1 The Republic Of The Union Of Myanmar Ministry of Electric Power Myanma Electric Power Enterprise Power System Development Scheme of MEPE Location - Naypyitaw Date

2 Contents 2 About Our Country Current Situation in Myanma Power System Upgrading Plan for the System (5 Years Plan) Conclusion Question and Answer

3 3

4 Brief Introduction to The Republic of Union of Myanmar 4 Area of Country 261, sq-mile(677,000 km 2 ) Population around million(as of 2011) Sagaing Kachin The country consists of States Regions (1) Kachin (1) Sagaing (2) Kayah (2) Tanintharyi Chin Mandalay Rakhaing Magway Bago Shan Kayar (3) Kayin (4) Chin (3) Bago (4) Magway Ayeyarwaddy Yangon Mon Kayin (5) Mon (6) Rakhaing (7) Shan (5) Mandalay (6) Yangon (7) Ayeyarwaddy Tanintharyi

5 Main facts abstract from Geography of Myanmar 5 Mandalay 1} According to the land form and climate of Myanmar, there are rich hydro power resources in Northern and Eastern Regions of Myanmar. There are more than 15 Hydro Power Resources which were the capacity >1000MW in that regions. 2) Myanmar have the border with the China, India and Thailand. Therefore the power trade to these country can be achieved. Naypyitaw 3) Yangon is the most populated region and it has about 7 millions peoples. Yangon has the main sea port and Industry Zones. Therefore, Yangon is the biggest load center of Myanmar. Mandalay, Naypyitaw and Ayeyarwaddy regions are also have the high population density and the power demand is increasing rapidly. Yangon

6 6

7 7 Background History for Power System The voltage levels of the Myanmar electrical power system are 500 kv 230 kv 132 kv 66 kv 33 kv 11 kv. The national grid has no direct connections to other grids of neighboring countries. The network comprises - 44 overhead lines at 230 kv with a total length of 3979 km - 41 overhead lines at 132 kv with a total length of 2334 km overhead lines at 66 kv with a total length of 3729 km - 11 overhead lines at 33 kv having a total length of 27 km. The 230 kv and 132 kv overhead lines are interconnecting approximately 69 substations. The above details are valid for the transmission system only and do not include the distribution network.

8 Location of Power Station within 29,51 % Sr Description Qty Myanma Power System Hydropower Gas-fired Coal-fired 3,56 % 66,93 % Hydro Gas Coal Installed Capacity (MW) 2, Myanma Power System 2, Mone 75 MW Mann Kyeeon Kyeewa 36.9 MW 74 MW Foreign 521 Total 35 3, , Kyungchaung 54.3 MW - - Thapanzeik 30 MW Shwedaung 55.35MW Myanaun g 34.7MW Kinda 56 MW Kun 60 MW Yenwe 25 MW Hlawga MW MW Ywama 70.3 MW 52 MW Sedawgyi 25 MW Yeywa 790 MW Paunglaung 280 MW Kabau ng 30MW Zawgyi(1) 18 MW Zawgyi(2) 12 MW Tigyit 120 MW Baluchaung(1) 28 MW Baluchaung(2) 168 MW Thauk-yekhat(2) Hydropower plant 120 MW Gas-fired power plant Zaungt u 20 MW Ahlone MW 121 MW Thaketa 92 MW 53.6 MW Dapein(1) 240MW Shweli(1) 600MW Shwegy in 75 MW Thaton MW Keng Taung 54 MW Coal-fired power plant Steam turbine power plant Mawlamyain g 12 MW 8 8

9 Power Stations in Myanmar (as of Dec 2012) Existing Power Station (Hydro, Gas-fired and Coal-fired Thermal) 9 Hydropower Output (MW) 1 Baluchaung Baluchaung Yeywa Kinda 56 5 Sedawgyi 25 6 Zawgyi Zawgyi Thapanzeik 30 9 Mone Paunglaung Kabaung Yenwe Zaungtu Shweli (300) 15 Keng taung Shwegyin Kun Kyeeon Kyeewa Dapein-1 240(221) 20 Thauk-ye-khat(2) 120 Subtotal 2780(521) Gas-fired Output (MW) 1 Kyungchaung Mann Shwedaung Mawlamyaing 12 5 Myanaung Hlawga = Ywama = Ahlone = Thaketa = Thaton Subtotal Coal-fired Output (MW) 1 Tigyit 120 Existing Power System Total = 3,896.05( )MW Note: Output in parentheses is power supply to Myanmar from JV Projects.

10 Power Supply Status of Myanmar in 2012 (Dry and Rainy Season) 10 Dry season : 1,298 MW (May 18, 2012 /10:00) Rainy season : 1,796 MW (October 18, 2012 /20:00) (Maximum power supply as of December 31, 2012)

11 Monthly Generation in GWh (2009 to 2012) Month Janurary Februrary March Apri May Jun July August Setember October November December Total

12 Janurary Februrary March Apri May Jun July August Setember October November December Monthly Generation in GWh (2009 to 2012)

13 Power Generation (GWh/month) Monthly Power Generation(by Power Producer) (2007 to 2012) Jan-07 Apr-07 Jul-07 Oct-07 Jan-08 Apr-08 Jul-08 Oct-08 Jan-09 Apr-09 Jul-09 Oct-09 Jan-10 Apr-10 Jul-10 Oct-10 Jan-11 Apr-11 Jul-11 Oct-11 Jan-12 Apr-12 Jul ,000 Monthly Power Generation ( ) MOEP1 HPGE Others MEPE Total Month Yenwe (25MW) COD: Feb Kabaung (30MW) COD: Mar Shweli -1(600MW) COD: May Kengtawng (54MW) COD: Mar Yeywa (790MW) COD: Dec Shwegyin (75 MW) COD: Oct Kun (60MW) COD: Jul Kyeeon Kyeewa (74 MW) COD: Aug. 2012

14 Number of Consumers (No.) Power Generation (GMh) Number of Consumers (No.) Power Consumption (1990 to 2009) Number of Consumers (No.) Comsumed Energy per Consumer (kwh/consumer) Comsumed Energy per Consumer (kwh/consumer) Comsumed Energy per Consumer (kwh/consumer) Comsumed Energy per Consumer (kwh/consumer) 14 Power Consumption(by Use) Household 一般 家庭用 Industrial 工業用商業用 Commercial 商業用その他 ( その他 Others 外灯等 (lighting) ) ( 外灯等 ) Power Consumption(by Use) (FY 2009) ,000 5,000 4,000 3,000 Commercial 商業用, 1,071GWh, 21% Others その他 (lighting), ( 外灯 57 等 ), 57GWh, 1% 1% 一般 家庭 Household 用, 2,015GWh, 41% ,000 1,000-2,500,000 2,500,000 2,500, Fisical year ,000,000 2,000,000 2,000,000 1,500,000 1,500,000 1,500,000 1,000,000 1,000,000 1,000, , , ,000 Power Consumption per Consumer Fisical year 5,000 4,000 3,000 2,000 1,000 5,000 5,000 5,000 4,000 4,000 4,000 3,000 3,000 3,000 2,000 2,000 2,000 1,000 1,000 1, Fisical 2003 year Fisical Fisical year year Fisical year Consumers Consumption per consumers (KWh/consumer) Consumers Consumption per consumers per consumers (KWh/consumer) (KWh/consumer) Consumers Consumption per consumers (KWh/consumer) Industrial 工業用, 1,850GWh, 37% Since 2006, the number of consumer has increased, however, power consumption per consumer has decreased. Restriction of power consumption (ex. planned outage) is thought to be one of the reasons of the reduction above.

15 % Energy Mix (MWh) (by Power Producer) % % Energy Mix (MWh) (by Power Producer) % % % Hydro Station (MWh) Gas-Fired Station (MWh) Coal-Fired Thermal Station (MWh) Hydro Station (MWh) Gas-Fired Station (MWh) Coal-Fired Thermal Station (MWh) % Energy Mix (MWh) (by Power Producer) % Energy Mix (MWh) (by Power Producer) % % % % Hydro Station (MWh) Gas-Fired Station (MWh) Coal-Fired Thermal Station (MWh) Hydro Station (MWh) Gas-Fired Station (MWh) Coal-Fired Thermal Station (MWh)

16 16 Electrification Ratio No Description Quantity 1 Population million 2 Numbers of Household 8.92 million 3 Electrified Household million 4 Percentage % 1 % increment in electrified household covers 89,200 households and is expected to be consumed MWh/yr.

17 17

18 18

19 Situation for Installed Capacity, Demand and Generation in upto for first five year plan MW rainy Dry 4871,6 3851, rainy Dry Demand Available in Dry Available in Wet Installed Capacity 3259 Dry rainy 19

20 During , Generation Mix Condition of Total Installed Capacity 20 In Myanma Power System Sr. No Description During , Installed Capacity (MW) Total Installed Capacity (MW) 1. Hydro 501 2, Coal % 0,73 % 40,45 % 3. Gas 2, , Solar Total 3, , ,16 % Hydro Coal Gas Solar 20

21 MOGE Gas Allocation and MOEP Gas Requirement of Gas Fired Power Plants 21 Sr Plant Name Installed Capacity MW Nos Total Allocati on Off-Shore Gas(mmscfd) Require ment In-Land Alloc Requir ation ement Current Generation (MW) Generation if more Gasis available (MW) 1 Hlawga STG Ywama NEDO STG Ahlone STG Tharkayta STG Yangon Total Shwetaung Myanaung Thatone Mawlamying Kyunchaung Mann Spare Local Total Yangon + Local TOTAL

22 Gas Fired Power Plants and Gas Engines Constructed by Foreign and Local Investments in Yangon 22 Sr Plant Name Installed Capacity MW Nos Total Current Allocation (mmscfd) Off-Shore Alloca Require tion ment Current Generation (MW) Production Efficiency 1 Hlawga (Zeya) % 2 Ywama (MSP) Ahlone (Toyo - Thai) Tharkayta (CIC) % Remark (19) Gas Engines are in Operation. Installation of 1 st stage is 100%completed Installation is 80% completed (2) Gas Turbines are in Operation. 1 st stage Simple cycle is 100%completed 1 st stage Installation is 100%completed and (6)Gas Engines have been tested. 5 Ywama(EGAT) ` Underconstruction TOTAL

23 Installed Capacity and Gas Requirement of MOEP Power Plants and Foreign and Local Investment Power Plants S r Plant Name Hlawga Hydrolancang (China) Ywama(EGAT) Donated by Thailand Tharkayta BKB( Korea) Tharkayta UREC(China) Mawlamying (Myanmar Lighting) 6 Kyaukphyu(MOEP ) Installed Capacity(MW) 1 st 2 nd Stag Stag Total e e Gas Requirement (mmscfd) 1 st 2 Stag nd Total Stage e Remark 23

24 Gas Turbine Power Plant Projects of State Own and Private Investment from Year to Year Plant Name Yearly Requirement of Off-Shore Gas (mmscfd) Total Gas Requirem ent Ywama(EGAT) Donated by Thailand Kyaukphyu(MOEP) Hlawga Hydrolancang(China) Tharkayta BKB (Korea) Tharkayta UREC (China) Mawlamying (Myanmar Lighting) Kanpouk (Dawei Power Utilities) TOTAL

25 Gas Allocation and Gas Requirement for MOEP and Foreign and Local Investment Gas Fired Power Plants 25 Sr Fiscal Year Gas Allocation (mmscfd) Gas Requirement (mmscfd) Planned Allocation (mmscfd) Gas Shortage (mmscfd) Plant Name Gas (mmscfd) Remark (2014 January) Ywama (EGAT) Myan Shwe Pyi CIC Toyo Thai Zeya Hydrolancang (China) BKB (Korea) UREC (China) Myanmar Lighting Kyaukphyu(MOEP) Dawei Power Utilities Hydrolancang (China) BKB (Korea) UREC (China) Myanmar Lighting Dawei Power Utilities Jan 2014 Jan 2014 Jan 2014 Jan 2014 Jan 2014 Nov 2015 Feb 2014 Dec 2014 April 2014 Dec 2015 March 2015 May 2016 Jan 2016 March 2015 Oct 2016 Feb

26 Status of Implementation of Projects (Transmission Lines & Substations), On-going and will be Completed During ( ) Financial Years 26 Sr State / Region 1 KACHIN STATE Transmission Lines kv33 kv kv kv kv (mile) (mile) (mile) (mile) (mile) 2 KAYAR STATE Substations 500 kv 230 kv 132 kv 66 kv No. MVA No. MVA No. MVA No. MVA 3 KAYIN STATE CHIN STATE MON STATE 6 RAKHINE STATE SHAN STATE (SOUTH) SHAN STATE (EAST) 9 SHAN STATE (NOUTH) SAGAING REGION 11 TANINTHARYI REGION 12 BAGO REGION (EAST) 13 BAGO REGION (WEST) 14 MAGWAY REGION MANDALAY REGION AYEYARWADDY REGION

27 Status of Implementation of Projects (Transmission Lines & Substations), On-going and will be Completed During ( ) Financial Years 27 Sr State / Region Transmission Lines kv kv kv kv kv (mile) (mile) (mile) (mile) (mile) Substations 500 kv 230 kv 132 kv 66 kv No. MVA No. MVA No. MVA No. MVA 1 KACHIN STATE KAYAR STATE 3 KAYIN STATE CHIN STATE MON STATE RAKHINE STATE SHAN STATE (SOUTH) 8 SHAN STATE (EAST) SHAN STATE (NOUTH) SAGAING REGION TANINTHARYI REGION BAGO REGION (EAST) BAGO REGION (WEST) MAGWAY REGION

28 Sr State / Region Transmission Lines kv kv kv kv kv (mile) (mile) (mile) (mile) (mile) Substations 500 kv 230 kv 132 kv 66 kv No. MVA No. MVA No. MVA No. MVA 1 KACHIN STATE KAYAR STATE KAYIN STATE CHIN STATE 5 MON STATE RAKHINE STATE SHAN STATE (SOUTH) 8 SHAN STATE (EAST) SHAN STATE (NOUTH) SAGAING REGION TANINTHARYI REGION BAGO REGION (EAST) BAGO REGION (WEST) Status of Implementation of Projects (Transmission Lines & Substations), On-going and will be Completed During ( ) Financial Years MAGWAY REGION

29 Sr State / Region 1 KACHIN STATE 2 KAYAR STATE 3 KAYIN STATE Transmission Lines kv kv kv kv kv (mile) (mile) (mile) (mile) (mile) Substations 500 kv 230 kv 132 kv 66 kv No. MVA No. MVA No. MVA No. MVA 4 CHIN STATE MON STATE RAKHINE STATE 7 SHAN STATE (SOUTH) 8 SHAN STATE (EAST) SHAN STATE (NOUTH) SAGAING REGION 11 TANINTHARYI REGION BAGO REGION (EAST) BAGO REGION (WEST) Status of Implementation of Projects (Transmission Lines & Substations), On-going and will be Completed During ( ) Financial Years MAGWAY REGION

30 Sr State / Region 500 kv (mile) Transmission Lines kv 66 kv kv (mile (mile) (mile) ) 33 kv (mile Substations 500 kv 230 kv 132 kv 66 kv No. MVA No. MVA No. MVA No. MVA ) 1 KACHIN STATE KAYAR STATE KAYIN STATE CHIN STATE MON STATE RAKHINE STATE SHAN STATE (SOUTH) 8 SHAN STATE (EAST) 9 SHAN STATE (NOUTH) SAGAING REGION TANINTHARYI REGION BAGO REGION (EAST) BAGO REGION (WEST) Status of Implementation of Projects (Transmission Lines & Substations), On-going and will be Completed During ( ) To ( ) Financial Years MAGWAY REGION MANDALAY REGION

31 List of Project To be Implemented by Myanma Electric Power Enterprise, Ministry of Electric Power Under (5) Years Plan ( ) To ( ) 31 Transmission Lines Substations Voltage (kv) No of Line Line Length (km) Voltage (kv) No of Substation Installed Capacity (MVA) Total Total

32 32

33 33

34 500 KV Power Transmission Plan In Myanmar kV ShweLi(3)- ThaPyaWa Double Circuit Line (250)miles (Proposal Stage) ShweLi(3) 1050MW ThaPyaWa MongTon 7000MW 500kV ThaPyaWa Taungoo Double Circuit Line (153.3)miles (Contracted Stage) Taungoo KarmarNut MyaungTagar 500kV MongTon-Taungoo Double Circuit Line (230)miles (Proposal Stage) 500kV Taungoo-KamarNat Double Circuit Line (117 )miles (Proposal Stage) 500kV KamarNat-MyaungTagar Double Circuit Line (50)miles (Proposal Stage)

35 Gas Requirement of MOEP Power Plants and Foreign and Local Investment Power Plants 35 Year Sr Plant Name GasRequirement (mmscfd) Off-Shore In-Land Installed Capacity (MW) 1 MOEP Private EGAT Foreign Investment TOTAL If (476 mmscfd) of Gas is more allocated than Year , (2357 MW) of Energy can be more generated.

36 Demand Forecasting for 30 Years (Stat: ) 36 ၄၄၄၄၄ ၄၄၄၄၄ ၄၄၄၄၄ Rapidly Growth ၄၄၄၄၄၄၄၄၄၄၄၄၄၄၄၄၄၄၄၄၄၄၄၄၄၄၄၄ Regular Growth Slowly Growth ၄၄၄၄၄၄၄၄၄၄၄၄၄၄၄၄၄၄၄ ,904 ၄၄၄၄၄ ၄၄၄၄၄ ,623 ၄၄၄၄၄ ၄၄၄၄၄ ၄၄၄၄၄ ၄၄၄၄၄ , ၄၄၄၄၄ ၄၄၄၄၄ ၄၄၄၄ 9000 ၄၄၄၄ 8000 ၄၄၄၄ 7000 ၄၄၄၄ 6000 ၄၄၄၄ ၄၄၄၄ MW

37 THANK YOU FOR YOUR KIND ATTENTION Q & A U Maung Maung Chief Engineer Power Transmission Project Department (PTP) Myanmar Electric Power Enterprise (MEPE) Ministry of Electric Power(MOEP) 37

Ex-Ante Evaluation (for Japanese ODA Loan)

Ex-Ante Evaluation (for Japanese ODA Loan) Japanese ODA Loan Ex-Ante Evaluation (for Japanese ODA Loan) 1. Name of the Project Country: The Republic of the Union of Myanmar Project: Urgent Rehabilitation and Upgrade Project Phase I Loan Agreement:

More information

Power Sector DeveloPMent in MyAnMAr

Power Sector DeveloPMent in MyAnMAr Power Sector DeveloPMent in MyAnMAr Kee-Yung Nam, Maria Rowena Cham, and Paulo Rodelio Halili no. 460 october 2015 adb economics working paper series ASIAN DEVELOPMENT BANK ADB Economics Working Paper

More information

Analysis One Code Desc. Transaction Amount. Fiscal Period

Analysis One Code Desc. Transaction Amount. Fiscal Period Analysis One Code Desc Transaction Amount Fiscal Period 57.63 Oct-12 12.13 Oct-12-38.90 Oct-12-773.00 Oct-12-800.00 Oct-12-187.00 Oct-12-82.00 Oct-12-82.00 Oct-12-110.00 Oct-12-1115.25 Oct-12-71.00 Oct-12-41.00

More information

AT&T Global Network Client for Windows Product Support Matrix January 29, 2015

AT&T Global Network Client for Windows Product Support Matrix January 29, 2015 AT&T Global Network Client for Windows Product Support Matrix January 29, 2015 Product Support Matrix Following is the Product Support Matrix for the AT&T Global Network Client. See the AT&T Global Network

More information

Overview on SEA output

Overview on SEA output 1 st SEA workshop of the revised PDP VII Overview on SEA output of Project N a t i o n a l P o w e r D e v e l o p m e n t P l a n p e r i o d 2 0 11-2 0 2 0, v i s i o n 2 0 3 0 ( P D P V I I ) P r e

More information

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS* COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) 2 Fixed Rates Variable Rates FIXED RATES OF THE PAST 25 YEARS AVERAGE RESIDENTIAL MORTGAGE LENDING RATE - 5 YEAR* (Per cent) Year Jan Feb Mar Apr May Jun

More information

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*

COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS* COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) 2 Fixed Rates Variable Rates FIXED RATES OF THE PAST 25 YEARS AVERAGE RESIDENTIAL MORTGAGE LENDING RATE - 5 YEAR* (Per cent) Year Jan Feb Mar Apr May Jun

More information

Laos Project Site. China. Thailand. Vietnam. Cambodia Ho Chi Minh. Malaysia

Laos Project Site. China. Thailand. Vietnam. Cambodia Ho Chi Minh. Malaysia Socialist Republic of Vietnam Pha Lai Thermal Power Plant Project (I) (IV) External Evaluators: The Japan Economic Research Institute Koki Hagiu, Yumi Ito Field Survey: November 27, February March 28 1.

More information

Electricity Demand and Supply in Myanmar

Electricity Demand and Supply in Myanmar RAJAWALI FOUNDATION INSTITUTE FOR ASIA Electricity Demand and Supply in Myanmar Prepared for Proximity Designs Myanmar This research paper was written by David Dapice (David_Dapice@harvard.edu), of the

More information

Glossary of Energy Terms. Know Your Power. Towards a Participatory Approach for Sustainable Power Development in the Mekong Region

Glossary of Energy Terms. Know Your Power. Towards a Participatory Approach for Sustainable Power Development in the Mekong Region Glossary of Energy Terms Know Your Power 2012 Towards a Participatory Approach for Sustainable Power Development in the Mekong Region List of terms Terms Page Terms Page Avoided cost 10 Installed capacity

More information

Headlines( On(the(right,(a(map(from(MIMU(showing(satelliteHdetected(floodwaters( between(10(july(and(17(august.(( (

Headlines( On(the(right,(a(map(from(MIMU(showing(satelliteHdetected(floodwaters( between(10(july(and(17(august.(( ( SituationReport4 2September2015 NationalNaturalDisasterManagementCommittee RepublicoftheUnionofMyanmar ThissituationreportwasjointlypreparedbytheGovernmentofMyanmarandtheUNSystem. Headlines Ontheright,amapfromMIMUshowingsatelliteHdetectedfloodwaters

More information

Feasibility Study for Introduction of LNG Receiving. Facilities in Myanmar

Feasibility Study for Introduction of LNG Receiving. Facilities in Myanmar Study on Economic Partnership Projects in Developing Countries in FY2013 Feasibility Study for Introduction of LNG Receiving Facilities in Myanmar Final Report February 2014 Prepared for: The Ministry

More information

JICA s Assistance for Electricity Sector

JICA s Assistance for Electricity Sector JICA s Assistance for Electricity Sector April 24 (Fri), 2015 Middle East and Europe Department Japan International Cooperation Agency 1 Contents Recent Situation of Egypt JICA s Assistance for Electricity

More information

Grid Operations and Planning

Grid Operations and Planning Grid Operations and Planning Report Kent Saathoff ERCOT Board of Directors April 20, 2010 Kent Content Summary March 2010 Operations Peak Demand: Actual vs. Forecast On-line Resources: Total at Peak and

More information

Case 2:08-cv-02463-ABC-E Document 1-4 Filed 04/15/2008 Page 1 of 138. Exhibit 8

Case 2:08-cv-02463-ABC-E Document 1-4 Filed 04/15/2008 Page 1 of 138. Exhibit 8 Case 2:08-cv-02463-ABC-E Document 1-4 Filed 04/15/2008 Page 1 of 138 Exhibit 8 Case 2:08-cv-02463-ABC-E Document 1-4 Filed 04/15/2008 Page 2 of 138 Domain Name: CELLULARVERISON.COM Updated Date: 12-dec-2007

More information

DAWEI Sea PROJECT Port Project DAWEI AND THE REGION

DAWEI Sea PROJECT Port Project DAWEI AND THE REGION February 2012 DAWEI Sea PROJECT Port Project DAWEI AND THE REGION PROJECT LOCATION Kunming India Middle East / Europe Dawei Africa Asia Regional Hub DAWEI Sea PROJECT Port Project DAWEI PROJECT OVERVIEW

More information

Electricity Supply. Monthly Energy Output by Fuel Type (MWh)

Electricity Supply. Monthly Energy Output by Fuel Type (MWh) Ontario Energy Report Q4 Electricity October December Electricity Supply Electricity production was lower in Q4 than in previous years, with milder than normal weather in October and December resulting

More information

The Philippines Leyte-Bohol Interconnection Project

The Philippines Leyte-Bohol Interconnection Project The Philippines Leyte-Bohol Interconnection Project External Evaluator: Toshiyuki Katagiri, Tomomi Ito (The Japan Economic Research Institute) Field Survey: November 2006, February 2007 1. Project Profile

More information

Power Tariff Structure in Thailand 23 October 2012, Singapore Dr. Pallapa Ruangrong Energy Regulatory Commission of Thailand

Power Tariff Structure in Thailand 23 October 2012, Singapore Dr. Pallapa Ruangrong Energy Regulatory Commission of Thailand Power Tariff Structure in Thailand 23 October 2012, Singapore Dr. Pallapa Ruangrong Energy Regulatory Commission of Thailand Singapore EAS ABOUT THAILAND Population 67 Million Customers (at end-2011) 19

More information

Enhanced Vessel Traffic Management System Booking Slots Available and Vessels Booked per Day From 12-JAN-2016 To 30-JUN-2017

Enhanced Vessel Traffic Management System Booking Slots Available and Vessels Booked per Day From 12-JAN-2016 To 30-JUN-2017 From -JAN- To -JUN- -JAN- VIRP Page Period Period Period -JAN- 8 -JAN- 8 9 -JAN- 8 8 -JAN- -JAN- -JAN- 8-JAN- 9-JAN- -JAN- -JAN- -JAN- -JAN- -JAN- -JAN- -JAN- -JAN- 8-JAN- 9-JAN- -JAN- -JAN- -FEB- : days

More information

WATER / WASTEWATER & POWER PROJECTS LAST 5 YEARS. No of Staff Provided by BCE. Overall Project Value (SR)

WATER / WASTEWATER & POWER PROJECTS LAST 5 YEARS. No of Staff Provided by BCE. Overall Project Value (SR) WATER / WASTEWATER & POWER PROJECTS LAST 5 YEARS A. Completed December 2001 Shedgum Debottlenecking # 45943/00 47.34 Million Total 600.8 Million 154 n American Oil Co. (ARAMCO) ARAMCO Feb. 1998 to Dec.

More information

Welcome to our open house. Thanks for coming. Please sign in and help yourself to refreshments. Energizing your community. www.fortisbc.

Welcome to our open house. Thanks for coming. Please sign in and help yourself to refreshments. Energizing your community. www.fortisbc. Welcome to our open house Thanks for coming Please sign in and help yourself to refreshments Integrated System Plan (ISP) Looks ahead 20 years to identify the energy and infrastructure needs of our customers

More information

Hydropower Projects Portfolio

Hydropower Projects Portfolio Business Network Forum 18th Meeting, Iquitos- Peru, 04 March 2008 MINISTRY OF ENERGY AND MINES Hydropower Projects Portfolio By Jorge Aguinaga Diaz General Director for Electricity 1 Content I. GENERAL

More information

Study on the New Power Plant Project in Mawlamyaing, Myanmar

Study on the New Power Plant Project in Mawlamyaing, Myanmar Study on Economic Partnership Projects In Developing Countries in FY2014 Study on the New Power Plant Project in Mawlamyaing, Myanmar Final Report February 2015 Prepared for Ministry of Economy, Trade

More information

CSP. Feranova Reflect Technology. klimaneutral natureoffice.com DE-296-558771 gedruckt

CSP. Feranova Reflect Technology. klimaneutral natureoffice.com DE-296-558771 gedruckt RENEWABLE SOURCES RENEWABLE SOURCES CSP Feranova Reflect Technology klimaneutral natureoffice.com DE-296-558771 gedruckt Gedruckt auf 100% Recyclingpapier Circlesilk Premium White 200/150 g/m 2 2012 Feranova

More information

Financial Summary 3rd quarter of FY2012. January 29, 2013 Tohoku Electric Power Co., Inc.

Financial Summary 3rd quarter of FY2012. January 29, 2013 Tohoku Electric Power Co., Inc. Financial Summary FY2012 January 29, 2013 Tohoku Electric Power Co., Inc. Contents 1. Summary of the FY2012 Results 2. Electricity Sales 3. Large Industry Sector 4. Electricity Generated and Purchased,

More information

The Israel Electric Corp. LTD. Welcome To IEC. (Israel Electric Corporation)

The Israel Electric Corp. LTD. Welcome To IEC. (Israel Electric Corporation) Welcome To IEC (Israel Electric Corporation) What we are going to speak About? About IEC Introduction to the Israeli market, Israel and its neighbors, Introduction to IEC (Generation, Transmission, Distribution

More information

Determination of the CO2 Emissions Factor the electrical system of the Dominican Republic

Determination of the CO2 Emissions Factor the electrical system of the Dominican Republic VI International Symposium on Energy & Innovation & Entrepreneurship Forum San Juan, Puerto Rico [20.feb.2014] Determination of the CO2 Emissions Factor the electrical system of the Dominican Republic

More information

Ayeyarwady Integrated River Basin Management Project

Ayeyarwady Integrated River Basin Management Project The Republic of The Union of Myanmar Ministry of Transport Directorate Of Water Resources and Improvement of River Systems Ayeyarwady Integrated River Basin Management Project ZAW LWIN Deputy Director

More information

Country Report of Myanmar

Country Report of Myanmar Country Report of Myanmar Sub regional Workshop On Strengthening ICT Policies and Applications to Achieve MDGs and WSIS Goals in Southeast Asia and the Pacific Bangkok, Thailand October 19 20, 2009 Presented

More information

Power Generation Division

Power Generation Division 22 nd February 2005 Power Generation Division 1. The Commonwealth Utilities Corporation, Power Generation Division is currently burning / operating LSADO (Low Sulphur Automotive Diesel Oil), which contains

More information

DECISION APPROVAL OF THE NATIONAL MASTER PLAN FOR POWER DEVELOPMENT FOR THE 2011-2020 PERIOD WITH THE VISION TO 2030

DECISION APPROVAL OF THE NATIONAL MASTER PLAN FOR POWER DEVELOPMENT FOR THE 2011-2020 PERIOD WITH THE VISION TO 2030 THE PRIME MINISTER ------- THE SOCIALIST REPUBLIC OF VIETNAM Independence - Freedom - Happiness No. 1208/QD-TTg --------------- Hanoi, 21 July 2011 DECISION APPROVAL OF THE NATIONAL MASTER PLAN FOR POWER

More information

Ghana's Economic Performance 2010

Ghana's Economic Performance 2010 GHANA STATISTICAL SERVICE (GSS) Statistics for Development and Progress Ghana's Economic Performance 21 i n f i g u r e s P.O. Box GP 198, Accra www. statsghana.gov.gh 211 Ghana's Economic Performance

More information

Meridian Energy broker presentation

Meridian Energy broker presentation Meridian Energy broker presentation 4 June, 2014 Meridian Energy will this week give a series of presentations to brokers and their clients on its business. The presentation is attached. For media queries,

More information

Electricity market drivers

Electricity market drivers Daniel Assandri Head of Power Systems ABB (China) Ltd Electricity market drivers March 2008 Global T&D Market Drivers ABB Power Systems division - slide # 2 ABB s view on and market drivers The Americas

More information

Greater Mekong Sub-region Power Trade and Interconnection, Mongolia Grid Interconnection Perspectives

Greater Mekong Sub-region Power Trade and Interconnection, Mongolia Grid Interconnection Perspectives Greater Mekong Sub-region Power Trade and Interconnection, Mongolia Grid Interconnection Perspectives Shigeru Yamamura( 山 村 繁 ), Energy Specialist, East Asia Department, Asian Development Bank GMS Power

More information

Newfoundland and Labrador Hydro Electricity Rates

Newfoundland and Labrador Hydro Electricity Rates Newfoundland and Hydro Electricity Rates The following charts and descriptions outline: 1) residential rates by area 2) general service rates information including basic customer charges, energy charges,

More information

Cooperation Opportunities in ICT Between Japan and Myanmar. Mr. Thein Oo President, Myanmar Computer Federation Chairman, Myanmar Info-Tech

Cooperation Opportunities in ICT Between Japan and Myanmar. Mr. Thein Oo President, Myanmar Computer Federation Chairman, Myanmar Info-Tech Cooperation Opportunities in ICT Between Japan and Myanmar Mr. Thein Oo President, Myanmar Computer Federation Chairman, Myanmar Info-Tech Contents Introduction of Myanmar Cooperation with CICC ICT Status

More information

Enlarged Wind Power Statistics 2010 including Denmark, Germany, Ireland and Great Britain

Enlarged Wind Power Statistics 2010 including Denmark, Germany, Ireland and Great Britain 1 Enlarged Wind Power Statistics 2010 including Denmark, Germany, Ireland and Great Britain Background This work is based on hourly time series for wind power output in Denmark, Germany, Ireland and Great

More information

Prospects and Viability of Solar Energy in Khyber Pakhtunkhwa Pakistan

Prospects and Viability of Solar Energy in Khyber Pakhtunkhwa Pakistan Prospects and Viability of Solar Energy in Khyber Pakhtunkhwa Pakistan Muhammad Riaz 1, Amjad Ullah 2, Khadim Ullah Jan 3 1,2 Department of Electrical Engineering, University of Engineering and Technology

More information

Energy Forecast UPDATE TO THE WHOLESALE ELECTRICITY PRICE FORECAST

Energy Forecast UPDATE TO THE WHOLESALE ELECTRICITY PRICE FORECAST Energy Forecast UPDATE TO THE WHOLESALE ELECTRICITY PRICE FORECAST February 213 Executive Summary This Wholesale Electricity Price Forecast updates the forecast developed in 21 for the Council s Sixth

More information

Natural Gas Diversification Strategy for PREPA GOVERNMENT DEVELOPMENT BANK FOR PUERTO RICO

Natural Gas Diversification Strategy for PREPA GOVERNMENT DEVELOPMENT BANK FOR PUERTO RICO Natural Gas Diversification Strategy for PREPA GOVERNMENT DEVELOPMENT BANK FOR PUERTO RICO Agenda 1 Importance of Diversifying to Natural Gas 2 Natural Gas Diversification Strategy 2 Currently, Puerto

More information

COMPARISON OF ELECTRICITY GENERATION COST OF NPP WITH ALTERNATES IN PAKISTAN

COMPARISON OF ELECTRICITY GENERATION COST OF NPP WITH ALTERNATES IN PAKISTAN COMPARISON OF ELECTRICITY GENERATION COST OF NPP WITH ALTERNATES IN PAKISTAN IAEA INPRO dialogue forum 8 toward nuclear energy system sustainability: economics, resource availability and institutional

More information

Appendix D: Electricity Price Forecast Preliminary Draft

Appendix D: Electricity Price Forecast Preliminary Draft Preliminary Draft Introduction... 1 Findings... 2 Approach and Assumptions... 5 Demand Growth... 5 Firm Capacity Standards... 6 Planning Reserve Margin Targets... 6 Firm Capacity Credit... 7 Existing Resources...

More information

SECTOR ASSESSMENT (SUMMARY): ENERGY 1

SECTOR ASSESSMENT (SUMMARY): ENERGY 1 Country Partnership Strategy: Uzbekistan 2012 2016 SECTOR ASSESSMENT (SUMMARY): ENERGY 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. The energy sector underpins Uzbekistan s sustained

More information

Wind energy development in Spain. Luis Atienza Chairman & Chief Executive Officer April, 3rd 2009

Wind energy development in Spain. Luis Atienza Chairman & Chief Executive Officer April, 3rd 2009 Luis Atienza Chairman & Chief Executive Officer April, 3rd 2009 Index Present Spanish energy outline The Spanish electricity sector Wind power in Spain today Cornerstones of the Spanish leadership in wind

More information

A. 5MWp SPV Plant at Khimsar, Rajasthan. B. 5MWp SPV Plant Installed Technologies. D. 5MWp SPV Plant Challenges. E. 5MWp SPV Plant - Performance

A. 5MWp SPV Plant at Khimsar, Rajasthan. B. 5MWp SPV Plant Installed Technologies. D. 5MWp SPV Plant Challenges. E. 5MWp SPV Plant - Performance An overview & Performance Analysis of 5 MWp Solar PV Plant at Khimsar, Rj Rajasthan Reliance Industries Limited June 2, 2011 July 2010 Contents A. 5MWp SPV Plant at Khimsar, Rajasthan B. 5MWp SPV Plant

More information

ELECTRICITY SECURITY OF SUPPLY CHALLENGES IN THE ENERGY COMMUNITY

ELECTRICITY SECURITY OF SUPPLY CHALLENGES IN THE ENERGY COMMUNITY ELECTRICITY SECURITY OF SUPPLY CHALLENGES IN THE ENERGY COMMUNITY - topics for discussion - 17 th PHLG Meeting 30-31 May 2006 Zagreb, Croatia - Prepared by ECS - 1 CONTENTS CONTENTS PURPOSE LEGAL PROVISIONS

More information

An Overview of Power Sector of Bangladesh. November, 2011 Bangladesh Power Development Board

An Overview of Power Sector of Bangladesh. November, 2011 Bangladesh Power Development Board An Overview of Power Sector of Bangladesh November, 2011 Bangladesh Power Development Board 1 Present Structure of Power Sector Apex Institution Power Division, Ministry of Power, Energy & Mineral Resources

More information

Smart Metering Initiative ADWEA Program

Smart Metering Initiative ADWEA Program Smart Metering Initiative ADWEA Program Saeed Nassouri Technical Advisor Abu Dhabi Water & Electricity Authority (ADWEA) Dec 2010 Company Background SMART GRID Basics AMI Project Strategy Project Scope

More information

Sea Water Heat Pump Project

Sea Water Heat Pump Project Sea Water Heat Pump Project Alaska SeaLife Center, Seward, AK Presenter: Andy Baker, PE, YourCleanEnergy LLC Also Present is ASLC Operations Manager: Darryl Schaefermeyer ACEP Rural Energy Conference Forum

More information

SECTOR ASSESSMENT (SUMMARY): ENERGY 1

SECTOR ASSESSMENT (SUMMARY): ENERGY 1 Country Partnership Strategy: Kazakhstan 2012 2016 SECTOR ASSESSMENT (SUMMARY): ENERGY 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Overview. Oil accounts for about a quarter

More information

BOUNDARY DAM CCS CROSSES THE FINISH LINE. October 2014

BOUNDARY DAM CCS CROSSES THE FINISH LINE. October 2014 Bellona Europa europe@bellona.org Rue d Egmont 15 +32 (0)2 648 31 22 1000 Brussels www.bellona.org BOUNDARY DAM CCS CROSSES THE FINISH LINE October 2014 Canadians can be proud of the Boundary Dam CCS facility,

More information

Electric Power Systems An Overview. Y. Baghzouz Professor of Electrical Engineering University of Nevada, Las Vegas

Electric Power Systems An Overview. Y. Baghzouz Professor of Electrical Engineering University of Nevada, Las Vegas Electric Power Systems An Overview Y. Baghzouz Professor of Electrical Engineering University of Nevada, Las Vegas Overview Power Generation Conventional power generation Power generation from renewables

More information

Proposed Rates 2012-2014. Mandates & Reliability

Proposed Rates 2012-2014. Mandates & Reliability Proposed Rates 2012-2014 Mandates & Reliability For over a year, we have been discussing the fundamental reasons why LADWP needs to increase Power & Water rates Legal mandates are driving a complete transformation

More information

Ashley Institute of Training Schedule of VET Tuition Fees 2015

Ashley Institute of Training Schedule of VET Tuition Fees 2015 Ashley Institute of Training Schedule of VET Fees Year of Study Group ID:DECE15G1 Total Course Fees $ 12,000 29-Aug- 17-Oct- 50 14-Sep- 0.167 blended various $2,000 CHC02 Best practice 24-Oct- 12-Dec-

More information

Status of Renewable Energy in Liberia

Status of Renewable Energy in Liberia Status of Renewable Energy in Liberia Augustus V. Goanue Principal Officer Prototype Rural and Renewable Energy Agency of Liberia Email: gusgoanue@yahoo.com Mobile: +231 655 9266 Presentation Outline Background

More information

SAUDI ELECTRICITY COMPANY (SEC) SAUDI ARABIA

SAUDI ELECTRICITY COMPANY (SEC) SAUDI ARABIA SAUDI ELECTRICITY COMPANY (SEC) SAUDI ARABIA Presented By SAAD M. AL DEKHAYL SEC Consultant Orlando, December 2012 Power Gen 2012 CONTENTS Introduction SEC Organization Structure Distribution Overview

More information

PJM Electric Market. PJM Electric Market: Overview and Focal Points. Federal Energy Regulatory Commission Market Oversight www.ferc.

PJM Electric Market. PJM Electric Market: Overview and Focal Points. Federal Energy Regulatory Commission Market Oversight www.ferc. PJM Electric Market: Overview and Focal Points Page 1 of 14 PJM Electric Market Source: Velocity Suite Intelligent Map Updated August 23, 21 145 PJM Electric Market: Overview and Focal Points Page 2 of

More information

Country Study Myanmar: Sustainable increase in power generation capacity a review of effective options

Country Study Myanmar: Sustainable increase in power generation capacity a review of effective options Country Study Myanmar: Sustainable increase in power generation capacity a review of effective options Power-Gen Asia, Kuala Lumpur, September 2014 Shah, Abhay Business Development Manager - Power Plants,

More information

AFRICAN DEVELOPMENT BANK

AFRICAN DEVELOPMENT BANK AFRICAN DEVELOPMENT BANK EMERGENCY POWER INFRASTRUCTURE REHABILITATION PROJECT - PHASE I SUPPLEMENTARY GRANT PROPOSAL COUNTRY : ZIMBABWE APPRAISAL REPORT ONEC DEPARTMENT December 2013 Table of Contents

More information

Utah Associated Municipal Power Systems. Kaysville City May 6, 2014

Utah Associated Municipal Power Systems. Kaysville City May 6, 2014 Utah Associated Municipal Power Systems Kaysville City May 6, 2014 UAMPS Overview An energy services interlocal that provides electric services on a non-profit basis to its members. Organized to develop,

More information

Natural Gas / Electricity and the Industrial Sector. The Dismantling of US Manufacturing

Natural Gas / Electricity and the Industrial Sector. The Dismantling of US Manufacturing Natural Gas / Electricity and the Industrial Sector The Dismantling of US Manufacturing Paul Cicio President Industrial Energy Consumers of America August, 2007 Who Are Energy Price Sensitive Industries?

More information

RENEWABLES INTEGRATION IN TURKISH POWER SYSTEM

RENEWABLES INTEGRATION IN TURKISH POWER SYSTEM RENEWABLES INTEGRATION IN TURKISH POWER SYSTEM Kazim SENOCAK Electrical Engineer Research, Planning & Coordination Department TURKISH ELECTRICITY TRANSMISSION CORPORATION () www.teias.gov.tr MAIN RESPONSIBILITIES

More information

Ontario Wholesale Electricity Market Price Forecast. Ontario Energy Board

Ontario Wholesale Electricity Market Price Forecast. Ontario Energy Board Ontario Wholesale Electricity Market Price Forecast For the Period May 1, 2015 through October 31, 2016 Presented to Ontario Energy Board April 20, 2015 Navigant Consulting Ltd. 333 Bay Street, Suite 1250

More information

NATIONAL CREDIT UNION SHARE INSURANCE FUND

NATIONAL CREDIT UNION SHARE INSURANCE FUND NATIONAL CREDIT UNION SHARE INSURANCE FUND PRELIMINARY & UNAUDITED FINANCIAL HIGHLIGHTS RENDELL L. JONES CHIEF FINANCIAL OFFICER MANAGEMENT OVERVIEW Balance Sheet Other - Insurance and Guarantee Program

More information

The Central Role of Energy Efficiency in the Energy Outlook and EIA s Energy Data Program

The Central Role of Energy Efficiency in the Energy Outlook and EIA s Energy Data Program The Central Role of Energy Efficiency in the Energy Outlook and EIA s Energy Data Program For MIT Energy Initiative Symposium May 12, 2014 Cambridge, MA By Howard Gruenspecht, Deputy Administrator U.S.

More information

SECTOR ASSESSMENT (SUMMARY): ENERGY 1. 1. Sector Performance, Problems, and Opportunities

SECTOR ASSESSMENT (SUMMARY): ENERGY 1. 1. Sector Performance, Problems, and Opportunities Country Partnership Strategy: Bangladesh, 2011 SECTOR ASSESSMENT (SUMMARY): ENERGY 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Power generation gap. Bangladesh endures long

More information

POLICY FEEDING RENEWABLE. How the Energy Bill might affect green electricity suppliers and also renewable generators

POLICY FEEDING RENEWABLE. How the Energy Bill might affect green electricity suppliers and also renewable generators FEEDING RENEWABLE POLICY How the Energy Bill might affect green electricity suppliers and also renewable generators Holly Tomlinson Regulation and Compliance Analyst for Ecotricity 18 th January 2013 Contents

More information

CONTENTS Introduction Policy guidance at the ministerial level in Myanmar Railway Vision of National Transport Development Plan (Rail Sector) Rail

CONTENTS Introduction Policy guidance at the ministerial level in Myanmar Railway Vision of National Transport Development Plan (Rail Sector) Rail 13-15 October, 2014 Bangkok, Thailand CONTENTS Introduction Policy guidance at the ministerial level in Myanmar Railway Vision of National Transport Development Plan (Rail Sector) Rail Sector Strategic

More information

Yield Reduction due to Shading:

Yield Reduction due to Shading: 1x4 1x16 10 x CBC Energy A/S x Danfoss Solar Inverters CBC-40W Poly 40 W TLX 1,5k 5 ; 1x11 3x4 0 1,5kW 1536 x CBC Energy A/S 1 x Power-One CBC-40W Poly 40 W TRIO-7,6-TL-OUTD 30 ; 4x14 0 7,6kW Location:

More information

TANZANIA ELECTRIC SUPPLY COMPANY LTD (TANESCO) PRESENTATION ON THE TANZANIAN SOLAR PV-HYBRID WORKSHOP HELD IN BERLIN, GERMANY

TANZANIA ELECTRIC SUPPLY COMPANY LTD (TANESCO) PRESENTATION ON THE TANZANIAN SOLAR PV-HYBRID WORKSHOP HELD IN BERLIN, GERMANY TANZANIA ELECTRIC SUPPLY COMPANY LTD (TANESCO) PRESENTATION ON THE TANZANIAN SOLAR PV-HYBRID WORKSHOP HELD IN BERLIN, GERMANY 16 TH MARCH 2015 by Eng. Patrice Tsakhara Principal Engineer Small Power Projects

More information

Climate Parliament Climate Change & Energy Access for the Poor March 26-28, 2010, Limbe, Cameroun

Climate Parliament Climate Change & Energy Access for the Poor March 26-28, 2010, Limbe, Cameroun Climate Parliament Climate Change & Energy Access for the Poor March 26-28, 2010, Limbe, Cameroun SHEP Ghana s Self-help Electrification Programme By Henry Vanderpuye Energy Consultant, Ministry of Energy

More information

Direct Energy Business Monthly Webinar. Expressly for Channel Partners February 25, 2016

Direct Energy Business Monthly Webinar. Expressly for Channel Partners February 25, 2016 Direct Energy Business Monthly Webinar Expressly for Channel Partners February 25, 2016 Webinar Agenda Tim Bigler, Sr. Market Strategist Commodity Market Update Beau Gjerdingen, Meteorologist Spring weather

More information

FIXED CHARGE: This is a cost that goes towards making the service available, including

FIXED CHARGE: This is a cost that goes towards making the service available, including ELECTRICITY BILL COMPONENTS FIXED CHARGE: This is a cost that goes towards making the service available, including installation and maintenance of poles, power lines and equipment, and 24-hour customer

More information

ERCOT Analysis of the Impacts of the Clean Power Plan Final Rule Update

ERCOT Analysis of the Impacts of the Clean Power Plan Final Rule Update ERCOT Analysis of the Impacts of the Clean Power Plan Final Rule Update ERCOT Public October 16, 2015 ERCOT Analysis of the Impacts of the Clean Power Plan Final Rule Update In August 2015, the U.S. Environmental

More information

Second Place: Industrial Facilities or Processes, New

Second Place: Industrial Facilities or Processes, New Second Place: Industrial Facilities or Processes, New Photo: Paul Howell Texas Medical Center in Houston is the largest medical center in North America. It has a chilled water system of 160,000 tons. Big

More information

2010 STATE OF THE MARKET REPORT

2010 STATE OF THE MARKET REPORT 2010 STATE OF THE MARKET REPORT FOR THE ERCOT WHOLESALE ELECTRICITY MARKETS POTOMAC ECONOMICS, LTD. Independent Market Monitor for the ERCOT Wholesale Market August 2011 TABLE OF CONTENTS Executive Summary...

More information

London Array Off-Shore Wind Farm

London Array Off-Shore Wind Farm London Array Off-Shore Wind Farm 1 Jamie R Mathlin Construction Manager Off-Shore Sub-Stations Project Commissioning Manager 27 Years Experience in the Power Industry Grid Trained Electrical Engineer 10

More information

150 Watts. Solar Panel. one square meter. Watts

150 Watts. Solar Panel. one square meter. Watts Tool USE WITH Energy Fundamentals Activity land art generator initiative powered by art! 150 Watts 1,000 Watts Solar Panel one square meter 600 Watts SECTION 1 ENERGY EFFICIENCY 250 Watts 1,000 Watts hits

More information

Presenter: Bruce Clay Clay Energy Fiji

Presenter: Bruce Clay Clay Energy Fiji IRENA - Renewable Energy Applications for Island Tourism: The Business Case for PV Systems - Fiji Presenter: Bruce Clay Clay Energy Fiji Page01 The Pacific Page02 Off-Grid Island RE Power 01/ PV/Diesel

More information

Brazilian Smart Grid: Regulatory Issues and R&D Projects

Brazilian Smart Grid: Regulatory Issues and R&D Projects Brazilian Smart Grid: Regulatory Issues and R&D Projects André Pepitone da Nóbrega Director Brussels, Belgium June 18th, 2012 Brazilian Electric Power Highlights Source: BIG/ANEEL Apr/2012, PDE 2020 Facilities

More information

Industries Association. ERCOT Successes and Challenges

Industries Association. ERCOT Successes and Challenges Texas Renewable Energy Industries Association ERCOT Successes and Challenges Laura Doll Board Chair Electric Reliability Council of Texas November 7, 2011 ERCOT Overview The ERCOT market covers roughly

More information

Kyrgyzstan: Power Generation & Transmission

Kyrgyzstan: Power Generation & Transmission Kyrgyzstan: Power Generation & Transmission October, 2010 Author: Artyom Zozulinsky, Business & Commercial Assistant, US Embassy Bishkek Contents SUMMARY... 2 POWER SECTOR OVERVIEW... 2 Infrastructure...

More information

INTRODUCTION OF POWER TRADING VIETNAM CHINA BY 220kV LINES HANOI 04/2014

INTRODUCTION OF POWER TRADING VIETNAM CHINA BY 220kV LINES HANOI 04/2014 INTRODUCTION OF POWER TRADING VIETNAM CHINA BY 220kV LINES HANOI 04/2014 1 Contents: 1 Overview 2 Electricity import from China by 220kV Overhead line 3 Trading and operating issues 2 Overview of Vietnam

More information

Electricity pricing in the residential sector of Myanmar

Electricity pricing in the residential sector of Myanmar 1..The electricity bill Electricity pricing in the residential sector of Myanmar by Mr. Aung Thet Paing October 2015 The electricity bill comes with monthly charges in post-paid system. It contains the

More information

Asian Journal on Energy and Environment

Asian Journal on Energy and Environment As. J. Energy Env. 2005, 6(02), 139-144 Asian Journal on Energy and Environment ISSN 1513-4121 Available online at www.asian-energy-journal.info The Small Hydropower Project as the Important Renewable

More information

RIIO-T1 business plan submission London Tuesday 6 September 2011

RIIO-T1 business plan submission London Tuesday 6 September 2011 RIIO-T1 business plan submission London Tuesday 6 September 2011 Cautionary statement This presentation contains certain statements that are neither reported financial results nor other historical information.

More information

Guidelines for Monthly Statistics Data Collection

Guidelines for Monthly Statistics Data Collection Guidelines for Monthly Statistics Data Collection Final version Data Expert Group 31 May 2015 1. Table of contents 1. Table of contents... 2 2. Remarks... 3 3. Introduction... 3 4. Geographical perimeter

More information

2013 STATE OF THE MARKET REPORT ERCOT WHOLESALE ELECTRICITY MARKETS POTOMAC ECONOMICS, LTD. Independent Market Monitor for the ERCOT Wholesale Market

2013 STATE OF THE MARKET REPORT ERCOT WHOLESALE ELECTRICITY MARKETS POTOMAC ECONOMICS, LTD. Independent Market Monitor for the ERCOT Wholesale Market 2013 STATE OF THE MARKET REPORT FOR THE ERCOT WHOLESALE ELECTRICITY MARKETS POTOMAC ECONOMICS, LTD. Independent Market Monitor for the ERCOT Wholesale Market September 2014 TABLE OF CONTENTS Executive

More information

B O A R D M E E T I N G N a s h v i l l e, T e n n e s s e e November 6, 2014

B O A R D M E E T I N G N a s h v i l l e, T e n n e s s e e November 6, 2014 B O A R D M E E T I N G Nashville, Tennessee November 6, 2014 PRESIDENT S REPORT B i l l J o h n s o n President & CEO Energy Environment Economic Development FY 2014 Overall Performance Safety Record

More information

David Payne, P.E. Associate Director February 18, 2014

David Payne, P.E. Associate Director February 18, 2014 David Payne, P.E. Associate Director February 18, 2014 Overview of Texas A&M University State's first public institution of higher education, was opened on Oct. 4, 1876 as the Agricultural and Mechanical

More information

FINANCIAL RESULTS Q1 2012. 16 May 2012

FINANCIAL RESULTS Q1 2012. 16 May 2012 FINANCIAL RESULTS Q1 2012 16 May 2012 Highlights Q1 2012 Satisfactory Q1 financials underlying EBITDA and profit before tax on a par with Q1 2011 - Lower power prices partly offset by increased power generation

More information

TEACHING SUSTAINABLE ENERGY SYSTEMS A CASE STUDY

TEACHING SUSTAINABLE ENERGY SYSTEMS A CASE STUDY M. Brito 1,3, K. Lobato 2,3, P. Nunes 2,3, F. Serra 2,3 1 Instituto Dom Luiz, University of Lisbon (PORTUGAL) 2 SESUL Sustainable Energy Systems at University of Lisbon (PORTUGAL) 3 FCUL, University of

More information

Further electricity cost increases with the introduction of the Carbon Pollution Reduction Scheme

Further electricity cost increases with the introduction of the Carbon Pollution Reduction Scheme Responding to electricity cost increases Dr Darren Oemcke, CEO Provisor Karl Forsyth, Principal Provisor Electricity costs have been on the rise with increases this year of between 16% and 36% for Provisor

More information

Consumer prices and the money supply

Consumer prices and the money supply Consumer prices and the money supply Annual rise. Per cent. -year moving average Money supply Consumer prices - - 9 9 9 96 98 Sources: Statistics Norway and Norges Bank JB Terra Kapitalmarkedsdager, Gardermoen.

More information

7 th TYNDP WS. The role of storage in a liberalized market. Georg Dorfleutner RAG Energy Storage GmbH www.rag-energy-storage.

7 th TYNDP WS. The role of storage in a liberalized market. Georg Dorfleutner RAG Energy Storage GmbH www.rag-energy-storage. 7 th TYNDP WS The role of storage in a liberalized market Georg Dorfleutner RAG Energy Storage GmbH www.rag-energy-storage.at Unbundled SSO since 1.1.2013 Operating a storage-pool in Austria - CEGH TOV:

More information

CENTERPOINT ENERGY TEXARKANA SERVICE AREA GAS SUPPLY RATE (GSR) JULY 2015. Small Commercial Service (SCS-1) GSR

CENTERPOINT ENERGY TEXARKANA SERVICE AREA GAS SUPPLY RATE (GSR) JULY 2015. Small Commercial Service (SCS-1) GSR JULY 2015 Area (RS-1) GSR GSR (LCS-1) Texarkana Incorporated July-15 $0.50690/Ccf $0.45450/Ccf $0.00000/Ccf $2.85090/MMBtu $17.52070/MMBtu Texarkana Unincorporated July-15 $0.56370/Ccf $0.26110/Ccf $1.66900/Ccf

More information

APO COE on GP Model: Green Energy. Dr. Jyh-Shing Yang Senior Supervisor Industrial Technology Research Institute

APO COE on GP Model: Green Energy. Dr. Jyh-Shing Yang Senior Supervisor Industrial Technology Research Institute APO COE on GP Model: Green Energy Dr. Jyh-Shing Yang Senior Supervisor Industrial Technology Research Institute Presentation Outline Taiwan Green Energy Achievements Green Energy Technical Services Future

More information

Expanded Programme on Immunization

Expanded Programme on Immunization Expanded Programme on Immunization Expanded Programme on Immunization has been delivered the immunization services to the targeted children of under one year old child and pregnant women. Currently total

More information