Hydrogeological Assessment Proposed Gravel Pit, Part Lot 28, Concession 11 Town of the Blue Mountains OS OS February 2010

Size: px
Start display at page:

Download "Hydrogeological Assessment Proposed Gravel Pit, Part Lot 28, Concession 11 Town of the Blue Mountains OS OS February 2010"

Transcription

1 Hydrogeological Assessment Proposed Gravel Pit, Part Lot 28, Concession 11 Town of the Blue Mountains OS OS February 2010 Prepared for: Mr. Dennis Breadner RR1 Clarksburg, ON N0H 1J0 Prepared by: GENIVAR Consultants LP 945 Third Avenue East, Suite 212 Owen Sound, Ontario N4K 2K8 Project No. OS OS

2

3 Hydrogeological Assessment Proposed Gravel Pit, Part Lot 28, Concession 11, Town of the Blue Mountains February 2010 Table of Contents 1.0 INTRODUCTION HYDROGEOLOGICAL SETTING Site Description Geological Mapping Water Well Records Field Reconnaissance for Water Wells INVESTIGATION PROCEDURE Initial Groundwater Level Monitoring Test Pit Investigation Additional Groundwater Level Monitoring SUBSURFACE SOIL CONDITIONS GROUNDWATER CONDITIONS DISCUSSION SUMMARY LIMITATIONS List of Tables Table 1 Summary of Water Level Data Table 2 Summary of Test Pit Conditions List of Figures Figure 1 Well Location Plan Figure 2 Site Plan Figure 3 Sections A-A and B-B Figure 4 Groundwater Contours Appendices Appendix A Ministry of Environment Well Record Summary and Individual Well Records Appendix B Borehole Logs and Water Level Data for the Adjacent Property to the South GENIVAR OS OS i

4 Hydrogeological Assessment Proposed Gravel Pit, Part Lot 28, Concession 11, Town of the Blue Mountains February Introduction Henderson Paddon & Associates (HPA), A Division of GENIVAR Consultants LP (GENIVAR), was retained by Mr. Dennis Breadner to carry out an investigation to assess the existing water table elevation at a property currently proposed for aggregate extraction operations. The subject property that would contain the proposed pit is described as Part Lot 28, Concession 11 in the Geographic Township of Collingwood, now in the Town of the Blue Mountains, Ontario. The location of the proposed pit is shown on Figure 1. It was understood that a Class A Licence, Category 3, under the Aggregate Resources Act was proposed for the subject property. Under Category 3, the pit operation is restricted to extracting aggregate material no closer than 1.5 metres above the established groundwater table. The Ministry of Natural Resources (MNR) defines the groundwater table as the surface of an unconfined water-bearing zone at which the fluid pressure in the unconsolidated medium is atmospheric. Generally, the groundwater table is the top of the saturated zone. If an applicant wishes to operate a gravel pit to excavate aggregate closer than 1.5 metres to the water table, then this type of extraction would generally be considered a below water application and would be licensed as a Category 1. A work plan for the proposed investigation was provided in a letter from GENIVAR to Mr. Breadner dated December 23, Written authorization to proceed with the investigation was provided by Mr. Breadner on January 12, GENIVAR OS OS 1-1

5 Hydrogeological Assessment Proposed Gravel Pit, Part Lot 28, Concession 11, Town of the Blue Mountains February Hydrogeological Setting 2.1 Site Description The subject property is located on the west side of Grey Road 13, approximately 1 kilometre southwest of the community of Clarksburg. Initially, an area of approximately 11.2 hectares (hereafter referred to as the Site) comprising approximately the eastern two-thirds of the subject property, on the east side of the Beaver River, was identified to GENIVAR by Cuesta Planning Consultants Inc. as the proposed area for aggregate extraction and this area was the subject of this investigation. The limits of the Site are shown on Figure 1. Subsequently, a slightly smaller area for the proposed aggregate extraction licence was identified to GENIVAR by Mr. Breadner. This area is shown on Figure 2. The Site is presently used for an apple orchard and we understand that the Site will be returned to use as an apple orchard after aggregate extraction. We understand that Mr. Breadner also owns a separate property located east of the Site and west of Grey Road 13, also legally described as Part Lot 28, Concession 11, Geographic Township of Collingwood, and municipally identified as Grey Road 13. That property contains Mr. Breadner s house and shop. The Beaver River generally flows from north to south, west of the Site. At its closest point, the Beaver River is located approximately 30 metres northwest of the northwest corner of the Site and approximately 220 metres northwest of the area proposed for aggregate extraction. Topographic mapping indicated that the Beaver River west of the Site is at approximate elevation 215 metres. Contours shown on Ontario Base Mapping (1:10,000 scale) indicated that the ground surface at the Site is highest in the western portion, at approximate elevation 235 metres. To the west, the ground surface slopes down toward the river. To the east, the ground surface slopes more gradually to an elevation of approximately metres at the eastern margin of the Site. As shown on Figure 2, the western portion of the Site is bordered to the north by an existing gravel pit, operated by E.C. King Contracting Ltd. The eastern portion of the Site is bordered to the north by an existing orchard, in an area where it is understood that near surface gravel was previously extracted. To the east, the Site is bordered by an existing orchard owned by Mr. Breadner. To the west, the Site is bordered by the treed valley slope associated with the Beaver River. To the south, the Site is bordered by predominantly agricultural properties. The wastewater lagoons for an apple processing facility (Apple Valley Juice LP) are located on the property immediately south of the Site. These lagoons are associated with a processing facility located further to the south and accessed from Grey County Road 40. Until approximately June 2009, this facility and the associated lagoons were operated by Apple Valley Juice LP (Apple Valley). GENIVAR OS OS 2-1

6 Hydrogeological Assessment Proposed Gravel Pit, Part Lot 28, Concession 11, Town of the Blue Mountains February Geological Mapping The Site is located within the Beaver Valley physiographic region identified by Chapman and Putnam ("The Physiography of Southern Ontario", Third Edition, 1984). The authors noted that the Beaver Valley exhibits considerable complexity of landforms including lake plains, beaches, moraines, steep valley sides and vertical cliffs. The quaternary geology in the vicinity of the Site was mapped on Ontario Geological Survey Preliminary Map P.919, Quaternary Geology of the Collingwood-Nottawasaga Area (G.J. Burwasser, 1974). That mapping indicated that near-surface soils at the Site consist predominantly of glaciolacustrine deposits of sandy gravel. Beach ridges and/or near-shore bars of previous lake stages were shown crossing the Site in a northwest-southeast orientation. The bedrock beneath the Site is mapped as Lucas Formation dolomite associated with the Detroit River Group. Bedrock topography mapping indicated that the overburden thickness was approximately 23 metres in the vicinity of the Site. 2.3 Water Well Records In conjunction with this investigation, a request was submitted to the Ministry of the Environment (MOE) for a summary of provincial water well records from the water well information system (WWIS) for an area consisting of Lots 28 and 29 of Concessions 10, 11, and 12 in the Geographic Township of Collingwood. This search area encompassed the area located within approximately 500 metres of the Site boundaries. A copy of the well computer print out data summary is provided in Appendix A. The locations of the wells, based on the coordinates provided from the WWIS, are shown on Figure 1. The water well records search identified eight wells located within 500 metres of the Site. The locations of these wells are shown on Figure 1, together with the associated MOE well identification number. None of the records were associated with an on-site well. Three shallow, bored wells were identified at locations approximately 60 to 230 metres south of the Site (MOE well numbers , , ). These wells were inferred to be associated with the apple processing facility located south of the Site and information provided to GENIVAR by a representative of Apple Valley indicated that the wells were actually located immediately north of the main building. Copies of the well records associated with these wells were requested from the MOE and are included in Appendix A. The records indicated that the wells were completed at depths ranging from 7.6 GENIVAR OS OS

7 Hydrogeological Assessment Proposed Gravel Pit, Part Lot 28, Concession 11, Town of the Blue Mountains February 2010 to 9.8 metres. The more northerly and westerly two wells ( and ) reportedly encountered gravel to depths of 4.6 metres (15 feet), below which the wells encountered clayey soils. The wells were terminated in the clay at depths of 9.8 and 7.6 metres. The static water level in those two wells in June 1981 reportedly occurred at depths of 4.0 and 3.0 metres below ground surface, respectively. The southernmost of the three shallow bored wells ( ) reportedly encountered gravel to a depth of 1.5 metres, underlain by sandy clay to a depth of 5.2 metres. Below the sandy clay, the third well reportedly encountered sand to 7.6 metres depth, underlain by clayey soil to a depth of 9.8 metres where the well was terminated. The static water level reportedly occurred at a depth of 6.4 metres in April A representative of Apple Valley indicated to GENIVAR that these three wells were previously abandoned, and that the water supply for the Apple Valley facility is currently obtained from the Beaver River. Two wells located further south (MOE well number ) and southeast (MOE well number ) of the Site were reportedly completed in sand and gravel strata within the overburden at depths of 25.0 and 17.1 metres, respectively. Information obtained by GENIVAR indicated that MOE well number was associated with the Grey County Roads Department facility and it was inferred that the actual well location is west of the location recorded in the WWIS. Additional comments on MOE well number are provided in the subsequent section of this report. The three wells located approximately 400 to 500 metres northeast of the Site were all reportedly completed in sand and gravel strata within the overburden at a depth of approximately 22 metres. 2.4 Field Reconnaissance for Water Wells Additional information on water wells in the vicinity of the Site was obtained by GENIVAR based on discussions with Mr. Breadner, adjacent property owners, and a field reconnaissance by GENIVAR. The approximate locations of the identified wells are shown on Figure 1. Two wells were identified on the Breadner property. The water supply for the Breadner house and shop, located east of the Site, is obtained from a shallow dug well located south of the house. This well was used in this assessment for water level monitoring and was identified as DB Well 1. The location of DB Well 1 is shown on Figure 2. Additional information on this well is provided in Section 3.1. A shallow dug well is located on the east side of the "bunkhouse" on the Breadner property, east of the Site, and is used for water supply for orchard workers. Three shallow wells were identified on the adjacent property to the north, which was not associated with a municipal number. This property is owned by Mr. J. Ardiel. Based on information provided to GENIVAR GENIVAR OS OS

8 Hydrogeological Assessment Proposed Gravel Pit, Part Lot 28, Concession 11, Town of the Blue Mountains February 2010 by Mr. Ardiel, a dug well was identified in the north-central portion of the property that was used for irrigation water supply. A shallow dug well was also identified near the northeast corner of the property that was not in use. These wells were identified as JA Well 1 and JA Well 2, respectively, and were used in this assessment for water level monitoring (see Figure 2). Additional information on these wells is provided in Section 3.1. Based on information provided to GENIVAR by Mr. Breadner, who contacted the tenants, a shallow dug well is located on the west side of the house on the adjacent property to the north and is used for water supply for the house. One well was identified on the property at Grey Road 13, located approximately 200 metres east of the southeast corner of the Site. Observations from the Breadner property indicated that this well was located on the west side of the existing house at Grey Road 13. Information provided to GENIVAR by Mr. Breadner indicated that this was a drilled well approximately 23 metres deep. No MOE well record was identified for this well. Two water supply wells were identified on the adjacent property to the south of the Site, at Grey Road 13. Information on these wells was provided to GENIVAR by Mr. Breadner, based on his correspondence with the property owner. The locations of the wells were identified by GENIVAR based on field GPS measurements. Both a shallow dug well and a deeper drilled well were identified on this property. The dug well was reported to be approximately 7.3 metres in depth and was not in use at the time of the assessment. The drilled well was reportedly used for water supply for the house and farm buildings on the property. GENIVAR associated this well with MOE well number , and a copy of the well record is included in Appendix A. The field-measured location of this well was approximately 150 metres northwest of the location recorded in the WWIS, and the location shown on Figure 1 was adjusted accordingly. The well record indicated that this well encountered approximately 3.0 metres of sand and sand and gravel which was underlain by clayey soils to a depth of approximately 8.2 metres. The well was reportedly completed in a sand and gravel stratum at a depth of approximately 17.1 metres. GENIVAR OS OS

9 Hydrogeological Assessment Proposed Gravel Pit, Part Lot 28, Concession 11, Town of the Blue Mountains February Investigation Procedure 3.1 Initial Groundwater Level Monitoring To assess the level of the groundwater table beneath the Site, water level monitoring was carried out using existing wells. Initially, four wells were identified for water level monitoring, described as follows: A monitoring well located near the south property boundary in the western portion of the Site. This monitoring well was reportedly installed on the Site by a consultant acting for the apple processing company located further to the south and was used for groundwater effects monitoring in conjunction with the operation of the wastewater lagoons on the adjacent property to the south. A borehole log for the monitoring well was obtained from Apple Valley Juice LP on December 2, 2008 and a copy of the log is included in Appendix B. The log identified the monitoring well as borehole 9 and indicated that it was installed by Terraprobe for Georgian Triangle Apples in June According to the log, the borehole was advanced to a depth of approximately 6.55 metres, encountering 2.2 metres of sand and gravel overlying clayey silt. The log indicated that the monitoring well was installed to a depth of approximately 2.7 metres, and was screened over the interface between the sand and gravel and the underlying clayey silt. The borehole log indicated that the groundwater level in the monitoring well was at a depth of 1.2 metres below ground surface on June 13, Additional information provided to GENIVAR by the consultant for Apple Valley, C.C. Tatham & Associates Ltd. (Tatham), indicated that this monitoring well had been re-designated as borehole 3 or monitoring well 3. For this assessment, this monitoring well was referred to as MW 3. The water supply well for the Breadner house, located east of the Site and identified as DB Well 1. The domestic well was located on the south side of the house, as shown on Figure 2. Mr. Breadner indicated that this was a relatively shallow dug well completed in the near surface granular soils. No water well record was identified for this well. An irrigation water supply well located on the adjacent property to the north, owned by Mr. J. Ardiel. Mr. Ardiel indicated that this was a dug well approximately 7.6 metres (25 feet) deep and constructed with concrete tiles. It was understood that this well is used seasonally for irrigation. This well was identified as JA Well 1. A second, relatively shallow well located on the adjacent property to the north. This well was not in use for water supply at the time of the investigation. According to Mr. Ardiel, this well consisted of a large-diameter, vertical steel tank-like section installed by excavation. This well was identified as JA Well 2. GENIVAR OS OS 3-1

10 Hydrogeological Assessment Proposed Gravel Pit, Part Lot 28, Concession 11, Town of the Blue Mountains February 2010 The well locations and elevations were determined by GENIVAR staff using GPS survey equipment on April 9, The elevations were referenced to a benchmark identified as Station U299 and described as "Highway No. 26 concrete bridge over Beaver River in town, tablet in east face of southwest concrete retaining wall, 1.92 m below top of steel guard rail and 66 cm north of south end of wall". The elevation of this benchmark was understood to be metres, relative to geodetic datum. At the time of the survey, on April 9, 2009, water level elevations of ponded water contained within excavations in the adjacent gravel pit to the north were determined as were ground surface elevations at selected locations. In addition, the water level elevation of the Beaver River was determined at a location adjacent to Grey County Road 40, southwest of the Site. Ground surface elevations were also determined over a grid pattern in the eastern portion of the Site. Ground surface contours inferred from the survey data are shown on Figure 2. Groundwater levels were initially measured in the wells described above by GENIVAR staff on February 18 and April 9, The associated groundwater elevations are shown in Table Test Pit Investigation To further assess the subsurface soil conditions in the southwest portion of the Site, two test pits were excavated on July 14, The approximate locations of the test pits, identified as HPA TP 1 and HPA TP 2, are shown on Figure 2. The test pits were excavated with a tracked excavator supplied and operated by E.C. King Contracting. Soil and groundwater conditions in the test pits were observed and recorded by a representative of GENIVAR. The soil and groundwater conditions encountered in the test pits are summarized in Table 2. Approximate ground surface elevations at the test pit locations were inferred from the Site survey carried out by GENIVAR on April 9, Additional information on subsurface soil conditions at the Site was obtained from Mr. Breadner based on his notes from investigative test pits excavated on May 30, Mr. Breadner indicated that four test pits were excavated on that date using an excavator supplied and operated by E.C. King Contracting. The approximate locations of two of these test pits, designated DB TP 1 and DB TP 2, were obtained by GENIVAR based on field GPS measurements referenced to shallow standpipes installed in the test pits. The approximate location of a third test pit, designated DB TP 4, was inferred from the notes recorded by Mr. Breadner. The approximate locations of these test pits are shown on Figure 2. The fourth test pit was reportedly located northwest of the area currently proposed for aggregate extraction (generally north of MW 3) and is not shown on Figure 2. Approximate ground surface elevations at the test pit locations were inferred from the Site survey carried out by GENIVAR on April 9, GENIVAR OS OS

11 Hydrogeological Assessment Proposed Gravel Pit, Part Lot 28, Concession 11, Town of the Blue Mountains February Additional Groundwater Level Monitoring To augment the groundwater level monitoring data for the southwest portion of the Site (i.e., MW 3), water level monitoring data for a series of monitoring wells located south of the Site was requested from Apple Valley. Water level data and information on those monitoring wells was provided to GENIVAR by Tatham on behalf of Apple Valley. The information provided indicated that six monitoring wells were installed at four locations around the perimeter of the wastewater treatment lagoons in One of those monitoring wells was the previously mentioned MW 3. The other monitoring wells were originally identified as boreholes 5a, 5b, 6, 8a and 8b and were subsequently identified by Tatham as BH or MW 1A, 1B, 2, 4B and 4A, respectively. Paired monitors (upper and lower) were installed by at the locations of MW 1 and MW 4. Copies of the borehole logs for these monitoring wells are provided in Appendix B. Groundwater level monitoring data for these monitoring wells were provided for three dates in 1996 (June 5, June 13 and September 17) and for two occasions in 2008 (June 27 and July 9). These data are summarized in Table B-1 in Appendix B. With the permission of the adjacent property owner to the south, provided to Mr. Breadner, GENIVAR measured the water levels in the off-site monitoring wells on August 12, These data are included in Table B-1. On the same date, water levels were also measured in the on-site monitoring well MW 3, the Breadner house well (DB Well 1), and the irrigation well on the adjacent property to the north (JA Well 1). These data are included in Table 1. JA Well 2 could not be located at the time of the August 12, 2009 monitoring event. GENIVAR OS OS

12 Hydrogeological Assessment Proposed Gravel Pit, Part Lot 28, Concession 11, Town of the Blue Mountains February Subsurface Soil Conditions HPA test pits 1 and 2, excavated on July 14, 2009, encountered approximately 0.2 metres of surficial topsoil. Beneath the topsoil, HPA TP 1 encountered predominantly sand and gravel to a depth of approximately 4.0 metres below ground surface. HPA TP 2 encountered predominantly sand and gravel to a depth of approximately 3.4 metres below ground surface. Beneath the sand and gravel, both test pits encountered and were terminated in a stratum of silty clay. Based on the inferred ground surface elevations at the test pit locations, the silty clay stratum was encountered at approximate elevation metres in HPA TP 1 and metres in HPA TP 2. The borehole log for MW 3, located west of HPA TP 1 and south of HPA TP 2, indicated that a stratum of clayey silt was encountered beneath the surficial sand and gravel at that location at approximate elevation metres. Based on the information provided to GENIVAR by Mr. Breadner, the following provides a general summary of the soil conditions encountered in the test pits excavated on the Site in May Breadner Test Pit Location Inferred Ground Elevation (m) Thickness of Sand & Gravel (m) DB TP > 3.4 DB TP DB TP The sand and gravel encountered in the test pits was reportedly underlain by predominantly clayey soils. It is our understanding that it is Mr. Breadner's intention to extract the upper sand and gravel from above the silty clay / clayey silt stratum. The ground surface profile and the soil conditions encountered in the test pits and boreholes are shown on the subsurface cross-sections on Figure 3. The locations of the sections are shown on Figure 2. GENIVAR OS OS 4-1

13 Hydrogeological Assessment Proposed Gravel Pit, Part Lot 28, Concession 11, Town of the Blue Mountains February Groundwater Conditions As shown in Table 1, the identified groundwater level elevations for DB Well 1, JA Well 1 and JA Well 2 were generally similar for the monitoring events on February 18 and April 9, On February 18, 2009, the groundwater elevations at these three locations ranged from metres at DB Well 1 to metres at JA Well 2. On April 9, 2009, the groundwater elevations at these three locations were similar to February 18 and ranged from metres at DB Well 1 to metres at JA Well 2. For each monitoring event, the groundwater elevation identified at MW 3 on the Site was approximately 10 metres higher than the groundwater elevation at DB Well 1. This difference in elevation was not consistent with differences recorded at the other monitoring locations and suggested that the groundwater level recorded at MW 3 was indicative of a perched condition. As previously noted in this report, the borehole log for MW 3 indicated that the well was approximately 2.7 metres deep and was completed in clayey silt which was encountered beneath the surficial sand and gravel at a depth of 2.2 metres. It was inferred that the relatively shallow, low permeability clayey silt was resulting in a localized perched groundwater condition which was not consistent with the groundwater elevation elsewhere on the Site where the surficial sand and gravel strata are presumably thicker. On July 14, 2009, groundwater was encountered in HPA TP 1 and TP 2 at a depth of approximately 3.1 metres below ground surface, or approximate elevation and metres, respectively. The encountered groundwater in HPA TP 1 was approximately 0.9 metres above the silty clay stratum and the encountered groundwater in HPA TP 2 was approximately 0.3 metres above the silty clay stratum. On the same date, groundwater was detected in MW 3 at an elevation of approximately metres. The groundwater encountered in HPA TP 1 had a noticeable odour that was similar to rotting apples. The presence of this odour suggested the potential for movement of shallow groundwater towards the test pit location from the wastewater treatment and infiltration lagoons located on the adjacent property to the south. It was our understanding that use of these lagoons for treatment of wastewater from the apple processing facility was terminated in June Groundwater levels recorded for the shallow off-site monitoring wells south of MW 3 on August 12, 2009 ranged from 2.2 to 5.7 metres below ground surface (or elevation to metres). In the two deeper monitors (MW 1A and MW 4B), completed at depths of approximately 9.2 and 6.4 metres, respectively, recorded groundwater levels were 8.1 and 6.2 metres below ground surface, or elevation metres in MW 1A and metres in MW 4B. The groundwater level in MW 4B, which was completed in a lower sand and gravel stratum, was approximately 4.0 metres lower than the groundwater level in the adjacent MW 4A, which was completed in an upper sand and gravel stratum. The granular GENIVAR OS OS 5-1

14 Hydrogeological Assessment Proposed Gravel Pit, Part Lot 28, Concession 11, Town of the Blue Mountains February 2010 strata were reportedly separated by a sandy silt unit. The groundwater level recorded in the deeper granular layer suggested that the groundwater in the upper granular layer was perched. A similar condition was indicated by the other available groundwater level data from 1996, as shown in Table B-1. Representative groundwater level data for the monitoring locations are shown on the stratigraphic sections on Figure 3. The available groundwater level data were used to infer potentiometric groundwater contours for the vicinity of the Site and these are shown on Figure 4. The inferred water table contours were based on water level data from April 9, 2009, which was considered to be generally representative of seasonal high conditions. The contours were inferred from measured water level data for DB Well 1, JA Well 1 and JA Well 2. In addition, a groundwater elevation of metres was estimated for MW 4B, the closest of the two deeper monitoring wells located on the adjacent property to the south. The groundwater elevation at this location for April 9, 2009 was estimated based on the measured water level on August 12, 2009 (elevation metres) plus approximately 1.3 metres, which was generally consistent with the difference in water levels recorded at the other monitoring locations between April 9 and August 12, The inferred water table contours for the Site indicated that the shallow groundwater flow direction was generally in a northerly to northeasterly direction. The inferred water table elevation ranged from approximately metres near the southwest corner of the Site to approximately metres near the northeast corner of the Site. The inferred water table contours near the southwest Site boundary were generally consistent with water level data reported on the well records for bored water supply wells previously located on the adjacent property to the south, as discussed in Section 2.3 of this report. On April 9, 2009, the water level in the Beaver River at a location immediately north of Grey Road 40, southwest of the Site, was determined to be at elevation metres, approximately 7 metres lower than the groundwater level inferred for the southwest corner of the Site. The water level in the Beaver River immediately west of the Site would be somewhat lower. Also shown on Figure 4 are inferred potentiometric contours for a perched groundwater table in the southwest portion of the Site. The inferred perched water table contours were based on water level data for February 18, 2009, when a seasonally high groundwater level was recorded at MW 3. In addition to the water level data from MW 3, groundwater elevations of and metres were estimated for the locations of HPA TP 1 and HPA TP 2, respectively, based on the recorded groundwater levels at those locations on July 14, 2009 plus approximately 1.2 metres, which was consistent with the difference in water levels recorded at MW 3 between February 18 and July 14, The inferred perched groundwater contours were also generally consistent with available groundwater level data for the adjacent property to the south, in the vicinity of the lagoons. GENIVAR OS OS

15 Hydrogeological Assessment Proposed Gravel Pit, Part Lot 28, Concession 11, Town of the Blue Mountains February Discussion It is our understanding that it is Mr. Breadner's intention to extract the surficial sand and gravel to a level at or near the first underlying clayey silt / silty clay stratum. We understand further that after extraction of the sand and gravel, the area of the gravel pit will be returned to use for an orchard. Based on the limited information on soil conditions at the Site available from test pits excavated by GENIVAR and by Mr. Breadner, the inferred maximum depth of extraction, based on the depth of the upper sand and gravel at the test pit locations, is shown approximately on the sections on Figure 3. Based on our investigation, the vertical separation between the bottom of the proposed pit and what appeared to be a perched water table on the underlying clayey silt stratum would be less than 1.5 metres. This scenario would potentially necessitate that the proposed pit be licensed as a Category 1 below water pit. Based on the results of our assessment, the vertical separation between the bottom of the proposed pit and the inferred groundwater table located below the upper perched water table would be 1.5 metres or greater. It was considered that extraction of sand and gravel from below the level of the perched groundwater table in the southwest portion of the Site would potentially encounter groundwater originating from the wastewater treatment lagoons on the adjacent property to the south. Further, extraction below the perched groundwater level would potentially result in enhanced movement of shallow groundwater from the area of the lagoons into the pit. As noted in this report, use of the lagoons for wastewater treatment was discontinued in June It is our understanding that the lagoons currently receive only stormwater from the vicinity of the former Apple Valley facility, and that disposal of stormwater will subsequently be discontinued and the lagoons will be decommissioned. Termination of the use of the lagoons for wastewater treatment and infiltration in June 2009 will potentially result in a decline in the level of the perched groundwater table from the levels identified in this report. The results of our assessment indicated that excavation of the proposed pit, at the estimated depth identified in this report, would not result in significant impacts to local groundwater and surface water resources and their uses. Shallow groundwater is used for domestic supply on the Breadner property, east of the Site, and on the adjacent property to the north for both irrigation and domestic supply. However, our investigation indicated that the bottom of the proposed pit would be more than 1.5 metres higher than the groundwater level identified at those well locations. Further, the existing pit on the adjacent property to the north is considerably deeper than the anticipated bottom elevation of the proposed pit on the Breadner property. GENIVAR OS OS 6-1

16 Hydrogeological Assessment Proposed Gravel Pit, Part Lot 28, Concession 11, Town of the Blue Mountains February Summary Groundwater levels in the vicinity of the Site were monitored at several locations in the period between February 18 and August 12, 2009, using existing wells. The groundwater level monitoring data for these locations, together with available information on soil conditions at and in the vicinity of the Site, were used to infer groundwater table contours for the Site. These groundwater contours, together with the associated groundwater elevations at the monitoring locations, are shown on Figure 4 of this report. Our investigation identified what appeared to be a relatively shallow perched groundwater table in the southwest portion of the Site. It was considered that infiltration from the lagoons on the adjacent property to the south, historically used for treatment of wastewater from an apple processing facility, would have contributed to the perched groundwater condition. Use of these lagoons for wastewater treatment was discontinued in June 2009, suggesting the potential for a decline in the level of the perched groundwater from the levels identified from this investigation. Based on our investigation, the vertical separation between the bottom of the proposed pit and what appeared to be a perched water table on the underlying clayey silt stratum would be less than 1.5 metres, and excavations for the pit would potentially encounter perched groundwater. This scenario would potentially necessitate that the proposed pit be licensed as a Category 1 below water pit. Based on the results of our assessment, the vertical separation between the bottom of the proposed pit and the inferred groundwater table located below the upper perched water table would be 1.5 metres or greater. Based on the results of our assessment, it was considered that extraction of sand gravel from within 1.5 metres of, or potentially below, the level of the perched groundwater result would not result in significant impacts to local groundwater and surface water resources and their uses. Extraction below the perched groundwater level in the southwest portion of the Site would potentially result in enhanced movement of shallow groundwater from the area of the lagoons into the pit; however, use of the lagoons for wastewater treatment was discontinued in June GENIVAR OS OS 7-1

17 Hydrogeological Assessment Proposed Gravel Pit, Part Lot 28, Concession 11, Town of the Blue Mountains February Limitations This report provides an assessment of hydrogeologic conditions and the water table elevation at the subject property located in part of Lot 28, Concession 11, Geographic Township of Collingwood in the Town of the Blue Mountains for the purpose of an application for a gravel pit. The report is intended for the exclusive use of the current property owner, Mr. Dennis Breadner. GENIVAR Consultants LP will not be responsible for any use of this report by any other party. Respectfully submitted: GENIVAR Consultants LP W. Brad Benson, P.Eng. Senior Hydrogeologist WBB/bb GENIVAR OS OS 8-1

18 Table 1 SUMMARY OF WATER LEVEL DATA Proposed Gravel Pit Part Lot 28, Concession 11, Geographic Township of Collingwood, Town of the Blue Mountains February 18, 2009 April 9, 2009 July 14, 2009 August 12, 2009 Monitoring Ground Top of Casing Depth to Groundwater Depth to Groundwater Depth to Groundwater Depth to Groundwater Location Elevation Elevation Water Elevation Water Elevation Water Elevation Water Elevation (m) 1 (m) (mbgs) 2 (m) (mbgs) (m) (mbgs) (m) (mbgs) (m) MW 3 (prev BH 9) DB Well JA Well JA Well Gone NA HPA TP NA (Enc.) HPA TP NA (Enc.) Notes: 1. Elevation in metres relative to geodetic datum. 2. "mbgs" - metres below ground surface. 3. "NA" - not applicable; "--" - no measured value; "Enc." - encountered water level 4. Table to be read in conjunction with accompanying report. February 2010 G:\2008\100\108060\Reports\Table 1 - GW Level Data.xls

19 Table 2 SUMMARY OF TEST PIT CONDITIONS Proposed Gravel Pit Part Lot 28, Concession 11, Geographic Township of Collingwood, Town of the Blue Mountains Ground Elevation 2 Depth Interval (mbgs) 3 Sample Number Groundwater Conditions Test Pit Simplified Stratigraphy Remarks (m) Brown sandy TOPSOIL, some gravel Dry Brown SILTY SAND AND GRAVEL 1 Dry Coarse GRAVEL, some sand and cobbles Dry Brown SAND AND GRAVEL, some cobbles, trace silt 2 Dry; wet to saturated at 3.05 m Brown CLAYEY SILT 3 Moist to wet Groundwater seepage at 3.05 m depth; little pooling in test pit. Slight "rotten apple" odour to groundwater Brown sandy TOPSOIL, some gravel Dry Brown SILTY SAND AND GRAVEL Dry Brown SAND AND GRAVEL, some cobbles, trace silt 1 Dry; wet to 2 saturated at 3.05 m Groundwater seepage at 3.05 m depth; pooling in test pit Red-brown SILTY CLAY, some mottling 3 Moist Notes: 1. Test pits excavated July 14, Approximate elevations inferred from ground surface contours. Elevations referred to geodetic datum. 3. "mbgs" - metres below ground surface. 4. For test pit locations, see Figure Table to be read in conjunction with accompanying report. February 2010 G:\2008\100\108060\Reports\Table 2 - Summary of Test Pits.xls

20 George St Matilda St rest St bilee Dr orge St Faircrest Lane William St 195 Brook St SCALE 1:12, GENIVAR CONSULTANTS LP FILE No. CIVIL & ENVIRONMENTAL ENGINEERING CONSULTANTS OS OS RD AVENUE EAST, SUITE 212 FIG. No OWEN SOUND, ONTARIO N4K 2K R R I V E R B E A V E DIGITAL DATA SOURCE: BASE MAP DATA PROVIDED BY LAND INFORMATION ONTARIO, MINISTRY OF NATURAL RESOURCES QUEEN S 229 PRINTER FOR ONTARIO, HOUSE/BUILDING 229 Clark St Marsh St Hill St Slabtown Rd ret St N Margaret St S John St Hillcrest Dr Grey Road 13 Fulton St 10th Line 30th Sideroad CLARKSBURG Grey Road 40 EXISTING PIT SUBJECT SITE LEGEND SUBJECT SITE CONTOURS - 5m INTERVALS 500m RADIUS OF SUBJECT SITE SPOT HEIGHT (m) AREA OF WELL RECORD SEARCH PIT OR QUARRY MOE WELL (WELL ID WITHIN RADIUS) CONSERVATION AREA DRILLED WELL (FIELD SURVEY) WOODED AREA DUG WELL (FIELD SURVEY) ,000 Metres 226 WELL LOCATION PLAN PROPOSED GRAVEL PIT PART LOT 28, CONCESSION 11 GEOGRAPHIC TOWNSHIP OF COLLINGWOOD DESIGN DRAWN APPROVED DATE JEG WBB SEPT The Blue Mountains-Euphrasia Townline Euphrasia-St Vincent Townline Grey Road 40 The Blue Mountains-Meaford Townline

21

22

23

24 Hydrogeological Assessment Proposed Gravel Pit, Part Lot 28, Concession 11, Town of the Blue Mountains February 2010 APPENDIX A Ministry of the Environment Well Record Summary and Individual Well Records GENIVAR OS OS

25

26

27

28

29

30

31

32

33

34 Hydrogeological Assessment Proposed Gravel Pit, Part Lot 28, Concession 11, Town of the Blue Mountains February 2010 APPENDIX B Borehole Logs and Water Level Data for the Adjacent Property to the South GENIVAR OS OS

35 Table B-1 SUMMARY OF GROUNDWATER LEVEL DATA FOR VICINITY OF LAGOONS ON ADJACENT PROPERTY TO THE SOUTH Proposed Gravel Pit Part Lot 28, Concession 11, Geographic Township of Collingwood, Town of the Blue Mountains June 5, 1996 June 13, 1996 September 17, 1996 Monitoring Ground Top of Casing Depth to Groundwater Depth to Groundwater Depth to Groundwater Location Elevation Elevation Water Elevation Water Elevation Water Elevation (m) 1 (m) 1 (mbgs) 2 (m) (mbgs) (m) (mbgs) (m) MW 1A (previous BH 5a) - Lower MW 1B (previous BH 5b) - Upper MW 2 (previous BH 6) MW 3 (previous BH 9) MW 4A (previous BH 8b) - Upper MW 4B (previous BH 8a) - Lower June 27, 2008 July 9, 2008 August 12, 2009 Monitoring Ground Top of Casing Depth to Groundwater Depth to Groundwater Depth to Groundwater Location Elevation Elevation Water Elevation Water Elevation Water Elevation (m) 1 (m) 1 (mbgs) 2 (m) (mbgs) (m) (mbgs) (m) MW 1A (previous BH 5a) - Lower NA -- NA MW 1B (previous BH 5b) - Upper MW 2 (previous BH 6) MW 3 (previous BH 9) MW 4A (previous BH 8b) - Upper MW 4B (previous BH 8a) - Lower NA -- NA Notes: 1. Elevation in metres relative to geodetic datum, as provided by C.C. Tatham & Associates Ltd. (except MW 3). 2. "mbgs" - metres below ground surface. 3. "NA" - not applicable; "--" - no measured value 4. Table to be read in conjunction with accompanying report. February 2010 G:\2008\100\108060\Reports\Table B-1 - GW Level Data for Apple Valley MWs.xls

36

37

38

39

40

41

How To Prepare A Geotechnical Study For A Trunk Sewer Project In Lincoln, Nebraska

How To Prepare A Geotechnical Study For A Trunk Sewer Project In Lincoln, Nebraska APPENDIX B Geotechnical Engineering Report GEOTECHNICAL ENGINEERING REPORT Preliminary Geotechnical Study Upper Southeast Salt Creek Sanitary Trunk Sewer Lincoln Wastewater System Lincoln, Nebraska PREPARED

More information

Report on Engineering Geological Investigation: Test pit logs in KwaMhlanga for RDP houses development.

Report on Engineering Geological Investigation: Test pit logs in KwaMhlanga for RDP houses development. Report on Engineering Geological Investigation: Test pit logs in KwaMhlanga for RDP houses development. 2012 Department of Geology GTX 713 Date Excavated: 18 April 2012 Machine: Bell 315SG Operator: Lesley

More information

WEST LONDON PIPELINE AND STORAGE LIMITED AND UNITED KINGDOM OIL PIPELINES LIMITED

WEST LONDON PIPELINE AND STORAGE LIMITED AND UNITED KINGDOM OIL PIPELINES LIMITED WEST LONDON PIPELINE AND STORAGE LIMITED AND UNITED KINGDOM OIL PIPELINES LIMITED WLPS BUNCEFIELD REBUILD Flood Risk Assessment Green Lane Hemel Hempstead Hertfordshire HP2 7HZ September 2009 Prepared

More information

SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT RESOURCE REGULATION TRAINING MEMORANDUM

SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT RESOURCE REGULATION TRAINING MEMORANDUM SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT RESOURCE REGULATION TRAINING MEMORANDUM DATE: December 04, 1996 This document is subject to change. If in doubt, verify current status with Technical Services

More information

NATURAL RESOURCES & NATURAL FEATURES

NATURAL RESOURCES & NATURAL FEATURES A3 NATURAL RESOURCES & NATURAL FEATURES INTRODUCTION This chapter will discuss the topography, geology, soils, and other natural features found in Casco Township. The identification of the natural features

More information

WILLOCHRA BASIN GROUNDWATER STATUS REPORT 2009-10

WILLOCHRA BASIN GROUNDWATER STATUS REPORT 2009-10 WILLOCHRA BASIN GROUNDWATER STATUS REPORT 2009-10 SUMMARY 2009-10 The Willochra Basin is situated in the southern Flinders Ranges in the Mid-North of South Australia, approximately 50 km east of Port Augusta

More information

SHAFT CONSTRUCTION IN TORONTO USING SLURRY WALLS

SHAFT CONSTRUCTION IN TORONTO USING SLURRY WALLS SHAFT CONSTRUCTION IN TORONTO USING SLURRY WALLS Vince Luongo Petrifond Foundation Co., Ltd. PROJECT DESCRIPTION The York Durham Sanitary System (YDSS) Interceptor in the Town of Richmond Hill located

More information

ALBERTA ENERGY AND UTILITIES BOARD Calgary Alberta

ALBERTA ENERGY AND UTILITIES BOARD Calgary Alberta ALBERTA ENERGY AND UTILITIES BOARD Calgary Alberta HUNT OIL COMPANY OF CANADA INC. APPLICATION FOR A SWEET NATURAL GAS PIPELINE HARMATTAN-ELKTON, RICINUS, Examiner Report 2001-3 AND CAROLINE FIELDS Application

More information

BASIN MANAGEMENT OBJECTIVES CHEROKEE SUBINVENTORY UNIT

BASIN MANAGEMENT OBJECTIVES CHEROKEE SUBINVENTORY UNIT BASIN MANAGEMENT OBJECTIVES CHEROKEE SUBINVENTORY UNIT Butte County Water Advisory Committee Member John Scott Contact Information Phone Number: (530) 533-8394 Email Address: john_lewis_scott@msn.com Description

More information

INFORMATION SHEET ORDER NO. R5-2011-XXXX TRIANGLE ROCK PRODUCTS, INC. FLORIN ROAD AGGREGATE PLANT SACRAMENTO COUNTY

INFORMATION SHEET ORDER NO. R5-2011-XXXX TRIANGLE ROCK PRODUCTS, INC. FLORIN ROAD AGGREGATE PLANT SACRAMENTO COUNTY ORDER NO. R5-2011-XXXX INFORMATION SHEET Background Triangle Rock, Inc. (Discharger) submitted a Report of Waste Discharge (RWD) on 23 August 2010. The Discharger is expanding the mining operations at

More information

4.11 Geologic and Soil Resources

4.11 Geologic and Soil Resources 4.11 Geologic and Soil Resources Geology and soils are evaluated as part of an environmental document because conditions in the project area can influence the type and size of a project s structure, the

More information

Appendix D.1. Testing Requirements for Infiltration, Bioretention and Sand Filter Subsoils

Appendix D.1. Testing Requirements for Infiltration, Bioretention and Sand Filter Subsoils Appendix D.1 Testing Requirements for Infiltration, Bioretention and Sand Filter Subsoils General Notes Pertinent to All Testing 1. For infiltration trench (I-1) and basin (I-2) practices, a minimum field

More information

Water-Table Elevation and Depth to Water Table

Water-Table Elevation and Depth to Water Table Water-Table Elevation and Depth to Water Table By Roberta Adams Minnesota Hydrogeology Atlas Series Atlas HG-03 Report Plate 1, Water-Table Elevation Plate 2, Depth to Water Table St. Paul June 2016 Minnesota

More information

MEMORANDUM. Further discussion regarding the Community s solid waste facility is described further in this memorandum.

MEMORANDUM. Further discussion regarding the Community s solid waste facility is described further in this memorandum. MEMORANDUM File: Sanikiluaq Improvement of the Existing Wastewater Treatment Facility To: Government of Nunavut Department of Community and Government Services Attention: Mr. Grigor Hope,, Project Officer

More information

TABLE OF CONTENTS. GENERAL PROJECT INFORMATION...3 Project Location... 3 Project Description... 3 STUDY OVERVIEW... 3 SITE EVALUATION TECHNIQUES...

TABLE OF CONTENTS. GENERAL PROJECT INFORMATION...3 Project Location... 3 Project Description... 3 STUDY OVERVIEW... 3 SITE EVALUATION TECHNIQUES... App. P-2 TABLE OF CONTENTS GENERAL PROJECT INFORMATION...3 Project Location... 3 Project Description... 3 STUDY OVERVIEW... 3 SITE EVALUATION TECHNIQUES...4 SITE CONDITIONS... 4 Land Use and Zoning...

More information

ources of Drinking Water

ources of Drinking Water The drop on water Sources of Drinking Water Did you know that 40 per cent of Nova Scotians get their water privately from a drilled well, a dug well, or a surface water source? The other 60 per cent rely

More information

Former Barn, Pincents Manor Hotel, Pincents Lane, Tilehurst, West Berkshire

Former Barn, Pincents Manor Hotel, Pincents Lane, Tilehurst, West Berkshire Former Barn, Pincents Manor Hotel, Pincents Lane, Tilehurst, West Berkshire An Archaeological Watching Brief For Mr M Webb by Jennifer Lowe Thames Valley Archaeological Services Ltd Site Code PMH08/105

More information

Chapter 9: Water, Hydrology and Drainage Land West of Uttoxeter

Chapter 9: Water, Hydrology and Drainage Land West of Uttoxeter Chapter 9: Water, Hydrology and Drainage Land West of Uttoxeter ENVIRONMENTAL STATEMENT: VOLUME 1 9.1 INTRODUCTION 9.1.1 This Chapter considers the effects of the Project on surface water and groundwater

More information

BALLANTRAE-MUSSELMAN LAKE SERVICING REPORT. Submitted to: The Town of Whitchurch-Stouffville. Submitted by:

BALLANTRAE-MUSSELMAN LAKE SERVICING REPORT. Submitted to: The Town of Whitchurch-Stouffville. Submitted by: BALLANTRAE-MUSSELMAN LAKE SERVICING REPORT Submitted to: The Town of Whitchurch-Stouffville Submitted by: AMEC Environment & Infrastructure 3215 North Service Road Burlington, ON L7N 3G2 Tel: 905-335-2353

More information

How To Map A Lake In The North Of The Holland (Fiji)

How To Map A Lake In The North Of The Holland (Fiji) 1. Hydrogelogical mapping Jiri Sima Aim of HG map Groundwater and rocks qualitative permeability and quantitative potential of rock units aquifers / aquitards / aquiclides Water points (spatial distribution

More information

SUMMARY REPORT ON COMPARISON OF THE QUARRY SLOPE ANGLES ADJACENT TO THREE KINGS RESERVE

SUMMARY REPORT ON COMPARISON OF THE QUARRY SLOPE ANGLES ADJACENT TO THREE KINGS RESERVE SUMMARY REPORT ON COMPARISON OF THE QUARRY SLOPE ANGLES ADJACENT TO THREE KINGS RESERVE (Dated: July 2008) FOR Prepared By: Graeme W. Fulton B.Sc. (Hons), Mining and Petroleum Engineering, MAusIMM Terra

More information

Stormwater Management Design Brief. Proposed Commercial Redevelopment 5830 Hazeldean Road Ottawa (Stittsville), Ontario.

Stormwater Management Design Brief. Proposed Commercial Redevelopment 5830 Hazeldean Road Ottawa (Stittsville), Ontario. Stormwater Management Design Brief Proposed Commercial Redevelopment 5830 Hazeldean Road Ottawa (Stittsville), Ontario Prepared For: 1319 Kanata Tires & Rims June 30, 2015 Report No: FS-15-013-REP.02 Stormwater

More information

Stormwater Management Functional Servicing Report

Stormwater Management Functional Servicing Report Stormwater Management Functional Servicing Report Part of Lot 12, Concession 10 Township of Cavan Monaghan Ian Cameron Rural Subdivision Engage Project No. 14016 Engage Engineering Ltd. January 7, 2015

More information

NJ650.1404 Interception Drainage

NJ650.1404 Interception Drainage NJ650.1404 Interception Drainage Interception drainage is used to intercept surface and subsurface water. The investigation, planning, and construction of surface interception drains follow the requirements

More information

STATE OF VERMONT AGENCY OF NATURAL RESOURCES DEPARTMENT OF ENVIRONMENTAL CONSERVATION WASTE MANAGEMENT DIVISION SOLID WASTE MANAGEMENT PROGRAM

STATE OF VERMONT AGENCY OF NATURAL RESOURCES DEPARTMENT OF ENVIRONMENTAL CONSERVATION WASTE MANAGEMENT DIVISION SOLID WASTE MANAGEMENT PROGRAM STATE OF VERMONT AGENCY OF NATURAL RESOURCES DEPARTMENT OF ENVIRONMENTAL CONSERVATION WASTE MANAGEMENT DIVISION SOLID WASTE MANAGEMENT PROGRAM Solid Waste Management Program Waste Management Division 103

More information

FACTUAL GROUND INVESTIGATION

FACTUAL GROUND INVESTIGATION FACTUAL GROUND INVESTIGATION REPORT COMMERCIAL/INDUSTRIAL REDEVELOPMENT OF LAND AT STEADMAN S WELTON CUMBRIA Web: www.geoenvironmentalengineering.com Telephone: 08456 768 895 Project Ref: 2013-657 Site

More information

COST AND PERFORMANCE REPORT

COST AND PERFORMANCE REPORT COST AND PERFORMANCE REPORT Pump and Treat of Contaminated Groundwater at the United Chrome Superfund Site Corvallis, Oregon September 1998 Prepared by: SITE INFORMATION Identifying Information: United

More information

CIVL451. Soil Exploration and Characterization

CIVL451. Soil Exploration and Characterization CIVL451 Soil Exploration and Characterization 1 Definition The process of determining the layers of natural soil deposits that will underlie a proposed structure and their physical properties is generally

More information

SOIL AND GROUNDWATER MANAGEMENT PLAN For Site Located at 420 South Avenue Rochester, New York NYSDEC Spill No. 1000563 PREPARED FOR: PREPARED BY:

SOIL AND GROUNDWATER MANAGEMENT PLAN For Site Located at 420 South Avenue Rochester, New York NYSDEC Spill No. 1000563 PREPARED FOR: PREPARED BY: SOIL AND GROUNDWATER MANAGEMENT PLAN For Site Located at 420 South Avenue Rochester, New York NYSDEC Spill No. 1000563 PREPARED FOR: FLOWER CITY MANAGEMENT & DEVELOPMENT THE MEDICAL ARTS BUILDING (USGBC

More information

Minnesota Department of Natural Resources \mn_dnr \mn_dnr\spatial \mn_dnr\tabular \mn_dnr\metadata

Minnesota Department of Natural Resources \mn_dnr \mn_dnr\spatial \mn_dnr\tabular \mn_dnr\metadata INDEX OF GIS SPATIAL DATA, TABULAR DATA, AND METADATA ASSOCIATED WITH REPORT 380, AGGREGATE RESOURCE POTENTIAL PARTS OF NORTHERN ST. LOUIS AND LAKE COUNTIES, MN. Project of the Minnesota Department of

More information

Principles of groundwater flow

Principles of groundwater flow Principles of groundwater flow Hydraulic head is the elevation to which water will naturally rise in a well (a.k.a. static level). Any well that is not being pumped will do for this, but a well that is

More information

Groundwater Training Course SOPAC, April 2005. Electromagnetic (EM) Induction method for Groundwater Investigations

Groundwater Training Course SOPAC, April 2005. Electromagnetic (EM) Induction method for Groundwater Investigations Groundwater Training Course SOPAC, April 2005 Electromagnetic (EM) Induction method for Groundwater Investigations Electromagnetic (EM) Induction Method Basic principle: An AC electric current is applied

More information

ACQUIRING MINERAL RIGHTS IN THE NORTHWEST TERRITORIES

ACQUIRING MINERAL RIGHTS IN THE NORTHWEST TERRITORIES ACQUIRING MINERAL RIGHTS IN THE NORTHWEST TERRITORIES Introduction Establishing and maintaining strong working relationships between the mineral industry and Northwest Territories (NWT) residents and community

More information

EARTHWORKS COMPLETION REPORT ELLEN STIRLING PARADE, ELLENBROOK. Ellenbrook, W.A. Georgiou Group Pty Ltd

EARTHWORKS COMPLETION REPORT ELLEN STIRLING PARADE, ELLENBROOK. Ellenbrook, W.A. Georgiou Group Pty Ltd EARTHWORKS COMPLETION REPORT ELLEN STIRLING PARADE, ELLENBROOK Ellenbrook, W.A. Georgiou Group Pty Ltd GEOTPERT08050AZ-AH 27 March 2013 EARTHWORKS COMPLETION REPORT ELLEN STIRLING PARADE, ELLENBROOK Ellenbrook,

More information

NUMERICAL ANALYSIS OF SEEPAGE THROUGH EMBANKMENT DAMS (CASE STUDY: KOCHARY DAM, GOLPAYEGAN)

NUMERICAL ANALYSIS OF SEEPAGE THROUGH EMBANKMENT DAMS (CASE STUDY: KOCHARY DAM, GOLPAYEGAN) NUMERICAL ANALYSIS OF SEEPAGE THROUGH EMBANKMENT DAMS (CASE STUDY: KOCHARY DAM, GOLPAYEGAN) *Reza Naghmehkhan Dahande 1 and Ahmad Taheri 2 1 Department of Civil Engineering-Water Management, Islamic Azad

More information

How Did These Ocean Features and Continental Margins Form?

How Did These Ocean Features and Continental Margins Form? 298 10.14 INVESTIGATION How Did These Ocean Features and Continental Margins Form? The terrain below contains various features on the seafloor, as well as parts of three continents. Some general observations

More information

Eurocode 7 - Geotechnical design - Part 2 Ground investigation and testing

Eurocode 7 - Geotechnical design - Part 2 Ground investigation and testing Brussels, 18-20 February 2008 Dissemination of information workshop 1 Eurocode 7 - Geotechnical design - Part 2 Ground investigation and testing Dr.-Ing. Bernd Schuppener, Federal Waterways Engineering

More information

Ground Water in the Piedmont and Blue Ridge Provinces of North Carolina

Ground Water in the Piedmont and Blue Ridge Provinces of North Carolina Ground Water in the Piedmont and Blue Ridge Provinces of North Carolina Prepared by: R.L. Huffman Extension Agricultural Engineering Specialist Published by: North Carolina Cooperative Extension Service

More information

Information Request 14

Information Request 14 Information Request 14 Information Request 14 14-1 Responses to Information Request 14 Response to Information Request 14a Response to Information Request 14b Response to Information Request 14c Response

More information

PILE FOUNDATIONS FM 5-134

PILE FOUNDATIONS FM 5-134 C H A P T E R 6 PILE FOUNDATIONS Section I. GROUP BEHAVIOR 6-1. Group action. Piles are most effective when combined in groups or clusters. Combining piles in a group complicates analysis since the characteristics

More information

Preliminary Plan for Expansion of the Regional Network of Floridan and Surficial Aquifer Monitor Wells for Northern Tampa Bay

Preliminary Plan for Expansion of the Regional Network of Floridan and Surficial Aquifer Monitor Wells for Northern Tampa Bay DRAFT - August 24, 2000 Preliminary Plan for Expansion of the Regional Network of Floridan and Surficial Aquifer Monitor Wells for Northern Tampa Bay Introduction In 1999, the Southwest Florida Water Management

More information

Draft Environmental Impact Statement. PORT OF OSWEGO AUTHORITY Lead Agency, State Environmental Quality Review Act

Draft Environmental Impact Statement. PORT OF OSWEGO AUTHORITY Lead Agency, State Environmental Quality Review Act CENTERSTATE NY INLAND PORT DRAFT SCOPING DOCUMENT FOR THE Draft Environmental Impact Statement PORT OF OSWEGO AUTHORITY Lead Agency, State Environmental Quality Review Act SEPTEMBER 30, 2015 INTRODUCTION

More information

Design, Testing and Automated Monitoring of ACIP Piles in Residual Soils

Design, Testing and Automated Monitoring of ACIP Piles in Residual Soils Design, Testing and Automated Monitoring of ACIP Piles in Residual Soils Stephen W. Lacz 1, M. ASCE, P.E. and Richard C. Wells 2, F. ASCE, P.E. 1 Senior Professional, Trigon Kleinfelder, Inc., 313 Gallimore

More information

FREDERICK SHERRELL LTD

FREDERICK SHERRELL LTD FREDERICK SHERRELL LTD CONSULTING ENGINEERING GEOLOGISTS AND GEOTECHNICAL ENGINEERS 66 WEST STREET TAVISTOCK DEVON PL19 8AJ Your Ref: Our Ref: 2962.NS.JR Telephone: 01822 612915 Facsimile: 01822 617394

More information

Description of Simandou Archaeological Potential Model. 13A.1 Overview

Description of Simandou Archaeological Potential Model. 13A.1 Overview 13A Description of Simandou Archaeological Potential Model 13A.1 Overview The most accurate and reliable way of establishing archaeological baseline conditions in an area is by conventional methods of

More information

JOHNSON STREET BRIDGE REPLACEMENT PROJECT

JOHNSON STREET BRIDGE REPLACEMENT PROJECT JOHNSON STREET BRIDGE REPLACEMENT Victoria, BC GEOTECHNICAL INVESTIGATION REPORT Prepared for: City Hall No. 1 Centennial Square Victoria, BC VW 1P Prepared by: Stantec 7 Dominion Street, Suite 5 Burnaby,

More information

Strength Determination of "Tooth-Paste" Like Sand and Gravel Washing Fines Using DMT

Strength Determination of Tooth-Paste Like Sand and Gravel Washing Fines Using DMT Strength Determination of "Tooth-Paste" Like Sand and Gravel Washing Fines Using DMT David L. Knott, P.E. and James M. Sheahan, P.E. HDR Engineering, Inc. 3 Gateway Center Pittsburgh, PA 15222-1074 Phone:

More information

SUBDIVISION AND DEVELOPMENT REGULATION

SUBDIVISION AND DEVELOPMENT REGULATION Province of Alberta MUNICIPAL GOVERNMENT ACT SUBDIVISION AND DEVELOPMENT REGULATION Alberta Regulation 43/2002 With amendments up to and including Alberta Regulation 119/2014 Office Consolidation Published

More information

A perforated conduit such as pipe, tubing or tile installed beneath the ground to intercept and convey ground water. or structures.

A perforated conduit such as pipe, tubing or tile installed beneath the ground to intercept and convey ground water. or structures. BMP: SUBSURFACE DRAIN Definition A perforated conduit such as pipe, tubing or tile installed beneath the ground to intercept and convey ground water. PurRoses 1. To prevent sloping soils from becoming

More information

Area No. 8 Test Pit No. 191

Area No. 8 Test Pit No. 191 Area No. 8 Test Pit No. 191 Area Sierra-Yoyo-Desan Road Excavator Cat 322 B Photographs Location 43 m @ 40 degrees from TP-189 Northing 6571912 Date 03 March 2003 R4-7 Easting 0568784 Weather -17 C, Snow

More information

WHAT MAPS SHOW US Maps do 4 things:

WHAT MAPS SHOW US Maps do 4 things: WHAT MAPS SHOW US Maps show us a range of features, for example: Landforms: Settlement: Communication: Land Use: Geology: Other Info: - hills - valleys - mountains - isolated dwellings - farms - villages

More information

SLOPE AND TOPOGRAPHY

SLOPE AND TOPOGRAPHY SLOPE AND TOPOGRAPHY What are Slope and Topography? Slope and topography describe the shape and relief of the land. Topography is a measurement of elevation, and slope is the percent change in that elevation

More information

Ground-Water-Level Monitoring and the Importance of Long-Term Water-Level Data U.S. Geological Survey Circular 1217

Ground-Water-Level Monitoring and the Importance of Long-Term Water-Level Data U.S. Geological Survey Circular 1217 Ground-Water-Level Monitoring and the Importance of Long-Term Water-Level Data U.S. Geological Survey Circular 1217 by Charles J. Taylor William M. Alley Denver, Colorado 2001 U.S. DEPARTMENT OF THE INTERIOR

More information

EXPLAINING GROUNDWATER AND WATER WELLS

EXPLAINING GROUNDWATER AND WATER WELLS EXPLAINING GROUNDWATER AND WATER WELLS This document aims to provide a non-technical description of groundwater: how it occurs, how it moves underground, and the basic principles behind constructing and

More information

Indiana State Department of Health Construction Guidelines for Gravity and Flood-Dose Trench Onsite Systems

Indiana State Department of Health Construction Guidelines for Gravity and Flood-Dose Trench Onsite Systems Indiana State Department of Health Construction Guidelines for Gravity and Flood-Dose Trench Onsite Systems The septic tank-absorption field sewage treatment system is composed of two major elements; the

More information

Module 1 : Site Exploration and Geotechnical Investigation. Lecture 5 : Geophysical Exploration [ Section 5.1 : Methods of Geophysical Exploration ]

Module 1 : Site Exploration and Geotechnical Investigation. Lecture 5 : Geophysical Exploration [ Section 5.1 : Methods of Geophysical Exploration ] Objectives In this section you will learn the following General Overview Different methods of geophysical explorations Electrical resistivity method Seismic refraction method 5 Geophysical exploration

More information

ON-SITE STORMWATER DISPOSAL SYSTEM (OSDS) DESIGN AND CONSTRUCTION MINIMUM GUIDELINES AND REQUIREMENTS

ON-SITE STORMWATER DISPOSAL SYSTEM (OSDS) DESIGN AND CONSTRUCTION MINIMUM GUIDELINES AND REQUIREMENTS ON-SITE STORMWATER DISPOSAL SYSTEM (OSDS) DESIGN AND CONSTRUCTION MINIMUM GUIDELINES AND REQUIREMENTS Land Use and Transportation BUILDING SERVICES September 26, 2007 Second Edition BACKGROUND INFORMATION

More information

Bedwyn Brail, Wiltshire: Geophysical and Earthworks Survey

Bedwyn Brail, Wiltshire: Geophysical and Earthworks Survey Bedwyn Brail, Wiltshire: Geophysical and Earthworks Survey Report no. 167.0306 & 167.0506 Authors L. Amadio MSc & B. Clarke MSc Date October 2012 Acknowledgement Wiltshire Archaeological and Natural History

More information

(http://www.molevalley.gov.uk/media/pdf/c/r/srfa_-_updated_jnauary_2012.pdf

(http://www.molevalley.gov.uk/media/pdf/c/r/srfa_-_updated_jnauary_2012.pdf Possible Submission about Water and Flooding (See maps 3a and 3b) From Mole Valley Local Development Framework: Strategic Flood Risk Assessment Update 2012 (http://www.molevalley.gov.uk/media/pdf/c/r/srfa_-_updated_jnauary_2012.pdf

More information

Topographic Maps Practice Questions and Answers Revised October 2007

Topographic Maps Practice Questions and Answers Revised October 2007 Topographic Maps Practice Questions and Answers Revised October 2007 1. In the illustration shown below what navigational features are represented by A, B, and C? Note that A is a critical city in defining

More information

Preliminary Assessment

Preliminary Assessment Preliminary Assessment Bonebrake Theological Seminary Site Dayton Unit III Dayton, Ohio Prepared by: U.S. Army Corps of Engineers Buffalo District 1776 Niagara Street Buffalo, NY 14207-3199 September 5,

More information

720 Contour Grading. General. References. Resources. Definitions

720 Contour Grading. General. References. Resources. Definitions 720 Contour Grading General Contour grading directs water to a desired point, prevents erosion, provides noise deflection, provides visual fit of the facility into the landscape, and protects desirable

More information

SOAK UP YOUR STORMWATER

SOAK UP YOUR STORMWATER SOAK UP YOUR STORMWATER This booklet explains how you can apply soakage on your property to achieve efficient disposal of stormwater. The following information on soakage is intended as a guide only. All

More information

Igneous rocks formed when hot molten material (magma) cools and hardens (crystallizes).

Igneous rocks formed when hot molten material (magma) cools and hardens (crystallizes). Objectives You will learn about how the land of North Dakota was formed. Introduction North Dakota is a wonderful place to live. Have you ever though about how it was formed? To answer that question, you

More information

THE APPRAISAL OF REAL ESTATE 3 RD CANADIAN EDITION BUSI 330

THE APPRAISAL OF REAL ESTATE 3 RD CANADIAN EDITION BUSI 330 THE APPRAISAL OF REAL ESTATE 3 RD CANADIAN EDITION BUSI 330 REVIEW NOTES by CHUCK DUNN CHAPTER 10 Copyright 2010 by the Real Estate Division and Chuck Dunn. All rights reserved ARE 3 rd EDITION REVIEW

More information

VOLUME III GEOLOGY, HYDROGEOLOGY & GEOTECHNICAL REPORT CAPITAL REGION RESOURCE RECOVERY CENTRE

VOLUME III GEOLOGY, HYDROGEOLOGY & GEOTECHNICAL REPORT CAPITAL REGION RESOURCE RECOVERY CENTRE 2.0 SITE INVESTIGATION METHODOLOGY The following section summarizes the Site investigation methodology applied during the subsurface investigation and hydrogeological assessment completed at the CRRRC

More information

GUIDELINES FOR GEOTECHNICAL INVESTIGATION OF BRIDGE STRUCTURES. Materials Engineering Report No. 2009-8M (Supersedes Report No.

GUIDELINES FOR GEOTECHNICAL INVESTIGATION OF BRIDGE STRUCTURES. Materials Engineering Report No. 2009-8M (Supersedes Report No. GUIDELINES FOR GEOTECHNICAL INVESTIGATION OF BRIDGE STRUCTURES Materials Engineering Report No. 2009-8M (Supersedes Report No. 21) F CHOWDHURY GEOMECHANICS AND STRUCTURAL MATERIALS ENGINEER S REHMAN GEOTECHNICAL

More information

BORRAS AIRFIELD & THE HOLT ESTATE. Planning Application to Extend Borras Quarry: Hydrological & Hydrogeological Assessment.

BORRAS AIRFIELD & THE HOLT ESTATE. Planning Application to Extend Borras Quarry: Hydrological & Hydrogeological Assessment. BCL Document Reference: BCL/htl/B110/031.doc BORRAS AIRFIELD & THE HOLT ESTATE Planning Application to Extend Borras Quarry: Hydrological & Hydrogeological Assessment August 2005 Report prepared for: Tarmac

More information

Geotechnical Investigation Report London Street Generating Station Peterborough, Ontario. February 2012

Geotechnical Investigation Report London Street Generating Station Peterborough, Ontario. February 2012 Geotechnical Investigation Report London Street Generating Station Peterborough, Ontario February 2012 Project No. 111-25780-00 February 7, 2012 Mr. Kevin McKeown, Generation Project Manager Peterborough

More information

Vulnerability Assessment

Vulnerability Assessment Vulnerability Assessment VULNERABILITY As used in this report, vulnerability refers to the sensitivity of groundwater to contamination, and is determined by intrinsic characteristics of the aquifer. It

More information

BERMUDA MARITIME SECURITY (HARBOUR AREAS) (RESTRICTED ZONES) ORDER 2010 BR 79 / 2010

BERMUDA MARITIME SECURITY (HARBOUR AREAS) (RESTRICTED ZONES) ORDER 2010 BR 79 / 2010 QUO FA T A F U E R N T BERMUDA MARITIME SECURITY (HARBOUR AREAS) (RESTRICTED ZONES) ORDER BR 79 / The Governor, in exercise of the powers conferred by section 12 of the Maritime Security Act 1997, makes

More information

SOIL-MAT ENGINEERS & CONSULTANTS LTD.

SOIL-MAT ENGINEERS & CONSULTANTS LTD. SOIL-MAT ENGINEERS & CONSULTANTS LTD. 130 LANCING DRIVE, HAMILTON, ONTARIO L8W 3A1 PHONE (905) 318-7440 FAX (905) 318-7455 E-MAIL: info@soil-mat.on.ca PROJECT NO.: SM 145464-E JANUARY 16, 2014 1371975

More information

Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation

Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation Jeff R. Hill, P.E. Hayward Baker Inc. 111 W. Port Plaza Drive Suite 600 St. Louis, MO 63146 314-542-3040 JRHill@HaywardBaker.com

More information

Settlement of Foundations on Expansive Clays Due to Moisture Demand of Trees CIGMAT 2008

Settlement of Foundations on Expansive Clays Due to Moisture Demand of Trees CIGMAT 2008 Settlement of Foundations on Expansive Clays Due to Moisture Demand of Trees CIGMAT 2008 Kenneth E. Tand, P.E. Practicing Geotechnical Engineer FRIEND OR FOE Trees are our friends. They extract carbon

More information

WHAT YOU NEED TO KNOW ABOUT LIVING NEAR INDIANA COAL MINES

WHAT YOU NEED TO KNOW ABOUT LIVING NEAR INDIANA COAL MINES WHAT YOU NEED TO KNOW ABOUT LIVING NEAR INDIANA COAL MINES Who Should Read This Guide? Home Buyers/Owners Lending Institutions Landowners Developers Local Officials Construction Design Realtors Companies

More information

Construction Dewatering and Ground Freezing

Construction Dewatering and Ground Freezing UNIVERSITY OF WASHINGTON DEPARTMENT OF CONSTRUCTION MANAGEMENT CM 420 TEMPORARY STRUCTURES Winter Quarter 2007 Professor Kamran M. Nemati Temporary Structures Construction Dewatering and Ground Freezing

More information

TECHNICAL SPECIFICATIONS CEMENT-BENTONITE SLURRY TRENCH CUTOFF WALL

TECHNICAL SPECIFICATIONS CEMENT-BENTONITE SLURRY TRENCH CUTOFF WALL TECHNICAL SPECIFICATIONS CEMENT-BENTONITE SLURRY TRENCH CUTOFF WALL SCOPE This section of the specifications includes requirements for the Slurry Trench Cutoff Wall and related work as indicated on the

More information

Basic Elements of Reading Plans

Basic Elements of Reading Plans Center for Land Use Education and Research at the University of Connecticut Basic Elements of Reading Plans University of Connecticut. The University of Connecticut supports all state and federal laws

More information

Moving Small Mountains Vesuvius Dam Rehab

Moving Small Mountains Vesuvius Dam Rehab Moving Small Mountains Vesuvius Dam Rehab Susan L. Peterson, P.E., regional dams engineer, Eastern Region, Bedford, IN Note: The following article, Moving Small Mountains Vesuvius Dam Rehab, by Sue Peterson,

More information

Rural Residential Buildable Lands Inventory

Rural Residential Buildable Lands Inventory The Dalles Periodic Review, May 2013 Rural Residential Lands Inventory Contents Introduction and Summary... 1 Concerns related to the 2007 Analysis... 2 Rural Residential Capacity Summary... 2 Methodology...

More information

Water-Table and Potentiometric-Surface Altitudes in the Upper Glacial, Magothy, and Lloyd Aquifers Beneath Long Island, New York, April May 2010

Water-Table and Potentiometric-Surface Altitudes in the Upper Glacial, Magothy, and Lloyd Aquifers Beneath Long Island, New York, April May 2010 Prepared in cooperation with the Nassau County Department of Public Works, the New York City Department of Environmental Protection, the New York State Department of Environmental Conservation, the Suffolk

More information

GUIDANCE DOCUMENT FOR DEVELOPMENTS AND SUBDIVISIONS WHERE ONSITE WASTEWATER TREATMENT SYSTEMS ARE PROPOSED

GUIDANCE DOCUMENT FOR DEVELOPMENTS AND SUBDIVISIONS WHERE ONSITE WASTEWATER TREATMENT SYSTEMS ARE PROPOSED February 2012 July 2012 GUIDANCE DOCUMENT FOR DEVELOPMENTS AND SUBDIVISIONS WHERE ONSITE WASTEWATER TREATMENT SYSTEMS ARE PROPOSED i Table of Contents List of Tables...iii List of Figures...iii 1 Introduction...

More information

High-resolution seismic reflection to image hydrogeologic sequences Richard D. Miller* and Jianghai Xia, Kansas Geological Survey

High-resolution seismic reflection to image hydrogeologic sequences Richard D. Miller* and Jianghai Xia, Kansas Geological Survey Richard D. Miller* and Jianghai Xia, Kansas Geological Survey Introduction High-resolution seismic reflection has been successfully used to delineate preferential pathways within groundwater systems that

More information

Zhou Shengen, 1 Zhang Sumin 2

Zhou Shengen, 1 Zhang Sumin 2 439 CHAPTER 5: SOILS AND FOUNDATIONS EXPLORATION INFORMATION ON THE LIQUEFIED FOUNDATION SOIL IN TANGSHAN AND ITS VICINITY Zhou Shengen, 1 Zhang Sumin 2 Sand boils and waterspouts occurred in an extensive

More information

Ontario Ministry of the Environment - Record of Site Condition # 206831 Record of Site Condition Under Part XV.1 of the Environment Protection Act

Ontario Ministry of the Environment - Record of Site Condition # 206831 Record of Site Condition Under Part XV.1 of the Environment Protection Act Ontario Ministry of the Environment - Record of Site Condition # 206831 Record of Site Condition Under Part XV.1 of the Environment Protection Act Summary Record of Site Condition Number 206831 Date Filed

More information

Long-Term Monitoring Network Optimization Evaluation. for. Wash King Laundry Superfund Site Lake County, Michigan

Long-Term Monitoring Network Optimization Evaluation. for. Wash King Laundry Superfund Site Lake County, Michigan Long-Term Monitoring Network Optimization Evaluation for Wash King Laundry Superfund Site Lake County, Michigan June 2006 Solid Waste and Emergency Response (5102P) EPA 542-R-06-004 December 2006 www.epa.gov

More information

Taylor Wimpey UK Ltd. December 2007

Taylor Wimpey UK Ltd. December 2007 Taylor Wimpey UK Ltd December 2007 QM Issue/revision Issue 1 Revision 1 Revision 2 Revision 3 Remarks Draft For Planning Date 3 August 2007 20 December 2007 Prepared by D Gooding P Barton Signature Checked

More information

Preventing Basement Flooding

Preventing Basement Flooding Preventing Basement Flooding Perry Lindquist Land Resources Manager Waukesha County Dept. of Parks & Land Use Waukesha County Storm Water Workshop April 10, 2013 Presentation Outline Background Case study

More information

MCLAREN VALE PWA GROUNDWATER LEVEL AND SALINITY STATUS REPORT 2009 10

MCLAREN VALE PWA GROUNDWATER LEVEL AND SALINITY STATUS REPORT 2009 10 MCLAREN VALE PWA GROUNDWATER LEVEL AND SALINITY STATUS REPORT 2009 10 SUMMARY 2009 10 The McLaren Vale PWA is located approximately 35 km south of Adelaide. It is a regional-scale resource for which groundwater

More information

A. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems.

A. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems. 19. STORMWATER MANAGEMENT A. Describe the existing drainage patterns on-site as shown on Map I, including any potential flooding and erosion problems. The majority of the approximately ±500 acre Property

More information

4. Environmental Impacts Assessment and Remediation Targets

4. Environmental Impacts Assessment and Remediation Targets 4. Environmental Impacts Assessment and Remediation Targets 4.1 Environmental Impacts Significant additional development in the Alder Creek watershed is not anticipated at this time; however, there are

More information

1.2 This technical note provides a preliminary investigation into the Flood Risk and provides outline drainage strategies.

1.2 This technical note provides a preliminary investigation into the Flood Risk and provides outline drainage strategies. ODYSSEY MARKIDES TECHNICAL NOTE PROJECT : CHAILEY HOUSE, BLEWBURY JOB NO. : 14-216 NOTE TITLE : PRELIMINARY FLOODING AND DRAIANGE AUTHOR : STEVEN ROOTH APPROVED : ANDREAS MARKIDES DATE : 02/09/2014 1.0

More information

PERC-RITE DRIP DISPERSAL DESIGN GUIDE FOR SEPTIC TANK OR ADVANCED TREATMENT EFFLUENT MAINE

PERC-RITE DRIP DISPERSAL DESIGN GUIDE FOR SEPTIC TANK OR ADVANCED TREATMENT EFFLUENT MAINE PERC-RITE DRIP DISPERSAL DESIGN GUIDE FOR SEPTIC TANK OR ADVANCED TREATMENT EFFLUENT MAINE This Perc-Rite Design Guide is intended to simplify the design process of a Perc-Rite Drip Dispersal System. This

More information

Benchmark Identify physical & human characteristics of places, regions in North America. Grade Level Indicator Describe, compare landforms, climates, population, vegetation, economic characteristics of

More information

GEOLOGIC MAPS. PURPOSE: To be able to understand, visualize, and analyze geologic maps

GEOLOGIC MAPS. PURPOSE: To be able to understand, visualize, and analyze geologic maps GEOLOGIC MAPS PURPOSE: To be able to understand, visualize, and analyze geologic maps Geologic maps show the distribution of the various igneous, sedimentary, and metamorphic rocks at Earth s surface in

More information

Highway 23 Paynesville Richmond Soils Borings, Soils Tests, and Reporting

Highway 23 Paynesville Richmond Soils Borings, Soils Tests, and Reporting Highway 23 Paynesville Richmond Soils Borings, Soils Tests, and Reporting MnDOT Contract No. 1003249 General Project Overview This work is located along Trunk Highway (TH) 23, for State Project (SP) 7305-124.

More information

DIRECTIONAL DRILLING

DIRECTIONAL DRILLING DIRECTIONAL DRILLING 1. General. Installation of pipelines through the levee embankment using directional drilling technology is prohibited. Installation of pipelines through a flood control project foundation

More information

How To Design A Foundation

How To Design A Foundation The Islamic university - Gaza Faculty of Engineering Civil Engineering Department CHAPTER (2) SITE INVESTIGATION Instructor : Dr. Jehad Hamad Definition The process of determining the layers of natural

More information

Multilevel Monitoring and Characterization of the Edwards and Trinity Aquifers of Central Texas

Multilevel Monitoring and Characterization of the Edwards and Trinity Aquifers of Central Texas Multilevel Monitoring and Characterization of the Edwards and Trinity Aquifers of Central Texas Brian A. Smith and Brian B. Hunt Barton Springs / Edwards Aquifer Conservation District, 1124 Regal Row,

More information

CHAPTER 2 - Kawartha Lakes and Peterborough Land Base -

CHAPTER 2 - Kawartha Lakes and Peterborough Land Base - CHAPTER 2 - Kawartha Lakes and Peterborough Land Base - September 15, 2006 2.1 Chapter 2 Kawartha Lakes and Peterborough Land Base 2.1 Introduction This chapter provides an overview of the physical characteristics

More information