1 Environmental Monitoring Report Project Number: December 2010 MLD: Prepared by Japan Port Consultants Co., Ltd. Malé, Maldives For Ministry of Finance and Treasury Ministry of Transport and Communication This report has been submitted to ADB by the Ministry of Finance and Treasury and is made publicly available in accordance with ADB s public communications policy (2005). It does not necessarily reflect the views of ADB.

2 TABLE OF CONTENTS 1. Introduction Summary of the Project Summary of Construction Works Environmental Management Plan Temporary Fence Temporary steel sheet pile wall Silt curtain Selection of Equipment Adjustment of hours for transport of filling material The other mitigation measure Environmental Monitoring Monitoring Items Monitoring Locations Monitoring Method Monitoring Time and Frequency Monitoring Record Results of the Environmental Monitoring Survey General Turbidity Water Quality Waste Generation Oil Spills and Marine Pollution Noise Traffic Air Pollution List of Figures Fig. 2.1 General Layout of the Project Site Fig. 3.1 Monitoring Locations

3 A List of Acronyms ADB: COD: EMP: GOM: IEE: JPC: MHE: MHUDB: MNH: MoFT: MPA: MTC: MTCC: PH: SS: kg: km: m: ppm: Asia Development Bank Chemical Oxygen Demand Environmental Management Plan Government of Maldives Initial Environmental Examination Japan Port Consultants, Co. Ltd. Ministry of Housing and Environment Maldives Housing and Urban Development Board Male North Harbor Ministry of Finance and Treasury Maldives Port Authority Ministry of Transport and Communication Maldives Transport and Contract Co. Ltd. Potential of Hydrogen Suspended Solid kilogram kilometer meter parts per million 2

4 1. Introduction 1. The Government of Maldives (GOM) requested ADB to provide a loan for. The project components are (i) institutional development and capacity building, and (ii) an investment component for improvement of North Malé Harbor. The institutional development and capacity component also covers efforts to strengthen MTC capacity in addressing environmental concern related to its activities. 2. The proposed improvement of Malé North Harbor was based on an approved Land Use Plan prepared by the Maldives Housing and Urban Development Board (MHUDB). According to the plan, a new quay would be constructed with in the existing Malé North Harbor and would be allocated for use of cargo and passenger vessels operating Malé and outer islands. The new quay will be expected to ease congestion and improve the operational conditions of the harbor. Since the Malé North Harbor is located in an already altered environment, and the construction work will involve limited physical interventions in the area protected with the breakwater, the potential environmental impacts would be manageable with appropriate mitigation measures. Hence the project is classified as Category B and requires an Initial Environmental Examination (IEE) in accordance with ADB s Environmental Assessment Guidelines The Initial Environment Examination (IEE) for this project was prepared in December A decision note had been issued for the IEE on the condition that the developer should submit a separate report prior to the commencement of the project with the information on detailed drawing and the circulation model as proposed in the December 2006 report giving due consideration to the cumulative impacts of the new fish market. 4. The Initial Environmental Examination (IEE) provided the framework for the development of the Environmental Management Plan (EMP) prepared in March The plan included a rolling action plan with periodical monitoring and appropriate budget allocations. The purpose of the Environmental Management Plan was to identify priorities, set objectives and targets, define performance indicators, document strategies and time frames to achieve targets, allocate responsibilities and identify the necessary resources to enable realization of the overall plan and establish mechanisms to monitor, evaluate and report progress. 5. The Ministry of Transport and Communication (MTC) of Maldives Government contracted the Male North Harbor Construction Works to the Maldives Transport and Contracting Co. Ltd. (MTCC) on 27th of October, The kickoff meeting to initiate the construction works was held on 5th of November, MTCC submitted the 3

5 environmental management plan (EMP) in accordance with the Contract Conditions including monitoring survey categories, method, frequency, locations, etc in December The Contractor was requested to submit the environmental survey report every 2 months and a collected report every 6 months. 6. This report presents the findings on implementation of the EMP and results of monitoring activities carried out by the contractor from January to June Summary of the Project 7. The following provides the project details at a glance: 2.1 Project Name: 2.2 Client Executing Agency: Ministry of Finance and Treasury (MoFT) Implementing agency: Ministry of Transport and Communication (MTC), Ministry of Housing and environment (MHE) 2.3 Finance: ADB Loan agreement No MLD 2.4 Consultant: Japan Port Consultants, Co. Ltd. (JPC) 2.5 Project Location: Male North Harbor (Eastern side of Male Port Authority) 2.6 Contractor: Maldives Transport and Contracting Co. Ltd. (MTCC) 2.7 Contracted Date and Period Contracted Date: 27 October 2009 Contracted Period: One year (5 November 2009 to 4 November 2010) 3. Summary of Construction Works 8. Construction of the Male North Harbor includes the following: 1) MSL 4.0 m Quay Wall ---- Steel Sheet Pile Foundation - Emergency Berth: m - Cargo Handling Area including Passenger, Dangerous Cargo: approx m - Mooring Area: approx m Interlocking Concrete Block Pavement: 5, m2 2) Shelter and Toilet: - Shelter: 8.0 m x 60.0 m including passenger room - Toilet: 3.50 m x 5.00 m 3) Office and Guard Room 4

6 - Office: m x 6.50 m with water control room 1.50m x 2.00 m - Guard Room: 8.15 m x 2.50 m 4) Lighting - H = 8.0 m Single Arm: 4 Nos. Double Arm: 7 Nos. 5) Water Supply - 2 Pressured Water Lines and 2 Outlets 6) Miscellaneous Works - Fender, Bollard, Entrance and Emergency Gates, Fence and Drainage Filling works for reclamation and dredging works include. 7) Reclamation Volume: approx. 26,100 m3 8) Dredging Volume: approx. 390 m3 (MSL- 4.0 m) 9. Final general layout plan is as shown in below: N Reclamation Area Mooring Area Dangerous Cargo Handling Area Fence H=2.5 m MPA Toilet Office & Guard Room MSL m Quay Wall General Cargo Handling Area Emergency Mooring Area Shelter 8.0m x 60 m 25.00m 20.00m Dredging Area (MSL-4.0 m) Proposed Lightings Water Pipeline Water Outlet Shelter General Dangerou Passenger General Cargo Cargo Cargo 15.0m 20.0m 20.0m 5.0m N Main Gate (Open type) Emergency Gate (Sliding Type) Fig. 2.1 General Layout of the Project Site 5

7 4. Environmental Management Plan 10. The Contractor was requested to submit the environmental management plan in accordance with the Conditions of Contract. Therefore, the Contractor MTCC submitted the EMP after commencement of the Works on December In accordance with the requirements of the EMP, the Contractor constructed/set up facilities and undertook measures as given in the following to mitigate and minimize environmental impacts on the harbor basin and land area. 4.1 Temporary Fence 12. The Temporary Fence with a length of 60 m of at entrance was installed in order to separate between the project site and existing land area which was a lively commercial area prior to commencement of the project works. The main purposes of the fence were: a. To restrict access to the construction site, b. To avoid impacts on the land nearby which is not part of the project construction, and c. To prevent disturbance to the construction site including theft of construction material 4.2 Temporary steel sheet pile wall 13. The temporary steel sheet pile wall was installed within face line of planned quay wall in order to prevent impacts on the quality of water within the harbor basin. The main purposes of the sheet pile wall are: a. To protect the filling material from flowing into the harbor basin, b. To prevent the diffusion of turbid water into the basin, and c. To prevent wastes, oil spills and other kinds of pollution from flowing into the basin. 4.3 Silt curtain 14. The silt curtain was also installed out side of the face line of planned quay wall in order to protect the water quality of the basin. The main purposes of the silt curtain are: a. To prevent diffusion of turbid water to the basin, and b. To prevent wastes, oil spills and other kinds of pollution from flowing into the 6

8 basin. 4.4 Selection of Equipment 15. The Contractor selected equipments so as not to cause heavy noise to the surrounding area. The construction equipments which were used are: a. Vibro-Hammer for pile driving works. The vibro-hammer is very quiet because it is electric run. It was selected instead of the diesel hammer is very noisy because of hitting the piles. It also cause oil spills from the use of diesel oil. b. A generator with soundproofing was used to provide electric power to the vibro-hammer, welding machine, etc. c. Other using equipment: Excavator, Crawler Crane 80 tons, etc. They are totally quiet even operation. 4.5 Adjustment of hours for transport of filling material 16. The project site is surrounded by busy commercial area. A vegetable and fishery market exists at eastern side while a commercial port exists on the western side. Therefore, too many cargo vessels are berthing along the coastal road and many people and vehicles gather outside of temporary fence during daytime 17. In order to prevent any additional congestion the transport of filling material from municipality stock yard to the construction site is being done during night. Therefore pushing and leveling works by the excavator is being done during the day time. 4.6 The other mitigation measure 18. Regular monitoring is being carried out for ensuring that the temporary fence, sheet pile wall and silt curtain is fulfilling their intended purposes as stated above. If any of the facilities are not serving their intended purpose and is resulting in negative impacts such as excessive siltation or pollution of the water within the harbor area, necessary investigations will be carried out. Immediate steps will be taken to prevent the problem from continuing. If necessary the construction works will be stopped and counter measures such as installation of another silt curtain will be carried out. 19. In addition, the construction area is made known to everyone by the public board installed on the temporary fence as shown in right pictures. 7

9 5. Environmental Monitoring 5.1 Monitoring Items 20. In addition to implementing the EMP the contractor is also required to conduct regular environmental quality monitoring of the following items: 1) Water Turbidity 2) Water Quality such SS, PH, COD, Visual Depth, etc. 3) Waste Generation 4) Oil Spills and Marine Pollution 5) Noise 6) Traffic 7) Air Pollution 5.2 Monitoring Locations 21. The monitoring survey locations for each survey item are shown in Fig No.7 No.5 No.6 No.2 No m No m 30.0 m m No.3 No.8 No.9 No m 50.0 m Turbidity (No. 1-No.7, 7places) Fig. 3.1 Monitoring Locations Waste Generation (No.2, 4, 5, & 7, 4 Places) Water Quality (No.1, 2, 3, 5 & 6, 5 Places) Oil Spill (No.2, 5 & 7, 3 Places) Noise (No. 8, 9 & 10, 3 Places) Traffic (No. 8, 1 place) 8

10 22. The survey at the location numbers Nos.1 to 4 could not be conducted due to continuous occupation of those locations by cargo vessels. In-spite of requests made by the Client and the Consultant sometimes to the Municipality to instruct to the occupied vessels to move out, the vessels did not move. Instead of No. 1, No.2 and No.4, the turbidity surveys were conducted outside of silt curtains which were placed around filling material. However, locations of that alternative survey was too close to the filling area so the survey data could only be used for additional reference. Hence, records of turbidity exist only for location Nos. 5, 6, and 7. Location of No.5 is near the reclamation area and Locations of No.6 and No.7 are at the boundary between inner harbor and outer harbor. Considering the main purpose of monitoring the water turbidity is to see the impact to the adjacent environment. The turbidity control was conducted by the combination at the 3 locations from inner harbor to outer harbor and daily visual checking. 23. In addition the Contractor and the Consultant s inspector conducted visual check around the filling material every day. (Therefore, usual turbidity control was achieved with sufficient effectiveness by the monitoring survey of 3 locations plus visual checking every day.) 5.3 Monitoring Method 24. The monitoring methods for each survey item are shown in below: Survey Item Method Turbidity: Turbidity Meter Water Quality: Taking Sample at each specified Locations and Laboratory Test Waste Generation: Visual Check and Count Oil Spill & Marine P: Visual Check Noise: Noise Sound Meter Traffic: Visual Check and Count P: Pollution 25. The contractor conducted the monitoring in the presence of an inspector representing the consultant. 5.4 Monitoring Time and Frequency 26. The Monitoring Survey Frequency for each item is shown in below: Survey Item Frequency Turbidity: Every day during dredging and reclamation works Water Quality: Once before commencement of the works and Every 2 9

11 Waste Generation: Oil Spill & Marine P: Noise: Traffic: P: Pollution months Every 2 months Once before commencement of the works and Every 2 months Once before commencement of the works and Every 2 months Every 2 months 27. The consultant requested the contractor to conduct daily turbidity survey at the same time every day to allow daily comparison as far as possible or at the time of the ebb of tide on which the diffusion of water pollution would be easier than on the flow of tide. 5.5 Monitoring Record 28. After the surveys, the contractor records the results of each survey item and the consultant confirms his records. The contractor then submits a report with the survey results every two months to the client 29. The following survey reports were submitted by the contractor since the start of the construction works till June 2010: No. of Survey and Date Survey Item Report No.1 27/Dec Water Quality, Oil Spill & Marine Pollution and Noise No.2 02/Feb Water Quality, Waste Generation, Oil Spill & Marine Pollution, Noise and Traffic No.3 04/Apr Water Quality, Waste Generation, Oil Spill & Marine Pollution, Noise and Traffic No.4 02/Jun Water Quality, Waste Generation, Oil Spill & Marine Pollution, Noise and Traffic 6. Results of the Environmental Monitoring Survey 30. The followings are the results of the environmental monitoring surveys as given in the contractor s report. 10

12 6.1 General 31. The temporary sheet pile wall and silt curtain were successful in preventing the filling material from flowing away from the reclaimed area into the harbor water and causing turbidity problems. 32. The survey points No.1, 2, 3 and 4 were always occupied by cargo vessels. Hence monitoring of turbidity, water quality, waste generation and oil spills could not be conducted at those points during construction works. 6.2 Turbidity 33. The turbidity surveys were conducted on a daily basis during reclamation works at location No.5, No.6 and No.7. According to the daily survey records, the turbidity values at the survey points are 1-29 ppm (1/1,000,000~29/1,000,000g). The original turbidity value was 8.0 ppm before commencement of the works. 6.3 Water Quality 34. The surveys were conducted and reported before commencement of site works and every 2 months. 35. After samplings for water quality test at the points, laboratory tests were conducted. The results showed that there was a small difference only in the SS. No difference could be found. In the PH, COD and Visual Depth Hence, the water quality had been maintained within original conditions. 6.4 Waste Generation 36. Visual surveys were conducted and reported every 2 months. It was found that almost all the waste generated was from cargo vessels and not the construction works. Some garbage such as polyvinyl bottles and bags, etc that were found to be mixed in with the reclaimed material, was removed and appropriately disposed off by the contractors. 6.5 Oil Spills and Marine Pollution 37. Visual surveys were conducted and reported before commencement of site works and every 2 months. According to the records, there were no oil spills and marine pollution in the project site. 11

13 6.6 Noise 38. Surveys were conducted and reported before commencement of site works and every 2 months. The contractor used crawler crane, excavator, generator, welder, concrete mixer, vibro-hammer and flat barges for the construction works. Noise levels of db were recorded. However, the survey points are located outside of temporary fence which separates the project site and nearby land area. Hence during construction works and use of the equipments, the noise from the site did not have any impact in the surrounding land area. It must be noted that noise generated at the survey points is mainly from the local social and economic activities. 6.7 Traffic 39. Traffic surveys were conducted during night time and reported every 2 months. The results found a cars/hour and people/hour passed through the survey point at night. The reason for conducting the survey only at night was because vehicle movement for the project took place only at night. 40. In order to cause further traffic congestion, dump trucks for transported reclamation material to the project site only at night (19:00 to 24:00). Most of other project construction equipments and vehicles, which were operational mainly only during the day, be hardly needed to move out of the construction area. Of the survey finding, the total number of dump trucks traveling per hour was only 3-5. Therefore it can be concluded that impacts on the local traffic from the project are negligible and traffic congestion at the survey point were created mainly from the local social and economic activities. 6.8 Air Pollution 41. There is no record of survey for air pollution in the contractor s report. However, exhaust gas created by the imperfect combustion is prevented by operator s thoroughly checking equipments before and after using. And the occurrence of dust in the project site is also prevented by sprinkling water accordingly. 12

Sustainable Resource Management Ltd

Sustainable Resource Management Ltd 6.0 Predicted nvironmental Impacts 6. Stages and Impacts Considered An nvironmental Impact Analysis has been carried out whereby all the possible environmental, socio economic and health & safety aspects

More information

REHABILITATION AND EXTENSION PROJECT FOR PORT OF LOBITO

REHABILITATION AND EXTENSION PROJECT FOR PORT OF LOBITO REHABILITATION AND EXTENSION PROJECT FOR PORT OF LOBITO Advantages of Port Lobito (1) Predominant geological locations Facing the Atlantic, Port Lobito locates around 30km north to Beguela City, and it

More information

Project Information Document Iskenderun Port Expansion Project

Project Information Document Iskenderun Port Expansion Project Project Information Document Iskenderun Port Expansion Project February 2013 Introduction This Project Information Document describes the Iskenderun Port Expansion Project (Project). It has been prepared

More information

MBJ Environmental Programmes

MBJ Environmental Programmes MBJ Airports Limited Environmental Policy The following is MBJ Airports Limited s (MBJ) Environmental Policy for Sangster International Airport (SIA): Integrate environmental management measures with planning,

More information

Environmental Management Plan

Environmental Management Plan Environmental Management Plan ENVIRONMENTAL MANAGEMENT PLAN An Environmental Management Plan is prepared for construction phase, post construction phase (commissioning & operation) and for post project

More information

ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS

ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS PREPARED BY: DEPARTMENT OF ENVIRONMENT AND LANDS INDUSTRIAL ENVIRONMENTAL ENGINEERING DIVISION APRIL 16, 1992 - TABLE OF

More information

DIRECT TRANSFER COAL FACILITY SPILL RESPONSE PLAN

DIRECT TRANSFER COAL FACILITY SPILL RESPONSE PLAN DIRECT TRANSFER COAL FACILITY SPILL RESPONSE PLAN Last revised June 5th, 2015 Page 1 of 13 Table of Contents 1. PURPOSE... 2 2. ROLES AND RESPONSIBILITIES... 2 3. SAFETY... 2 4. COAL SPILLS... 3 4.1. COAL

More information

TERMS OF REFERENCE FOR THE RAPID EIA STUDY

TERMS OF REFERENCE FOR THE RAPID EIA STUDY TERMS OF REFERENCE FOR THE RAPID EIA STUDY 1 SUMMARY OF EIA METHODOLOGY STEP I : SCOPING OF THE ASSESSMENT Own with prevailing regulatory setting and criteria Identification of Environmental Assessment

More information

FREMANTLE PORTS. A Guide to Our Business

FREMANTLE PORTS. A Guide to Our Business FREMANTLE PORTS A Guide to Our Business Our Vision, Mission and Values VISION To be valued by our customers and the community for our leadership and excellence. MISSION To facilitate trade in a sustainable

More information

Marine & Shipping Sources of Pollution Port Operations

Marine & Shipping Sources of Pollution Port Operations Marine & Shipping Sources of Pollution Port Operations Liquids Solids Mixed Waste Air Pollution Ballast Water Bilge Water Bunker Fuel Tank Washing Oil spills Compartments at the bottom of a ship that are

More information

GMS: Rehabilitation of Railway in Cambodia

GMS: Rehabilitation of Railway in Cambodia Environmental Monitoring Report Monthly Report February 2014 GMS: Rehabilitation of Railway in Cambodia Prepared by, for the Ministry of Public Works and Transport, the Kingdom of Cambodia, and the Asian

More information

MAYFLOWER HOUSE, ARMADA WAY, PLYMOUTH PROPOSED STUDENT ACOMMODATION FOR GUILDHOUSE (UK) LTD PRELIMINARY CONSTRUCTION MANAGEMENT STATEMENT FOR PLANNING

MAYFLOWER HOUSE, ARMADA WAY, PLYMOUTH PROPOSED STUDENT ACOMMODATION FOR GUILDHOUSE (UK) LTD PRELIMINARY CONSTRUCTION MANAGEMENT STATEMENT FOR PLANNING MAYFLOWER HOUSE, ARMADA WAY, PLYMOUTH PROPOSED STUDENT ACOMMODATION FOR GUILDHOUSE (UK) LTD PRELIMINARY CONSTRUCTION MANAGEMENT STATEMENT FOR PLANNING PREPARED BY WARDELL ARMSTRONG (RJWA) LTD Suite 8,

More information

Temporary Erosion Control and Job Site Management for Memorandum of Understanding Partners

Temporary Erosion Control and Job Site Management for Memorandum of Understanding Partners Temporary Erosion Control and Job Site Management for Memorandum of Understanding Partners Introduction Standard Condition Silt Fence, Wattles, and Inlet Protection Tree & Vegetation Protection Dewatering

More information

Port of Farsund. The exotic choice. Your first and foremost port in Norway

Port of Farsund. The exotic choice. Your first and foremost port in Norway Port of Farsund The exotic choice Your first and foremost port in Norway Here in Farsund we have the space and the facilities to meet your needs. FFS A/S is the lead towage and barge company in the region.

More information

MEMORANDUM. Further discussion regarding the Community s solid waste facility is described further in this memorandum.

MEMORANDUM. Further discussion regarding the Community s solid waste facility is described further in this memorandum. MEMORANDUM File: Sanikiluaq Improvement of the Existing Wastewater Treatment Facility To: Government of Nunavut Department of Community and Government Services Attention: Mr. Grigor Hope,, Project Officer

More information

SULTANATE OF OMAN SPECIAL ECONOMIC ZONE AUTHORITY AT DUQM

SULTANATE OF OMAN SPECIAL ECONOMIC ZONE AUTHORITY AT DUQM SULTANATE OF OMAN SPECIAL ECONOMIC ZONE AUTHORITY AT DUQM www.duqm.gov.om 1. INTRODUCTION 2. ACCESSIBILITY TO DUQM 3. SEZAD PREVIOUS MASTERPLAN 4. DUQM URBAN PLANNING 5. SPECIAL ECONOMIC ZONE DISTRICTS

More information

Single Family Residential Erosion and Sediment Control Standards

Single Family Residential Erosion and Sediment Control Standards July 2011 Planning and Development Services Single Family Residential Erosion and Sediment Control Standards This booklet contains standard plans and procedures appropriate for typical residential building

More information

Spill Prevention, Control and Countermeasure (SPCC) Rule

Spill Prevention, Control and Countermeasure (SPCC) Rule Spill Prevention, Control and Countermeasure (SPCC) Rule Code of Federal Regulations Title 40 CFR Part 112 Training Guide for Oil and Fuel handlers on Farms 1 Purpose of SPCC Rule To prevent oil discharges

More information

PROVINCE OF BRITISH COLUMBIA MINISTRY OF ENERGY AND MINES

PROVINCE OF BRITISH COLUMBIA MINISTRY OF ENERGY AND MINES PROVINCE OF BRITISH COLUMBIA MINISTRY OF ENERGY AND MINES QUARRY PERMIT APPROVING WORK SYSTEM AND RECLAMATION PROGRAM (Issued pursuant to Section 10 of the Mines Act R.S.B.C. 1996, C.293) Permit: Q-9-042

More information

TERMS OF REFERENCE (TOR)

TERMS OF REFERENCE (TOR) TERMS OF REFERENCE (TOR) 1. INTRODUCTION Terms of Reference (TOR) for preparation of Environmental Impact assessment (EIA) and Environmental Management Plan for building construction projects ( 1,50,000

More information

Waste Management. Sunny Mistry. Rensselaer Polytechnic Institute. Solid and Hazardous Waste Prevention and Control Engineering. Spring 2014 MANE-6960

Waste Management. Sunny Mistry. Rensselaer Polytechnic Institute. Solid and Hazardous Waste Prevention and Control Engineering. Spring 2014 MANE-6960 Waste Management Sunny Mistry Rensselaer Polytechnic Institute Solid and Hazardous Waste Prevention and Control Engineering Spring 2014 MANE-6960 Introduction: Modern waste management strategies have been

More information

Greenhouse Gas Emissions

Greenhouse Gas Emissions Greenhouse Gas Emissions 12 12 Greenhouse gases (GHG) are naturally occurring gases in the earth s atmosphere that absorb and radiate infrared radiation (heat) reflected from the earth s surface. The most

More information

Use dry cleaning methods whenever practical for surface cleaning activities.

Use dry cleaning methods whenever practical for surface cleaning activities. SIDEWALK, PLAZA, AND FOUNTAIN MAINTENANCE AND CLEANING Pollutants on sidewalks and other pedestrian traffic areas and plazas are typically due to littering and vehicle use. Fountain water containing chlorine

More information

COLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION

COLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION COLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION (1) Project Name: (2) Project Contractor: (3) Erosion Control Supervisor/SWMP Administrator: (4) CDOT Project

More information

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (SSBMP) PLAN/STORM WATER POLLUTION PREVENTION PLAN (SWPPP) REVIEW CHECKLIST

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (SSBMP) PLAN/STORM WATER POLLUTION PREVENTION PLAN (SWPPP) REVIEW CHECKLIST This checklist may be used by applicants for encroachment permits, and contractors in development of Site Specific Best Management Practice (SSBMP) Plans or Storm Water Pollution Prevention Plans (SWPPP)

More information

SECTION 02100 SITE PREPARATION

SECTION 02100 SITE PREPARATION SECTION 02100 SITE PREPARATION PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and General Provisions of Contract, including General Conditions and Supplementary Conditions and Division 1 through Division

More information

This document aims to inform developers and architects of Waste and Recycling Service requirements in the London Borough of Hounslow.

This document aims to inform developers and architects of Waste and Recycling Service requirements in the London Borough of Hounslow. GUIDANCE FOR PLANNING APPLICATIONS: RECYCLING & NON RECYCLING PROVISION FOR NEW DEVELOPMENTS WITHIN THE LONDON BOROUGH OF HOUNSLOW FOR RESIDENTIAL & COMMERCIAL SITES This document aims to inform developers

More information

REPORT ENVIRONMENTAL VIOLATIONS WHAT YOU CAN DO TO ASSIST US IN STOPPING ENVIRONMENTAL VIOLATIONS:

REPORT ENVIRONMENTAL VIOLATIONS WHAT YOU CAN DO TO ASSIST US IN STOPPING ENVIRONMENTAL VIOLATIONS: REPORT ENVIRONMENTAL VIOLATIONS WHAT YOU CAN DO TO ASSIST US IN STOPPING ENVIRONMENTAL VIOLATIONS: Become aware of violations that are harmful to our environment. (See pictures of common violation below)

More information

Mauritius Ports Authority

Mauritius Ports Authority Mauritius Ports Authority IORA Blue Economy Conference 2015 Enhancing Sea Port and Shipping Activities September 2015 Ocean Economy Objectives The objectives under the Ocean Economy is to transform Port

More information

ENVIRONMENTAL MANAGEMENT PLAN :-

ENVIRONMENTAL MANAGEMENT PLAN :- ENVIRONMENTAL MANAGEMENT PLAN :- The Environment Management Plan (EMP) is required to ensure sustainable development in the area of the proposed project. Hence it needs to be all encompassive plan for

More information

Environmental Guidelines for Preparation of an Environmental Management Plan

Environmental Guidelines for Preparation of an Environmental Management Plan 2013 Environmental Guidelines for Preparation of an Environmental Management Plan Environmental Management Division Environmental Protection Agency 3/13/2013 ENVIRONMENTAL GUIDELINES FOR PREPARATION OF

More information

Activity Yes No N/A Notes

Activity Yes No N/A Notes CE 2020 (Rev. 12/11) Page 1 of 5 PROJECT NAME AND SITE ADDRESS: CONTRACT NUMBER: ORACLE NUMBER: WDID NUMBER: CONTRACTOR NAME AND ADDRESS: PROJECT SITE RISK LEVEL: Risk Level 1 Risk Level 2 Risk Level 3

More information

Wellington Inner City Improvements National War Memorial Park (Pukeahu) Certification Review

Wellington Inner City Improvements National War Memorial Park (Pukeahu) Certification Review Wellington Inner City Improvements National War Memorial Park (Pukeahu) Air Quality (Dust) Certification Review 22 November 2012 [CAQMP1 TR] Prepared in association with: Document produced by: Apecx PO

More information

Independent Contractor Policy

Independent Contractor Policy Independent Contractor Policy This Policy has been implemented to prevent accidents and personal injuries. It is not intended to be entirely inclusive. It is the responsibility of the Independent Contractor

More information

TECHNICAL GUIDELINE. Requirements For The Reduction Of Construction and Demolition Noise

TECHNICAL GUIDELINE. Requirements For The Reduction Of Construction and Demolition Noise إرشاد فني TECHNICAL GUIDELINE Number رقم (9) متطلبات خفض الضجيج الناتج من أعمال البناء أو الهدم Requirements For The Reduction Of Construction and Demolition Noise أبريل April 2011 قسم الدراسات والتخطيط

More information

Module No. # 02. Impact of oil and gas industry on marine environment

Module No. # 02. Impact of oil and gas industry on marine environment Health, Safety and Environmental Management in Petroleum and offshore Engineering Dr. Srinivasan Chandrasekaran Department of Ocean Engineering Indian Institute of Technology, Madras Module No. # 02 Lecture

More information

consulting engineers and scientists

consulting engineers and scientists consulting engineers and scientists Incorporating Sustainable Principles into Cleanups June 2014 Presented by: Rich Truax, PE GEI Consultants, 650 Personnel Nationwide Rich Truax, P.E. Sr. Program Manager

More information

PROJECT PROFILE WATER RECLAMATION FACILITIES FOR YUEN LONG, SAI KUNG AND STANLEY SEWAGE TREATMENT WORKS

PROJECT PROFILE WATER RECLAMATION FACILITIES FOR YUEN LONG, SAI KUNG AND STANLEY SEWAGE TREATMENT WORKS ELECTRICAL AND MECHANICAL PROJECTS DIVISION PROJECT PROFILE WATER RECLAMATION FACILITIES FOR YUEN LONG, SAI KUNG AND STANLEY SEWAGE TREATMENT WORKS Page 1 Table of Content 1 PROJECT INFORMATION... 3 1.1

More information

A.P.I.C.E. Common Mediterranean strategy and local practical Actions for the mitigation of Port, Industries and Cities Emissions

A.P.I.C.E. Common Mediterranean strategy and local practical Actions for the mitigation of Port, Industries and Cities Emissions A.P.I.C.E. Common Mediterranean strategy and local practical Actions for the mitigation of Port, Industries and Cities Emissions The study area of Venice ARPA Veneto and Veneto Region Kick off meeting

More information

GUIDANCE DOCUMENT FOR PREPARATION AND SUBMISSION OF ENVIRONMENTAL MANAGEMENT PLAN (EMP) 1.0 INTRODUCTION TO GUIDANCE DOCUMENT

GUIDANCE DOCUMENT FOR PREPARATION AND SUBMISSION OF ENVIRONMENTAL MANAGEMENT PLAN (EMP) 1.0 INTRODUCTION TO GUIDANCE DOCUMENT GUIDANCE DOCUMENT FOR PREPARATION AND SUBMISSION OF ENVIRONMENTAL MANAGEMENT PLAN (EMP) A. THE GUIDANCE DOCUMENT 1.0 INTRODUCTION TO GUIDANCE DOCUMENT Environmental Management Plan (EMP) translates the

More information

Click to edit Master title style. Click to edit Master text styles Second level TOOLBOX TALK ENVIRONMENTAL AWARENESS

Click to edit Master title style. Click to edit Master text styles Second level TOOLBOX TALK ENVIRONMENTAL AWARENESS Click to edit Master title style TOOLBOX TALK ENVIRONMENTAL AWARENESS 1 Click Environmental to edit Master Awareness title style Protecting the environment is not only a commitment to future generations,

More information

FLOOD WARNING EVACUATION PLAN CORY ENVIRONMENTAL, WASTE MANAGEMENT FACILITY, AISECOME WAY, WESTON SUPER MARE

FLOOD WARNING EVACUATION PLAN CORY ENVIRONMENTAL, WASTE MANAGEMENT FACILITY, AISECOME WAY, WESTON SUPER MARE FLOOD WARNING EVACUATION PLAN CORY ENVIRONMENTAL, WASTE MANAGEMENT FACILITY, AISECOME WAY, WESTON SUPER MARE SITE MANAGER:INSERT DETAILS (MOBILE:INSERT DETAILS) AREA MANAGER: INSERT DETAILS (MOBILE INSERT

More information

THE DILEMMA OF VESSEL NOISE SmartComp Consultation Day

THE DILEMMA OF VESSEL NOISE SmartComp Consultation Day THE DILEMMA OF VESSEL NOISE SmartComp Consultation Day 13.2.2013 at Meriton Grand Conference and Spa Hotel, Tallinn Maria Mustonen, TFK Transport Research Institute Agenda Noise as an environmental problem

More information

Integrated waste management system for the reuse of used frying oils to produce biodiesel for municipality fleet of Oeiras

Integrated waste management system for the reuse of used frying oils to produce biodiesel for municipality fleet of Oeiras LIFE ENVIRONMENT Programme Integrated waste management system for the reuse of used frying oils to produce biodiesel for municipality fleet of Oeiras Project co-funded by the LIFE Environment programme

More information

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited

2x800 MW Thermal Power Project Near Village Paraspani, Tehsil Pathargama, Godda- District By Adani Power (Jharkhand) Limited (IV) Proposed Terms of Reference for EIA Studies Project Category Project Proponent Location Paraspani Thermal Power Plant (2x800 MW) Coal based Thermal Power Project A [1(d) Thermal Power Plant 500 MW]

More information

CITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES

CITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES CITY OF VINCENT CONSTRUCTION MANAGEMENT PLAN GUIDELINES INTRODUCTION What is a Construction Management Plan? The City of Vincent requires careful management of construction involving excavation and retention

More information

Entry Improvement Concept Border Field State Park California State Parks Southern Service Center May, Walls 4I NTERNATIONAL

Entry Improvement Concept Border Field State Park California State Parks Southern Service Center May, Walls 4I NTERNATIONAL Entry Improvement Concept Border Field State Park California State Parks Southern Service Center May, 2013 The entrance to Border Field State Park is the primary access point for the southern portion of

More information

Law Relating to the Prevention of Marine Pollution and Maritime Disaster

Law Relating to the Prevention of Marine Pollution and Maritime Disaster Law Relating to the Prevention of Marine Pollution and Maritime Disaster (Law No. 136 of 1970 as amended through Law No. 68 of 1998) Chapter I. General Provisions (Purpose) Article 1. The purpose of this

More information

Community Construction Management Plan

Community Construction Management Plan Community Construction Management Plan SR 520 Union Bay Natural Area Wetland Mitigation Site 2/9/2016 The Community Construction Management Plan (CCMP) is a mitigation measure for the construction of the

More information

Tariff General Cargo. Tariff 2013. DB Port Szczecin Sp. z o.o. Bytomska14_Str. 70 603 Szczecin, Poland. This Tariff includes: rates for services,

Tariff General Cargo. Tariff 2013. DB Port Szczecin Sp. z o.o. Bytomska14_Str. 70 603 Szczecin, Poland. This Tariff includes: rates for services, Tariff General This Tariff includes: rates for services, valid at DB Port Szczecin 01.01.2013 do 31.12.2013. DB Port Szczecin Sp. z o.o. Bytomska14_Str. 70 603 Szczecin, Poland 1 Table of contents: 1.

More information

Mersin, TURKEY. Port extension project

Mersin, TURKEY. Port extension project Mersin, TURKEY Port extension project Mersin is situated on the Mediterranean Sea, on the southeast coast of Turkey. Several international contracting companies were invited to bid for the upgrading of

More information

Extraction Oil and Gas, LLC. Diamond Valley Central Oil Terminal Waste Management Plan

Extraction Oil and Gas, LLC. Diamond Valley Central Oil Terminal Waste Management Plan Extraction Oil and Gas, LLC. Diamond Valley Central Oil Terminal Waste Management Plan Scope: This Extraction Oil and Gas Waste Management Plan has been prepared to provide operations personnel at the

More information

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED PHASE 2 EXPANSION OF THE TRANSNET IRON ORE HANDLING FACILITY, SALDANHA

ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED PHASE 2 EXPANSION OF THE TRANSNET IRON ORE HANDLING FACILITY, SALDANHA ENVIRONMENTAL IMPACT ASSESSMENT PROCESS PROPOSED PHASE 2 EXPANSION OF THE TRANSNET IRON ORE HANDLING FACILITY, SALDANHA BACKGROUND INFORMATION DOCUMENT 1 BACKGROUND Transnet Limited s (Transnet) existing

More information

APPENDIX O. Spill Prevention and Emergency Response Plan. G3 Terminal Vancouver Port Metro Vancouver Project Permit Application APPENDIX O

APPENDIX O. Spill Prevention and Emergency Response Plan. G3 Terminal Vancouver Port Metro Vancouver Project Permit Application APPENDIX O APPENDIX O Spill Prevention and Emergency Response Plan APPENDIX O G3 Terminal Vancouver Port Metro Vancouver Project Permit Application G3 TERMINAL VANCOUVER: PORT METRO VANCOUVER SPILL PREVENTION AND

More information

Energy from Waste Combined Heat and Power Facility, North Yard, Devonport. Community Ambient Air Quality Monitoring Programme Report Quarter 4, 2015

Energy from Waste Combined Heat and Power Facility, North Yard, Devonport. Community Ambient Air Quality Monitoring Programme Report Quarter 4, 2015 Energy from Waste Combined Heat and Power Facility, North Yard, Devonport Community Ambient Air Quality Monitoring Programme Report Quarter 4, 2015 Overview of Monitoring Programme MVV started ambient

More information

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (BMP) PLAN REVIEW CHECKLIST

SITE-SPECIFIC BEST MANAGEMENT PRACTICES (BMP) PLAN REVIEW CHECKLIST This checklist may be used by applicants for encroachment permits, and contractors in development of Site- Specific BMP Plans for projects. plan reviewers will use this checklist to review the Site-Specific

More information

Ardessie Hydro Electric Project

Ardessie Hydro Electric Project Ardessie Hydro Electric Project Appendix T - Traffic Management Plan 13 th December 2014 V1.0 Jacinta MacDermot DHG Hydro Ltd 7 St James s Gardens London W11 4RB Jacinta.macdermot@dhghydro.com 077 888

More information

L2571-AZE: Water Supply and Sanitation Investment Program Nakhchivan City Water Supply and Sewerage Subproject (Tranche 1)

L2571-AZE: Water Supply and Sanitation Investment Program Nakhchivan City Water Supply and Sewerage Subproject (Tranche 1) Environmental Monitoring Report Semestral Report January 2012 L2571-AZE: Water Supply and Sanitation Investment Program Nakhchivan City Water Supply and Sewerage Subproject (Tranche 1) Prepared by SAWMC,

More information

Category Environmental Item Main Check Items Confirmation of Environmental and Social Considerations

Category Environmental Item Main Check Items Confirmation of Environmental and Social Considerations al Checklist: 7. Petroleum Refining(1) 1. Permits and Approvals, Explanations 2. Antipollution (1) ESIA and al Permits (2) Explanations to the Public (1) Air Quality (2) Water Quality 1 Have ESIA reports

More information

7 WASTE MANAGEMENT IMPLICATIONS

7 WASTE MANAGEMENT IMPLICATIONS 80 7 WASTE MANAGEMENT IMPLICATIONS This section presents the management and disposal strategy of the wastes generated from the construction and operational phases of the proposed Wholesale Fish Market

More information

City of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements

City of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements City of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements Overview of the City s Construction Storm Water Program The City of Paso Robles is committed to protecting

More information

Find job and training opportunities at SteadyGrowth.ca

Find job and training opportunities at SteadyGrowth.ca 3 4 Find job and training opportunities at SteadyGrowth.ca 5 6 7 8 9 10 11 12 13 14 Manitoba Trades What you do Program Entry Requirements Years to Complete Program Where the Jobs are Minimum Wages Apprentice

More information

Spill Prevention and Response Procedures

Spill Prevention and Response Procedures Spill Prevention and Response Procedures Line MB Extension Project Baltimore and Harford Counties, MD July 2015 Contents Section Page Acronyms and Abbreviations... v 1.0 Spill Prevention... 1-1 1.1 Preventative

More information

Civil Engineering Sector Labour-Management Health and Safety Committee

Civil Engineering Sector Labour-Management Health and Safety Committee PROCEDURE FOR THE STORAGE AND HANDLING OF FUEL ON CONSTRUCTION SITES Civil Engineering Sector Labour-Management Health and Safety Committee July 2008 PROCEDURE FOR THE STORAGE AND HANDLING OF FUEL ON CONSTRUCTION

More information

Pollution Incident Response Management Plan

Pollution Incident Response Management Plan Pollution Incident Response Management Plan POLLUTION INCIDENT RESPONSE MANAGEMENT PLAN 1. Introduction This Pollution Incident Response Management Plan (PIRMP) has been prepared to describe the processes

More information

Waste Handling & Disposal

Waste Handling & Disposal Objectives Cover Contain Educate Reduce/Minimize Product Substitution Description Improper storage and handling of solid wastes can allow toxic compounds, oils and greases, heavy metals, nutrients, suspended

More information

Ex-Ante Evaluation (for Japanese ODA Loan)

Ex-Ante Evaluation (for Japanese ODA Loan) Japanese ODA Loan Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Project Country: The Democratic Socialist Republic of Sri Lanka Project: New Bridge Construction Project over the Kelani River

More information

Approval requirements for local government works in coastal management district

Approval requirements for local government works in coastal management district Coastal Protection and Management Act 1995 This guideline is designed to help local government identify and meet requirements associated with obtaining coastal development approvals under the Sustainable

More information

Environmental guidelines for preparation of an Environment Management Plan

Environmental guidelines for preparation of an Environment Management Plan Environmental guidelines for preparation of an Environment Management Plan Environment Protection Authority MAY 2013 Australian Capital Territory, Canberra 2013 This work is copyright. Apart from any use

More information

CONTENTS TRAFFIC ACCIDENTS AND SAFETY POLICIES INTRODUCTION 1. Traffic Accidents in General 1 2. Promotion of Traffic Safety and Accident Trends 3 3. The Future Direction of Traffic Safety Measures 6 BOOK

More information

The Faust Corporation has always held safety, quality and environmental impact as its first concern in the designing and construction of projects.

The Faust Corporation has always held safety, quality and environmental impact as its first concern in the designing and construction of projects. The Faust Corporation is a full service Marine Construction company providing dredging services to our private and public sector clients. Our services range from simple dredging projects providing additional

More information

PUBLIC OPEN HOUSE & INFORMATION SESSION WHY IS THE CITY INVESTING IN FREIGHT AND MARITIME USES AND WHY AT SBMT?

PUBLIC OPEN HOUSE & INFORMATION SESSION WHY IS THE CITY INVESTING IN FREIGHT AND MARITIME USES AND WHY AT SBMT? WHY IS THE CITY INVESTING IN FREIGHT AND MARITIME USES AND WHY AT SBMT? CRITICAL ROLE IN FREIGHT TRANSPORTATION SBMT is the only maritime industrial site in Brooklyn, Queens and Long Island capable of

More information

Liquid Effluent Treatment Plant (LETP) Land Clean-Up

Liquid Effluent Treatment Plant (LETP) Land Clean-Up Liquid Effluent Treatment Plant (LETP) Land Clean-Up Frequently Asked Questions What is proposed? Magnox Ltd is proposing to remove the redundant Liquid Effluent Treatment Plant (LETP) at Harwell and to

More information

Household waste & recycling storage requirements

Household waste & recycling storage requirements South Gloucestershire Council Guidance for Developers on Household waste & recycling storage requirements INTRODUCTION As part of the Council s aim to improve the quality of life for residents as well

More information

Lebanon Hotspot Report: the Garbage Mountain

Lebanon Hotspot Report: the Garbage Mountain International POPs Elimination Project Fostering Active and Efficient Civil Society Participation in Preparation for Implementation of the Stockholm Convention Lebanon Hotspot Report: the Garbage Mountain

More information

Environmental Construction Operations Plan (ECO Plan) Framework

Environmental Construction Operations Plan (ECO Plan) Framework ALBERTA INFRASTRUCTURE AND TRANSPORTATION Environmental Construction Operations Plan (ECO Plan) Framework COPYRIGHT, MAY 2005 THE CROWN IN RIGHT OF THE PROVINCE OF ALBERTA, AS REPRESENTED BY THE MINISTER

More information

U l t i m a t e e f f i c i e n c y D re D ging

U l t i m a t e e f f i c i e n c y D re D ging 1 Ultimate efficiency Dredging We have a deep attitude. 2 Ultimate efficiency 3 Growth of global population, tourism, transportation of people and goods together with increased awareness of the need to

More information

DESCRIPTION OF MINE AND PREVIOUS ACTIVITY

DESCRIPTION OF MINE AND PREVIOUS ACTIVITY Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Bodos Open Pit, Covasna County, DESCRIPTION OF MINE AND PREVIOUS ACTIVITY Design: SANTEDIL

More information

INTRODUCTION... 3. 1.0 Purpose... 4. 2.0 Policy... 4. Exception for Short-Term Workplace Visits... 4. Relevant Legislation and Regulations...

INTRODUCTION... 3. 1.0 Purpose... 4. 2.0 Policy... 4. Exception for Short-Term Workplace Visits... 4. Relevant Legislation and Regulations... March 2006 INTRODUCTION... 3 1.0 Purpose... 4 2.0 Policy... 4 Exception for Short-Term Workplace Visits... 4 Relevant Legislation and Regulations... 5 Definitions... 5 Contractor Safety Coordination Overview...

More information

Management of Marine Environment ENVS 590. Instructor Dr. Assad A. Al-Thukair

Management of Marine Environment ENVS 590. Instructor Dr. Assad A. Al-Thukair Management of Marine Environment ENVS 590 Instructor Dr. Assad A. Al-Thukair Contingency Planning Background Elements of Contingency Planning Information gathering Strategy development Operational plan

More information

Construction Management Statement. Residential development at Bywell House, St Mary s Hill, Ascot

Construction Management Statement. Residential development at Bywell House, St Mary s Hill, Ascot Construction Management Statement Residential development at Bywell House, St Mary s Hill, Ascot Parking of Vehicles of Site Personnel, Operatives and Visitors Site staff, visitors to the development and

More information

Proposed Terms of Reference for EIA studies

Proposed Terms of Reference for EIA studies 1 Proposed Terms of Reference for EIA studies Base line data collection will be collected for the Post-Monsoon season 2016 (September to November 2016) in study area and 10 kms radius from project site.

More information

Course Description List

Course Description List Course Description List Arc Flash This course is used to raise awareness about the specific electrical hazards of an arc flash. This course will also introduce a new CSA Standard on workplace electrical

More information

Applicable Rules - Air 30 TAC 116.110 Permits All facilities must be authorized by a permit, a standard permit, or a permit by rule. Small mixers unde

Applicable Rules - Air 30 TAC 116.110 Permits All facilities must be authorized by a permit, a standard permit, or a permit by rule. Small mixers unde Concrete Batch Plant Investigations 1 Applicable Rules - Air 30 TAC 116.110 Permits All facilities must be authorized by a permit, a standard permit, or a permit by rule. Small mixers under 5 ft 3 are

More information

(25) CONCEPT STUDY OSLO HUB A MEGA PROJECT 07.06.2016. Nina Tveiten Norwegian National Rail Administration

(25) CONCEPT STUDY OSLO HUB A MEGA PROJECT 07.06.2016. Nina Tveiten Norwegian National Rail Administration (25) CONCEPT STUDY OSLO HUB A MEGA PROJECT 07.06.2016 Nina Tveiten Norwegian National Rail Administration The study has been conducted on behalf of: The Ministry of Transport and Communications The Municipality

More information

33 CFR 322 Permits for Structures or Work in or Affecting Navigable Waters of the United States

33 CFR 322 Permits for Structures or Work in or Affecting Navigable Waters of the United States 33 CFR 322 Permits for Structures or Work in or Affecting Navigable Waters of the United States AUTHORITY: 33 U.S.C. 403 Section 322.1 - General. This regulation prescribes, in addition to the general

More information

Prevention Pollution by Garbage from Ships in China. E Hailiang Deputy Director Maritime Safety Administration People s s Republic of China

Prevention Pollution by Garbage from Ships in China. E Hailiang Deputy Director Maritime Safety Administration People s s Republic of China Prevention Pollution by Garbage from Ships in China E Hailiang Deputy Director Maritime Safety Administration People s s Republic of China 1 General Ship source garbage has been identified as one of the

More information

Prepared and Submitted by

Prepared and Submitted by Technical Feasibility Study Report of Proposed Sulfuric Acid and Phosphoric Acid Unloading Facilities, Acid Storage Tanks at the existing Wharf and Acid Transfer Pipeline Falling within the CRZ area &

More information

Annex 2.2. Questionnaire for Solid Waste Management Survey

Annex 2.2. Questionnaire for Solid Waste Management Survey Annex 2.2 Questionnaire for Solid Waste Management Survey This Annex is a reproduction of Annex 2 of: WHO (1996). Guides for Municipal Solid Waste Management in Pacific Countries. Healthy Cities - Healthy

More information

INCREASE OF DURABILITY AND LIFETIME OF EXISTING BRIDGES. PIARC TC 4.4 EXPERIENCE.

INCREASE OF DURABILITY AND LIFETIME OF EXISTING BRIDGES. PIARC TC 4.4 EXPERIENCE. INCREASE OF DURABILITY AND LIFETIME OF EXISTING BRIDGES. PIARC TC 4.4 EXPERIENCE. M.Sc. Gediminas Viršilas Head of Bridge Division, Lithuanian Road Administration Working group 2 of PIARC Technical Committee

More information

Exploration for natural gas

Exploration for natural gas FACT SHEET NO. 42 Exploration for natural gas Quick facts QGC holds licences from the Queensland Government called Authorities to Prospect that allow us to explore in areas known as tenements We work with

More information

MONTHLY ENVIRONMENTAL MONITORING AND AUDIT REPORT NO. 33

MONTHLY ENVIRONMENTAL MONITORING AND AUDIT REPORT NO. 33 THE GOVERNMENT OF THE HONG KONG SPECIAL ADMINISTRATIVE REGION TERRITORY DEVELOPMENT DEPARTMENT HK ISLAND & ISLANDS DEVELOPMENT OFFICE Agreement No. CE 7/99 Design and Construction MONTHLY ENVIRONMENTAL

More information

LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT

LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT LIQUID WASTE TREATMENT FACILITY MENDIS ROAD, HUDSON CREEK DRAFT GUIDELINES FOR A PUBLIC ENVIRONMENTAL REPORT Introduction The purpose of this Public Environmental Report (PER) is to provide the Government

More information

Building a new substation

Building a new substation Building a new substation Building for the future Key Points Prior to the construction of a new substation, we complete a State Government-approved process under the Sustainable Planning Act 2009 (SPA),

More information

Improper storage of fuel on construction sites will increase the risk of water pollution that may occur as a result of leaks or spills.

Improper storage of fuel on construction sites will increase the risk of water pollution that may occur as a result of leaks or spills. WQ-10 Best Management Practice (BMP) Water Quality Protection Guideline Secondary Containment Design Standards Fuel Storage on Construction Sites According to the EPA, the majority of water pollution in

More information

A SOLUTION FOR THE NEW YORK HARBOR TODAY. A LEADER FOR THE SHIPPING WORLD TOMORROW.

A SOLUTION FOR THE NEW YORK HARBOR TODAY. A LEADER FOR THE SHIPPING WORLD TOMORROW. NYCT EXPANSION Last years record cargo volume was impressive under any circumstances. "It's kind of like having the family over for a big dinner and you've just started renovation of your kitchen," says

More information

Date: September 14, 2004 Location: The Mining Exploitation Borsa At community consultation were invited representatives from:

Date: September 14, 2004 Location: The Mining Exploitation Borsa At community consultation were invited representatives from: Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Burloaia Central, Maramures County, Design: ICPM Baia Mare DESCRIPTION OF MINE AND PREVIOUS

More information

Duties and Responsibilities of Road Builders in Dubai

Duties and Responsibilities of Road Builders in Dubai The primary duty of a road construction contractor is to complete the project on time and within the stipulated budget. They oversee the entire construction project or renovation of existing roads and

More information

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE

PROJECT INFORMATION DOCUMENT (PID) APPRAISAL STAGE Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Project Name Region Sector Project ID Borrower(s) PROJECT INFORMATION DOCUMENT (PID)

More information

Examples of Eligible Projects. Project Category Description Examples

Examples of Eligible Projects. Project Category Description Examples Examples of Eligible Projects Public Transit Local Roads, Bridges, and Active Transportation Regional and Local Airports which supports a shared passenger transport system which is available for public

More information