1 ECO-PILING METHODS Ong Tiong Siew Group CEO Ryobi Kiso Holdings Visit our website. 1/63

2 Scope Introduction Overview Deep Cement Mix (DCM) / Grout Mix Piling (GMP) Trench Cutting & Re-mixing Deep Wall (TRD) Grouted Press Spun Pile In-situ Continuous Wall (ICW) Continuous Flight Auger Method (CFA) Conclusion 2/63

3 Introduction Need to move towards more sustainable construction methods in Singapore Characteristics of Eco-friendly piling method Low noise Low vibration Less material used Less removal of soil Overall better cost effectiveness 3/63

4 Overview Singapore Grout Mix Piling (DCM), 1983 Soil Mix Wall (SMW), 2000 Grouted Press Spun Pile, 2003 Trench-cutting Remixing Deep-Wall (TRD), 2006 Malaysia DCM, 2003 Vietnam DCM, 2012 Australia DCM, 2003 SMW, 2005 In-situ Concrete Wall (ICW), 2005 Continuous Flight Auger (CFA) piling, /63

5 DEEP CEMENT MIX / GROUT MIX PILING 5/63

6 DCM Introduction DCM involves the mechanical mixing of in-situ soil with binders such as lime, cement and bentonite, etc Popularised in Japan since the 1950s Commonly used in Singapore. Increasingly popular in Europe, North America and rest of Asia. Applications : Ground Improvement Works Temporary Retaining Structures Foundation for Light Structures Improve Ground Bearing Capacity Prevent Ground Heave Improve Accessibility and Trafficability 6/63

7 DCM Introduction 1956, our founder, Mr Shuntaro Shiga started R&D on Electric motor top drive auger and subsequently patented it. 1983, Ryobi Kiso Co, Japan first introduced DCM to Singapore With Obayashi Corporation for Treasury Building construction; subsequently adopted for Outram MRT project in , DCM actively popularised in local construction temporary earth retaining (both reinforced and non-reinforced). Over 90 projects were successfully completed to date 2004, DCM used as a ground strut for a basement construction instead of using CBP as retaining wall (SIA-Lasalle College of Arts) 2009, DCM used on large scale (~2.5million m 3 ) in Marina Coastal Expressway (MCE) by various grouting contractors 7/63

8 DCM Applications GL Prevent ground heaving Prevent sliding failure caused by high embankment As foundation for light structure Prevent slope stability failure Prevent water seepage Open excavation is possible Improve accessibility 8/63

9 DCM Method DCM can be installed in multiple configuration which includes: Compound columns system (base grouting) Contiguous piles (wall system). Grids system 9/63

10 DCM Method Step1 : Setting up auger Rig at pile position Step2 : Augering with the required size auger Step3 : Augering and mixing with pumping of cement grout Step4 : Mixing is by auger rotation as a form of mechanical agitation Step5 : Mixing & withdraw auger in anticlockwise rotation Step6 : Installation of Grout Mix Pile is completed 10/63

11 DCM Equipment Single Shaft 11/63

12 DCM Equipment Eco-friendly piling solutions Twin Shaft 12/63

13 DCM Equipment Triple Shaft 13/63

14 Advantages Relatively low cost Controllable column sizes (same as auger) from Ø700mm to Ø2200mm. Environmentally friendly (in-situ materials). Less disposal soil (30-40% of soil treated) Low pressure method (5 15 bar) Low vibration. Low noise. Minimum ground heave. High installation speed. Suitable for various type of soil condition. Impermeable retaining wall 14/63

15 Case Study : MCE C482 15/63

16 Case Study : MCE C482 SOIL PROFILE N /63

17 Case Study : MCE C482 SOIL PROFILE 17/63

18 Case Study : MCE C482 PLAN VEIW O1300 DCM Design GL SECTION VEIW 1300 AREA 2.50 m Double auger shafts DCM Top DCM Toe DCM Base Grout Section E m 9.00 m m GL DCM Layout DCM Top DCM Toe DCM Base Grout m m m Section E3 18/63

19 Case Study : MCE C482 Eco-friendly piling solutions DCM Layout Total DCM columns : 6633 Panels, 110,562.5 m3 19/63

20 Case Study : MCE C482 Quality Review Requirement The coring shall be one cored hole per continuous block, Plus one cored hole per 1,000 linear metres (rounded up to the nearest whole number of cored holes), of DCM columns. TCR must be at least 85% to establish DCM Depth : 99.6% For each Core Run SCR > 85% : 92.7% Mean UCS at 95% Lower Confidence Limit > 800 kpa : kpa Mean Modulus Em at 95% Lower Confidence Limit > 150 MPa : MPa 20/63

21 Case Study : MCE C482 Cored Samples Samples selected here Samples selected here 21/63

22 Case Study : MCE C482 On Site Operation 22/63

23 Case Study : MCE C482 On Site Operation 23/63

24 Past Projects BUCKLAY 18 24/63

25 Past Projects EASTERN MANSION AT MEYER ROAD 25/63

26 Past Projects KOVAN AT UPPER SERANGOON 26/63

27 Past Projects BARTLEY RIDGE 27/63

28 TRENCH-CUTTING RE-MIXING DEEP WALL (TRD) 28/63

29 TRD Introduction Pioneered by the Japanese in the 1990s Provides a more uniform soil-mixed wall. Formed by chainsaw like equipment that cut and mixes existing soil with an injected cement and bentonite water. Allow the installation of a continuous improved soil wall without creating an open cut trench. TRD was being used in over 250 projects in Japan. Ryobi Kiso (S) first introduced this method to Singapore in 2006 Until 2008, the only company in Asia outside Japan to commercially utilise the TRD machine for environmental protection engineering projects 29/63

30 TRD Method GROUT PLANT Crawler Crane T R D Industrial waste Excavator TRD-WALL Cutter Post Sand layer Clay layer 30/63

31 TRD Method 31/63

32 TRD Construction 32/63

33 TRD Advantages Low noise. Low vibration. Improve speed of construction. Less material used and disposed. Better quality control. Suitable for various types of soil condition by vertical mixing. No open trench cutting. High Impermeability 33/63

34 TRD wall Case Study: Sungei Serangoon Sungei Serangoon Effluent runoff Protection of seepage (Prevent effluent from being flowed into the river) 34/63

35 Case Study: Sungei Serangoon Quality Review a) Requirements Permeability < 1.0 x 10-9 m/s Unconfined Compressive Strength (Qu) 125 KPa b) Permeability test results c) On site permeability test pictures 35/63

36 Case Study: Sungei Serangoon On site Operations 36/63

37 GROUTED PRESS SPUN PILE 37/63

38 Introduction Press Grouted Spun Pile method spearheaded by Ryobi Kiso Generally used in areas where stringent vibration limits are required Overcome ground subsidence of bored hole with conventional boring of pile holes Stabilising grout improves shaft friction while setting of pile by hydraulic hammer enhances end bearing capacity Applications Foundation Piles Impervious contiguous Spun Pile Retaining Wall Sub-structural Wall Grout Spun pile Spun pile Soil 38/63

39 Field Construction Soil augered to required depth Spun pile lowered and pressed. 39/63

40 Field Construction Completed Piles 40/63

41 Field Construction Welding Sensors and extensometers 41/63

42 Field Construction Test monitoring 42/63

43 Advantages Minimum noise and vibration problems. Enhanced shaft friction. Higher reliability on toe bearing. Improved toe bearing. Ease of construction for larger diameter pile. Marginal spoil problem. Lesser impact to adjacent built structures. 43/63

44 Test Pile Summary Eco-friendly piling solutions Soil properties and preliminary pile design Case Study : Buckley Rd Designed load = 219 T Pile diameter = 600 mm Thickness = 100 mm Pile length = 23.5 m Instrumentation details 44/63

45 Case Study : Buckley Rd Loads (kn) Failure criteria (after Davisson, 1972) Settlement (mm) Load settlement curve Load distribution along pile axis (third cycle) 45/63

46 Case Study : Buckley Rd Loads (kn) Skin friction (kpa) Pile head settlement (mm) Total bearing Shaft resistace End bearing Depth (m) Load movement curve (third cycle) Skin friction along pile (third cycle) 46/63

47 Case Study : Buckley Rd Cycle Pile head settlements Residual settl. Recovery 1 st (219 T) 6.26 mm 0 mm 100% 2 nd (438 T) mm 0.5 mm 96.7% 3 rd (657 T) mm mm 51.2% Total shaft resistance at 3 rd cycle = T (66.3%) 9.84 t/m 2 Total toe bearing at 3 rd cycle = T(33.7%) t/m 2 47/63

48 IN-SITU CONCRETE WALL (ICW) 48/63

49 ICW Introduction Compile Australia has developed a trenching machine to construct a cast in-situ concrete wall (ICW) Used for basement excavations In-situ concrete wall is typically 300mm thick and intended as a permanent load-bearing structural component Over 60 projects to date 49/63

50 ICW Method Eco-friendly piling solutions 1. A trenching machine is attached to a 40-tonne track excavator and controlled by an excavator operator. 2. Trenching machine drilled to designed depth and progressively excavates the trench. 50/63

51 ICW Method 3. Concrete is poured into the trench excavated directly behind the trenching machine auger to form a permanent and stable concrete wall. 4. The high-strength concrete mix is designed with a very high slump so that reinforcing bars may be inserted into the poured concrete as the machine progresses. 51/63

52 ICW Construction Eco-friendly piling solutions 52/63

53 Advantages Low noise Minimal vibration Able to install closer to boundaries where existing structures require retaining High production rate can cast over 30 lineal meters in one shift Less material wastage and overbreak. Good wall finish 53/63

54 CONTINUOUS FLIGHT AUGER (CFA) 54/63

55 CFA Introduction CFA first introduced about 50 years ago Widely used in western countries (US, Europe and Australia) Applications: Foundation Piles / Secant Piles/ Contiguous Bored Pile Pile size commonly mm diameter and up to 41m deep. (1500mm recently introduced) 55/63

56 Generally consist of 3 phases: CFA Method 56/63

57 CFA Method 1) Continuous Flight Auger drilled to target depth 57/63

58 CFA Method 2) Concrete is pumped to the rig through flexible and fixed hose. Auger is extracted in the process. 58/63

59 CFA Method 3) Reinforcing steel cage is placed into the correct depth 59/63

60 CFA Method Eco-friendly piling solutions 4) Completed Piles 60/63

61 Advantages Low vibration Low noise Less slurry produced. Faster installation (up to 3 times faster than current method) Less wastage Safer (Less lifting operations, No exposed bore hole, better housekeeping) 61/63

62 Conclusion Important to adopt eco-friendly methods of piling in today s dense urban environment As a leading foundation specialist in Singapore, Ryobi Kiso has capabilities to introduce new ecofriendly piling methods 62/63

63 END Youtube link /63

Piling Datasheets. Continuous flight auger (CFA) Driven Rotary

Piling Datasheets. Continuous flight auger (CFA) Driven Rotary Piling Datasheets Continuous flight auger (CFA) Driven Rotary Continuous Flight Auger Piles (CFA) Technical Data Application Well suited to soft and/or water bearing ground where deep casings or bentonite

More information

Design and Construction of Auger Cast Piles

Design and Construction of Auger Cast Piles Design and Construction of Auger Cast Piles 101 th Annual Road School 2015 3/11/2015 Malek Smadi, Ph.D., P.E. Principal Engineer - GEOTILL - Fishers, IN msmadi@geotill.com - www.geotill.com CONTENTS 1.

More information

STRUCTURES. 1.1. Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.

STRUCTURES. 1.1. Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL. STRUCTURES 1. General. Critical structures may impact the integrity of a flood control project in several manners such as the excavation for construction of the structure, the type of foundation, backfill

More information

ARCHITECTURAL TECHNOLGY 4 ADVANCED CONSTRUCTION TECHNOLOGY BASEMENT CONSTRUCTION YEAR 3 SEMESTER 1 AIDAN WALSH R00060057. Lecturer: Jim Cahill

ARCHITECTURAL TECHNOLGY 4 ADVANCED CONSTRUCTION TECHNOLOGY BASEMENT CONSTRUCTION YEAR 3 SEMESTER 1 AIDAN WALSH R00060057. Lecturer: Jim Cahill ARCHITECTURAL TECHNOLGY 4 ADVANCED CONSTRUCTION TECHNOLOGY BASEMENT CONSTRUCTION YEAR 3 SEMESTER 1 AIDAN WALSH R00060057 Lecturer: Jim Cahill 29 th November 2011 TABLE OF CONTENTS SUMMARY 1 MAIN BODY SECTION

More information

BUTE Department of Construction Management and Technology

BUTE Department of Construction Management and Technology BUTE Department of Construction Management and Technology 02.10.2012 Definition 1: Foundation: The structure, that transmits the load of the building to the soil Definition 2: Load bearing soil (strata):

More information

SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DEEP FOUNDATIONS

SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DEEP FOUNDATIONS Page 1 of 9 SAMPLE GUIDE SPECIFICATIONS FOR OSTERBERG CELL LOAD TESTING OF DEEP FOUNDATIONS 1. GENERAL REQUIREMENTS 1. Description of Work: This work consists of furnishing all materials, equipment and

More information

SHAFT CONSTRUCTION IN TORONTO USING SLURRY WALLS

SHAFT CONSTRUCTION IN TORONTO USING SLURRY WALLS SHAFT CONSTRUCTION IN TORONTO USING SLURRY WALLS Vince Luongo Petrifond Foundation Co., Ltd. PROJECT DESCRIPTION The York Durham Sanitary System (YDSS) Interceptor in the Town of Richmond Hill located

More information

TECHNICAL SPECIFICATIONS CEMENT-BENTONITE SLURRY TRENCH CUTOFF WALL

TECHNICAL SPECIFICATIONS CEMENT-BENTONITE SLURRY TRENCH CUTOFF WALL TECHNICAL SPECIFICATIONS CEMENT-BENTONITE SLURRY TRENCH CUTOFF WALL SCOPE This section of the specifications includes requirements for the Slurry Trench Cutoff Wall and related work as indicated on the

More information

California Department of Transportation Doyle Drive Test Program Contract No. 04A3362

California Department of Transportation Doyle Drive Test Program Contract No. 04A3362 California Department of Transportation Doyle Drive Test Program Deep Soil Mixing (DSM) /Cutter Soil Mixing (CSM) Testing Report By Malcolm Drilling Company, Inc. 3524 Breakwater Ave., Suite 108 Hayward,

More information

King Post Wall Information

King Post Wall Information King Post Wall Information DAWSON-WAM specialise in the installation of piled retaining wall systems including steel sheet piling, concrete piled walls and king post walls. This document is our guide to

More information

Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation

Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation Jeff R. Hill, P.E. Hayward Baker Inc. 111 W. Port Plaza Drive Suite 600 St. Louis, MO 63146 314-542-3040 JRHill@HaywardBaker.com

More information

Geotechnical Building Works (GBW) Submission Requirements

Geotechnical Building Works (GBW) Submission Requirements Building Control (Amendment) Act 2012 and Regulations 2012: Geotechnical Building Works (GBW) Submission Requirements Building Engineering Group Building and Construction Authority May 2015 Content : 1.

More information

Local Authority Building Control Technical Information Note 3 Driven and In-situ Piled Foundations

Local Authority Building Control Technical Information Note 3 Driven and In-situ Piled Foundations Local Authority Building Control Technical Information Note 3 Driven and In-situ Piled Foundations Cambridge City Council - East Cambridgeshire District Council - Fenland District Council, Huntingdonshire

More information

High Strain Dynamic Load Testing of Drilled Shafts

High Strain Dynamic Load Testing of Drilled Shafts Supplemental Technical Specification for High Strain Dynamic Load Testing of Drilled Shafts SCDOT Designation: SC-M-712 (9/15) September 3, 2015 1.0 GENERAL This work shall consist of performing high-strain

More information

Design, Testing and Automated Monitoring of ACIP Piles in Residual Soils

Design, Testing and Automated Monitoring of ACIP Piles in Residual Soils Design, Testing and Automated Monitoring of ACIP Piles in Residual Soils Stephen W. Lacz 1, M. ASCE, P.E. and Richard C. Wells 2, F. ASCE, P.E. 1 Senior Professional, Trigon Kleinfelder, Inc., 313 Gallimore

More information

ITEM #0702770 OSTERBERG CELL LOAD TESTING OF DRILLED SHAFT

ITEM #0702770 OSTERBERG CELL LOAD TESTING OF DRILLED SHAFT ITEM #0702770 OSTERBERG CELL LOAD TESTING OF DRILLED SHAFT Description: This work shall consist of furnishing all materials, equipment and labor necessary for conducting an Osterberg Cell (O-Cell) Load

More information

DESIGNING STRUCTURES IN EXPANSIVE CLAY

DESIGNING STRUCTURES IN EXPANSIVE CLAY DESIGNING STRUCTURES IN EXPANSIVE CLAY A GUIDE FOR A RCHITECTS AND E NGINEERS Table of Contents 1. Introduction Page 1 2. Common Foundation Systems Page 2 3. Drilled Piers Page 3 a. Skin Friction Piers

More information

Lymon C. Reese & Associates LCR&A Consulting Services Tests of Piles Under Axial Load

Lymon C. Reese & Associates LCR&A Consulting Services Tests of Piles Under Axial Load Lymon C. Reese & Associates LCR&A Consulting Services Tests of Piles Under Axial Load Nature of Services The company has a long history of performance of tests of piles and pile groups under a variety

More information

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS July 14, 2015 1.0 GENERAL BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS This work shall consist of furnishing all materials, equipment, labor, and incidentals necessary for conducting bi-directional

More information

FRANKIPILE. High Pile Loads Optimum Adaptation to Foundation Soil Low-noise Manufacturing Process

FRANKIPILE. High Pile Loads Optimum Adaptation to Foundation Soil Low-noise Manufacturing Process FRANKIPILE High Pile Loads Optimum Adaptation to Foundation Soil Low-noise Manufacturing Process The FRANKIPILE Application possibilities The FRANKIPILE can be used in a wide range of foundation soil conditions

More information

ATLAS RESISTANCE Pier Foundation Systems

ATLAS RESISTANCE Pier Foundation Systems ATLAS RESISTANCE Pier Foundation Systems Foundation Repair Systems for Civil Construction Applications: Residential, Commercial, Industrial Atlas Resistance Piers have been used to restore and/or stabilize

More information

SECTION 1 GENERAL REQUIREMENTS

SECTION 1 GENERAL REQUIREMENTS Page 1 of 6 SECTION 1 GENERAL REQUIREMENTS 1. SCOPE OF WORK: The work to be performed under the provisions of these documents and the contract based thereon includes furnishing all labor, equipment, materials,

More information

Dead load (kentledge) A structure over the test pile. Ground anchorage either by tension piles or ground anchors. Bi-directional (Osterberg-cell)

Dead load (kentledge) A structure over the test pile. Ground anchorage either by tension piles or ground anchors. Bi-directional (Osterberg-cell) Introduction Fugro LOADTEST Overview STATIC LOAD TESTING O-cell Bi-directional testing State of the art Dr Melvin England Fugro LOADTEST Static load tests Previous/existing technology Developments O-cell

More information

The International Workshop on Micropiles, 2007

The International Workshop on Micropiles, 2007 MICROPILE FOUNDATION REPAIR AND UNDERPINNING, ARTS AND SCIENCE MUSEUM, UNIVERSITY OF PUERTO RICO, MAYAGUEZ Presented at: International Society of Micropiles (ISM) The International Workshop on Micropiles,

More information

The Stabilizer TM. Benefits. www.griptite.com. Supplemental support system for sagging beams and floor joists within a crawl space

The Stabilizer TM. Benefits. www.griptite.com. Supplemental support system for sagging beams and floor joists within a crawl space The Stabilizer TM Supplemental support system for sagging beams and floor joists within a crawl space Pre-drilled holes in steel plate allow for connection to beam or floor joists. Benefits Levels and

More information

Designed and Engineered to Perform

Designed and Engineered to Perform History EARTH CONTACT PRODUCTS, L.L.C., is a family owned company, based in Olathe, Kansas. This company was built upon Don May s U.S. Patented fourth-generation Steel Piering System that has led to the

More information

Emergency repair of Bridge B421

Emergency repair of Bridge B421 Emergency repair of Bridge B421 over the Olifants River after fl ood damage INTRODUCTION AND BACKGROUND Bridge B421 is located on the R555 at km 5.03 on Section 01E between Witbank (now known as emalahleni)

More information

Jack-in Piling Environmental Friendly Piling System

Jack-in Piling Environmental Friendly Piling System Jack-in Piling Environmental Friendly Piling System Part 1 - Chris Loh 7 Nov 12 CSC HOLDINGS LIMITED Gracious Piling Environmental Friendly Low Noise No Vibration Jack-in Piling How Many Decibels? Permissible

More information

Walls Datasheets. Diaphragm walls Slurry trench Bored pile walls

Walls Datasheets. Diaphragm walls Slurry trench Bored pile walls Walls Datasheets Diaphragm walls Slurry trench Bored pile walls Diaphragm Walls Technical Data Application Diaphragm walls can be used in most ground conditions to construct deep basements, underground

More information

Supplier ID: 26421. Local Office: GLASGOW 69 Buchanan Street Glasgow G1 3HL

Supplier ID: 26421. Local Office: GLASGOW 69 Buchanan Street Glasgow G1 3HL M D & FOUNDATIONS MIDLANDS Supplier ID: 26421 MINI PILING PILING REINFORCED CONCRETE UNDERPINNING DRILLING & GROUTING SITE INVESTIGATION & PILE TESTING NATIONWIDE SPECIALIST PILING & FOUNDATION SERVICES

More information

Geotechnical Investigation Reports and Foundation Recommendations - Scope for Improvement - Examples

Geotechnical Investigation Reports and Foundation Recommendations - Scope for Improvement - Examples Geotechnical Investigation Reports and Foundation Recommendations - Scope for Improvement - Examples Prof. V.S.Raju (Formerly: Director, IIT Delhi & Professor and Dean, IIT Madras) Email: rajuvs_b@yahoo.com

More information

Settlement of Precast Culverts Under High Fills; The Influence of Construction Sequence and Structural Effects of Longitudinal Strains

Settlement of Precast Culverts Under High Fills; The Influence of Construction Sequence and Structural Effects of Longitudinal Strains Settlement of Precast Culverts Under High Fills; The Influence of Construction Sequence and Structural Effects of Longitudinal Strains Doug Jenkins 1, Chris Lawson 2 1 Interactive Design Services, 2 Reinforced

More information

Construction Technology 3

Construction Technology 3 www.beautiful-basements.co.uk Construction Technology 3 Assignment 2: Basement Construction Dr. Patrick Tang, School of Architecture and the Built Environment Michael Dernee C3089219 Abstract: In the brief

More information

LEGACY REPORT ER-5110. www.icc-es.org. ICC Evaluation Service, Inc. Reissued November 1, 2003. Legacy report on the 1997 Uniform Building Code

LEGACY REPORT ER-5110. www.icc-es.org. ICC Evaluation Service, Inc. Reissued November 1, 2003. Legacy report on the 1997 Uniform Building Code LEGACY REPORT Reissued November 1, 2003 ICC Evaluation Service, Inc. www.icc-es.org Business/Regional Office # 5360 Workman Mill Road, Whittier, California 90601 # (562) 699-0543 Regional Office # 900

More information

EN 1997-1 Eurocode 7. Section 10 Hydraulic Failure Section 11 Overall Stability Section 12 Embankments. Trevor L.L. Orr Trinity College Dublin Ireland

EN 1997-1 Eurocode 7. Section 10 Hydraulic Failure Section 11 Overall Stability Section 12 Embankments. Trevor L.L. Orr Trinity College Dublin Ireland EN 1997 1: Sections 10, 11 and 12 Your logo Brussels, 18-20 February 2008 Dissemination of information workshop 1 EN 1997-1 Eurocode 7 Section 10 Hydraulic Failure Section 11 Overall Stability Section

More information

Asset Data Dictionary Definition Document Continuous Flight Auger Piles (CFA) Uniclass Classification

Asset Data Dictionary Definition Document Continuous Flight Auger Piles (CFA) Uniclass Classification Asset Data Dictionary Definition Document Continuous Flight Auger Piles (CFA) Uniclass Classification Contents Introduction... 3 Asset Details... 3 Description... 3 Asset Tagging... 3 Attributes... 4 Data

More information

Section 02415. Installation of pipe and casing for sanitary sewer by methods of augering.

Section 02415. Installation of pipe and casing for sanitary sewer by methods of augering. ITY OF PRLN UGRING PIP OR SING FOR SWRS Section 02415 UGRING PIP OR SING FOR SWRS 1.0 G N R L 1.01 STION INLUS Installation of pipe and casing for sanitary sewer by methods of augering. References to Technical

More information

1 Mobilisation and demobilisation 1 Deep boring sum 2 Cone penetration tests sum 3 Miscellenous tests sum

1 Mobilisation and demobilisation 1 Deep boring sum 2 Cone penetration tests sum 3 Miscellenous tests sum Malaysian Civil Engineering Standard Method of Measurement (MyCESMM) CLASS D: SITE INVESTIGATION WORK Measurement covered under other classes: Excavation not carried out for the purpose of soil investigation

More information

Federation of Piling Specialists July 2010

Federation of Piling Specialists July 2010 Examples of Hazards associated with Piling and Diaphragm Walling Works and how these might be managed within the design phase of a project (neither exhaustive nor exclusive) This list of examples has been

More information

Milan M5 metro extension the construction of Lotto station

Milan M5 metro extension the construction of Lotto station Milan M5 metro extension the construction of Lotto station Giuseppe LUNARDI, Rocksoil S.p.A., Italy giuseppe.lunardi@rocksoil.com Luca MANCINELLI, Rocksoil S.p.A., Italy, luca.mancinelli@rocksoil.com Massimiliano

More information

Process. CSM Cutter Soil Mixing Process and equipment

Process. CSM Cutter Soil Mixing Process and equipment Process CSM Cutter Soil Mixing Process and equipment 905-656-X_01-16_CSM.qxd 26.02.2016 9:27 Uhr Seite 2 CSM-Process Mixing of self-hardening slurries with native soils by using a modified trench cutter

More information

SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION

SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION 1. SCOPE Pipe subsoil drains shall be constructed in accordance with this specification and in conformity with the lines, grades and cross-sections shown

More information

THE LEANING TOWER OF PISA STABILISATION WORK Laurie Wesley University of Auckand, New Zealand

THE LEANING TOWER OF PISA STABILISATION WORK Laurie Wesley University of Auckand, New Zealand THE LEANING TOWER OF PISA STABILISATION WORK Laurie Wesley University of Auckand, New Zealand Inducing a wayward structure to be a little more upright The University of Auckland tower (still upright) 1

More information

METHOD OF STATEMENT FOR STATIC LOADING TEST

METHOD OF STATEMENT FOR STATIC LOADING TEST Compression Test, METHOD OF STATEMENT FOR STATIC LOADING TEST Tension Test and Lateral Test According to the American Standards ASTM D1143 07, ASTM D3689 07, ASTM D3966 07 and Euro Codes EC7 Table of Contents

More information

High Capacity Helical Piles Limited Access Projects

High Capacity Helical Piles Limited Access Projects High Capacity Helical Piles Limited Access Projects Tel 403 228-1767 Canada, USA, Russia Brendan ODonoghue 519 830-6113 Presentation Summary 1. Helical piles Background on large diameter shafts and helices

More information

The advantages and disadvantages of dynamic load testing and statnamic load testing

The advantages and disadvantages of dynamic load testing and statnamic load testing The advantages and disadvantages of dynamic load testing and statnamic load testing P.Middendorp & G.J.J. van Ginneken TNO Profound R.J. van Foeken TNO Building and Construction Research ABSTRACT: Pile

More information

SECTION 02401 SHEETING, SHORING AND BRACING

SECTION 02401 SHEETING, SHORING AND BRACING SECTION 02401 SHEETING, SHORING AND BRACING This section should be edited to reflect soil conditions specific to the project site and the recommendations of a Geotechnical Engineer licensed in the State

More information

New construction Repairing failed or old foundations Retrofit foundations Permanent battered piers Machinery/equipment foundations

New construction Repairing failed or old foundations Retrofit foundations Permanent battered piers Machinery/equipment foundations from New construction foundations don t have to be a headache. The CHANCE Helical Pier Foundation System gives you the performance of concrete without the drawbacks and liabilities of driven piles and

More information

INSITU TESTS! Shear Vanes! Shear Vanes! Shear Vane Test! Sensitive Soils! Insitu testing is used for two reasons:!

INSITU TESTS! Shear Vanes! Shear Vanes! Shear Vane Test! Sensitive Soils! Insitu testing is used for two reasons:! In-situ Testing! Insitu Testing! Insitu testing is used for two reasons:! To allow the determination of shear strength or penetration resistance or permeability of soils that would be difficult or impossible

More information

Up-Down Construction Utilizing Steel Sheet Piles and Drilled Shaft Foundations

Up-Down Construction Utilizing Steel Sheet Piles and Drilled Shaft Foundations Up-Down Construction Utilizing Steel Sheet Piles and Drilled Shaft Foundations Nathan A. Ingraffea, P.E., S.E. Associate, KPFF Consulting Engineers, Portland, Oregon, USA Abstract The use of steel sheet

More information

Strengthening of Large Storage Tank Foundation Walls in an Aggressive Environment by External Post-tensioning. May 7th 2013: Dominique Deschamps

Strengthening of Large Storage Tank Foundation Walls in an Aggressive Environment by External Post-tensioning. May 7th 2013: Dominique Deschamps Strengthening of Large Storage Tank Foundation Walls in an Aggressive Environment by External Post-tensioning May 7th 2013: Dominique Deschamps Scope of the paper Presentation of the project Cause of cracks

More information

CIVL451. Soil Exploration and Characterization

CIVL451. Soil Exploration and Characterization CIVL451 Soil Exploration and Characterization 1 Definition The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally

More information

-SQA-SCOTTISH QUALIFICATIONS AUTHORITY HIGHER NATIONAL UNIT SPECIFICATION GENERAL INFORMATION

-SQA-SCOTTISH QUALIFICATIONS AUTHORITY HIGHER NATIONAL UNIT SPECIFICATION GENERAL INFORMATION -SQA-SCOTTISH QUALIFICATIONS AUTHORITY HIGHER NATIONAL UNIT SPECIFICATION GENERAL INFORMATION -Unit number- 4420798 -Unit title- CONSTRUCTION TECHNOLOGY 2: SUBSTRUCTURE AND REMEDIAL WORKS -Superclass category-

More information

TYPES OF PIERS USED IN NORTH AND EAST TEXAS RESIDENTIAL FOUNDATION REPAIR

TYPES OF PIERS USED IN NORTH AND EAST TEXAS RESIDENTIAL FOUNDATION REPAIR TYPES OF PIERS USED IN NORTH AND EAST TEXAS RESIDENTIAL FOUNDATION REPAIR If you listen to the hype, it sounds like there must be 20 or 30 different types of piers out there. Company A says they have an

More information

HOUSE BUILDING DIGEST

HOUSE BUILDING DIGEST HOUSE BUILDING DIGEST (Construction Specifications-Foundations) Creating Enabling Environment for Affordable Housing for All This is an attempt by BMTPC to provide useful but often ignored information

More information

Tunnelling & Underground. Specialists

Tunnelling & Underground. Specialists Tunnelling & Underground Specialists Mined Tunnels Excavation at Ayer Rajah Avenue, Singapore Introduction Amberg & TTI Engineering Pte Ltd (AETTI) was established in Singapore in 2002 by Amberg Engineering

More information

Safe & Sound Bridge Terminology

Safe & Sound Bridge Terminology Safe & Sound Bridge Terminology Abutment A retaining wall supporting the ends of a bridge, and, in general, retaining or supporting the approach embankment. Approach The part of the bridge that carries

More information

Emergency Spillways (Sediment basins)

Emergency Spillways (Sediment basins) Emergency Spillways (Sediment basins) DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short-Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1]

More information

CEEN 162 - Geotechnical Engineering Laboratory Session 7 - Direct Shear and Unconfined Compression Tests

CEEN 162 - Geotechnical Engineering Laboratory Session 7 - Direct Shear and Unconfined Compression Tests PURPOSE: The parameters of the shear strength relationship provide a means of evaluating the load carrying capacity of soils, stability of slopes, and pile capacity. The direct shear test is one of the

More information

SPECIFICATION FOR DYNAMIC CONSOLIDATION / DYNAMIC REPLACEMENT

SPECIFICATION FOR DYNAMIC CONSOLIDATION / DYNAMIC REPLACEMENT SPECIFICATION FOR DYNAMIC CONSOLIDATION / DYNAMIC REPLACEMENT 1.0 SOIL IMPROVEMENT 1.1 General Soil Investigation Information are provided in Part B1 annex as a guide to the Contractor for his consideration

More information

Moving Small Mountains Vesuvius Dam Rehab

Moving Small Mountains Vesuvius Dam Rehab Moving Small Mountains Vesuvius Dam Rehab Susan L. Peterson, P.E., regional dams engineer, Eastern Region, Bedford, IN Note: The following article, Moving Small Mountains Vesuvius Dam Rehab, by Sue Peterson,

More information

Appendix A Sub surface displacements around excavations Data presented in Xdisp sample file

Appendix A Sub surface displacements around excavations Data presented in Xdisp sample file Appendix A Sub surface displacements around excavations Data presented in Xdisp sample file Notation B1 = lowest level of basement slab c = cohesion E = drained Young s Modulus Eu = undrained Young s Modulus

More information

Table of Contents 16.1 GENERAL... 16.1-1. 16.1.1 Overview... 16.1-1 16.1.2 Responsibilities... 16.1-1

Table of Contents 16.1 GENERAL... 16.1-1. 16.1.1 Overview... 16.1-1 16.1.2 Responsibilities... 16.1-1 Table of Contents Section Page 16.1 GENERAL... 16.1-1 16.1.1 Overview... 16.1-1 16.1.2 Responsibilities... 16.1-1 16.1.2.1 Geotechnical Section/Bridge Bureau Coordination... 16.1-1 16.1.2.2 Geotechnical

More information

CONSTANT HEAD AND FALLING HEAD PERMEABILITY TEST

CONSTANT HEAD AND FALLING HEAD PERMEABILITY TEST CONSTANT HEAD AND FALLING HEAD PERMEABILITY TEST 1 Permeability is a measure of the ease in which water can flow through a soil volume. It is one of the most important geotechnical parameters. However,

More information

MLD: Domestic Maritime Transport Project

MLD: Domestic Maritime Transport Project Environmental Monitoring Report Project Number: 37265 December 2010 MLD: Prepared by Japan Port Consultants Co., Ltd. Malé, Maldives For Ministry of Finance and Treasury Ministry of Transport and Communication

More information

PILE FOUNDATIONS FM 5-134

PILE FOUNDATIONS FM 5-134 C H A P T E R 6 PILE FOUNDATIONS Section I. GROUP BEHAVIOR 6-1. Group action. Piles are most effective when combined in groups or clusters. Combining piles in a group complicates analysis since the characteristics

More information

Pile test at the Shard London Bridge

Pile test at the Shard London Bridge technical paper Pile test at the Shard London Bridge David Beadman, Byrne Looby Partners, Mark Pennington, Balfour Beatty Ground Engineering, Matthew Sharratt, WSP Group Introduction The Shard London Bridge,

More information

Worldwide network in over 40 countries.

Worldwide network in over 40 countries. Worldwide network in over 40 countries. April 2012 56 rue de Neuilly 93136 Noisy le Sec Cedex - France Tel : +33 (0)1 49 42 72 95 Fax : +33 (0)1 48 44 00 02 E-mail : contact@ptc.fayat.com PTC s vibrodrivers

More information

Tremie Concrete CM 420 CM 420 CM 420 CM 420. Temporary Structures. Tremie Concrete

Tremie Concrete CM 420 CM 420 CM 420 CM 420. Temporary Structures. Tremie Concrete Tremie Concrete Underwater concrete plays an important role in the construction of offshore structures. It may be used to tie together various elements in composite action (i.e., to tie piling to the footing).

More information

COPYRIGHT. Dincel Construction System Pty Ltd

COPYRIGHT. Dincel Construction System Pty Ltd BASEMENT CONSTRUCTION Dincel Construction System Pty Ltd 101 Quarry Road ERSKINE PARK NSW 2759 PO Box 104, ST CLAIR NSW 2759 Phone: (612) 9670 1633 Fax: (612) 9670 6744 Email: construction@dincel.com.au

More information

GLOSSARY OF TERMINOLOGY

GLOSSARY OF TERMINOLOGY GLOSSARY OF TERMINOLOGY AUTHORIZED PILE LENGTHS - (a.k.a. Authorized Pile Lengths letter) Official letter stating Engineer's recommended length of concrete piles to be cast for construction of foundation.

More information

FUTURE SLAB. PENETRATIONS and. DEMOLITION of POST-TENSIONED FLOORS

FUTURE SLAB. PENETRATIONS and. DEMOLITION of POST-TENSIONED FLOORS FUTURE SLAB PENETRATIONS and DEMOLITION of POST-TENSIONED FLOORS 1.0 INTRODUCTION Post-tensioned floor slabs in Australia and South East Asia are now universally regarded as the most cost effective form

More information

Use of a Reinforced Jet Grout Excavation Support System for a Major Sewer Line Repair

Use of a Reinforced Jet Grout Excavation Support System for a Major Sewer Line Repair Use of a Reinforced Jet Grout Excavation Support System for a Major Sewer Line Repair Eric M. Klein, P. E., Rummel, Klepper & Kahl, LLP, Baltimore, Maryland Kenneth B. Andromalos, P. E., Brayman Environmental,

More information

Cardok Sàrl CP37 CH-1295 Tannay Switzerland Phone: 0041 22 77 66 051 info@cardok.com

Cardok Sàrl CP37 CH-1295 Tannay Switzerland Phone: 0041 22 77 66 051 info@cardok.com CARDOK CARLIFT Fast access to underground garages Fast, Silent, Discreet, Design, High-Tech Installation to replace an access ramp on private property Dimensions: (Built to measure, all dimensions can

More information

Flowtite Jacking Pipe

Flowtite Jacking Pipe U.S. COMPOSITE PIPE SOUTH, LLC. MEMBER OF KTI PIPE GROUP OF COMPANIES Flowtite Jacking Pipe 18585 Samuels Rd. Zachary, La. 70791 PH. 225-658-6166 Fax 225-658-0947 www.flowtitepipe.com Flowtite GRP Pipe

More information

EXAMPLE 1 DESIGN OF CANTILEVERED WALL, GRANULAR SOIL

EXAMPLE 1 DESIGN OF CANTILEVERED WALL, GRANULAR SOIL EXAMPLE DESIGN OF CANTILEVERED WALL, GRANULAR SOIL A sheet pile wall is required to support a 2 excavation. The soil is uniform as shown in the figure. To take into account the friction between the wall

More information

DIRECTIONAL DRILLING

DIRECTIONAL DRILLING DIRECTIONAL DRILLING 1. General. Installation of pipelines through the levee embankment using directional drilling technology is prohibited. Installation of pipelines through a flood control project foundation

More information

IPR-02-64. Äspö Hard Rock Laboratory. International Progress Report. Temperature Buffer Test. Report for retaining plug and anchoring

IPR-02-64. Äspö Hard Rock Laboratory. International Progress Report. Temperature Buffer Test. Report for retaining plug and anchoring International Progress Report IPR-02-64 Äspö Hard Rock Laboratory Temperature Buffer Test Report for retaining plug and anchoring Richard Bäck Äspö HRL September 2002 Svensk Kärnbränslehantering AB Swedish

More information

SECTION 411 DRILLED PIERS

SECTION 411 DRILLED PIERS Section Payment will be made under: Pay Item Foundation Excavation Foundation Excavation for Bent No. at Station Foundation Excavation for End Bent No. at Station Pay Unit Cubic Yard Lump Sum Lump Sum

More information

Chapter. Restoration of Damaged Structures

Chapter. Restoration of Damaged Structures 5 Chapter Restoration of Damaged Structures Bringing back a damaged structure to its pre-earthquake state and original strength is called restoration. This is the first step of building rehabilitation.

More information

How To Retaining Wall Guide

How To Retaining Wall Guide How To Retaining Wall Guide Before you start: Consents and Engineering Building Consent Retaining walls over 1.5m high will require a building consent from the Local Body Council. Walls that carry extra

More information

Integrated Manhole Ladder System

Integrated Manhole Ladder System Application: This innovative product has been designed to provide safe access and egress to precast concrete manholes and inspection chambers. It can also be used within any other underground concrete

More information

Construction sites are dewatered for the following purposes:

Construction sites are dewatered for the following purposes: 9. DEWATERING CONTROL OF GROUNDWATER Construction of buildings, powerhouses, dams, locks and many other structures requires excavation below the water table into water-bearing soils. Such excavations require

More information

TECHNICAL NOTE Lining of Casings with SaniTite HP Pipe

TECHNICAL NOTE Lining of Casings with SaniTite HP Pipe TECHNICAL NOTE Lining of Casings with SaniTite HP Pipe TN 5.18 October 2015 In sanitary sewer, it is often necessary to use trenchless technology methods to install a casing pipe under high volume roads,

More information

Stabilenka HUESKER. and Separation. Engineering with Geosynthetics SKER HUESKER HUESKER HUESKER HUESKERHUES

Stabilenka HUESKER. and Separation. Engineering with Geosynthetics SKER HUESKER HUESKER HUESKER HUESKERHUES HUESKER Engineering with Geosynthetics rhuesker HUESKER HUESKER HUESKER HUESKER HUESKERr rhuesker HUESKER Woven HUESKER HUESKER Fabrics HUESKER HUESKERr SKER HUESKER HUESKER HUESKER HUESKERHUES rhuesker

More information

TBM CROSSING OF STATIONS

TBM CROSSING OF STATIONS TBM CROSSING OF STATIONS Eng. Marco Barbanti Astaldi S.p.A. Eng. Tommaso Grosso Astaldi S.p.A. 18-11-2011 In the presence of groundwater the permeability of the ground is of great interest. It is important

More information

SECTION 02200 SUPPORT OF EXCAVATION

SECTION 02200 SUPPORT OF EXCAVATION SECTION 02200 PART 1 GENERAL 1.01 DESCRIPTION A. Section including specifications for design and installation of excavation support. B. Section also includes specifications for excavation support systems

More information

Design of pile foundations following Eurocode 7-Section 7

Design of pile foundations following Eurocode 7-Section 7 Brussels, 18-20 February 2008 Dissemination of information workshop 1 Workshop Eurocodes: background and applications Brussels, 18-20 Februray 2008 Design of pile foundations following Eurocode 7-Section

More information

DESIGN OF PILES AND PILE GROUPS CONSIDERING CAPACITY, SETTLEMENT, AND NEGATIVE SKIN FRICTION

DESIGN OF PILES AND PILE GROUPS CONSIDERING CAPACITY, SETTLEMENT, AND NEGATIVE SKIN FRICTION DESIGN OF PILES AND PILE GROUPS CONSIDERING CAPACITY, SETTLEMENT, AND NEGATIVE SKIN FRICTION Introduction Bengt H. Fellenius, Dr.Tech., P.Eng. Background Notes for Demo Example for UniPile at www.unisoftltd.com

More information

TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE

TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE TECHNICAL SPECIFICATION PART 8000 - PRECAST CONCRETE TABLE OF CONTENTS Item Number Page 8100 PRECAST CONCRETE CONSTRUCTION - GENERAL 8-3 8101 General

More information

EXCAVATION and BASEMENT CONSTRUCTION. Introduction

EXCAVATION and BASEMENT CONSTRUCTION. Introduction EXCAVATION and BASEMENT CONSTRUCTION Introduction In general, excavation means to loosen and.take out materials leaving space above or below ground. Sometimes in civil engineering term earthwork is used

More information

Monobuckets and the competitiveness versus monopiles and jacket structures.

Monobuckets and the competitiveness versus monopiles and jacket structures. Monobuckets and the competitiveness versus monopiles and jacket structures. Lars Bo Ibsen, Aalborg University, Professor. Foundation concepts for offshore Wind Turbines The Universal Foundation Carbon

More information

Comparison of Seismic Retrofitting Methods for Existing Foundations in Seismological Active Regions

Comparison of Seismic Retrofitting Methods for Existing Foundations in Seismological Active Regions Comparison of Seismic Retrofitting Methods for Existing Foundations in Seismological Active Regions Peyman Amini Motlagh, Ali Pak Abstract Seismic retrofitting of important structures is essential in seismological

More information

Amendment to OPSS 415 (Nov 2008) Construction Specification for Pipeline and Utility Installation by Tunnelling

Amendment to OPSS 415 (Nov 2008) Construction Specification for Pipeline and Utility Installation by Tunnelling Engineering and Construction Services Division Standard Specifications for Sewers and Watermains TS 415 April 2013 Amendment to OPSS 415 (Nov 2008) Construction Specification for Pipeline and Utility Installation

More information

CHAPTER 9 LONG TERM MONITORING AT THE ROUTE 351 BRIDGE

CHAPTER 9 LONG TERM MONITORING AT THE ROUTE 351 BRIDGE CHAPTER 9 LONG TERM MONITORING AT THE ROUTE 351 BRIDGE 9.1 INTRODUCTION An important reason that composite piles have not gained wide acceptance in the civil engineering practice is the lack of a long

More information

System. Stability. Security. Integrity. 150 Helical Anchor

System. Stability. Security. Integrity. 150 Helical Anchor Model 150 HELICAL ANCHOR System PN #MBHAT Stability. Security. Integrity. 150 Helical Anchor System About Foundation Supportworks is a network of the most experienced and knowledgeable foundation repair

More information

Dynamic Load Testing of Helical Piles

Dynamic Load Testing of Helical Piles Dynamic Load Testing of Helical Piles ANNUAL KANSAS CITY SPECIALTY SEMINAR 2014 JANUARY 10, 2014 Jorge Beim JWB Consulting LLC Pile Dynamics, Inc. Main Topics Brief description of the Dynamic Load Test

More information

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.

SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250. 02150-1 of 6 SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING 02150.01 GENERAL A. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily

More information

METHOD STATEMENT HIGH STRIAN DYNAMIC TESTING OF PILE. Prepared by

METHOD STATEMENT HIGH STRIAN DYNAMIC TESTING OF PILE. Prepared by METHOD STATEMENT HIGH STRIAN DYNAMIC TESTING OF PILE Prepared by Infratech ASTM CO., LTD. Contents Chapter Description Page Contents...... 1 List of Appendix. 1 1. Introduction.. 2 2. Test Method..2 3.

More information