMU must complete a training session conducted by Counsel's Chambers Ltd. 3.2 Window Type Air Conditioning Units Window type Air Conditioning Units are not permitted to be installed on the buildings Phillip St Façade. The window units geometry, installation and operation conflict with the façade design. 2

3 4.0 INSTALLATIONS - LIGHT WELLS 4.1 Split System Type Air Conditioning Units Outdoor units shall be mounted as outlined in section 8.1. To preserve the integrity of the membrane coating on the wall, the edges of the brackets and around all fastenings shall be sealed immediately after installation with a single part polyurethane flexible sealant. Sufficient insulation is required around refrigerant piping and fixtures to prevent condensate formation. Indoor units may be placed where required subject to the approval of Counsel s Chambers. Pipes and conduits may only pass through neat holes out in the window glazing and any openings shall be sealed watertight. Infill panels of wood or other material are not to be used. Any new or replacement glazing shall be Georgian wired type. Penetrations shall not be made in frames of windows or exterior walls. 4.2 Window Type Air Conditioning Units Shall be installed in windows only without modification to frames or mullions. The window glazing shall be cut to a neat size to accept the unit and the surrounding void shall be sealed using a suitable weatherproof silicon sealant. Infill panels of timber or other material shall not be used. Any new or replacement glazing shall be Georgian wired type. Where external brackets are required, they shall be manufactured and installed in a similar manner to those described for the outdoor units. 4.3 Condensate Disposal Condensate from all units shall be disposed of into the existing main drain system at each level. Connection to the system is to be via clear flexible hose, securely fastened to the air conditioning unit s drain. No units shall be installed unless a drainage system using the above is provided and drainage of condensate onto the floor of the light wells is not permitted. The use of hot-boxes as previously prescribed by Counsel's Chambers Ltd is not acceptable. 3

4 5.0 INSTALLATION PROCESS WINDOWS 5.1 Asbestos in Window Mastic MEMORANDUM: TRACES OF ASBESTOS IN WINDOW MASTIC The mastic in the windows of Selborne & Wentworth Chambers contains traces of asbestos. The mastic surrounds the glass in the window panes, providing a seal for the window. The affected windows are those that are original to the building. The new windows in Selborne & Wentworth Chambers, which are bronze in colour, are not affected and do not utilize mastic containing asbestos. CCL has been advised that provided the mastic remains in good condition and is not disturbed it presents no material danger. A management plan has been developed and implemented by CCL to address the risk associated with the window mastic. The plan involves testing, inspections and ensuring that some simple rules are observed. Under the plan the following measures must be strictly observed by all occupants of and visitors to the building: The mastic must not be disturbed, removed or damaged in any way. All persons occupying space in Chambers must be aware of the presence of asbestos in the window mastic. The mastic has been sealed and CCL has been advised that it presents no danger in its current form, however it must remain in place and remain undisturbed. All building work carried out in Chambers must be approved by Counsel s Chambers Limited prior to any work taking place and must be carried out in accordance with the Rules for Tradespersons and Contractor on site Procedures. Counsel s Chambers must be notified of any intention to repair or replace air conditioning units. This type of work may affect the window mastic in which case the appropriate safety measures will need to be put in place. The replacement or removal of glazing is prohibited unless prior notification is submitted to and approval obtained from Counsel s Chambers Limited. Counsel s Chambers Limited will require advice to be obtained from an Environmental or OH&S Consultant and any work that is to be carried out on the windows that will affect the window mastic will require that the mastic is removed by a licensed asbestos contractor. 5.2 Window Frames The window frames are not to be altered in any way during the installation process. Penetrations of the window frame to accommodate a split system unit are NOT PERMITTED. All penetrations are to be made through the glass. The windows are to be re-instated as new, and previous damage from existing installations to be made good and as approved by CCL. All glazing work is to be carried out by a glazier approved by Counsel s Chambers. 4

5 5.3 Glass Should the replacement of glass be required, that glass is to be of the Georgian Wired type. The glass is to be sealed in its original position using Polyshim II or what is known as butyl tape. The windows are to be re-instated as originally installed and all glazing work is to be carried out by a glazier approved by Counsel s Chambers. 5.4 Mounting the unit The weight of external unit is not to be placed upon window frames. The frames are not designed as load bearing members, and the weight of these units distorts the frame and damages the window seals. Mounting blocks are to be used to support the weight of the external units during the installation process. 6.0 UNIT IDENTIFICATION All units installed in Selborne and Wentworth Chambers must have labels or tags which clearly identify the installer and the relevant contact details. In the case of split system units, both internal and external units must have these tags or labels. The date of installation must be indicated on the identification tag or label. 7.0 SYSTEM SELECTION The design of the system shall be according to the current Australian Standard MOUNTING OF EXTERNAL UNITS The mounting of all external items must be in accordance with these guidelines. The items included in this specification are the external unit for split system air conditioning units, all piping and conduit and the mounting brackets for these items. The following applies for units of approximately 40kg. Heavier units must have superior fasteners and/or brackets and must have Counsel's Chambers Ltd approval. 8.1 Fastening equipment All brackets supporting the external unit must be fastened to the wall with Hilti HLC R 12 x 75 stainless steel expansion anchors. The installation of these anchors must be according to the manufacturer directions. The wall depth of 90 mm must not be breached. For the use of alternative fastening items, prior approval must be sought from Counsels Chambers. Should you arrive onsite without the correct fasteners, Hilti fasteners will be available for purchase from the Maintenance Office at a cost of $5 per anchor. A minimum of two anchors per bracket must be used, 4 in total. Nylon wall plugs are not permissible. The outdoor units shall be secured to the brackets using stainless steel bolts, nuts, washers and spring washers with the units separated from the brackets by rubber washers. All 4 feet of external units must be secured in this fashion. The external units must be mounted a maximum of 100 millimetres from the exterior wall. 5

6 8.2 Support Brackets All brackets used to support external air conditioning units must be hot dipped galvanised (minimum 4mm gauge) and must have, at least, the critical dimensions shown below. The vertical location of the horizontal cross-member is free. The member must be welded to the upright on all four sides. Brackets that do not comply with these criteria, must be approved by Counsel s Chambers prior to installation. Alternatively, a two piece unistrut bracket may be used as mounting brackets for units, after consultation and approval from Counsel s Chambers Limited. Warranty: Shall be twelve (12) months parts and labour if a minimum 12 months maintenance contract awarded, else twelve (12) months parts and ninety (90) days labour. 6

Air-Conditioning, Heating, and Refrigeration Institute. Sheet Metal and Air-Conditioning Contractors National Association

Air-Conditioning, Heating, and Refrigeration Institute. Sheet Metal and Air-Conditioning Contractors National Association Air-Conditioning, Heating, and Refrigeration Institute Sheet Metal and Air-Conditioning Contractors National Association GUIDELINE B-1997 ACKNOWLEDGEMENT These guidelines for Roof Mounted Outdoor Air-

More information

INSTALLATION OF A BAY WINDOW

INSTALLATION OF A BAY WINDOW INSTALLATION OF A BAY WINDOW Installation of a Bay Window These instructions relate to the replacement of an existing bay window or replacement of a straight window with a new bay window, in an opening

More information

March 14, 2007. Installation of Bay, Bow and Garden Windows

March 14, 2007. Installation of Bay, Bow and Garden Windows March 14, 2007 Re: Installation of Bay, Bow and Garden Windows Attached are the Atrium Companies, Inc recommendation for the installation of bay, bow and garden windows. These instructions were developed

More information

Packaged Terminal Air Conditioner Wall Sleeve Installation

Packaged Terminal Air Conditioner Wall Sleeve Installation Installation & Maintenance Data IM 1196 Group: PTAC Part Number: 910141799 Date: October 2013 Packaged Terminal Air Conditioner Installation x 42" PGAN with Top-Mounted Hydronic Heat Note: Installation

More information

Acumen Enterprises, Inc.

Acumen Enterprises, Inc. Hourly rates Discount w/o Rebate Electrician $78.00 10% $70.20 $70.73 HVAC Technician $78.00 10% $70.20 $70.73 Insulator $42.00 10% $37.80 $38.08 Sheet Metal Worker $74.00 10% $66.60 $67.10 Plumber/Pipefitter

More information

Residential Deck Safety, Construction, and Repair

Residential Deck Safety, Construction, and Repair Juneau Permit Center, 4 th Floor Marine View Center, (907)586-0770 This handout is designed to help you build your deck to comply with the 2006 International Residential Building code as modified by the

More information

The Butler MR-24 Standing Seam Roof Difference. A comparison between metal roof systems

The Butler MR-24 Standing Seam Roof Difference. A comparison between metal roof systems The Butler MR-24 Standing Seam Roof Difference A comparison between metal roof systems Roof Systems Necessities Weathertight (don t leak!) Low maintenance Weathertightness Roof clips, seams, panel alignment

More information

SECTION 23 05 29 - HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

SECTION 23 05 29 - HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT SECTION 23 05 29 - HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT PART 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Pipe hangers and supports. 2. Hanger rods. 3. Inserts. 4. Flashing. 5. Equipment

More information

necessary for years of satisfactory service. SmartBlock insulating form concrete walls share the

necessary for years of satisfactory service. SmartBlock insulating form concrete walls share the Chapter 7 PLUMBING AND ELECTRICAL 7.1 Introduction to Plumbing and Electrical Consideration of support services such as plumbing and electrical systems from the preliminary schematics phase through final

More information

Schlüter -KERDI-BOARD Substrate, structural panel, bonded waterproofing

Schlüter -KERDI-BOARD Substrate, structural panel, bonded waterproofing Substrate, structural panel, bonded waterproofing The universal substrate for tiles Perfect covering No matter whether you work with mosaics or large format tiles, an absolutely level substrate with straight

More information

Installation Instructions

Installation Instructions READ BEFORE INSTALLING UNIT For Slider Casement Air Conditioners To avoid risk of personal injury, property damage, or product damage due to the weight of this device and sharp edges that may be exposed:

More information

Installation Instructions

Installation Instructions Installation Instructions READ BEFORE INSTALLING UNIT For Low Profile Window Air Conditioner INSTALLATION WARNINGS AND CAUTION Carefully read the installation manual before beginning. Follow each step

More information

PART E SPECIFICATIONS

PART E SPECIFICATIONS PART E SPECIFICATIONS Page 1 of 5 PART E - SPECIFICATIONS GENERAL E1. APPLICABLE SPECIFICATIONS, STANDARD DETAILS AND DRAWINGS E1.1 The City of Winnipeg Works and Operations Division Standard Construction

More information

TECHNICAL ASSISTANCE TOLL FREE TELEPHONE NUMBER 1.800.591.9360 TECHNICAL ASSISTANCE FAX: 1.626.855.4894

TECHNICAL ASSISTANCE TOLL FREE TELEPHONE NUMBER 1.800.591.9360 TECHNICAL ASSISTANCE FAX: 1.626.855.4894 ACORN SAFETY P.O. BOX 3527 CITY OF INDUSTRY, CA 9744-0527 UNITED STATES OF AMERICA WWW.ACORNSAFETY.COM INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS FREEZE RESISTANT WALL MOUNTED EMERGENCY EYEWASH

More information

We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden window unit.

We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden window unit. Important Information for New Construction Installations Attention Installer! We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden

More information

7. Installation. installation 7.1.1. CAST-IN WINDOW SYSTEM 7.1. INSTALLATION OF WINDOW MAIN FRAME

7. Installation. installation 7.1.1. CAST-IN WINDOW SYSTEM 7.1. INSTALLATION OF WINDOW MAIN FRAME 7. Installation Window involves the fixing of window frame at an earlier construction stage and subsequent of the window sashes. This is a highly workmanship dependent process. Only trained and approved

More information

Assessing Curtain Walls

Assessing Curtain Walls Assessing Curtain Walls Considerations and Best Practices Paul E Beers GCI Consultants, LLC pbeers@gciconsultants.com What is a Curtain Wall System? A curtain wall system is an outer covering of a building

More information

-1- SPECIFICATIONS 002085 CONE SETTER PLATFORM ATTACHMENT INDEX

-1- SPECIFICATIONS 002085 CONE SETTER PLATFORM ATTACHMENT INDEX -1-002085 CONE SETTER PLATFORM ATTACHMENT INDEX I. GENERAL EQUIPMENT : A. Intent Statement B. Cone Setter Platform II. III. 1. Understructure Frame 2. Mounting Components 3. Paint 4. Basket 5. Labels 6.

More information

Select Radiators Installation Guide

Select Radiators Installation Guide Select Radiators Installation Guide Table of Contents Informational Symbols...3 Before You Begin...4 Select Rough-In... 5 Connection Installation...6 Optional Piping Arrangements...7 Conventional Wall

More information

FIRE RATED GLAZING System Guide

FIRE RATED GLAZING System Guide SYSTEM GUIDE Issue date: 05-05-2015 Expiry date: 31-12-2016 System Guide Introduction Pyropanel Developments are specialists in fire rated glazing solutions, and our systems are designed for easy installation

More information

CONTENTS. Yale University Design Standards. Underground Electrical Duct Bank. A. Summary. B. System Design and Performance Requirements

CONTENTS. Yale University Design Standards. Underground Electrical Duct Bank. A. Summary. B. System Design and Performance Requirements 16600 Underground Electrical Duct Bank This document provides design standards only, and is not intended for use, in whole or in part, as a specification. Do not copy this information verbatim in specifications

More information

12.1 Schlüter -KERDI-BOARD

12.1 Schlüter -KERDI-BOARD I n n o v a t i v e p r o f i l e s 12.1 Schlüter -KERDI-BOARD S u b s t r a t e U N I V E R S A L S T R U C T U R A L P A N E L, B O N D E D W A T E R P R O O F I N G Application and Function Schlüter

More information

Seismic Installation for Attic Storage System

Seismic Installation for Attic Storage System Your Performance Partner Seismic Installation for Storage System CONTENTS SSafety Precautions................................. 2 Required Tools..................................... 2 Parts and Fastener

More information

Storage Store the siding in a dry and ventilated area. Do not place it directly on the ground. Always cover the siding after a day s work.

Storage Store the siding in a dry and ventilated area. Do not place it directly on the ground. Always cover the siding after a day s work. Installation Guide Before you begin, take the time to read this entire guide to clearly understand the requirements and steps to follow for proper installation. Warning Do not install defective material.

More information

Composite Panel Firewall Systems

Composite Panel Firewall Systems Composite Panel Firewall Systems part of the Protecting more than your business Insulated mineral fibre panels have excellent thermal and acoustic properties, ideal for factory and office partition walls.

More information

Building Code Clarifications - 7. Fire Resistance

Building Code Clarifications - 7. Fire Resistance Building Code Clarifications - 7. Fire Resistance 7.1 (15-12-030) Use of combustibles in Type III construction roof assemblies Code Section (15-12-030) Use of Combustibles was revised on May 17, 2000,

More information

SECTION 08360 SECTIONAL OVERHEAD DOORS 521 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS

SECTION 08360 SECTIONAL OVERHEAD DOORS 521 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS SECTION 08360 SECTIONAL OVERHEAD DOORS 521 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS Display hidden notes to specifier by using Tools / Options / View / Hidden Text. On newer versions of Microsoft Word

More information

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001)

INSTALLATION INSTRUCTIONS for Vinyl Windows with Integral Nailing Fin (JII001) Thank you for selecting JELD-WEN products. Attached are JELD-WEN s recommended installation instructions for Vinyl windows with an integral nailing fin. While the use of these installation instructions

More information

CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN 55110 Fax: 651-429-8503. Re-Roofing: Asphalt Shingles

CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN 55110 Fax: 651-429-8503. Re-Roofing: Asphalt Shingles CITY OF WHITE BEAR LAKE BUILDING INSPECTION DEPARTMENT 4701 Highway 61 White Bear Lake, MN 55110 Fax: 651-429-8503 Re-Roofing: Asphalt Shingles This is a summary of the standard requirements based on the

More information

We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden window unit.

We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden window unit. Important Information for New Construction Installations Attention Installer! We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden

More information

Renovation instructions

Renovation instructions 1(13) Renovation instructions The purpose of these instructions is to inform you of the things to consider when renovating an apartment. You can avoid many possible problems and additional costs following

More information

CERTIFICATE NAME OF PRODUCT MANUFACTURER PRODUCT DESCRIPTION CERTIFICATION PROCEDURE. No VTT C-6044-10 Date of issue 11.10.2010, Updated July 1, 2011

CERTIFICATE NAME OF PRODUCT MANUFACTURER PRODUCT DESCRIPTION CERTIFICATION PROCEDURE. No VTT C-6044-10 Date of issue 11.10.2010, Updated July 1, 2011 CERTIFICATE NAME OF PRODUCT No VTT C-6044-10 Date of issue 11.10.2010, Updated July 1, 2011 H-CONTROL REFLEX+ reflective insulating vapour control layer for roof and wall applications MANUFACTURER ACTIS

More information

!!!!!! !!! Decra Plus DPSW010 DPSTW011 DPSW012 DPSW013 DPSW014 DPSW015 DPSW016 DPSW020 DPSW021 DPSW024 DPSW030 DPSW031 DPSW035 DPSW030 DPSW031 DPSW035

!!!!!! !!! Decra Plus DPSW010 DPSTW011 DPSW012 DPSW013 DPSW014 DPSW015 DPSW016 DPSW020 DPSW021 DPSW024 DPSW030 DPSW031 DPSW035 DPSW030 DPSW031 DPSW035 Decra Plus Drawing no DPSW010 DPSTW011 DPSW012 DPSW013 DPSW014 DPSW015 Description Shown In Decra Brochure Most Commonly Used Detail t~êã=oççñ=b~îéë=aéí~áä=b~îéë=lîéêü~åö=táíü=fåëìä~íéç=c~ëåá~=~åç=pçññáí

More information

Asphalt Shingle Application Requirements

Asphalt Shingle Application Requirements Alberta Allied Roofing Association Asphalt Shingle Application Requirements Section 1 Roof Decks 1.1 General Asphalt Shingles are not permitted to be installed directly over rigid insulation. When Asphalt

More information

Residential Garage Door Terminology

Residential Garage Door Terminology A Air Infiltration: The leakage or passage of air through a door system Anodize: A hard non-corrosive oxide film on the surface of aluminum Astragal: A compressible or deformable seal provided on the bottom

More information

FIRESTOPPING & SMOKE SEALS

FIRESTOPPING & SMOKE SEALS SPECIFICATION SECTION 07 84 00 FIRESTOPPING & SMOKE SEALS 1 GENERAL 1.1 SECTION INCLUDES 1.1.1 Comply with Division 1, General Requirements and Documents referred to therein. 1.1.2 It is the intent of

More information

BUILT-IN DISHWASHER INSTALLATION INSTRUCTIONS

BUILT-IN DISHWASHER INSTALLATION INSTRUCTIONS BUILT-IN DISHWASHER INSTALLATION INSTRUCTIONS PLEASE READ COMPLETE INSTRUCTIONS BEFORE YOU BEGIN LEAVE INSTALLATION INSTRUCTIONS AND USER'S GUIDE WITH OWNER ALL ELECTRIC WIRING AND PLUMBING MUST BE DONE

More information

Window Installation Instructions

Window Installation Instructions Caution The correct installation methods of windows in full frame or insert applications is critical towards achieving the tested performance of the window and longterm enjoyment and energy savings for

More information

Installation Instructions For Slider Casement Air Conditioners

Installation Instructions For Slider Casement Air Conditioners Installation Instructions For Slider Casement Air Conditioners NOTE: These instructions describe installation in a typical wood framed window with a wood SLIDE-BY sash, or installation in a metal CASEMENT

More information

Reverse Cycle Inverter Split System Air Conditioner

Reverse Cycle Inverter Split System Air Conditioner Reverse Cycle Inverter Split System Air Conditioner Model Number TAC-09CHSA/JAI5 INSTALLATION MANUAL Contents 03 Warranty Details 04 Welcome 05 General Safety Instructions 06 Product Overview 07 Selecting

More information

Services Enclosures and Protected Shafts - Maintaining Compartmentation

Services Enclosures and Protected Shafts - Maintaining Compartmentation Introduction When a fire resisting element is used to provide fire compartmentation, every opening that allows services to pass through the element must be adequately protected by sealing, or fire stopping

More information

Saferand easierinstallation

Saferand easierinstallation EN 85-07 Saferand easierinstallation IföSigninstallationsystem andifösignbuilt-incistern www.ifosanitar.com/sign Aneffectivesolution withmanyadvantages. Ifö Sign installation system makes life a little

More information

INSTALLATION INSTRUCTIONS BL-8704

INSTALLATION INSTRUCTIONS BL-8704 INSTALLATION INSTRUCTIONS BL-8704 EXPOSED BLACK LEVER THERMOSTATIC MIXING VALVE WITH RISER KIT, HANDSET, LEVER DIVERTER, 8 ROSE AND ADJUSTABLE RISER PIPE BRACKET. Dimensions in Inches (& Millimetres) 1

More information

City of San Diego, CWP Guidelines

City of San Diego, CWP Guidelines PART 1 -- GENERAL SECTION 08520-1.1 WORK OF THIS SECTION City of San Diego, CWP Guidelines A. The WORK of this Section includes providing aluminum windows with frames, bracing, glazing attachments, screens,

More information

The Embassy of the United States of America invites you to submit an offer for supply and install the following A/Cs:

The Embassy of the United States of America invites you to submit an offer for supply and install the following A/Cs: RFQ number PR4877728 The Embassy of the United States of America invites you to submit an offer for supply and install the following A/Cs: A- Supplying and installing 30 high wall A/C split unit 3HP- 24,000

More information

Preformed Metal Roofing and Siding

Preformed Metal Roofing and Siding Page -1-1. GENERAL 1.1. Description This specification along with the drawings covers the furnishing of all material, products, equipment, accessories, tools, services, transportation, labor and supervision

More information

The Rooflight Company s Operations & Maintenance Guide

The Rooflight Company s Operations & Maintenance Guide The Rooflight Company s Operations & Maintenance Guide January 2015 This guide is designed for use by the end user and contains important information about product registration, guarantee, maintenance

More information

WARNING: FAILURE TO FOLLOW THESE RULES MAY RESULT IN SERIOUS PERSONAL INJURY CAUTION: INSTALLATION LOCATION:

WARNING: FAILURE TO FOLLOW THESE RULES MAY RESULT IN SERIOUS PERSONAL INJURY CAUTION: INSTALLATION LOCATION: Revision Level: 01 Revision Date: 07/07/2011 Please read all instructions carefully to help ensure a correct and SAFE installation of your Second Wind Ultraviolet Germicidal Air Purifier. Failure to do

More information

Operating Instructions

Operating Instructions Operating Instructions Cable Glands Ex d and Ex e with Compound > Contents 1 Contents 1 Contents...2 2 General Information...2 3 General Safety Information...3 4 Designated Use...4 5 Technical Data...4

More information

SECTION 14 20 10 - FREIGHT & PARKING GARAGE ELEVATORS PART I - GENERAL

SECTION 14 20 10 - FREIGHT & PARKING GARAGE ELEVATORS PART I - GENERAL SECTION 14 20 10 - FREIGHT & PARKING GARAGE PART I - GENERAL 1.1 SECTION INCLUDES [NOTE to AE: The following lists requirements that are specific to freight elevators. These requirements are in addition

More information

DRAFT TERMITE PROTECTION IN BUILDINGS

DRAFT TERMITE PROTECTION IN BUILDINGS DRAFT TERMITE PROTECTION IN BUILDINGS Protection of homes and businesses from termites in Florida requires the combined efforts of builders, pest management professionals, and building inspectors. The

More information

39HQ Airovision Air Handling Units

39HQ Airovision Air Handling Units 39HQ Airovision Air Handling Units Mounting instructions CONTENTS 1 - TRANSPORT AND LIFTING INSTRUCTIONS... 3 1.1 - General... 3 1.2 - Transport and storage... 3 1.3 - Roof edge protection during transport

More information

Technical Solution Sheet 7.08 7: Mechanical Services (Including duct heating)

Technical Solution Sheet 7.08 7: Mechanical Services (Including duct heating) 7: Mechanical Services (Including duct heating) Split System Air Conditioning AIM The aim of this technical solution is to inform practitioners on the requirements for the safe discharge of condensate

More information

UB1 AIR CONDITIONING UNIT INSTALLATION INSTRUCTIONS

UB1 AIR CONDITIONING UNIT INSTALLATION INSTRUCTIONS UB1 AIR CONDITIONING UNIT INSTALLATION INSTRUCTIONS INSTALLATION INSTRUCTIONS: Carefully read these instructions before installing your new air-conditioner. AUSTRALIAN AUTOMOTIVE AIR AL00500054E 1 Table

More information

Shower and Floor Gullies Channel Drain and Tile Drain SECTION

Shower and Floor Gullies Channel Drain and Tile Drain SECTION Shower and Floor Gullies Channel Drain and Tile Drain SECTION 2 Shower and Floor Gullies, Channel Drain and Tile Drain 29 General Information Shower and Floor Gullies McAlpine has responded to market conditions

More information

Installation Instructions

Installation Instructions Installation Instructions One-Piece Deep Wall Sleeve For Use with Packaged Terminal Units Please read these instructions completely before attempting installation. NOTE: Ensure that the unit is only installed

More information

INSTALLATION INSTRUCTIONS MK-8704

INSTALLATION INSTRUCTIONS MK-8704 INSTALLATION INSTRUCTIONS MK-8704 EXPOSED MACKINTOSH THERMOSTATIC MIXING VALVE WITH RISER KIT, HANDSET, LEVER DIVERTER, 8 ROSE AND ADJUSTABLE RISER PIPE BRACKET. Dimensions in Inches (& Millimetres) 1

More information

Commercial Roof Inspection Form

Commercial Roof Inspection Form Inspection Date: Inspector: Building Information Building ID: No.: Used For: Year Roof Applied: Building Description: Permanent Temporary Building Type: Retail Industrial Residential Building Name: Building

More information

UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Architectural. Roofing. Basis of Design

UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Architectural. Roofing. Basis of Design Basis of Design This section applies to roofing membranes, flashing and accessories. Design Criteria Adhere to the standards and details of the latest editions of the National Contractors Association (NRCA)

More information

foot skylight) is enough to knock a worker off their feet. A 10 mph wind gust on a 5 x 6 skylight develops a wind force of 270 lbs.

foot skylight) is enough to knock a worker off their feet. A 10 mph wind gust on a 5 x 6 skylight develops a wind force of 270 lbs. Skylight Installation Instructions This document provides instruction and guidelines for installation of both curb mount (CM) and self flashing (SF) unit skylights on flat, pitched (> or equal to 3/12

More information

Architectural Testing

Architectural Testing FIELD AND MOCK-UP TESTING SERVICES 130 Derry Court York, PA 17406-8405 phone: 717-764-7700 fax: 717-764-4129 www.archtest.com Mock-up Test Methods (Laboratory Mock-up or Field Mock-up): ASTM E 283, Standard

More information

Premium Nixalite All Stainless Steel Bird Barrier Spikes Includes specifications for: Premium Nixalite Models S, H and W and Mounting Hardware.

Premium Nixalite All Stainless Steel Bird Barrier Spikes Includes specifications for: Premium Nixalite Models S, H and W and Mounting Hardware. Three-Part Specifications - Copyright 2014 - Nixalite of America Inc Premium Nixalite All Stainless Steel Bird Barrier Spikes Includes specifications for: Premium Nixalite Models S, H and W and Mounting

More information

B. Types of mechanical insulation specified in this section include the following:

B. Types of mechanical insulation specified in this section include the following: SECTION 23 0700 HVAC INSULATION PART 1 - GENERAL 1.1 SUMMARY A. Extent of mechanical insulation required by this section is indicated on drawings and schedules, and by requirements of this section. B.

More information

SECTION 02630 STORM DRAINAGE SYSTEM

SECTION 02630 STORM DRAINAGE SYSTEM SECTION 02630 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for storm drainage systems including modifications and connections to existing storm drainage systems. 1.02 REFERENCE

More information

DE Frame with C Series Sidelight

DE Frame with C Series Sidelight TOOLS REQUIRED Tape measure 6' magnetic level 3' magnetic level Screw gun with clutch adjusted #2 phillips tip #3 phillips tip Screwdriver (used to adjust frame on will using oval slots) Pry Bar Powder

More information

SECTION 807 PUMP STATION REHABILITATION

SECTION 807 PUMP STATION REHABILITATION SECTION 807 PUMP STATION REHABILITATION 807-1 DESCRIPTION: Rehabilitation of pump stations shall be defined as the cleaning, removal, repair and/or replacement of any and/or all components including but

More information

This permit does not include replacement or upgrading of the existing electrical panel or service (a separate electrical permit must be obtained).

This permit does not include replacement or upgrading of the existing electrical panel or service (a separate electrical permit must be obtained). CITY OF MILPITAS Building & Safety Department 455 E. Calaveras Blvd. Milpitas, CA 95035 408-586-3240 www.ci.milpitas.ca.gov RESIDENTIAL AIR CONDITIONING, REPLACEMENT 1. PERMIT INFORMATION: The replacement

More information

Installation Instructions

Installation Instructions PUSH Installation Instructions A DA C O M PLIA NT shown with optional Bradley 90-75 faucet Front-Mounted Barrier Free Rectangular Bowl Stainless Steel Lav Table of Contents Pre-Installation Information...........2

More information

Terms of Reference Air Handling Unit (HVAC System) Cleaning

Terms of Reference Air Handling Unit (HVAC System) Cleaning Terms of Reference Air Handling Unit (HVAC System) Cleaning Introduction General cleaning of the air handling units is currently undertaken by the Mechanical Division staff composing of 3 personnel. Cleaning

More information

1. Description. 2. List of Accessories included A B C F G H

1. Description. 2. List of Accessories included A B C F G H 1. Description This unit is a pump that will clear the waste from a domestic shower and washbasin. The unit will start automatically. Please pay particular attention to the following: Possible danger to

More information

6720616592.00-1.SD. Flat roof. Rack Mounting. Installation instructions 6 720 647 036 (2010/11) AU

6720616592.00-1.SD. Flat roof. Rack Mounting. Installation instructions 6 720 647 036 (2010/11) AU 6720616592.00-1.SD Flat roof Rack Mounting AU Installation instructions 2 Contents AU Contents 1 Key to symbols and safety instructions....... 3 1.1 Explanation of symbols................ 3 1.2 Safety

More information

MAJESTIC. OUTDOOR / INDOOR WOOD FIREPLACES Model: ODSR36A OWNERS INSTALLATION & OPERATING INSTRUCTIONS. KEEP THESE INSTRUCTIONS FOR FUTURE REFERANCE.

MAJESTIC. OUTDOOR / INDOOR WOOD FIREPLACES Model: ODSR36A OWNERS INSTALLATION & OPERATING INSTRUCTIONS. KEEP THESE INSTRUCTIONS FOR FUTURE REFERANCE. MAJESTIC OUTDOOR / INDOOR WOOD FIREPLACES Model: ODSR36A OWNERS INSTALLATION & OPERATING INSTRUCTIONS. KEEP THESE INSTRUCTIONS FOR FUTURE REFERANCE. CONTENTS Part 1: Safety Information Part 2: Installation

More information

Chapter 7 Plumbing Connections

Chapter 7 Plumbing Connections Chapter 7 Plumbing Connections 7-1 General All plumbing equipment and installations must be designed, constructed, and installed in accordance with this code and where not specific, to the applicable provisions

More information

SERIES NG 1800 STRUCTURAL STEELWORK

SERIES NG 1800 STRUCTURAL STEELWORK MANUAL OF CONTRACT DOCUMENTS FOR HIGHWAY WORKS VOLUME 2 NOTES FOR GUIDANCE ON THE SPECIFICATION FOR HIGHWAY WORKS SERIES NG 1800 STRUCTURAL STEELWORK Contents Clause Title Page NG 1800 (08/14) General

More information

Server Chassis and Triplet Hardware v1.0

Server Chassis and Triplet Hardware v1.0 Server Chassis and Triplet Hardware v1.0 Author: Steve Furuta, Mechanical Designer 1 Scope This document describes the technical specifications for the custom chassis used in Open Compute Project servers

More information

SECTION 08332 COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here)

SECTION 08332 COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here) SECTION 08332 COILING COUNTER DOORS Display hidden notes to specifier. (Don't know how? Click Here) PART 1 GENERAL 1.1 SECTION INCLUDES A. Coiling Metal Counter Doors. B. Coiling Counter Fire Doors. 1.2

More information

I-Line. Accessories. Essential cable installation products for corrugated, smooth wall, and braided cables

I-Line. Accessories. Essential cable installation products for corrugated, smooth wall, and braided cables I-Line TM Essential cable installation products for corrugated, smooth wall, and braided cables Installation Coaxial cable installation components for corrugated, smooth wall and braided cables Proven

More information

Installation Instructions

Installation Instructions Installation Instructions E19-120 (Plastic showerhead) E19-120A (Stainless steel showerhead) E19-120SS (All Stainless Steel) Drench Shower - Horizontal Supply Table of Contents Pre-Installation Information..........................2.............................3

More information

Proposed Minimum Subterranean Termite Treatment Standards

Proposed Minimum Subterranean Termite Treatment Standards Proposed Minimum Subterranean Termite Treatment Standards Introduction This document is intended to serve as a model for states considering the adoption of standards for soil application of termiticides.

More information

Office of the State Fire Marshal. Fire Rated Doors

Office of the State Fire Marshal. Fire Rated Doors Office of the State Fire Marshal Fire Rated Doors Fire Rated Doors These doors serve a purpose. They are manufactured in a way that is to help reduce the spread of fire and smoke. Fire rated doors allow

More information

The better way to build TM. Installation Manual. FOUNDATION SIPs & FROST WALLS SIPs

The better way to build TM. Installation Manual. FOUNDATION SIPs & FROST WALLS SIPs The better way to build TM Installation Manual FOUNDATION SIPs & FROST WALLS SIPs February 2016 PWF FOUNDATION & FROST WALL SIPs Installation Manual Table of Contents Topics General Requirements...................................

More information

State of Connecticut Department of Public Health RADON PROGRAM

State of Connecticut Department of Public Health RADON PROGRAM State of Connecticut Department of Public Health RADON PROGRAM Scope The Connecticut Department of Public Health (DPH) Radon Program is providing this information for contractors who decide to build radon

More information

WATER LEAKAGE IN GLAZED CURTAIN WALL SYSTEMS:

WATER LEAKAGE IN GLAZED CURTAIN WALL SYSTEMS: WATER LEAKAGE IN GLAZED CURTAIN WALL SYSTEMS: BY WILLIAM D. SMITH Figure 1 Four Corporate Center, Franklin, TN. Architect: Little & Associates,Charlotte, NC. Gen. Contractor: Ray Bell Const. Co., Nashville,

More information

0845 0098 980 www.nicholsonsts.com

0845 0098 980 www.nicholsonsts.com 0845 0098 980 www.nicholsonsts.com ROOFTRAK The IFP is revolutionising the way we fix things to roofs. Technical Director of a leading UK roofing system manufacturer The ROOFTRAK-IFP A revolutionary solution

More information

Skirt 1 / 4. The Skirt. The skirt patterns were downloaded from Mark's site but they need expanding before they can be used.

Skirt 1 / 4. The Skirt. The skirt patterns were downloaded from Mark's site but they need expanding before they can be used. Skirt 1 / 4 The Patterns The Skirt The skirt patterns were downloaded from Mark's site but they need expanding before they can be used. I used Corel Draw's real world dimensions to expand the patterns

More information

Basement Window Installation Guide Hopper and Sliding

Basement Window Installation Guide Hopper and Sliding Basement Window Installation Guide Hopper and Sliding americancraftsmanwindows.com Project Requirements: Installation must comply with all applicable building codes. Existing window frame, wall and weatherresistant

More information

GENERAL SPECIFICATION FOR CIVIL ENGINEERING WORKS SECTION 13 WORK FOR ELECTRICAL AND MECHANICAL INSTALLATIONS

GENERAL SPECIFICATION FOR CIVIL ENGINEERING WORKS SECTION 13 WORK FOR ELECTRICAL AND MECHANICAL INSTALLATIONS GENERAL SPECIFICATION FOR CIVIL ENGINEERING WORKS SECTION 13 WORK FOR ELECTRICAL AND MECHANICAL INSTALLATIONS 13.1 13.2 2006 Edition SECTION 13 WORK FOR ELECTRICAL AND MECHANICAL INSTALLATIONS GENERAL

More information

Fire Barrier Duct Wrap 15A

Fire Barrier Duct Wrap 15A 3 Fire Barrier Duct Wrap 15A Commerical Kitchen Grease Duct Fire Protection System Product Data and Installation Instructions Compliance 1998 Edition Complies with International Mechanical Code Complies

More information

KEEP FOR FUTURE REFERENCE MRTALP VERTICAL LIFT BAR READ ALL INSTRUCTIONS AND WARNINGS BEFORE USING THIS PRODUCT

KEEP FOR FUTURE REFERENCE MRTALP VERTICAL LIFT BAR READ ALL INSTRUCTIONS AND WARNINGS BEFORE USING THIS PRODUCT KEEP FOR FUTURE REFERENCE INSTRUCTIONS P.O. Box 368 908 West Main Laurel, MT USA 59044 phone 800-548-7341 phone 406-628-8231 fax 406-628-8354 International Version MODEL NUMBER: LB10VLB MRTALP VERTICAL

More information

ATS Overhead Table Shelf System INSTRUCTION MANUAL

ATS Overhead Table Shelf System INSTRUCTION MANUAL ATS Overhead Table Shelf System INSTRUCTION MANUAL ATS Overhead Table Shelf System Instruction Manual Warranty Newport Corporation warrants this product to be free of defects in material and workmanship

More information

plumbing products guide

plumbing products guide plumbing products guide radiator pipe guide & seals A significant development in the drive to reduce air leakage and heat loss. Installations such as that shown are all too common. The detail is poorly

More information

60.12. Depend-O-Lok FxE Expansion Coupling. System No. Submitted By Spec Sect Para Location Date Approved Date. DEPEND-O-LOK FxE EXPANSION COUPLING

60.12. Depend-O-Lok FxE Expansion Coupling. System No. Submitted By Spec Sect Para Location Date Approved Date. DEPEND-O-LOK FxE EXPANSION COUPLING 60.1 D-O-L FxE expansion couplings are a bolted, split-sleeve design that provides for expansion and contraction at the coupled joint. These couplings are furnished with restraint rings that, when affixed

More information

Clad Direct Glaze Window Installation Instructions

Clad Direct Glaze Window Installation Instructions Clad Direct Glaze Window Installation Instructions Sill flashing and sealing: 2. An overview of the proper flashing sequence is shown in figure 1. Please read entire installation instructions carefully

More information

HORIZONTAL INSTALLATION

HORIZONTAL INSTALLATION THERMO/SOLAR Žiar s.r.o. MANUAL FOR INSTALLATION PV SUPPORTING FRAMES HORIZONTAL INSTALLATION Technical alternation reserved A1410 1 12/2014 CONTENT ORD.NO. PAGE Mounting information 3 Mounting, flat roof

More information

TS 813 GROUNDING AND BONDING TTD 813.001 TRAFFIC SIGNAL INSTALLATION AND CONTROLLER CABINET GROUNDING SYSTEM TTD 813.005 CONTROLLER CABINET GROUNDING

TS 813 GROUNDING AND BONDING TTD 813.001 TRAFFIC SIGNAL INSTALLATION AND CONTROLLER CABINET GROUNDING SYSTEM TTD 813.005 CONTROLLER CABINET GROUNDING TORONTO TRANSPORTATION January 2012 TS 813 GROUNDING AND BONDING TABLE OF CONTENTS 1. DRAWINGS TTD 813.001 TRAFFIC SIGNAL INSTALLATION AND CONTROLLER CABINET GROUNDING SYSTEM TTD 813.005 CONTROLLER CABINET

More information

RESIDENTIAL ELECTRICAL REQUIREMENTS (REVISED 3/28/2008) PERMIT REQUIREMENTS:

RESIDENTIAL ELECTRICAL REQUIREMENTS (REVISED 3/28/2008) PERMIT REQUIREMENTS: RESIDENTIAL ELECTRICAL REQUIREMENTS (REVISED 3/28/2008) PERMIT REQUIREMENTS: Signed completed Electrical Permit application form. Minnesota law requires all electrical work is to be performed by licensed,

More information

This unit is a pump that will clear the waste from a domestic shower and washbasin, bath, washing machine, glass washer and a sink.

This unit is a pump that will clear the waste from a domestic shower and washbasin, bath, washing machine, glass washer and a sink. 1. Description This unit is a pump that will clear the waste from a domestic shower and washbasin, bath, washing machine, glass washer and a sink. The unit will start automatically. Please pay particular

More information

INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACION FOR DOUBLE-HUNG VENT REPLACEMENT WINDOW

INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACION FOR DOUBLE-HUNG VENT REPLACEMENT WINDOW Vinyl Windows and Doors Manufactured by Pella Corporation INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACION FOR DOUBLE-HUNG VENT REPLACEMENT WINDOW Lea las instrucciones en español en el reverso.

More information

PANELIZED HOME INSTALLATION GUIDELINE

PANELIZED HOME INSTALLATION GUIDELINE PANELIZED HOME INSTALLATION GUIDELINE A typical home package will be constructed of Snap-N-Lock Insulated Panels clad with steel skins. 4" panels will be used for the walls, and 6" panels for the roof.

More information

Table of Contents. Western States Standing Seam SS675 Panel Installation, Flashings & Shop Drawing Detail Guide. Notes to Designer /Installers..

Table of Contents. Western States Standing Seam SS675 Panel Installation, Flashings & Shop Drawing Detail Guide. Notes to Designer /Installers.. Western States Standing Seam SS675 Panel Installation, Flashings & Shop Drawing Detail Guide Table of Contents Section Page Section Page Notes to Designer /Installers.. 1 Fastener Placement and Selection.2-3

More information